Digital twinborn safety monitoring data intelligent analysis early warning platform applied to reservoir
By introducing display components of electric lifting racks and projection equipment into the intelligent analysis and early warning platform, the problem of insufficient display space on the existing platform is solved, and better display effect and convenient operation process are achieved.
Patent Information
- Application Number
- CN202510255171.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-05
- Publication Date
- 2025-05-13
AI Technical Summary
When the existing intelligent analysis and early warning platform displays the operating status of the reservoir, due to the limited display space, operators can easily block the display screen during operation, which makes it inconvenient for other personnel to observe and discuss and cannot provide a good display effect.
An intelligent analysis and early warning platform for digital twin security monitoring data including main box, monitor, operating section and display components is designed. The display components include a storage case, an electric lifting rack, a projection device and a cleaning member. The display content can be projected through the electric lifting rack and a projection device, and the display space can be expanded.
By projecting the display content, the overall display effect is significantly improved, which is convenient for operators to discuss and analyze. At the same time, the projection equipment can be protected without affecting the service life.
Smart Images

Figure CN119992895A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of intelligent analysis and early warning platforms, and in particular to an intelligent analysis and early warning platform for digital twin safety monitoring data applied to reservoirs. Background Art
[0002] The digital twin safety monitoring data intelligent analysis and early warning platform for reservoirs is a comprehensive management platform that integrates advanced technologies such as digital twin technology, Internet of Things (IoT), big data analysis and artificial intelligence (AI). The platform builds a digital copy of the physical entity of the reservoir to achieve real-time collection, intelligent analysis and early warning of reservoir safety monitoring data. It uses digital twin technology to simulate the actual situation of the reservoir in virtual space with high precision, thereby achieving comprehensive monitoring and prediction of the reservoir operation status;
[0003] The current intelligent analysis and early warning platform can use digital twin technology to build a digital copy of the reservoir with high precision and real-time characteristics, which can accurately reflect the actual situation of the reservoir. At the same time, it uses visual display technology to provide rich visualization tools and charts, so that managers can intuitively understand the operating status of the reservoir and make scientific and reasonable decisions.
[0004] When the existing early warning platform conducts decision-making discussions by displaying the operating status of the reservoir, the display space on the platform is very limited, and the operator will block the display screen when operating, causing inconvenience to other personnel when listening to the explanation and observing the screen. As a result, the existing intelligent analysis and early warning platform cannot provide a good display effect when conducting explanations and discussions on corresponding decisions. Summary of the invention
[0005] The purpose of the present invention is to provide a digital twin safety monitoring data intelligent analysis and early warning platform applied to reservoirs, which can project and display the intelligent analysis and early warning platform through the provided components, so that the overall display effect is better and it is convenient for operators to discuss and analyze.
[0006] To achieve the above-mentioned purpose, the present invention provides a digital twin safety monitoring data intelligent analysis and early warning platform applied to a reservoir, comprising a main box, a display and an operation panel, wherein the display is mounted on the main box, the operation panel is electrically connected to the display and mounted on the main box, and further comprises a display component;
[0007] The display assembly includes a storage shell, an electric lifting frame, a projection device and a cleaning component;
[0008] The storage shell is fixedly mounted on the back side of the display, the electric lifting frame is mounted on the storage shell, the projection device is connected to the electric lifting frame and is electrically connected to the display, and the cleaning component is connected to the storage shell for cleaning the projection device received into the storage shell.
[0009] Wherein, the cleaning component includes a booster pump, a lead-out rack and a sealing component, the lead-out rack is fixedly mounted on one side of the storage shell; the booster pump is mounted on the lead-out rack; the sealing component is connected to the lead-out rack for sealing the lead-out rack without being affected by any external force.
[0010] Wherein, the blocking component comprises a blocking slider and a compression spring, and the blocking slider is slidably mounted on the lead-out frame; two sides of the compression spring are respectively connected to the blocking slider and the lead-out frame.
[0011] Wherein, the display assembly also includes a winding rack, a curtain, a mounting frame, an extension member, a connecting member and an auxiliary member, wherein the two winding racks are installed on one side of the mounting frame through the extension member; the curtain is arranged between the two winding racks; the mounting frame is installed on one side of the main box through the connecting member; the extension member is connected to the mounting frame for unfolding or folding the winding racks on both sides; the connecting member is connected to the main box for adjusting the position height of the mounting frame; the auxiliary member is connected to the winding rack for assisting the winding rack in unfolding.
[0012] Among them, the extending member includes a sliding plate, a connecting piece and a bidirectional driving mechanism, and the two sliding plates are respectively slidably installed on the upper and lower sides of the mounting frame; the connecting pieces are rotatably installed on both sides of each sliding plate, and the connecting pieces arranged on both sides of the sliding plate are respectively rotatably connected to the two winding frames; the bidirectional driving mechanism is connected to the mounting frame for correspondingly driving the two sliding plates.
[0013] Among them, the connecting component includes an ejection rack, an ejection mechanism, a lifting rack and an adjusting component. The ejection rack is slidably installed on the back side of the main box; the ejection mechanism is connected to the main box and is used to drive the ejection rack to move; the lifting rack is slidably connected to the mounting rack and is slidably installed on one side of the ejection rack; the adjusting component is connected to the lifting rack and is used to drive the lifting rack and the mounting rack accordingly.
[0014] Among them, the auxiliary component includes a connecting bracket, a soft scraper, a compression spring and a moving part, the two connecting brackets are respectively fixedly installed on the two winding racks; the soft scraper is slidably installed on each connecting bracket; the two sides of the compression spring are respectively connected to the soft scraper and the connecting bracket; the moving part is connected to the lifting frame to assist the pushing frame in pushing out.
[0015] Wherein, the adjusting component includes a jacking mechanism and a lifting mechanism, the jacking mechanism is connected to the ejection frame and is used to drive the lifting frame to move on the ejection frame; the lifting mechanism is connected to the lifting frame and is used to drive the mounting frame to move on the lifting frame.
[0016] Among them, the moving parts include a fixed frame, a movable plate, rollers and a buffer spring, the fixed frame is fixedly installed at the bottom of the lifting frame; the movable plate is slidably installed on the fixed frame; the two rollers are rotatably installed on both sides of the movable plate; the two sides of the buffer spring are respectively connected to the movable plate and the lifting frame.
[0017] The present invention provides a digital twin safety monitoring data intelligent analysis and early warning platform for a reservoir, wherein the main box is provided with the display and the operation panel, and the corresponding monitoring data can be recorded, viewed and analyzed through the operation panel and the display, and the display is provided with a corresponding early warning system, and when the monitoring data is abnormal, an early warning can be issued through the early warning system, the storage shell is fixedly installed on the back side of the display, and the storage shell is provided with the electric lifting frame, the electric lifting frame is composed of a rising plate and an electric push rod for driving the plate to rise, and the projection device is installed on the plate provided on the electric lifting frame, the projection device includes a bottom bracket and an upper projection instrument, and the projection instrument is rotatably arranged on the bottom bracket, and the projection device also includes a corresponding driving motor, and the projection instrument can be driven to rotate on the corresponding bottom bracket by the arranged driving motor, so as to adjust the projection angle of the projection instrument, the projection device is electrically connected to the display, and the user can start and close the projection device by manipulating the control element inside the display;
[0018] In actual operation, the user can first move the projection device out of the storage shell through the electric lifting frame, and then adjust the projection angle of the corresponding projection instrument according to the actual situation through the motor arranged inside the projection device, so that the user can better display and watch, and thus use the built-in projection device to display the corresponding picture when discussion is needed, which greatly enhances the display effect of the overall equipment, so as to facilitate user analysis and discussion. When the display is completed, the projection device can be driven by the electric lifting frame to be re-stored into the storage shell, so as to protect the projection device and prevent the external environment from affecting the service life of the projection device. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below.
[0020] Figure 1 It is a schematic diagram of the overall structure of the digital twin safety monitoring data intelligent analysis and early warning platform applied to reservoirs of the present invention.
[0021] Figure 2 It is a structural schematic diagram of the connecting component of the present invention.
[0022] Figure 3 It is a structural schematic diagram of the auxiliary component of the present invention.
[0023] Figure 4 It is a schematic structural diagram of the cleaning component of the present invention.
[0024] Figure 5 It is a schematic structural diagram of the blocking component of the present invention.
[0025] Figure 6 It is a schematic diagram of the structure of the storage shell of the present invention when it is cut open.
[0026] Figure 7 It is a schematic structural diagram of the stretching member of the present invention.
[0027] Figure 8 It is a structural schematic diagram of the ejection of the ejection rack of the present invention.
[0028] Fig. 9 It is a structural schematic diagram of the unfolded curtain of the present invention.
[0029] In the figure: 1-main box, 2-display, 3-operation panel, 4-storage shell, 5-electric lifting frame, 6-projection equipment, 7-cleaning component, 8-winding frame, 9-screen, 10-mounting frame, 11-extension component, 12-connecting component, 13-auxiliary component, 701-boosting pump, 702-export frame, 703-blocking component, 1101-sliding plate, 1102-connecting piece, 1103-bidirectional driving mechanism, 1201-push Out of the rack, 1202-ejection mechanism, 1203-lifting frame, 1204-adjusting component, 1301-connecting bracket, 1302-soft scraper, 1303-compression spring, 1304-moving component, 7031-blocking slider, 7032-extrusion spring, 12041-lifting mechanism, 12042-lifting mechanism, 13041-fixed frame, 13042-movable plate, 13043-roller, 13044-buffer spring. DETAILED DESCRIPTION
[0030] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0031] In the description of the present invention, it should be understood that “plurality” means two or more than two, unless otherwise clearly and specifically defined.
[0032] See also Figures 1 to 9 The present invention provides a digital twin safety monitoring data intelligent analysis and early warning platform applied to a reservoir: it includes a main box 1, a display 2, an operation panel 3 and a display component, the display component includes a storage shell 4, an electric lifting frame 5, a projection device 6 and a cleaning component 7, the cleaning component 7 includes a booster pump 701, a lead-out frame 702 and a blocking component 703, the blocking component 703 includes a blocking slider 7031 and an extrusion spring 7032. The above-mentioned scheme solves the problem that when the existing early warning platform displays the operating status of the reservoir for decision-making discussion, the operator will block the display screen when operating due to the limited display space of the platform, which makes it inconvenient for other personnel to listen to the explanation and observe the screen, thereby making it impossible for the existing intelligent analysis and early warning platform to provide a good display effect when explaining and discussing the corresponding decision.
[0033] Furthermore, the display 2 is installed on the main box 1, the operation panel 3 is electrically connected to the display 2 and installed on the main box 1, the storage shell 4 is fixedly installed on the back side of the display 2, the electric lifting frame 5 is installed on the storage shell 4, the projection device 6 is connected to the electric lifting frame 5 and electrically connected to the display 2, and the cleaning component 7 is connected to the storage shell 4 for cleaning the projection device 6 received into the storage shell 4.
[0034] Specifically, the main box 1 is provided with the display 2 and the operation panel 3. The corresponding monitoring data can be recorded, viewed and analyzed through the operation panel 3 and the display 2. At the same time, the display 2 is provided with a corresponding early warning system. When the monitoring data is abnormal, an early warning can be issued through the early warning system. The storage shell 4 is fixedly installed on the back of the display 2. The storage shell 4 is provided with the electric lifting frame 5. The electric lifting frame 5 is composed of a rising plate and an electric push rod for driving the plate to rise. The projection device 6 is installed on the plate provided on the electric lifting frame 5. The projection device 6 includes a bottom bracket and an upper projection instrument. The projection instrument is rotatably arranged on the bottom bracket. At the same time, the projection device 6 also includes a corresponding driving motor. The projection instrument can be driven to rotate on the corresponding bottom bracket by the arranged driving motor, so as to adjust the projection angle of the projection instrument. The projection device 6 is electrically connected to the display 2. The user can start and close the projection device 6 by manipulating the control element inside the display 2.
[0035] In actual operation, the user can first move the projection device 6 out of the storage shell 4 through the electric lifting frame 5, and then adjust the projection angle of the corresponding projection instrument according to the actual situation through the motor arranged inside the projection device 6, so that the user can better display and watch, and thus use the built-in projection device 6 to display the corresponding picture when discussion is needed, which greatly enhances the display effect of the overall equipment, so as to facilitate user analysis and discussion. When the display is completed, the projection device 6 can be driven by the electric lifting frame 5 to be re-stored into the storage shell 4, so as to protect the projection device 6 and prevent the external environment from affecting the service life of the projection device 6.
[0036] Furthermore, the lead-out rack 702 is fixedly mounted on one side of the storage shell 4; the booster pump 701 is mounted on the lead-out rack 702; and the blocking component 703 is connected to the lead-out rack 702 for blocking the lead-out rack 702 without being acted upon by any external force.
[0037] Furthermore, the blocking slider 7031 is slidably mounted on the lead-out frame 702 ; and both sides of the extrusion spring 7032 are respectively connected to the blocking slider 7031 and the lead-out frame 702 .
[0038] When the present embodiment is in use, the lead-out frame 702 is connected to the storage shell 4, the booster pump 701 is arranged on the lead-out frame 702 on the side of the storage shell 4, the air outlet port of the booster pump 701 is connected to the lead-out frame 702, and the air inlet port of the booster pump 701 is provided with a one-way introduction mechanism and a filter plate, and the one-way introduction mechanism is provided so that the booster pump 701 can only be inflated toward the storage shell 4 and the lead-out frame 702, and when the booster pump 701 is not working, the gas cannot be led out from the air inlet port of the booster pump 701, and the blocking slider 7031 is slidably installed at the expenditure guide frame opened at the open end of the lead-out frame 702 The extrusion spring 7032 is provided at the connection between the blocking slider 7031 and the internal boss of the expenditure guide frame of the output frame 702. When no external force is applied, the blocking slider 7031 will block the opening of the expenditure guide frame of the output frame 702 under the action of the extrusion spring 7032, so that the storage shell 4 is in a completely sealed state. When the booster pump 701 starts to work and guides the air flow into the storage shell 4 and the output frame 702, the blocking slider 7031 will squeeze the extrusion spring 7032 under the action of air pressure, thereby opening the output frame 702 to facilitate the discharge of the gas inside the storage shell 4.
[0039] By means of the boosting pump 701 being provided in cooperation with the lead-out rack 702 and the blocking slider 7031 and the extrusion spring 7032 arranged on the lead-out rack 702, after the projection device 6 is received into the storage shell 4, the dust attached to the projection device 6 can be blown away by the airflow introduced by the boosting pump 701, and then when the blocking slider 7031 opens the opening of the lead-out rack 702, the blown away dust will be discharged from the lead-out rack 702, and since the air inlet port of the boosting pump 701 is provided with a corresponding filter plate, the introduced gas will not be attached with dust, and the air inlet port of the boosting pump 701 is arranged at the bottom, so that when the boosting pump 701 is not working, the dust attached to the filter plate can fall off under the action of gravity and external airflow.
[0040] Preferably, the display assembly provided by the present invention also includes a winding rack 8, a curtain 9, a mounting frame 10, an extension member 11, a connecting member 12 and an auxiliary member 13, the extension member 11 includes a sliding plate 1101, a connecting member 1102 and a two-way driving mechanism 1103, the connecting member 12 includes a push-out rack 1201, a push-out mechanism 1202, a lifting rack 1203 and an adjusting component 1204, the auxiliary component 13 includes a connecting bracket 1301, a soft scraper 1302, a compression spring 1303 and a moving component 1304, the adjusting component 1204 includes a lifting mechanism 12041 and a lifting mechanism 12042, and the moving component 1304 includes a fixed frame 13041, a movable plate 13042, a roller 13043 and a buffer spring 13044.
[0041] Furthermore, the two winding frames 8 are installed on one side of the mounting frame 10 through the extending member; the curtain 9 is arranged between the two winding frames 8; the mounting frame 10 is installed on one side of the main box 1 through the connecting member 12; the extending member 11 is connected to the mounting frame 10, and is used to unfold or fold the winding frames 8 on both sides; the connecting member 12 is connected to the main box 1, and is used to adjust the position height of the mounting frame 10; the auxiliary member 13 is connected to the winding frame 8, and is used to assist the winding frame 8 in unfolding.
[0042] Furthermore, the two sliding plates 1101 are respectively slidably installed on the upper and lower sides of the mounting frame 10; the connecting parts 1102 are rotatably installed on both sides of each sliding plate 1101, and the connecting parts 1102 arranged on both sides of the sliding plate 1101 are respectively rotatably connected to the two winding frames 8; the two-way driving mechanism 1103 is connected to the mounting frame 10, and is used for correspondingly driving the two sliding plates 1101.
[0043] When the present embodiment is in use, a corresponding curtain cloth 9 is arranged between the two winding racks 8, and corresponding winding mechanisms are arranged inside the two winding racks 8. The curtain cloth 9 is wound around the winding mechanisms arranged on the winding racks 8 on both sides. The winding mechanisms inside the two winding racks 8 use a reset structure such as a torsion spring so that the wound curtain cloth 9 can be pulled and folded normally. The two winding racks 8 are connected to the two sliding plates 1101 slidably mounted on the mounting frame 10 through the connecting piece 1102. Both sides of each sliding plate 1101 are connected to the winding racks 8 on both sides through the corresponding connecting piece 1102. Both sides of the connecting piece 1102 can be rotated. The two sliding plates 1101 are correspondingly rotated by the bidirectional driving mechanism 1103. Drive, the two-way driving mechanism 1103 is composed of screws with opposite thread rotation directions on both sides and corresponding driving motors. Since the two-way driving mechanism 1103 is provided with screws with opposite thread rotation directions on both sides, when the corresponding motor drives the screws provided in the two-way driving mechanism 1103 to rotate, the sliding plates 1101 on both sides will expand toward the corresponding sides or move closer to each other, and then the synchronous movement of the two sliding plates 1101 and the coordinated connection piece 1102 can realize the opening and closing of the winding frames 8 on both sides, thereby completing the extension of the curtain 9, so that the user can directly display the projection picture of the projection device 6 through the set curtain 9 during actual operation, making it more convenient for the user to operate in practice, and there is no need to select a specific venue for image projection.
[0044] Furthermore, the ejection rack 1201 is slidably installed on the back side of the main box 1; the ejection mechanism 1202 is connected to the main box 1, and is used to drive the ejection rack 1201 to move; the lifting rack 1203 is slidably connected to the mounting frame 10, and is slidably installed on one side of the ejection rack 1201; the adjustment component 1204 is connected to the lifting rack 1203, and is used to drive the lifting rack 1203 and the mounting frame 10 accordingly.
[0045] Furthermore, the lifting mechanism 12041 is connected to the ejection frame 1201 and is used to drive the lifting frame 1203 to move on the ejection frame 1201 ; the lifting mechanism 12042 is connected to the lifting frame 1203 and is used to drive the mounting frame 10 to move on the lifting frame 1203 .
[0046] When the present embodiment is in use, the push-out frame 1201 is arranged on the back side of the main box 1, the lifting frame 1203 is arranged on the push-out frame 1201, and the mounting frame 10 is slidably mounted on the lifting frame 1203. The push-out frame 1201 slides on the main box 1 through the push-out mechanism 1202, and the lifting frame 1203 moves on the push-out frame 1201 through the corresponding lifting mechanism 12041, and the mounting frame 10 moves on the lifting frame 1203 through the lifting mechanism 12042. The push-out mechanism 1202, the lifting mechanism 12041 and the lifting mechanism 12042 are all screw drive structures, and the corresponding motor drives the corresponding screw to realize the driving of the corresponding plate;
[0047] When the user operates, the pushing rack 1201 can be first pushed out from the side of the main box 1 through the pushing mechanism 1202, and then the moving distance of the pushing rack 1201 can be adjusted according to the actual situation, and then the lifting rack 1203 and the mounting rack 10 can be driven respectively by the jacking mechanism 12041 and the lifting mechanism 12042, so as to adjust the height of the two winding racks 8 and the curtain 9, so that the user can adjust the unfolding position of the curtain 9 according to the actual situation, thereby adjusting the overall display position. When the operation is completed, the entire display structure can be stored by moving the corresponding frame, which makes it more convenient in actual operation.
[0048] Furthermore, the two connecting brackets 1301 are fixedly mounted on the two winding racks 8 respectively; the soft scraper 1302 is slidably mounted on each connecting bracket 1301; the two sides of the compression spring 1303 are respectively connected to the soft scraper 1302 and the connecting bracket 1301; the moving part 1304 is connected to the lifting frame 1203 to assist the pushing frame 1201 in pushing out.
[0049] Furthermore, the fixed frame 13041 is fixedly installed at the bottom of the lifting frame 1203; the movable plate 13042 is slidably installed on the fixed frame 13041; the two rollers 13043 are rotatably installed on both sides of the movable plate 13042; and the two sides of the buffer spring 13044 are respectively connected to the movable plate 13042 and the lifting frame 1203.
[0050] When the present embodiment is in use, each of the winding racks 8 is provided with the connecting bracket 1301, and each of the connecting brackets 1301 is also slidably mounted with the corresponding soft scraper 1302, and the soft scraper 1302 is provided with a soft plate on the side close to the curtain 9, so that the winding racks 8 on both sides can scrape and clean the display side of the curtain 9 when winding and unfolding, so as to avoid the impurities attached to the surface of the curtain 9 affecting the overall display effect, and at the same time, each position where the soft scraper 1302 is connected to the connecting bracket 1301 is provided with a corresponding compression spring 1303, and the compression spring 1303 can ensure that the soft scraper 1302 and the curtain 9 are closely matched, so that the effect of scraping and cleaning is better;
[0051] The fixed frame 13041 is fixedly arranged at the bottom of the lifting frame 1203, and the movable plate 13042 is slidably installed on the fixed frame 13041. The corresponding rollers 13043 are arranged on both sides of the movable plate 13042, and the corresponding buffer springs 13044 are also installed at the connection between the movable plate 13042 and the fixed frame 13041, so that the vibration generated can be buffered by the expansion and contraction of the buffer springs 13044 during the overall movement, thereby ensuring the stability of the movement process of the push-out frame 1201. In this way, the rollers 13043, the movable plate 13042 and the buffer springs 13044 can be used to assist in supporting the overall structure when the lifting frame 1203 and the entire display structure are stored, and at the same time, the overall components can be guided when the push-out frame 1201 is pushed out, so that the push-out frame 1201 can stably push out the entire display structure.
[0052] What is disclosed above is only one or more preferred embodiments of the present application, and cannot be used to limit the scope of rights of the present application. Ordinary technicians in this field can understand that all or part of the processes of implementing the above embodiments and equivalent changes made according to the claims of the present application are still within the scope covered by the present application.
Claims
1. A digital twin safety monitoring data intelligent analysis and early warning platform applied to a reservoir, comprising a main box, a display and an operating panel, wherein the display is mounted on the main box, and the operating panel is electrically connected to the display and mounted on the main box, characterized in that: Also includes display components; The display assembly includes a storage shell, an electric lifting frame, a projection device and a cleaning component; The storage shell is fixedly mounted on the back side of the display, the electric lifting frame is mounted on the storage shell, the projection device is connected to the electric lifting frame and is electrically connected to the display, and the cleaning component is connected to the storage shell for cleaning the projection device received into the storage shell.
2. The digital twin safety monitoring data intelligent analysis and early warning platform applied to reservoirs as claimed in claim 1 is characterized in that: The cleaning component includes a booster pump, a lead-out frame and a blocking component. The lead-out frame is fixedly mounted on one side of the storage shell; the booster pump is mounted on the lead-out frame; the blocking component is connected to the lead-out frame for blocking the lead-out frame without being affected by any external force.
3. The digital twin safety monitoring data intelligent analysis and early warning platform applied to reservoirs as claimed in claim 2 is characterized in that: The blocking component comprises a blocking slider and a pressing spring. The blocking slider is slidably mounted on the lead-out frame. Two sides of the pressing spring are respectively connected to the blocking slider and the lead-out frame.
4. The digital twin safety monitoring data intelligent analysis and early warning platform applied to reservoirs according to claim 1, characterized in that: The display assembly further includes a winding frame, a curtain, a mounting frame, an extension member, a connecting member and an auxiliary member, wherein the two winding frames are mounted on one side of the mounting frame through the extension member; the curtain is arranged between the two winding frames; and the mounting frame is mounted on one side of the main box through the connecting member; The extending member is connected to the mounting frame and is used to unfold or fold the winding frames on both sides; the connecting member is connected to the main box and is used to adjust the position and height of the mounting frame; The auxiliary component is connected to the winding frame and is used to assist the winding frame in unfolding.
5. The digital twin safety monitoring data intelligent analysis and early warning platform applied to reservoirs as claimed in claim 4 is characterized in that: The extending member includes a sliding plate, a connecting piece and a bidirectional driving mechanism, and the two sliding plates are respectively slidably mounted on the upper and lower sides of the mounting frame; the connecting pieces are rotatably mounted on both sides of each sliding plate, and the connecting pieces arranged on both sides of the sliding plate are respectively rotatably connected to the two winding frames; the bidirectional driving mechanism is connected to the mounting frame for correspondingly driving the two sliding plates.
6. The digital twin safety monitoring data intelligent analysis and early warning platform applied to reservoirs as claimed in claim 5, characterized in that: The connecting component includes an ejection rack, an ejection mechanism, a lifting rack and an adjusting component. The ejection rack is slidably installed on the back side of the main box; the ejection mechanism is connected to the main box and is used to drive the ejection rack to move; the lifting rack is slidably connected to the mounting rack and is slidably installed on one side of the ejection rack; the adjusting component is connected to the lifting rack and is used to drive the lifting rack and the mounting rack accordingly.
7. The digital twin safety monitoring data intelligent analysis and early warning platform applied to reservoirs as claimed in claim 6, characterized in that: The auxiliary component includes a connecting bracket, a soft scraper, a compression spring and a moving part. The two connecting brackets are respectively fixedly mounted on the two winding racks; the soft scraper is slidably mounted on each connecting bracket; the two sides of the compression spring are respectively connected to the soft scraper and the connecting bracket; the moving part is connected to the lifting frame to assist the pushing frame in pushing out.
8. The digital twin safety monitoring data intelligent analysis and early warning platform applied to reservoirs as claimed in claim 7, characterized in that: The adjusting component includes a jacking mechanism and a lifting mechanism. The jacking mechanism is connected to the ejection frame and is used to drive the lifting frame to move on the ejection frame; the lifting mechanism is connected to the lifting frame and is used to drive the mounting frame to move on the lifting frame.
9. The digital twin safety monitoring data intelligent analysis and early warning platform applied to reservoirs as claimed in claim 7, characterized in that: The moving component includes a fixed frame, a movable plate, rollers and a buffer spring. The fixed frame is fixedly installed at the bottom of the lifting frame; the movable plate is slidably installed on the fixed frame; the two rollers are rotatably installed on both sides of the movable plate; and the two sides of the buffer spring are respectively connected to the movable plate and the lifting frame.