Measuring device for TBM tunnel construction monitoring points

By designing a TBM tunnel construction monitoring point measurement device including installation groove, installation rod and support mechanism, the connection difficulties and stability problems caused by the high positioning position of the positioning column are solved, and the rapid, stable installation and flexible measurement of the positioning disk are achieved.

CN119879873APending Publication Date: 2025-04-25SHIHEZI UNIVERSITY
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202510023567.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-07
Publication Date
2025-04-25

AI Technical Summary

Technical Problem

In TBM tunnel construction, when the tunnel is large, the positioning position of the positioning column is higher, which makes it difficult to connect the fixed cap, time-consuming and labor-intensive, and the stability after connection cannot be guaranteed, and the use effect is not good.

Method used

A measurement device for the TBM tunnel construction monitoring point is designed, including the installation groove and installation rod on the side of the tunnel. Through the coordination of the installation rod and the support mechanism, the positioning plate can be quickly installed and stable and fixed, and the measurement flexibility and accuracy can be improved through auxiliary devices such as adjustment mechanisms and LED lights.

Benefits of technology

It realizes rapid installation and stable fixation of positioning discs, simplifies the operation process, improves the stability and use effect of assembly, and is suitable for tunnel construction environments of all sizes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119879873A_ABST
    Figure CN119879873A_ABST
Patent Text Reader

Abstract

The invention discloses a TBM tunnel construction monitoring point measuring device, and relates to the technical field of tunnel construction, and the technical scheme is that the TBM tunnel construction monitoring point measuring device comprises a tunnel, mounting grooves are formed in the middle and the top of the side face of the tunnel, fixing grooves are formed in the bottoms of the mounting grooves, mounting rods are inserted into the mounting grooves, and adjusting mechanisms are arranged at the bottoms of the mounting rods. After the mounting rod is inserted into the mounting groove, the supporting plates can be driven to move towards the two sides through the supporting mechanisms arranged on the two sides of the upper portion of the mounting rod, the interior of the mounting groove is pressed through the supporting plates on the two sides, and the mounting rod can be fixed; the fixing mechanisms arranged on the lower portions of the mounting rods can drive the fixing clamps arranged on the two sides to be closed inwards so as to be clamped into the fixing grooves formed in the bottoms of the mounting grooves, then fixing is conducted again, operation is easy, assembling is convenient, and the stability during assembling can be effectively improved through the fixing mode that the inner side and the outer side are combined.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel construction, and in particular to a measuring device for a TBM tunnel construction monitoring point. Background Art

[0002] In TBM tunnel construction, the measuring devices at the monitoring points are crucial to ensuring construction safety and project quality. These monitoring points are arranged at key locations in the tunnel. By regularly collecting data, the deformation, stress and environmental changes of the tunnel can be tracked in real time. These data not only help to evaluate the impact of the construction process on the surrounding environment, but also can promptly discover potential safety hazards. The application of measuring devices enables engineers to respond quickly during the construction process and effectively manage emergencies. These monitoring data provide an important basis for the subsequent analysis and evaluation of the project, and enhance the scientificity and accuracy of the construction. In a complex geological environment, systematic monitoring methods have greatly improved the safety and efficiency of TBM tunnel construction, providing a strong guarantee for the smooth progress of the project. Through a strict monitoring system, the stability of the tunnel is ensured, and ultimately a solid foundation is laid for the safe operation of the tunnel.

[0003] After searching, the Chinese patent number CN217155389U discloses a measuring device for monitoring points of TBM tunnel construction, including a tunnel segment, and the middle and top of the side of the tunnel segment are provided with mounting holes. A connecting column is connected by internal threads of three fixing caps, and one side of the inner wall of the three connecting segments is rotatably connected with a positioning column, and one end of the three positioning columns away from the connecting segments is fixedly connected with a positioning disk, and the top side of the outer wall of the three connecting columns is threadedly connected with a locking nut, and then the three positioning columns and the fixing caps can be loosened by unscrewing the locking nut, and the three positioning columns and the three fixing caps can be separated by rotating, so as to facilitate the purpose of rapid installation and disassembly. At the same time, the fixing cap is fixedly connected to the mounting hole by glue, and by providing multiple fixing caps, it is convenient to provide an installation position for the connecting column, so that the user can reuse the positioning column and the positioning disk to measure the inside of the tunnel. Compared with the prior art, the Chinese patent number CN217155389U solves the problem that the existing measuring device is not convenient for installation and disassembly, which has a certain impact on the later reuse.

[0004] However, in actual use of the above device, when the tunnel is large, the placement position of the positioning column is relatively high, and it is difficult, time-consuming and labor-intensive to connect the fixing cap to the positioning column. Moreover, the stability cannot be guaranteed after the connection is completed, and the use effect is not good. Therefore, a measuring device for TBM tunnel construction monitoring points is proposed. Summary of the invention

[0005] The purpose of the present invention is to solve the problem that when the tunnel is large, the placement position of the positioning column is relatively high, it is difficult to connect the fixing cap to the positioning column, it is time-consuming and labor-intensive, and the stability cannot be guaranteed after the connection is completed, resulting in poor use effect. A measuring device for TBM tunnel construction monitoring points is proposed to solve the problem.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions:

[0007] A measuring device for a monitoring point of a TBM tunnel construction comprises a tunnel, wherein a mounting groove is arranged at the middle and top of the side of the tunnel, a fixing groove is arranged at the bottom of the mounting groove, a mounting rod is inserted into the mounting groove, an adjusting mechanism is arranged at the bottom of the mounting rod, a positioning plate is fixedly connected to the bottom of the adjusting mechanism, and the adjusting mechanism can drive the positioning plate to rotate;

[0008] A total station is placed at the bottom of the tunnel, and the three positioning plates can be measured by the total station. Two supporting mechanisms are symmetrically arranged on the upper part of the mounting rod, and the supporting mechanisms can drive the supporting plate to move to both sides. The lower end of the mounting rod is fixedly connected with a fixing mechanism, and the fixing mechanism can drive the fixing clamps arranged on both sides to close inwardly, so as to clamp the two sides of the mounting groove.

[0009] The above technical solution further includes:

[0010] A reflector is fixedly connected to the front end of the positioning plate, the positioning plate is coaxial with the positioning plate, a fixed protrusion is fixedly connected to the axial position of the positioning plate, and an LED lamp is arranged at the axial position of the side of the positioning plate away from the reflector.

[0011] The adjusting mechanism comprises an adjusting shell fixedly connected to the bottom of the mounting rod, a third motor is arranged inside the adjusting shell, and an adjusting component is arranged at the output end of the third motor.

[0012] The adjustment component includes a worm arranged at the output end of the third motor, the worm is rotationally connected to the adjustment housing, the worm is meshingly connected with a worm wheel, the worm wheel is rotationally connected to the adjustment housing, and a positioning plate is fixedly connected to the side of the worm wheel away from the adjustment housing.

[0013] The fixing mechanism comprises a fixing shell fixedly connected to the lower part of the reflector, a first motor is arranged at the lower side of the fixing shell, and a fixing component is arranged at the output end of the first motor.

[0014] The fixing assembly includes a rotating rod arranged at the output end of the first motor, connecting rods are rotatably connected to both sides of the rotating rod, a sliding block is rotatably connected to the side of the connecting rod away from the rotating rod, the sliding block is slidably connected to the fixed shell, and a fixing clamp is fixedly connected to the front end of the sliding block.

[0015] After the installation rod is completely inserted into the installation slot, the fixing clips are just located at both sides of the fixing slot, and when the fixing clips are closed inwards, they can be directly inserted into the fixing slot.

[0016] The support mechanism comprises a support shell fixedly connected to the upper part of the reflective plate, a second motor is arranged inside the support shell, and a support assembly is arranged at the output end of the second motor.

[0017] The support assembly includes a screw rod arranged at the output end of the second motor, the screw rod is rotatably connected to the support shell, the screw rod is threadedly connected to a transmission rod, both sides of the transmission rod are rotatably connected to rotating wheels, the rotating wheel is rotatably connected to a lifting rod, and the lifting rod is rotatably connected to a support plate on the side away from the rotating wheel.

[0018] The transmission rod is slidably connected to limiting grooves on both sides, and the limiting grooves are fixedly connected to the supporting shell.

[0019] The present invention has the following beneficial effects:

[0020] 1. In the present invention, when installing the positioning plate, the personnel only need to use a tool to insert the mounting rod into the mounting groove. After the insertion is completed, the support plates can be driven to move to both sides by the support mechanisms on both sides arranged on the upper part of the mounting rod, and the mounting rod can be fixed by pressing the inside of the mounting groove through the support plates on both sides. After the internal fixation, the fixing clips arranged on both sides can also be driven to close inwards by the fixing mechanism arranged at the lower part of the mounting rod, so as to be stuck in the fixing groove arranged at the bottom of the mounting groove, so as to be fixed again. The operation is simple and the assembly is convenient. Moreover, the stability during assembly can be effectively improved by the fixing method combining the inside and the outside.

[0021] 2. In the present invention, a reflective plate and a fixed protrusion are provided on one side of the positioning disk, and the reflective plate and the fixed protrusion can facilitate personnel to identify the positioning disk when using the total station for measurement. An LED light is also provided on the back side of the positioning disk, and the positioning disk can be driven to rotate through an adjustment mechanism. Personnel can flexibly adjust the positioning disk according to the on-site monitoring environment, thereby improving the use effect of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 A schematic diagram of the structure of a measuring device for a TBM tunnel construction monitoring point proposed by the present invention;

[0023] Figure 2 It is a schematic diagram of the three-dimensional structure of the present invention;

[0024] Figure 3 It is a schematic diagram of the first structure of the present invention;

[0025] Figure 4 It is a second structural schematic diagram of the present invention;

[0026] Figure 5 It is a schematic diagram of the third structure of the present invention;

[0027] Figure 6 It is a schematic diagram of the fourth structure of the present invention;

[0028] Figure 7 It is a fifth structural schematic diagram of the present invention;

[0029] Figure 8 It is a sixth structural schematic diagram of the present invention;

[0030] Fig. 9 This is the seventh structural diagram of the present invention.

[0031] In the figure: 1. tunnel; 2. total station; 3. positioning plate; 4. mounting slot; 5. reflector; 6. positioning bump; 7. adjustment shell; 8. fixing clamp; 9. fixing slot; 10. fixing shell; 11. first motor; 12. slider; 13. rotating rod; 14. connecting rod; 15. mounting rod; 16. LED lamp; 17. support plate; 18. transmission rod; 19. support shell; 20. screw; 21. rotating wheel; 22. limiting slot; 23. lifting rod; 24. second motor; 25. third motor; 26. worm; 27. worm wheel. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] Embodiment 1

[0034] like Figure 1-Figure 9 As shown, a measuring device for a monitoring point of a TBM tunnel construction comprises a tunnel 1, a mounting groove 4 is arranged at the middle and top of the side of the tunnel 1, a fixing groove 9 is arranged at the bottom of the mounting groove 4, a mounting rod 15 is inserted into the mounting groove 4, an adjusting mechanism is arranged at the bottom of the mounting rod 15, a positioning plate 3 is fixedly connected to the bottom of the adjusting mechanism, and the adjusting mechanism can drive the positioning plate 3 to rotate;

[0035] A total station 2 is placed at the bottom of the tunnel 1, and the three positioning plates 3 can be measured by the total station 2. Two supporting mechanisms are symmetrically arranged on the upper part of the mounting rod 15, and the supporting mechanisms can drive the supporting plate 17 to move to both sides. The lower end of the mounting rod 15 is fixedly connected with a fixing mechanism, and the fixing mechanism can drive the fixing clamps 8 arranged on both sides to close inwardly, so as to clamp both sides of the mounting groove 4;

[0036] The fixing mechanism includes a fixing housing 10 fixedly connected to the lower part of the reflector 5, a first motor 11 is arranged at the lower side of the fixing housing 10, a fixing assembly is arranged at the output end of the first motor 11, and the fixing assembly includes a rotating rod 13 arranged at the output end of the first motor 11, connecting rods 14 are rotatably connected to both sides of the rotating rod 13, a sliding block 12 is rotatably connected to the side of the connecting rod 14 away from the rotating rod 13, the sliding block 12 is slidably connected to the fixing housing 10, a fixing clamp 8 is fixedly connected to the front end of the sliding block 12, and after the mounting rod 15 is fully inserted into the mounting groove 4, the fixing clamp 8 is just located at both sides of the fixing groove 9, and when the fixing clamp 8 is closed inwardly, it can be directly inserted into the fixing groove 9;

[0037] The supporting mechanism includes a supporting shell 19 fixedly connected to the upper part of the reflector 5, a second motor 24 is arranged inside the supporting shell 19, a supporting assembly is arranged at the output end of the second motor 24, and the supporting assembly includes a screw rod 20 arranged at the output end of the second motor 24, the screw rod 20 is rotatably connected to the supporting shell 19, the screw rod 20 is threadedly connected to the transmission rod 18, both sides of the transmission rod 18 are rotatably connected to the rotating wheels 21, the rotating wheels 21 are rotatably connected to the lifting rod 23, the lifting rod 23 is rotatably connected to the support plate 17 on the side away from the rotating wheel 21, both sides of the transmission rod 18 are slidably connected to the limiting grooves 22, and the limiting grooves 22 are fixedly connected to the supporting shell 19.

[0038] In this embodiment, the installation groove 4 is pre-installed in the middle and top of both sides of the tunnel 1. When measurement is required, the personnel only need to fully insert the installation rod 15 into the installation groove 4, and then start the second motor 24 on the support shell 19. The second motor 24 drives the screw rod 20 to rotate. The rotation of the screw rod 20 can drive the threaded transmission rod 18 to move. The movement of the transmission rod 18 can drive the rotating wheels 21 rotatably connected on both sides to move synchronously, and the movement of the rotating wheel 21 can drive one side of the lifting rod 23 rotatably connected thereto to move, thereby driving the lifting rod 23 to rotate, so that the support plate 17 rotatably connected to the lifting rod 23 moves, and the support plates 17 on both sides press the inside of the installation groove 4, so that the installation rod 15 can be fixed;

[0039] After completing the internal fixation, the first motor 11 provided on the fixed shell 10 is then started. The first motor 11 can drive the rotating rod 13 to rotate. The rotation of the rotating rod 13 can drive the connecting rod 14 rotatably connected on both sides to rotate. The rotation of the connecting rod 14 can drive the rotatably connected slider 12 to move along the fixed shell 10. The movement of the slider 12 can drive the fixed connection fixing clip 8 to close inward, so that it is stuck in the fixing groove 9 provided at the bottom of the installation groove 4 for fixing again. The operation is simple and the assembly is convenient. Moreover, the stability during assembly can be effectively improved through the fixing method combining the inside and outside.

[0040] Embodiment 2

[0041] like Figure 1-Figure 9 As shown, the front end of the positioning plate 3 is fixedly connected to a reflector 5, the positioning plate 3 is coaxial with the positioning plate 3, a positioning protrusion 6 is fixedly connected to the axis position of the positioning plate 3, and an LED light 16 is arranged at the axis position of the side of the positioning plate 3 away from the reflector 5;

[0042] The adjusting mechanism includes an adjusting shell 7 fixedly connected to the bottom of the mounting rod 15, a third motor 25 is arranged inside the adjusting shell 7, an adjusting component is arranged at the output end of the third motor 25, the adjusting component includes a worm 26 arranged at the output end of the third motor 25, the worm 26 is rotationally connected to the adjusting shell 7, the worm 26 is meshingly connected to a worm wheel 27, the worm wheel 27 is rotationally connected to the adjusting shell 7, and a positioning plate 3 is fixedly connected to the side of the worm wheel 27 away from the adjusting shell 7.

[0043] In this embodiment, after the installation is completed, a reflective plate 5 and a positioning protrusion 6 are provided on one side of the positioning disk 3. The reflective plate 5 and the positioning protrusion 6 can facilitate personnel to identify the positioning disk 3 when using the total station 2 for measurement, and an LED lamp 16 is also provided on the back side of the positioning disk 3. The LED lamp 16 can emit light and can also be used to position the positioning disk 3. The third motor 25 arranged inside the adjusting shell 7 can drive the worm 26 to rotate, and the rotation of the worm 26 can drive the meshing worm wheel 27 to rotate, and the rotation of the worm wheel 27 can drive the positioning disk 3 to rotate, so that personnel can flexibly adjust the positioning method according to the on-site monitoring environment, thereby improving the use effect of the device.

[0044] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A measuring device for monitoring points of a TBM tunnel construction, comprising a tunnel (1), characterized in that: The middle and top of the side of the tunnel (1) are both provided with a mounting groove (4), the bottom of the mounting groove (4) is provided with a fixing groove (9), a mounting rod (15) is inserted into the mounting groove (4), an adjustment mechanism is provided at the bottom of the mounting rod (15), a positioning plate (3) is fixedly connected to the bottom of the adjustment mechanism, and the adjustment mechanism can drive the positioning plate (3) to rotate; A total station (2) is placed at the bottom of the tunnel (1), and three positioning plates (3) can be measured by the total station (2). Two supporting mechanisms are symmetrically arranged on the upper part of the installation rod (15), and the supporting mechanisms can drive the supporting plate (17) to move to both sides. The lower end of the installation rod (15) is fixedly connected with a fixing mechanism, and the fixing mechanism can drive the fixing clamps (8) arranged on both sides to close inwardly, so as to clamp the two sides of the installation groove (4).

2. A measuring device for monitoring points of TBM tunnel construction according to claim 1, characterized in that: The front end of the positioning plate (3) is fixedly connected to a reflector (5), the positioning plate (3) and the positioning plate (3) are coaxial, a positioning protrusion (6) is fixedly connected to the axial position of the positioning plate (3), and an LED lamp (16) is arranged at the axial position of the side of the positioning plate (3) away from the reflector (5).

3. A measuring device for monitoring points of TBM tunnel construction according to claim 1, characterized in that: The adjustment mechanism comprises an adjustment housing (7) fixedly connected to the bottom of the mounting rod (15), a third motor (25) is arranged inside the adjustment housing (7), and an adjustment component is arranged at the output end of the third motor (25).

4. A measuring device for monitoring points of TBM tunnel construction according to claim 3, characterized in that: The adjustment assembly comprises a worm (26) arranged at the output end of the third motor (25), the worm (26) being rotationally connected to the adjustment housing (7), the worm (26) being meshingly connected to a worm wheel (27), the worm wheel (27) being rotationally connected to the adjustment housing (7), and a positioning plate (3) being fixedly connected to the side of the worm wheel (27) away from the adjustment housing (7).

5. The measuring device for monitoring points of TBM tunnel construction according to claim 1, characterized in that: The fixing mechanism comprises a fixing housing (10) fixedly connected to the lower part of the reflective plate (5), a first motor (11) is arranged on the lower side of the fixing housing (10), and a fixing component is arranged at the output end of the first motor (11).

6. A measuring device for monitoring points in TBM tunnel construction according to claim 5, characterized in that: The fixing assembly comprises a rotating rod (13) arranged at the output end of the first motor (11), the two sides of the rotating rod (13) are rotatably connected to connecting rods (14), the side of the connecting rod (14) away from the rotating rod (13) is rotatably connected to a sliding block (12), the sliding block (12) is slidably connected to the fixed housing (10), and the front end of the sliding block (12) is fixedly connected to a fixing clamp (8).

7. A measuring device for monitoring points of TBM tunnel construction according to claim 1, characterized in that: After the installation rod (15) is completely inserted into the installation groove (4), the fixing clip (8) is just located on both sides of the fixing groove (9), and when the fixing clip (8) is closed inwards, it can be directly inserted into the fixing groove (9).

8. The measuring device for monitoring points of TBM tunnel construction according to claim 1, characterized in that: The support mechanism comprises a support shell (19) fixedly connected to the upper part of the reflector (5), a second motor (24) is arranged inside the support shell (19), and a support assembly is arranged at the output end of the second motor (24).

9. A measuring device for monitoring points in TBM tunnel construction according to claim 8, characterized in that: The support assembly comprises a screw rod (20) arranged at the output end of a second motor (24), the screw rod (20) being rotatably connected to a support housing (19), the screw rod (20) being threadedly connected to a transmission rod (18), both sides of the transmission rod (18) being rotatably connected to rotating wheels (21), the rotating wheels (21) being rotatably connected to a lifting rod (23), and the lifting rod (23) being rotatably connected to a support plate (17) on a side away from the rotating wheel (21).

10. A measuring device for monitoring points in TBM tunnel construction according to claim 9, characterized in that: The transmission rod (18) is slidably connected to limiting grooves (22) on both sides, and the limiting grooves (22) are fixedly connected to the support shell (19).

Citation Information

Patent Citations

  • Measuring device for TBM tunnel construction monitoring points

    CN217155389U