Silt dam system and control system thereof

By designing a silt dam system including shore gates, silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-silt-s

CN119877454APending Publication Date: 2025-04-25INNER MONGOLIA UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311387231.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-10-24
Publication Date
2025-04-25

AI Technical Summary

Technical Problem

The water resource utilization rate in the Yellow River's "Jiziwan" area is low. While intercepting silt and sediment and maintaining water and soil, the silt dam system has brought about problems such as hydrological circulation, efficient use of water resources and surrounding ecological governance.

Method used

A silt dam system is designed, including shore gates, silt area gates and buffer gates, forming a water storage canal, and water flow filtering and diversion is carried out through shore water passing pipes, silt area water passing pipes and buffer area water passing pipes to reduce the adverse impact of water impact on the planting area.

Benefits of technology

Through this system, the utilization rate of water resources has been improved, reducing the adverse impact of water impact on the planting area, and enhancing the overall, economic and ecological nature of the silt dam.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119877454A_ABST
    Figure CN119877454A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of water and soil treatment, in particular to a silt dam system and a control system thereof, in the first direction, a silt accumulation area gate is arranged between a silt dam and a buffer area gate, and a water storage ditch comprises a silt accumulation area, a buffer area and a planting area; the silt accumulation area is located between the silt dam and the silt accumulation area gate, the buffer area is located between the silt accumulation area gate and the buffer area gate, the planting area is located on the side, away from the silt dam, of the buffer area gate, and the first direction is the length direction of the water storage channel. The invention aims to provide a silt dam system and a control system thereof in order to solve at least one technical problem related in the background technology.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of soil and water management, and in particular to a silt dam system and a control system thereof. Background Art

[0002] The hinterland of the "Ji Zi Bay" of the Yellow River is short of water resources and unevenly distributed in time and space. It is a structural and engineering water-deficient area. Therefore, the water resource utilization rate in the "Ji Zi Bay" area of ​​the Yellow River has become a key issue that needs to be solved urgently. As a relatively common soil and water conservation project in the Loess Plateau, the silt dam system not only plays the role of intercepting sediment, maintaining water and soil, and preventing floods and ensuring harvest, but also brings new challenges to hydrological cycles, efficient use of water resources, and surrounding ecological governance. If these problems can be solved in time, the silt dam in the "Ji Zi Bay" area of ​​the Yellow River will be more global, economical, and ecological. Among them, the efficient use of water resources is the most urgent problem to be solved. Summary of the invention

[0003] The purpose of the present application is to provide a silt dam system and a control system thereof in view of at least one technical problem involved in the background technology.

[0004] In order to achieve the above objectives, this application adopts the following technical solutions:

[0005] One aspect of the present application provides a silt dam system, comprising a silt dam, a bank gate, a silt accumulation area gate, and a buffer zone gate, all of which are used to be set between two adjacent watershed mountains. The bank gate, the silt accumulation area gate, and the buffer zone gate are all located upstream of the silt dam. A water storage channel is formed between the two adjacent watershed mountains. The two bank gates are used to be set on both sides of the water storage channel in a one-to-one correspondence. The bank gates extend along a first direction.

[0006] The siltation area gate and the buffer area gate are both arranged in the water storage channel, and the siltation area gate and the buffer area gate are both arranged between the two bank gates. In the first direction, the siltation area gate is arranged between the siltation dam and the buffer area gate.

[0007] The water storage channel includes a siltation area, a buffer area and a planting area. The siltation area is located between the siltation dam and the siltation area gate, the buffer area is located between the siltation area gate and the buffer area gate, and the planting area is located on the side of the buffer area gate away from the siltation dam. The first direction is the length direction of the water storage channel.

[0008] Optionally, the silt dam system provided in the present application further includes a plurality of shore water pipes, each of which is arranged in the first direction, one end of the shore water pipe passes through the shore gate, and the other end of the shore water pipe extends to the siltation area.

[0009] The beneficial effect of this technical solution is that by setting up a shore water pipe, the water initially filtered by the shore gate can be diverted to the siltation area, so that when the precipitation is large, the water flowing down from the diversion mountain will not easily cross the gate and directly impact the buffer zone and the plant area, thereby reducing the adverse effects of water impact on the plant area.

[0010] Optionally, the siltation dam system provided in the present application further includes a plurality of siltation area water pipes, each of which is arranged in the second direction, one end of the siltation area water pipe passes through the siltation area gate, and the other end of the siltation area water pipe extends to the buffer zone, the diameter of the siltation area water pipe is smaller than the diameter of the shore water pipe, and the second direction is the arrangement direction of the two shore gates; and / or,

[0011] The silt dam system also includes a plurality of buffer zone water pipes, each of which is arranged in the second direction, one end of the buffer zone water pipe passes through the buffer zone gate, and the other end of the buffer zone water pipe extends to the planting area, and the diameter of the buffer zone water pipe is smaller than the diameter of the siltation zone water pipe.

[0012] The beneficial effect of this technical solution is that the silt in the siltation area settles downward, and the relatively clean water overflows into the buffer zone through the water pipe in the siltation area, making it impossible for larger debris to enter the buffer zone through the water pipe in the siltation area; the water pipe in the buffer zone further filters the water entering the planting area from the buffer zone.

[0013] Optionally, the silt dam system provided in the present application further includes a data collection processor, a spillway and a stepped water discharge device installed in the siltation area, the stepped water discharge device includes a stepped body and a plurality of drainage well assemblies, the stepped body includes a plurality of steps, and each of the drainage well assemblies is installed one by one on each of the steps, the stepped water discharge device and the spillway are respectively located on opposite sides of the silt dam, and each of the drainage well assemblies is connected to the spillway, the data collection processor is installed on the stepped body, and the stepped water discharge device is communicatively connected to the data collection processor.

[0014] The beneficial effect of this technical solution is that as the liquid level in the siltation area rises to the height of a certain step, the water in the siltation area can be discharged from the drainage well assembly on the step and the drainage well assembly on the step below the step, so that the water entering the siltation area is not easy to enter the buffer zone and the planting area in large quantities at one time, which will have an adverse effect on the crops in the planting area.

[0015] Optionally, the drainage well assembly includes a well body, a blockage monitor, a clearing agent storage box, a water pump and a nozzle; the blockage monitor and the clearing agent storage box are both installed on the inner wall of the well body; the water pump is installed inside the clearing agent storage box; the nozzle is connected to the water pump and is used to spray the clearing agent into the well body; and the blockage monitor and the water pump are both communicatively connected to the data collection processor.

[0016] The beneficial effect of this technical solution is that when the clogging monitor detects clogging in the well body, the clogging monitor transmits the clogging signal to the data collection processor, and the data collection processor controls the water pump to spray the dredging agent in the dredging agent storage box into the well body through the nozzle, thereby dredging the drainage well.

[0017] Optionally, the silt dam system provided in the present application further includes a spiral dredging assembly and a slider drive controller both installed in the silt accumulation area, the spiral dredging assembly including a first support seat, a first track, a first sliding block, a first lifting rod, a first lifting drive, a first rotating drive and a spiral blade, the first track is fixed to the first support seat, the first track is horizontally arranged above the stepped water discharge device, the extension direction of the first track is the same as the arrangement direction of each step on the stepped body, the first sliding block slides with the first track, the first lifting rod and the first lifting drive are both installed on the first sliding block, the first lifting rod is vertically arranged, the first lifting drive is used to drive the first lifting rod to move in the vertical direction, the bottom end of the first lifting rod is connected to the first rotating drive, the output shaft of the first rotating drive is fixedly connected to the spiral blade, the spiral blade is used to extend into the well body, and the slider drive controller is communicatively connected to the data collection processor, the first lifting drive and the first rotating drive.

[0018] The beneficial effect of this technical solution is that when serious blockage occurs in the well body, the slider drive controller receives the data collection processor instruction, controls the first sliding block to move to the designated well body, controls the first lifting drive member to drive the first lifting rod to move vertically, and controls the first rotating drive member to drive the spiral blade to dredge the corresponding drainage well.

[0019] Optionally, the spiral dredging assembly also includes a manhole cover suction cup, a second sliding block, a second lifting drive member and a second lifting rod, the second sliding block slidingly cooperates with the first track, the second lifting drive member and the second lifting rod are both installed on the second sliding block, the second lifting drive member is used to drive the second lifting rod to move in a vertical direction, the manhole cover suction cup is fixed to the bottom end of the second lifting rod, the drainage well also includes a manhole cover that is detachably installed on the port of the well body, the manhole cover suction cup is an electromagnetic member for adsorbing the manhole cover, and the manhole cover suction cup, the second sliding block and the second lifting drive member are all communicatively connected to the slider drive controller.

[0020] The beneficial effect of this technical solution is that, in this way, when serious blockage occurs in the well body, the slider drive controller receives the data collection processor instruction, first controls the second sliding block to move to the designated well body, and controls the second lifting drive member to drive the second lifting rod to move vertically, the manhole cover suction cup moves to above the manhole cover, the manhole cover suction cup is energized to suck up the manhole cover through magnetic force, the slider drive controller continues to control the second sliding block to move away from the designated well body, controls the first sliding block to move to the designated well body, and controls the first lifting drive member to drive the first lifting rod to move vertically, and controls the first rotating drive member to drive the spiral blade to dredge the corresponding drainage well. After the dredging work is completed, the first sliding block is removed, and the second sliding block is controlled to replace the manhole cover to the designated well body.

[0021] Optionally, the spiral dredging assembly also includes a second support seat and a second track, the second track is fixed to the second support seat, the second track is horizontally arranged, and the second track is vertically connected to the first track, and the first sliding block and the second sliding block are both used to slide with the second track.

[0022] The beneficial effect of this technical solution is that the second track is provided to provide more moving space for the first sliding block and the second sliding block.

[0023] Optionally, the silt dam system provided in the present application further includes a water level monitor and a flood peak monitor, both of which are communicatively connected to the data collection processor, and the data collection processor, the water level monitor and the flood peak monitor are all installed at the top of the stepped body.

[0024] The beneficial effects of this technical solution are: the processor of the water level monitor analyzes the water level changes and rainfall, and the signal transmitter sends the analysis results to the data collection processor; the main function of the peak flood monitor is to monitor the peak flood situation during the flood season, and the water level height when the flood water level in previous years is the highest is input into the peak flood monitor, and the monitor is set to compare and analyze the current water level with the flood water level in previous years in real time to determine whether a flood disaster is likely to occur, and send the analysis results to the data collection processor so as to make decisions and early warnings in advance; the data collection processor, the main function is to collect and process the signals and data sent by the siltation monitor, water level monitor, peak flood monitor, etc., make decisions on how to deal with the siltation of drainage wells, extract the empirical relationship between rainfall and changes in water storage level and peak flood changes, make judgments on various situations, issue processing instructions, and realize automatic control.

[0025] The technical solution provided by this application can achieve the following beneficial effects:

[0026] The silt dam system and control system provided by the present application are that the water flowing down from the upstream of the water storage channel is gathered at the silt dam, and the water flowing down from the watershed mountain is also gathered at the silt dam. Whether it is the water flowing down from the upstream of the water storage channel or the water flowing down from the watershed mountain, the silt carried by it will be continuously washed to the silt dam and gradually accumulated in the siltation area. The water flowing down from the upper body of the watershed will carry a large amount of large branches, shrubs and other debris. The bank gates set on both sides of the water storage channel are used to intercept these branches, shrubs and other debris, and preliminarily filter the water flow. If there is too much silt in the siltation area, it will pass through the siltation area gate and enter the buffer zone. The siltation area gate will also filter the water flowing from the siltation area to the buffer zone and intercept larger debris. Setting up the buffer zone gate will intercept the water and silt moving from the buffer zone to the planting area to a certain extent, making it difficult for these water flows and silt to have a large impact on the planting area, thereby reducing the adverse effects on the growth of crops in the planting area. Cash crops such as agricultural crops can be planted in the planting area. These cash crops can provide convenience for the breeding and life of local managers, thereby improving the utilization rate of water resources.

[0027] The additional technical features and advantages of the present application will be more clearly explained in the following description, or can be understood through the specific practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the technical solutions of the specific implementation methods of the present application, the following is a brief introduction to the drawings required for the description of the specific implementation methods. Obviously, the drawings described below are some implementation methods of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0029] Figure 1 A partial structural schematic diagram of an implementation method of a silt dam system provided in an embodiment of the present application;

[0030] Figure 2 A partial structural schematic diagram of an implementation method of a stepped water discharge device provided in an embodiment of the present application;

[0031] Figure 3 A partial structural schematic diagram of an implementation method of a drainage well assembly provided in an embodiment of the present application;

[0032] Figure 4 A partial structural schematic diagram of an implementation method of a silt dam system provided in an embodiment of the present application;

[0033] Figure 5 A partial structural schematic diagram of an implementation method of a silt dam system provided in an embodiment of the present application;

[0034] Figure 6 A partial structural schematic diagram of an implementation method of a silt dam system provided in an embodiment of the present application;

[0035] Figure 7 A partial structural schematic diagram of an implementation method of a silt dam system provided in an embodiment of the present application;

[0036] Figure 8 A flow chart of an implementation method of a control method for a silt dam system provided in an embodiment of the present application;

[0037] Fig. 9 This is a logical control diagram of the smart system provided for the application example of this application.

[0038] Reference numerals:

[0039] 01- watershed mountain; 02- silt dam;

[0040] 03-Drip irrigation system; 04-Smart system;

[0041] 05-Ecological restoration system; 06-Soil condition detector;

[0042] 07- Water supply system; 08- Spillway;

[0043] 09- stepped body; 10- shore water pipe;

[0044] 11-shore gate; 12-scouring channel;

[0045] 13-buffer zone gate; 14-buffer zone water pipe;

[0046] 15- water pipe in siltation area; 16- planting area;

[0047] 17- buffer zone; 18- siltation zone gate;

[0048] 19-siltation area; 20-water level monitor;

[0049] 21- flood peak monitor; 22- data collection processor;

[0050] 23-well body; 24-well cover;

[0051] 25-dredging agent storage box; 26-dredging agent delivery pipeline;

[0052] 27- nozzle; 28- clogging monitor;

[0053] 29-first support seat; 30-slider drive controller;

[0054] 31-line; 32-first sliding block;

[0055] 33-first track; 34-second track;

[0056] 35-second support seat; 36-manhole cover suction cup;

[0057] 37- spiral blade; 38- capping of the well cover gap;

[0058] 39-first lifting rod; 40-second sliding block;

[0059] 41- Second lifting rod. DETAILED DESCRIPTION

[0060] The technical solution of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.

[0061] In the description of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present application. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0062] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0063] like Figures 1 to 7 As shown, one aspect of the present application provides a silt dam system, comprising a silt dam 02, a bank gate 11, a silt accumulation area gate 18 and a buffer zone gate 13, all of which are used to be set between two adjacent watershed mountains 01. The bank gate 11, the silt accumulation area gate 18 and the buffer zone gate 13 are all located upstream of the silt dam 02. A water storage channel is formed between the two adjacent watershed mountains 01. The two bank gates 11 are used to be set on both sides of the water storage channel in a one-to-one correspondence. The bank gates 11 extend along a first direction.

[0064] The siltation area gate 18 and the buffer area gate 13 are both arranged in the water storage channel, and the siltation area gate 18 and the buffer area gate 13 are both arranged between the two bank gates 11. In the first direction, the siltation area gate 18 is arranged between the siltation dam 02 and the buffer area gate 13.

[0065] The water storage channel includes a siltation area 19, a buffer area 17 and a planting area 16. The siltation area 19 is located between the siltation dam 02 and the siltation area gate 18. The buffer area 17 is located between the siltation area gate 18 and the buffer area gate 13. The planting area 16 is located on the side of the buffer area gate 13 away from the siltation dam 02. The first direction is the length direction of the water storage channel.

[0066] In the silt dam system provided by the present application, water flowing down from the upstream of the water storage channel is collected at the silt dam 02, and water flowing down from the watershed mountain 01 is also collected at the silt dam 02. Regardless of whether it is the water flowing down from the upstream of the water storage channel or the water flowing down from the watershed mountain 01, the silt carried by it will be continuously washed toward the silt dam 02 and gradually accumulated in the siltation area 19. The water flowing down from the upper body of the watershed will carry a large amount of large branches, shrubs and other debris. The bank gates 11 set on both sides of the water storage channel are used to intercept these branches, shrubs and other debris, and preliminarily filter the water flow to remove the silt in the siltation area 19. If the amount is excessive, it will pass through the siltation area gate 18 and enter the buffer zone 17. The siltation area gate 18 will also filter the water flowing from the siltation area 19 to the buffer zone 17 and intercept larger debris. The buffer zone gate 13 will intercept the water and silt moving from the buffer zone 17 to the planting area 16 to a certain extent, making it difficult for these water flows and silt to have a large impact on the planting area 16, thereby reducing the adverse effects on the growth of crops in the planting area 16. The planting area 16 can be used to plant cash crops such as agricultural crops, which can provide convenience for the breeding and life of local managers, thereby improving the utilization rate of water resources.

[0067] In the embodiment of the present application, preferably, scouring channels 12 are formed on both sides of the water storage channel. The scouring channels 12 mainly refer to the channels on both sides formed by scouring of water in the silt dam 02 area, which are formed by concrete hardening treatment in the later stage. The shore gate 11 is set on the scouring channel 12.

[0068] Optionally, the silt dam system provided in the embodiment of the present application further includes a plurality of bank water pipes 10, each of which is arranged in the first direction, one end of the bank water pipe 10 passes through the bank gate 11, and the other end of the bank water pipe 10 extends to the silt accumulation area 19. In the embodiment of the present application, the number of bank water pipes 10 is determined according to the size of the silt accumulation area 19. The larger the size of the silt accumulation area 19 in the first direction, the more the number of bank water pipes 10. For example, the number of bank water pipes 10 set on each side of the bank of the water storage channel can be 3 to 8, or 3, 4, or 5. By setting the bank water pipe 10, the water body preliminarily filtered by the bank gate 11 can be diverted to the silt accumulation area 19, so that when the precipitation is large, the water body flowing down from the water diversion mountain is not easy to cross the gate and directly impact the buffer zone 17 and the plant area, thereby reducing the adverse effects of water impact on the plant area.

[0069] Optionally, the siltation dam system provided in the embodiment of the present application further includes a plurality of siltation area water pipes 15, each of the siltation area water pipes 15 is arranged in the second direction, one end of the siltation area water pipe 15 passes through the siltation area gate 18, and the other end of the siltation area water pipe 15 extends to the buffer zone 17, the diameter of the siltation area water pipe 15 is smaller than the diameter of the shore water pipe 10, and the second direction is the arrangement direction of the two shore gates 11; and / or,

[0070] The silt dam system also includes a plurality of buffer zone water pipes 14, each of which is arranged in the second direction, one end of the buffer zone water pipe 14 passes through the buffer zone gate 13, and the other end of the buffer zone water pipe 14 extends to the planting area 16, and the diameter of the buffer zone water pipe 14 is smaller than the diameter of the siltation zone water pipe 15. In the embodiment of the present application, the number of siltation zone water pipes 15 can be determined according to the distance between the two banks of the water storage channel, and can be 5 to 15, for example, 6, 8, 10, 12 or 14, etc. The preferred number of siltation zone water pipes 15 is 10. The silt in the siltation zone 19 settles downward, and the relatively clean water overflows into the buffer zone 17 through the siltation zone water pipe 15, so that larger debris cannot enter the buffer zone 17 through the siltation zone water pipe 15.

[0071] In the embodiment of the present application, the number of buffer zone water pipes 14 can be determined according to the distance between the two banks of the water storage channel, and can be 5 to 15, for example, 6, 8, 10, 12 or 14, etc. The preferred number of buffer zone water pipes 14 is 10. The buffer zone water pipes 14 further filter the water entering the planting area 16 from the buffer zone 17.

[0072] Optionally, the silt dam system provided in the embodiment of the present application further includes a data collection processor 22, a spillway 08, and a stepped water discharge device installed in the silt accumulation area 19, the stepped water discharge device includes a stepped body 09 and a plurality of drainage well assemblies, the stepped body 09 includes a plurality of steps, each of the drainage well assemblies is installed on each of the steps in a one-to-one correspondence, the stepped water discharge device and the spillway 08 are respectively located on opposite sides of the silt dam 02, and each of the drainage well assemblies is connected to the spillway 08, the data collection processor 22 is installed on the stepped body 09, and the stepped water discharge device is connected to the data collection processor 22 in communication. In this way, as the liquid level in the silt accumulation area 19 rises to the height of a certain step, the water in the silt accumulation area 19 can be discharged from the drainage well assembly on the step and the drainage well assembly on the step below the step, so that the water entering the silt accumulation area 19 is not easy to enter the buffer zone 17 and the planting area 16 in large quantities at one time, which has an adverse effect on the crops in the planting area 16. In the embodiment of the present application, the number of steps on the stepped body 09 can be 2 to 5, for example, 3 or 4, and 3 steps are preferred in the embodiment of the present application. The water supply system 07 is located below the silt dam, mainly referring to a well, and its main function is to irrigate the surrounding economic crops in the season when the water source is not abundant, mainly supplying the planting area behind the dam and the planting area on the hillsides on both sides.

[0073] Optionally, the drainage well assembly includes a well body 23, a clogging monitor 28, a dredging agent storage box 25, a water pump and a nozzle 27. The clogging monitor 28 and the dredging agent storage box 25 are both installed on the inner wall of the well body 23. The water pump is installed inside the dredging agent storage box 25. The nozzle 27 is connected to the water pump. The nozzle 27 is used to spray the dredging agent into the well body 23. The clogging monitor 28 and the water pump are both connected to the data collection processor 22. When the clogging monitor 28 detects clogging in the well body 23, the clogging monitor 28 transmits a clogging signal to the data collection processor 22. The data collection processor 22 controls the water pump to spray the dredging agent in the dredging agent storage box 25 into the well body 23 through the nozzle 27, thereby dredging the drainage well. In the embodiment of the present application, the clogging monitor 28 includes a plurality of sensors, and the clogging monitor 28 may also be composed of a plurality of sensors. Specifically, the clogging monitor 28 includes a pipeline pressure sensor (using an existing sensor: Nanjing Zhongzhiyan Measurement and Control Technology Co., Ltd. ZZY-1 type), a pipeline water flow velocity meter (using an existing instrument: Nanjing Zhongzhiyan Measurement and Control Technology Co., Ltd. ZZY-2 type) and a signal transmitter. The drainage well assembly preferably also includes a dredging agent delivery pipeline 26, which is installed between the dredging agent storage box 25 and the shower-shaped nozzle 27, and its main function is to deliver the dredging agent to the nozzle 27.

[0074] Optionally, the silt dam system provided in the embodiment of the present application further includes a spiral dredging component and a slider drive controller 30 both installed in the silt accumulation area 19, the spiral dredging component includes a first support seat 29, a first track 33, a first sliding block 32, a first lifting rod 39, a first lifting drive member, a first rotating drive member and a spiral blade 37, the first track 33 is fixed to the first support seat 29, the first track 33 is horizontally arranged above the stepped water discharge device, the extension direction of the first track 33 is the same as the arrangement direction of each step on the stepped body 09, the first sliding block 32 is connected to the first lifting rod 39, the first lifting drive member, the first rotating drive member and the ... The first track 33 is slidably matched, the first lifting rod 39 and the first lifting drive are both installed on the first sliding block 32, the first lifting rod 39 is vertically arranged, the first lifting drive is used to drive the first lifting rod 39 to move in the vertical direction, the bottom end of the first lifting rod 39 is connected to the first rotating drive, the output shaft of the first rotating drive is fixedly connected to the spiral blade 37, the spiral blade 37 is used to extend into the well body 23, the slider drive controller 30 is in communication connection with the data collection processor 22, the first lifting drive and the first rotating drive. When a serious blockage occurs in the well body 23, the slider drive controller 30 receives the instruction of the data collection processor 22, controls the first sliding block 32 to move to the designated well body 23, controls the first lifting drive to drive the first lifting rod 39 to move vertically, and controls the first rotating drive to drive the spiral blade 37 to clear the corresponding drainage well.

[0075] Optionally, the spiral dredging assembly also includes a manhole cover suction cup 36, a second sliding block 40, a second lifting drive member and a second lifting rod 41. The second sliding block 40 is slidably matched with the first track 33. The second lifting drive member and the second lifting rod 41 are both installed on the second sliding block 40. The second lifting drive member is used to drive the second lifting rod 41 to move in the vertical direction. The manhole cover suction cup 36 is fixed to the bottom end of the second lifting rod 41. The drainage well also includes a manhole cover 24 that is detachably installed on the port of the well body 23. The manhole cover suction cup 36 is an electromagnetic member for adsorbing the manhole cover 24. The manhole cover suction cup 36, the second sliding block 40 and the second lifting drive member are all communicatively connected to the slider drive controller 30. In this way, when a serious blockage occurs in the well body 23, the slider drive controller 30 receives the instruction of the data collection processor 22, first controls the second sliding block 40 to move to the designated well body 23, and controls the second lifting drive to drive the second lifting rod 41 to move vertically, and the manhole cover suction cup 36 moves to the top of the manhole cover 24. The manhole cover suction cup 36 is energized to suck up the manhole cover 24 through magnetic force, and the slider drive controller 30 continues to control the second sliding block 40 to move away from the designated well body 23, controls the first sliding block 32 to move to the designated well body 23, and controls the first lifting drive to drive the first lifting rod 39 to move vertically, and controls the first rotating drive to drive the spiral blade 37 to dredge the corresponding drainage well. After the dredging work is completed, the first sliding block 32 is removed, and the second sliding block 40 is controlled to reposition the manhole cover 24 to the designated well body 23. The first sliding block 32 and the second sliding block 40 are both connected to the slider drive controller 30 through the line 31.

[0076] Optionally, the spiral dredging assembly further includes a second support seat 35 and a second track 34, wherein the second track 34 is fixed to the second support seat 35, the second track 34 is horizontally arranged, and the second track 34 is vertically connected to the first track 33, and the first sliding block 32 and the second sliding block 40 are both used for sliding cooperation with the second track 34. The second track 34 is provided to provide more moving space for the first sliding block 32 and the second sliding block 40. In the embodiment of the present application, the first sliding block 32 and the corresponding components installed on the first sliding block 32 form a unit, and each spiral dredging assembly may include one or more such units. Similarly, the second sliding block 40 and the corresponding components installed on the second sliding block 40 form a unit, and each spiral dredging assembly may include one or more such units.

[0077] In the embodiment of the present application, preferably, the silt dam system also includes a manhole cover gap capping 38, which is connected to the bottom end of the first lifting rod 39, and the first rotating drive member is installed on the manhole cover gap capping 38. The manhole cover gap capping 38 is used to cooperate with the port of the well body after the manhole cover 24 is removed, so that debris can fly out of the well body 23 when the spiral blade 37 rotates to clear.

[0078] Optionally, the silt dam system provided in the embodiment of the present application also includes a water level monitor 20 and a flood peak monitor 21, both of which are communicatively connected to the data collection processor 22, and the data collection processor 22, the water level monitor 20 and the flood peak monitor 21 are all installed at the top of the stepped body 09. In the embodiment of the present application, the water level monitor 20 preferably includes an electronic water gauge with equal precision of 0.5 cm and a signal transmitter. The electronic water gauge can be customized in range, and different customized ranges are selected for different silt dams 02. The electronic water gauge is made of stainless steel and contains a processor. The electronic water gauge measures the water level behind the dam, and the processor of the water level monitor 20 analyzes the water level changes and rainfall, and the signal transmitter sends the analysis results to the data collection processor 22; the main function of the flood peak monitor 21 is to monitor the flood peak during the flood season, and the water level height at the highest flood level in previous years is input into the flood peak monitor 21 (Nanjing Zhongzhiyan Measurement and Control Technology Technology Co., Ltd., HFT-1 model), set up a monitor to compare and analyze the current water level with the flood levels of previous years in real time, judge whether a flood disaster is likely to occur, and send the analysis results to the data collection processor 22, so as to make decisions and early warnings in advance; the data collection processor 22, the main function is to collect and process the signals and data sent by the siltation monitor 28, the water level monitor 20, the flood peak monitor 21, etc., make decisions on how to deal with the siltation of drainage wells, extract the empirical relationship between rainfall and water level changes and flood peak changes, make judgments on various situations, issue processing instructions, and realize automatic control.

[0079] Preferably, the silt dam system provided in the embodiment of the present application also includes a drip irrigation system 03 and a soil condition detector 06 for detecting soil salt content, water content, soil temperature, pH value and soil stability. The soil condition detector 06 is installed inside the watershed mountain 01, at the shallow surface of the ground below the ecological restoration system 05 and the drip irrigation system 03. The number and spacing of the installations are determined according to the length and slope of the slopes on both sides of the watershed mountain 01. Generally, they are arranged at 5 to 10 meters. The main function is to monitor the salt content (salt content less than 0.5% is within the normal range), water content (50% to 70% is suitable for crop growth), soil temperature, pH value, soil stability, etc. inside the soil, and send the monitoring data to the data collection center. Processor 22; The main function of this component is to provide the entire smart system 04 with the drought conditions of the soil. If it is lower than the minimum water storage capacity of vegetation such as sea buckthorn and caragana, the entire smart system 04 will issue a command to drip irrigate the vegetation on the hillside. When the irrigation volume reaches the predetermined requirement (stop when the water penetrates 10 to 20 cm from the root), the irrigation will be stopped. At the same time, the growth conditions of the vegetation in the feedback system can be monitored by temperature, pH and nutrient components (the sensor uses the existing sensor ZZY-3), so that the technicians can manage it in time. The drip irrigation system 03 is installed on the watershed mountain 01 and the lower layer of the ecological restoration system 05. Its main function is to provide water for the ecological restoration system 05 and irrigate the economic crops in the ecological restoration area. After receiving the soil drought signal, it provides water for the ecological restoration system 05 to irrigate the economic crops.

[0080] Based on the above embodiments of the silt dam system, the present application further provides an embodiment of a control method for the silt dam system, which is executed by the data collection processor 22 mentioned in the above embodiments.

[0081] See also Figure 8 The control method of the silt dam system specifically includes the following contents:

[0082] Step 110: receiving soil drought monitoring data collected by a soil condition detector installed inside the watershed mountain; Step 120: judging whether the soil is currently in drought condition based on the soil drought monitoring data; if so, executing step 130: controlling the drip irrigation system preset in the silt dam system to perform drip irrigation operation; if not, returning to step 110.

[0083] In step 110, soil condition detectors 06 are installed inside the watershed mountain 01, in the shallow surface layer of the ground below the ecological restoration system 05 and the drip irrigation system 03. The number and spacing of the detectors are determined based on the length and slope of the slopes on both sides of the watershed mountain 01, and are generally arranged at 5 to 10 meters.

[0084] In one or more embodiments of the present application, soil drought monitoring data includes: salt content inside the soil (salt content less than 0.5% is within the normal range), water content (50% to 70% is suitable for crop growth), soil temperature, pH value, soil stability, etc.

[0085] In step 120, a specific method for determining whether the soil is currently in a drought condition based on the soil drought monitoring data may be as follows: determining whether there is currently a drought condition based on preset threshold ranges corresponding to different types of soil drought monitoring data. For example, if any one of the salt content, water content, soil temperature, pH value, and soil stability inside the soil does not meet the corresponding preset threshold or threshold range, it is determined that the soil is currently in a drought condition.

[0086] For example, if the salt content is greater than or equal to 0.5%, it can be determined that the current soil is in a drought state; for another example, if the water content is less than 50%, it can be determined that the current soil is in a drought state.

[0087] Step 210: If a drainage well blockage signal is received from a blockage monitor preset in the silt dam system, the nozzle preset in the silt dam system is controlled to spray a dredging agent into the well body of the drainage well according to the level corresponding to the drainage well blockage signal and / or the spiral dredging component preset in the silt dam system is controlled to perform a spiral dredging operation on the drainage well.

[0088] In step 210, when the clogging monitor 28 detects clogging in the well body 23, the clogging monitor 28 transmits the clogging signal to the data collection processor 22. The data collection processor 22 first determines whether it is a normal level drainage well clogging signal or an excessive level drainage well clogging signal based on the identification of the clogging signal. If it is the former, the spiral dredging component preset in the silt dam system is controlled to perform spiral dredging operations on the drainage well; if it is the latter, the water pump is controlled to spray the dredging agent in the dredging agent storage box 25 into the well body 23 through the nozzle 27. At the same time, it can be selected whether to control the spiral dredging component preset in the silt dam system to perform spiral dredging operations on the drainage well, thereby dredging the drainage well.

[0089] Step 310: Receive water level monitoring data collected by a water level monitor preset in the silt dam system; Step 320: Determine whether the water level is too high based on the water level monitoring data. If so, execute step 330: Control the stepped water release device preset in the siltation area to perform drainage operations; if not, return to step 310.

[0090] In step 310, the water level monitoring data may include data on changes in the water level behind the dam and data on changes in rainfall; correspondingly, in step 320, the specific implementation of judging whether the water level is currently too high based on the water level monitoring data may be: if one of the data on changes in the water level behind the dam and the data on changes in rainfall exceeds a preset threshold or threshold range, it is judged that the water level is currently too high.

[0091] Step 410: If a flood peak signal collected by a flood peak monitor preset in the silt dam system is received, the shore gate preset in the siltation area is controlled to perform water interception and filtering operations according to the flood peak signal.

[0092] In order to further illustrate the control method of the above-mentioned silt dam system, the present application also provides a specific application example of the control method of the silt dam system. The control method of the silt dam system can be a smart system, see Fig. 9 In this intelligent system, the water level monitor can also be called a behind-the-dam water level monitor, the shore gate can also be called a flushing channel gate, the stepped water release device can also be called a stepped water release system, the nozzle can also be called a dredging agent releaser, and the spiral dredging assembly can also be called a spiral dredging device.

[0093] In addition, before executing the above-mentioned smart system, the following preparations must be performed:

[0094] 1. Instrument and equipment inspection: Before installing the instruments, conduct technical inspections on all instruments to ensure that the instruments are operating normally and that the entire system can be used stably for a long time. Check whether each system is working properly and whether the line connections are normal.

[0095] 2. Plant selection: Plants need to be carefully selected before planting, and plants that are suitable for the climate of the silt dam area, easy to cultivate, and have high economic value should be selected.

[0096] 3. Selection of unclogging agent (solvent): The unclogging agent added to the drainage well should be a solvent mainly composed of anaerobic microorganisms to ensure environmental friendliness.

[0097] 4. Instrument layout: All instruments are laid out according to the above embodiments, paying attention to the differences in the layout positions of the instruments to ensure that the instruments are installed in reasonable positions and operate normally.

[0098] 5. Inspection of drainage wells and spillways: Check whether the drainage wells and spillways in the silted areas are unobstructed to ensure that they can drain water and silt normally.

[0099] 6. Final inspection: Conduct a second inspection of the construction area to retest whether the previous instrument and equipment inspections are accurate and whether the entire system can operate normally, so as to achieve the goal of rigor and efficiency.

[0100] The above-mentioned implementation methods are only general implementation methods of the present invention. During the test, the order can be adjusted in real time according to the test plan. The present invention can use the silt dam to conserve water sources, nurture economic crops in silted areas, and convert the ecological benefits generated by ecological restoration into economic benefits. At the same time, the system of "one basin water nurtures an entire basin ecology" can achieve a substantial increase in water utilization, precise water use, precise water collection, and water recycling. In addition, the present invention can achieve the ecological regeneration benefits of fragile geological areas from point to surface, use a silt dam to achieve a basin or local ecological regeneration, and use several silt dams to achieve several ecological regeneration zones. The later ecological zones are gradually connected in series, and finally the ecological restoration of fragile geological areas is achieved, effectively reducing the soil and water loss in the Jizi Bay of the Yellow River, and promoting the high-quality development of the Yellow River Basin. It realizes the combination of ecological measures and engineering measures, and the simultaneous implementation of slope management and channel management.

[0101] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.

Claims

1. A silt dam system, characterized in that: The invention comprises a silt dam, a bank gate, a silt accumulation area gate and a buffer zone gate, all of which are used to be set between two adjacent watershed mountains. The bank gate, the silt accumulation area gate and the buffer zone gate are all located upstream of the silt dam. A water storage channel is formed between the two adjacent watershed mountains. The two bank gates are used to be set on both sides of the water storage channel in a one-to-one correspondence. The bank gates extend along a first direction. The siltation area gate and the buffer area gate are both arranged in the water storage channel, and the siltation area gate and the buffer area gate are both arranged between the two bank gates. In the first direction, the siltation area gate is arranged between the siltation dam and the buffer area gate. The water storage channel includes a siltation area, a buffer area and a planting area. The siltation area is located between the siltation dam and the siltation area gate, the buffer area is located between the siltation area gate and the buffer area gate, and the planting area is located on the side of the buffer area gate away from the siltation dam. The first direction is the length direction of the water storage channel.

2. The silt dam system according to claim 1, characterized in that: It also includes a plurality of shore water pipes, each of which is arranged in the first direction, one end of each shore water pipe passes through the shore gate, and the other end of each shore water pipe extends to the siltation area.

3. The silt dam system according to claim 2, characterized in that: It also includes a plurality of siltation area water pipes, each of which is arranged in the second direction, one end of the siltation area water pipe passes through the siltation area gate, and the other end of the siltation area water pipe extends to the buffer zone, the diameter of the siltation area water pipe is smaller than the diameter of the shore water pipe, and the second direction is the arrangement direction of the two shore gates; and / or, The silt dam system also includes a plurality of buffer zone water pipes, each of which is arranged in the second direction, one end of the buffer zone water pipe passes through the buffer zone gate, and the other end of the buffer zone water pipe extends to the planting area, and the diameter of the buffer zone water pipe is smaller than the diameter of the siltation zone water pipe.

4. The silt dam system according to any one of claims 1 to 3, characterized in that: It also includes a data collection processor, a spillway and a stepped water discharge device installed in the siltation area, the stepped water discharge device includes a stepped body and a plurality of drainage well assemblies, the stepped body includes a plurality of steps, each of the drainage well assemblies is installed on each level of the steps in a one-to-one correspondence, the stepped water discharge device and the spillway are respectively located on opposite sides of the siltation dam, and each of the drainage well assemblies is communicated with the spillway, the data collection processor is installed on the stepped body, and the stepped water discharge device is communicatively connected to the data collection processor.

5. The silt dam system according to claim 4, characterized in that: The drainage well assembly includes a well body, a blockage monitor, a clearing agent storage box, a water pump and a nozzle. The blockage monitor and the clearing agent storage box are both installed on the inner wall of the well body. The water pump is installed inside the clearing agent storage box. The nozzle is connected to the water pump and is used to spray the clearing agent into the well body. The blockage monitor and the water pump are both communicatively connected to the data collection processor.

6. The silt dam system according to claim 5, characterized in that: It also includes a spiral dredging component and a slider drive controller both installed in the silt accumulation area, the spiral dredging component including a first support seat, a first track, a first sliding block, a first lifting rod, a first lifting drive member, a first rotating drive member and a spiral blade, the first track is fixed to the first support seat, the first track is horizontally arranged above the stepped water discharge device, the extension direction of the first track is the same as the arrangement direction of each step on the stepped body, the first sliding block is slidably matched with the first track, the first lifting rod and the first lifting drive member are both installed on the first sliding block, the first lifting rod is vertically arranged, the first lifting drive member is used to drive the first lifting rod to move in the vertical direction, the bottom end of the first lifting rod is connected to the first rotating drive member, the output shaft of the first rotating drive member is fixedly connected to the spiral blade, the spiral blade is used to extend into the well body, and the slider drive controller is communicatively connected to the data collection processor, the first lifting drive member and the first rotating drive member.

7. The silt dam system according to claim 6, characterized in that: The spiral dredging assembly also includes a manhole cover suction cup, a second sliding block, a second lifting drive member and a second lifting rod. The second sliding block is slidably matched with the first track. The second lifting drive member and the second lifting rod are both installed on the second sliding block. The second lifting drive member is used to drive the second lifting rod to move in the vertical direction. The manhole cover suction cup is fixed to the bottom end of the second lifting rod. The drainage well also includes a manhole cover that is detachably installed on the port of the well body. The manhole cover suction cup is an electromagnetic member for adsorbing the manhole cover. The manhole cover suction cup, the second sliding block and the second lifting drive member are all communicatively connected to the slider drive controller.

8. The silt dam system according to claim 7, characterized in that: The spiral dredging assembly also includes a second support seat and a second track, the second track is fixed to the second support seat, the second track is horizontally arranged, and the second track is vertically connected to the first track, and the first sliding block and the second sliding block are both used for sliding cooperation with the second track.

9. The silt dam system according to claim 4, characterized in that: It also includes a water level monitor and a flood peak monitor, both of which are connected to the data collection processor for communication. The data collection processor, the water level monitor and the flood peak monitor are all installed on the top of the stepped body.

10. A control method for a silt dam system, characterized in that: The method is executed by a data collection processor, wherein the data collection processor is arranged in the silt dam system according to any one of claims 1 to 9; The control method of the silt dam system comprises: Receiving soil drought monitoring data collected by a soil condition detector installed inside the watershed mountain, and judging whether the soil is currently in drought condition based on the soil drought monitoring data, and if so, controlling a drip irrigation system preset in the silt dam system to perform drip irrigation operation; If a drainage well clogging signal sent by a clogging monitor preset in the silt dam system is received, then according to the level corresponding to the drainage well clogging signal, a nozzle preset in the silt dam system is controlled to spray a dredging agent into the well body of the drainage well and / or a spiral dredging component preset in the silt dam system is controlled to perform a spiral dredging operation on the drainage well; Receiving water level monitoring data collected by a water level monitor preset in the silt dam system, and judging whether the water level is too high based on the water level monitoring data, and if so, controlling a stepped water discharge device preset in the silt accumulation area to perform drainage operations; If a flood peak signal collected by a flood peak monitor preset in the silt dam system is received, the shore gate preset in the siltation area is controlled to perform water interception and filtering operations according to the flood peak signal.