Construction project comprehensive approval system and method based on cloud platform
By designing a comprehensive approval system for construction projects based on cloud platform, the problems of data traceability, security, stability and efficiency in engineering construction project approval have been solved, and the standardization of approval business and service efficiency have been achieved.
Patent Information
- Application Number
- CN202510070868.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-16
- Publication Date
- 2025-06-06
AI Technical Summary
It is difficult for the existing technology to achieve comprehensive approval of engineering construction projects, and lacks data traceability, security, stability and efficiency.
Design a comprehensive approval system for construction projects based on cloud platform, including engineering construction project approval management subsystem, performance inspection subsystem and basic support platform, adopting J2EE architecture and distributed Java applications to provide business application services, performance inspection and data management.
The standardization of approval business has been achieved, the traceability, security, stability and efficiency of data has been ensured, and the efficiency and humanization of approval services have been improved.
Smart Images

Figure CN120106766A_ABST
Abstract
Description
Technical Field
[0001] This document relates to the field of computer technology, and in particular to a comprehensive approval system and method for construction projects based on a cloud platform. Background Art
[0002] In the existing technology, in order to comprehensively sort out the approval service items, we should reduce them if possible, release them if possible, merge them if possible, transfer them if possible, and adjust them if possible, leaving no blind spots. We should reduce the approval links, merge the approval items, shorten the processing time, and recreate a convenient, efficient and humanized approval process. In order to carry out classified management, precise approval, optimize services, reduce costs, innovate mechanisms, standardize operations, link approval and management, strengthen supervision, coordinate planning, and intensive construction, we urgently need a comprehensive approval system for construction projects to achieve this. Summary of the invention
[0003] The purpose of the present invention is to provide a cloud platform-based construction project comprehensive approval system and method, aiming to solve the above-mentioned problems in the prior art.
[0004] The present invention provides a comprehensive construction project approval system based on a cloud platform, which is connected with a third-party business system through an engineering construction project approval management system interface service, is based on a J2EE architecture and adopts a B / S mode and a distributed Java application, and the system specifically includes:
[0005] The construction project approval management subsystem is used to provide users with business application services related to construction project approval, facing the comprehensive service window and approval departments;
[0006] The engineering construction project approval efficiency supervision subsystem is connected to the engineering construction project approval management subsystem and is used to provide users with engineering construction project approval efficiency supervision services based on the process and results of engineering construction project approval of the engineering construction project approval management subsystem for business supervision departments, store and view approval process supervision data, perform statistical analysis on the approval process supervision data, and display the statistical analysis results;
[0007] The basic support platform for engineering construction project approval is connected to the engineering construction project approval management subsystem and the engineering construction project approval efficiency inspection subsystem. It is used to encapsulate public services such as organization, user, authority, and search based on the form designer, process designer, CMS page designer, template engine, organizational system model, and data application model, so as to provide business resource support for the engineering construction project approval management subsystem and the engineering construction project approval efficiency inspection subsystem.
[0008] The present invention provides a comprehensive approval method for construction projects based on a cloud platform, which is used in the comprehensive approval system for construction projects based on a cloud platform, comprising:
[0009] Through the basic support platform for project construction project approval, based on form designer, process designer, CMS page designer, template engine, organizational system model, and data application model, public services such as organization, user, authority, and search are encapsulated to provide business resource support for the project construction project approval management subsystem and the project construction project approval efficiency supervision subsystem;
[0010] Through the construction project approval management subsystem, it provides users with business application services related to construction project approval, facing the comprehensive service window and approval departments;
[0011] Through the engineering construction project approval efficiency supervision subsystem, facing the business supervision department, based on the process and results of engineering construction project approval of the engineering construction project approval management subsystem, it provides users with engineering construction project approval efficiency supervision services, stores and views the approval process supervision data, conducts statistical analysis on the approval process supervision data, and displays the statistical analysis results.
[0012] An embodiment of the present invention also provides an electronic device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the computer program is executed by the processor, the steps of the above-mentioned cloud platform-based comprehensive construction project approval method are implemented.
[0013] An embodiment of the present invention also provides a computer-readable storage medium, on which a program for implementing information transmission is stored. When the program is executed by a processor, the steps of the above-mentioned cloud platform-based comprehensive approval method for construction projects are implemented.
[0014] By adopting the embodiment of the present invention, through the comprehensive approval system for construction projects based on the cloud platform, the approval business is standardized, data traceability, data security, data stability, data efficiency and data practicality can be guaranteed, the humanization and efficiency of approval services can be improved, and classified management, accurate approval, optimized services, cost reduction, innovative mechanisms, standardized operation, approval and management linkage, strengthened supervision, overall planning and intensive construction can be achieved. Provide flexible system management and business customization functions, can adapt to the ever-changing organizational structure and business needs. The system should provide and open interface specifications to facilitate data exchange with similar systems at superior and peer levels. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate one or more embodiments of this specification or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in this specification. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0016] Figure 1 is a schematic diagram of a comprehensive construction project approval system based on a cloud platform according to an embodiment of the present invention;
[0017] Figure 2 is a schematic diagram of the overall logical architecture of the system according to an embodiment of the present invention;
[0018] Figure 3 It is a schematic diagram of the application architecture of the engineering construction project approval management subsystem according to an embodiment of the present invention;
[0019] Figure 4 is a schematic diagram of a system network architecture of an embodiment of the present invention;
[0020] Figure 5 is a flow chart of a comprehensive construction project approval method based on a cloud platform according to an embodiment of the present invention;
[0021] Figure 6 is a schematic diagram of an electronic device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0022] In order to enable those skilled in the art to better understand the technical solutions in one or more embodiments of this specification, the following will be combined with the drawings in one or more embodiments of this specification to clearly and completely describe the technical solutions in one or more embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this specification, not all of the embodiments. Based on one or more embodiments of this specification, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this document.
[0023] System Example
[0024] According to an embodiment of the present invention, a comprehensive construction project approval system based on a cloud platform is provided, which is connected with a third-party business system through an engineering construction project approval management system interface service, is based on a J2EE architecture and adopts a B / S mode and distributed Java applications. Figure 1 Schematic diagram of a comprehensive construction project approval system based on a cloud platform according to an embodiment of the present invention. Figure 1 As shown, the comprehensive construction project approval system based on the cloud platform according to an embodiment of the present invention specifically includes:
[0025] The construction project approval management subsystem 10 is used to provide users with business application services related to construction project approval for the comprehensive service window and approval departments; specifically, it includes:
[0026] User access layer, used to provide unified application access services for user roles;
[0027] The business application layer is used to integrate business application services related to the approval of engineering construction projects, provide application services for project application, acceptance, approval, supervision, and analysis, and provide application services including multi-plan integration project planning generation, investment project coding, and government service reviews through docking with related platforms and systems;
[0028] The data resource layer is used to adopt a sub-database and partition design to aggregate basic data, business data, and access data of external systems related to the approval of engineering construction projects, and provide data support for the business application layer;
[0029] The platform support layer is connected to the user access layer, the business application layer and the data resource layer, and is used to provide unified user authentication, event management, and scheduling management services, data exchange, data governance, and data development services, form design, process design, and visual programming services, and unified log management, equipment monitoring, and service monitoring services;
[0030] The basic support layer is connected to the user access layer, business application layer, data resource layer and platform support layer, and is used to provide computing, storage, network and security resource support for the operation of the engineering construction project approval management subsystem through cloud resources.
[0031] The engineering construction project approval efficiency supervision subsystem 12 is connected to the engineering construction project approval management subsystem, and is used to provide users with engineering construction project approval efficiency supervision services based on the process and results of engineering construction project approval of the engineering construction project approval management subsystem for business supervision departments, store and view approval process supervision data, perform statistical analysis on the approval process supervision data, and display the statistical analysis results;
[0032] The basic support platform 14 for project construction project approval is connected to the project construction project approval management subsystem and the project construction project approval efficiency inspection subsystem, and is used to encapsulate public services such as organization, user, authority, and search based on the form designer, process designer, CMS page designer, template engine, organizational system model, and data application model, and provide business resource support for the project construction project approval management subsystem and the project construction project approval efficiency inspection subsystem. Specifically used for:
[0033] Define and integrate business processes based on user operations, build business applications, provide service support for various business applications of the engineering construction project approval management subsystem and the engineering construction project approval efficiency inspection subsystem, realize unified management and authorization authentication of account information, manage user rights based on roles, realize business division of labor and business rights management through unified setting of various operation rights and organizational structures, provide form document support capabilities, provide a unified message exchange application system, provide government service notification messages to the public, realize intelligent management and automatic distribution of various message notifications, and provide unified master data management services; provide unified organizational maintenance and unit management functions, provide unified report design component services, provide unified log management component services, and provide unified task management component services. It is used to provide construction unit user information data, administrative department user information data, approval matter service guide data, project information data, matter approval declaration data, matter approval process data, matter approval result data, matter material data, approval process receipt data, approval process supervision data, and data generated by docking with third-party systems. It organizes the saved data according to metadata standards, operates on the data using intermediate table buffering technology, and ensures the error-free nature of migrated data through metadata management, definition of various interfaces, automatic error checking and manual custom error checking, error modification, review and verification.
[0034] The above technical solution of the embodiment of the present invention is described in detail below in conjunction with the accompanying drawings.
[0035] The overall logical architecture is as follows Figure 2 As shown in the figure, the analysis and sorting of the business logic architecture can be carried out from two levels: business process analysis and business subject domain analysis, forming the main line of high-end process > sub-process > activity > activity unit > task > event; business process is relatively dynamic information. On the basis of business process analysis, the business organization, business domain and business object are sorted out, thus forming the business skeleton of business domain > business subject domain > business module > business unit > business component, which is relatively static information. The activity unit analyzed from the business process may form business components and business modules: and the business module analyzed from the business subject domain may have more fine-grained processes and activities; these business interactions and interfaces are also an indispensable part of the business architecture analysis. From the three perspectives of business modeling, process modeling and interface modeling, help enterprise users quickly realize the construction and change iteration of their core business applications: In addition, the scope of government affairs business is larger, the business rules are more complex, the integration and change of business are more frequent, the management model is more flexible, and its business organization model is more diversified.
[0036] like Figure 3 As shown in the figure, the construction project approval management subsystem specifically includes:
[0037] (1) User access layer: The user access layer provides unified application access services for user roles such as business enterprises and the public, window reception staff, business approval personnel, supervisors, leaders at all levels, and system managers. It supports access from terminal devices such as computers (WEB), self-service integrated machines, mobile phones and tablets (APP), and large visual screens.
[0038] (2) Business application layer: The business application layer integrates business application services related to the approval of engineering construction projects. Relying on the engineering construction project approval management platform, it provides application services such as project application, acceptance, approval, supervision, and analysis; through docking with related platforms and systems, it provides services including multi-plan integration project planning generation, investment project coding (approval and filing), and government service reviews.
[0039] (3) Data resource layer: The data resource layer gathers basic data and business data related to the approval of engineering construction projects, providing data support for business applications. The data resource layer adopts a sub-database and partition design. In addition to the data generated by the engineering construction project approval platform, it also stores external access data, including project database, matter database, case database, unit database, personnel database, license database, credit database, etc.
[0040] (4) Platform support layer: The platform support layer is the basic support platform for engineering construction project approval, which ensures the easy expansion and high availability of the engineering construction project approval management platform. It provides unified user authentication, event management, scheduling management and other services; data exchange, data governance, data development and other services; provides form design, process design, visual programming and other services; provides unified log management, equipment monitoring, service monitoring and other services.
[0041] (5) Infrastructure layer: The infrastructure layer uses cloud resources to provide computing, storage, network, security and other resource support for platform operation.
[0042] The city (state) management system for engineering construction project approval mainly provides services to construction units, comprehensive service windows, and approval departments in the government extranet environment. The overall data architecture is composed of data belonging to the engineering construction project approval management subsystem and the engineering construction project approval efficiency supervision subsystem, mainly including construction unit user information data, administrative department user information data, approval matter service guide data, project information data, matter approval declaration data, matter approval process data, matter approval result data, matter material data, approval process receipt data, approval process supervision data, and data generated by docking with third-party systems.
[0043] (1) Data traceability: Data is sorted according to metadata standards, with detailed records of the source, processing mode, method, destination, time, etc. of the data sorting. After the data is sorted, the source can be traced one by one. This provides us with a basis for modifying the data. Even if the data has been imported into the target database, the source of the data can still be obtained through the migration management tool.
[0044] (2) Data security: Data loss and damage are the biggest security risks when organizing data. As long as the data is operated, it is inevitable to damage the data. Therefore, the intermediate table buffer technology is adopted, so that a large number of data operations are performed in the intermediate table, thereby reducing the data operations on the source database and the target database, and greatly reducing the risk of damage to the original data and the migrated data.
[0045] (3) Data stability: Taking into account various situations that may arise during data organization (including various incompatibilities, concurrent access, etc.), the smooth conversion of the metadata database to the target database is fully guaranteed through metadata management and the definition of various interfaces. In addition, the system's automatic error checking and manual custom error checking, as well as the modification, review and verification of errors, ensure the error-free nature of the migrated data, allowing the entire migration to be implemented stably.
[0046] (4) Data efficiency: The system is an operational system. The organizational structure, software and hardware configurations must be coordinated with each other. The data produced must meet the requirements of the specifications to avoid repeated data collection. The established database system must be able to operate in a business manner. At the same time, advanced production technology, construction plans, operation processes and database construction standards must be adopted during the database construction process to minimize manual operations and improve work efficiency.
[0047] (5) Data practicality: Data construction should establish a comprehensive, dynamic and real-time database that can provide scientific basic data for leadership decision-making and provide basic data support for the platform.
[0048] The core part of the overall system architecture needs to adopt a mature framework based on J2EE. The J2EE architecture provides a middle-tier integration framework to meet the needs of low-cost, high-availability, high-reliability and scalable applications. By providing a unified development platform, J2EE reduces the cost and complexity of developing multi-layer applications, simplifies the development process, and provides strong support for the integration of existing applications, speeding up deployment. In addition, the implementation of distributed Java applications can also improve scalability and reliability.
[0049] Specifically, the core part of the overall structure of the system, namely the B / S system, is developed using the object-oriented, distributed, high-performance, and portable dynamic language J2EE. It is designed strictly in accordance with the technical specifications of J2EE. The system structure of J2EE is divided into four layers, namely the service layer, the presentation layer, the business logic layer, and the data integration layer. The service layer provides WEB services to the outside world, and publishes some functions that need to be made public, such as spatial information, in the form of WEB services; the presentation layer provides a flexible and convenient user interaction interface to Browser users through the Struts architecture; the business logic layer uses J2EE's EJB technology to process the core application logic, ensuring the security, stability, and reliability of business processing; the data integration layer provides transparent storage and access capabilities from RDBMS to ODBMS, from text file data to spatial data, and it also provides integrated connections between the system and other heterogeneous EISs (enterprise information systems).
[0050] like Figure 4 As shown, the overall network of the system relies on cloud resources, using the existing network without building a new network. The network used is mainly the government external network. It mainly deploys the engineering construction project approval management system, the engineering construction project approval efficiency supervision system, the engineering construction project approval management system interface service, the database service MONGODB service and the simulation environment service and the test environment service.
[0051] The entire project selects the J2EE multi-layer distributed architecture and fully adopts the B / S model. In order to support high performance, high reliability and high security, it is planned to use Tomcat as a cross-platform application running container that complies with the J2EE standard; and Apache HTTP Server is selected as the Web server; it is planned to use MySQL database to integrate all approval business data and electronic supervision data, unify business coding, establish business model views, and establish approval center database and supervision center database with certain forward-looking and scalable data standards and specifications.
[0052] 1. Technical architecture
[0053] J2EE is a set of technical architectures that includes a large number of components, which can simplify and standardize the development and deployment of application systems, thereby improving portability, scalability, security and reuse value. The core is a set of technical specifications and guidelines. The various components, service architectures and technical levels included in it all have common standards and specifications, so that various software developed in accordance with the J2EE architecture have good compatibility, solving the dilemma of incompatibility between software products, which makes it difficult for internal or external applications to communicate with each other.
[0054] J2EE is an architecture that uses the Java2 platform to simplify the complex issues related to the development, deployment and management of information solutions. The foundation of J2EE technology is the standard version of the core Java platform or Java2 platform. J2EE not only consolidates many advantages of the standard version, such as the "write once, run anywhere" feature, JDBC API for easy access to databases, CORBA technology, and a security model that can protect data in Internet applications, but also provides comprehensive support for EJB (Enterprise JavaBeans), Java Servlets API, JSP (Java Server Pages) and XML technology. The J2EE architecture provides a middle-tier integration framework to meet the needs of applications that do not require too much cost but require high availability, high reliability and scalability. By providing a unified development platform, J2EE reduces the cost and complexity of developing multi-layer applications, while providing strong support for the integration of existing applications. It has good wizard support for packaging and deploying applications, adds directory support, enhances security mechanisms, and improves performance.
[0055] The open structure design provides comprehensive customization functions. It adopts the most popular J2EE+MVC+SOA architecture mode, fully adopts the B / S mode, uses Tomcat as the cross-platform application running container that complies with the J2EE standard, selects ApacheHTTP Server as the Web server, and MySQL and mongoDB databases. The system structure is reasonable, stable and reliable, easy to expand and maintain. It contains a large number of components that can simplify and standardize the development and deployment of application systems, thereby improving the technical architecture of portability, scalability, security and reuse value, and provides a middle-tier integration framework to meet the needs of applications that do not require too much cost but require high availability, high reliability and scalability. By providing a unified development platform, J2EE reduces the cost and complexity of developing multi-layer applications, while providing strong support for the integration of existing applications, with good wizard support for packaging and deploying applications, adding directory support, enhancing security mechanisms, and improving performance.
[0056] The analysis and sorting of business architecture can be carried out from two levels: business process analysis and business subject domain analysis, forming the main line of high-end process > sub-process > activity > activity unit > task > event; business process is relatively dynamic information.
[0057] Based on the business process analysis, the business organization, business domain and business objects are sorted out to form a business skeleton of business domain > business subject domain > business module > business unit > business component, which are relatively static information.
[0058] The activity units analyzed from the business process may form business components and business modules, while the business modules analyzed from the business subject domain may have more fine-grained processes and activities. These business interactions and interfaces are also an indispensable part of the business architecture analysis. From the three perspectives of business modeling, process modeling, and interface modeling, it helps enterprise users quickly build and change their core business applications. In addition, the scope of government business is larger, the business rules are more complex, the integration and changes of business are more frequent, the management model is more flexible, and its business organization model is more diversified.
[0059] Page management (CMS):
[0060] The interface can be generated by dragging and dropping components using a visual page. The preview mode allows the page configuration to take effect immediately and view the final effect. In addition, different application styles of the same type of components can be generated through different configurations to highly meet various application scenarios. At the same time, a large number of flexible interfaces are reserved for second-hand development, which is convenient for various companies to customize development and plug-in implantation.
[0061] Process Engine: The platform provides powerful workflow support capabilities and the most complete workflow system support tool set, which can provide comprehensive support for the design, execution, monitoring, analysis and improvement of business processes. ① Graphical process model design with full B / S structure, the design and management of the process are intuitive, simple and easy to use; ② Rich customization options, powerful functions and meticulous design meet users' requirements for higher-level flexibility, friendliness and intelligence of the process; ③ Leading process version management realizes smooth transition of process modification, optimization and reorganization; ④) Original equivalent process function realizes multiple processes with the same flow rules. Through equivalent reference, only one process template needs to be designed, managed and maintained; ⑤ Powerful process nesting can easily decompose large and complex processes into relatively independent, logically clear, easy to manage and reusable sub-processes; ⑥ Support multiple complex process definitions, including conditional judgment, main and auxiliary flow application, branch flow nesting, process serial, parallel, serial and parallel mixed modes; ⑦ In the process of graphical process modeling, you can quickly understand the detailed information of organizational units, business information, functions and other details involved in each process link; ⑧ Provide process model and logic inspection, standardize and bundle the correct establishment and operation of the model in the process of process modeling, realize intelligent process model simulation, reduce the complexity of workflow design and debugging, and improve the efficiency and quality of process design.
[0062] Dynamic forms: Forms are carriers of information. A large number of businesses are represented through documents and forms. Documents and forms are the basic interface and basic resources for enterprise applications. The system provides powerful form and document support capabilities. Based on the online form designer, Word and Html layout import, users can easily create and modify documents of various forms and styles.
[0063] Supports common table types, standard data forms, RTF documents, electronic forms, HTML documents, clerical documents, form documents, decision-making statistical documents, summary statistical documents, table documents, form documents (including data grid, record view, tree view), rich documents (supports two page modes: flow mode and grid mode); for various documents and forms, the platform provides a powerful and easy-to-use WYSIWYG online web designer, allowing users to customize and modify documents and forms at will. At the same time, it provides Word import and htm1 import functions, allowing users to quickly typeset and layout documents and forms. Supports combining documents of various formats into the same information form to achieve highly complex, flexible and powerful information presentation (such as supporting dynamic presentation of data fields and field labels; supporting multimedia plug-ins; inserting arbitrary interface presentation components into tables); achieving smooth transition during form and document modification, optimization and reorganization; customizing output formats, unifying document styles, including formats, layouts, etc., and supporting copy printing functions⑥Powerful data presentation and organization, display and output capabilities Multiple data organization and extraction methods, support for storage procedures of various database products, support for automatic generation of documents in various commonly used data-aware formats, connection between documents and data, and automatic input perception.
[0064] The technical solution of the embodiment of the present invention has the following beneficial effects:
[0065] ①Business standardization:
[0066] Follow the relevant documents and standards of the state, province and city to ensure the normalization and standardization of the system. ② Architecture advancement: on the basis of ensuring reliability and technical maturity, adopt advanced application software design ideas and implementation technologies, scientific system architecture, reasonable construction methods, and perfect system hardware and software platforms to provide the best technical platform support for the realization of various application functions.
[0067] ③Reliability and availability:
[0068] We use reliable system architecture, high-performance hardware platform, standardized and fault-tolerant software system, comprehensive system monitoring measures, and complete security means to ensure that important data is safe and the reliability and continuous availability of the system are guaranteed.
[0069] ④Mature design:
[0070] While focusing on advancement, the system design and development platform adopts technologies that are recognized as mature and widely used in the industry to reduce system implementation risks.
[0071] ⑤Economical:
[0072] Fully consider economic factors, make full use of existing resources and infrastructure, optimize system hardware and software equipment, technology development system and application system construction plan to ensure a good performance-price ratio.
[0073] ⑥Flexible deployment and scalability:
[0074] Provide flexible system management and business customization functions to adapt to the ever-changing organizational structure and business needs. The system should provide and open interface specifications to facilitate data exchange with similar systems at the superior and same level.
[0075] ⑦Interface standard:
[0076] The platform design actively adopts corresponding international, domestic, local or industry standards in the expression of the system's internal data, the form of interfaces, and related management specifications, ensuring the openness of the platform in connecting with international and domestic mainstream software products or related technologies, and avoiding closed-door development and self-isolation.
[0077] ⑧Easy access:
[0078] On the basis of advanced architecture and interface standards, the platform should still pay special attention to the convenience of access to existing and future applications. According to the changes in the applications, services, and data being accessed, the system should have corresponding expansion capabilities, and the expansion methods provided should not affect the system's work efficiency. At the same time, the system should also try its best to reduce the workload of access application transformation without violating the standards. Try to achieve fast access to non-standard applications through interface proxy, adaptation, etc.
[0079] ⑨The system is safe and reliable:
[0080] Strictly comply with the relevant national security and confidentiality laws and regulations, and take effective measures to ensure information security. Apply advanced network encryption, identification, filtering, control and other security technologies to strengthen the security protection of network information resources and enhance network reliability and survivability. The system should be able to provide effective security protection, with complete identity authentication, access control, log management and system audit and other security and confidentiality mechanisms to ensure the security of internal information in the system.
[0081] The subsystem design scheme is described in detail below.
[0082] (I) Construction project approval management subsystem
[0083] 1. Unified connection
[0084] The functions of "unified acceptance" mainly include: project registration, project acceptance, confirmation of supplementary documents, confirmation of denial of permission, registration of supplementary documents, printing of receipts and related query views, etc.
[0085] (1) My News
[0086] You can enter the message module management through the My Message shortcut.
[0087] (2) Registration management
[0088] ①Project registration
[0089] Project registration is to enter the project information provided by the owner when reporting into the system project library to realize the preservation and retrieval of project information. The input information is specifically: basic project information, including but not limited to project name, parent project, project type, key projects, funding sources, project labels, attachments, etc.; project legal person unit (owner), including but not limited to project legal person unit, unit license type, unit license number, contact person, contact person mobile phone number, contact person email address, notes and other information.
[0090] ② Project acceptance
[0091] The functions of "Project Acceptance" mainly include creating new projects, making appointments for acceptance, registering for acceptance, checking processing documents, checking pre-examination documents, checking preliminary opinions, etc.
[0092] ③View project
[0093] The “Document Registration” view displays all construction and other projects in normal status, and unified recipients can search and view related projects.
[0094] (3) Department operation confirmation
[0095] Correction confirmation
[0096] After the approval department makes corrections, the relevant corrections to be confirmed will be displayed in the "pending confirmation" of the receiving window. After the correction is registered and confirmed, print the "Notice of Correction of Materials".
[0097] ②Confirmation of non-acceptance
[0098] After the approval department rejects the application, the "Pending Confirmation" in the "Pending Confirmation" window will show the relevant "Not Accepted Pending Confirmation". If the rejection is confirmed, the "Not Accepted Notice" will be printed.
[0099] ③Document printing
[0100] The unified receiving personnel can print the relevant documents and hand them over to the owners who come to the window to collect the documents.
[0101] ④Correct registration
[0102] After "Correction Confirmation", the documents will be displayed in the "Correction Registration" under the approval business of the receiving window. When the owner resubmits the supplementary materials, the receiving window will register the correction. After the correction is registered, the "Correction Material Receipt Certificate" will be printed. The "Correction Registration" view displays all documents in the "Correction" or "Process Correction" status, and the unified receiving personnel can search and view the relevant correction documents.
[0103] ⑤ Overdue registration
[0104] After the supplement is confirmed, the document will be displayed in the approval business of the receiving window. When the owner resubmits the supplementary materials, the receiving window will register the supplement. After the supplement is registered, print the "Receipt of Supplementary Materials in the Review Stage"
[0105] ⑥ Registration with missing documents
[0106] The "Incomplete Registration" view displays all the missing documents that have not been completed. The unified receiving personnel can search and view the relevant missing documents. The unified receiving personnel accept the missing materials resubmitted by the owner unit on site and send them to the responsible approval department for acceptance and approval.
[0107] ⑦ Material citation
[0108] The approval system supports citing various types of materials, including citing intermediary service results, citing provincial / municipal (state) electronic certificate libraries, etc.
[0109] ⑧Material reuse
[0110] All submitted materials are stored in the material library. Applicants do not need to submit materials such as identity cards, organization code certificates, business licenses, etc. repeatedly. When receiving documents at the window, the system can automatically analyze the applicant's information and call up all materials submitted by the applicant. If it is found that the materials required by the applicant already exist, they can be directly called up without the need to scan them electronically again, thus avoiding secondary review and reducing a lot of manpower and material resources for reviewing and managing duplicate paper documents.
[0111] ⑨Online application
[0112] The "Online Application" view displays all online applications submitted by the owner units that are in the "pending acceptance", "pending correction acceptance", "pending over-supplement acceptance" and other states. The unified receiving personnel can search and view the relevant online applications. The unified receiving personnel can send the online applications to the responsible approval department for review.
[0113] ⑩Material stamping / batch stamping
[0114] Need to connect to the local signature system to realize the function of stamping materials and batch stamping ①) Sharing of approval documents and certificates
[0115] A certificate and license investigation method is provided, which adopts the method of required items + optional items. Users can choose which pre-approval documents need to be read according to different situations. The project number is used as the index. At the same time, the sub-project automatically reads the results of the parent project's declaration items.
[0116] ) Received items statistics
[0117] Provides due date statistics and operation statistics. Due date statistics include the information on the documents that need to be issued by each approval department within the promised time within a certain period of time, which can be searched by the stage of the application or the category of the matter; operation statistics are for a certain type of operation (pending approval, receipt, in-process receipt, supplementary documents, return of documents that cannot be processed, return of documents that are temporarily suspended, etc.) to count all the application information of this account within a certain period of time.
[0118] 3. Statistics of receipt and handling
[0119] Display the registration / correction registration / overdue registration / incomplete registration / supplementary provincial network application materials of the personnel at this registration window and send them to the departments, as well as the process of their handling by the approval departments, including the processing of cases collected from other places on behalf of the departments stationed in this center, and the processing of cases collected by this center on behalf of the approval departments in other places.
[0120] (4) Expiration Statistics
[0121] Statistics are kept on the cases that have been accepted and are being counted under the matters of each department, including the cases that are collected from other places and sent to the departments stationed in this center.
[0122] ⑤Project statistics
[0123] Statistics of project information under the center where the registration window is located.
[0124] 6) Construction unit statistics table
[0125] Statistical registration window is located in the center of the construction unit related information
[0126] (4) Project Management
[0127] ①Project Library
[0128] The functions of "Project Library" mainly include registration of receipt of documents, appointment for receipt of documents, checking of processed documents, checking of pre-examination documents, checking of preliminary opinions, checking of project tree, creation of new projects, etc.
[0129] ②Items awaiting review
[0130] The "Projects to be reviewed" function mainly includes viewing projects to be reviewed, project approval, etc.
[0131] ③ Obsolete projects
[0132] "Voided Items" displays all invalid items that have been "voided" through operations. Unified recipients can search and view related voided items.
[0133] ④Projects to be merged
[0134] The functions of "Projects to be Merged" mainly include viewing projects to be merged, merging other projects, regenerating local codes, etc.
[0135] ⑤Blacklist library
[0136] The “Blacklist Library” displays all blacklisted items, and unified receivers can search and view relevant blacklisted items.
[0137] (5) Document query
[0138] You can query information such as pending documents, handling documents database, pre-examination documents, preliminary opinion database, overdue documents, expired documents, documents with missing documents, and license database.
[0139] (6) Statistical reports
[0140] Statistical reports mainly include: expiration statistics, receipt statistics, etc.
[0141] 2. Unified delivery
[0142] Responsible for the owner's pickup business and pickup registration, as well as confirmation of supplementary items, confirmation of denial of administrative license, confirmation of special procedures, and confirmation of document issuance.
[0143] (1) My News
[0144] You can enter the message module management through the My Message shortcut.
[0145] (2) Waiting for pickup
[0146] You can quickly view the list project code, project name, approval method, approval items, etc.; you can query all pending pickup data based on the page turning controls; you can query key pending pickup information based on fuzzy search: you can quickly understand the number of pending pickups based on the quantity prompts; you can view the details of pending pickups through the list data.
[0147] (3) Shipment Management
[0148] ①Items to be confirmed
[0149] Support the sending window staff to receive the approval results of the substantive review by the approval department staff, such as process correction, disapproval, document issuance, special procedures, etc., and notify the reporting owner after confirmation. The unified sending window staff needs to confirm the department operation and print the documents.
[0150] ②Department operation confirmation
[0151] A. Over-compensation confirmation
[0152] After the approval department has completed the supplementary operation, the relevant supplementary documents to be confirmed will be displayed in the pending confirmation business in the sending window. If the supplementary documents are approved, the "Notice of Supplementary Materials in the Review Stage" will be printed.
[0153] B. Refusal to confirm administrative license
[0154] After the approval department denies the administrative license, the "Pending Confirmation Processing" of the relevant denial of administrative license will be displayed in the pending confirmation business of the sending window, and the denial of administrative license will be confirmed in the sending window. If the denial of administrative license is confirmed, the "Decision on Denial of Administrative License" will be printed.
[0155] C. Special Procedure Confirmation
[0156] When the approval department starts the "special procedure" during the approval process, the relevant special procedure "pending confirmation" will be displayed in the pending confirmation business of the sending window, and the sending window will confirm the special procedure. If the special procedure is confirmed, the "Special Procedure Notice" will be printed.
[0157] D. Confirmation of the document
[0158] After the approval department performs the document issuance operation, the related documents to be confirmed will be displayed in the pending confirmation business of the sending window, and the sending window will confirm the issuance of the document. After the issuance of the document is confirmed, the "delivery receipt" will be printed.
[0159] E. Secondary confirmation
[0160] After the approval department performs the second document issuance operation, the staff at the sending window will confirm the issuance of the document to be confirmed and print the relevant documents.
[0161] F. Pickup Registration
[0162] When the owner picks up the item, he / she will register the item at the delivery window in the "Pickup Registration" under the approval business. When the owner picks up the item, the delivery window staff will find the corresponding item under the approval business and register the "Pickup Registration", register the relevant information, automatically record the registration date and time, and print the relevant documents.
[0163] G. Same-day operation
[0164] "Same-day operation" unified sender can view the operation log records of the corresponding documents executed by "me" today
[0165] H.Sending Statistics
[0166] Provides due date statistics and operation statistics. Due date statistics include the information on documents that need to be issued by each approval department within the promised time within a certain period of time, which can be searched by the stage of processing or item classification; operation statistics are for a certain type of operation (pending approval, receiving, receiving in progress, supplementing, return that cannot be processed, return that is temporarily suspended, etc.) to count all the processing information of this account within a certain period of time.
[0167] (4) Project Management
[0168] ①The functions of "Project Library" mainly include viewing projects, viewing processing documents, viewing pre-examination documents, viewing preliminary opinions, etc.
[0169] ②Blacklist library
[0170] The “Blacklist Library” view displays all blacklisted items. The unified sending window staff can search and view the relevant blacklisted items.
[0171] ③Document query
[0172] You can query overdue documents, due documents, urged documents, missing documents, etc.
[0173] (5) Certificate Library
[0174] The "Certificate and License Database" displays certificates and licenses that are automatically synchronized to the database when the documents are processed and issued. Registration window staff can query, upload and maintain information of all certificates and licenses through the certificate and license database, and dispatch window staff can search and view relevant approval documents and licenses.
[0175] (6) Statistical reports
[0176] The statistical reports mainly include the expiration statistics table, the shipment handling statistics table, the pickup statistics table, etc.
[0177] 3. Approval management
[0178] (1) My News
[0179] You can enter the message module management through the My Message shortcut
[0180] (2) Approval Management
[0181] ① Documents awaiting preliminary review
[0182] <Documents to be pre-examined> displays all documents that need to be pre-examined by this department. Department staff can search and view relevant pre-examination documents.
[0183] ② Documents to be accepted
[0184] <Documents to be Accepted> displays all the documents that need to be accepted and approved by this department. Department staff can search and view relevant documents.
[0185] ③ Documents awaiting review
[0186] <Documents to be reviewed> displays all the documents that need to be reviewed by the department. Department staff can search and view relevant documents.
[0187] ④ Missing parts to be filled
[0188] <Missing items to be supplemented> displays the missing items for which the materials have not been completed. Department staff can search and view the relevant missing items and track them.
[0189] ⑤ Documents awaiting review
[0190] <Documents to be reviewed> displays the documents that need to be reviewed by this department. Department staff can search and view related documents.
[0191] ⑥ Documents awaiting approval
[0192] <Documents awaiting approval> displays documents that require approval from this department. Department staff can search and view related documents.
[0193] ⑦ Files to be issued
[0194] <Documents to be issued> displays documents that require the department to issue documents. Department staff can search and view related documents.
[0195] ⑧ In special process
[0196] <Documents in Special Procedure> displays all the documents in the department that are in special procedure status. Department staff can search and view relevant documents.
[0197] ⑨In the supplementary document
[0198] <In Correction> shows all the corrections / correction process operations performed by the department and confirmed to be passed, and the processing personnel of the processing department can track the processing status.
[0199] @Preliminary comments awaiting feedback
[0200] <Preliminary opinions awaiting feedback> displays all preliminary opinions that require feedback from this department. Department staff can search and view relevant preliminary opinions awaiting feedback.
[0201] I) Acceptance Arrangement Table for Feedback
[0202] <Acceptance Schedule Awaiting Feedback> displays all on-site acceptance schedules that require the department's participation in the acceptance. Department staff can search and view relevant acceptance schedules awaiting feedback.
[0203] 12) Acceptance schedule to be confirmed
[0204] <Acceptance Arrangement Table to be Confirmed> displays the on-site acceptance arrangement table for all projects that require this department to be the lead department. Department handling personnel can search and view the relevant acceptance arrangement table to be confirmed
[0205] 1) Same-day operation
[0206] Support department staff to view the operation log records of the counter-processing items performed by "me" today: support searching for the operations of the counter-processing items performed by "me" within a certain period of time
[0207] (3) Document query
[0208] ① Pre-examination documents
[0209] "Preliminary Review Documents" displays all non-deleted preliminary review documents under all matters of this department. Department staff can search and view relevant preliminary review documents.
[0210] ②Document handling library
[0211] The "Document Library" displays all non-deleted documents under the department's affairs, and department staff can search and view related documents.
[0212] ③ Missing parts
[0213] “Missing Documents” displays all missing documents handled by the department. Department staff can search and view relevant missing documents.
[0214] ④ Overdue
[0215] "Overdue documents" shows the unfinished cases under the department, all cases that are in the process of handling by the department and have passed the promised completion date, and all pre-examination cases that have passed the expiration date and are "pending pre-examination". Department handling personnel can search and view relevant cases.
[0216] ⑤ Expired documents
[0217] "Expired Documents" displays the unfinished applications under the department's affairs, all documents that are being processed by the department and have a promised completion date within 24 hours of a future working day, and "pending pre-examination" documents that are due within 24 hours of a future working day. Department processing personnel can search and view relevant documents.
[0218] ⑥ Expedited documents
[0219] "Urgent Cases" displays the unfinished cases under the department's affairs, all cases that are being processed by the department and have a promised completion date within 24-48 hours in the future working day, and "pending preliminary review" cases that are due within 24-48 hours in the future working day. Department processing personnel can search and view relevant cases.
[0220] ⑦Preliminary opinion database
[0221] The "Preliminary Opinion Library" view displays all cases that require preliminary opinions from the department. Department staff can search and view relevant cases.
[0222] @Rectification due
[0223] The "Rectification Due Documents" view displays matters in the fourth stage of declaration, during which the department will carry out process correction operations. For documents that have not been submitted within 24 hours of the correction deadline, department staff can search and view relevant documents.
[0224] ⑨Matter Library
[0225] The "Matters Library" view displays all matters under the department, and department staff can search and view related matters.
[0226] @Participation acceptance schedule
[0227] The "Participation in Acceptance Arrangement Table" view displays the on-site acceptance arrangement table for the department's participation in acceptance. Department staff can search and view the relevant participation in acceptance arrangement table.
[0228] 1D) Certificate Library
[0229] The "Certificate and License Library" view displays the approval documents generated by the department. Department staff can search and view relevant approval documents and licenses.
[0230] (4) Statistical reports
[0231] The statistical reports mainly include: statistics on the handling of matters, statistics on the handling of cases, statistics on expiration, statistics on the declaration of matters, detailed registration tables, credit commitment ledgers, statistics on the application of credit information, etc.
[0232] 4. Business Management
[0233] My News
[0234] You can enter the message module management through the My Message shortcut.
[0235] (1) Event Management
[0236] ①Matter Library
[0237] A. You can add or edit the basic information of the matter, including the matter name, number, matter type, department to which it belongs, department code, approval result, corresponding materials, leading department, approval document type, stamp, working day, method of delivery of processing results, applicable project type, materials to be submitted, etc.
[0238] B. You can add or edit the service guide information of the matter, including the implementing department, contact person, consultation phone number, approval object, nature of the matter, type of case, approval category, approval basis, application conditions, and handling method.
[0239] C. You can add or edit item configuration information, including whether to enable, whether to display on the external network, whether to enable online reservation, whether to enable online pre-examination, batch acceptance approval period, registration window personnel, etc.
[0240] D. Preliminary opinion configuration
[0241] a. Basic information of previous opinions can be added or edited, including parallel stage matters, stage, previous opinion type, and previous opinion name.
[0242] b. You can add or edit the configuration of preliminary review opinions, and configure the specific handling unit, handling unit name code, working day, etc. You can add, delete, move up, and move down.
[0243] c. You can add or edit technical guidance configurations, configure specific handling units, handling unit name codes, working days, etc., and you can add, delete, move up, and move down.
[0244] d. You can add or edit the previous opinion configuration, configure the specific handling unit, handling unit name code, working day, etc., and you can add, delete, move up, and move down.
[0245] (2) Project Management
[0246] Project management mainly includes: project library, obsolete projects, projects to be merged, cycle management, stage management, blacklist library and other project-related management
[0247] (3) Document management
[0248] Case management mainly includes: pre-examination case, case database, preliminary opinion database, document database, license database, etc.
[0249] (4) Unit management
[0250] <Unit Management> displays all unit information. Registration window staff can search and view related units, and registration window staff can add, modify and maintain unit information.
[0251] (5) Description of the parallel approval process
[0252] Apply for parallel documents and upload materials once, such as a scanned copy of your ID card. The applicant only needs to upload it once, and all departments involved can see it without having to upload it repeatedly. At the same time, through the processing of the front and back relationships, the approval document of a certain matter can also be directly used as the original approval material for other matters. During the approval process, parallel documents can view the approval status of other matters, and the supplementary and refunding documents of each matter are independent and do not affect each other.
[0253] (6) Decomposition rules
[0254] When the system enables a parallel stage approval, it can be understood as the driver of multiple serial approvals. Parallel approval will form a service guide according to the stage, which is reflected in the system as the configuration of a parallel matter (the parallel matter configuration includes multiple serial approval matters of the departments involved in this stage.
[0255] (7) Pre- and post-position relationship
[0256] The configuration of items for parallel approval sorts out the pre- and post-condition relationships of the approval items of each department involved in each parallel stage. When item 1 is a pre-condition for item 2, the system will automatically determine the pre- and post-condition relationships of the two items during the approval process, and remind the post-condition unit and the pre-condition unit of the approval progress in real time.
[0257] (8) Time limit control
[0258] Each approval item has its promised time limit. During the parallel approval process, through sorting, matters with a preceding and following relationship can also be handled in parallel, which can effectively compress the overall time limit of the parallel items and provide timely reminders for parallel items that are about to expire or overdue.
[0259] (9) Information Sharing
[0260] During the approval process of each department, the approval opinions and document information of each unit involved in the parallel approval process are implemented, so that the relevant departments share information and communicate with each other in the parallel approval process.
[0261] (10) Soliciting opinions
[0262] For some matters that require coordination with other departments for joint review, or where the department to which the non-processed matters belong needs to give handling opinions, the approval personnel can initiate a request for opinions.
[0263] (11) Check corporate credit report
[0264] It is necessary to connect to the credit platform to obtain the credit report and red and black lists of the project unit, and assist the approval personnel to check the credit status of the project unit.
[0265] (12) Electronic certificates
[0266] The approval system supports uploading certificate templates according to different certificate templates and configuring the result table of the matter handling to generate electronic certificates / approvals. It also supports generating certificate files in multiple formats such as word, pdf, and ofd. (13) Statistical reports
[0267] It includes statistics on the handling of matters, statistics on the handling of cases, statistics on expiration, statistics on the declaration of matters, detailed registration tables, credit commitment ledgers, and statistics on the application of credit information.
[0268] 5. Joint completion acceptance
[0269] The joint acceptance is led by the construction department. Each acceptance department must participate in the project completion acceptance and supervision work within the specified time, put forward acceptance opinions in a timely manner, and issue acceptance reports and supervision reports as required to achieve centralized implementation, unified acceptance, and completion within a time limit.
[0270] (1) Preliminary Examination
[0271] The construction unit initiates an online pre-examination through the online service hall of the engineering construction project, and the pre-examination document information is displayed in the "pending pre-examination documents" list of the relevant acceptance department. The acceptance department can view the details of the pre-examination document and handle the business. The acceptance department must give the approval result within two working days after the construction unit applies for online pre-examination.
[0272] ①Correction
[0273] If the materials submitted by the construction unit are insufficient, the acceptance department may require the construction unit to submit these materials through the correction operation. When the acceptance department performs the correction operation, it is necessary to check the materials to be corrected, enter the reason for the correction, and can make notes on relevant information.
[0274] After the correction, the processing time limit of the pre-examination document will be suspended, and the system will send a text message to notify the construction unit to submit the relevant materials. The construction unit can view the pre-examination document to be corrected in the "My Pre-examination Documents" and "Correction" lists in the online service hall of the engineering construction project. After the construction unit submits the corrected materials, the acceptance department will re-process it and resume the processing time limit.
[0275] ② No acceptance required
[0276] If the acceptance department does not need to accept this project, they can perform the "no acceptance required" operation and enter the reason for not requiring acceptance.
[0277] After submitting the operation, the construction unit can view the pre-examination information in the online service hall of the engineering construction project.
[0278] ③Through
[0279] Once the acceptance department has approved the pre-examination document, the "pass" operation can be performed and relevant remarks can be entered. After the operation is submitted, the construction unit can view the pre-examination document information in the "My Pre-examination Documents" and "Pass" lists in the online service hall of the engineering construction project.
[0280] ④Fail
[0281] If the construction unit reports the wrong pre-examination items or the pre-examination form information is incorrect, the acceptance department can return the pre-examination document through the "fail" operation. When the acceptance department performs the "fail" operation, it is necessary to enter the reason for the failure. After submitting the operation, the construction unit can view the pre-examination information in the online service hall of the engineering construction project. If the pre-examination items are reported incorrectly, the construction unit can re-initiate the online pre-examination of the corresponding items: If the pre-examination form information is filled in incorrectly, the construction unit can re-initiate the online pre-examination for this pre-examination item.
[0282] ⑤Forward
[0283] If the project is approved and managed according to the location, the forwarding department can be configured in the relevant matters. When the applicant submits the online pre-examination application to the wrong region, the acceptance department can forward the pre-examination document to the corresponding department for processing. If it is forwarded to the wrong department and the forwarding department has not yet performed business operations, the acceptance department can withdraw the forwarded pre-examination document through the "Withdraw Application" operation.
[0284] If the department that receives the forwarded pre-examination document determines that the pre-examination document is not within its jurisdiction, it may return the pre-examination document to the original acceptance department for processing.
[0285] ⑥The system automatically passes
[0286] If the acceptance department fails to handle it within the deadline, the system will automatically pass the online pre-examination.
[0287] ⑦Appointment notification
[0288] When all the acceptance items declared by the user have passed the preliminary review or it is determined that no acceptance is required, the system will send a text message to notify the construction unit to log in to the online service hall of the engineering construction project to make an appointment for the on-site acceptance time and window declaration time.
[0289] (2) Acceptance appointment
[0290] After the construction unit completes the preliminary review of the acceptance materials, it can make an acceptance appointment through the online service hall of the engineering construction project.
[0291] ①Acceptance appointment
[0292] When the construction unit makes an acceptance appointment through the online service hall of the construction project, it can choose to make an appointment two working days later.
[0293] ② Feedback from test participants
[0294] After the applicant successfully makes an appointment, the system automatically pushes a message to the relevant acceptance departments. The acceptance department staff can view the on-site acceptance schedule information in the "Participating Acceptance Arrangement" list, and must fill in the on-site acceptance schedule with the participating personnel and contact phone number information 1 working day before the on-site acceptance time.
[0295] ③ After confirming the acceptance arrangement, the participating departments shall arrange the participating personnel, and the leading department shall be responsible for finalizing the list of on-site participating personnel and organizing the participating personnel to go to the site for acceptance. The leading department personnel can view the on-site acceptance arrangement table to be arranged in the "Leading Acceptance Arrangement Table" list and fill in the leading contact person, contact phone number, transportation method and other relevant information. After the leading department confirms the acceptance arrangement, the system will send a text message system with the arrangement information such as the acceptance time and location of the participating personnel. At the same time, the leading department can print the "On-site Acceptance Arrangement Table" as the basis for on-site acceptance.
[0296] ④Cancel the acceptance arrangement
[0297] If the construction unit cannot conduct on-site acceptance at the scheduled time due to special reasons, it can inform the leading department to cancel the appointment. The leading department can cancel the appointment within two working days before the scheduled on-site acceptance time, perform the "Cancel acceptance arrangement" operation in the on-site situation schedule, and enter the reason for cancellation. After canceling the appointment, the construction unit can view the appointment information in the online service hall of the engineering construction project.
[0298] (3) Registration
[0299] After the construction unit completes the acceptance pre-examination and acceptance appointment, it shall go to the window to declare according to the appointment declaration time. When the registration window staff makes an appointment registration, the applicant needs to inform the appointment number information on the appointment form, and the registration window staff will enter the declaration form page after entering the appointment number.
[0300] The items to be reported are those that have been approved during the online pre-examination of the scheduled project. At the same time, the list of materials on the application form shows the electronic materials that have been submitted during the pre-examination, which reduces the input work at the registration window.
[0301] After the information and materials are submitted, the application form can be sent to the department for formal review. If the construction unit fails to report to the window at the scheduled reporting time, the system will automatically send a text message to notify the construction unit, cancel the corresponding on-site acceptance appointment, and add the unit to the system blacklist. The status of the canceled appointment form is changed to "unreported frozen", and the construction unit can no longer use this appointment form information to report related matters.
[0302] (4) Acceptance
[0303] For the handling of matters in the completion acceptance stage, the acceptance department cannot make corrections or reject the application during the formal review process. If the application information and material information are correct, the acceptance department can accept the application. If the paper materials submitted by the applicant are inconsistent with the electronic materials submitted in the online pre-examination, the acceptance department can accept the application with incomplete information.
[0304] (5) Acceptance opinion
[0305] ①Confirm acceptance opinion
[0306] The acceptance department must provide acceptance feedback within 3 working days after returning from the on-site acceptance. The acceptance department can click the "Confirm Acceptance Opinion" button on the handling form to provide feedback.
[0307] ② Acceptance qualified
[0308] A. If the on-site acceptance is passed, the acceptance opinion needs to select "Acceptance Passed". After the operation is submitted, the system will suspend the processing time limit.
[0309] B. If the acceptance department fails to confirm the acceptance opinion within the deadline, the system will automatically default the department's acceptance opinion to "acceptance qualified"
[0310] C. When the acceptance opinions of all acceptance departments are "acceptance qualified", the system will restore the time limit for each case, and each acceptance department must issue a qualified document.
[0311] ⑧Need to be rectified
[0312] If the on-site acceptance fails, the acceptance opinion must select "needs rectification". At the same time, the acceptance department needs to carry out process correction operations and inform the construction unit of the contents that need rectification. The construction unit must complete the rectification within 3 months.
[0313] When the correction and confirmation of the sending window process is passed, the construction unit must be informed to make rectifications, and the processing time limit for the matter will be suspended at the same time.
[0314] If multiple acceptance departments have acceptance opinions of "rectification required", when the sending window confirms that the last acceptance department's process correction operation has been passed, the system will automatically generate a "Joint Acceptance Correction Opinion Summary Table" and the sending window staff will print it out for the construction unit.
[0315] ④Confirm the re-inspection opinion
[0316] If the construction unit completes the rectification within 3 months, it can bring the materials to the registration window for supplementary registration or submit the supplementary materials in the online service hall of the engineering construction project. After confirmation by the registration window staff, it will be sent to the acceptance department for process receipt. After the process receipt, the acceptance department needs to conduct re-inspection on site. After the on-site re-inspection, the acceptance department needs to feedback the re-inspection opinions.
[0317] ⑤Qualified
[0318] If the re-inspection is passed, the acceptance department's re-inspection opinion must be selected as "qualified". If the acceptance department does not submit a re-inspection opinion within 3 working days after the process is received, the system defaults to the department's re-inspection opinion as "qualified".
[0319] ⑥ Unqualified
[0320] If the re-inspection fails, the acceptance department must select "unqualified" in its re-inspection opinion. After submission, the system will resume the time limit for handling the matter, and the acceptance department can proceed with subsequent business processing.
[0321] If there are multiple items that need to be rectified, after the last acceptance department completes the process acceptance operation, the system will inform the department whose acceptance opinion is "accepted" in a pop-up window, and push the supplementary materials submitted by each rectification item to all acceptance departments. The department whose acceptance opinion is "accepted" must submit a re-inspection opinion within 3 working days after receiving the system reminder.
[0322] After all the acceptance departments have submitted their re-inspection opinions, if all the re-inspection opinions of the acceptance departments are "qualified", the system will resume the time limit for each handling case and inform the acceptance departments to issue the documents with "qualified" results through a pop-up window.
[0323] If the re-inspection opinion of some acceptance departments is "unqualified", the system will restore the time limit for the approval of these departments and issue a document of unqualified approval. Departments with re-inspection opinions of "qualified" do not need to handle them again. The system will automatically complete these cases and inform the corresponding acceptance departments in a pop-up window.
[0324] If the construction unit fails to submit the supplementary materials on time, the system will default the re-inspection opinion of this comparison document to "unqualified" and notify the corresponding acceptance department to issue an unqualified document.
[0325] ⑦Joint publication
[0326] When all acceptance departments have an acceptance opinion of "acceptance qualified", each acceptance department must issue a qualified document. After the document is confirmed by the sending window, the system automatically generates a "Joint Acceptance Notice (Qualified)", which is notified by the sending window to the construction unit for collection. The construction unit can also log in to the online service hall of the engineering construction project to download it by itself. If the department's re-inspection opinion is "unqualified", it can only issue an unqualified document. After the document is confirmed by the sending window, the system automatically generates a "Joint Acceptance Notice (Unqualified)", which is notified by the sending window to the construction unit for collection.
[0327] (6) Completion acceptance record
[0328] The system pushes the processing status of each acceptance department of the construction department. When all matters of the acceptance department are accepted as qualified, the construction department must complete the acceptance filing within the promised time limit, and issue an acceptance filing certificate through qualified documents. After the sending window issues a document to confirm the approval, the sending window will deliver all the approval results to the construction unit at one time.
[0329] If one or more acceptance departments issue an unqualified opinion or the construction unit fails to complete the rectification within the rectification period.
[0330] If there is a change, the Municipal Construction Bureau will not file it and will need to issue a document that is unqualified. After the document is confirmed by the sending window, all approval results will be delivered to the construction unit at one time by the sending window.
[0331] (7) Rectification due
[0332] The "Rectification Due Documents" list shows the matters in the declaration and acceptance stage, and the departments are making corrections in the process, but the materials have not been submitted within 24 hours of the correction deadline. Department processing personnel can view the rectification due documents for which the department has made corrections in the process, so as to notify the construction unit offline to complete the missing materials in time. Fuzzy search function is provided, and relevant rectification due documents can be searched by project code, project name, approval matters, etc.
[0333] (8) Documents to be issued if re-test fails
[0334] The list of "Documents to be issued for failed re-inspection" shows all the documents that have been submitted for the final acceptance stage and for which the department has made an "unqualified re-inspection opinion" but has not issued a document. Department staff can view and approve documents that require a document from their department. A fuzzy search function is provided to query related documents to be approved by project code, project name, approval method, approval items, etc.
[0335] (9) Acceptance Arrangement Table for Feedback
[0336] The list of "Acceptance Arrangement List to be Feedbacked" shows all the on-site acceptance arrangement lists that are waiting for department feedback. Department handling personnel can view and handle the on-site acceptance arrangement lists that require feedback from their departments.
[0337] Provides fuzzy search function, which can query relevant on-site acceptance arrangement table according to project code, project name, applicant unit, etc.
[0338] (10) Participation in acceptance schedule
[0339] The "Participation in Acceptance Arrangement Table" list displays the on-site arrangement table of the approval department's participation in the acceptance. The acceptance department's processing personnel can view and process the on-site arrangement table that their department needs to participate in the acceptance.
[0340] Provides fuzzy search function, which can query relevant on-site acceptance schedule according to project code, project name, applicant unit, etc.
[0341] (11) Lead acceptance schedule
[0342] The "Lead Acceptance Arrangement Table" list displays the on-site acceptance arrangement table for the project industry that the lead department is responsible for. Department handling personnel can view and handle the on-site situation table that their department needs to take the lead in handling.
[0343] Provides fuzzy search function, which can query relevant on-site acceptance schedule according to project code, project name, applicant unit, etc.
[0344] 6. City (state), county (district, city)
[0345] Incorporate the approval items of each county (district) into the project construction project approval management platform, so that owners can report items at the service halls of municipal and county (district) government service centers and online service halls, and owners can report items nearby. Mainly realized: Owners can report municipal and county (district) level items at municipal or county (district) level government service centers; When reporting in parallel, you can choose to report municipal and district (county) level items at the same time
[0346] (II) Engineering Construction Project Approval Efficiency Supervision Subsystem
[0347] 1. Project database inspection
[0348] You can view project information (project code, project name and project legal entity name): display the statistics of cases completed on the day of acceptance today, this week and last week, and view specific case details.
[0349] 2. A blueprint
[0350] By connecting with cities (states) and the "multi-plan integration" business collaboration platform to obtain relevant data, you can view the city's blueprint information, support basic map operations, project search, positioning, detection, and project information display,
[0351] 3. Supervision and management
[0352] (1) Project Library
[0353] You can view all projects in the system; you can view the application information, applicant information, handling information, received materials, and handling process records of a certain case, and you can view all documents generated in the process; you can check all pre-examination cases under the project; you can view the application information, applicant information, handling information, received materials, and handling process records of a certain pre-examination case; you can check preliminary opinions under the project; you can view the application information, applicant information, handling information, received materials, and handling process records of a certain preliminary opinion; you can check the life cycle of a project.
[0354] (2) Overdue
[0355] You can view the cases that have been accepted but not yet completed, the cases that are being processed by the department and have passed the promised completion date, and all the pre-examination cases that have passed the expiration date and are "pending pre-examination"
[0356] (3) Expired documents.
[0357] You can view all the cases that have been accepted but not yet completed, all the cases that are being processed by the department and have passed the promised completion date, and all the pre-examination cases that have passed the expiration date and are "pending pre-examination".
[0358] (4) Expedited documents
[0359] You can view the cases that have been accepted but not yet completed, the cases that are being processed by the department and have a promised completion date within 24-48 hours in the future working day, and all the pre-examination cases that are "pending pre-examination" and have an expiration date within 24-48 hours in the future working day.
[0360] (5) Documents awaiting preliminary review
[0361] You can view all the "pending pre-examination" documents that require pre-examination by the approval department.
[0362] (6) Items to be accepted
[0363] You can view the status of the local department matters, which are pending acceptance, withdrawn pending acceptance, supplement pending acceptance, overdue supplement pending approval, and missing supplement pending acceptance.
[0364] (7) Documents awaiting examination
[0365] You can view all the documents waiting to be processed by the department before the approval conclusion is given to the applicant after the acceptance / acceptance with missing documents / process receipt under local department matters.
[0366] (8) In special process
[0367] You can view the cases that are in the special procedure status under local department matters.
[0368] (9) In the supplementary document
[0369] You can check the local department matters to make corrections / process corrections and confirm the approved documents.
[0370] (10)Waiting for pickup
[0371] You can view the documents that have been received by the local registration window and sent to the local department and are in the "Process Correction", "Special Procedure", "Rejected Permission", "Formal Documentation" status but have not been picked up.
[0372] (11) Preliminary opinions awaiting feedback
[0373] You can view all the cases that require preliminary opinions from departments and are in the "pending approval" status.
[0374] (12) Schedule for acceptance inspection
[0375] You can view the pending site acceptance schedule for all projects.
[0376] (13) Unit Library
[0377] Can view all unit information
[0378] (14) Same-day operation
[0379] You can view the operation log records of the receiving window for handling the documents on the same day. You can view the operation log records of the sending window for handling the documents on the same day.
[0380] You can view the operation log records of the department’s handling personnel on that day.
[0381] (15) Document Enquiry
[0382] All the documents and related status in the system can be queried through the pre-examination documents, document database, preliminary opinion database, and license database.
[0383] 4. Statistical reports
[0384] The statistical reports mainly include: preliminary opinion statistics, statistics on the handling process of each department's matters, statistics on the handling status of each department, statistics on the handling status of each receiving and sending personnel, statistics on the expiration of each department's matters, statistics on the handling process of joint completion acceptance pre-examination documents, statistics on the collection of documents, statistics on the completion of each department's matters on the day of acceptance, etc.
[0385] (1) List of “zero” handling items in the corresponding counties and districts of the city (state)
[0386] Statistics have been collected from cities, prefectures and corresponding counties since the system was put into operation so far: the number of departments that should be involved, the number of departments that have generated cases, the number of matters that have been published, and the total number of "zero" cases.
[0387] (2) Implementation status of relevant reform measures in corresponding counties and districts of cities (prefectures)
[0388] Statistics on relevant reform measures in cities (states) and corresponding counties and districts within a certain period of time.
[0389] (3) Ranking of overdue cases in cities and counties
[0390] The overdue ranking display from the big screen can be found in the [Total Data] of the chart analysis, including fields such as project basic information, project basic information, overdue rate, etc.
[0391] (4) Statistics of cases completed at each stage in urban areas (counties)
[0392] It is necessary to count the status of cases handled at each stage of cities, prefectures and corresponding counties within a certain period of time, and count the number of cases handled in the four stages of project land use permit stage, engineering construction permit stage, construction permit stage, and completion acceptance stage, as well as the total number of completed cases. The data can be consistent with the number of stage projects in the chart analysis.
[0393] (5) Statistics of city (county) affairs and project handling
[0394] The total number of items, the number of items completed, the percentage, the number of projects, the number of projects, and the number of projects that have been coordinated in the early stage within the statistical time interval can be mapped to the [Total Data] in the chart analysis.
[0395] (6) Approval time table
[0396] Statistics are collected within each county and district time period from the time the cases are received to the time the cases are completed within 0-5 minutes, from the time the departments start handling the cases to the time the cases are completed within 0-5 minutes, from the time the cases are received to the time the cases are completed within 0-30 minutes, from the time the cases are received to the time the cases are completed within 0-30 minutes, and the proportion of each type of cases. For specific fields, please refer to the "Approval Time Situation Table" in the attachment.
[0397] (7) Table of coverage of major approval items
[0398] The number of cases handled during the statistical period is based on national standard matters.
[0399] (8) Municipal public service coverage table
[0400] Statistics are collected on the number of municipal public affairs (national standard affairs) handled within a time period.
[0401] 5. Project Lifecycle
[0402] The project life cycle management is realized, with the "project code" as the clue, which runs through the whole process management of the project from "land planning permission stage, feasibility study approval and engineering planning permission stage, construction drawing review stage, construction permit stage to "completion acceptance and filing stage". Different colors are used to distinguish the processing status, green represents completed, red represents in progress, and blue represents unprocessed. The acceptance unit, in-progress items and processing status of the entire project are clear at a glance.
[0403] 6. Large screen visual analysis display
[0404] (1)Overview
[0405] Through the visualization large screen, the average number of acceptances at the project stage, the average approval time at the project stage, the overdue rate ranking of each city (county), the project stage situation analysis, the case information summary, the stage case statistics, and the case situation analysis are displayed in the form of charts, and can be switched by county or district.
[0406] (2) Project Analysis
[0407] Through the large visual screen, the project area situation, project approval time interval statistics, project key situations, and the average longest time for each project stage are displayed in the form of charts, and can be switched by county or district.
[0408] (3) Case analysis
[0409] Through the visual large screen, statistics on the acceptance of each department and unit, analysis of the source of application, summary of the result delivery method, the case handling situation in the past year, case handling situation, and document issuance situation are displayed in the form of charts, and can be switched by county or district.
[0410] (4) The light turns on when the document is processed
[0411] Through a large visual screen, statistics are displayed in the form of charts on the city's annual key projects and regional projects, and the application and processing status of all projects at each stage is displayed in the form of lights, and can be switched by county or district.
[0412] (5) Summary of reform implementation
[0413] The large screen visualizes the summary of the implementation of the reform, mainly including: the name of the city and county, the number of engineering construction projects, the number of approval and service cases, the number of projects planned and generated through "one blueprint", the number of projects that implement the results of regional assessment, the number of cases implemented through parallel approval, the number of projects implemented through joint review, the number of projects implemented through joint acceptance, the number of cases implemented through notification and commitment, and the number of projects that handle municipal public services through the system.
[0414] (6) Parallel approval
[0415] The large-screen visualization displays the parallel approval situation with statistical charts, mainly including: city and county name, number of engineering construction projects, number of approval service cases, parallel approval (number of engineering construction projects, number of approval service cases), parallel approval ratio (project proportion (%), case proportion (%)).
[0416] (7) Joint acceptance statistics
[0417] The large-screen visualization displays the joint acceptance situation with statistical charts, mainly including: city and county names, number of engineering construction projects, number of approval service cases, joint acceptance (number of engineering construction projects, number of approval service cases), joint acceptance ratio (project proportion (%), case proportion (%)).
[0418] (8) Statistics of joint drawing review
[0419] The large screen visualization displays the joint review situation with statistical charts, mainly including: city and county name, number of engineering construction projects, number of approval service cases, joint review (number of engineering construction projects, number of approval service cases), joint review ratio (project ratio (%), case ratio (%))
[0420] (9) Project planning generates statistical tables
[0421] The large-screen visualization uses statistical charts to display the project planning and generation situation, mainly including: city and county names, number of engineering construction projects, number of projects planned and generated through "one blueprint", and project generation ratio (%).
[0422] (10) Statistical table of notification and commitment
[0423] The large-screen visualization displays the notification and commitment situation in the form of statistical charts, mainly including: city and county names, number of approval service cases (pieces), number of cases implemented with notification and commitment (pieces), and the proportion of notification and commitment implemented (%).
[0424] (11) Regional Assessment Statistics
[0425] The large screen visualization displays the regional assessment situation in statistical charts, mainly including:
[0426] Name of city and county, number of engineering construction projects, number of regional assessment projects implemented, and regional assessment ratio (%). (12) Municipal public utility case statistics table
[0427] The large-screen visualization displays the status of municipal public utility cases in the form of statistical charts, mainly including: city and county names, number of engineering construction projects, number of water supply registration (access) projects, number of drainage registration (access) projects, number of gas supply registration (access) projects, number of heating registration (access) projects, number of power supply registration (access) projects, number of radio and television registration (access) projects, number of communications registration (access) projects, number of municipal public service projects handled through the system, and proportion of municipal public services handled through the system.
[0428] 7. City (state), county (district) joint inspection
[0429] Achieve full-process life cycle efficiency supervision of approval matters in cities (states), counties (districts) that are included in the city (state), county (district) project construction project approval management system. Through the efficiency supervision of city-county joint affairs, the city-county linkage, etc.
[0430] (III) Basic support platform for city (state) engineering construction project approval
[0431] The basic support platform is based on the form designer, process designer, CMS page designer, template engine, organizational system model, and data application model. It encapsulates public services such as organization, users, permissions, and search, and provides service support for various front-end applications.
[0432] The basic support platform provides a variety of designers, IDE development tools, and code generation tools. Using the components and code generators designed by these modeling tools, users can quickly build business applications without coding or with just a small amount of code, shortening a project that would take one or two years to develop using traditional methods to a few months or even less.
[0433] Establish a unified security authentication and authorization system for the public on the demand side, legal persons and supply-side staff, realize unified management and authorization authentication of account information, form a unified and secure account security system, and provide security support for the "one-stop" approval of engineering construction projects.
[0434] 2. Permission Management
[0435] Role-based user authority management, through the setting of various types of operation authority and unified setting of organizational structure, realizes business division of labor and business authority management. The system can not only perform general authority control on organizations, institutions, positions, and personnel, but also realize complex authority management functions such as hierarchical authority management and authority inheritance. (1) It can perform general authority control on organizations, institutions, positions, and personnel, and also realize complex authority management functions such as hierarchical authority management and authority inheritance. The authority control capabilities include management authority, business division of labor, operation authority, data authority, and hierarchical authority.
[0436] (2) You can create roles, view role details, query roles, edit roles, and delete roles. You can set role levels and select appropriate application permissions for roles.
[0437] 3. Document management
[0438] The basic support platform provides rich and powerful form document support capabilities. Users can easily create and modify documents of various forms and styles for data collection by clicking / dragging. The platform provides good support for all types of documents that may be encountered in informatization.
[0439] (1) Supports visual form designer, which can draw various business forms based on layout and UI control design by dragging and dropping in the designer:
[0440] (2) The designer provides various common UI controls, such as date, value, drop-down box, single selection, checkbox, rich text editor, single-line text, multi-line text, etc.
[0441] (3) The designer provides a variety of attachment controls
[0442] ① Text control: It can directly call the client office software (such as WPS) in the browser to create documents for editing. It supports two mainstream calling methods in the industry: Chromium-based A. and Kingsoft-based JSAPI. The D11 method supports the attachment to be opened, pasted, uploaded, etc. using the client. Regardless of the D1 or JSAPI call, it must support leaving traces on the document and reflecting the editor author, etc.:
[0443] ② Icon attachments: Based on Chromium's D call, you can directly open and edit attachments according to the default local client of the attachment format;
[0444] ③ List attachments: support uploading multiple attachments, support one-click download and other functions, support custom buttons to expand functions, and the button order can be adjusted freely;
[0445] (4) The designer provides a table control: it supports displaying data from another form in the current form in the form of a table, and supports list display, grouped list display, inline display, inline editing, pop-up window editing, inline editing, etc. of these row data;
[0446] (5) The designer provides layout configuration controls, which implement the following functions
[0447] ①Block: You can configure the name, code, display and hide of the block;
[0448] ② Tabs: You can configure the name, code, and activation status of the tab, as well as the name, code, and activation status of the sub-tab; (6) Support sub-forms, which can be used to carry out various common form blocks; (7) Support extended forms, where different items in the same form under the same product can have their own personalized fields:
[0449] (8) Supports full-process data management, including table structure definition, data storage, and deletion;
[0450] (9) Supports multiple display formats. One storage form allows multiple editing documents, such as storage documents, display documents, mobile documents, etc.
[0451] (10) Supports all-round application of processes. The display properties, constraint properties, and editing properties of each control on the form document can be configured in the process engine. It supports the configuration of the display and hiding properties of each layout of the document, and supports the use of different editing documents in different stages of the process.
[0452] (11) Supports validation of data in each control according to its specified constraints, such as length, type, and required fields.
[0453] (12) Provide a second interface to facilitate function expansion, such as formula calculation, event entry, callback function, etc.
[0454] 4. Process Management
[0455] It consists of a workflow engine and a graphical process designer, providing users with a universal, uniformly managed, and highly scalable business process management platform, on which users can define and integrate business processes and build a variety of diverse business applications.
[0456] (1) Visual process definition designer
[0457] ① Design area: provides selection tools, mobile canvas, straight flow, curve flow, start node, link node, judgment node, end node, sub-flow, annotation, copy, clear and other visual design functions ② Process attribute definition: divided into basic attribute configuration, process authority configuration and timing configuration. Basic attribute configuration can configure the form, name, D, module, etc. used by the process. Process authority configuration can configure the process initiator, participant, supervisor, monitor, reader and other process permissions. Timing configuration can configure the process timing.
[0458] Time unit, timing link, timing field, etc.: ③ Flow attribute definition: Supports basic settings such as flow name and connection line type, supports branch flow configuration such as branch mode aggregation, shared branches, branch condition settings, and supports archiving configuration such as archiving method and archiving folder:
[0459] ④Condition attribute definition: configurable condition node name, description, etc.;
[0460] ⑤ Link attribute definition: divided into basic settings, permission settings, form settings and flow settings. Basic settings support configuration of name, ID, handler settings, CC settings, supervision settings, etc. Permission settings support configuration of sending permissions, pending permissions, and completed permissions. Form settings support configuration of editing, hiding, displaying of various controls in the form, and operation permissions of corresponding buttons, etc., and also support control of various layouts of the form. Flow settings support configuration of branch mode, handling progress, information distribution, operation records, etc.:
[0461] ⑥ Sub-process attribute definition: support configuration of business categories, business roles, predecessor relationships, summary links, support configuration of processing progress, information distribution, operation records, etc.:
[0462] ⑦Advanced settings: support advanced settings such as JS dual opening and event monitoring.
[0463] (2) Process Engine
[0464] ① Approving personnel: The process node setting can obtain the approving personnel from the organizational structure, form fields, completed links, various personnel functions, etc. It can automatically filter and screen the approving personnel according to the dimensions of department, superior leader, group, etc., and also supports obtaining the approving personnel through the interface customization;
[0465] ② Process drive: support sequential execution, support fallback, support exclusive selection (select one from multiple optional approval paths to execute), support single merger (merge multiple optional exclusive approval paths), support multi-path parallel (multi-path parallel including preconditions, automatically execute all or the approval paths that meet the preconditions), support multi-path selection (multi-path selection including preconditions, select several from all optional paths or optional paths that meet the preconditions to execute), support multi-path merger (merge all multi-path parallel approval paths), support partial merger (support merge some parallel approval paths, and the remaining ones continue to run in parallel);
[0466] ③ Approval actions: support workflow approval actions such as submit, return, direct return, transfer, countersign, copy, resume, suspend, withdraw, transfer, jump, etc.; support adding and customizing approval actions from existing approval actions; support customizing approval actions from second opening events;
[0467] ④ Branch flow: Support dynamic multi-branch mode, dynamically generate multiple approval path instances from the fixed approval path in the process; support branch waiting, and merge into the next link only after all branches are processed;
[0468] ⑤ Sub-process: Supports automatic creation of one or more new independent processes during the process flow, and merges them into the main process after completion; supports custom main process data copying to sub-process; supports custom sub-process data returning to the main process; supports sub-process waiting, and automatically enters the next link after all sub-processes are completed; supports sub-process independence, and automatically enters the next link after the main sub-process is completed, and other sub-processes continue to be processed. Supports the main process to follow up and manage sub-processes. The main process can add sub-processes, terminate sub-processes, reset sub-processes, and adjust sub-process time limits at any time;
[0469] ⑥Support JS secondary development;
[0470] ⑦Support configuration event monitoring;
[0471] ⑧ Monitoring: Real-time monitoring and management of the operation of process instances. The operation status of each process instance can be obtained from the process engine, and relevant query statistics can be performed, as well as the current operation status of the intervention process instance.
[0472] 5. Message Service
[0473] The basic support platform provides a unified message exchange application system, provides government service notification messages to the public, and realizes intelligent management and automated distribution of various message notifications.
[0474] (1) Integrate messaging, email, SMS, calendar and other messaging services;
[0475] (2) Realize the read and unread status list of messages, and forward, reply, and delete the received messages;
[0476] (3) Support centralized display and reminder of the work waiting to be processed and being processed in the business system in the message center, and push the information that needs to be processed to the business system workbench interface in real time
[0477] 6. Data Management
[0478] The basic support platform provides unified master data management services. Based on the platform, master data from various departments are integrated and managed to establish a single standard authoritative master data center to solve problems such as standard unification, data inconsistency, data conflict, and low data quality.
[0479] (1) Support MySOL, domestic DAMO and other databases to build a unified database to achieve unified storage and application of all application data;
[0480] (2) Implement file storage service based on MongoDB;
[0481] (3) Support regular automatic backup of the database, local backup and off-site backup
[0482] 7. Organization and Management
[0483] The basic support platform provides unified organizational maintenance and unit management functions, supports multi-business organizational management, and provides comprehensive management support for organizational structures. Different businesses can build the same organization based on the platform, or build different organizational models to cope with different businesses, supporting one person in multiple positions.
[0484] (1) Multi-business organization management: providing comprehensive management support for organizations. Different businesses can build the same organization based on the platform, or they can build different organizational models to cope with different businesses, supporting one person to hold multiple positions.
[0485] (2) Support different types of nodes, including departments, business units, and classification nodes; (3) Support multiple system units. Different system units have their own multi-business organizations, and the data between different system units do not interfere with each other and are not visible to each other.
[0486] (4) Organization management: supports setting up unit user personnel, manually adding or importing personnel to create and edit departments, and manually sorting departments and global personnel; personnel can be moved to corresponding departments, and personnel can be set up for part-time work, personnel permissions can be edited, personnel can be exported, and other functions can be performed;
[0487] (5) Position management: you can manually create and edit positions, select appropriate roles for positions, and drag and move the order of positions.
[0488] 8. Reporting Tools
[0489] The basic support platform provides a unified report design component service and supports user-defined query reports, including report data source definition, report style definition, report query, data export and other functions.
[0490] 9. Log Management
[0491] The basic support platform provides a unified log management component service, supporting system operation and maintenance logs, system operation log recording, query and other functions.
[0492] 10. Task Management
[0493] The basic support platform provides a unified task management component service, supporting tasks definition, task maintenance, task scheduling, task batch processing and other functions.
[0494] System integration (interconnection) solutions,
[0495] The municipal (state) management system for project construction approval needs to be interconnected with the following business systems and exchange data through the provincial data sharing and exchange platform.
[0496] Connect to the provincial engineering construction project approval and supervision system.
[0497] Connect to the provincial investment project approval online supervision platform.
[0498] Connect with the provincial construction industry supervision and public service platform.
[0499] Connect to the provincial government service network.
[0500] Connect to the SMS platform of the Provincial Government Affairs Center.
[0501] Connect to the provincial energy engineering construction project approval management system.
[0502] Connect with the "multi-plan integration" business collaboration platform of each city (state).
[0503] Connect to the city (state) digital joint drawing review platform.
[0504] Connect with provincial, municipal and state credit platforms.
[0505] Connect with the public resource bidding and tendering systems of each city (state) and connect with the electronic certificate and license database of each city (state).
[0506] Connect with the self-built systems of the business departments involved in project approval in each city (state).
[0507] 1. Access method
[0508] (1) This system is connected with the provincial engineering construction project approval and supervision system. The provincial engineering construction project approval and supervision system has been established, and the interconnection is achieved through webservice in accordance with the "Engineering Construction Project Approval Management System Data Sharing and Exchange Standard 2.0".
[0509] (2) This system is connected to the provincial investment project online approval and supervision platform. The municipal (state) engineering construction project approval management system pushes the approval process information and approval result information of the case to the investment project online approval and supervision platform through webservice to achieve the purpose of supervision.
[0510] (3) This system is connected with the provincial construction industry supervision and public service platform. The provincial construction industry supervision and public service platform has been built and put into use, and the webservice connection method is used to achieve interconnection.
[0511] (4) This system is connected to the provincial government service network. According to the connection standard of the provincial government service network, the webservice method is used to interconnect the two systems.
[0512] (5) This system and the SMS platform of the Provincial Government Service Center. The SMS platform of the Provincial Government Service Center has achieved the ability to push SMS data throughout the province. According to the data connection standard of the SMS platform of the Provincial Government Service Center, it is interconnected with the SMS platform of the Provincial Government Service Center through webservice.
[0513] (6) This system is connected with the provincial energy engineering construction project approval management system. The provincial energy engineering construction project approval management system has been established and put into use. It is connected with the system, and the case data is interconnected using webservice. The project information is obtained through the front-end library.
[0514] (7) The system is connected to the "multi-regulation integration" business collaboration platform of each city (state). The connection between the two systems is interconnected by webservice and front-end library.
[0515] (8) This system is connected with the digital joint drawing review system of each city (state). According to the connection standard communicated by both parties, the webservice method is used for interconnection.
[0516] (9) This system is connected with the provincial and municipal credit platforms. The province and municipal credit platforms have their own credit platforms. The connection standards are determined through communication with the credit platforms, and relevant credit information is obtained through webservice or front-end database or file exchange.
[0517] (10) This system is connected with the public resource bidding system of each city (state). The two systems mainly involve the interconnection of project information, bidding results and other information, and mainly adopt the webservice connection method.
[0518] (11) The system is connected with the electronic license databases of various cities (states). The system is connected according to the connection standards of the electronic license databases of various cities (states), mainly using the webservice connection method.
[0519] (12) This system is connected with the self-built business systems of the approval departments of each city (state) involved in the approval of engineering construction projects. The connection is carried out in accordance with the technical standards and business standards of the engineering construction project approval management system of each city (state), and the webservice connection method is mainly adopted.
[0520] 2. Docking plan
[0521] (1) Connecting with the provincial engineering construction project approval and supervision system
[0522] Realize interconnection and information sharing between the city (state) engineering construction project approval management system (hereinafter referred to as the local system) and the provincial engineering construction project approval supervision system (hereinafter referred to as the provincial system), and achieve real-time transmission of the approval process and results.
[0523] (2) Connecting to the online approval and supervision platform for investment projects
[0524] When a new construction project is created in the project approval management system of each city (state), the project information is obtained by matching the project of the provincial investment project online approval and supervision platform through the central code. After the applicant submits the application in the city (state) project approval management system and the relevant business personnel handle it, the city (state) project approval management system will push the approval process information and approval result information of the application to the investment project online approval and supervision platform through webservice to achieve the purpose of supervision.
[0525] When a new construction project is created in the city (state) project approval management system, the project information is obtained by matching the provincial investment project online approval and supervision platform project through the central code. After the applicant submits the application in the city (state) project approval management system and the relevant business personnel handle it, the city (state) project approval management system will push the approval process information and approval result information of the application to the investment project online approval and supervision platform through webservice to achieve the purpose of supervision.
[0526] (3) Connect with the provincial construction industry supervision and public service platform
[0527] The provincial engineering construction project approval city (state) management system is interconnected with the provincial construction industry supervision and public service platform, so that when the construction unit applies for a construction permit on the city (state) engineering construction project approval management platform, it can share data with the provincial construction industry supervision and public service platform in real time, jump to the data filling interface required by the construction industry supervision and public service platform, and automatically import relevant data, so as to share the application information, application materials, approval process, and approval result data of the construction permit. The main docking method is webservice.
[0528] (4) Connect to the Provincial Government Service Network
[0529] As a secondary subsystem of the provincial government service network, the provincial engineering construction project approval city (state) management system needs to implement single sign-on, secondary subsystem integration, approval process data and approval result push with the provincial government service network, to achieve interconnection between the two systems, to solve the problem of construction units having multiple accounts and multiple systems reporting, to solve the problem of approval departments needing to approve and enter information in multiple systems, and to solve the problem of inconsistent supervision information of regulatory departments requiring comparison and viewing in multiple systems.
[0530] (5) Connect to the SMS platform of the Provincial Government Affairs Center
[0531] The project construction project approval management system of each city (state) is connected to the SMS platform of the Provincial Government Service Center through webservice, so that the approval process nodes, correction information, document information, and return information of the project construction project approval management system of each city (state) can be notified to the construction unit in a timely manner.
[0532] The project approval management system of each city (state) is connected to the SMS platform of the Provincial Government Service Center through webservice, so that the construction unit can be notified of the correction information, document issuance information, and return information during the approval process of the project approval management system of each city (state) in a timely manner:
[0533] (6) Connect with the provincial energy engineering construction project approval management system
[0534] The engineering construction project approval management systems of each city (state) are connected with the provincial energy engineering construction project approval management system through a front-end library, and the energy engineering construction project approval matters are delegated to each city (state), county (district, city), so that construction units can report matters through the engineering construction project approval management systems of each city (state). Project information, application process, approval process, and approval result data are pushed to the provincial energy engineering construction project approval management system in real time. At the same time, the provincial energy engineering construction project approval management system will push supervision information to the engineering construction project approval management systems of each city (state).
[0535] Description of the connection requirements between the provincial energy industrial reform system and the municipal (state) industrial reform system: After the staff at the first window of the provincial government affairs center registers to receive documents through the provincial energy industrial reform system, the provincial energy industrial reform system will push the approval documents belonging to the relevant departments of each city (state) to the industrial reform system of the corresponding city (state). After the municipal (state) industrial reform system receives it, the corresponding approval department will review it through the municipal (state) industrial reform system. After the document is issued, the processing result will be returned to the provincial energy industrial reform system. The staff at the first window of the provincial government affairs center will register to pick up documents through the provincial energy industrial reform system to complete the whole process management of approval matters. During the approval process, the municipal (state) industrial reform system will keep the process data synchronized with the provincial energy industrial reform system in real time.
[0536] (7) Connecting to the “Multi-Plan Integration” Business Collaboration Platform
[0537] The engineering construction project approval management system of each city (state) is connected to the "multi-plan integration" business collaboration platform, and uses webservice and front-end library to push business data, query case data, and download and push related attachments in accordance with the engineering construction project approval management platform connection standards.
[0538] After the engineering construction projects of each city (state) are planned and generated in the "multi-plan integration" business collaboration platform, the preliminary review opinions and land boundary map attachments formed in the planning and generation process will be pushed to the engineering construction project approval management platform according to the project code (the project code is the central code obtained from the online approval and supervision platform for investment projects).
[0539] (8) Connecting to the Digital Joint Drawing Review System
[0540] The project approval management system of each city (state) is interconnected with the digital joint review system of each city (state), and the digital joint review is integrated into the information system of the project construction project as part of the reform of the project approval system, so that the construction unit can declare at a unified entrance and obtain the approval results at a unified exit. At the same time, when the digital joint review results are used as the approval materials for subsequent matters, the construction unit does not need to provide the joint review results, and the system automatically retrieves them. The project approval management system of each city (state) realizes the business connection with the digital joint review system of each city (state) using webservice
[0541] (9) Connecting to the credit platform
[0542] The project approval management system of each city (state) is interconnected with the provincial and city (state) credit platforms, such as Credit, Credit Zunyi, etc., as well as the credit platforms built by the credit management departments of each city (state), and the urban management credit information platform, so that the project approval management system of each city (state) can obtain the credit information of each construction unit for the approval department to use as a reference for approval. The project approval management system of each city (state) realizes business connection with the credit platform of each city (state) by using webservice or front-end database or file exchange to obtain relevant credit information.
[0543] (10) Connect with the public resource bidding system of each city (state)
[0544] The project approval management system of each city (state) is connected with the public resource bidding system of each city (state), so that the bidding results of each project construction project can be collected in the project approval management system of each city (state), so that the construction unit can automatically access the bidding results when applying in the industrial reform system. It mainly involves the interconnection of project information, bidding results and other information, and mainly adopts the webservice docking method.
[0545] (11) Connect with the electronic license database of each city (state)
[0546] The project approval management system of each city (state) is connected with the electronic license database of each city (state) to realize the access to the existing licenses in the electronic license database of each city (state) to reduce the preparation of application materials for construction units: the approval results and issued licenses of the approval department in the city (state) project approval management system are pushed to the city (state) electronic license database in real time. The main docking method is webservice.
[0547] By connecting to the electronic certificate management systems of various cities (states), we will promote the mutual recognition and sharing of electronic certificates across levels, regions and departments, and realize the "one-time generation, multiple-party reuse, one-database management, mutual recognition and sharing" of relevant information in the process of handling affairs of various departments:
[0548] (12) Connect with the self-built systems of the project approval departments of each city (state)
[0549] The city (state) project approval management system realizes the interconnection and intercommunication with the self-built business systems of the approval departments involved in the approval of project construction projects in each city (state), and realizes the interconnection and intercommunication of project information, application information, approval process, and approval result data of project construction projects applied for through the city (state) project approval management system, so as to avoid multiple inputs, realize unified application, unified certification, etc. The main docking method is webservice.
[0550] The municipal (state) engineering construction project approval management system realizes the comprehensive centralized acceptance of "one window", and is linked online with the approval systems of municipal (state) / county (district, city) departments to improve work efficiency. The municipal (state) engineering construction project approval management system establishes interface standards and unified interface docking specifications. However, as a latecomer, the municipal (state) engineering construction project approval management system must, in principle, follow the interface standards of the self-built business systems of the municipal (state) departments or call the self-built business systems of the municipal (state) departments. The self-built business system calls the municipal (state) engineering construction project approval management system using the interface standards of the municipal (state) engineering construction project approval management system to complete the interconnection between the two systems.
[0551] The departments involved in the approval of engineering construction projects in various cities (prefectures) mainly include: Development and Reform Commission, Housing and Urban-Rural Development Bureau, Natural Resources and Planning Bureau, Transportation Bureau, Water Resources Bureau, Civil Air Defense Office, Environmental Protection Department, Urban Management Department, Public Security Department, Meteorological Bureau, Water Supply Department, Power Supply Department, Gas Supply Department, Communications Department (Joint Construction Office), etc., which need to be interconnected with the self-built business systems of the departments above the city (prefecture). The interfaces involved mainly include: push of information on receiving documents, push of application materials, reception of supplementary information and push of application information and application materials after correction, reception and feedback of non-acceptance information, reception and feedback of administrative license rejection information, reception and feedback of special procedure information, push and feedback of information on the handling process of each link of the application, push of approval opinions, push of approval results, push and feedback of guidance opinions and solicitation of opinions, push of the handling process and results of parallel approval pre-order matters, etc.
[0552] Method Embodiment
[0553] According to an embodiment of the present invention, a cloud platform-based construction project comprehensive approval method is provided, which is characterized in that it is used in the above-mentioned cloud platform-based construction project comprehensive approval system, Figure 5 is a flow chart of a comprehensive construction project approval method based on a cloud platform according to an embodiment of the present invention, such as Figure 5 As shown, the comprehensive approval method for construction projects based on a cloud platform according to an embodiment of the present invention specifically includes:
[0554] Step 501, through the basic support platform for project construction approval, based on the form designer, process designer, CMS page designer, template engine, organizational system model, and data application model, encapsulates public services such as organization, user, authority, and search, and provides business resource support for the project construction approval management subsystem and the project construction approval efficiency supervision subsystem; specifically, it includes:
[0555] Define and integrate business processes based on user operations, build business applications, provide service support for various business applications of the engineering construction project approval management subsystem and the engineering construction project approval efficiency inspection subsystem, realize unified management and authorization authentication of account information, manage user rights based on roles, realize business division of labor and business rights management through unified setting of various operation rights and organizational structures, provide form document support capabilities, provide a unified message exchange application system, provide government service notification messages to the public, realize intelligent management and automatic distribution of various message notifications, and provide unified master data management services; provide unified organizational maintenance and unit management functions, provide unified report design component services, provide unified log management component services, and provide unified task management component services.
[0556] It provides construction unit user information data, administrative department user information data, approval matter service guide data, project information data, matter approval declaration data, matter approval process data, matter approval result data, matter material data, approval process receipt data, approval process supervision data, and data generated by docking with third-party systems. It organizes the saved data according to metadata standards, operates on the data using intermediate table buffering technology, and ensures the error-free nature of migrated data through metadata management, definition of various interfaces, automatic error checking and manual custom error checking, error modification, review and verification.
[0557] Step 502, through the construction project approval management subsystem, facing the comprehensive service window and the approval department, provides users with business application services related to construction project approval; specifically including:
[0558] Provide unified application access services for user roles through the user access layer;
[0559] Through the business application layer, business application services related to the approval of engineering construction projects are integrated to provide application services for project application, acceptance, approval, supervision and analysis. By connecting to related platforms and systems, application services including multi-plan integration project planning generation, investment project coding, and government service reviews are provided.
[0560] The data resource layer adopts a sub-database and partition design to aggregate basic data, business data and access data of external systems related to the approval of engineering construction projects, providing data support for the business application layer;
[0561] Through the platform support layer, it provides unified user authentication, event management, and scheduling management services; provides data exchange, data governance, and data development services; provides form design, process design, and visual programming services; and provides unified log management, equipment monitoring, and service monitoring services.
[0562] The Tonggu basic support layer uses cloud resources to provide computing, storage, network, and security resource support for the operation of the engineering construction project approval management subsystem.
[0563] Step 503, through the engineering construction project approval efficiency supervision subsystem, facing the business supervision department, based on the process and results of engineering construction project approval of the engineering construction project approval management subsystem, provide users with engineering construction project approval efficiency supervision services, store and view approval process supervision data, perform statistical analysis on the approval process supervision data, and display the statistical analysis results.
[0564] The embodiment of the present invention is a method embodiment corresponding to the above-mentioned system embodiment. The specific operation of each step can be understood by referring to the description of the system embodiment, which will not be repeated here.
[0565] Device Example 1
[0566] An embodiment of the present invention provides an electronic device, such as Figure 6 As shown, it includes: a memory 60, a processor 62, and a computer program stored in the memory 60 and executable on the processor 62. When the computer program is executed by the processor 62, the steps described in the method embodiment are implemented.
[0567] Device Example 2
[0568] An embodiment of the present invention provides a computer-readable storage medium, on which a program for implementing information transmission is stored. When the program is executed by the processor 62, the steps described in the method embodiment are implemented.
[0569] The computer-readable storage medium in this embodiment includes, but is not limited to, ROM, RAM, magnetic disk or optical disk, etc.
[0570] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A comprehensive construction project approval system based on a cloud platform, characterized in that: The project construction project approval management system interface service is used to connect with the third-party business system. Based on the J2EE architecture and using the B / S model and distributed Java applications, the system specifically includes: The construction project approval management subsystem is used to provide users with business application services related to construction project approval, facing the comprehensive service window and approval departments; The engineering construction project approval efficiency supervision subsystem is connected to the engineering construction project approval management subsystem and is used to provide users with engineering construction project approval efficiency supervision services based on the process and results of engineering construction project approval of the engineering construction project approval management subsystem for business supervision departments, store and view approval process supervision data, perform statistical analysis on the approval process supervision data, and display the statistical analysis results; The basic support platform for engineering construction project approval is connected to the engineering construction project approval management subsystem and the engineering construction project approval efficiency inspection subsystem. It is used to encapsulate public services such as organization, user, authority, and search based on the form designer, process designer, CMS page designer, template engine, organizational system model, and data application model, so as to provide business resource support for the engineering construction project approval management subsystem and the engineering construction project approval efficiency inspection subsystem.
2. The system according to claim 1, characterized in that The engineering construction project approval management subsystem specifically includes: User access layer, used to provide unified application access services for user roles; The business application layer is used to integrate business application services related to the approval of engineering construction projects, provide application services for project application, acceptance, approval, supervision, and analysis, and provide application services including multi-plan integration project planning generation, investment project coding, and government service reviews through docking with related platforms and systems; The data resource layer is used to adopt a sub-database and partition design to aggregate basic data, business data, and access data of external systems related to the approval of engineering construction projects, and provide data support for the business application layer; The platform support layer is connected to the user access layer, the business application layer and the data resource layer, and is used to provide unified user authentication, event management, and scheduling management services, data exchange, data governance, and data development services, form design, process design, and visual programming services, and unified log management, equipment monitoring, and service monitoring services; The basic support layer is connected to the user access layer, business application layer, data resource layer and platform support layer, and is used to provide computing, storage, network and security resource support for the operation of the engineering construction project approval management subsystem through cloud resources.
3. The system according to claim 1, characterized in that The basic support platform for project construction project approval is specifically used for: Define and integrate business processes according to user operations, build business applications, provide service support for various business applications of the engineering construction project approval management subsystem and the engineering construction project approval efficiency supervision subsystem, realize unified management and authorization authentication of account information, manage user rights based on roles, realize business division of labor and business rights management through unified setting of various operation rights and organizational structures, provide form document support capabilities, provide a unified message exchange application system, provide government service notification messages to the public, realize intelligent management and automatic distribution of various message notifications, and provide unified master data management services; Provide unified organization maintenance and unit management functions, provide unified report design component services, provide unified log management component services, and provide unified task management component services.
4. The system according to claim 3, characterized in that The basic support platform for project construction project approval is specifically used for: It is used to provide construction unit user information data, administrative department user information data, approval matter service guide data, project information data, matter approval declaration data, matter approval process data, matter approval result data, matter material data, approval process receipt data, approval process supervision data, and data generated by docking with third-party systems. It organizes the saved data according to metadata standards, operates on the data using intermediate table buffering technology, and ensures the error-free nature of migrated data through metadata management, definition of various interfaces, automatic error checking and manual custom error checking, error modification, review and verification.
5. A comprehensive approval method for construction projects based on a cloud platform, characterized in that: The cloud platform-based construction project comprehensive approval system used in any one of claims 1 to 4, wherein the method specifically comprises: Through the basic support platform for project construction project approval, based on form designer, process designer, CMS page designer, template engine, organizational system model, and data application model, public services such as organization, user, authority, and search are encapsulated to provide business resource support for the project construction project approval management subsystem and the project construction project approval efficiency supervision subsystem; Through the construction project approval management subsystem, it provides users with business application services related to construction project approval, facing the comprehensive service window and approval departments; Through the engineering construction project approval efficiency supervision subsystem, facing the business supervision department, based on the process and results of engineering construction project approval of the engineering construction project approval management subsystem, it provides users with engineering construction project approval efficiency supervision services, stores and views the approval process supervision data, conducts statistical analysis on the approval process supervision data, and displays the statistical analysis results.
6. The method according to claim 5, characterized in that Through the construction project approval management subsystem, the comprehensive service window and approval department are provided to users with business application services related to construction project approval, including: Provide unified application access services for user roles through the user access layer; Through the business application layer, business application services related to the approval of engineering construction projects are integrated to provide application services for project application, acceptance, approval, supervision and analysis. By connecting to related platforms and systems, application services including multi-plan integration project planning generation, investment project coding, and government service reviews are provided. The data resource layer adopts a sub-database and partition design to aggregate basic data, business data and access data of external systems related to the approval of engineering construction projects, providing data support for the business application layer; Through the platform support layer, it provides unified user authentication, event management, and scheduling management services; provides data exchange, data governance, and data development services; provides form design, process design, and visual programming services; and provides unified log management, equipment monitoring, and service monitoring services. The Tonggu basic support layer uses cloud resources to provide computing, storage, network, and security resource support for the operation of the engineering construction project approval management subsystem.
7. The method according to claim 5, characterized in that The basic support platform for project construction project approval is based on form designer, process designer, CMS page designer, template engine, organizational system model, and data application model, encapsulating public services such as organization, user, authority, and search, and providing business resource support for the project construction project approval management subsystem and the project construction project approval efficiency supervision subsystem, including: Define and integrate business processes based on user operations, build business applications, provide service support for various business applications of the engineering construction project approval management subsystem and the engineering construction project approval efficiency inspection subsystem, realize unified management and authorization authentication of account information, manage user rights based on roles, realize business division of labor and business rights management through unified setting of various operation rights and organizational structures, provide form document support capabilities, provide a unified message exchange application system, provide government service notification messages to the public, realize intelligent management and automatic distribution of various message notifications, and provide unified master data management services; provide unified organizational maintenance and unit management functions, provide unified report design component services, provide unified log management component services, and provide unified task management component services.
8. The method according to claim 7, characterized in that The provision of unified master data management services specifically includes: It provides construction unit user information data, administrative department user information data, approval matter service guide data, project information data, matter approval declaration data, matter approval process data, matter approval result data, matter material data, approval process receipt data, approval process supervision data, and data generated by docking with third-party systems. It organizes the saved data according to metadata standards, operates on the data using intermediate table buffering technology, and ensures the error-free nature of migrated data through metadata management, definition of various interfaces, automatic error checking and manual custom error checking, error modification, review and verification.
9. An electronic device, characterized in that: include: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the computer program, when executed by the processor, implements the steps of the cloud platform-based comprehensive construction project approval method as described in any one of claims 5 to 8.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores an implementation program for information transmission, and when the program is executed by the processor, the steps of the comprehensive approval method for construction projects based on a cloud platform as described in any one of claims 5 to 8 are implemented.