Grenade body material metal smelting device and smelting method
By integrating the discharge channels of water and steel slag in the arc furnace, and using dual-controlled doors and diverters to achieve efficient exhaust emissions, the problems of high energy consumption and instability in traditional arc furnaces are solved, and the smelting efficiency is improved.
Patent Information
- Application Number
- CN202510210685.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-25
- Publication Date
- 2025-04-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The discharge channels of water and steel slag in traditional electric arc furnaces are separated, resulting in the furnace body swinging in reverse, increasing energy consumption, and instability factors.
A metal smelting device for grenade elastomer material is designed to integrate the discharge channels of steel and steel slag together, and efficient discharge of steel and steel slag through dual-controlled doors and diverters, reducing furnace body swing and reducing flame heating time.
It realizes efficient discharge of steel and steel slag, reduces the energy consumption of reverse swing of the furnace body, improves smelting efficiency, and reduces the occurrence of unstable factors.
Smart Images

Figure CN119826538A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of metal smelting, in particular to a metal smelting device and a smelting method for grenade body materials. Background Art
[0002] An electric arc furnace is an electric furnace that uses the high temperature generated by the electrode arc to melt ores and metals. The slag discharge channel and the molten steel discharge channel in the traditional electric arc furnace are different and are relatively distributed on both sides of the furnace body. In this way, the furnace body swings to one side to discharge the molten steel, and then swings in the opposite direction to discharge the slag. The discharge occurs after the electrode leaves the furnace body. In order to prevent the temperature from changing, flame heating can be performed inside the electric arc furnace to prevent the molten steel and slag from becoming thick due to the temperature drop. If the molten steel and slag channels are integrated together, the driving energy consumption when the furnace body swings back and forth can be saved, and the discharge of slag can be accelerated, and the flame heating time can be reduced. In addition, there are many unstable factors in the swing of the furnace body containing high-temperature fluid. By reducing the swing, the occurrence of unstable factors can be reduced. For this reason, the present invention provides a metal smelting device and smelting method for grenade projectile materials. Summary of the invention
[0003] The object of the present invention is to provide a metal smelting device and a smelting method for grenade body materials to solve the problems raised in the above background technology.
[0004] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a metal smelting device for grenade projectile material, comprising a barrel-shaped furnace body, a spherical groove is arranged at the bottom of the inner cavity of the furnace body, a discharging convex body is fixed on one side of the furnace body, and a spherical semi-groove connected to the spherical groove of the furnace body is opened in the discharging convex body, a plate cavity for installing a mechanism is opened above the spherical semi-groove of the discharging convex body, the plate cavity of the discharging convex body and the furnace body are separated by a double-control door, and the double-control door also blocks the feed port on the spherical semi-groove of the discharging convex body, and the discharging convex body is also opened A discharge pipe cavity is provided, the top of the discharge pipe cavity is connected to the spherical semi-groove of the discharge convex body, a diverter is provided at the bottom of the discharge pipe cavity, and the diverter is distributed in the square groove opened at the bottom of the discharge convex body, a supplementary heat flamethrower and a heat insulation plate for protecting the supplementary heat flamethrower are provided in the plate cavity of the discharge convex body, a multi-controller is installed outside the discharge convex body, and the multi-controller establishes transmission with the double-control door, the diverter and the heat insulation plate respectively, a furnace cover is covered on the top of the furnace body, a plurality of through holes are opened in the middle of the furnace cover, and an electrode passes through each through hole, and an exhaust pipe is fixed above the furnace cover.
[0005] The double-controlled door includes a fixed door plate fixed in the discharging convex body, a valve plate in sliding contact with one side of the fixed door plate, a door gear meshing and transmission connected with a row of teeth and grooves on the valve plate, a door shaft fixedly connected to the door gear at one end, and a guide rod fixed on the discharging convex body, and the guide rod slides through the column hole opened in the valve plate, the door gear is arranged in the column groove opened in the fixed door plate, and the spherical semi-groove on the discharging convex body is blocked by a semicircular plate on the valve plate, and the other end of the door shaft extends to the outside of the discharging convex body and establishes transmission with the multi-controller.
[0006] The multi-controller includes an integrated frame fixed on the outside of the discharging convex body, a double-headed prism sliding through a rectangular hole opened in the integrated frame, a pressing device with a transmission connection at one end of the double-headed prism, and an ignition group that establishes transmission with the pressing device, and the other end of the double-headed prism establishes transmission with the diverter.
[0007] The driving group includes a driving plate gear with one end driven by the pressing device, a worm gear meshing and drivingly connected to the other end of the driving plate gear, and a driving shaft vertically passing through the middle of the driving plate gear, one end of the driving shaft is meshing and drivingly connected to the bevel gear fixed on the door shaft through a fixed bevel gear, the other end of the driving shaft is movably sleeved in a through hole opened on the integrated frame, and one end of the worm gear is movably sleeved in a column hole opened on the integrated frame.
[0008] The diverter includes a discharge block movable in the square groove at the bottom of the discharge convex body, rail rods arranged at the four corners of the discharge block, a plate rack fixedly connected to the discharge block at one end, a conversion gear meshing and transmission connected to one side of the plate rack, and a conversion shaft fixedly connected to the conversion gear at one end, the other end of the conversion shaft extends to the outside of the discharge convex body, and the end is meshing and transmission connected to a row of teeth arranged on the double-headed prism through an axis gear. A funnel tube cavity for conveying molten steel and a thick column tube cavity for conveying slag are provided in the discharge block, and the end of the rail rod is fixed on the discharge convex body, and the rail rod slides through the column hole opened in the discharge block.
[0009] The heat insulation plate tool includes a heat insulation folding plate fixed in the discharge convex plate cavity, a heat insulation flat plate in sliding contact with one side of the heat insulation folding plate, a protective gear meshing and transmission connected with a row of teeth and grooves on the heat insulation flat plate, and a protective shaft coaxially fixed to the protective gear at one end, the other end of the protective shaft extends to the outside of the discharge convex body and establishes transmission with the pressing device, the heat insulation folding plate is covered on the heat insulation flat plate by a fixed concave plate, the heat insulation folding plate isolates a chamber in the discharge convex plate cavity to protect the supplementary heat flamethrower, and the heat insulation folding plate is provided with a circular hole for the flame to pass through.
[0010] The pressing device includes a pressure plate gear meshing and transmission connected to the guide plate gear, a lead-out shaft vertically transmitted to the protective shaft, and a dual-drive group that establishes transmission between the lead-out shaft and the pressure plate gear. The lead-out shaft is movably sleeved in a through hole opened on the integrated frame, and one end of the lead-out shaft is meshing and transmission connected to the bevel gear fixed on the protective shaft through a fixed bevel gear.
[0011] The dual-drive group includes a second rotating shaft with one end vertically fixed to the middle of the pressure plate gear, a dual-drive frame vertically fixed at the other end of the second rotating shaft, a C-shaped spring for pushing the dual-drive frame to reset, a dual pressure plate for pressing the dual-drive frame, and a first rotating shaft vertically fixed on the dual pressure plate.
[0012] The second rotating shaft and the first rotating shaft are respectively movably sleeved in two through holes opened on the integrated frame, one end of the C-shaped spring piece is fixed on the integrated frame, the double pressure plate is two semicircular plate splicing bodies of different sizes, the double drive frame includes an inclined plate, an outer arc rack fixed at one end of the inclined plate, and an inner arc rack fixed in the middle of the inclined plate, the outer arc rack of the double drive frame is meshed and transmitted with a row of teeth arranged on the double-headed prism, and the inner arc rack of the double drive frame is meshed and transmitted with a shaft gear fixed at the end of the lead-out shaft.
[0013] A method for metal smelting of grenade projectile material, comprising the following steps:
[0014] Step 1: Pour the smelting raw materials into the furnace body, then control the furnace cover to move horizontally and cover the furnace body, and then control the electrode to be inserted into the furnace body from top to bottom;
[0015] Step 2: An arc is generated between the energized electrode and the metal material, and the high temperature of the arc is used to directly heat the raw material, generating molten steel with floating slag on the surface in the spherical groove of the furnace body;
[0016] Step 3: Control the de-energized electrode to rise and leave the furnace body, and then the furnace cover is separated from the furnace body by swinging and translation. Next, the furnace body gradually swings and tilts, and the spherical semi-groove feed inlet blocked by the double-control door is opened. The molten steel is discharged after passing through the discharge pipe cavity and the diverter in turn. The door opening space opened by the double-control door is submerged in the molten steel, and the slag floating on the surface of the molten steel is intercepted by the double-control door;
[0017] Step 4: After the molten steel is discharged, the double-control door is fully opened, the channel switching is completed in the diverter, the furnace body continues to swing and tilt, and the slag fluid is discharged after passing through the discharge pipe cavity and the diverter in turn.
[0018] Compared with the prior art, the present invention has the following beneficial effects:
[0019] 1. Compared with the separate design of molten steel and slag discharge channels in traditional electric arc furnaces, the present invention integrates the molten steel and slag discharge channels together. After the molten steel is discharged, there is no need to control the reverse swing of the furnace body, which saves the driving energy consumption in the reverse swing of the furnace body and improves the efficiency of high-temperature fluid discharge in the furnace.
[0020] 2. The present invention switches the channel by moving the discharge block. The funnel cavity is used to transport the molten steel for external discharge. The fine pore size of the funnel cavity can prevent the molten steel from splashing when it is discharged. During the stage of discharging slag fluid, the coarse column cavity is switched to the bottom of the discharge cavity, and the coarse pore size channel is used to avoid adhesion or blockage of the thick slag fluid. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the structure of the present invention.
[0022] Figure 2 Schematic diagram of the internal structure of an electric arc furnace.
[0023] Figure 3 It is a schematic diagram of the discharge convex structure.
[0024] Figure 4 Schematic diagram of the diverter location.
[0025] Figure 5 This is a schematic diagram of the double-control door structure.
[0026] Figure 6 This is a schematic diagram of the multi-controller structure.
[0027] Figure 7 Schematic diagram of the diverter structure.
[0028] Figure 8 Schematic diagram of the discharge block structure.
[0029] Fig. 9 It is a schematic diagram of the structure of the heat insulation board.
[0030] Fig.10 Schematic diagram of the double-headed prism structure.
[0031] Fig.11 It is a schematic diagram of the structure of the pressing device.
[0032] Fig.12 It is a schematic diagram of the dual drive group structure.
[0033] Fig.13 This is a schematic diagram of the dual-drive frame structure.
[0034] In the figure: furnace body 1, discharge convex body 2, double control door 3, discharge tube cavity 4, diverter 5, supplementary heat flamethrower 6, insulation plate 7, multi-controller 8, furnace cover 9, electrode 10, exhaust pipe 11, guide rod 12, fixed door plate 13, valve plate 14, door gear 15, door shaft 16, double-headed prism 17, pressing device 18, integrated frame 19, induction group 20, induction shaft 21, induction plate gear 22, worm 23, conversion shaft 24, conversion gear 25, rail rod 26, plate rack 27, discharge block 28, funnel tube cavity 281, thick column tube cavity 282, insulation folding plate 29, protection gear 30, insulation plate 31, protection shaft 32, double drive group 33, lead-out shaft 34, pressure plate gear 35, first rotating shaft 36, double pressure plate 37, C-shaped spring 38, double drive frame 39, second rotating shaft 40. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the technical solutions in the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] See also Figures 1 to 13 The present invention provides a technical solution: a metal smelting device for grenade projectile material, comprising a barrel-shaped furnace body 1, a spherical groove is arranged at the bottom of the inner cavity of the furnace body 1, a discharging convex body 2 is fixed on one side of the furnace body 1, and a spherical semi-groove connected to the spherical groove of the furnace body 1 is opened in the discharging convex body 2, a plate cavity for installing a mechanism is opened above the spherical semi-groove of the discharging convex body 2, the plate cavity of the discharging convex body 2 and the furnace body 1 are separated by a double-control door 3, and the double-control door 3 also blocks the feed port on the spherical semi-groove of the discharging convex body 2, and a discharging tube cavity 4 is also opened in the discharging convex body 2, and the discharging The top of the tube cavity 4 is connected to the spherical semi-groove of the discharge convex body 2, and a diverter 5 is arranged at the bottom of the discharge tube cavity 4, and the diverter 5 is distributed in the square groove opened at the bottom of the discharge convex body 2, and a supplementary heat flamethrower 6 and a heat insulation plate 7 for protecting the supplementary heat flamethrower 6 are arranged in the plate cavity of the discharge convex body 2. A multi-controller 8 is installed outside the discharge convex body 2, and the multi-controller 8 establishes transmission with the double-control door 3, the diverter 5 and the heat insulation plate 7 respectively. The top of the furnace body 1 is covered with a furnace cover 9, and a plurality of through holes are opened in the middle of the furnace cover 9, and an electrode 10 passes through each through hole, and an exhaust pipe 11 is also fixed above the furnace cover 9.
[0037] refer to Figure 5It is understood that the double-controlled door 3 includes a fixed door plate 13 fixed in the discharging protrusion 2, a valve plate 14 slidingly contacting one side of the fixed door plate 13, a door gear 15 meshing and transmission connected with a row of teeth and grooves on the valve plate 14, a door shaft 16 fixedly connected to the door gear 15 at one end, and a guide rod 12 fixed on the discharging protrusion 2, and the guide rod 12 slides through the column hole opened on the valve plate 14, the door gear 15 is arranged in the column groove opened on the fixed door plate 13, and the spherical semi-groove on the discharging protrusion 2 is blocked by a semicircular plate on the valve plate 14, the other end of the door shaft 16 extends to the outside of the discharging protrusion 2 and then establishes transmission with the multi-controller 8, and the door shaft 16 is movably sleeved in the through hole opened on the limit block set on the fixed door plate 13.
[0038] refer to Figure 6 It is understood that the multi-controller 8 includes an integrated frame 19 fixed to the outside of the discharging protrusion 2, a double-headed prism 17 sliding through a rectangular hole opened in the integrated frame 19, a pressing device 18 transmission-connected to one end of the double-headed prism 17, and an actuating group 20 that establishes transmission with the pressing device 18, and the other end of the double-headed prism 17 establishes transmission with the diverter 5.
[0039] refer to Figure 6 It is understood that the driving group 20 includes an driving plate gear 22 with one end driven by the pressing device 18, a worm 23 meshing and drivingly connected to the other end of the driving plate gear 22, and a driving shaft 21 vertically passing through the middle of the driving plate gear 22, one end of the driving shaft 21 is meshing and drivingly connected to the bevel gear fixed on the door shaft 16 through a fixed bevel gear, the other end of the driving shaft 21 is movably sleeved in a through hole opened on the integrated frame 19, and one end of the worm 23 is movably sleeved in a column hole opened on the integrated frame 19.
[0040] refer to Figure 7 It is understood that the diverter 5 includes a discharge block 28 that moves in the square groove at the bottom of the discharge convex body 2, a rail rod 26 arranged at the four corners of the discharge block 28, a plate rack 27 fixedly connected to the discharge block 28 at one end, a conversion gear 25 meshing and transmission connected to one side of the plate rack 27, and a conversion shaft 24 fixedly connected to the conversion gear 25 at one end, the other end of the conversion shaft 24 extends to the outside of the discharge convex body 2, and the end is meshing and transmission connected with a row of teeth arranged on the double-headed prism 17 by setting an axis gear, a funnel tube cavity 281 for conveying molten steel, and a thick column tube cavity 282 for conveying slag are provided in the discharge block 28, the end of the rail rod 26 is fixed on the discharge convex body 2, and the rail rod 26 slides through the column hole opened on the discharge block 28, and a plate groove for the plate rack 27 to move is also provided in the discharge convex body 2, and the conversion shaft 24 is movably sleeved in the convex through hole set on the discharge convex body 2.
[0041] The bottom of the funnel tube cavity 281 has a small diameter to prevent splashing of molten steel when it is discharged. The thick column tube cavity 282 has a large diameter to discharge the slag fluid and prevent the viscous slag fluid from clogging the channel.
[0042] refer to Fig. 9 It is understood that the heat insulation plate 7 includes a heat insulation folding plate 29 fixed in the plate cavity of the discharge convex body 2, a heat insulation flat plate 31 in sliding contact with one side of the heat insulation folding plate 29, a protective gear 30 with a row of teeth and grooves meshing and transmission connected to the heat insulation flat plate 31, and a protective shaft 32 with one end coaxially fixed to the protective gear 30, the other end of the protective shaft 32 extends to the outside of the discharge convex body 2 and establishes transmission with the pressing device 18, the heat insulation folding plate 29 is covered on the heat insulation flat plate 31 by a fixed concave plate, the heat insulation folding plate 29 isolates a chamber in the plate cavity of the discharge convex body 2 for protecting the heat supplement flamethrower 6, and the heat insulation folding plate 29 is provided with a circular hole for the flame to pass through.
[0043] The pressing device 18 includes a pressure plate gear 35 meshing and drivingly connected to the guide plate gear 22, a lead-out shaft 34 vertically driven by the protective shaft 32, and a dual-drive group 33 that establishes transmission between the lead-out shaft 34 and the pressure plate gear 35. The lead-out shaft 34 is movably sleeved in a through hole opened on the integrated frame 19, and one end of the lead-out shaft 34 is meshing and drivingly connected to the bevel gear fixed on the protective shaft 32 through a fixed bevel gear.
[0044] The dual-drive group 33 includes a second rotating shaft 40 with one end vertically fixed to the middle of the pressure plate gear 35, a dual-drive frame 39 vertically fixed at the other end of the second rotating shaft 40, a C-shaped spring 38 for pushing the dual-drive frame 39 to reset, a dual pressure plate 37 for pressing the dual-drive frame 39, and a first rotating shaft 36 vertically fixed on the dual pressure plate 37.
[0045] The second rotating shaft 40 and the first rotating shaft 36 are respectively movably sleeved in two through holes opened on the integrated frame 19, one end of the C-shaped spring piece 38 is fixed on the integrated frame 19, the double pressure plate 37 is two semicircular plate splicing bodies of different sizes, the double drive frame 39 includes an inclined plate, an outer arc rack fixed at one end of the inclined plate, and an inner arc rack fixed in the middle of the inclined plate, the outer arc rack of the double drive frame 39 is meshed and transmitted with a row of teeth arranged on the double-headed prism 17, and the inner arc rack of the double drive frame 39 is meshed and transmitted with a shaft gear fixed at the end of the lead-out shaft 34.
[0046] A method for metal smelting of grenade projectile material, comprising the following steps:
[0047] Step 1: pour the smelting raw materials into the furnace body 1, then control the furnace cover 9 to move horizontally to cover the furnace body 1, and then control the electrode 10 to be inserted into the furnace body 1 from top to bottom;
[0048] Step 2: an arc is generated between the energized electrode 10 and the metal material, and the high temperature of the arc is used to directly heat the raw material, so that molten steel with floating slag on the surface is generated in the spherical groove of the furnace body 1;
[0049] Step 3: Control the de-energized electrode 10 to rise and leave the furnace body 1, and then the furnace cover 9 is separated from the furnace body 1 by swinging and translation. Next, the furnace body 1 gradually swings and tilts, and the spherical semi-groove feed port blocked by the double-control door 3 is opened. The molten steel is discharged after passing through the discharge cavity 4 and the diverter 5 in sequence. The door opening space opened by the double-control door 3 is submerged in the molten steel, and the slag floating on the surface of the molten steel is intercepted by the double-control door 3.
[0050] Step 4: After the molten steel is discharged, the double-control door 3 is fully opened, the channel switching is completed in the diverter 5, the furnace body 1 continues to swing and tilt, and the slag fluid is discharged after passing through the discharge pipe cavity 4 and the diverter 5 in turn.
[0051] The worm 23 is connected to the driving mechanism in the prior art. The rotation of the worm 23 drives the driving plate gear 22 to rotate, and then the door shaft 16 is transmitted through the driving shaft 21, thereby causing Figure 5 The valve plate 14 in the furnace rises and falls. During the stage of molten steel discharge, the valve plate 14 does not rise completely, and part of the space in the channel between the valve plate 14 and the spherical semi-groove of the discharge convex body 2 is opened. The molten steel flows into the discharge pipe cavity 4 through this part of the space, and then flows down through the funnel pipe cavity 281 and is discharged. During the process, the channel controls the inclination degree of the furnace body 1 to control the molten steel to always submerge the channel below the middle part of the valve plate 14, so that the slag floating on the surface of the molten steel is intercepted by the valve plate 14.
[0052] After the molten steel is discharged, the worm 23 continues to rotate, and finally the valve plate 14 is completely lifted and opened, so that the slag fluid can flow into the discharge tube cavity 4, and the diverter 5 below the discharge tube cavity 4 completes the channel replacement. Specifically, the driving plate gear 22 rotates to drive the pressure plate gear 35, and then drives the double pressure plate 37 through the first rotating shaft 36. The rotation of the double pressure plate 37 in the molten steel discharge stage is always that the small semicircular plate presses the inclined plate on the double drive frame 39, and the double pressure plate 37 continues to rotate, and the double The large semicircular plate of the pressure plate 37 will rotate to compress the inclined plate of the dual-drive frame 39, so that in the stage of slag fluid discharge, the dual-drive frame 39 has completed swinging, and the swing of the dual-drive frame 39 will drive the double-headed prism 17 to descend, thereby driving the conversion shaft 24 to rotate, and then the conversion gear 25 rotates to drive the plate rack 27 to translate, and the plate rack 27 pulls the discharge block 28, and the coarse column tube cavity 282 on the discharge block 28 is connected to the discharge tube cavity 4, so that the slag fluid is discharged through the coarse column tube cavity 282.
[0053] The slag fluid is also heated by flames during the discharge stage to avoid the problem of cooling and thickening of the slag fluid caused by long-term lack of heat supply. Specifically, the dual-drive frame 39 swings and transmits the lead-out shaft 34, and then the protective shaft 32 rotates to drive the protective gear 30. The insulation plate 31 slides to expose the circular hole on the insulation folding plate 29, and the heat supplement flamethrower 6 sprays flames outwardly onto the discharged slag fluid. By adding heat, the slag fluid is prevented from becoming thick, and the slag fluid is prevented from adhering to the inner wall when passing through the discharge pipe cavity 4 and the thick column pipe cavity 282, thereby ensuring that the slag fluid can be discharged smoothly.
[0054] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A metal smelting device for grenade body material, comprising a barrel-shaped furnace body (1), characterized in that: A spherical groove is provided at the bottom of the inner cavity of the furnace body (1); a discharge convex body (2) is fixed on one side of the furnace body (1); a spherical semi-groove connected to the spherical groove of the furnace body (1) is provided in the discharge convex body (2); a plate cavity for installing a mechanism is provided above the spherical semi-groove of the discharge convex body (2); a double-control door (3) is provided between the plate cavity of the discharge convex body (2) and the furnace body (1); the double-control door (3) also blocks the feed port on the spherical semi-groove of the discharge convex body (2); a discharge tube cavity (4) is also provided in the discharge convex body (2); the top end of the discharge tube cavity (4) is connected to the spherical semi-groove of the discharge convex body (2); the discharge tube cavity (4) is provided in the discharge convex body (2); 4) A flow divider (5) is arranged at the bottom, and the flow divider (5) is distributed in a square groove opened at the bottom of the discharge convex body (2); a heat supplement flamethrower (6) and a heat insulation plate (7) for protecting the heat supplement flamethrower (6) are arranged in the plate cavity of the discharge convex body (2); a multi-controller (8) is installed outside the discharge convex body (2), and the multi-controller (8) respectively establishes transmission with the double control door (3), the flow divider (5) and the heat insulation plate (7); the top end of the furnace body (1) is covered with a furnace cover (9), a plurality of through holes are opened in the middle of the furnace cover (9), and an electrode (10) passes through each through hole; an exhaust pipe (11) is also fixed above the furnace cover (9).
2. A grenade body material metal smelting device according to claim 1, characterized in that: The double-controlled door (3) comprises a fixed door plate (13) fixed in the discharge convex body (2), a valve plate (14) in sliding contact with one side of the fixed door plate (13), a door gear (15) meshing and transmission-connected with a row of tooth grooves on the valve plate (14), a door shaft (16) fixedly connected to the door gear (15) at one end, and a guide rod (12) fixed on the discharge convex body (2), wherein the guide rod (12) slides through a column hole on the valve plate (14), the door gear (15) is arranged in a column groove on the fixed door plate (13), the valve plate (14) is provided with a semicircular plate to block the spherical semi-groove on the discharge convex body (2), and the other end of the door shaft (16) extends to the outside of the discharge convex body (2) and then establishes transmission with the multi-controller (8).
3. A grenade body material metal smelting device according to claim 2, characterized in that: The multi-controller (8) comprises an integrated frame (19) fixed to the outside of the discharge convex body (2), a double-headed prism (17) slidingly passing through a rectangular hole provided in the integrated frame (19), a pressing device (18) connected to one end of the double-headed prism (17) in transmission, and an ignition group (20) establishing transmission with the pressing device (18), and the other end of the double-headed prism (17) establishing transmission with the diverter (5).
4. A grenade body material metal smelting device according to claim 3, characterized in that: The driving group (20) comprises a driving plate gear (22) having one end that drives the pressing device (18), a worm (23) meshingly connected to the other end of the driving plate gear (22), and a driving shaft (21) vertically penetrating the middle of the driving plate gear (22); one end of the driving shaft (21) is meshingly connected to the bevel gear fixed on the door shaft (16) through a fixed bevel gear, the other end of the driving shaft (21) is movably sleeved in a through hole opened on the integrated frame (19), and one end of the worm (23) is movably sleeved in a column hole opened on the integrated frame (19).
5. The metal smelting device for grenade body material according to claim 3, characterized in that: The flow divider (5) comprises a discharge block (28) movable in a square groove at the bottom of a discharge protrusion (2), rail rods (26) arranged at four corners of the discharge block (28), a plate rack (27) fixedly connected to the discharge block (28) at one end, a conversion gear (25) meshingly connected to one side of the plate rack (27), and a conversion shaft (24) fixedly connected to the conversion gear (25) at one end.
6. A grenade body material metal smelting device according to claim 5, characterized in that: The other end of the conversion shaft (24) extends to the outside of the discharge convex body (2), and the end is connected to a row of teeth arranged on the double-headed prism (17) by means of a shaft gear. The discharge block (28) is provided with a funnel tube cavity (281) for conveying molten steel, and a thick column tube cavity (282) for conveying slag. The end of the rail rod (26) is fixed on the discharge convex body (2), and the rail rod (26) slides through the column hole provided on the discharge block (28).
7. The metal smelting device for grenade body material according to claim 4, characterized in that: The heat insulation plate tool (7) comprises a heat insulation folding plate (29) fixed in the plate cavity of the discharge convex body (2), a heat insulation flat plate (31) in sliding contact with one side of the heat insulation folding plate (29), a protective gear (30) having a row of teeth and grooves meshing and transmission connection with the heat insulation flat plate (31), and a protective shaft (32) having one end coaxially fixed with the protective gear (30), the other end of the protective shaft (32) extending to the outside of the discharge convex body (2) and then establishing transmission with the pressing device (18), the heat insulation folding plate (29) is covered on the heat insulation flat plate (31) by a fixed concave plate, the heat insulation folding plate (29) isolates a chamber in the plate cavity of the discharge convex body (2) for protecting the supplementary heat flamethrower (6), and the heat insulation folding plate (29) is provided with a circular hole for flame to pass through.
8. The metal smelting device for grenade body material according to claim 7, characterized in that: The pressure-generating device (18) comprises a pressure plate gear (35) meshingly connected to the guide plate gear (22), a lead-out shaft (34) vertically connected to the protective shaft (32), and a dual-drive group (33) for establishing transmission between the lead-out shaft (34) and the pressure plate gear (35); the lead-out shaft (34) is movably sleeved in a through hole provided on the integrated frame (19), and one end of the lead-out shaft (34) is meshingly connected to the bevel gear fixed on the protective shaft (32) through a fixed bevel gear.
9. The metal smelting device for grenade body material according to claim 8, characterized in that: The dual-drive group (33) comprises a second rotating shaft (40) having one end vertically fixed to the middle of a pressure plate gear (35), a dual-drive frame (39) vertically fixed to the other end of the second rotating shaft (40), a C-shaped spring (38) for pushing the dual-drive frame (39) to reset, a dual pressure plate (37) for pressing the dual-drive frame (39), and a first rotating shaft (36) vertically fixed on the dual pressure plate (37).
10. The metal smelting device for grenade body material according to claim 9, characterized in that: The second rotating shaft (40) and the first rotating shaft (36) are respectively movably sleeved in two through holes opened on the integrated frame (19); one end of the C-shaped spring sheet (38) is fixed on the integrated frame (19); the double pressure plate (37) is a spliced body of two semicircular plates of different sizes; the double drive frame (39) comprises an inclined plate, an outer arc rack fixed at one end of the inclined plate, and an inner arc rack fixed at the middle of the inclined plate; the outer arc rack of the double drive frame (39) is meshed and connected to a row of teeth arranged on the double-headed prism (17); and the inner arc rack of the double drive frame (39) is meshed and connected to a shaft gear fixed at the end of the lead-out shaft (34).
11. A method for smelting metal of grenade projectile material, using the device for smelting metal of grenade projectile material according to claim 1, characterized in that: The following steps are involved: Step 1: pouring the smelting raw materials into the furnace body (1), then controlling the furnace cover (9) to move horizontally to cover the furnace body (1), and then controlling the electrode (10) to be inserted into the furnace body (1) from top to bottom; Step 2: an arc is generated between the energized electrode (10) and the metal material, and the high temperature of the arc is used to directly heat the material, thereby generating molten steel with floating slag on the surface in the spherical groove of the furnace body (1); Step 3: The electrode (10) that is powered off is controlled to rise and leave the furnace body (1), and then the furnace cover (9) is separated from the furnace body (1) by swinging and translating. Next, the furnace body (1) gradually swings and tilts, and the spherical semi-groove feed inlet blocked by the double-control door (3) is opened. The molten steel is discharged after passing through the discharge pipe cavity (4) and the diverter (5) in sequence. The door opening space opened by the double-control door (3) is submerged in the molten steel, and the steel slag floating on the surface of the molten steel is intercepted by the double-control door (3); Step 4: After the molten steel is discharged, the double-control door (3) is fully opened, the channel switching is completed in the diverter (5), the furnace body (1) continues to swing and tilt, and the slag fluid passes through the discharge pipe cavity (4) and the diverter (5) in turn before being discharged.