Urban rail transit power equipment fault emergency disposal simulation system and method
By designing an emergency response simulation system for urban rail transit power equipment faults, including emergency processes, fault simulations and fault emergency subsystems, the problems of slow response speed and unsatisfactory results of traditional emergency response methods are solved, and more efficient and accurate fault emergency response is achieved, reducing the impact on urban rail transit operation.
Patent Information
- Application Number
- CN202411983517.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-31
- Publication Date
- 2025-04-29
AI Technical Summary
The emergency response method of traditional urban rail transit power equipment faults is slow and the treatment effect is not ideal, making it difficult to conduct comprehensive and accurate simulation and analysis of complex and changeable fault conditions.
Design a simulation system for emergency response to urban rail transit power equipment faults, including three subsystems: emergency process, fault simulation and fault emergency response. By simulating real equipment fault phenomena, it provides a practical training platform for intelligent equipment control and scheduling, process-based emergency response procedures, and improves the efficiency of emergency response to faults.
It improves the efficiency and accuracy of emergency response to urban rail transit power equipment faults, reduces the impact of faults on urban rail transit operation, and improves professional skills and ability to deal with sudden failures.
Smart Images

Figure CN119905025A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of rail transit power equipment, and in particular to a simulation system and method for emergency handling of faults of urban rail transit power equipment. Background Art
[0002] The power equipment in the urban rail transit system is responsible for providing a stable power supply for train operation, station facilities, signal communication, etc. Once the power equipment fails, it may lead to serious consequences such as train suspension, signal interruption, station service interruption, etc., affecting the normal order of urban transportation and the travel safety of passengers.
[0003] With the continuous expansion and complexity of urban rail transit networks, higher requirements are placed on the reliability and emergency response capabilities of power equipment.
[0004] Traditional emergency response to power equipment failures in urban rail transit mainly relies on manual experience and fixed emergency plans. This approach may have problems such as slow response and unsatisfactory response results when facing complex and changeable fault conditions.
[0005] Traditional emergency response methods make it difficult to simulate and analyze faults comprehensively and accurately, which is not conducive to formulating effective response strategies and conducting personnel training in advance. Summary of the invention
[0006] In order to overcome the defects of the above-mentioned prior art, the present invention provides a simulation system and method for emergency handling of urban rail transit power equipment failures. The system and method improve the efficiency and accuracy of emergency handling of urban rail transit power equipment failures, reduce the impact of failures on urban rail transit operations, and aim to provide industry personnel with a forward-looking scientific and technological training platform to enhance their professional skills and ability to cope with sudden failures.
[0007] In order to achieve the above object, the technical solution adopted by the present invention is:
[0008] An urban rail transit power equipment fault emergency handling simulation system includes a power equipment fault emergency handling simulation platform 1, the power equipment fault emergency handling simulation platform 1 includes three subsystems: emergency process 2, fault simulation 3, and fault emergency 4;
[0009] The power equipment failure emergency response simulation platform 1 is used to pilot the equipment intelligent control power dispatching and disaster prevention dispatching;
[0010] By building a simulation platform for emergency response to power equipment failures, we can simulate real equipment failure phenomena and provide a practical training platform for equipment intelligent control and dispatching;
[0011] Improve business skills; second, expand and establish a digital process for emergency response to power supply equipment failures, streamline the emergency response procedures, quickly provide emergency auxiliary information to dispatchers, and improve the efficiency of emergency response to failures. Third, explore the possibility of realizing an environmental control equipment operation simulation platform and expand the platform's application scenarios;
[0012] The emergency process 2 is based on the emergency handling of urban rail transit electric ring faults and the electric ring dispatching manual, and is combined with a large number of real rail transit faults to compile a fault emergency handling process, which is convenient for the electric ring dispatcher to simulate and familiarize himself with the fault emergency process of each substation on the entire line;
[0013] The fault simulation 3 is used to simulate the fault of power equipment, realize the real fault handling scenario of power ring dispatch, expose the shortcomings of the handling personnel, and promote the improvement of power ring dispatch business; it is an important means for departments to test the emergency response capabilities of professionals;
[0014] The fault emergency 4 sets different faults for different equipment in existing line stations, displays real fault phenomena, and configures specific alarm information for different faults to provide a fault handling demonstration process for the electric ring dispatcher in a guided manner;
[0015] First, enter the power equipment fault emergency response simulation platform 1, enter the lower-level webpage, and see three subsystems: emergency process 2, fault simulation 3, and fault emergency 4. By clicking on the three subsystems, you can enter different function pages;
[0016] The emergency process 2 includes an emergency process interface 25; the emergency process interface 25 is used to display the electronic emergency handling process of different faults at each station, which is convenient for personnel to view;
[0017] Fault Simulation 3 includes power system Figure 5 , fault alarm bar 6, head menu bar 7, prompt window 8;
[0018] The power system Figure 5 It is used to display the status of on-site power equipment, so that professionals can be familiar with the equipment distribution and power supply status. At the same time, it can truly reflect the status of on-site equipment in the event of a fault, so as to identify the fault type. Figure 5 Operate relevant equipment and adjust the operation mode;
[0019] The fault alarm bar 6 is used to display the real fault alarm information when a fault occurs, and generate alarm information to remind professionals to make corresponding responses;
[0020] The head menu bar 7 is used for emergency process, fault simulation, fault emergency and return to home page switching;
[0021] The prompt window 8 is used to prompt the next step of the electric ring dispatching failure to be notified, and the information required in the power system Figure 5Equipment and precautions for operation;
[0022] The fault alarm bar 6 includes account information 9, an alarm display area 10, and an event confirmation bar 11;
[0023] The account information 9 is used for the electric ring dispatch to log in to the account, and displays the electric ring dispatch account information, operator information and real-time time;
[0024] The alarm display area 10 is used to display various alarm information in the event of a fault, including alarm level, occurrence time, fault type, system, station, fault location, and event description;
[0025] The event confirmation column 11 is used for fault event query, fault alarm sound confirmation, power system Figure 5 Zoom in and out and pan left and right;
[0026] The event confirmation column 11 includes event confirmation 12, alarm sound confirmation 13, zoom in / out 14, and event column 24;
[0027] The fault event confirmation 12 is used for the generation of a large number of alarm information of related equipment in the case of a fault, and the electric ring dispatcher checks the relevant alarm information and confirms the corresponding fault alarm information after the fault is handled;
[0028] The alarm sound confirmation 13 is used to generate a fault alarm sound in the event of a fault, prompting relevant personnel to make a corresponding response;
[0029] The zoom in / out 14 is used for the power system Figure 5 Zoom in, zoom out, and pan locally to facilitate the electric ring dispatcher to check the equipment status;
[0030] The event column 24 is used to display the alarm information when the equipment fails and the dispatcher's operation record;
[0031] Fault emergency 4 includes power system diagram 15, fault alarm bar 6, head menu bar 7, prompt window 16;
[0032] The power system diagram 15 is used to display the status of on-site power equipment, so that professionals can be familiar with the equipment distribution and power supply status. At the same time, in the event of a fault, it truly reflects the status of the on-site equipment to facilitate identification of the fault type;
[0033] The prompt window 16 is used to prompt the electric ring dispatcher to report the next step of the fault, the specific equipment operation and precautions;
[0034] The fault alarm bar 6 includes account information 9, an alarm display area 10, and an event confirmation bar 11;
[0035] The account information 9 is used for the electric ring dispatch to log in to the account, and displays the electric ring dispatch account information, operator information and real-time time;
[0036] The alarm display area 10 is used to display various alarm information in the event of a fault, including alarm level, occurrence time, fault type, system, station, fault location, and event description;
[0037] The event confirmation bar 11 is used for fault event query, fault alarm sound confirmation, power system diagram zooming in and out, and left and right translation in the event of a fault;
[0038] The event confirmation column 11 includes event confirmation 12, alarm sound confirmation 13, and zoom in / out 14;
[0039] The fault event confirmation 12 is used for the generation of a large number of alarm information of related equipment in the case of a fault, and the electric ring dispatcher checks the relevant alarm information and confirms the corresponding fault alarm information after the fault is handled;
[0040] The alarm sound confirmation 13 is used to generate a fault alarm sound in the event of a fault, prompting relevant personnel to make a corresponding response;
[0041] The zoom in / out 14 is used to zoom in, zoom out, and translate a part of the power system diagram, so that the power ring dispatcher can check the equipment status;
[0042] The line page 18 is used to display the train icons of each line, and the subway line interface 23 is entered by clicking the train icon;
[0043] The subway line interface 23 includes a navigation bar 19, an exit 20, and an SVG line map 22;
[0044] The navigation bar 19 is used to display each station of the subway line. Entering the submenu of each station displays the different equipment faults of each station, and entering the corresponding fault interface by clicking;
[0045] The exit 20 is used to return to the page of the power equipment failure emergency handling simulation platform 1 by clicking the exit button;
[0046] The SVG line map 22 is used to display the subway line map, and to distinguish the transfer stations, the mixed station and the step-down station by icons;
[0047] A method for using an urban rail transit power equipment fault emergency handling simulation system comprises the following steps:
[0048] Step 1: The end user opens the power equipment failure emergency response simulation platform 1 through the Internet;
[0049] Step 2: The terminal user logs in to the power equipment failure emergency response simulation platform 1 using the account password;
[0050] Step 3: The user can select a line type through the login page 17 and enter the line page 18 to view the SVG line map 22 according to his / her needs;
[0051] Step 4: The user clicks on the navigation bar 19 to select the corresponding station of the line, enters the secondary menu, selects the corresponding fault simulation of the corresponding station, and enters the fault simulation scene;
[0052] Step 5: On the fault simulation scenario page, the user clicks on the emergency process 2 in the head menu bar 7 to enter the corresponding fault emergency handling process 25 to learn the fault emergency handling ideas;
[0053] Step 6: The user clicks Fault Simulation 3 in the header menu bar 7 to enter the real fault simulation scenario;
[0054] Step 7: The user clicks the fault simulation 3 button to 100% restore the fault emergency scenario, and the power system 5 displays the equipment action status and fault phenomenon. Click the zoom in / out 14 button to zoom in / out the power system 5 to facilitate viewing of the equipment status;
[0055] Step 8: The user checks the alarm information displayed in the alarm display area 10 under the alarm bar 6 and the event bar 24 under the event confirmation bar 11 to confirm the fault condition;
[0056] Step 9: The user clicks event confirmation 12 to confirm the alarm information, and clicks alarm sound confirmation 13 to eliminate the alarm sound;
[0057] Step 10: The user should check the account information 9 before operating the device;
[0058] Step 11: The user reports fault information, makes equipment adjustments, etc. according to prompt window 8;
[0059] Step 12: The user clicks the return button 21 to return to the subway line interface 23;
[0060] Step 13: The user clicks the fault emergency 4 button to enter the power system diagram 15;
[0061] Step 14: The user clicks the fault emergency 4 button to enter the fault emergency scene. The system can learn the fault handling ideas according to the prompt window 16 and the equipment action phenomenon on the power system diagram 15, and click the prompt window 16 to enter the next step of fault handling;
[0062] Step 15: After the fault emergency response is completed, the user clicks the return button 21 in the head menu bar to return to the subway line interface 23, and selects other fault scenarios in the navigation bar 19 for study;
[0063] Step 16: After the fault learning is completed, click the exit 20 button on the subway line interface 23 to return to the login page 17;
[0064] Step 17: The user shuts down the system and the learning is completed.
[0065] Beneficial effects of the present invention:
[0066] On the one hand, the present invention can provide a brand-new platform for the training of the environment and equipment facilities in the track area. It can break through the bottleneck of the increasing operation time of the subway, the continuous compression of the maintenance time of the track area, and the limited training time. It can continuously improve the familiarity of employees with the relevant equipment in the track area. For locations with few reference objects in the line, the platform can be used to fully display the relevant equipment. At the same time, more examination items can be added to fully grasp and strengthen the skills of employees in a targeted manner.
[0067] On the other hand, the content of emergency response to equipment failure is combined with the equipment business card labels in each scene. In emergency situations, it satisfies the familiarity of driving personnel with relevant equipment and improves the level of emergency response. BRIEF DESCRIPTION OF THE DRAWINGS
[0068] Figure 1 This is the login interface of the present invention.
[0069] Figure 2 It is the line identification interface of the present invention.
[0070] Figure 3 This is the line fault selection interface of the present invention.
[0071] Figure 4 It is an emergency measure for failure of the present invention.
[0072] Figure 5 It is a schematic diagram of the emergency process of the present invention.
[0073] Figure 6 This is a schematic diagram of fault simulation of the present invention.
[0074] Figure 7 This is the SVG image editing interface of the present invention.
[0075] Figure 8 It is a schematic diagram of the process of the present invention. DETAILED DESCRIPTION
[0076] The present invention is further described in detail below with reference to the accompanying drawings.
[0077] like Figure 8 As shown, a simulation system for emergency handling of power equipment failures in urban rail transit is a simulation system for emergency handling of failures based on modern Internet of Things application technology. The system is equipped with emergency process 2, fault simulation 3, and fault emergency 4 systems;
[0078] The emergency process 2 is used to provide professional personnel with emergency handling ideas and emergency skills for faults at all stations along the entire line;
[0079] The fault simulation 3 is used to simulate the fault of power equipment, providing a real fault handling environment for the electric ring dispatch, which is convenient for improving the electric ring dispatch business;
[0080] The fault emergency 4 is used to set different faults according to different equipment in the existing line station, demonstrate the real fault handling process, and lay a good foundation for the later emergency handling of electric ring dispatching faults;
[0081] The fault simulation 3 includes the power system Figure 5 , fault alarm bar 6, head menu bar 7, prompt window 8;
[0082] The power system Figure 5 It is used to display the status of on-site power equipment, so that professionals can be familiar with the equipment distribution and power supply status. At the same time, it can truly reflect the status of on-site equipment in the event of a fault, so as to facilitate the identification of the fault category. When handling the fault, the relevant equipment can be operated on the power system diagram to adjust the operation mode. The fault alarm bar 6 is used to display the real fault alarm information when a fault occurs, and at the same time generate alarm information to remind professionals to make corresponding responses. The head menu bar 7 is used for emergency procedures, fault simulation, fault emergency and return to the home page. The prompt window 8 is used to prompt the information to be notified in the next step of the electric ring dispatch fault, the equipment that needs to be operated on the power system diagram, and precautions;
[0083] The fault alarm bar 6 includes account information 9, an alarm display area 10, and an event confirmation bar 11;
[0084] The account information 9 is used for the electric ring dispatch to log in to the account, display the electric ring dispatch account information, operator information and real-time time, the alarm display area 10 is used to display various alarm information in the case of a fault, including the alarm level, occurrence time, fault type, system, station, fault location, event description, and the event confirmation column 11 is used for fault event query, fault alarm sound confirmation, power system diagram zooming in and out, and left and right translation in the case of a fault;
[0085] The event confirmation column 11 includes fault event confirmation 12, fault alarm sound confirmation 13, power system diagram zoom in and out 14;
[0086] The fault event confirmation 12 is used for generating a large amount of alarm information of related equipment in the case of a fault, and the electric ring dispatcher checks the relevant alarm information and confirms the corresponding fault alarm information after the fault is handled. The fault alarm sound confirmation 13 is used for generating a fault alarm sound in the case of a fault to prompt relevant personnel to make a corresponding response. The power system diagram zooming in and out 14 is used to zoom in, zoom out, and translate the power system diagram locally, so that the electric ring dispatcher can check the equipment status;
[0087] The fault emergency 4 includes a power system diagram 15, a fault alarm bar 6, a head menu bar 7, and a fault handling prompt window 16;
[0088] The power system diagram 15 is used to display the status of on-site power equipment, so that professionals can be familiar with the equipment distribution and power supply status. At the same time, in the event of a fault, it truly reflects the status of on-site equipment to facilitate identification of the fault type. The fault handling prompt window 16 is used to prompt the power ring dispatcher to report the next step of the fault, the specific equipment operation and precautions;
[0089] like Figure 1-Figure 7 As shown, a method for implementing an emergency handling simulation system for urban rail transit power equipment failures includes the following contents:
[0090] The terminal user opens the power equipment failure emergency response simulation platform 1 through the Internet. First, the front-end page is realized, using the html text markup language as the basic language, the vue system framework to build the system framework login page 17, the line page 18, and the subway line interface 23;
[0091] The login page 17, the line page 18, and the subway line interface 23 are constructed based on the vue system framework. The login page 17 realizes the page jump to the line page 18 after login. The subway line interface 23 mainly realizes the loading of the svg line map 22 and the various fault navigation bars 19 of each station of Line 16.
[0092] The element component library implements system components such as the exit 20 button, the return 21 button, and the header menu bar 7;
[0093] The exit 20 button will execute the system exit operation and clear the user login information. We will use Vue combined with the relevant components of the Element component library to add this button to the page, realize the front-end and back-end data interaction through JavaScript computer language and jquery plug-in library language, and give it the exit function logic;
[0094] The back 21 button is used by users to return to the previously browsed page. We will use the relevant components and functions in the Vue framework and the Element component library, add a click event to it through the JavaScript computer language and the jquery plug-in library to call a custom function, so that it triggers the return to the previously browsed page;
[0095] The head menu bar 7 uses the menu component in the Element component library to create a menu bar at the head of the page. It contains three submenus. Users can navigate to different pages to switch pages by clicking on different menu items. The menu display and style are adjusted using the Element component library's own styles. The interactive functions are configured and implemented using the JavaScript computer language and the jquery plug-in library.
[0096] The dhtmlxgrid table component builds the fault alarm column 6 and the event column 24;
[0097] When the alarm bar 6 and event bar 24 have equipment failures, JavaScript and jQuery languages are used to implement data interaction between the front and back ends, store the corresponding fault data in the back end, and obtain it from the back end to the fault alarm bar and event bar of the dhtmlxgrid table on the front end interface. Specifically, we will use jQuery's AJAX function to send a request to the back end to obtain the equipment failure information data. After obtaining the data, the dhtmlxgrid component is used to render the data in a table at the corresponding position of the web page. In this way, the user can intuitively see the equipment failure information, including a detailed description of the failure, the time of occurrence, the specific location of the failure, and other information;
[0098] Inkscape drawing software drawing power system Figure 5 、svg line diagram 22;
[0099] The power system Figure 5 , svg line diagram 22 Use Inkscape drawing software to draw the corresponding power system diagram and SVG line diagram, and configure parameters for different elements in the diagram, such as line color value red: energized, gray de-energized, line thickness value bus: 5px, line: 3px, switch position status value closing: red, closing success: red flashing, opening: green, opening success: green flashing, fault: yellow, communication interruption: blue, shape, etc. JavaScript and jQuery languages are used at the same time to complete the interaction between the front and back ends. When the user clicks the switch, the front end will send the real-time switch status value information to the back end, and the back end will perform corresponding logical processing according to the status value, such as updating the status information of the switch in the database. At the same time, the front end will update the display status of the switch in the diagram according to the response of the back end;
[0100] For example, when a user clicks an element representing a switch, the front end will send a request to the back end through jQuery's AJAX function to tell the back end that the state of the switch has changed. After the back end completes the corresponding processing, it will give a response to the front end. Based on this response, the front end changes the color of the switch in the SVG image or other attributes representing the state to show whether the switch is on or off.
Claims
1. An urban rail transit power equipment fault emergency handling simulation system, characterized in that: The utility model comprises an emergency response simulation platform for power equipment failure (1), wherein the emergency response simulation platform for power equipment failure (1) comprises three subsystems: emergency process (2), failure simulation (3), and failure emergency response (4); The power equipment fault emergency handling simulation platform (1) is used to pilot equipment intelligent control and dispatching; By building a simulation platform for emergency response to power equipment failures, we can simulate real equipment failure phenomena and provide a practical training platform for equipment intelligent control and dispatching; The emergency process (2) is based on the urban rail transit electric ring fault emergency handling and electric ring dispatching manual, combined with a large number of real rail transit faults, to compile a fault emergency handling process, which is convenient for the electric ring dispatcher to simulate and familiarize himself with the fault emergency process of each substation on the entire line; The fault simulation (3) is used to simulate the fault of power equipment and realize the real fault handling scenario of power ring dispatch; The fault emergency (4) sets different faults for different equipment in existing line stations, displays real fault phenomena, and configures specific alarm information for different faults, providing a fault handling demonstration process for the electric ring dispatcher in a guided manner.
2. According to claim 1, an urban rail transit power equipment fault emergency handling simulation system is characterized in that: The emergency process (2) includes an emergency process interface (25); the emergency process interface (25) is used to display the electronic emergency handling processes of different faults at each station, which is convenient for personnel to view.
3. The urban rail transit power equipment fault emergency handling simulation system according to claim 1 is characterized in that: The fault simulation (3) includes a power system diagram (5), a fault alarm bar (6), a header menu bar (7), and a prompt window (8); The power system diagram (5) is used to display the status of on-site power equipment, so that professionals can be familiar with the equipment distribution and power supply status. At the same time, in the event of a fault, it truly reflects the status of on-site equipment to facilitate identification of the fault type. When handling a fault, the relevant equipment is operated on the power system diagram (5) to adjust the operation mode. The fault alarm bar (6) is used to display the real fault alarm information when a fault occurs, and at the same time generate alarm information to remind professionals to make corresponding responses; The head menu bar (7) is used for emergency procedures, fault simulation, fault emergency and return to the home page; The prompt window (8) is used to prompt the information to be notified in the next step of the electric ring dispatching fault, the equipment that needs to be operated on the power system diagram (5), and the precautions.
4. The urban rail transit power equipment fault emergency handling simulation system according to claim 3 is characterized in that: The fault alarm bar (6) includes account information (9), an alarm display area (10), and an event confirmation bar (11); The account information (9) is used by the electric ring dispatcher to log in to the account, and to display the electric ring dispatcher account information, operator information and real-time time; The alarm display area (10) is used to display various alarm information in the event of a fault, including alarm level, occurrence time, fault type, system, station, fault location, and event description; The event confirmation column (11) is used for querying fault events, confirming fault alarm sounds, and zooming in and out and shifting the power system diagram (5) left and right in the event of a fault.
5. The urban rail transit power equipment fault emergency handling simulation system according to claim 4 is characterized in that: The event confirmation column (11) includes event confirmation (12), alarm sound confirmation (13), zoom in / out (14), and event column (24); The fault event confirmation (12) is used in the event of a fault. When a large amount of alarm information of related equipment is generated, the electric ring dispatcher checks the relevant alarm information and confirms the corresponding fault alarm information after the fault is handled. The alarm sound confirmation (13) is used to generate a fault alarm sound in the event of a fault, prompting relevant personnel to make a corresponding response; The zoom in / out (14) is used to partially zoom in, zoom out, and translate the power system diagram (5) to facilitate the power ring dispatcher to check the equipment status; The event column (24) is used to display alarm information when equipment fails and the dispatcher's operation record.
6. The urban rail transit power equipment fault emergency handling simulation system according to claim 1 is characterized in that: The fault emergency (4) includes a power system diagram (15), a fault alarm bar (6), a head menu bar (7), and a prompt window (16); The power system diagram (15) is used to display the status of on-site power equipment, so that professionals can be familiar with the equipment distribution and power supply status. At the same time, in the event of a fault, it truly reflects the status of the on-site equipment to facilitate identification of the fault type. The prompt window (16) is used to prompt the electric ring dispatcher to report the next step of the fault, the specific equipment operation and precautions.
7. The urban rail transit power equipment fault emergency handling simulation system according to claim 6 is characterized in that: The fault alarm bar (6) includes account information (9), an alarm display area (10), and an event confirmation bar (11); The account information (9) is used by the electric ring dispatcher to log in to the account, and to display the electric ring dispatcher account information, operator information and real-time time; The alarm display area (10) is used to display various alarm information in the event of a fault, including alarm level, occurrence time, fault type, system, station, fault location, and event description; The event confirmation bar (11) is used for querying fault events, confirming fault alarm sounds, zooming in and out, and shifting the power system diagram left and right in the event of a fault; The event confirmation column (11) includes event confirmation (12), alarm sound confirmation (13), and zoom in / out (14); The fault event confirmation (12) is used in the event of a fault. When a large amount of alarm information of related equipment is generated, the electric ring dispatcher checks the relevant alarm information and confirms the corresponding fault alarm information after the fault is handled. The alarm sound confirmation (13) is used to generate a fault alarm sound in the event of a fault, prompting relevant personnel to make a corresponding response; The zoom in / out (14) is used to partially zoom in, zoom out, and translate the power system diagram, so as to facilitate the power ring dispatcher to check the equipment status.
8. The urban rail transit power equipment fault emergency handling simulation system according to claim 7 is characterized in that: The power equipment fault emergency handling simulation platform (1) comprises a login page (17), the login page (17) comprises a line page (18), the line page (18) is used to display train icons of each line, and a subway line interface (23) is entered by clicking on the train icon; The subway line interface (23) includes a navigation bar (19), an exit (20), and an SVG line map (22); The navigation bar (19) is used to display each station on the subway line. Entering the submenu of each station displays the faults of different equipment at each station, and entering the corresponding fault interface by clicking; The exit (20) is used to return to the page of the power equipment failure emergency handling simulation platform (1) by clicking the exit button; The SVG line map (22) is used to display a subway line map and to distinguish transfer stations, mixed stations and step-down stations by icons.
9. A method for using the urban rail transit power equipment fault emergency handling simulation system according to any one of claims 1 to 8, characterized in that: The following steps are involved: Step 1: The end user opens the power equipment failure emergency response simulation platform through the Internet (1); Step 2: The terminal user logs in to the power equipment failure emergency response simulation platform (1) using the account password; Step 3: The user can select a line type on the login page (17) according to his / her needs and enter the line page (18) to view the SVG line map (22); Step 4: The user clicks the navigation bar (19) to select the corresponding station of the line, enters the secondary menu, selects the corresponding fault simulation of the corresponding station, and enters the fault simulation scene; Step 5: On the fault simulation scenario page, the user clicks the emergency process (2) in the top menu bar (7) to enter the corresponding fault emergency handling process (25) to learn the fault emergency handling ideas; Step 6: The user clicks Fault Simulation (3) in the header menu bar (7) to enter the real fault simulation scenario; Step 7: The user clicks the fault simulation (3) button to 100% restore the fault emergency scenario, the power system (5) displays the equipment operation status, and clicks the zoom in / out (14) button to zoom in / out the power system (5) to facilitate viewing of the equipment status; Step 8: The user checks the alarm information displayed in the alarm display area (10) under the alarm bar (6) and the event bar (24) under the event confirmation bar (11) to confirm the fault condition; Step 9: The user clicks the event confirmation (12) to confirm the alarm information, and clicks the alarm sound confirmation (13) button to eliminate the alarm sound; Step 10: The user should check the account information (9) before operating the device; Step 11: The user reports fault information and makes equipment adjustments according to the prompt window (8); Step 12: The user clicks the return (21) button to return to the subway line interface (23); Step 13: The user clicks the Fault Emergency (4) button to enter the power system diagram (15); Step 14: The user clicks the Fault Emergency (4) button to enter the fault emergency scenario. According to the prompt window (16) and the equipment action phenomenon on the power system diagram (15), the system learns the fault handling ideas and clicks the prompt window (16) to enter the next step of fault handling; Step 15: After the fault emergency response is completed, the user clicks the return button (21) on the top menu bar to return to the subway line interface (23) and selects other fault scenarios in the navigation bar (19) for study; Step 16: After the fault learning is completed, click the exit (20) button on the subway line interface (23) to return to the login page (17); Step 17: The user shuts down the system and the learning is completed.