Intelligent transfer control system and method for rail transfer trolley

Through the transfer dispatch module and maintenance management module of the intelligent transfer control system, the inefficiency of rail transshipment vehicles and untimely troubleshooting of multiple tasks, multiple transfer vehicles and multiple priority conditions is solved, efficient path planning and resource utilization are achieved, and operational efficiency is improved.

CN119904049APending Publication Date: 2025-04-29HUAIBEI XIANGTAI SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411975434.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-31
Publication Date
2025-04-29

AI Technical Summary

Technical Problem

The existing rail transshipment vehicle path planning is inefficient under multi-tasking, multi-transshipment vehicle, and multi-priority conditions, and is not handled in time when a fault occurs.

Method used

An intelligent transport control system is designed, including a transport dispatch module and a maintenance management module. The transport scheduling module optimizes path planning and resource allocation by building a three-dimensional cone model; the maintenance management module monitors the vehicle status in real time and distributes tasks based on the matching values ​​of the maintenance personnel.

Benefits of technology

It improves the efficient operation of the transfer truck, ensures the rationality of task allocation and resource utilization, reduces transportation delays caused by failure and insufficient power, and improves overall operational efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119904049A_ABST
    Figure CN119904049A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent transfer control system and method for a rail transfer trolley, and relates to the technical field of rail transfer trolley control. Comprising a data acquisition module, a server, a transfer scheduling module and a maintenance management module, the transfer scheduling module performs task scheduling and path planning according to the real-time data, optimizes resource allocation, and ensures efficient operation of the transfer trolley; the maintenance management module monitors the safety state and the electric quantity state of the transfer trolley in real time, and performs task allocation according to the matching value of the maintenance personnel; by comprehensively considering a plurality of factors such as vehicle electric quantity, load, fault state, task priority and path planning, flexible task scheduling can be realized, and efficient operation of the system and optimal utilization of resources are ensured; and on the basis of the scheduling mode of the maintenance matching value and the electric quantity priority, it is ensured that the most suitable maintenance personnel deal with the faulty transfer trolley in the shortest time, and the utilization rate of personnel resources is optimized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of rail transfer vehicle control, and in particular to an intelligent transfer control system and method for a rail transfer vehicle. Background Art

[0002] Rail transfer vehicles are automated transport equipment that runs on dedicated tracks. They are usually used for automated transport of materials or goods in industrial, warehousing and logistics, mining and other scenarios. Their design draws on the railway transportation system and uses track guidance to move automatically or semi-automatically within a predetermined route. Rail transfer vehicles can carry out precise transportation according to the preset tracks without the need for human intervention, and can efficiently complete the task of transporting materials, goods or products.

[0003] At present, although the existing route planning of rail transfer vehicles can handle routine transportation tasks, when faced with multiple tasks, multiple transfer vehicles, and multiple priorities, the route planning has problems such as inefficiency and unreasonable planning, resulting in reduced transfer efficiency; when faced with failures of rail transfer vehicles, there is a problem that they cannot be handled in a timely and effective manner.

[0004] In order to solve the above-mentioned defects, an intelligent transfer control system for a rail transfer vehicle is now provided. Summary of the invention

[0005] The main purpose of the present invention is to provide an intelligent transfer control system and method for a rail transfer vehicle to overcome the problems mentioned in the above background technology.

[0006] To achieve the above object, according to one aspect of the present invention, there is provided an intelligent transport control system for a rail transport vehicle, the system comprising: a transport scheduling module and a maintenance management module;

[0007] The transfer scheduling module performs task scheduling and route planning based on real-time data, optimizes resource allocation, and ensures efficient operation of the transfer vehicle; the specific steps are as follows:

[0008] The carrying value Zi of the rail transfer vehicle to be transferred and the priority Pj of the task are used to construct a three-dimensional cone model; the bottom radius of the three-dimensional cone model is set to r, which is related to the carrying value Zi of the rail transfer vehicle, where r = a3 × Zi, a3 is the set weight factor; the height h of the three-dimensional cone model is set to be related to the priority Pj of the task, where That is, the higher the task priority, the greater the height of the cone, and a4 is the set weight factor; substitute the values ​​of the bottom radius r of the three-dimensional cone model and the height h of the cone into the formula Calculate the total volume V of the three-dimensional cone model 总 ; When the target distance Li changes, the three-dimensional cone model is cut; the cutting process is:

[0009] Substitute the maximum value of the distance Li from the transfer vehicle to the target and the maximum mission distance L into the formula proportional factor = 1-LL 最 i 大 The proportional factor of the target distance change is calculated; then the base radius of the cut cone is The height of the cone after cutting is Using the formula The effective volume after the cone is cut is calculated, that is, the priority value V of the rail transfer vehicle to be transferred;

[0010] Set a comprehensive priority value interval, compare and analyze the priority value of the rail transfer vehicle to be transferred with the set comprehensive priority value interval, when the priority value of the rail transfer vehicle to be transferred is greater than the maximum value of the set comprehensive priority value interval, the rail transfer vehicle to be transferred is marked as high priority; when the priority value of the rail transfer vehicle to be transferred is within the set comprehensive priority value interval, the rail transfer vehicle is marked as medium priority; when the priority value of the rail transfer vehicle to be transferred is less than the minimum value of the set comprehensive priority value interval, the rail transfer vehicle is marked as low priority; sort the high-priority rail transfer vehicles from large to small according to the priority value, and assign the high-priority tasks in turn until the high-priority tasks are assigned; sort the medium-priority rail transfer vehicles from large to small according to the priority value, and assign the medium-priority tasks in turn until the medium-priority tasks are assigned; sort the low-priority rail transfer vehicles from large to small according to the priority value, and assign the low-priority tasks in turn until the low-priority tasks are assigned;

[0011] The maintenance management module monitors the safety status and power status of the transfer vehicle in real time, and assigns tasks based on the matching values ​​of maintenance personnel.

[0012] Furthermore, it also includes a data acquisition module and a server;

[0013] The data acquisition module collects the vehicle information and power data of the transfer vehicle in real time, and sends the collected information to the server for storage.

[0014] Further, the specific analysis of the carrying value is:

[0015] Get the current power of the rail transfer vehicle and mark it as Ei, where i = 1, 2, 3...I, I is a positive integer, I represents the total number of rail transfer vehicles, and i represents the number of any rail transfer vehicle; get the maximum power of the transfer vehicle (power when fully charged) and mark it as Emax; get the fault signal on the rail transfer vehicle and mark it as Fi, where When Fi = 0, the rail transfer vehicle is marked as a maintenance transfer vehicle and does not participate in task allocation; the load capacity of the rail transfer vehicle is obtained and marked as Wi; the current power Ei of the fault-free rail transfer vehicle, the maximum power Emax of the transfer vehicle and the load capacity Wi are substituted into the formula The carrying value Zi of the rail transfer vehicle is calculated, where a1 and a2 are the set weight factors respectively.

[0016] Further, the specific analysis of task priority and task distance is as follows:

[0017] The entire transfer task area is divided into several sub-areas. The specific sub-areas are divided by industry professionals according to the specific geographical information of the sub-areas, the distribution of task objectives and the priority of the tasks; the current positions of all rail transfer vehicles to be transferred in the sub-areas are obtained and marked as Pi; the positions of the task objectives are obtained and marked as Rj, where j = 1, 2, 3...J, J is a positive integer, J represents the total number of task objectives, and j represents the serial number of any task objective; the priority of a task is set and marked as Pj, where Pj∈{1, 2, 3}, where Pj=1 is a high priority task; Pj=2 is a medium priority task; Pj=3 is a low priority task; the total length of the path from the current position Pi of the rail transfer vehicle to be transferred to the task target position Rj is set as Li, and the path is divided into N nodes, and the distance of each node is Dn, where n=1, 2, 3...N, N is a positive integer, N represents the total number of task path nodes, and n represents the serial number of any task path node; using the formula Calculate the path length of the rail transfer vehicle to be transferred from the current position Pi to the task target Rj, that is, the task distance Li; set a maximum distance from the rail transfer vehicle to be transferred to the task target and mark it as Lmax.

[0018] Further, the specific analysis of the rail transfer vehicles to be transferred is as follows:

[0019] According to the normalized carrying value of the rail transfer vehicle, a carrying threshold is set, and the carrying value of the rail transfer vehicle is compared with the set carrying threshold for analysis; when the carrying value of the rail transfer vehicle is greater than the set carrying threshold, the rail transfer vehicle is marked as a rail transfer vehicle to be transferred, and the vehicle to be transferred will be used for task allocation, and the number of all rail transfer vehicles to be transferred will be counted; when the carrying value of the rail transfer vehicle is less than or equal to the set carrying threshold, the rail transfer vehicle is marked as a rail transfer vehicle to be maintained, and the vehicle to be maintained should be replenished or troubleshooted until the carrying value threshold is reached before it can participate in the task again, and the number of all rail transfer vehicles to be maintained will be counted.

[0020] Further, the specific analysis of the maintenance personnel matching value is as follows:

[0021] Obtain the fault signal of the transport vehicle to be maintained, and obtain the current position of the faulty transport vehicle, set the maintenance range with the current position of the transport vehicle to be maintained as the center point, match the current position of the background personnel to be maintained with the maintenance range, and mark the maintenance personnel whose current position is in the maintenance range as personnel to be maintained; it should be noted that the maintenance range of the transport vehicle to be maintained is set by industry insiders according to their needs; obtain the personal information of the background personnel to be maintained, and mark the length of service of each maintenance personnel as Gm, where m=1, 2, 3...M, M is a positive integer, M represents the total number of background maintenance personnel, and m represents the number of any one of the maintenance personnel; obtain the current position of the background personnel to be maintained, and calculate the distance difference between the current position of the background personnel to be maintained and the position of the transport vehicle with maintenance fault to obtain the maintenance distance of the maintenance personnel, and mark it as Hm; obtain the number of maintenance times of the background personnel to be maintained, and mark it as Cm; substitute the values ​​of the maintenance personnel's length of service Gm, maintenance distance Hm and maintenance times Cm into the formula The maintenance matching value Um of the backstage maintenance personnel is calculated, where b1, b2 and b3 are respectively set weight factors, and e is a natural constant.

[0022] Furthermore, the task allocation of the maintenance management module is specifically as follows:

[0023] A maintenance matching threshold is set, and the maintenance matching value of the backstage personnel to be maintained is compared with the set maintenance matching threshold for analysis; when the maintenance matching value of the backstage personnel to be maintained is greater than the set maintenance matching threshold, the maintenance personnel is marked as the first maintenance sequence; when the maintenance matching value of the backstage personnel to be maintained is less than or equal to the set maintenance matching threshold, the maintenance personnel is marked as the second maintenance sequence; the personnel to be maintained with the largest maintenance matching value in the first maintenance sequence is selected as the maintenance personnel, and the fault transfer vehicles are matched in turn until the fault transfer vehicles are allocated; after the maintenance instruction is sent to the maintenance personnel end, the maintenance times of the maintenance personnel are updated once, and the maintenance personnel is removed from the queue of personnel to be maintained until the maintenance is completed and added to the queue of personnel to be maintained for maintenance matching.

[0024] Further, the specific analysis of the power state is as follows;

[0025] Get the current power Ei of all transport vehicles, set the power threshold of a transport vehicle, and mark it as E 阈value; when the current power of the rail transfer vehicle is less than or equal to the power threshold, it means that the power of the transfer vehicle is too low and needs to be replenished; when the power of the transfer vehicle is lower than the set power threshold, the transfer vehicle is marked as a transfer vehicle to be charged and does not participate in task allocation; the transfer vehicle to be charged is added to the queue of transfer vehicles to be maintained, and is prioritized from low to high according to the power of the transfer vehicles to be charged, the status information of the transfer vehicles with low power is updated, and the maintenance personnel of the second maintenance sequence are notified to replenish the power; the maintenance matching values ​​of the maintenance personnel of the second maintenance sequence are allocated in sequence from large to small until the transfer vehicles to be charged are allocated; after the maintenance personnel receives the charging instruction, the maintenance personnel is removed from the queue of personnel to be maintained, and after the maintenance personnel replenishes the power of the transfer vehicle to be charged, it will rejoin the queue of personnel to be maintained for maintenance matching.

[0026] In order to achieve the above object, according to another aspect of the present invention, an intelligent transfer control method for a rail transfer vehicle is provided, the method comprising the following steps:

[0027] S1: collect vehicle information and power data of the transfer vehicle in real time through various sensors, and store the collected information;

[0028] S2: Perform task scheduling and route planning based on real-time data, optimize resource allocation, and ensure efficient operation of the transfer vehicle; the specific steps are as follows:

[0029] The carrying value Zi of the rail transfer vehicle to be transferred and the priority Pj of the task are used to construct a three-dimensional cone model; the bottom radius of the three-dimensional cone model is set to r, which is related to the carrying value Zi of the rail transfer vehicle, where r = a3 × Zi, a3 is the set weight factor; the height h of the three-dimensional cone model is set to be related to the priority Pj of the task, where That is, the higher the task priority, the greater the height of the cone, and a4 is the set weight factor; substitute the values ​​of the bottom radius r of the three-dimensional cone model and the height h of the cone into the formula Calculate the total volume V of the three-dimensional cone model 总 ; When the target distance Li changes, the three-dimensional cone model is cut; the cutting process is:

[0030] Substitute the maximum value of the distance Li from the transfer vehicle to the target and the maximum task distance L into the formula The proportional factor of the target distance change is calculated; then the base radius of the cut cone is The height of the cone after cutting is Using the formula The effective volume after the cone is cut is calculated, that is, the priority value V of the rail transfer vehicle to be transferred;

[0031] Set a comprehensive priority value interval, compare and analyze the priority value of the rail transfer vehicle to be transferred with the set comprehensive priority value interval, when the priority value of the rail transfer vehicle to be transferred is greater than the maximum value of the set comprehensive priority value interval, the rail transfer vehicle to be transferred is marked as high priority; when the priority value of the rail transfer vehicle to be transferred is within the set comprehensive priority value interval, the rail transfer vehicle is marked as medium priority; when the priority value of the rail transfer vehicle to be transferred is less than the minimum value of the set comprehensive priority value interval, the rail transfer vehicle is marked as low priority; sort the high-priority rail transfer vehicles from large to small according to the priority value, and assign the high-priority tasks in turn until the high-priority tasks are assigned; sort the medium-priority rail transfer vehicles from large to small according to the priority value, and assign the medium-priority tasks in turn until the medium-priority tasks are assigned; sort the low-priority rail transfer vehicles from large to small according to the priority value, and assign the low-priority tasks in turn until the low-priority tasks are assigned;

[0032] S3: The maintenance management module monitors the safety status and power status of the transfer vehicle in real time, and assigns tasks according to the matching values ​​of the maintenance personnel.

[0033] Beneficial effects of the present invention:

[0034] 1. The present invention calculates the carrying value of each vehicle according to the vehicle's power and load capacity, and effectively screens through the carrying threshold, and only assigns vehicles suitable for the task to the task to be transferred, ensuring the rationality of task allocation and improving resource utilization; through path calculation, the travel time of the transfer vehicle can be effectively reduced, energy consumption can be reduced, and the efficiency of task completion can be improved; by comprehensively considering multiple factors such as vehicle power, load, fault status, task priority and path planning, it can achieve flexible task scheduling, dynamic path adjustment, and timely adjustment in the event of an emergency, ensuring efficient operation of the system and optimal utilization of resources.

[0035] 2. The present invention can reduce transportation delays caused by faulty shutdowns and insufficient power by quickly detecting and handling faults and power problems, thereby improving the availability and work efficiency of transfer vehicles; the scheduling method based on maintenance matching values ​​and power priority ensures that the most suitable maintenance personnel handle the faulty transfer vehicle in the shortest time, thereby optimizing the utilization rate of personnel resources; through reasonable maintenance personnel matching and power management, it ensures that the transfer vehicle fault is repaired in time, avoiding the problem of inability to work due to low power, thereby improving the overall operational efficiency; through systematic maintenance task allocation, it avoids the waste of maintenance personnel resources, reduces manual intervention, and improves the execution efficiency of maintenance tasks. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:

[0037] Figure 1 is a schematic diagram of system module connection of the present invention;

[0038] Figure 2 It is a schematic flow chart of the method of the present invention. DETAILED DESCRIPTION

[0039] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0040] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0041] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so as to describe the embodiments of the present invention described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0042] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0043] According to an embodiment of the present invention, Figure 1 As shown, an intelligent transport control system for a rail transport vehicle is provided, the system comprising: a data acquisition module, a server, a transport scheduling module and a maintenance management module;

[0044] The data acquisition module collects the vehicle information and power data of the transfer vehicle in real time through various sensors, and sends the collected information to the server for storage; the vehicle information includes: the load capacity and real-time location of the transfer vehicle; the power data includes: the power status of the battery of the transfer vehicle;

[0045] The server is used to receive and store data from the data acquisition module and provide data support to the transport scheduling module;

[0046] The transfer scheduling module performs task scheduling and route planning based on real-time data, optimizes resource allocation, and ensures efficient operation of the transfer vehicle; the specific steps are as follows:

[0047] Get the current power of the rail transfer vehicle and mark it as Ei, where i = 1, 2, 3...I, I is a positive integer, I represents the total number of rail transfer vehicles, and i represents the number of any rail transfer vehicle; get the maximum power of the transfer vehicle (power when fully charged) and mark it as Emax; get the fault signal on the rail transfer vehicle and mark it as Fi, where When Fi = 0, it means that the transfer vehicle has a fault or is at risk of failure, and the rail transfer vehicle is marked as a maintenance transfer vehicle and does not participate in task allocation; obtain the load capacity of the rail transfer vehicle and mark it as Wi; substitute the current power Ei of the fault-free rail transfer vehicle, the maximum power Emax of the transfer vehicle, and the load capacity Wi into the set formula The carrying value Zi of the rail transfer vehicle is calculated, where a1 and a2 are the set weight factors respectively. It can be seen from the formula that the greater the current power of the vehicle, the greater the carrying value of the rail transfer vehicle; the greater the load capacity of the vehicle, the greater the carrying value of the rail transfer vehicle;

[0048] A carrying threshold is set, and the carrying value of the rail transfer vehicle is compared with the set carrying threshold for analysis; when the carrying value of the rail transfer vehicle is greater than the set carrying threshold, the rail transfer vehicle is marked as a rail transfer vehicle to be transferred, and the vehicle to be transferred will be used for task allocation, and the number of all rail transfer vehicles to be transferred will be counted; when the carrying value of the rail transfer vehicle is less than or equal to the set carrying threshold, the rail transfer vehicle is marked as a rail transfer vehicle to be maintained, and the vehicle to be maintained should be charged or troubleshooted until the carrying value threshold is reached before it can re-participate in the task, and the number of all rail transfer vehicles to be maintained will be counted;

[0049] The entire transfer task area is divided into several sub-areas. The specific sub-areas are divided by industry professionals according to the specific geographical information of the sub-areas, the distribution of task objectives and the priority of the tasks; the current positions of all rail transfer vehicles to be transferred in the sub-areas are obtained and marked as Pi; the positions of the task objectives are obtained and marked as Rj, where j = 1, 2, 3...J, J is a positive integer, J represents the total number of task objectives, and j represents the sequence number of any task objective; the priority of a task is set and marked as Pj, where Pj∈{1, 2, 3}, where Pj=1 Pj=2 is a high-priority task that needs to be executed as soon as possible, possibly due to time sensitivity, high importance or involving an emergency; Pj=3 is a low-priority task that needs to be completed within normal working hours but is not urgent; Pj=3 is a low-priority task that can be delayed and has little impact; the total length of the path from the current position Pi of the rail transfer vehicle to be transferred to the task target position Rj is set to Li, and the path is divided into N nodes, and the distance of each node is Dn, where n=1, 2, 3...N, N is a positive integer, N represents the total number of task path nodes, and n represents the number of any task path node; using the formula Calculate the path length of the rail transfer vehicle to be transferred from the current position Pi to the task target Rj, that is, the task distance Li; set the maximum distance from the rail transfer vehicle to be transferred to the task target as Lmax;

[0050] The carrying value Zi of the rail transfer vehicle to be transferred and the priority Pj of the task are used to construct a three-dimensional cone model; the bottom radius of the three-dimensional cone model is set to r, which is related to the carrying value Zi of the rail transfer vehicle, where r = a3 × Zi, a3 is the set weight factor; the height h of the three-dimensional cone model is set to be related to the priority Pj of the task, where That is, the higher the task priority, the greater the height of the cone, and a4 is the set weight factor; substitute the values ​​of the bottom radius r of the three-dimensional cone model and the height h of the cone into the formula Calculate the total volume V of the three-dimensional cone model 总 ; When the target distance Li changes, the three-dimensional cone model is cut; the cutting process is:

[0051] Substitute the maximum value of the distance Li from the transfer vehicle to the target and the maximum mission distance L into the set formula The proportional factor of the target distance change is calculated; then the base radius of the cut cone is The height of the cone after cutting is Using the formula The effective volume after the cone is cut is calculated, that is, the priority value V of the rail transfer vehicle to be transferred; it can be seen from the formula that the smaller the task distance from the transfer vehicle to the target, the larger the proportional factor, the smaller the cut volume, the larger the remaining effective volume of the cone, and the larger the priority value of the rail transfer vehicle to be transferred; the larger the task distance from the transfer vehicle to the target, the smaller the proportional factor, and the smaller the remaining effective volume of the cone; the larger the carrying value of the rail transfer vehicle, the larger the remaining effective volume of the cone, and the larger the priority value of the rail transfer vehicle to be transferred; the higher the priority of the task, the larger the remaining effective volume of the cone, and the larger the priority value of the rail transfer vehicle to be transferred; when the distance from the transfer vehicle to the task target is zero, that is, when the transfer vehicle to be transferred is already at the location of the task target, the priority value of the rail transfer vehicle to be transferred is the largest;

[0052] Set a comprehensive priority value interval, compare and analyze the priority value of the rail transfer vehicle to be transferred with the set comprehensive priority value interval, when the priority value of the rail transfer vehicle to be transferred is greater than the maximum value of the set comprehensive priority value interval, the rail transfer vehicle to be transferred is marked as high priority; when the priority value of the rail transfer vehicle to be transferred is within the set comprehensive priority value interval, the rail transfer vehicle is marked as medium priority; when the priority value of the rail transfer vehicle to be transferred is less than the minimum value of the set comprehensive priority value interval, the rail transfer vehicle is marked as low priority; sort the high-priority rail transfer vehicles from large to small according to the priority value, and assign the high-priority tasks in turn until the high-priority tasks are assigned; sort the medium-priority rail transfer vehicles from large to small according to the priority value, and assign the medium-priority tasks in turn until the medium-priority tasks are assigned; sort the low-priority rail transfer vehicles from large to small according to the priority value, and assign the low-priority tasks in turn until the low-priority tasks are assigned;

[0053] The carrying value of each vehicle is calculated based on the vehicle's power and load capacity, and the carrying threshold is used for effective screening. Only vehicles suitable for the task are assigned to the transfer task, ensuring the rationality of task allocation and improving resource utilization. Path calculation can effectively reduce the travel time of the transfer vehicle, reduce energy consumption, and improve the efficiency of task completion. By comprehensively considering multiple factors such as vehicle power, load, fault status, task priority and path planning, flexible task scheduling, dynamic path adjustment, and timely adjustment in the event of an emergency can be achieved to ensure efficient operation of the system and optimal utilization of resources.

[0054] The maintenance management module monitors the safety status and power status of the transfer vehicle in real time and assigns tasks according to the matching values ​​of the maintenance personnel; the specific steps are as follows:

[0055] Obtain the fault signal of the transport vehicle to be maintained, and obtain the current position of the faulty transport vehicle, set the maintenance range with the current position of the transport vehicle to be maintained as the center point, match the current position of the background personnel to be maintained with the maintenance range, and mark the maintenance personnel whose current position is in the maintenance range as personnel to be maintained; it should be noted that the maintenance range of the transport vehicle to be maintained is set by industry insiders according to their needs; obtain the personal information of the background personnel to be maintained, and mark the length of service of each maintenance personnel as Gm, where m=1, 2, 3...M, M is a positive integer, M represents the total number of background maintenance personnel, and m represents the number of any one of the maintenance personnel; obtain the current position of the background personnel to be maintained, and calculate the distance difference between the current position of the background personnel to be maintained and the position of the transport vehicle with maintenance fault to obtain the maintenance distance of the maintenance personnel, and mark it as Hm; obtain the number of maintenance times of the background personnel to be maintained, and mark it as Cm; substitute the values ​​of the maintenance personnel's length of service Gm, maintenance distance Hm and maintenance times Cm into the set formula The maintenance matching value Um of the backend maintenance personnel is calculated, where b1, b2 and b3 are the set weight factors, and e is a natural constant. It can be seen from the formula that the closer the length of service of the maintenance personnel is to 10 years, the greater the maintenance matching value; the smaller the maintenance distance of the maintenance personnel, the greater the maintenance matching value; the more maintenance times the maintenance personnel perform, the greater the maintenance matching value;

[0056] A maintenance matching threshold is set, and the maintenance matching value of the backstage personnel to be maintained is compared and analyzed with the set maintenance matching threshold; when the maintenance matching value of the backstage personnel to be maintained is greater than the set maintenance matching threshold, the maintenance personnel is marked as the first maintenance sequence; when the maintenance matching value of the backstage personnel to be maintained is less than or equal to the set maintenance matching threshold, the maintenance personnel is marked as the second maintenance sequence; the personnel to be maintained with the largest maintenance matching value in the first maintenance sequence is selected as the maintenance personnel, and the fault transfer vehicles are matched in turn until the fault transfer vehicles are allocated; after the maintenance instruction is sent to the maintenance personnel end, the maintenance times of the maintenance personnel are updated and increased by one, and the maintenance personnel is removed from the queue of personnel to be maintained until the maintenance is completed and added to the queue of personnel to be maintained for maintenance matching;

[0057] Get the current power Ei of all transport vehicles, set the power threshold of a transport vehicle, and mark it as E 阈value; when the current power of the rail transfer vehicle is less than or equal to the power threshold, it means that the power of the transfer vehicle is too low and needs to be replenished; when the power of the transfer vehicle is lower than the set power threshold, the transfer vehicle is marked as a transfer vehicle to be charged and does not participate in task allocation; the transfer vehicle to be charged is added to the queue of transfer vehicles to be maintained, and is prioritized from low to high according to the power of the transfer vehicles to be charged, the status information of the transfer vehicles with low power is updated, and the maintenance personnel of the second maintenance sequence are notified to replenish the power; the maintenance matching values ​​of the maintenance personnel of the second maintenance sequence are allocated in sequence from large to small until the transfer vehicles to be charged are allocated; after the maintenance personnel receives the charging instruction, the maintenance personnel is removed from the queue of personnel to be maintained, and after the maintenance personnel replenishes the power of the transfer vehicle to be charged, it will rejoin the queue of personnel to be maintained for maintenance matching;

[0058] By quickly detecting and handling faults and power issues, transportation delays caused by faulty outages and insufficient power can be reduced, and the availability and work efficiency of transfer vehicles can be improved; the scheduling method based on maintenance matching values ​​and power priority ensures that the most suitable maintenance personnel handle faulty transfer vehicles in the shortest time, optimizing the utilization of personnel resources; through reasonable maintenance personnel matching and power management, it ensures that transfer vehicle faults are repaired in a timely manner, avoiding the problem of inability to work due to low power, thereby improving overall operational efficiency; through systematic maintenance task allocation, it avoids the waste of maintenance personnel resources, reduces manual intervention, and improves the execution efficiency of maintenance tasks.

[0059] According to an embodiment of the present invention, Figure 2 As shown, an intelligent transfer control method for a rail transfer vehicle is also provided, the method comprising the following steps:

[0060] S1: collect vehicle information and power data of the transfer vehicle in real time through various sensors, and store the collected information;

[0061] S2: Perform task scheduling and route planning based on real-time data, optimize resource allocation, and ensure efficient operation of the transfer vehicle; the specific steps are as follows:

[0062] The carrying value Zi of the rail transfer vehicle to be transferred and the priority Pj of the task are used to construct a three-dimensional cone model; the bottom radius of the three-dimensional cone model is set to r, which is related to the carrying value Zi of the rail transfer vehicle, where r = a3 × Zi, a3 is the set weight factor; the height h of the three-dimensional cone model is set to be related to the priority Pj of the task, where That is, the higher the task priority, the greater the height of the cone, and a4 is the set weight factor; substitute the values ​​of the bottom radius r of the three-dimensional cone model and the height h of the cone into the formula Calculate the total volume V of the three-dimensional cone model 总; When the target distance Li changes, the three-dimensional cone model is cut; the cutting process is:

[0063] Substitute the maximum value of the distance Li from the transfer vehicle to the target and the maximum task distance L into the formula The proportional factor of the target distance change is calculated; then the base radius of the cut cone is The height of the cone after cutting is Using the formula The effective volume after the cone is cut is calculated, that is, the priority value V of the rail transfer vehicle to be transferred;

[0064] Set a comprehensive priority value interval, compare and analyze the priority value of the rail transfer vehicle to be transferred with the set comprehensive priority value interval, when the priority value of the rail transfer vehicle to be transferred is greater than the maximum value of the set comprehensive priority value interval, the rail transfer vehicle to be transferred is marked as high priority; when the priority value of the rail transfer vehicle to be transferred is within the set comprehensive priority value interval, the rail transfer vehicle is marked as medium priority; when the priority value of the rail transfer vehicle to be transferred is less than the minimum value of the set comprehensive priority value interval, the rail transfer vehicle is marked as low priority; sort the high-priority rail transfer vehicles from large to small according to the priority value, and assign the high-priority tasks in turn until the high-priority tasks are assigned; sort the medium-priority rail transfer vehicles from large to small according to the priority value, and assign the medium-priority tasks in turn until the medium-priority tasks are assigned; sort the low-priority rail transfer vehicles from large to small according to the priority value, and assign the low-priority tasks in turn until the low-priority tasks are assigned;

[0065] S3: The maintenance management module monitors the safety status and power status of the transfer vehicle in real time, and assigns tasks according to the matching values ​​of the maintenance personnel.

[0066] The above are only embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent substitution, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of the claims of the present invention.

Claims

1. An intelligent transport control system for a rail transport vehicle, characterized in that: include: Transshipment scheduling module and maintenance management module; The transfer scheduling module performs task scheduling and route planning based on real-time data, optimizes resource allocation, and ensures efficient operation of the transfer vehicle; the specific steps are as follows: A three-dimensional cone model is constructed by using the carrying value of the rail transfer vehicle to be transferred and the priority value of the task; the bottom radius of the three-dimensional cone model is set as the carrying value of the rail transfer vehicle; the height of the three-dimensional cone model is set as the priority value of the task; the bottom radius of the three-dimensional cone model and the height of the cone are calculated to obtain the total volume of the three-dimensional cone model; when the target distance value changes, the three-dimensional cone model is cut; wherein the cutting process is: Substitute the distance from the transfer vehicle to the target and the maximum task distance into the normalized form to obtain the proportional factor of the target distance change; process the base radius of the three-dimensional cone model and the height of the cone according to the proportional factor of the target distance value to obtain the effective volume after the cone is cut, and the value of the effective volume is the priority value of the rail transfer vehicle to be transferred; Set a comprehensive priority value interval, compare and analyze the priority value of the rail transfer vehicle to be transferred with the set comprehensive priority value interval, when the priority value of the rail transfer vehicle to be transferred is greater than the maximum value of the set comprehensive priority value interval, the rail transfer vehicle to be transferred is marked as high priority; when the priority value of the rail transfer vehicle to be transferred is within the set comprehensive priority value interval, the rail transfer vehicle is marked as medium priority; when the priority value of the rail transfer vehicle to be transferred is less than the minimum value of the set comprehensive priority value interval, the rail transfer vehicle is marked as low priority; sort the high-priority rail transfer vehicles from large to small according to the priority value, and assign the high-priority tasks in turn until the high-priority tasks are assigned; sort the medium-priority rail transfer vehicles from large to small according to the priority value, and assign the medium-priority tasks in turn until the medium-priority tasks are assigned; sort the low-priority rail transfer vehicles from large to small according to the priority value, and assign the low-priority tasks in turn until the low-priority tasks are assigned; The maintenance management module monitors the safety status and power status of the transfer vehicle in real time, and assigns tasks based on the matching values ​​of maintenance personnel.

2. The intelligent transport control system for a rail transport vehicle according to claim 1, characterized in that: Also includes a data acquisition module and a server; The data acquisition module collects the vehicle information and power data of the transfer vehicle in real time, and sends the collected vehicle information and power data to the server for storage.

3. The intelligent transport control system for a rail transport vehicle according to claim 1, characterized in that: The specific analysis of the carrying value is: Obtain the current power of the rail transfer vehicle and mark it; obtain the maximum power of the rail transfer vehicle and mark it; obtain the fault signal on the rail transfer vehicle and mark it; obtain the load capacity of the rail transfer vehicle and mark it; The current power of the fault-free rail transfer vehicle, the maximum power of the transfer vehicle and the load capacity are normalized to obtain the carrying value of the rail transfer vehicle.

4. The intelligent transport control system for a rail transport vehicle according to claim 1, characterized in that: The specific analysis of task priority and task distance is as follows: Divide the entire transfer task area into several sub-areas; obtain the current positions of all rail transfer vehicles to be transferred in the sub-areas and mark them; obtain the position of the task target and mark it; set the priority of a task and mark it; Set the total length of the path from the current position of the rail transfer vehicle to the mission target position and mark it, divide the path into several nodes, and mark the distance of each node; normalize the node distance of each rail transfer vehicle to be transferred to obtain the path length mission distance from the current position of the rail transfer vehicle to be transferred to the mission target; mark the maximum distance from the rail transfer vehicle to be transferred to the mission target.

5. The intelligent transport control system for rail transport vehicles according to claim 4, characterized in that: The specific analysis of the rail transfer vehicles to be transferred is as follows: According to the normalized carrying value of the rail transfer vehicle, a carrying threshold is set, and the carrying value of the rail transfer vehicle is compared with the set carrying threshold for analysis; when the carrying value of the rail transfer vehicle is greater than the set carrying threshold, the rail transfer vehicle is marked as a rail transfer vehicle to be transferred, and the vehicle to be transferred will be used for task allocation, and the number of all rail transfer vehicles to be transferred will be counted; when the carrying value of the rail transfer vehicle is less than or equal to the set carrying threshold, the rail transfer vehicle is marked as a rail transfer vehicle to be maintained, and the vehicle to be maintained should be replenished with electricity or troubleshooted until the carrying value threshold is reached, and then it will re-participate in the task, and the number of all rail transfer vehicles to be maintained will be counted.

6. The intelligent transport control system for a rail transport vehicle according to claim 1, characterized in that: The specific analysis of the power status is as follows: Get the current power of all transfer vehicles, and set a power threshold for a transfer vehicle; when the current power of the rail transfer vehicle is less than or equal to the power threshold, it means that the power of the transfer vehicle is too low and needs to be replenished; when the power of the transfer vehicle is lower than the set power threshold, the transfer vehicle is marked as a transfer vehicle to be charged and does not participate in task allocation; add the transfer vehicle to be charged to the queue of transfer vehicles to be maintained, and prioritize them from low to high according to the power of the transfer vehicles to be charged, update the status information of the transfer vehicles with low power, and notify the maintenance personnel of the second maintenance sequence to replenish the power; allocate the maintenance matching values ​​of the maintenance personnel of the second maintenance sequence in sequence from large to small until the transfer vehicles to be charged are allocated; after receiving the charging instruction, the maintenance personnel will be removed from the queue of personnel to be maintained, and after the maintenance personnel replenishes the power of the transfer vehicle to be charged, they will rejoin the queue of personnel to be maintained for maintenance matching.

7. An intelligent transfer control method for a rail transfer vehicle, characterized in that An intelligent transport control system for a rail transport vehicle as described in any one of claims 1 to 6, the method comprising the following steps: S1: collect vehicle information and power data of the transfer vehicle in real time through various sensors, and store the collected information; S2: Perform task scheduling and route planning based on real-time data, optimize resource allocation, and ensure efficient operation of the transfer vehicle; the specific steps are as follows: A three-dimensional cone model is constructed by using the carrying value of the rail transfer vehicle to be transferred and the priority value of the task; the bottom radius of the three-dimensional cone model is set as the carrying value of the rail transfer vehicle; the height of the three-dimensional cone model is set as the priority of the task; the bottom radius of the three-dimensional cone model and the height of the cone are normalized to obtain the total volume of the three-dimensional cone model; when the target distance value changes, the three-dimensional cone model is cut; wherein the cutting process is: Substitute the values ​​of the distance from the transfer vehicle to the target and the maximum task distance for normalization to obtain the proportional factor of the target distance change; normalize the base radius of the three-dimensional cone model and the height of the cone according to the proportional factor of the target distance value to obtain the effective volume after the cone is cut, that is, the priority value of the rail transfer vehicle to be transferred; Set a comprehensive priority value interval, compare and analyze the priority value of the rail transfer vehicle to be transferred with the set comprehensive priority value interval, when the priority value of the rail transfer vehicle to be transferred is greater than the maximum value of the set comprehensive priority value interval, the rail transfer vehicle to be transferred is marked as high priority; when the priority value of the rail transfer vehicle to be transferred is within the set comprehensive priority value interval, the rail transfer vehicle is marked as medium priority; when the priority value of the rail transfer vehicle to be transferred is less than the minimum value of the set comprehensive priority value interval, the rail transfer vehicle is marked as low priority; sort the high-priority rail transfer vehicles from large to small according to the priority value, and assign the high-priority tasks in turn until the high-priority tasks are assigned; sort the medium-priority rail transfer vehicles from large to small according to the priority value, and assign the medium-priority tasks in turn until the medium-priority tasks are assigned; sort the low-priority rail transfer vehicles from large to small according to the priority value, and assign the low-priority tasks in turn until the low-priority tasks are assigned; S3: The maintenance management module monitors the safety status and power status of the transfer vehicle in real time, and assigns tasks according to the matching values ​​of the maintenance personnel.