TOB boundary creating method and system and storage medium
By obtaining necessary information, establishing application forms, creating and modifying isolation instructions, and performing boundary conflict verification in the process of TOB boundary creation and management, the inefficiency and conflict detection problems of TOB boundary creation and management in the existing technology are solved, and efficient and conflict-free TOB boundary management is achieved.
Patent Information
- Application Number
- CN202510107671.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-23
- Publication Date
- 2025-05-13
AI Technical Summary
When setting the TOB boundary in the prior art, isolation instructions cannot be created and modified in a timely and efficient manner, and it is difficult to determine whether the boundary and its boundary instructions conflict with other isolation management services.
By obtaining the necessary information during isolation and transfer, establishing an application form for the isolation and transfer boundary, creating an isolation instructions in the application form, determining whether the instructions meet the set requirements, and making changes based on the requirements before and after submission and review. At the same time, boundary conflict verification is carried out to ensure that the created TOB boundary is free of conflicts in the entire isolation management system.
It realizes efficient creation and management of TOB boundaries, ensures the applicability of isolation instructions in different scenarios, and ensures the availability and conflict-freeness of boundaries through boundary conflict verification.
Smart Images

Figure CN119996162A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of handover and isolation management, and in particular to a TOB (handover-isolation) boundary creation method, system and storage medium. Background Art
[0002] Boundary management is part of commissioning management. TOB isolation transfer refers to the transfer of system isolation management responsibilities when the system is transferred from installation to commissioning.
[0003] When setting TOB boundaries, isolation instructions cannot be created and modified in a timely and efficient manner. Moreover, after setting the isolation boundary, it is not easy to accurately determine whether the current boundary and its boundary instructions conflict with other isolation management services. Summary of the invention
[0004] In view of the shortcomings of the prior art mentioned above, the purpose of the present invention is to provide a TOB boundary creation method, system and storage medium, which are used to solve the problem in the prior art that when setting the TOB boundary, the isolation instructions cannot be created and modified in a timely and efficient manner, and after setting the isolation boundary, it is not easy to accurately determine whether the current boundary and its boundary instructions conflict with other isolation management services.
[0005] To achieve the above-mentioned purpose and other related purposes, the present invention provides a TOB boundary creation method, including the following steps: obtaining necessary information for isolation transfer, and establishing an application form for the isolation transfer boundary; creating an isolation instruction in the application form, and determining whether the isolation instruction meets the set requirements. If not, the isolation instruction is modified according to the relevant requirements before and after submission for review, and then submitted; determining whether the application form at the time of submission meets the logical requirements of the boundary conflict. If so, the creation of the application form is completed; if not, the output of the corresponding warning prompt is controlled.
[0006] In one embodiment of the present invention, necessary information for isolation and handover is obtained, and an application form for the isolation and handover boundary is established, including: obtaining the title information of the planned factory, unit, system name, and handover description when creating the isolation and handover boundary, and creating the application form after obtaining the selection instruction of the isolation and handover application.
[0007] In one embodiment of the present invention, creating an isolation instruction in an application form includes: adding device instructions in sequence in a display interface of the application form to obtain each column of newly created isolation instructions.
[0008] In one embodiment of the present invention, in the display interface of the application form, newly created isolation instructions for each column are obtained by adding device instructions in sequence, including: after collecting the newly added instructions as selection instructions for device instructions, entering the device instruction adding interface; obtaining the input information of the device code, querying to obtain a list of all functional location entries associated with the entered device code, so as to select the functional location corresponding to the boundary instruction.
[0009] In one embodiment of the present invention, it is determined whether the isolation instruction meets the set requirements. If not, the isolation instruction is modified according to the relevant requirements before and after submission for review, and then submitted, including: determining whether the isolation instruction before the application form is submitted meets the set requirements. If so, the application form is submitted for review; if not, the isolation instruction is directly modified and then submitted; wherein, before the application form is submitted includes before the application form is submitted to the isolation manager platform.
[0010] In one embodiment of the present invention, submitting an application form to the operation isolation manager platform includes: determining whether all boundaries and their isolation instructions have been fully entered; if not, temporarily saving the entered boundaries and the boundaries being entered and their boundary instructions; and submitting the application form to the operation isolation manager platform after all boundaries have been entered and verified.
[0011] In one embodiment of the present invention, it is determined whether the isolation instruction meets the set requirements. If not, the isolation instruction is changed according to the relevant requirements before and after submission for review, and then submitted, including: determining whether the isolation instruction after the application form is submitted meets the set requirements. If so, directly verifying whether the application form meets the logical requirements of the boundary conflict. If not, the control is to change the isolation instruction after the submission for review is returned; wherein, after the application form is submitted, it includes after all boundaries are entered and submitted to the isolation manager platform.
[0012] In one embodiment of the present invention, it is determined whether the application form meets the logical requirements of boundary conflicts when submitted, including: querying the corresponding business management type based on the boundary device code and boundary status in the application form, and determining whether the business management type meets the logical requirements of boundary conflicts during isolation and handover, wherein the business management types include maintenance isolation, operation isolation, administrative isolation, isolation and handover boundary management, and temporary operation and handover boundary management.
[0013] The present invention also provides a TOB boundary creation system, including: an application creation unit, which obtains necessary information during isolation and transfer, and establishes an application form for the isolation and transfer boundary; a modification submission unit, which creates an isolation instruction in the application form, and determines whether the isolation instruction meets the set requirements. If not, the isolation instruction is changed according to the relevant requirements before and after submission and review, and then submitted; and a verification and analysis unit, which determines whether the application form at the time of submission meets the logical requirements of the boundary conflict. If so, the creation of the application form is completed. If not, the corresponding warning prompt is controlled to be output.
[0014] The present invention further provides a computer-readable storage medium on which a computer program is stored, and the computer program is used to execute the above method.
[0015] Beneficial effects of the present invention: The present invention proposes a TOB boundary creation method, system and storage medium. The method, system and storage medium are responsible for inputting the necessary information during isolation transfer through debugging to create an application form, and add boundary instructions based on the application form, thereby realizing the creation and management of the TOB boundary. After the isolation instruction is created, since corresponding boundary changes may be involved, corresponding modifications are made according to the relevant modification requirements before and after the boundary review is submitted to resolve the conflict between the review of the operating isolation manager platform and the boundary change, thereby realizing separate management of the modification of the isolation instruction before and after the submission for review, so as to ensure the applicability of the modification of the isolation instruction in different scenarios. Furthermore, after the isolation instruction is added, when the boundary is submitted, the availability and conflict-free nature of the created TOB boundary in the entire isolation management system can be ensured by performing a boundary conflict check on the submitted boundary. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 Flow chart of the boundary creation method of the present invention.
[0017] Figure 2 This is a block diagram of the display interface of the control panel during TOB application in a preferred embodiment of the present invention.
[0018] Figure 3 A block diagram of a display interface when creating a device instruction in a preferred embodiment of the present invention.
[0019] Figure 4 This is a block diagram of the display interface when selecting device code in a preferred embodiment of the present invention.
[0020] Figure 5 This is a block diagram of the display interface during conflict simulation, saving and submission in a preferred embodiment of the present invention.
[0021] Figures 6 to 8It is a block diagram of the display interface of the TOB creation process in a preferred embodiment of the present invention.
[0022] Fig. 9 Create an architectural diagram of the system for the boundary of the present invention. DETAILED DESCRIPTION
[0023] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.
[0024] It should be noted that the illustrations provided in the following embodiments are only schematic illustrations of the basic concept of the present invention, and thus the drawings only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed arbitrarily, and the component layout may also be more complicated.
[0025] In the following description, numerous details are discussed to provide a more thorough explanation of the embodiments of the present invention. However, it is obvious to those skilled in the art that the embodiments of the present invention can be implemented without these specific details. In other embodiments, well-known structures and devices are shown in the form of block diagrams rather than in detail to avoid making the embodiments of the present invention difficult to understand.
[0026] See also Figure 1 In one embodiment of the present invention, the present invention provides a TOB boundary creation method, including the following steps: obtaining necessary information for isolation transfer, and establishing an application form for the isolation transfer boundary; creating an isolation instruction in the application form, and determining whether the isolation instruction meets the set requirements. If not, the isolation instruction is modified according to the relevant requirements before and after submission for review, and then submitted; determining whether the application form at the time of submission meets the logical requirements of the boundary conflict. If so, the creation of the application form is completed. If not, the corresponding warning prompt is controlled to be output.
[0027] In this embodiment, through the steps of obtaining the necessary information for isolation transfer and establishing the application form for isolation transfer boundary, it can be seen that when creating a TOB application, the necessary information for isolation transfer is input by the debugger, and then the application form for TOB boundary application is obtained. Specifically, the application form can be the display interface when the TOB application is initiated, and the creation of the isolation instruction can be continued according to the application form of the display interface obtained. Through the above steps, it is possible to quickly create an application form for the TOB boundary based on the basic information of TOB according to the necessary information during isolation transfer. Through the steps of creating an isolation instruction in the application form, judging whether the isolation instruction meets the set requirements, if not, changing the isolation instruction according to the relevant requirements before and after submission for review, and then submitting it, it can be seen that after the application form is created, the creation of the isolation instruction can be realized in the application form. And after the isolation instruction is created, there may be a situation where, for example, an incorrect boundary instruction is added. Of course, this incorrect boundary instruction may be determined before submission for review or after submission for review. After obtaining the incorrect boundary instruction, the isolation instruction can be changed according to the corresponding requirements before and after submission for review, and then submitted after the change is completed. Through the above steps, it is possible to manage the modification of the isolation instructions before and after submission for review separately, so as to ensure the applicability of the modification of the isolation instructions in different scenarios. Through the steps: determine whether the application form at the time of submission meets the logical requirements of the boundary conflict. If it does, the creation of the application form is completed. If it does not, the control outputs the corresponding warning prompt. It can be seen that regardless of whether the isolation instructions are modified, a boundary conflict check is required when submitting the isolation boundary to ensure that the submitted application form completes the creation of the application form under the premise of meeting the logical requirements of the boundary conflict, and prints out the paper boundary instructions according to the items of the corresponding line of the boundary instructions. Through the above steps, it is easy to ensure the availability and conflict-free nature of the created TOB boundary in the entire isolation management system when the boundary is submitted.
[0028] In one embodiment of the present invention, the basic information of the application form can be created by filling in the necessary information during the isolation and handover. Specifically, the necessary information during the isolation and handover is obtained, and the application form for the isolation and handover boundary is established, including: obtaining the title information of the planned factory, unit, system name, and handover description when creating the isolation and handover boundary, and after obtaining the selection instruction of the isolation and handover application, the application form is created.
[0029] See also Figure 2In a preferred embodiment, when creating a handover application control panel for a TOB, select "TOB Application" in the basic operation first, select the factory as 5120 in the default setting, and select Unit 1. The planned factory and unit selected in this interface can be the default planned factory and unit for TOB creation. Then the TOB / TOTO (temporary operation handover) application initiation interface will pop up, and the planned factory 5120 and Unit 1 information will be attached. Then, the system name and the title information of the handover description will be selected in the TOB / TOTO application initiation interface.
[0030] In one embodiment of the present invention, during the TOB boundary creation process, it is necessary to create isolation instructions. Specifically, creating isolation instructions in an application form includes: adding device instructions in sequence in the display interface of the application form to obtain newly created isolation instructions in each column. In this embodiment, by sequentially creating isolation instructions in an application form with certain necessary information, the efficiency of creating isolation instructions can be further improved. That is to say, in the display interface of the application form, it is possible to add device instructions in the display interface according to the relevant boundary state requirements of the TOB boundary, and then create various types of newly added isolation instructions to form a TOB boundary. Among them, the newly added instructions include device instructions and comment instructions.
[0031] See also Figure 3 In a preferred embodiment, when selecting the TOB application, the planned factory selects 5120, the unit selects unit 1, the system name is LKF, the title is TOB debugging application creation, and by selecting a new instruction, a new instruction window will pop up. The new instruction window includes equipment instructions and comment instruction buttons. The current selection is the equipment instruction, and the current equipment instruction is selected by confirming the selection at the bottom of the window.
[0032] In one embodiment of the present invention, when creating an isolation instruction, by selecting a device instruction in the newly added instruction, a device instruction adding interface can be obtained. Specifically, in the display interface of the application form, by adding device instructions in sequence, the newly created isolation instructions of each column are obtained, including: after collecting the newly added instruction as the selection instruction of the device instruction, entering the device instruction adding interface; obtaining the input information of the device code, querying and obtaining a list of all functional position entries associated with the input device code, so as to select the functional position corresponding to the boundary instruction.
[0033] See also Figure 4 In a preferred embodiment, Figure 3After selecting the equipment instruction and confirming the selection, the equipment instruction new interface window will pop up. You can use the custom field boundary equipment number to query the functional location and functional location description information. Specifically, by filling in "*1*RCP*" in the equipment code and selecting "A" for the version, the functional location window will pop up and the entry will be found. For example, the current pop-up name is "Functional location (2) 2114 Found entry". In the list of each item, the functional location is: CN-1-06-RCPC-000BA1, the functional location is described as Reactor Pressure Vessel, Core; Functional Location: CN-1-06-RCP000TY, the functional location is described as Auxiliary Reactor Coolant SystemPipes (Auxiliary Reactor Coolant System Pipes); Functional Location: CN-1-06-RCP000VP, the functional location is described as Reactor Cooling System Valve Body; Functional Location: CN-1-06-RCP000AR, the functional location is described as Cabinet; Functional Location: CN-1-06-RCP000BA, the functional location is described as Regulator; Functional Location: CN-1-06-RCP000CR, the functional location is described as Electrical Junction Box; Functional Location: CN-1-06-RCP000DK, the functional location is described as RCP Pressure Relief Box Burst Disk RUPTURE DISK; Functional position: CN-1-06-RCP000EL, functional position description is RCPO01VP valve pilot solenoid valve; Functional position: CN-1-06-RCP000EP, functional position description is RCPO01VP valve position electric / gas converter; Functional position: CN-1-06-RCP000GV, functional position description is steam generator; Functional position: CN-1-06-RCP000GVR, functional position description is steam generator (temporary functional position newly added for SG overhaul); Functional position: CN-1-06-RCP000MT, functional position description is reactor shell seal leakage temperature; Functional position: CN-1-06-RCP000PO, functional position description is reactor shell seal leakage temperature REACTORCOOLANTPUMP1; Functional position: CN-1-06-RCP000RG, functional position description is regulator heating control regulator; Functional position: CN-1-06-RCP000RS, functional position description is PZR BACKUP HTG GR.1 SWITCHBOARD.
[0034] In one embodiment of the present invention, when judging whether the isolation instruction meets the set requirements, the corresponding requirements before and after submission for review are included. Among them, judging whether the isolation instruction meets the set requirements, if not, the isolation instruction is changed according to the relevant requirements before and after submission for review, and then submitted, including: judging the isolation instruction before submission for review. Specifically, judging whether the isolation instruction before the application form is submitted meets the set requirements, if it is satisfied, the application form is submitted for review, if not, the isolation instruction is directly changed and submitted; wherein, before the application form is submitted, it includes before the application form is submitted to the operating isolation manager platform. In this embodiment, if an incorrect boundary instruction is added before submission for review, the corresponding boundary instruction can be selected, and the boundary state of the newly added incorrect boundary instruction can be modified or the incorrect boundary instruction can be deleted. In addition, in order to better realize the record of various operations, when changing the boundary instruction, the corresponding operation will have a corresponding operation record.
[0035] In one embodiment of the present invention, before all boundaries are entered and checked, the boundary data can be protected by temporary preservation. Specifically, submitting the application form to the operation isolation manager platform includes: determining whether all boundaries and their isolation instructions have been entered. If not, temporarily saving the entered boundaries and the boundaries being entered and their boundary instructions, and submitting them to the operation isolation manager platform after all boundaries are entered and checked. In this embodiment, if temporary protection is required for the boundary midway, it can be saved by clicking the "Save" button in the TOB / TOTO application initiation interface. If all boundaries are entered and checked, the "Submit" button in the TOB / TOTO application initiation interface can be clicked to submit all boundaries to the operation isolation manager platform, through which boundary conflict verification of all boundaries can be achieved.
[0036] In one embodiment of the present invention, when judging whether the isolation instruction meets the set requirements, the corresponding requirements before and after submission for review are included. Wherein, judging whether the isolation instruction meets the set requirements, if not, the isolation instruction is changed according to the relevant requirements before and after submission for review, and then submitted, including: judging the isolation instruction after submission for review. Specifically, judging whether the isolation instruction after the application form is submitted meets the set requirements, if it is satisfied, the application form is directly checked to see whether it meets the logical requirements of the boundary conflict, if not, the control is controlled to change the isolation instruction after the submission for review is returned; wherein, after the application form is submitted, it includes after all boundaries are entered and submitted to the operating isolation manager platform. In this embodiment, after clicking "Submit" on the isolation boundary, the transferred application form cannot be directly modified. If it needs to be re-modified, because the application form has been submitted to the isolation manager platform, the isolation manager platform needs to return the application form, and then the application form will be returned to the person in charge of debugging for modification. Wherein, the modification of the isolation instruction includes the deletion or modification of the boundary instruction.
[0037] In one embodiment of the present invention, after adding, modifying or deleting isolation instructions on an application form, when submitting the application form, it is also necessary to determine whether the application form has a boundary conflict. Specifically, judging whether the application form meets the logical requirements of the boundary conflict when submitted includes: querying the corresponding business management type according to the boundary device code and boundary status in the application form, and judging whether the business management type meets the logical requirements of the boundary conflict during isolation and handover, wherein the business management types include maintenance isolation, operational isolation (PA), administrative isolation (PO), isolation handover (TOB) boundary management, and temporary operation handover (TOTO) boundary management.
[0038] In this embodiment, verification is performed by simulating the boundary conflict during submission, and logical verification is performed through the boundary conflict rules. That is to say, the TB (abbreviation of TOB) / TO (abbreviation of TOTO) type WCD (operation sheet) boundary, that is, the boundary of the ETG (an isolated state) state, is queried according to the boundary device code and boundary status. During verification, if TOB / TOTO (normal setting boundary) does not exist in the isolation management system, no verification information is prompted. If a TOB sheet exists in the isolation management system, a warning is prompted and the sharing is marked. If a TOTO sheet (normal setting boundary) exists in the isolation management system, no information is prompted. If TOB / TOTO exists at the same time in the isolation management system, the boundary is shared. If the TOB / TOTO boundaries are consistent and the states are inconsistent, a pop-up prompt and a simulated warning prompt are given.
[0039] In one embodiment of the present invention, if there is an approved TOB ticket in the quarantine management system, when creating a new TOB application for the system, the quarantine system will prompt but not block when saving the WCA (work permit). In this way, the subsequent TOB expansion of the system can be successfully created.
[0040] See also Figure 5 In a preferred embodiment, in the TOB / TOTO application modification interface, the boundary instructions can be saved and submitted through the "Save" and "Submit" options; the boundary instructions can be printed through the print boundary instruction list option; the boundary conflict can be simulated through the simulation option; the modification log information of the boundary instruction can be viewed through the head modification log; and the return information of the submitted application form can be queried through the return record. There are "Add Instructions", "Delete Instructions", "Cancel Deletion", "Modify Instructions" and "Log" at the bottom of the interface to change the boundary instructions.
[0041] See also Figures 6 to 8 In a preferred embodiment, when a TOB is created, a new TB category is added to the USAGE field of WCA and WCD for the business management of the user's TOB. When creating a TOB again, the operation is the same as creating a work permit, and TB is selected as the type. Plan approval, worker approval, isolation preparation, isolation confirmation, and isolation manager approval are the same as the normal work permit operations. If the system already has an approved TOB ticket, when creating a new TOB application for the system, the isolation system will prompt when saving WCA, but will not block it, so that the system can successfully create the TOB when it is expanded later (blocking is set when WCD is set up for preparation). When adding instructions, if there are the same boundaries as in the approved TOB ticket, it is prompted that the device status should be consistent. Directly modify the current ticket device status to be consistent with the device status in the approved TOB, and then continue with subsequent operations.
[0042] like Fig. 9 As shown, in one embodiment of the present invention, the present invention also provides a TOB boundary creation system, including: an application creation unit, the application creation unit obtains necessary information during isolation transfer, and establishes an application form for the isolation transfer boundary; a modification submission unit, the modification submission unit creates an isolation instruction in the application form, and determines whether the isolation instruction meets the set requirements. If not, the isolation instruction is changed according to the relevant requirements before and after submission for review, and then submitted; and a verification and analysis unit, the verification and analysis unit determines whether the application form at the time of submission meets the logical requirements of the boundary conflict. If so, the creation of the application form is completed. If not, the control output is a corresponding warning prompt.
[0043] In this embodiment, during the TOB boundary creation process, the debugger first inputs the necessary information for isolation transfer, and creates an application form according to the necessary information through the application creation unit. And after the application form is established, the creation of the isolation instruction is further realized in the application form by modifying the submission unit. And after the isolation instruction is created, there will be a situation of adding incorrect boundary instructions, and it may appear before the boundary is submitted for review or after the boundary is submitted for review. Therefore, after determining that there is an incorrect boundary instruction, the modification of the isolation instruction is completed according to the corresponding modification rules before and after the boundary is submitted for review, and then the boundary is submitted. Through the verification analysis unit, the boundary conflict analysis of the application form at the time of submission is realized, so that when the boundary in the application form meets the logical requirements of the boundary conflict, the review of the application form is completed, that is, the creation is completed. If it does not meet the logical requirements of the boundary conflict, a warning prompt is given to adjust the boundary state by modifying the boundary instruction and other methods to meet the logical requirements of the boundary conflict.
[0044] The present invention further provides a computer-readable storage medium on which a computer program is stored, and the computer program is used to execute the above method. The computer-readable storage medium may be included in the electronic device described in the above embodiment, or may exist independently without being assembled into the electronic device.
[0045] In summary, the present invention creates an application form by debugging the necessary information for inputting isolation transfer, and adds boundary instructions based on the application form, thereby realizing the creation and management of TOB boundaries. After the isolation instruction is created, since corresponding boundary changes may be involved, corresponding modifications are made according to the relevant modification requirements before and after the boundary review is submitted to resolve the conflict between the review of the operating isolation manager platform and the boundary changes, thereby realizing separate management of the modification of the isolation instruction before and after the submission for review, so as to ensure the applicability of the modification of the isolation instruction in different scenarios. Furthermore, after the isolation instruction is added, when the boundary is submitted, the availability and conflict-free nature of the created TOB boundary in the entire isolation management system can be ensured by performing a boundary conflict check on the submitted boundary. Therefore, the present invention effectively overcomes the various shortcomings in the prior art and has a high industrial utilization value.
[0046] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.
Claims
1. A TOB boundary creation method, characterized in that: The steps include: Obtain necessary information for isolation transfer and establish an application form for isolation transfer boundaries; Creating an isolation instruction in the application form, determining whether the isolation instruction meets the set requirements, and if not, modifying the isolation instruction according to the relevant requirements before and after submission for review, and then submitting the application form; It is determined whether the application form meets the logical requirements of boundary conflict when submitted. If so, the creation of the application form is completed. If not, the corresponding warning prompt is output.
2. The TOB boundary creation method according to claim 1, characterized in that: Obtain the necessary information for isolation transfer and establish an application form for isolation transfer boundaries, including: The title information of the planned factory, unit, system name, and handover description when creating the isolation and handover boundary is obtained, and after obtaining the selection instruction of the isolation and handover application, the application form is created.
3. The TOB boundary creation method according to claim 1, characterized in that: Create a quarantine instruction in the said application, including: In the display interface of the application form, the newly created isolation instructions in each column are obtained by adding device instructions in sequence.
4. The TOB boundary creation method according to claim 3, characterized in that: In the display interface of the application form, by adding device instructions in sequence, the newly created isolation instructions in each column are obtained, including: After collecting the newly added command as the selection command of the device command, enter the device command adding interface; The input information of the equipment code is obtained, and a list of all functional position entries associated with the input equipment code is obtained by querying to select a functional position corresponding to the boundary instruction.
5. The TOB boundary creation method according to claim 1, characterized in that: Determine whether the isolation instruction meets the set requirements. If not, modify the isolation instruction according to the relevant requirements before and after submission for review, and then submit it, including: Determine whether the isolation instruction before the application form is submitted meets the set requirements. If so, submit the application form for review. If not, directly modify the isolation instruction and submit it. Before the application form is submitted, it includes before submitting the application form to the isolation manager platform.
6. The TOB boundary creation method according to claim 5, characterized in that: Submit the application form to the Operation Isolation Manager platform, including: Determine whether all boundaries and their isolation instructions have been entered. If not, temporarily save the entered boundaries and the boundaries being entered and their boundary instructions, and submit them to the operation isolation manager platform after all boundaries have been entered and verified.
7. The TOB boundary creation method according to claim 1 or 5, characterized in that: Determine whether the isolation instruction meets the set requirements. If not, modify the isolation instruction according to the relevant requirements before and after submission for review, and then submit it, including: Determine whether the isolation instruction after the application form is submitted meets the set requirements. If so, directly verify whether the application form meets the logical requirements of boundary conflicts. If not, control the isolation instruction to be changed after the submission is reviewed and returned; wherein, after the application form is submitted, it includes after all boundaries are entered and submitted to the isolation manager platform.
8. The TOB boundary creation method according to claim 1, characterized in that: Determining whether the application form meets the logical requirements of boundary conflict when submitted includes: According to the boundary equipment code and boundary status in the application form, the corresponding business management type is queried to determine whether the business management type meets the logical requirements of boundary conflicts during isolation and handover. The business management types include maintenance isolation, operation isolation, administrative isolation, isolation and handover boundary management, and temporary operation and handover boundary management.
9. A TOB boundary creation system, characterized in that: include: An application creation unit, which obtains necessary information for isolation transfer and establishes an application form for the isolation transfer boundary; A modification submission unit, wherein the modification submission unit creates an isolation instruction in the application form, determines whether the isolation instruction meets the set requirements, and if not, modifies the isolation instruction according to the relevant requirements before and after the submission review, and then submits the application form; as well as The verification and analysis unit determines whether the application form meets the logical requirements of boundary conflicts when submitted. If so, the creation of the application form is completed. If not, the corresponding warning prompt is output.
10. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and the computer program is used to execute the method according to any one of claims 1 to 8.