Computing power scheduling engine generation method based on large programming model and electronic equipment

Through the computing power scheduling engine generation method based on programming large models, the problem of the computing power scheduling system in the existing technology requires a lot of manpower to participate when integrating new systems, and realize automatic code generation, automatic testing and document generation, which improves development efficiency and system flexibility.

CN119960740AActive Publication Date: 2025-05-09PENG CHENG LAB
4 Cites 0 Cited by

Patent Information

Application Number
CN202510061121.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-14
Publication Date
2025-05-09
Estimated Expiration
2045-01-14

AI Technical Summary

Technical Problem

The existing computing power scheduling system requires a lot of time and manpower to participate when integrating new systems, resulting in limited flexibility and scalability of the system, increasing the development and testing workload, and limiting its application potential in a wider range of scenarios.

Method used

The computing power scheduling engine generation method based on programming large models is adopted. By obtaining the target text template, converting it into target format files, inputting the programming large model to generate scheduling system code, integrating preset scheduling engine code, conducting tests and generating documents, the code is automatically generated, automatic testing and document generation is realized.

Benefits of technology

It reduces the manual coding time of developers, improves development efficiency, realizes rapid development and testing of computing power scheduling systems, and accelerates the rapid integration and expansion of the system.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention discloses a computing power scheduling engine generation method based on a large programming model and electronic equipment, and the method comprises the steps: obtaining a target text template which is filled with a plurality of pieces of template description information of a computing power scheduling engine relative to a computing power scheduling system; according to the target data exchange format, converting multiple pieces of template description information in the target text template into a target format file; inputting the target format file into the target programming large model to obtain a scheduling system code for the computing power scheduling system; obtaining a preset scheduling engine code, and fusing the scheduling system code with the preset scheduling engine code to obtain a to-be-tested scheduling engine code; testing the to-be-tested scheduling engine code to obtain a test result; and when the test result is that the test is passed, generating a target computing power scheduling engine code document for the to-be-tested scheduling engine code passing the test. In the embodiment of the invention, the manual coding time of developers is reduced, and the development efficiency is improved.
Need to check novelty before this filing date? Find Prior Art