By obtaining historical simulation data in nuclear power plants and screening and inserting fault data during serious accident stages, the impact of the development and use of serious accident simulators on the full-range simulator platform is solved, and the normal simulation calculation and training use of the full-range simulator are guaranteed.
Patent Information
- Application Number
- CN202311416359.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-27
- Publication Date
- 2025-04-29
AI Technical Summary
During the development and use of existing nuclear power plants, the full-range simulator platform will be transformed and debugged, resulting in the inability to keep the normal training in parallel with the training of the serious accident simulator, reducing the efficiency of the training and use of the full-range simulator.
A nuclear power plant data simulation method is proposed. By obtaining the historical simulation data of the nuclear power plant, screening the data in response to entering the serious accident stage, inserting the fault data for simulation calculations, and using an external serious accident simulator to reduce the impact on the full-range simulator system platform.
This method reduces the impact on the system platform, original models, and training use of the full-range simulator, and ensures the normal simulation calculation effect and training use frequency of the original full-range simulator.
Smart Images

Figure CN119903630A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of nuclear power simulation technology, and in particular to a nuclear power plant data simulation method, device, electronic equipment and storage medium. Background Art
[0002] The severe accident simulators currently used for training in nuclear power plants are all secondary developed and modified based on the full-scale simulator systems of the original corresponding units. In the later training and use, the severe accident simulators also rely on the full-scale simulators to simulate and calculate the accident process before the severe accident stage. This results in the modification and debugging of the full-scale simulation model during the development and use of the severe accident simulators. The normal training of the full-scale simulator platform cannot be kept in parallel with the training of the severe accident simulators, which reduces the training and use efficiency of the full-scale simulators. Summary of the invention
[0003] The present application aims to solve one of the technical problems in the related art at least to some extent.
[0004] To this end, the first purpose of this application is to propose a nuclear power plant data simulation method to reduce the impact on the full-range simulator system platform, original model, and training use, and to ensure the normal simulation calculation effect and training frequency of the original full-range simulator.
[0005] The second objective of this application is to provide a nuclear power plant data simulation device.
[0006] The third objective of the present application is to provide an electronic device.
[0007] A fourth objective of the present application is to provide a computer-readable storage medium.
[0008] A fifth object of the present application is to provide a computer program product.
[0009] To achieve the above-mentioned purpose, the first embodiment of the present application proposes a nuclear power plant data simulation method, including:
[0010] Acquiring initial simulation data, wherein the initial simulation data is historical simulation data of the nuclear power plant;
[0011] In response to entering a severe accident phase, screening the initial simulation data to determine target data;
[0012] The fault data is inserted into the target data to perform simulation calculation.
[0013] To achieve the above-mentioned purpose, the second embodiment of the present application proposes a nuclear power plant data simulation device, including:
[0014] An acquisition module, used for acquiring initial simulation data, wherein the initial simulation data is historical simulation data of the nuclear power plant;
[0015] A screening module, configured to screen the initial simulation data to determine target data in response to entering a severe accident phase;
[0016] The simulation module is used to insert the fault data into the target data to perform simulation calculation.
[0017] To achieve the above-mentioned purpose, the third aspect of the present application provides an electronic device, including: a processor, and a memory communicatively connected to the processor;
[0018] The memory stores computer-executable instructions;
[0019] The processor executes the computer-executable instructions stored in the memory to implement a nuclear power plant data simulation method proposed in the first aspect of the embodiment of the present application.
[0020] To achieve the above-mentioned purpose, the fourth aspect embodiment of the present application proposes a computer-readable storage medium, in which computer execution instructions are stored. When the computer execution instructions are executed by the processor, they are used to implement a nuclear power plant data simulation method proposed in the first aspect embodiment of the present application.
[0021] To achieve the above-mentioned purpose, the fifth aspect of the present application proposes a computer program product, including a computer program, which, when executed by a processor, implements a nuclear power plant data simulation method proposed in the first aspect of the present application.
[0022] The nuclear power plant data simulation method, device, electronic device and storage medium provided by the present application obtain initial simulation data, which are historical simulation data of the nuclear power plant; in response to entering the severe accident stage, the initial simulation data are screened to determine the target data; the fault data are inserted into the target data to perform simulation calculations, and through an external severe accident simulator, the impact on the full-range simulator system platform, the original model, and the training use is reduced, thereby ensuring the normal simulation calculation effect and training use frequency of the original full-range simulator.
[0023] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:
[0025] Figure 1A schematic diagram of a flow chart of a nuclear power plant data simulation method provided in an embodiment of the present application;
[0026] Figure 2 A schematic flow chart of another nuclear power plant data simulation method provided in an embodiment of the present application;
[0027] Figure 3 A schematic diagram of the structure of a nuclear power plant data simulation device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0028] Embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.
[0029] The following describes the nuclear power plant data simulation method and device according to the embodiments of the present application with reference to the accompanying drawings.
[0030] Figure 1 A flow chart of a nuclear power plant data simulation method provided in an embodiment of the present application.
[0031] At present, the severe accident simulator needs to be connected to the full-range simulator. Therefore, the entire process of development and use of the severe accident simulator will have an impact on the corresponding full-range simulator. The scope of impact includes but is not limited to: the transformation of the full-range simulator platform system, the modification and debugging of the full-range simulation model, and the normal training of the full-range simulator platform cannot be kept in parallel with the training of the severe accident simulator, which reduces the training and use efficiency of the full-range simulator.
[0032] Among them, the full-range simulator is a device used to train and assess nuclear power plant operators and senior operators. It completely replicates the main control room of a nuclear power plant and reproduces the entire process of the nuclear power plant realistically and in real time on a computer through a mathematical model, simulating the normal operation and accident handling operations of the main control room.
[0033] In view of the above problems, the embodiment of the present application provides a nuclear power plant data simulation method, which is applied to an external severe accident simulator to ensure the normal simulation calculation effect and training frequency of the original full-range simulator. The formal development stage of the external severe accident simulator is completely separated from the full-range simulator, which does not affect the normal training use of the full-range simulator. Figure 1 As shown, the nuclear power plant data simulation method includes the following steps:
[0034] Step 101, obtaining initial simulation data, where the initial simulation data is historical simulation data of a nuclear power plant.
[0035] It should be noted that the external severe accident simulator can reproduce the operating data of the full-range simulator and the actual operating data of the power plant units, and can be separated from the full-range simulator without affecting the normal training use of the full-range simulator.
[0036] Optionally, subsequent data simulation is performed by reproducing the acquired historical simulation data of the nuclear power plant as initial simulation data.
[0037] The historical simulation data may be simulation data within a certain period of time before the current time, for example, simulation data within one hour before the current time.
[0038] Since the process of obtaining initial simulation data will not cause any changes to the model of the full-range simulator system, even if it is arranged during the normal training of the full-range simulator, it will not affect the normal use of the full-range simulation.
[0039] Step 102 , in response to entering the severe accident stage, screening the initial simulation data to determine target data.
[0040] Optionally, in the acquired historical data, if the temperature parameter reaches the preset temperature, it means that the nuclear power plant has entered a serious accident stage. In the serious accident stage, the steam turbine and other equipment in the secondary circuit have stopped running. By screening the running data in the initial simulation data as the target data, subsequent data analysis is carried out.
[0041] Step 103, inserting the fault data into the target data to perform simulation calculation.
[0042] Optionally, in the process of obtaining initial simulation data, simulation data when a fault occurs can be obtained as fault data. The target data is the data running during the severe accident stage. The fault data is inserted into the target data, and the target data is modified to realize the insertion of the fault and debugging during the severe accident stage. The scenario of the accident is simulated, and the target data after the fault is inserted is simulated and calculated to realize simulation calculation and obtain real-time simulation data.
[0043] In this embodiment, initial simulation data is obtained, which is the historical simulation data of the nuclear power plant; in response to entering the severe accident stage, the initial simulation data is screened to determine the target data; the fault data is inserted into the target data to perform simulation calculations, and an external severe accident simulator is used to reduce the impact on the full-range simulator system platform, the original model, and training use, thereby ensuring the normal simulation calculation effect and training use frequency of the original full-range simulator.
[0044] exist Figure 1 Based on the embodiment shown, this embodiment provides another nuclear power plant data simulation method. Figure 2 A flow chart of another nuclear power plant data simulation method provided in an embodiment of the present application.
[0045] like Figure 2 As shown, the nuclear power plant data simulation method may include the following steps:
[0046] Step 201, obtaining initial simulation data, where the initial simulation data is historical simulation data of the nuclear power plant.
[0047] In an embodiment of the present application, the first historical operating data of the full-range simulator and the second historical operating data of the power plant units are collected according to a preset receiving frequency; the first historical data and the second operating data are arranged in chronological order as initial simulation data.
[0048] The historical simulation data may be simulation data within a certain period of time before the current time, for example, simulation data within one hour before the current time.
[0049] In an embodiment of the present application, historical simulation data comes from a full-range simulator or partial simulation data provided by a real power plant unit, mainly including system interface data, fault interface data for fault simulation, equipment interface, event interface, etc.
[0050] Among them, the system interface data include: chemical volume control system, passive core cooling system, passive containment cooling system, secondary circuit system (steam generator system, main steam system, main feed water system, sewage system) and other system interface data.
[0051] The acquisition of initial simulation data provides a complete data source and data-driven library for the simulation calculation of the external severe accident simulator from the design basis accident stage to before entering the severe accident stage.
[0052] The data that the full-range simulator needs to provide during the calculation process can be extracted in advance through the external severe accident simulator. When the severe accident calculation is actually performed, there is no need for the external severe accident simulator and the full-range simulator to run at the same time, which can free up some resources of the full-range simulator.
[0053] Step 202, in response to entering the severe accident stage, selecting the operation data of the severe accident stage from the initial simulation data as the target data.
[0054] Optionally, based on the core outlet temperature, it is determined whether the nuclear power plant has entered a severe accident stage.
[0055] In the embodiment of the present application, in response to the core outlet temperature being greater than or equal to a preset temperature, it is determined that the nuclear power plant has entered a severe accident stage. As a possible implementation, the preset temperature is 650°C.
[0056] It should be noted that the initial simulation data is the simulation data within a certain time period before the current moment. If the current moment has not entered the serious accident stage, the initial simulation data is the simulation data of the full-range simulator within a certain time period obtained; if the current moment has entered the serious accident stage, the initial simulation data includes not only the simulation data of the full-range simulator, but also some data calculated after entering the serious accident stage.
[0057] After entering the severe accident stage, the steam turbine and other equipment in the secondary circuit have stopped running. The severe accident analysis software is mainly responsible for the simulation calculation of the core, primary circuit, steam generator and the phenomenon in the containment. For example, after entering the severe accident stage, the nuclear power plant may lose power and fail to start the safety facilities (fail to start the water supply), resulting in core melting. By screening the running data in the initial simulation data as the target data, subsequent data analysis is carried out. However, before entering the severe accident stage, the operating data of the secondary circuit still needs to be paid attention to.
[0058] Step 203, inserting the fault data into the target data to perform simulation calculation.
[0059] In the embodiment of the present application, in the initial simulation data, the operating data where the fault occurs is extracted as the fault data; in response to triggering the fault event, the fault data is inserted into the target data using the fault interface.
[0060] Among them, fault data may include fault interface data, device interface, and event interface.
[0061] Furthermore, during the severe accident stage, faults may continue to occur. For example, a breach in a circuit may occur during the simulation process. The breach may be artificially enlarged or reduced to modify the fault data. The fault data is then inserted into the target data to simulate the fault.
[0062] As a possible implementation, based on the switch state of the valve, the device interface data can be determined, for example, during the training process, the device is started and shut down, the device interface data is determined, and inserted into the target data.
[0063] As a possible implementation method, in different scenarios, event judgment is performed to determine whether an event occurs, so as to determine an event interface and insert it into the target data.
[0064] Among them, the method of inserting fault data is to modify the target data, such as adding, modifying, deleting, etc. a single point of data, or adding, modifying, deleting, replacing, etc. the whole end of a time series.
[0065] Optionally, a preset severe accident analysis program is used to update input data in real time, wherein the input data is data after the fault data is inserted into the target data.
[0066] The data updated in real time is the data obtained by simulation calculation, which can be displayed in the user development interface. Furthermore, the data obtained by simulation calculation can be presented in the form of a two-dimensional monitoring interface and a three-dimensional dynamic display model to meet diverse training and display needs.
[0067] Furthermore, during the operation phase, the interface data of the severe accident analysis software can also be modified online in real time to implement fault insertion, action of related equipment, and triggering of events.
[0068] In this embodiment, initial simulation data is obtained, which is the historical simulation data of the nuclear power plant; in response to entering the severe accident stage, the operating data of the severe accident stage is selected from the initial simulation data as the target data; the fault data is inserted into the target data to perform simulation calculations, and the impact on the full-range simulator system platform, the original model, and training use is reduced through an external severe accident simulator, thereby ensuring the normal simulation calculation effect and training use frequency of the original full-range simulator.
[0069] In order to implement the above embodiments, the present application also proposes a nuclear power plant data simulation device.
[0070] Figure 3 A schematic diagram of the structure of a nuclear power plant data simulation device provided in an embodiment of the present application.
[0071] like Figure 3 As shown, the nuclear power plant data simulation device 300 includes: an acquisition module 301 , a screening module 302 and a simulation module 303 .
[0072] An acquisition module 301 is used to acquire initial simulation data, where the initial simulation data is historical simulation data of a nuclear power plant;
[0073] A screening module 302 is used for screening the initial simulation data to determine target data in response to entering the severe accident stage;
[0074] The simulation module 303 is used to insert the fault data into the target data to perform simulation calculation.
[0075] Furthermore, in a possible implementation of the embodiment of the present application, the acquisition module 301 is further configured to:
[0076] Collecting the first historical operation data of the full-range simulator and the second historical operation data of the power plant units according to a preset receiving frequency;
[0077] The first historical data and the second operating data are arranged in chronological order to serve as initial simulation data.
[0078] Furthermore, in a possible implementation of the embodiment of the present application, the screening module 302 is further configured to:
[0079] In the initial simulation data, the operating data of the severe accident stage is selected as the target data.
[0080] Based on the core outlet temperature, determine whether the nuclear power plant has entered the severe accident stage.
[0081] In response to the core outlet temperature being greater than or equal to a preset temperature, it is determined that the nuclear power plant enters a severe accident stage.
[0082] Furthermore, in a possible implementation of the embodiment of the present application, the simulation module 303 is further configured to:
[0083] Using a preset severe accident analysis program, the input data is updated in real time, wherein the input data is the data after the fault data is inserted into the target data.
[0084] In the initial simulation data, the operating data where the fault occurs is extracted as the fault data;
[0085] In response to triggering a fault event, the fault data is inserted into the target data using the fault interface.
[0086] It should be noted that the aforementioned explanation of the embodiment of the nuclear power plant data simulation method is also applicable to the nuclear power plant data simulation device of this embodiment, and will not be repeated here.
[0087] In the embodiment of the present application, initial simulation data is obtained, which is the historical simulation data of the nuclear power plant; in response to entering the severe accident stage, the initial simulation data is screened to determine the target data; the fault data is inserted into the target data to perform simulation calculations, and an external severe accident simulator is used to reduce the impact on the full-range simulator system platform, the original model, and training use, thereby ensuring the normal simulation calculation effect and training use frequency of the original full-range simulator.
[0088] In order to implement the above embodiments, the present application also proposes an electronic device, comprising: a processor, and a memory communicatively connected to the processor; the memory stores computer-executable instructions; the processor executes the computer-executable instructions stored in the memory to implement the method provided by the above embodiments.
[0089] In order to implement the above embodiments, the present application also proposes a computer-readable storage medium, in which computer-executable instructions are stored. When the computer-executable instructions are executed by a processor, they are used to implement the methods provided by the above embodiments.
[0090] In order to implement the above embodiments, the present application also proposes a computer program product, including a computer program, which implements the methods provided by the above embodiments when executed by a processor.
[0091] The collection, storage, use, processing, transmission, provision and disclosure of user personal information involved in this application are in compliance with relevant laws and regulations and do not violate public order and good morals.
[0092] It should be noted that personal information from users should be collected for legitimate and reasonable purposes and should not be shared or sold outside of these legitimate uses. In addition, such collection / sharing should be carried out after receiving the user's informed consent, including but not limited to notifying the user to read the user agreement / user notice and sign the agreement / authorization including authorization of relevant user information before the user uses the function. In addition, any necessary steps should be taken to protect and safeguard access to such personal information data and ensure that others who have access to personal information data comply with its privacy policy and procedures.
[0093] The present application is expected to provide an implementation scheme for users to selectively block the use or access of personal information data. That is, the present disclosure is expected to provide hardware and / or software to prevent or block access to such personal information data. Once the personal information data is no longer needed, the risk can be minimized by limiting data collection and deleting the data. In addition, when applicable, such personal information is de-identified to protect the privacy of the user.
[0094] In the description of the aforementioned embodiments, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0095] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0096] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, fragment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present application belong.
[0097] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute the instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.
[0098] It should be understood that the various parts of the present application can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0099] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.
[0100] In addition, each functional unit in each embodiment of the present application may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.
[0101] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present application. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present application.
Claims
1. A nuclear power plant data simulation method, characterized in that: Applied to an external severe accident simulator, the following steps are included: Acquiring initial simulation data, wherein the initial simulation data is historical simulation data of the nuclear power plant; In response to entering a severe accident phase, screening the initial simulation data to determine target data; The fault data is inserted into the target data to perform simulation calculation.
2. The nuclear power plant data simulation method according to claim 1, characterized in that: The obtaining of initial simulation data comprises: Collecting the first historical operation data of the full-range simulator and the second historical operation data of the power plant units according to a preset receiving frequency; The first historical data and the second operating data are arranged in chronological order to serve as the initial simulation data.
3. The nuclear power plant data simulation method according to claim 1, characterized in that: The screening of the initial simulation data to determine target data includes: In the initial simulation data, the operation data of the severe accident stage is selected as the target data.
4. The nuclear power plant data simulation method according to claim 1, characterized in that: The inserting the fault data into the target data to perform simulation calculation comprises: The input data is updated in real time using a preset severe accident analysis program, wherein the input data is the data after the fault data is inserted into the target data.
5. The nuclear power plant data simulation method according to claim 1, characterized in that: The inserting the fault data into the target data comprises: Extracting the operating data in which the fault occurs from the initial simulation data as the fault data; In response to triggering a fault event, the fault data is inserted into the target data using a fault interface.
6. The nuclear power plant data simulation method according to claim 1, characterized in that: The response to a serious accident includes: Based on the core outlet temperature, it is determined whether the nuclear power plant has entered a severe accident stage.
7. The nuclear power plant data simulation method according to claim 6, characterized in that: The determining, based on the core outlet temperature, whether the nuclear power plant has entered a severe accident stage comprises: In response to the core outlet temperature being greater than or equal to a preset temperature, it is determined that the nuclear power plant has entered a severe accident stage.
8. A nuclear power plant data simulation device, characterized in that: include: An acquisition module, used for acquiring initial simulation data, wherein the initial simulation data is historical simulation data of the nuclear power plant; A screening module, configured to screen the initial simulation data to determine target data in response to entering a severe accident phase; The simulation module is used to insert the fault data into the target data to perform simulation calculation.
9. An electronic device, characterized in that: include: A processor, and a memory communicatively connected to the processor; The memory stores computer-executable instructions; The processor executes the computer-executable instructions stored in the memory to implement the method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-executable instructions, which are used to implement the method according to any one of claims 1 to 7 when executed by a processor.