Automobile metal part surface treatment equipment and method

By using a rotating motor to drive the cleaning seat, air-drying seat and spraying seat to rotate in the surface treatment equipment of automotive metal parts, the cleaning box, air-drying box and spraying box in the component treatment equipment are evenly distributed, which solves the problem of uneven process processing speed and improves the overall processing efficiency.

CN119869830AActive Publication Date: 2025-04-25NANTONG CHAYO ELECTROCHEMICAL TECH CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202510376822.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-28
Publication Date
2025-04-25
Estimated Expiration
2045-03-28

AI Technical Summary

Technical Problem

In the electroplating, cleaning, air drying and spraying processes, the inconsistent operating time period leads to uneven processing speeds, and there is a shortage of supply or oversupply, affecting the overall efficiency.

Method used

A surface treatment equipment for automotive metal parts is designed, and the cleaning seat, air-drying seat and spray seat are driven by rotating the motor to rotate the cleaning seat, air-drying seat and spray seat, so that the cleaning box, air-drying box and spray box are evenly distributed, achieving consistency in the loading and discharge speeds at each time, thereby optimizing the process processing efficiency.

Benefits of technology

Through uniformly distributed cleaning boxes, air-drying boxes and spraying boxes, queuing is avoided, congestion in parts to be processed is reduced, and the overall efficiency of surface treatment of automotive metal parts is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119869830A_ABST
    Figure CN119869830A_ABST
Patent Text Reader

Abstract

The invention relates to automobile metal part surface treatment equipment and method, and relates to the technical field of metal part machining, the automobile metal part surface treatment equipment comprises a machine base, an electroplating bath, a cleaning base, an air drying base and a spraying base are sequentially arranged on the machine base, the electroplating bath is fixedly connected with the machine base, and the cleaning base, the air drying base and the spraying base are all rotationally connected with the machine base; a plurality of cleaning boxes are arranged on the cleaning seat, a plurality of air drying boxes are arranged on the air drying seat, a plurality of spraying boxes are arranged on the spraying seat, conveying frames are arranged above the electroplating bath, the cleaning boxes and the air drying boxes, conveying through grooves are formed in the conveying frames in a penetrating mode, a group of guide grooves are formed in the inner walls of the conveying through grooves, and the guide grooves are oppositely arranged; a plurality of net baskets are jointly and movably arranged on the conveying frame, and workpieces are placed in the net baskets. The automobile metal part surface treatment device has the effect of improving the automobile metal part surface treatment efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of metal parts processing, and in particular to a surface treatment device and method for automobile metal parts. Background Art

[0002] As an indispensable basic component of the automotive industry, automotive metal parts include brake calipers, control arms, connecting rods, steering columns, pulleys, fenders, oil pipe joints, bolts, nuts, fasteners, four-door and two-lid hinges, wiring harness brackets, special-shaped stampings, etc. At present, in order to improve the surface properties of automotive metal parts, such as oxidation resistance, corrosion resistance, wear resistance and other surface characteristics, alloy plating and powder coating are usually deposited on the surface of metal parts to improve the surface properties of metal parts.

[0003] In the related art, a Chinese patent with authorization announcement number CN216514231U provides a metal parts processing anti-oxidation treatment device, which includes a base and an inner tank. The upper surface of the base is sequentially installed with an electroplating tank, a cleaning box, an air drying box and a spraying box from left to right. The electroplating tank, the cleaning box and the air drying box are all adapted to the inner tank and movably connected. The metal parts to be processed are placed in the inner tank, and the inner tank is immersed in the electroplating liquid in the electroplating tank to electroplate the metal parts. After the electroplating of the metal parts is completed, the inner tank is placed in the cleaning box to clean the metal parts. After the metal parts are cleaned, the inner tank is moved to the air drying box to air dry the metal parts. After the metal parts are dried, they are placed in the spraying box for spraying, so as to achieve the electroplating and spraying effects on the metal parts, and deposit the alloy plating layer and powder coating on the surface of the metal parts.

[0004] In the process of implementing this application, the inventors found that there are at least the following problems in this technology: since the operation time required for the same automotive metal parts in the electroplating process, cleaning process, air-drying process and spraying process is inconsistent, and the number of automotive metal parts that can be processed by the electroplating tank, cleaning box, air-drying box and spraying box at the same time is limited, therefore, in the process with shorter operation time, the processing speed of automotive metal parts is fast, there will be a situation of supply exceeding demand, and the equipment will often be idle waiting for automotive metal parts to be processed, while in the process with longer operation time, the processing speed of automotive metal parts is slow, there will be a situation of oversupply, and multiple automotive metal parts to be processed will often be in a waiting state in line, resulting in a large number of automotive metal parts being congested in the slow processing process position, affecting the overall efficiency of the surface treatment of automotive metal parts. Summary of the invention

[0005] In order to improve the surface treatment efficiency of automobile metal parts, the present application provides an automobile metal parts surface treatment device and method.

[0006] The present application provides an automotive metal parts surface treatment equipment adopts the following technical solution: A surface treatment equipment for automobile metal parts comprises a machine base, on which a plating tank, a cleaning seat, an air-drying seat and a spraying seat are sequentially arranged, the plating tank is fixedly connected to the machine base, the cleaning seat, the air-drying seat and the spraying seat are all rotatably connected to the machine base, a plurality of cleaning boxes are arranged on the cleaning seat, a plurality of air-drying boxes are arranged on the air-drying seat, a plurality of spraying boxes are arranged on the spraying seat, a conveying rack is arranged above the plating tank, the cleaning box and the air-drying box, a conveying through slot is penetrated through the conveying rack, a group of guide slots are arranged on the inner wall of the conveying through slot, the guide slots are arranged relatively to each other, a plurality of net baskets are movably arranged on the conveying rack, and the net baskets are used to place workpieces.

[0007] Preferably, the number of the electroplating tanks is K1, K1 is 1, the duration of the workpiece electroplating process is T1, the number of the cleaning boxes is K2, the duration of the workpiece cleaning process is T2, the number of the air drying boxes is K3, the duration of the workpiece air drying process is T3, the number of the spraying boxes is K4, the duration of the workpiece spraying process is T4, and the number of the spraying boxes is K5. .

[0008] Preferably, a rotating top seat is fixedly arranged at the bottom of the cleaning seat, the air-drying seat and the spraying seat, a rotating base is arranged under the rotating top seat, the rotating base is fixedly connected to the machine base, a motor slot is opened on the top of the rotating base, a rotating motor is fixedly arranged in the motor slot, the output shaft of the rotating motor is fixedly connected to the bottom of the rotating top seat, and the rotating motors are equidistantly distributed along the machine base.

[0009] By adopting the above technical scheme, in order to keep the feeding speed of automobile metal parts consistent each time in the cleaning process, the cleaning box is driven to rotate by a rotating motor to drive the cleaning seat to rotate, so that the cleaning box is moved to the corresponding feeding position of automobile metal parts; in order to keep the unloading speed of automobile metal parts consistent each time in the cleaning process, the cleaning box is driven to rotate by a rotating motor to drive the cleaning seat to rotate, so that the cleaning box is moved to the corresponding unloading position of automobile metal parts; in order to keep the feeding speed of automobile metal parts consistent each time in the air-drying process, the air-drying box is driven to rotate by a rotating motor to drive the air-drying seat to rotate, so that the air-drying box is moved to the corresponding unloading position of automobile metal parts. Corresponding loading position; in order to keep the unloading speed of automobile metal parts consistent each time in the air-drying process, the air-drying box is driven to rotate by a rotating motor to drive the air-drying seat to rotate, so that the air-drying box is moved to the corresponding unloading position of automobile metal parts; in order to keep the loading speed of automobile metal parts consistent each time in the spraying process, the spray box is driven to rotate by a rotating motor to drive the spray seat to rotate, so that the spray box is moved to the corresponding loading position of automobile metal parts; in order to keep the unloading speed of automobile metal parts consistent each time in the spraying process, the spray box is driven to rotate by a rotating motor to drive the spray seat to rotate, so that the spray box is moved to the corresponding unloading position of automobile metal parts.

[0010] Preferably, the cleaning boxes are distributed in a circular array on the cleaning seat with the rotation axis of the cleaning seat as the center, and the distances between adjacent cleaning boxes are equal; the air-drying boxes are distributed in a circular array on the air-drying seat with the rotation axis of the air-drying seat as the center, and the distances between adjacent air-drying boxes are equal; the spraying boxes are distributed in a circular array on the spraying seat with the rotation axis of the spraying seat as the center, and the distances between adjacent spraying boxes are equal.

[0011] By adopting the above technical scheme, the cleaning boxes are evenly distributed on the cleaning seat, so that the loading distance of automobile metal parts in each cleaning process is kept consistent; the cleaning boxes are evenly distributed on the cleaning seat, so that the unloading distance of automobile metal parts in each cleaning process is kept consistent; the air-drying boxes are evenly distributed on the air-drying seat, so that the loading distance of automobile metal parts in each air-drying process is kept consistent; the air-drying boxes are evenly distributed on the air-drying seat, so that the unloading distance of automobile metal parts in each air-drying process is kept consistent; the spraying boxes are evenly distributed on the spraying seat, so that the loading distance of automobile metal parts in each spraying process is kept consistent; the spraying boxes are evenly distributed on the spraying seat, so that the unloading distance of automobile metal parts in each spraying process is kept consistent.

[0012] Preferably, a group of upper belt grooves and a group of lower belt grooves are provided in the guide groove, the upper belt groove is located above the lower belt groove, belt conveyors are fixedly arranged in the upper belt groove and the lower belt groove, the opposite surfaces of the belt conveyors are flush with the inner wall of the guide groove, a hanging frame is fixedly arranged on the net basket, a hanging seat is fixedly arranged on the hanging frame, a group of movable grooves are provided on the top of the hanging seat, movable arms are slidably arranged in the movable grooves, a lap arm is fixedly arranged on the back side of the movable arm, and the lap arm is used to be inserted in the guide groove at one end away from the movable arm, a pressing groove is provided on the inner wall of the movable groove, the pressing groove passes through the side wall of the hanging seat, a pressing block is slidably arranged in the pressing groove, the pressing block is fixedly connected to the movable arm, a pressing spring is fixedly arranged between one end of the pressing block and the inner wall of the movable groove, and the other end of the pressing block is used to protrude from the side wall of the hanging seat.

[0013] Preferably, an input lifting cylinder is arranged on the cleaning seat, air-drying seat and spraying seat, and an output lifting cylinder is arranged on the electroplating tank, cleaning seat and air-drying seat. The input lifting cylinder and the output lifting cylinder are both detachably connected to the machine base. An input telescopic cylinder is arranged on the output shaft of the input lifting cylinder, and an output telescopic cylinder is arranged on the output shaft of the output lifting cylinder. The output shafts of the input telescopic cylinder and the output shafts of the output telescopic cylinder are both oriented toward the output axis of the rotating motor. A clamping seat is fixedly arranged on the output shafts of the input telescopic cylinder and the output shafts of the output telescopic cylinder, and a group of clamping arms are slidably arranged on the clamping seat, and the clamping arms are used to clamp the hanging seat.

[0014] Preferably, a driving groove is provided on the clamping seat, a driving motor is fixedly arranged in the driving groove, a forward screw is fixedly arranged on the output shaft of the driving motor, a reverse screw is fixedly arranged on the forward screw, the reverse screw is rotatably connected to the inner wall of the driving groove, the forward screw and the reverse screw are both threadedly connected to driving blocks, the driving blocks are slidably arranged in the driving groove, one of the driving blocks is fixedly connected to one of the clamping arms, and the other driving block is fixedly connected to the other clamping arm, a clamping groove is provided on the opposite surface of the clamping arm, a plurality of clamping cylinders are fixedly arranged on the opposite surface of the clamping groove, and a clamping plate is fixedly arranged on the output shaft of the clamping cylinder.

[0015] Preferably, the guide groove includes a first horizontal section, a second vertical section, a third horizontal section and a fourth vertical section, the first horizontal section, the second vertical section, the third horizontal section and the fourth vertical section are connected in sequence, the first horizontal section and the third horizontal section are both horizontally arranged, the second vertical section and the fourth vertical section are both vertically arranged, one of the upper belt grooves is located in the first horizontal section, and the other upper belt groove is located in the third horizontal section, one of the lower belt grooves is located in the first horizontal section, and the other lower belt groove is located in the third horizontal section, the input end of the first horizontal section is the upper material position, and the output end of the fourth vertical section is the lower material position, the lower material position of the conveying rack is arranged directly below the upper material position of the adjacent conveying rack, and the lower material position of the conveying rack and the upper material position of the conveying rack are both located on the rotation axis.

[0016] Preferably, the input end of the first horizontal section, the output end of the first horizontal section and the input end of the second vertical section are located at the same height, the input end of the second vertical section is located above the output end of the second vertical section, the output end of the second vertical section, the input end of the third horizontal section, the output end of the third horizontal section and the input end of the fourth vertical section are located at the same height, the input end of the fourth vertical section is located above the output end of the fourth vertical section, the height difference between the input end of the second vertical section and the output end of the second vertical section is greater than the distance between the top of the lap arm and the bottom of the basket, the height difference between the input end of the fourth vertical section and the output end of the fourth vertical section is greater than the distance between the top of the lap arm and the bottom of the basket, the input telescopic cylinder is located below the first horizontal section, the length of the input telescopic cylinder is less than the length of the first horizontal section, the output telescopic cylinder is located below the third horizontal section, the length of the output telescopic cylinder is less than the length of the third horizontal section.

[0017] Preferably, the working method of the device comprises the following steps: Step S1, device initialization settings; Step S2: start the electroplating tank. The start time of the electroplating tank is ; Step S3: start the cleaning seat and the cleaning box. The start time of the cleaning seat and the cleaning box is ,and ; Step S4: Start the air drying seat and the air drying box. The start time of the air drying seat and the air drying box is ,and ; Step S5: start the spraying seat and the spraying box. The start time of the spraying seat and the spraying box is ,and ; Step S6: The first workpiece to be processed is placed in the equipment. The time when the workpiece to be processed is placed in the equipment is ,in, ; Step S7, after an interval of T1, the next workpiece to be processed is placed in the equipment, and it is checked whether all the workpieces to be processed are placed in the equipment; Step S8: If all the workpieces to be processed are placed in the equipment, proceed to step S9; if not all the workpieces to be processed are placed in the equipment, proceed to step S7; Step S9: the equipment continues to run until the last workpiece to be processed is output from the equipment, and then the equipment stops running.

[0018] Preferably, the step S1 comprises the following steps: Step S11: Test and obtain the time for the workpiece to be placed in the electroplating tank. ; The test shows that the workpiece is immersed in the electroplating tank for a period of time ; The test shows that the time it takes for the workpiece to move from the electroplating tank to the loading position above the electroplating tank is ; The test shows that the time it takes for the workpiece to move from the loading position above the electroplating tank to the unloading position above the cleaning seat is ; The test shows that the time it takes for the workpiece to move from the top of the cleaning seat to the cleaning box is ; The test shows that the workpiece is cleaned in the cleaning box for ; The test shows that the time it takes for the workpiece to move from the cleaning box to the loading position above the cleaning seat is ; The test shows that the time it takes for the workpiece to move from the upper material position above the cleaning seat to the lower material position above the air drying seat is ; The test shows that the time it takes for the workpiece to move from the top of the air-drying seat to the air-drying box is ; The test shows that the workpiece takes about 2 hours to dry in the air drying oven. ; The test shows that the time it takes for the workpiece to move from the air drying box to the loading position above the air drying seat is ; The test shows that the time it takes for the workpiece to move from the upper material position above the air drying seat to the lower material position above the spraying seat is ; The test shows that the time it takes for the workpiece to move from the top of the spray seat to the spray box is ; The test shows that the workpiece is sprayed in the spray box for a period of time ; The test shows that the time it takes for the workpiece to move from the spray box to the loading position above the spray seat is ; Step S12: Calculate the workpiece electroplating process time T1. ; Calculate the workpiece cleaning process time T2, ; Calculate the workpiece air-drying process time T3, ; Calculate the workpiece spraying process time T4, ; Step S13: Utilize , the number of cleaning boxes K2, the number of air drying boxes K3 and the number of spraying boxes K4 are calculated; Step S14, install the cleaning boxes, air drying boxes and spraying boxes accordingly according to the number of cleaning boxes K2, the number of air drying boxes K3 and the number of spraying boxes K4.

[0019] Preferably, in step S3, each interval of the cleaning seat The duration rotates at a speed of ω2 Duration, including ; In step S4, each interval of the air-drying seat The duration rotates at a speed of ω3 Duration, including In step S5, each interval of the spraying seat The duration rotates at a speed of ω4 Duration, including .

[0020] The present application provides a method for surface treatment of automotive metal parts using the following technical solutions: A surface treatment method for automobile metal parts comprises the following steps: Step 1, electroplating process: the pre-treated workpiece is placed in the electroplating tank, and the workpiece is electroplated in the electroplating tank. After the electroplating is completed, the workpiece is moved from the electroplating tank to the loading position above the electroplating tank. The workpiece electroplating process takes T1. , where the time the workpiece is placed in the electroplating tank is ; The workpiece is immersed in the electroplating tank for ; The test shows that the time it takes for the workpiece to move from the electroplating tank to the loading position above the electroplating tank is ; Step 2: The workpiece is moved from the loading position above the electroplating tank to the unloading position above the cleaning seat. The time it takes for the workpiece to move from the loading position above the electroplating tank to the unloading position above the cleaning seat is ; Step 3, cleaning process: the workpiece is moved into the cleaning box from the unloading position above the cleaning seat, and the workpiece is cleaned in the cleaning box. After the workpiece is cleaned, it is moved from the cleaning box to the loading position above the cleaning seat. The duration of the workpiece cleaning process is T2. , where the time it takes for the workpiece to move from the top of the cleaning seat to the cleaning box is ; The workpiece is cleaned in the cleaning box for ; The time it takes for the workpiece to move from the cleaning box to the loading position above the cleaning seat is ; Step 4: The workpiece is moved from the loading position above the cleaning seat to the unloading position above the air drying seat. The time it takes for the workpiece to move from the loading position above the cleaning seat to the unloading position above the air drying seat is ; Step 5, air drying process: the workpiece is moved into the air drying box from the unloading position above the air drying seat, and the workpiece is air dried in the air drying box. After the workpiece is air dried, it is moved from the air drying box to the loading position above the air drying seat. The workpiece air drying process takes T3. , where the time it takes for the workpiece to move from the top of the air-drying seat to the air-drying box is ; The workpiece is dried in the air drying box for ; The time it takes for the workpiece to move from the air drying box to the loading position above the air drying seat is ; Step 6: The workpiece is moved from the loading position above the air drying seat to the unloading position above the spraying seat. The time it takes for the workpiece to move from the loading position above the air drying seat to the unloading position above the spraying seat is ; Step 7, spraying process: the workpiece is moved into the spray box from the unloading position above the spray seat, and the workpiece is sprayed in the spray box. After the workpiece is sprayed, it is moved from the spray box to the loading position above the spray seat. The workpiece spraying process takes T4. , where the time it takes for the workpiece to move from the top of the spraying seat to the spraying box is ; The workpiece is sprayed in the spray box for ; The time it takes for the workpiece to move from the spray box to the loading position above the spray seat is ; Step 8. The finished product is moved out from the loading position above the spraying seat.

[0021] By adopting the above technical solution, the pre-treated workpiece is sequentially electroplated, cleaned, air-dried and sprayed to achieve the electroplating and spraying effects on the metal parts, and the alloy plating and powder coating are deposited on the surface of the metal parts.

[0022] In summary, the present application includes at least one of the following beneficial technical effects: 1. By adjusting the number of electroplating tanks, cleaning tanks, air drying tanks and spraying tanks, it is less likely for automotive metal parts to queue up during the cleaning, air drying and spraying processes after electroplating, reducing the congestion of automotive metal parts to be processed in the slow processing process position, and achieving the effect of improving the surface treatment efficiency of automotive metal parts; 2. Determine the ratio of the number of cleaning boxes, air drying boxes and spraying boxes by using the duration of the workpiece electroplating process, the duration of the workpiece cleaning process, the duration of the workpiece air drying process and the duration of the spraying process; 3. By setting the first horizontal section, the second vertical section, the third horizontal section and the fourth vertical section; utilizing the height difference between the upper material position and the lower material position, providing clearance space for the input lifting cylinder, the input telescopic cylinder, the output lifting cylinder and the output telescopic cylinder, thereby reducing the interference between the net basket and the input lifting cylinder, the input telescopic cylinder, the output lifting cylinder and the output telescopic cylinder. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a structural schematic diagram of an automobile metal parts surface treatment equipment in an embodiment of the present application.

[0024] Figure 2 It is a cross-sectional view showing the connection relationship between the rotating top seat and the rotating base in the embodiment of the present application.

[0025] Figure 3 It is a cross-sectional view showing the positional relationship between the conveying rack and the conveying slot in the embodiment of the present application.

[0026] Figure 4 It is a cross-sectional view showing the connection relationship between the conveyor frame and the belt conveyor in the embodiment of the present application.

[0027] Figure 5 It is a cross-sectional view showing the connection relationship between the bracket seat and the lap arm in the embodiment of the present application.

[0028] Figure 6 It is a cross-sectional view showing the connection relationship between the bracket seat and the pressing arm in the embodiment of the present application.

[0029] Figure 7 It is a cross-sectional view showing the connection relationship between the clamping seat and the clamping arm in the embodiment of the present application.

[0030] Figure 8 It is a flow chart showing the working method of the surface treatment equipment for automobile metal parts in the embodiment of the present application.

[0031] Fig. 9 It is a flow chart of a surface treatment method for automotive metal parts in an embodiment of the present application.

[0032] Explanation of the reference numerals: 1. machine base; 11. electroplating tank; 12. cleaning base; 121. cleaning box; 13. air drying base; 131. air drying box; 14. spraying base; 141. spraying box; 2. rotating motor; 21. rotating top base; 22. rotating base; 23. motor slot; 3. conveying rack; 31. conveying slot; 4. guide slot; 41. first horizontal section; 411. upper material position; 42. second vertical section; 43. third horizontal section; 44. fourth vertical section; 441. lower material position; 5. belt conveyor; 51. upper belt slot; 52. lower Belt groove; 6, net basket; 61, hanging frame; 62, hanging seat; 63, movable arm; 631, movable groove; 64, overlapping arm; 65, pressing block; 651, pressing groove; 66, pressing spring; 71, input lifting cylinder; 72, input telescopic cylinder; 81, output lifting cylinder; 82, output telescopic cylinder; 9, clamping seat; 91, clamping arm; 911, clamping groove; 912, clamping cylinder; 913, clamping plate; 92, driving groove; 921, driving motor; 922, forward screw rod; 923, reverse screw rod; 924, driving block. DETAILED DESCRIPTION

[0033] The following is combined with Figure 1-9 This application is described in further detail.

[0034] The present application embodiment discloses a surface treatment device for automobile metal parts. Figures 1 to 3 , including a machine base 1, on which a plating tank 11, a cleaning seat 12, an air-drying seat 13 and a spraying seat 14 are sequentially mounted. The plating tank 11 is fixedly mounted on the machine base 1, and the cleaning seat 12, the air-drying seat 13 and the spraying seat 14 are all rotatably mounted on the machine base 1. The duration of the workpiece electroplating process is T1, the duration of the workpiece cleaning process is T2, the duration of the workpiece air-drying process is T3, and the duration of the workpiece spraying process is T4. There are K1 plating tanks 11, K2 cleaning boxes 121 are installed on the cleaning seat 12, K3 air-drying boxes 131 are installed on the air-drying seat 13, and K4 spraying boxes 141 are installed on the spraying seat 14. K1 is 1, and . Plating solution is injected into the plating tank 11; cleaning nozzles and stirring blades are installed in the cleaning box 121; several air ducts are installed in the air drying box 131; several spray nozzles are installed in the spray box 141, and the nozzles are connected to the paint box through a paint pump. A conveying rack 3 is installed above the plating tank 11, the cleaning box 121 and the air drying box 131, and a conveying through groove 31 is provided on the conveying rack 3. A group of guide grooves 4 are provided on the inner wall of the conveying through groove 31, and the guide grooves 4 are arranged oppositely. Several net baskets 6 are movably arranged on the conveying rack 3, and the net baskets 6 are used to place workpieces. Pad nets are installed in the plating tank 11, the cleaning box 121 and the air drying box 131, and the pad nets are used to receive the net baskets 6. The pre-treated automobile metal parts are placed in the net baskets 6, and the net baskets 6 move along the guide grooves 4 to realize the circulation of automobile metal parts between the plating tank 11, the cleaning box 121, the air drying box 131 and the spray box 141. The metal parts of the automobile are subjected to electroplating, cleaning, air drying and spraying in sequence to achieve the electroplating and spraying effects on the metal parts, and the alloy plating layer and the powder coating are deposited on the surface of the metal parts. By adjusting the number of the electroplating tank 11, the cleaning box 121, the air drying box 131 and the spraying box 141, the metal parts of the automobile after electroplating are not prone to queuing when undergoing the cleaning process, the air drying process and the spraying process, and the congestion of the metal parts of the automobile to be processed in the slow processing process position is reduced, so as to achieve the effect of improving the surface treatment efficiency of the metal parts of the automobile.

[0035] In order to keep the loading speed of automobile metal parts consistent in the same process, and to keep the unloading speed of automobile metal parts consistent in the same process, refer to Figure 1 and Figure 2, a rotating top seat 21 is installed at the bottom of the cleaning seat 12, the air-drying seat 13 and the spraying seat 14, and a rotating base 22 is installed under the rotating top seat 21. The rotating base 22 is welded to the machine base 1, and a motor slot 23 is provided on the top of the rotating base 22. A rotating motor 2 is installed in the motor slot 23, and the output shaft of the rotating motor 2 is fixedly connected to the bottom of the rotating top seat 21, and the rotating motor 2 is equidistantly distributed along the machine base 1. The cleaning boxes 121 are distributed in a circular array on the cleaning seat 12 with the rotation axis of the cleaning seat 12 as the center, and the distances between adjacent cleaning boxes 121 are equal; the air-drying boxes 131 are distributed in a circular array on the air-drying seat 13 with the rotation axis of the air-drying seat 13 as the center, and the distances between adjacent air-drying boxes 131 are equal; the spraying boxes 141 are distributed in a circular array on the spraying seat 14 with the rotation axis of the spraying seat 14 as the center, and the distances between adjacent spraying boxes 141 are equal.

[0036] In order to flexibly install the net basket 6 on the conveying frame 3 and move the net basket 6 along the guide groove 4, refer to Figures 1 to 6 A group of upper belt grooves 51 and a group of lower belt grooves 52 are provided in the guide groove 4. The upper belt groove 51 is located above the lower belt groove 52. The upper belt groove 51 and the lower belt groove 52 are both installed with belt conveyors 5, and the opposite surfaces of the belt conveyors 5 are flush with the inner wall of the guide groove 4. A hanging frame 61 is welded on the net basket 6, and a hanging seat 62 is welded on the hanging frame 61. A group of movable grooves 631 are provided at the top of the hanging seat 62, and a movable arm 63 is slidably provided in the movable groove 631. A lap arm 64 is welded on the back of the movable arm 63, and the lap arm 64 is used to be inserted into the guide groove 4 at one end away from the movable arm 63. A pressing groove 651 is provided on the inner wall of the movable groove 631, and the pressing groove 651 passes through the side wall of the hanging seat 62. A pressing block 65 is slidably provided in the pressing groove 651, and the pressing block 65 is welded to the movable arm 63. A pressing spring 66 is installed between one end of the pressing block 65 and the inner wall of the movable groove 631, and the other end of the pressing block 65 is used to protrude from the side wall of the hanging seat 62. When the pressing block 65 is not subjected to force, the opposite end of the lap arm 64 protrudes from the side wall of the hanging seat 62, so that the lap arm 64 is inserted into the guide groove 4. When the lap arm 64 is inserted into the guide groove 4, the net basket 6 is hung on the conveying frame 3. When the belt conveyor 5 is running, the lap arm 64 moves along the guide groove 4, and the movement of the lap arm 64 drives the hanging seat 62 to move, and the movement of the hanging seat 62 drives the net basket 6 to move, so as to achieve the effect of the circulation of automobile metal parts. When the net basket 6 is removed from the conveying frame 3, the pressing block 65 is forced to retract into the pressing groove 651, and at this time, the pressing block 65 drives the movable arms 63 to approach each other, so that the movable arms 63 drive the lap arm 64 to approach each other, until the lap arm 64 is separated from the guide groove 4.

[0037] In order to achieve the effect of disassembling the net basket 6 and the conveying rack 3, refer to Figures 1 to 7The input lifting cylinder 71 is installed on the cleaning seat 12, the air drying seat 13 and the spraying seat 14, and the output lifting cylinder 81 is installed on the electroplating tank 11, the cleaning seat 12 and the air drying seat 13. The input lifting cylinder 71 and the output lifting cylinder 81 are detachably connected to the machine base 1 through bolts. The input telescopic cylinder 72 is installed on the output shaft of the input lifting cylinder 71, and the output telescopic cylinder 82 is installed on the output shaft of the output lifting cylinder 81. The output shafts of the input telescopic cylinder 72 and the output telescopic cylinder 82 are both facing the output axis of the rotating motor 2. The output shafts of the input telescopic cylinder 72 and the output telescopic cylinder 82 are both installed on the clamping seat 9, and a group of clamping arms 91 are slidably arranged on the clamping seat 9, and the clamping arms 91 are used to clamp the hanging seat 62.

[0038] The process of moving the net basket 6 from the electroplating tank 11 to the conveying rack 3 is as follows: when the electroplating of the automobile metal parts is completed, the output lifting cylinder 81 and the output telescopic cylinder 82 first drive the clamping arm 91 to clamp the hanging seat 62, and then the output shaft of the output lifting cylinder 81 is extended. After the net basket 6 is removed from the electroplating tank 11, the output shaft of the output lifting cylinder 81 continues to extend until the lap arm 64 is inserted into the conveying through groove 31 and the end of the lap arm 64 is aligned with the guide groove 4, the clamping arm 91 is separated from the hanging seat 62, so that the lap arm 64 is inserted into the guide groove 4, and then the output shaft of the output lifting cylinder 81 is shortened to wait for the next automobile metal part.

[0039] When there is one cleaning box 121 or one air drying box 131, the circulation process of the net basket 6 between adjacent conveying racks 3 is as follows: the input lifting cylinder 71 and the input telescopic cylinder 72 first drive the clamping arm 91 to clamp the hanging seat 62 on the conveying rack 3, and then the output shaft of the input lifting cylinder 71 is shortened to move the net basket 6 into the corresponding slot or box; when the net basket 6 is moved into the corresponding slot or box, the input lifting cylinder 71 and the input telescopic cylinder 72 drive the clamping arm 91 to move away from the top of the corresponding slot or box; when the processing of the automobile metal parts is completed, the output lifting cylinder 81 and the output telescopic cylinder 82 first drive the clamping arm 91 clamps the hanging seat 62, and then the output shaft of the output lifting cylinder 81 is extended to move the net basket 6 out of the corresponding trough or box; thereafter, the output shaft of the output telescopic cylinder 82 is shortened to move the net basket 6 away from the top of the corresponding trough or box; when the net basket 6 is moved away from the top of the corresponding trough or box, the output shaft of the output lifting cylinder 81 continues to extend until the lap arm 64 is inserted into the conveying through groove 31 and the end of the lap arm 64 is aligned with the guide groove 4, and then the output shaft of the extending telescopic cylinder is extended to move the net basket 6 to the loading position 411, and finally the clamping arm 91 is separated from the hanging seat 62, so that the lap arm 64 is inserted into the guide groove 4.

[0040] When there are two or more cleaning boxes 121 or air drying boxes 131 or spray boxes 141, the circulation process of the net basket 6 between adjacent conveying racks 3 is as follows: the input lifting cylinder 71 and the input telescopic cylinder 72 first drive the clamping arm 91 to clamp the hanging seat 62 on the conveying rack 3, and then the output shaft of the input lifting cylinder 71 is shortened to move the overlapping arm 64 to the bottom of the conveying rack 3, and then the output shaft of the input telescopic cylinder 72 is shortened; when the net basket 6 moves to the top of the corresponding trough or box, the output shaft of the input lifting cylinder 71 continues to shorten, and the net basket 6 is moved into the corresponding trough or box, and finally the input lifting cylinder 71 and the input telescopic cylinder 72 drive the clamping arm 91 to move away from the top of the corresponding trough or box; when the automobile metal parts are loaded After the work is completed, the output lifting cylinder 81 and the output telescopic cylinder 82 first drive the clamping arm 91 to clamp the hanging seat 62, and then the output shaft of the output lifting cylinder 81 is extended to move the net basket 6 out of the corresponding trough body or box body, and move the hanging arm to the transmission slot 31, and then the output shaft of the output telescopic cylinder 82 is shortened to move the net basket 6 away from above the electroplating tank 11; when the net basket 6 is moved away from above the electroplating tank 11, the output shaft of the output lifting cylinder 81 continues to extend until the lap arm 64 is inserted into the transmission slot 31 and the end of the lap arm 64 is aligned with the guide slot 4, and then the output shaft of the extending telescopic cylinder is extended to move the net basket 6 to the loading position 411, and finally the clamping arm 91 is separated from the hanging seat 62, so that the lap arm 64 is inserted into the guide slot 4.

[0041] When there is only one spray box 141, the process of moving the net basket 6 from the conveying rack 3 to the spray box 141 is as follows: the input lifting cylinder 71 and the input telescopic cylinder 72 first drive the clamping arm 91 to clamp the hanging seat 62 on the conveying rack 3, and then the output shaft of the input lifting cylinder 71 is shortened to separate the net basket 6 from the conveying rack 3; then the net basket 6 is manually removed from the clamping arm 91, and the automobile metal parts in the net basket 6 are manually placed in the spray box 141 for spraying; when the spraying of the automobile metal parts is completed, the finished automobile metal parts with completed surface treatment are manually taken out.

[0042] When there are two or more spray boxes 141, the process of moving the net basket 6 from the conveying rack 3 to the spray box 141 is as follows: the input lifting cylinder 71 and the input telescopic cylinder 72 first drive the clamping arm 91 to clamp the hanging seat 62 on the conveying rack 3, and then the output shaft of the input lifting cylinder 71 is shortened to move the overlapping arm 64 to the bottom of the conveying rack 3, and then the output shaft of the input telescopic cylinder 72 is shortened; when the net basket 6 moves to the top of the corresponding trough body or box body, the net basket 6 is manually removed from the clamping arm 91, and then the automobile metal parts in the net basket 6 are manually placed in the spray box 141 for spraying; when the spraying of the automobile metal parts is completed, the finished automobile metal parts with completed surface treatment are manually taken out.

[0043] In order to make the clamping arm 91 clamp the mounting seat 62, refer to Figures 1 to 7, a driving groove 92 is provided on the clamping seat 9, a driving motor 921 is installed in the driving groove 92, a forward screw rod 922 is installed on the output shaft of the driving motor 921, a reverse screw rod 923 is installed on the forward screw rod 922, and the reverse screw rod 923 is rotatably connected to the inner wall of the driving groove 92. The forward screw rod 922 and the reverse screw rod 923 are both threadedly connected to the driving block 924, and the driving block 924 is slidably arranged in the driving groove 92. One of the driving blocks 924 is welded to one of the clamping arms 91, and the other driving block 924 is welded to the other clamping arm 91. A clamping groove 911 is provided on the opposite surface of the clamping arm 91, and a plurality of clamping cylinders 912 are installed on the opposite surface of the clamping groove 911, and a clamping plate 913 is installed on the output shaft of the clamping cylinder 912. The driving motor 921 is started to drive the forward screw rod 922 and the reverse screw rod 923 to rotate synchronously. Since the threads of the forward screw rod 922 and the reverse screw rod 923 are opposite, the clamping arms 91 can move closer to or farther away from each other synchronously, and cooperate with the output shaft of the clamping cylinder 912 to drive the clamping plate 913 to move, so that the clamping plate 913 can abut against the side wall of the hanging seat 62, thereby achieving the purpose of the clamping arm 91 clamping the hanging seat 62.

[0044] In order to reduce the interference between the net basket 6 and the input lifting cylinder 71, the input telescopic cylinder 72, the output lifting cylinder 81 and the output telescopic cylinder 82, refer to Figures 1 to 4The guide groove 4 includes a first horizontal section 41, a second vertical section 42, a third horizontal section 43 and a fourth vertical section 44. The first horizontal section 41, the second vertical section 42, the third horizontal section 43 and the fourth vertical section 44 are connected in sequence. The first horizontal section 41 and the third horizontal section 43 are both arranged horizontally, and the second vertical section 42 and the fourth vertical section 44 are both arranged vertically. The input end of the first horizontal section 41, the output end of the first horizontal section 41 and the input end of the second vertical section 42 are located at the same height, the input end of the second vertical section 42 is located above the output end of the second vertical section 42, the output end of the second vertical section 42, the input end of the third horizontal section 43, the output end of the third horizontal section 43 and the input end of the fourth vertical section 44 are located at the same height, and the input end of the fourth vertical section 44 is located above the output end of the fourth vertical section 44. The height difference between the input end of the second vertical section 42 and the output end of the second vertical section 42 is greater than the distance between the top of the lap arm 64 and the bottom of the net basket 6, and the height difference between the input end of the fourth vertical section 44 and the output end of the fourth vertical section 44 is greater than the distance between the top of the lap arm 64 and the bottom of the net basket 6. The input telescopic cylinder 72 is located below the first horizontal section 41, and the length of the input telescopic cylinder 72 is less than the length of the first horizontal section 41. The output telescopic cylinder 82 is located below the third horizontal section 43, and the length of the output telescopic cylinder 82 is less than the length of the third horizontal section 43. One of the upper belt grooves 51 is located in the first horizontal section 41, and the other upper belt groove 51 is located in the third horizontal section 43; one of the lower belt grooves 52 is located in the first horizontal section 41, and the other lower belt groove 52 is located in the third horizontal section 43. The input end of the first horizontal section 41 is the upper material position 411, and the output end of the fourth vertical section 44 is the lower material position 441. The unloading position 441 of the conveyor rack 3 is arranged directly below the loading position 411 of the adjacent conveyor rack 3, and the unloading position 441 of the conveyor rack 3 and the loading position 411 of the conveyor rack 3 are both located on the rotation axis. When the net basket 6 is circulated in the adjacent processes, it moves along the first horizontal section 41, the second vertical section 42, the third horizontal section 43 and the fourth vertical section 44 in sequence. In the first horizontal section 41 and the third horizontal section 43, the net basket 6 drives the overlapping arm 64 through the belt conveyor 5 to move to the second vertical section 42 and the fourth vertical section 44, and the net basket 6 falls by its own weight. The height difference between the loading position 411 and the unloading position 441 provides clearance space for the input lifting cylinder 71, the input telescopic cylinder 72, the output lifting cylinder 81 and the output telescopic cylinder 82.

[0045] Reference Figures 1 to 8 , the embodiment of the present application discloses a working method of a surface treatment device for automobile metal parts, comprising the following steps.

[0046] Step S1, device initialization setting, step S1 includes the following steps.

[0047] Step S11: Test and obtain the time length of the workpiece placed in the electroplating tank 11. ; The test shows that the workpiece is immersed in the electroplating tank 11 for a period of ; The test shows that the time it takes for the workpiece to move from the electroplating tank 11 to the loading position 411 above the electroplating tank 11 is The test shows that the time it takes for the workpiece to move from the upper material position 411 above the electroplating tank 11 to the lower material position 441 above the cleaning seat 12 is The test shows that the time it takes for the workpiece to move from the unloading position 441 above the cleaning seat 12 to the cleaning box 121 is ; The test shows that the time for the workpiece to be cleaned in the cleaning box 121 is The test shows that the time it takes for the workpiece to move from the cleaning box 121 to the loading position 411 above the cleaning seat 12 is The test shows that the time it takes for the workpiece to move from the upper material position 411 above the cleaning seat 12 to the lower material position 441 above the air drying seat 13 is The test shows that the time it takes for the workpiece to move from the unloading position 441 above the air-drying seat 13 to the air-drying box 131 is The test results show that the workpiece is dried in the air drying box 131 for The test shows that the time it takes for the workpiece to move from the air drying box 131 to the loading position 411 above the air drying seat 13 is The test shows that the time it takes for the workpiece to move from the upper material position 411 above the air drying seat 13 to the lower material position 441 above the spraying seat 14 is The test results show that the time it takes for the workpiece to move from the top of the spraying seat 14 to the spraying box 141 is The test shows that the workpiece is sprayed in the spray box 141 for a period of The test shows that the time it takes for the workpiece to move from the spray box 141 to the material loading position 411 above the spray seat 14 is ; Step S12: Calculate the workpiece electroplating process time T1. ; Calculate the workpiece cleaning process time T2, ; Calculate the workpiece air-drying process time T3, ; Calculate the workpiece spraying process time T4, ; Step S13: Utilize , the number K2 of the cleaning boxes 121, the number K3 of the air drying boxes 131 and the number K4 of the spraying boxes 141 are calculated; Step S14, correspondingly install the cleaning boxes 121, the air-drying boxes 131 and the spraying boxes 141 according to the number K2 of the cleaning boxes 121, the number K3 of the air-drying boxes 131 and the number K4 of the spraying boxes 141.

[0048] Step S2, the electroplating tank 11 is started, and the electroplating tank 11 is started at .

[0049] Step S3: start the cleaning seat 12 and the cleaning box 121. The start time of the cleaning seat 12 and the cleaning box 121 is ,and In step S3, the cleaning seat 12 is cleaned every The duration rotates at a speed of ω2 Duration, including .

[0050] Step S4, the air drying seat 13 and the air drying box 131 are started, and the start time of the air drying seat 13 and the air drying box 131 is ,and . Air drying seat 13 per interval The duration rotates at a speed of ω3 Duration, including .

[0051] Step S5, the spraying seat 14 and the spraying box 141 are started, and the spraying seat 14 and the spraying box 141 are started at ,and In step S5, the spraying seat 14 is spaced The duration rotates at a speed of ω4 Duration, including .

[0052] Step S6: The first workpiece to be processed is placed in the equipment. The time when the workpiece to be processed is placed in the equipment is ,in, .

[0053] Step S7: after an interval of time T1, the next workpiece to be processed is placed into the equipment, and it is detected whether all the workpieces to be processed are placed into the equipment.

[0054] Step S8: If all the workpieces to be processed are placed in the equipment, proceed to step S9; if not all the workpieces to be processed are placed in the equipment, proceed to step S7.

[0055] Step S9: the equipment continues to run until the last workpiece to be processed is output from the equipment, and then the equipment stops running.

[0056] Reference Figures 1 to 9 , the embodiment of the present application discloses a method for surface treatment of automobile metal parts, comprising the following steps.

[0057] Step 1, electroplating process: the pre-treated workpiece is placed in the electroplating tank 11, and the workpiece is electroplated in the electroplating tank 11. After the electroplating is completed, the workpiece is moved from the electroplating tank 11 to the loading position 411 above the electroplating tank 11. The workpiece electroplating process lasts for T1. , wherein the time for which the workpiece is placed in the electroplating tank 11 is The workpiece is immersed in the electroplating tank 11 for a period of ; The test shows that the time it takes for the workpiece to move from the electroplating tank 11 to the loading position 411 above the electroplating tank 11 is .

[0058] Step 2: The workpiece is moved from the loading position 411 above the electroplating tank 11 to the unloading position 441 above the cleaning seat 12. The time for the workpiece to move from the loading position 411 above the electroplating tank 11 to the unloading position 441 above the cleaning seat 12 is .

[0059] Step 3, cleaning process: the workpiece is moved from the unloading position 441 above the cleaning seat 12 into the cleaning box 121, and the workpiece is cleaned in the cleaning box 121. After the workpiece is cleaned, it is moved from the cleaning box 121 to the loading position 411 above the cleaning seat 12. The duration of the workpiece cleaning process is T2. , wherein the time length for the workpiece to move from the unloading position 441 above the cleaning seat 12 into the cleaning box 121 is The workpiece is cleaned in the cleaning box 121 for The time it takes for the workpiece to move from the cleaning box 121 to the loading position 411 above the cleaning seat 12 is .

[0060] Step 4: The workpiece is moved from the loading position 411 above the cleaning seat 12 to the unloading position 441 above the air-drying seat 13. The time for the workpiece to move from the loading position 411 above the cleaning seat 12 to the unloading position 441 above the air-drying seat 13 is .

[0061] Step 5, air drying process: the workpiece is moved from the unloading position 441 above the air drying seat 13 into the air drying box 131, and the workpiece is air dried in the air drying box 131. After the workpiece is air dried, it is moved from the air drying box 131 to the loading position 411 above the air drying seat 13. The workpiece air drying process takes T3. , wherein the time length for the workpiece to move from the unloading position 441 above the air-drying seat 13 into the air-drying box 131 is The workpiece is dried in the air drying box 131 for The time it takes for the workpiece to move from the air drying box 131 to the loading position 411 above the air drying seat 13 is .

[0062] Step 6: The workpiece is moved from the loading position 411 above the air-drying seat 13 to the unloading position 441 above the spraying seat 14. The time for the workpiece to move from the loading position 411 above the air-drying seat 13 to the unloading position 441 above the spraying seat 14 is .

[0063] Step 7, spraying process: the workpiece is moved from the unloading position 441 above the spraying seat 14 into the spraying box 141, and the workpiece is sprayed in the spraying box 141. After the workpiece is sprayed, it is moved from the spraying box 141 to the loading position 411 above the spraying seat 14. The duration of the workpiece spraying process is T4. , wherein the time length for the workpiece to move from the unloading position 441 above the spraying seat 14 into the spraying box 141 is The workpiece is sprayed in the spray box 141 for a period of The workpiece moves from the spray box 141 to the material position 411 above the spray seat 14 for a period of time .

[0064] Step eight, the finished product is removed from the loading position 411 above the spraying seat 14.

[0065] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. An automobile metal parts surface treatment equipment, comprising a machine base, on which a plating tank, a cleaning seat, an air drying seat and a spraying seat are arranged in sequence, and the plating tank is fixedly connected to the machine base, characterized in that: The cleaning seat, air-drying seat and spraying seat are all rotatably connected to the machine base. A plurality of cleaning boxes are arranged on the cleaning seat, a plurality of air-drying boxes are arranged on the air-drying seat, a plurality of spraying boxes are arranged on the spraying seat, and a conveying rack is arranged above the electroplating tank, the cleaning box and the air-drying box. A conveying through groove is provided on the conveying rack, and a group of guide grooves are provided on the inner wall of the conveying through groove. The guide grooves are arranged relatively to each other. A plurality of net baskets are movably arranged on the conveying rack, and the net baskets are used to place workpieces.

2. The surface treatment equipment for automobile metal parts according to claim 1, characterized in that: The number of the electroplating tanks is K1, K1 is 1, the duration of the workpiece electroplating process is T1, the number of the cleaning boxes is K2, the duration of the workpiece cleaning process is T2, the number of the air drying boxes is K3, the duration of the workpiece air drying process is T3, the number of the spraying boxes is K4, the duration of the workpiece spraying process is T4, .

3. The surface treatment equipment for automobile metal parts according to claim 1, characterized in that: A rotating top seat is fixedly arranged at the bottom of the cleaning seat, the air-drying seat and the spraying seat, a rotating base is arranged under the rotating top seat, the rotating base is fixedly connected to the machine base, a motor slot is arranged on the top of the rotating base, a rotating motor is fixedly arranged in the motor slot, the output shaft of the rotating motor is fixedly connected to the bottom of the rotating top seat, and the rotating motors are equidistantly distributed along the machine base.

4. The surface treatment equipment for automobile metal parts according to claim 1, characterized in that: The cleaning boxes are distributed in a circular array on the cleaning seat with the rotation axis of the cleaning seat as the center, and the distances between adjacent cleaning boxes are equal; the air-drying boxes are distributed in a circular array on the air-drying seat with the rotation axis of the air-drying seat as the center, and the distances between adjacent air-drying boxes are equal; the spraying boxes are distributed in a circular array on the spraying seat with the rotation axis of the spraying seat as the center, and the distances between adjacent spraying boxes are equal.

5. The surface treatment equipment for automobile metal parts according to claim 1, characterized in that: A group of upper belt grooves and a group of lower belt grooves are provided in the guide groove, the upper belt groove is located above the lower belt groove, and belt conveyors are fixedly arranged in the upper belt groove and the lower belt groove, and the opposite surfaces of the belt conveyors are flush with the inner wall of the guide groove; a hanging frame is fixedly arranged on the net basket, and a hanging seat is fixedly arranged on the hanging frame; a group of movable grooves are provided on the top of the hanging seat, and movable arms are slidably arranged in the movable grooves, and a lap arm is fixedly arranged on the back side of the movable arm, and the lap arm is used to be inserted in the guide groove at one end away from the movable arm; a pressing groove is provided on the inner wall of the movable groove, and the pressing groove passes through the side wall of the hanging seat, and a pressing block is slidably arranged in the pressing groove, and the pressing block is fixedly connected to the movable arm, a pressing spring is fixedly arranged between one end of the pressing block and the inner wall of the movable groove, and the other end of the pressing block is used to protrude from the side wall of the hanging seat.

6. The surface treatment equipment for automobile metal parts according to claim 5, characterized in that: An input lifting cylinder is arranged on the cleaning seat, air-drying seat and spraying seat, and an output lifting cylinder is arranged on the electroplating tank, cleaning seat and air-drying seat. The input lifting cylinder and the output lifting cylinder are both detachably connected to the machine base. An input telescopic cylinder is arranged on the output shaft of the input lifting cylinder, and an output telescopic cylinder is arranged on the output shaft of the output lifting cylinder. The output shafts of the input telescopic cylinder and the output shafts of the output telescopic cylinder are both oriented toward the output axis of the rotating motor. A clamping seat is fixedly arranged on the output shafts of the input telescopic cylinder and the output shafts of the output telescopic cylinder, and a group of clamping arms are slidably arranged on the clamping seat, and the clamping arms are used to clamp the hanging seat.

7. The surface treatment equipment for automobile metal parts according to claim 6, characterized in that: The clamping seat is provided with a driving groove, a driving motor is fixedly arranged in the driving groove, a forward screw is fixedly arranged on the output shaft of the driving motor, a reverse screw is fixedly arranged on the forward screw, the reverse screw is rotatably connected to the inner wall of the driving groove, the forward screw and the reverse screw are both threadedly connected with driving blocks, the driving blocks are slidably arranged in the driving groove, one of the driving blocks is fixedly connected to one of the clamping arms, and the other driving block is fixedly connected to the other clamping arm, a clamping groove is provided on the opposite surface of the clamping arm, a plurality of clamping cylinders are fixedly arranged on the opposite surface of the clamping groove, and a clamping plate is fixedly arranged on the output shaft of the clamping cylinder.

8. The surface treatment equipment for automobile metal parts according to claim 5, characterized in that: The guide groove includes a first horizontal section, a second vertical section, a third horizontal section and a fourth vertical section, the first horizontal section, the second vertical section, the third horizontal section and the fourth vertical section are connected in sequence, the first horizontal section and the third horizontal section are both horizontally arranged, the second vertical section and the fourth vertical section are both vertically arranged, one of the upper belt grooves is located in the first horizontal section, and the other upper belt groove is located in the third horizontal section, one of the lower belt grooves is located in the first horizontal section, and the other lower belt groove is located in the third horizontal section, the input end of the first horizontal section is the upper material position, and the output end of the fourth vertical section is the lower material position, the lower material position of the conveying rack is arranged directly below the upper material position of the adjacent conveying rack, and the lower material position of the conveying rack and the upper material position of the conveying rack are both located on the rotation axis.

9. The surface treatment equipment for automobile metal parts according to claim 8, characterized in that: The input end of the first horizontal section, the output end of the first horizontal section and the input end of the second vertical section are located at the same height, the input end of the second vertical section is located above the output end of the second vertical section, the output end of the second vertical section, the input end of the third horizontal section, the output end of the third horizontal section and the input end of the fourth vertical section are located at the same height, the input end of the fourth vertical section is located above the output end of the fourth vertical section, the height difference between the input end of the second vertical section and the output end of the second vertical section is greater than the distance between the top of the lap arm and the bottom of the basket, the height difference between the input end of the fourth vertical section and the output end of the fourth vertical section is greater than the distance between the top of the lap arm and the bottom of the basket, the input telescopic cylinder is located below the first horizontal section, and the length of the input telescopic cylinder is less than the length of the first horizontal section, the output telescopic cylinder is located below the third horizontal section, and the length of the output telescopic cylinder is less than the length of the third horizontal section.

10. The surface treatment equipment for automobile metal parts according to claim 1, characterized in that: The working method of the device comprises the following steps: Step S1, device initialization settings; Step S2: start the electroplating tank. The start time of the electroplating tank is ; Step S3: start the cleaning seat and the cleaning box. The start time of the cleaning seat and the cleaning box is ,and ; Step S4: Start the air drying seat and the air drying box. The start time of the air drying seat and the air drying box is ,and ; Step S5: start the spraying seat and the spraying box. The start time of the spraying seat and the spraying box is ,and ; Step S6: The first workpiece to be processed is placed in the equipment. The time when the workpiece to be processed is placed in the equipment is ,in, ; Step S7, after an interval of T1, the next workpiece to be processed is placed in the equipment, and it is checked whether all the workpieces to be processed are placed in the equipment; Step S8: If all the workpieces to be processed are placed in the equipment, proceed to step S9; if not all the workpieces to be processed are placed in the equipment, proceed to step S7; Step S9: the equipment continues to run until the last workpiece to be processed is output from the equipment, and then the equipment stops running.

11. The surface treatment equipment for automobile metal parts according to claim 10, characterized in that: The step S1 comprises the following steps: Step S11: Test and obtain the time for the workpiece to be placed in the electroplating tank. ; The test shows that the workpiece is immersed in the electroplating tank for a period of time ; The test shows that the time it takes for the workpiece to move from the electroplating tank to the loading position above the electroplating tank is ; The test shows that the time it takes for the workpiece to move from the loading position above the electroplating tank to the unloading position above the cleaning seat is ; The test shows that the time it takes for the workpiece to move from the top of the cleaning seat to the cleaning box is ; The test shows that the workpiece is cleaned in the cleaning box for ; The test shows that the time it takes for the workpiece to move from the cleaning box to the loading position above the cleaning seat is ; The test shows that the time it takes for the workpiece to move from the upper material position above the cleaning seat to the lower material position above the air drying seat is ; The test shows that the time it takes for the workpiece to move from the top of the air-drying seat to the air-drying box is ; The test shows that the workpiece takes about 2 hours to dry in the air drying oven. ; The test shows that the time it takes for the workpiece to move from the air drying box to the loading position above the air drying seat is ; The test shows that the time it takes for the workpiece to move from the upper material position above the air drying seat to the lower material position above the spraying seat is ; The test shows that the time it takes for the workpiece to move from the top of the spray seat to the spray box is ; The test shows that the workpiece is sprayed in the spray box for a period of time ; The test shows that the time it takes for the workpiece to move from the spray box to the loading position above the spray seat is ; Step S12: Calculate the workpiece electroplating process time T1. ; Calculate the workpiece cleaning process time T2, ; Calculate the workpiece air-drying process time T3, ; Calculate the workpiece spraying process time T4, ; Step S13: Utilize , the number of cleaning boxes K2, the number of air drying boxes K3 and the number of spraying boxes K4 are calculated; Step S14, install the cleaning boxes, air drying boxes and spraying boxes accordingly according to the number of cleaning boxes K2, the number of air drying boxes K3 and the number of spraying boxes K4.

12. The surface treatment equipment for automobile metal parts according to claim 10, characterized in that: In step S3, each interval of the cleaning seat The duration rotates at a speed of ω2 Duration, including ; In step S4, each interval of the air-drying seat The duration rotates at a speed of ω3 Duration, including In step S5, each interval of the spraying seat The duration rotates at a speed of ω4 Duration, including .

13. A method for surface treatment of automobile metal parts, used in the surface treatment equipment for automobile metal parts according to any one of claims 1 to 12, characterized in that: The following steps are involved: Step 1, electroplating process: the pre-treated workpiece is placed in the electroplating tank, and the workpiece is electroplated in the electroplating tank. After the electroplating is completed, the workpiece is moved from the electroplating tank to the loading position above the electroplating tank. The workpiece electroplating process takes T1. , where the time the workpiece is placed in the electroplating tank is ; The workpiece is immersed in the electroplating tank for ; The test shows that the time it takes for the workpiece to move from the electroplating tank to the loading position above the electroplating tank is ; Step 2: The workpiece is moved from the loading position above the electroplating tank to the unloading position above the cleaning seat. The time it takes for the workpiece to move from the loading position above the electroplating tank to the unloading position above the cleaning seat is ; Step 3, cleaning process: the workpiece is moved into the cleaning box from the unloading position above the cleaning seat, and the workpiece is cleaned in the cleaning box. After the workpiece is cleaned, it is moved from the cleaning box to the loading position above the cleaning seat. The duration of the workpiece cleaning process is T2. , where the time it takes for the workpiece to move from the top of the cleaning seat to the cleaning box is ; The workpiece is cleaned in the cleaning box for ; The time it takes for the workpiece to move from the cleaning box to the loading position above the cleaning seat is ; Step 4: The workpiece is moved from the loading position above the cleaning seat to the unloading position above the air drying seat. The time it takes for the workpiece to move from the loading position above the cleaning seat to the unloading position above the air drying seat is ; Step 5, air drying process: the workpiece is moved into the air drying box from the unloading position above the air drying seat, and the workpiece is air dried in the air drying box. After the workpiece is air dried, it is moved from the air drying box to the loading position above the air drying seat. The workpiece air drying process takes T3. , where the time it takes for the workpiece to move from the top of the air-drying seat to the air-drying box is ; The workpiece is dried in the air drying box for ; The time it takes for the workpiece to move from the air drying box to the loading position above the air drying seat is ; Step 6: The workpiece is moved from the loading position above the air drying seat to the unloading position above the spraying seat. The time it takes for the workpiece to move from the loading position above the air drying seat to the unloading position above the spraying seat is ; Step 7, spraying process: the workpiece is moved into the spray box from the unloading position above the spray seat, and the workpiece is sprayed in the spray box. After the workpiece is sprayed, it is moved from the spray box to the loading position above the spray seat. The workpiece spraying process takes T4. , where the time it takes for the workpiece to move from the top of the spraying seat to the spraying box is ; The workpiece is sprayed in the spray box for ; The time it takes for the workpiece to move from the spray box to the loading position above the spray seat is ; Step 8. The finished product is moved out from the loading position above the spraying seat.

Citation Information

Patent Citations

  • Continuous coating production line

    CN116445881A

  • Automatic spraying mechanism for plate processing and using method thereof

    CN118491754A

  • Anti-oxidation treatment device for metal part machining

    CN216514231U

  • Surface grafting equipment for keeping warm of nano water-repellent down feather

    CN217127753U

  • Process and apparatus for spray-coating of hollow workpieces

    EP0420038A2