Research and development project management system
Through the R&D project management system, the problems of uneven task allocation and insufficient progress monitoring have been solved, and the project is completed on schedule and management efficiency has been improved.
Patent Information
- Application Number
- CN202510079965.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-18
- Publication Date
- 2025-05-13
AI Technical Summary
Due to uneven task allocation and the inability to monitor project progress in real time, existing R&D projects cannot be completed within a regular period, delaying the project application process.
Provide a R&D project management system, including project planning module, project tracking and monitoring module and project review and analysis module. Through the project requirements manual, clarify customer needs, estimate workload, assign tasks, monitor progress in real time, and improve the project management system through data analysis.
Real-time monitoring and reasonable allocation of project progress are achieved to ensure that the project is completed on schedule, avoid delays, and improve the efficiency and effectiveness of project management through continuous improvement.
Smart Images

Figure CN119991034A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of research and development projects, and in particular to a research and development project management system. Background Art
[0002] With the development of Internet technology, digital and information management has become an important manifestation of corporate management level and core competitiveness, and is also an important guarantee for corporate compliance in the information age.
[0003] Existing R&D projects need to be completed within a specified period. During the process of writing R&D projects, uneven task distribution and inability to monitor project progress in real time may result in the R&D projects not being completed within the specified period, thus delaying the project application process. Summary of the invention
[0004] The purpose of the present invention is to provide a research and development project management system that solves the problems raised in the above-mentioned background technology.
[0005] To achieve the above purpose, the present invention provides the following technical solution: a research and development project management system, the system includes
[0006] The project planning module clarifies customer needs through project requirements specifications and initiates projects based on customer needs;
[0007] The project tracking and monitoring module consists of a project scale estimation module, a project tracking module, and a scientific and technological personnel configuration management module. The project scale estimation module is used to estimate the workload of the project.
[0008] The project review and analysis module consists of a project summary module and a data analysis module.
[0009] Preferably, the project requirements specification includes business scenarios, business processes, business activities, business objects and data items.
[0010] Preferably, the scientific and technological personnel configuration management module allocates the estimated project workload, and then monitors the project completion status in real time through the project tracking module, and the project progress is pushed through the terminal.
[0011] Preferably, the project summary includes monthly summary, quarterly summary and annual summary, and the closed-loop management and continuous improvement of the entire project management system are completed through data analysis.
[0012] The present invention provides a research and development project management system, which has the following beneficial effects:
[0013] 1. The R&D project management system clarifies customer needs through a project requirement book. Customers provide materials based on the project requirement book to establish the project. After the project is established, the project workload is estimated through the project scale estimation module, and then the workload is allocated through the scientific and technological personnel configuration management module so that it is reasonably allocated to the staff. The project progress can be pushed through the terminal (mobile phone, computer) to monitor the project progress at all times. The staff summarizes the project every week, month, and year, and analyzes it through the data analysis module to improve the project management system step by step. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a structural schematic diagram of a research and development project management system of the present invention.
[0015] In the figure: 1. main body; 2. pressing plate; 3. first hydraulic rod; 4. connecting plate; 5. telescopic inner cylinder; 6. telescopic outer cylinder; 7. second hydraulic rod; 8. operating box; 9. manipulator; 10. connecting block; 11. cylinder; 12. protective cover; 13. carrier plate; 14. conveyor belt; 15. conveyor wheel; 16. connecting shaft; 17. first control panel; 18. second control panel; 19. motor; 20. support frame; 21. rotating shaft; 22. stirring rod; 23. baffle; 24. first roller; 25. second roller; 26. fixing groove; 27. pressure sensor; 28. reserved opening. DETAILED DESCRIPTION
[0016] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0017] In the description of the present invention, unless otherwise specified, "plurality" means two or more than two; the orientations or positional relationships indicated by the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0018] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0019] See also Figure 1 The present invention provides a technical solution: a research and development project management system, the system includes
[0020] The project planning module clarifies customer needs through project requirements specifications and initiates projects based on customer needs;
[0021] The project tracking and monitoring module consists of a project scale estimation module, a project tracking module, and a scientific and technological personnel configuration management module. The project scale estimation module is used to estimate the workload of the project.
[0022] The project review and analysis module consists of a project summary module and a data analysis module.
[0023] Furthermore, the project requirements specification includes business scenarios, business processes, business activities, business objects and data items.
[0024] Furthermore, the scientific and technological personnel allocation management module allocates the estimated project workload, and then monitors the project completion status in real time through the project tracking module, and the project progress is pushed through the terminal.
[0025] Furthermore, the project summary includes monthly summary, quarterly summary and annual summary, and the closed-loop management and continuous improvement of the entire project management system are completed through data analysis.
[0026] To sum up, when using the R&D project management system, the customer needs are clarified through the project requirements book. The customer provides materials based on the project requirements book and the project is established. After the project is established, the project workload is estimated through the project scale estimation module, and then the workload is allocated through the scientific and technological personnel configuration management module so that it is reasonably distributed to the staff. The project progress can be pushed through the terminal (mobile phone, computer) to monitor the project progress at all times. The staff summarizes the project every week, month, and year, analyzes it through the data analysis module, and improves the project management system step by step.
[0027] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A research and development project management system, characterized in that: System includes The project planning module clarifies customer needs through project requirements specifications and initiates projects based on customer needs; The project tracking and monitoring module consists of a project scale estimation module, a project tracking module, and a scientific and technological personnel configuration management module. The project scale estimation module is used to estimate the workload of the project. The project review and analysis module consists of a project summary module and a data analysis module.
2. A research and development project management system according to claim 1, characterized in that: The project requirements specification includes business scenarios, business processes, business activities, business objects and data items.
3. A research and development project management system according to claim 1, characterized in that: The scientific and technological personnel configuration management module allocates the estimated project workload, and then monitors the project completion status in real time through the project tracking module, and the project progress is pushed through the terminal.
4. A research and development project management system according to claim 1, characterized in that: The project summary includes monthly summary, quarterly summary and annual summary, and completes the closed-loop management and continuous improvement of the entire project management system through data analysis.