Tunneling water retention device based on mine mining and control method
By designing a water retention device for mine mining, the problem of timely detection and sealing of water seepage in the drill hole is solved, real-time monitoring and sealing of the mine rock strata is achieved, and the risk of water inrush accidents is reduced.
Patent Information
- Application Number
- CN202510291149.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-12
- Publication Date
- 2025-04-25
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the mining process of mine, it is difficult to detect and seal seepage in the drilling hole in time, which increases the risk of water incursion accidents and lacks the means of monitoring the internal rock formation of the mine.
A water retention device for mining is designed, including a monitoring terminal, a drilling mechanism, a sealing mechanism, a measuring unit and a signal transmission unit. The device drills through a drilling mechanism. The measuring unit measures the humidity and air pressure in the drilling hole. The signal sends the data to the monitoring terminal. If water seepage is detected, an alarm will be issued and the drilling hole will be sealed through the sealing mechanism.
Early detection and sealing of water seepage in the drill holes is achieved, the probability of water inrush accidents is reduced, and the humidity and air pressure inside the ore rock formation is monitored in real time, avoiding the risk of water seepage in the inner wall of the ore channel.
Smart Images

Figure CN119878002A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water-retaining mining, and in particular to a tunneling water-retaining device based on mine mining and a control method thereof. Background Art
[0002] Due to the complex hydrogeological conditions in the mining area, there are abundant underground aquifers and fissure water bodies, and the water pressure is relatively high, which is easily released during the mining process. During the mining process, the rock strata may break, resulting in increased permeability of groundwater, and water enters the mine, causing water inrush accidents. When the mining work approaches or penetrates the underground gravel layer, quicksand layer and karst limestone layer containing water accumulation layers, it will cause water seepage accidents; once water seepage occurs, it will not only affect the normal production of the mine, but sometimes also cause casualties, flooding the mine and mining area, and the harm is very serious.
[0003] A drill is usually used to drill holes on the working surface, and then observe whether there is water seepage in the borehole to determine the water content inside the rock formation ahead. If the borehole penetrates into the water cavity in the rock formation, the water in the water cavity will flow out of the borehole. The detection results are not fed back in a timely manner, which is not conducive to timely blocking of the borehole and will increase the risk of water inrush. If the amount of water in the mine is too large, it will affect the production progress and personnel safety. In addition, the water in the aquifer inside the rock formation of the mine tunnel may penetrate into the mine tunnel through the gap, which may cause a water inrush accident in severe cases. The penetration of water may affect the structural stability of the rock formation around the mine tunnel, especially when the water continues to penetrate, the water may weaken the bearing capacity and structural integrity of the rock, and the water may cause the rock formation to swell, soften or dissolve, increasing the risk of rock collapse. Therefore, it is still necessary to monitor the inner wall of the mine tunnel. For this purpose, a tunneling water conservation device and a control method based on mine mining are proposed to solve the above problems. Summary of the invention
[0004] In order to solve the above technical problems, a tunneling water conservation device and control method based on mine mining is provided. This technical solution solves the problem that detecting the water content ahead by observing whether there is water seepage in the borehole is not conducive to timely blocking and there is a lack of means to monitor the internal rock formations of the mine tunnel.
[0005] In order to achieve the above purpose, the technical solution adopted by the present invention is: A water conservation device for excavation based on mine mining, comprising: A monitoring terminal, wherein the monitoring terminal is installed at the upper end of the base plate; A drilling mechanism, which is installed at the upper end of the bottom plate and is used to drill holes in the working surface and side walls of the mine tunnel; A plugging mechanism, which is arranged on one side of the drilling mechanism, the lower end of which is rotatably connected to the bottom plate, and is used to plug the drill hole; A measuring unit, which is placed inside a borehole opened in the side wall of the mine tunnel and measures humidity and air pressure data in the borehole; A signal sending unit, which is arranged outside a borehole opened in a side wall of a mine tunnel and is electrically connected to the measuring unit, and is used to receive measurement data of the measuring unit and send it to a monitoring terminal; The drilling mechanism includes a rotating frame, a guide block, a sliding block, a drill rod and a drill bit. Slide grooves are provided on both sides of the rotating frame. The lower end of the sliding block is slidably connected to the rotating frame through the slide groove. A hydraulic motor is installed above the sliding block. The output end of the hydraulic motor is connected to the input end of the reduction gear box. The output end of the reduction gear box is fixedly connected to the drill rod. The front end of the drill rod is provided with a drill bit. The outer side of the drill rod is slidably connected to the guide block. The guide block is fixedly connected to one side of the rotating frame. An inner cavity is axially provided inside the drill rod. Two through holes are provided at one end of the inner cavity close to the drill bit. A first detection electrode and a second detection electrode are respectively installed inside the two through holes. The first detection electrode and the second detection electrode are both electrically connected to the monitoring terminal. The plugging mechanism includes a rotating block and a grouting assembly. The rotating block is rotatably mounted on one end of the third rotating arm. One side of the rotating block is connected to a liquid inlet pipe. One end of the rotating block is fixedly connected to a grouting assembly. The grouting assembly is used to transport the plugging agent into the borehole.
[0006] Preferably, the drilling mechanism also includes a fixed frame, a first hydraulic rod, a first connecting rod, a second connecting rod and a second hydraulic rod, the lower end of the fixed frame is fixedly connected to the base plate, a rotating shaft is provided on one side of the fixed frame and is rotatably connected to the rotating frame, the first hydraulic rod is fixedly installed above the rotating frame through a mounting block, the output end of the first hydraulic rod is fixedly connected to the rotating frame, the rotating frame is driven by the first hydraulic rod to move along the slide groove, both sides of the rotating frame are rotatably connected to the first connecting rod through the rotating shaft, the other end of the first connecting rod is rotatably connected to the second connecting rod, the other end of the second connecting rod is rotatably connected to one side of the fixed frame, second hydraulic rods are installed at both ends of the fixed frame, and the output ends of the second hydraulic rods are rotatably connected to the middle part of the second connecting rod.
[0007] Preferably, the sealing mechanism also includes a rotating assembly, a mounting seat and a first rotating arm. The rotating assembly is mounted on the upper end of the base plate. The upper turntable of the rotating assembly is rotated by hydraulic drive. The mounting seat is fixedly mounted on the upper end of the rotating assembly. The middle part of the mounting seat is rotatably connected to the first rotating arm.
[0008] Preferably, one end of the first rotating arm is rotatably connected to the second rotating arm, the other end of the second rotating arm is rotatably connected to the third rotating arm, one end of the third rotating arm away from the second rotating arm is rotatably connected to the rotating block, the first rotating arm, the second rotating arm and the third rotating arm are all driven to rotate by a hydraulic cylinder, and the first rotating arm, the second rotating arm and the third rotating arm are used to drive the grouting assembly to move to the blocking position.
[0009] Preferably, the grouting assembly includes a fixing module, a pneumatic fixing claw, a sealing airbag and a grouting port, the fixing module is fixedly connected to the outside of the grouting assembly, a plurality of grooves are provided inside the fixing module, a pneumatic fixing claw is provided inside the grooves, one end of the pneumatic fixing claw is rotatably connected to the groove via a rotating shaft, the pneumatic fixing claw is driven by a pneumatic push rod, a plurality of anti-slip teeth are provided on the outside of the pneumatic fixing claw, a sealing airbag is provided on one side of the fixing module, the sealing airbag is used to be inflated to block the borehole during blocking, a plurality of grouting ports are provided at one end of the grouting assembly, the grouting ports are used to inject sealing agent into the borehole to block rock cracks.
[0010] Preferably, the signal sending unit includes a signal transmitter, a connecting block, a fixed tube, a sliding groove and a sliding ring, the signal transmitter is fixedly installed on one side of the connecting block, the other side of the connecting block is fixedly connected to the fixed tube, the surface of the fixed tube is provided with a plurality of sliding grooves, the inside of the sliding groove is slidably connected with a sliding ring, the sliding ring is sleeved on the outside of the fixed tube, the inner side of the fixed tube is provided with a threaded groove and is threadedly connected to an adjusting bolt, one end of the adjusting bolt extends to one side of the signal sending unit and is provided with a knob, the end of the sliding ring away from the connecting block is rotatably connected to a plurality of push rods, the other ends of the push rods are rotatably connected to the abutment blocks, the other end of the abutment blocks is rotatably connected to the surface of the fixed tube, an anti-slip pad is provided on the outside of the abutment block, and the sliding ring moves along the sliding groove to drive the plurality of abutment blocks to expand outward.
[0011] Preferably, a hydraulic pump is installed at the upper end of the base plate, a hydraulic oil tank is provided on one side of the hydraulic pump, an oil inlet pipe on the hydraulic pump is connected to the hydraulic oil tank, a plugging agent storage tank is provided on one side of the hydraulic oil tank, and the plugging agent storage tank is used to store polyurethane plugging agent.
[0012] Preferably, a plunger pump is installed at the upper end of the base plate, the input end of the plunger pump is connected to the plugging agent storage tank, the output end of the plunger pump is connected to the liquid inlet pipe through a pipeline, and a compressed air component is installed at the upper end of the base plate, and the compressed air component is used to pressurize and inflate the sealing airbag.
[0013] Preferably, a crawler track for driving the device to move is provided below the base plate.
[0014] The present invention also provides a control method for a tunneling water conservation device based on mine mining, which specifically comprises the following steps: S1, first determine the drilling position, then control the second hydraulic rod to extend and drive the rotating frame to rotate to a corresponding angle so that the drill bit is aligned with the drilling position, and start the hydraulic motor to drive the drill rod and the drill bit to rotate; S2, controlling the first hydraulic rod to extend and push the drill bit forward to drill forward; S3. If water seepage occurs in the borehole during drilling, the first detection electrode and the second detection electrode will contact the water flow to form a closed loop, and the monitoring terminal will issue an early warning after receiving the electrical signal; S4, controlling the first hydraulic rod to retract and drive the drill bit to return; S5, control the rotation of the rotary assembly to make the first rotary arm face the direction of the drilling hole, control each hydraulic cylinder to extend and respectively drive the first rotary arm, the second rotary arm and the third rotary arm to rotate and drive the grouting assembly close to the drilling hole, control the rotation of the rotary block to make the grouting assembly face the drilling hole, adjust the position so that the grouting assembly extends into the drilling hole, control the pneumatic push rod to push the pneumatic fixed claw to rotate so that the anti-slip teeth on one side of the pneumatic fixed claw abut against the inner wall of the drilling hole, pressurize and inflate the sealing airbag through the compressed air assembly to expand the sealing airbag to seal the drilling hole, and inject the polyurethane plugging agent in the plugging agent storage tank into the drilling hole through the grouting port to seal the crack; S6, recover the grouting components to complete the plugging; S7. Place a measuring unit inside the borehole to be monitored and seal the borehole with a sealant. The measuring unit measures the humidity and air pressure inside the borehole, and records the humidity and air pressure data inside the borehole as initial data. Place the abutment block inside the borehole, twist the adjustment bolt to expand the abutment block outward, and fix the signal sending unit outside the borehole. S8. The measuring unit continuously transmits the measuring data to the signal transmitter, and the signal transmitter sends the measuring data to the monitoring terminal. If the difference between the humidity and air pressure data and the initial data exceeds the threshold, it indicates that there is a risk of water seepage inside the rock formation. The monitoring terminal issues an alarm, and the operator sends the signal to the unit and seals the borehole according to the steps.
[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. The drill rod of the excavation water conservation device provided by the present invention is provided with a first detection electrode and a second detection electrode. When water seepage occurs in the borehole during the drilling process, the first detection electrode and the second detection electrode will contact the water and conduct to form a loop. The monitoring terminal will receive data and issue an alarm to remind the operator to seal the borehole. Compared with the method of observing whether there is water in the borehole after drilling, the risk of water seepage can be discovered earlier, thereby reducing the probability of mine water inrush accidents.
[0016] 2. The present invention is provided with a measuring unit and a signal sending unit. The measuring unit is placed inside a borehole opened in the wall of a mine tunnel and the borehole is sealed. The measuring unit measures the humidity and air pressure in the borehole. The measuring unit continuously transmits the measurement data to the signal transmitter. The signal transmitter sends the measurement data to the monitoring terminal. The monitoring terminal compares the humidity and air pressure data in the borehole with the initial data. If the difference between the humidity and air pressure data and the initial data exceeds the threshold, it indicates that there is a risk of water seepage inside the rock formation. The monitoring terminal initiates an alarm to remind the operating personnel to seal the borehole and monitor the inner wall of the mine tunnel in real time to prevent water in the aquifer inside the rock formation of the mine tunnel from infiltrating into the mine tunnel through the gaps.
[0017] 3. The present invention is provided with a sealing mechanism, and a grouting assembly is arranged in the sealing mechanism. When the borehole is sealed, the grouting assembly is extended into the borehole, and the pneumatic fixing claw is rotated and extended to abut against the borehole wall to provide support for the grouting assembly. A sealing airbag is arranged on one side of the pneumatic fixing claw, and the opened pneumatic fixing claw will also support the sealing airbag, so that the sealing airbag can be stably inflated to firmly block the water flow, and the polyurethane plugging agent can be fully diffused into the borehole and the crack for sealing, thereby improving the sealing efficiency and reducing the risk of water inrush. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a structural schematic diagram of the present invention; Figure 2 It is a structural schematic diagram of the drilling mechanism in the present invention; Figure 3 It is a schematic diagram of the internal structure of the drill rod in the present invention; Figure 4 It is a structural schematic diagram of the blocking mechanism in the present invention; Figure 5 It is a structural schematic diagram of the grouting assembly in the present invention; Figure 6 It is a structural schematic diagram of the signal sending unit in the present invention.
[0019] The numbers in the figure are: 1. Bottom plate; 11. Tracks; 12. Hydraulic pump; 13. Hydraulic oil tank; 14. Monitoring terminal; 15. Compressed air assembly; 16. Plunger pump; 17. Blocking agent storage tank; 2. Drilling mechanism; 21. Fixed frame; 22. Rotating frame; 221. Slideway; 23. Guide block; 24. Sliding block; 241. Hydraulic motor; 242. Reduction gear box; 25. Drill rod; 251. Inner cavity; 252. First detection electrode; 253. Second detection electrode; 26. Drill bit; 27. First hydraulic rod; 281. First connecting rod; 282. Second connecting rod; 29. Second hydraulic rod; 3. Blocking mechanism; 31. Rotating assembly; 32. Mounting seat; 33. First rotating arm; 34. Second rotating arm; 35. Third rotating arm; 36. Rotating block; 361. Liquid inlet pipe; 37. Grouting assembly; 371. Fixing module; 372. Pneumatic fixing claw; 373. Sealing airbag; 374. Grouting port; 4. Measurement unit; 5. Signal sending unit; 51. Signal transmitter; 52. Connecting block; 53. Fixed pipe; 54. Sliding groove; 55. Sliding ring; 56. Adjusting bolt; 57. Abutting block; 58. Push connecting rod. DETAILED DESCRIPTION
[0020] For example, certain words are used in the specification and claims to refer to specific components. Those skilled in the art should understand that hardware manufacturers may use different terms to refer to the same component. This specification and claims do not use differences in names as a way to distinguish components, but use differences in the functions of components as the criteria for distinction. As mentioned throughout the specification and claims, "including" is an open term, so it should be interpreted as "including but not limited to". The subsequent description of the specification is a preferred embodiment of implementing the present application, but the description is for the purpose of illustrating the general principles of the present application, and is not used to limit the scope of the present application. The scope of protection of the present application shall be determined by the definition of the attached claims.
[0021] like Figure 1-6 As shown, a water conservation device for excavation based on mine mining comprises: A crawler 11, which is arranged at the lower end of the base plate 1 and drives the device to move; A hydraulic pump 12, which is installed at the upper end of the base plate 1, a hydraulic oil tank 13 is provided on one side of the hydraulic pump 12, an oil inlet pipe on the hydraulic pump 12 is connected to the hydraulic oil tank 13, a plugging agent storage tank 17 is provided on one side of the hydraulic oil tank 13, and the plugging agent storage tank 17 is used to store polyurethane plugging agent; A monitoring terminal 14, the monitoring terminal 14 is installed at the upper end of the base plate 1; A plunger pump 16, the input end of the plunger pump 16 is connected to a plugging agent storage tank 17; A compressed air assembly 15 is mounted on the upper end of the base plate 1 to provide high-pressure gas to the device; A drilling mechanism 2, which is installed at the upper end of the bottom plate 1 and is used to drill holes in the working surface and side walls of the mine tunnel; A plugging mechanism 3, which is disposed on one side of the drilling mechanism 2, and a lower end of the plugging mechanism 3 is rotatably connected to the bottom plate 1, and the plugging mechanism 3 is used to plug the drill hole; The measuring unit 4 is placed inside a borehole opened in the side wall of the mine tunnel and measures the humidity and air pressure data in the borehole; A signal sending unit 5, which is disposed outside the borehole and electrically connected to the measuring unit 4, and is used to receive the measurement data of the measuring unit 4 and send it to the monitoring terminal 14; The drilling mechanism 2 includes a rotating frame 22, a guide block 23, a sliding block 24, a drill rod 25 and a drill bit 26. Slide grooves 221 are provided on both sides of the rotating frame 22. The lower end of the sliding block 24 is slidably connected to the rotating frame 22 through the slide groove 221. A hydraulic motor 241 is installed above the sliding block 24. The output end of the hydraulic motor 241 is connected to the input end of the reduction gear box 242. The output end of the reduction gear box 242 is fixedly connected to the drill rod 25. A drill bit 26 is provided at the front end of the drill rod 25. The outer side of the drill rod 25 is slidably connected to the guide block 23. The guide block 23 provides guidance for the drill rod 25. The hydraulic motor 241 is driven by a high-pressure hydraulic The drill rod 25 is driven by hydraulic pressure to rotate for drilling. The guide block 23 is fixedly connected to one side of the rotating frame 22. An inner cavity 251 is axially arranged inside the drill rod 25. The inner cavity 251 has two through holes at one end close to the drill bit 26. The first detection electrode 252 and the second detection electrode 253 are respectively installed inside the two through holes. The first detection electrode 252 and the second detection electrode 253 are both electrically connected to the monitoring terminal 14. When water seepage occurs in the borehole during the drilling process, the first detection electrode 252 and the second detection electrode 253 will be turned on and form a loop. The monitoring terminal 14 will receive the data and issue an alarm to remind the operator to seal the borehole.
[0022] like Figure 2 As shown, the drilling mechanism 2 also includes a fixed frame 21, a first hydraulic rod 27, a first connecting rod 281, a second connecting rod 282 and a second hydraulic rod 29. The lower end of the fixed frame 21 is fixedly connected to the base plate 1, a rotating shaft is provided on one side of the fixed frame 21 and is rotatably connected to the rotating frame 22, the first hydraulic rod 27 is fixedly installed above the rotating frame 22 through a mounting block, the output end of the first hydraulic rod 27 is fixedly connected to the rotating frame 22, and the rotating frame 22 is driven by the first hydraulic rod 27 to move along the slide groove 221, both sides of the rotating frame 22 are rotatably connected with the first connecting rod 281 through the rotating shaft, the other end of the first connecting rod 281 is rotatably connected to the second connecting rod 282, and the other end of the second connecting rod 282 is rotatably connected to one side of the fixed frame 21, and the second hydraulic rod 29 is installed at both ends of the fixed frame 21, and the output end of the second hydraulic rod 29 is rotatably connected to the middle part of the second connecting rod 282. The extension of the second hydraulic rod 29 can drive the rotating frame 22 to rotate 180°, thereby expanding the scope of the drilling operation.
[0023] Please refer to Figure 4 and 5The plugging mechanism 3 includes a swivel assembly 31, a mounting seat 32, a first swivel arm 33, a second swivel arm 34, a third swivel arm 35, a rotating block 36 and a grouting assembly 37. The swivel assembly 31 is mounted on the upper end of the base plate 1. The upper turntable of the swivel assembly 31 is driven to rotate by hydraulic pressure. The mounting seat 32 is fixedly mounted on the upper end of the swivel assembly 31. The middle part of the mounting seat 32 is rotatably connected to the first swivel arm 33. One end of the first swivel arm 33 is rotatably connected to the second swivel arm 34. The other end of the second swivel arm 34 is rotatably connected to the third swivel arm 35. The third swivel arm 35 is away from the second One end of the rotating arm 34 is rotatably connected to the rotating block 36, and the rotating block 36 is rotatably installed on one end of the third rotating arm 35. One side of the rotating block 36 is connected to a liquid inlet pipe 361, and the liquid inlet pipe 361 is connected to the plugging agent storage tank 17 through a pipeline. One end of the rotating block 36 is fixedly connected to a grouting assembly 37, and the grouting assembly 37 is used to transport the plugging agent into the borehole. The first rotating arm 33, the second rotating arm 34 and the third rotating arm 35 are all driven to rotate by a hydraulic cylinder, and the first rotating arm 33, the second rotating arm 34 and the third rotating arm 35 are used to drive the grouting assembly 37 to move to the plugging position.
[0024] The grouting assembly 37 includes a fixing module 371, a pneumatic fixing claw 372, a sealing airbag 373 and a grouting port 374. The fixing module 371 is fixedly connected to the outside of the grouting assembly 37. A plurality of grooves are provided inside the fixing module 371. A pneumatic fixing claw 372 is provided inside each groove. One end of the pneumatic fixing claw 372 is rotatably connected to the groove through a rotating shaft. The pneumatic fixing claw 372 is driven by a pneumatic push rod. A plurality of anti-slip teeth are provided on the outside of the pneumatic fixing claw 372. When the grouting assembly 37 is extended into the borehole, the pneumatic fixing claw 372 is rotated and extended to abut against the borehole wall to prevent the grouting assembly 37 from slipping. The grouting assembly 37 shakes due to the water pressure. A sealing airbag 373 is provided on one side of the fixing module 371. The sealing airbag 373 is used to be pressurized and inflated by the compressed air assembly 15 to block the borehole during sealing. The opened pneumatic fixing claws 372 will also support the sealing airbag 373 so that the sealing airbag 373 can firmly block the water flow. A plurality of grouting ports 374 are provided at one end of the grouting assembly 37. The grouting ports 374 are used to inject sealing agents into the borehole to seal the cracks in the rock formation. The polyurethane sealing agent will quickly solidify to seal the cracks in the borehole to prevent the cracks from expanding due to water erosion.
[0025] like Figure 6As shown, the signal sending unit 5 includes a signal transmitter 51, a connection block 52, a fixed tube 53, a sliding groove 54 and a sliding ring 55. The signal transmitter 51 is fixedly installed on one side of the connection block 52. The signal transmitter 51 is electrically connected to the measuring unit 4 through a signal line. The other side of the connection block 52 is fixedly connected to the fixed tube 53. The surface of the fixed tube 53 is provided with a plurality of sliding grooves 54. The inside of the sliding groove 54 is slidably connected to the sliding ring 55. The sliding ring 55 is sleeved on the outside of the fixed tube 53. The inside of the fixed tube 53 is provided with a threaded groove and is threadedly connected to the adjusting bolt 56. One end of the adjusting bolt 56 extends to one end of the signal sending unit 5. A knob is provided on the side, and one end of the sliding ring 55 away from the connecting block 52 is rotatably connected to a plurality of pushing links 58, and the other ends of the pushing links 58 are rotatably connected to the abutment blocks 57, and the other ends of the abutment blocks 57 are rotatably connected to the surface of the fixed tube 53. An anti-slip pad is provided on the outside of the abutment blocks 57, and the sliding ring 55 moves along the sliding groove 54 to drive the plurality of abutment blocks 57 to expand outward. Turning the knob can make the sliding ring 55 approach the abutment blocks 57, and then the pushing links 58 drive the abutment blocks 57 to expand outward and abut the inner wall of the borehole, so that the signal sending unit 5 can be easily installed at the borehole, and it is also convenient to quickly remove the signal sending unit 5.
[0026] This embodiment also provides a control method for a tunneling water conservation device based on mine mining, which specifically includes the following steps: S1, first determine the drilling position, then control the second hydraulic rod to extend and drive the rotating frame to rotate to a corresponding angle so that the drill bit is aligned with the drilling position, and start the hydraulic motor to drive the drill rod and the drill bit to rotate; S2, controlling the first hydraulic rod to extend and push the drill bit forward to drill forward; S3. If water seepage occurs in the borehole during drilling, the first detection electrode and the second detection electrode will contact the water flow to form a closed loop, and the monitoring terminal will issue an early warning after receiving the electrical signal; S4, controlling the first hydraulic rod to retract and drive the drill bit to return; S5, control the rotation of the rotary assembly to make the first rotary arm face the direction of the drilling hole, control each hydraulic cylinder to extend and respectively drive the first rotary arm, the second rotary arm and the third rotary arm to rotate and drive the grouting assembly close to the drilling hole, control the rotation of the rotary block to make the grouting assembly face the drilling hole, adjust the position so that the grouting assembly extends into the drilling hole, control the pneumatic push rod to push the pneumatic fixed claw to rotate so that the anti-slip teeth on one side of the pneumatic fixed claw abut against the inner wall of the drilling hole, pressurize and inflate the sealing airbag through the compressed air assembly to expand the sealing airbag to seal the drilling hole, and inject the polyurethane plugging agent in the plugging agent storage tank into the drilling hole through the grouting port to seal the crack; S6, recover the grouting components to complete the plugging; S7. Place a measuring unit inside the borehole to be monitored and seal the borehole with a sealant. The measuring unit measures the humidity and air pressure inside the borehole, and records the humidity and air pressure data inside the borehole as initial data. Place the abutment block inside the borehole, twist the adjustment bolt to expand the abutment block outward, and fix the signal sending unit outside the borehole. S8. The measuring unit continuously transmits the measuring data to the signal transmitter, and the signal transmitter sends the measuring data to the monitoring terminal. If the difference between the humidity and air pressure data and the initial data exceeds the threshold, it indicates that there is a risk of water seepage inside the rock formation. The monitoring terminal issues an alarm, and the operator sends the signal to the unit and seals the borehole according to the steps.
[0027] The above description is only a specific implementation mode of the present application and is not intended to limit the scope of protection of the present application. For those skilled in the art, the present application may have various modifications and changes. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application shall be included in the scope of protection of the present application. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should also be included in the scope of protection of the present application. Therefore, the scope of protection of the present application shall be based on the scope of protection of the claims.
[0028] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
Claims
1. A water conservation device for excavation based on mine mining, characterized in that: include: A monitoring terminal (14), wherein the monitoring terminal (14) is installed at the upper end of the base plate (1); A drilling mechanism (2), the drilling mechanism (2) being mounted on the upper end of the bottom plate (1), the drilling mechanism (2) being used to drill holes in the working surface and side walls of the mine tunnel; A blocking mechanism (3), the blocking mechanism (3) being arranged on one side of the drilling mechanism (2), the lower end of the blocking mechanism (3) being rotatably connected to the bottom plate (1), and the blocking mechanism (3) being used to block the drill hole; A measuring unit (4), the measuring unit (4) being placed inside a borehole opened in the side wall of a mine tunnel and measuring humidity and air pressure data in the borehole; A signal sending unit (5), the signal sending unit (5) being arranged outside a borehole opened in a side wall of a mine tunnel and being electrically connected to the measuring unit (4), the signal sending unit (5) being used to receive measurement data from the measuring unit (4) and send the measurement data to a monitoring terminal (14); The drilling mechanism (2) comprises a rotating frame (22), a guide block (23), a sliding block (24), a drill rod (25) and a drill bit (26); two sides of the rotating frame (22) are provided with sliding grooves (221); the lower end of the sliding block (24) is slidably connected to the rotating frame (22) via the sliding grooves (221); a hydraulic motor (241) is installed above the sliding block (24); the output end of the hydraulic motor (241) is connected to the input end of a reduction gear box (242); the output end of the reduction gear box (242) is fixedly connected to the drill rod (25); the drill rod A drill bit (26) is provided at the front end of the drill rod (25), the outer side of the drill rod (25) is slidably connected to the guide block (23), the guide block (23) is fixedly connected to one side of the rotating frame (22), and the interior of the drill rod (25) is axially provided with an inner cavity (251)), and two through holes are provided at one end of the inner cavity (251) close to the drill bit (26), and a first detection electrode (252) and a second detection electrode (253) are respectively installed in the two through holes, and the first detection electrode (252) and the second detection electrode (253) are both electrically connected to the monitoring terminal (14); The plugging mechanism (3) comprises a rotating block (36) and a grouting assembly (37); the rotating block (36) is rotatably mounted on one end of the third rotating arm (35); one side of the rotating block (36) is connected to a liquid inlet pipe (361); one end of the rotating block (36) is fixedly connected to the grouting assembly (37); the grouting assembly (37) is used to transport a plugging agent into a borehole.
2. The excavation water conservation device based on mine mining according to claim 1 is characterized in that: The drilling mechanism (2) further comprises a fixed frame (21), a first hydraulic rod (27), a first connecting rod (281), a second connecting rod (282) and a second hydraulic rod (29); the lower end of the fixed frame (21) is fixedly connected to the base plate (1); a rotating shaft is provided on one side of the fixed frame (21) and is rotatably connected to the rotating frame (22); the first hydraulic rod (27) is fixedly mounted above the rotating frame (22) via a mounting block; the output end of the first hydraulic rod (27) is fixedly connected to the rotating frame (22); the rotating frame ( 22) is driven by a first hydraulic rod (27) to move along a slide groove (221), both sides of the rotating frame (22) are rotatably connected to a first connecting rod (281) via a rotating shaft, the other end of the first connecting rod (281) is rotatably connected to a second connecting rod (282), the other end of the second connecting rod (282) is rotatably connected to one side of a fixed frame (21), and both ends of the fixed frame (21) are installed with a second hydraulic rod (29), and the output end of the second hydraulic rod (29) is rotatably connected to the middle part of the second connecting rod (282).
3. The excavation water conservation device based on mine mining according to claim 1 is characterized in that: The blocking mechanism (3) further comprises a slewing assembly (31), a mounting seat (32) and a first slewing arm (33); the slewing assembly (31) is mounted on the upper end of the base plate (1); the upper turntable of the slewing assembly (31) is driven to rotate by hydraulic pressure; the mounting seat (32) is fixedly mounted on the upper end of the slewing assembly (31); and the middle part of the mounting seat (32) is rotatably connected to the first slewing arm (33).
4. The excavation water conservation device based on mine mining according to claim 3 is characterized in that: One end of the first rotating arm (33) is rotatably connected to the second rotating arm (34); the other end of the second rotating arm (34) is rotatably connected to the third rotating arm (35); one end of the third rotating arm (35) away from the second rotating arm (34) is rotatably connected to the rotating block (36); the first rotating arm (33), the second rotating arm (34) and the third rotating arm (35) are all driven to rotate by a hydraulic cylinder; the first rotating arm (33), the second rotating arm (34) and the third rotating arm (35) are used to drive the grouting assembly (37) to move to a blocking position.
5. The excavation water conservation device based on mine mining according to claim 1 is characterized in that: The grouting assembly (37) comprises a fixing module (371), a pneumatic fixing claw (372), a sealing airbag (373) and a grouting port (374); the fixing module (371) is fixedly connected to the outside of the grouting assembly (37); a plurality of grooves are provided inside the fixing module (371); a pneumatic fixing claw (372) is provided inside each of the grooves; one end of the pneumatic fixing claw (372) is rotatably connected to the groove via a rotating shaft; the pneumatic fixing claw (372) is driven by a pneumatic push rod; a plurality of anti-slip teeth are provided on the outside of the pneumatic fixing claw (372); a sealing airbag (373) is provided on one side of the fixing module (371); the sealing airbag (373) is used to inflate and block a borehole during plugging; a plurality of grouting ports (374) are provided at one end of the grouting assembly (37); the grouting ports (374) are used to inject a plugging agent into the borehole to plug rock formation cracks.
6. The excavation water conservation device based on mine mining according to claim 1 is characterized in that: The signal sending unit (5) comprises a signal transmitter (51), a connection block (52), a fixed tube (53), a sliding groove (54) and a sliding ring (55); the signal transmitter (51) is fixedly mounted on one side of the connection block (52); the other side of the connection block (52) is fixedly connected to the fixed tube (53); a plurality of sliding grooves (54) are provided on the surface of the fixed tube (53); the interior of the sliding groove (54) is slidably connected to the sliding ring (55); the sliding ring (55) is sleeved on the outside of the fixed tube (53); the inside of the fixed tube (53) is provided with a threaded groove The sliding ring (55) is threadedly connected to an adjusting bolt (56); one end of the adjusting bolt (56) extends to one side of the signal sending unit (5) and is provided with a knob; one end of the sliding ring (55) away from the connecting block (52) is rotatably connected to a plurality of push connecting rods (58); the other ends of the push connecting rods (58) are rotatably connected to abutment blocks (57); the other ends of the abutment blocks (57) are rotatably connected to the surface of the fixed tube (53); an anti-slip pad is provided on the outside of the abutment blocks (57); the sliding ring (55) moves along the sliding groove (54) to drive the plurality of abutment blocks (57) to expand outward.
7. The excavation water conservation device based on mine mining according to claim 1 is characterized in that: A hydraulic pump (12) is installed at the upper end of the base plate (1), a hydraulic oil tank (13) is arranged on one side of the hydraulic pump (12), an oil inlet pipe on the hydraulic pump (12) is connected to the hydraulic oil tank (13), and a plugging agent storage tank (17) is arranged on one side of the hydraulic oil tank (13), and the plugging agent storage tank (17) is used to store polyurethane plugging agent.
8. The excavation water conservation device based on mine mining according to claim 1 is characterized in that: A plunger pump (16) is installed at the upper end of the base plate (1), the input end of the plunger pump (16) is connected to the plugging agent storage tank (17), and the output end of the plunger pump (16) is connected to the liquid inlet pipe (361) through a pipeline. A compressed air component (15) is installed at the upper end of the base plate (1), and the compressed air component (15) is used to pressurize and inflate the sealing airbag (373).
9. The excavation water conservation device based on mine mining according to claim 1 is characterized in that: A crawler (11) for driving the device to move is arranged below the bottom plate (1).
10. A control method for a tunneling water conservation device based on mine mining, characterized in that: The control method is applicable to a tunneling water conservation device based on mine mining as shown in any one of claims 1 to 9, and specifically comprises the following steps: S1, first determine the drilling position, then control the second hydraulic rod to extend and drive the rotating frame to rotate to a corresponding angle so that the drill bit is aligned with the drilling position, and start the hydraulic motor to drive the drill rod and the drill bit to rotate; S2, controlling the first hydraulic rod to extend and push the drill bit forward to drill forward; S3. If water seepage occurs in the borehole during drilling, the first detection electrode and the second detection electrode will contact the water flow to form a closed loop, and the monitoring terminal will issue an early warning after receiving the electrical signal; S4, controlling the first hydraulic rod to retract and drive the drill bit to return; S5, control the slewing assembly to rotate so that the first slewing arm faces the direction of the drilling hole, control each hydraulic cylinder to extend and respectively drive the first slewing arm, the second slewing arm and the third slewing arm to rotate and drive the grouting assembly close to the drilling hole, control the rotating block to rotate so that the grouting assembly faces the drilling hole, adjust the position so that the grouting assembly extends into the drilling hole, control the pneumatic push rod to push the pneumatic fixed claw to rotate so that the anti-slip teeth on one side of the pneumatic fixed claw abut against the inner wall of the drilling hole, pressurize and inflate the sealing airbag through the compressed air assembly to expand the sealing airbag to seal the drilling hole, and inject the polyurethane plugging agent in the plugging agent storage tank into the drilling hole through the grouting port to seal the crack; S6, recover the grouting components to complete the plugging; S7. Place a measuring unit inside the borehole to be monitored and seal the borehole with a sealant. The measuring unit measures the humidity and air pressure inside the borehole, and records the humidity and air pressure data inside the borehole as initial data. Place the abutment block inside the borehole, twist the adjustment bolt to expand the abutment block outward, and fix the signal sending unit outside the borehole. S8. The measuring unit continuously transmits the measuring data to the signal transmitter, and the signal transmitter sends the measuring data to the monitoring terminal. If the difference between the humidity and air pressure data and the initial data exceeds the threshold, it indicates that there is a risk of water seepage inside the rock formation. The monitoring terminal issues an alarm, and the operator sends the signal to the unit and seals the borehole according to the steps.
Citation Information
Cited By
Green mining grouting device for Jurassic coal field and mining method
CN120889602A