Resource management method and device of network equipment, electronic equipment and storage medium

Through the network management system, the target association system is automatically determined in multiple association systems and the device change request is generated, and the information island problem caused by the independent operation of information systems in the prior art is solved, and the automation and efficiency of equipment resource management is realized.

CN120124860APending Publication Date: 2025-06-10INDUSTRIAL AND COMMERCIAL BANK OF CHINA
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202510212713.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-25
Publication Date
2025-06-10

AI Technical Summary

Technical Problem

In the existing multi-system management architecture, each information system operates independently, and the information transmission between systems depends on manual operations to cause information islands, which seriously reduces the response speed of equipment management.

Method used

The network management system detects the status changes of the target network equipment, obtains status change information, and determines the target association system in multiple association systems such as the configuration management system, enterprise resource management system, and department asset approval system based on this information, generates a device change request and sends it to the target association system, and triggers the device change process.

Benefits of technology

It realizes the automation and efficiency of equipment resource management processes, reduces manual errors, enhances the real-time response capabilities and information accuracy of network equipment management, solves the information island problem, and improves the response speed of equipment management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120124860A_ABST
    Figure CN120124860A_ABST
Patent Text Reader

Abstract

The invention discloses a resource management method and device for network equipment, electronic equipment and a storage medium, and relates to the field of financial science and technology or other related fields, and the method comprises the steps: obtaining state change information under the condition that the state change of target network equipment is detected; a target association system is determined in N association systems based on the state change information, the N association systems at least comprise a configuration management system, an enterprise resource management system and a department asset approval system, and N is an integer greater than or equal to 3; and generating an equipment change request, and sending the equipment change request to the target association system, the target association system triggering an equipment change process based on the equipment change request, and executing an equipment change operation. According to the method and the device, the technical problems of information isolated island and serious reduction of the equipment management response speed caused by independent operation of each information system in the existing multi-system management architecture and dependence on manual operation of information transmission between the systems in the prior art are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of fintech or other related fields. Specifically, it relates to a resource management method and apparatus for network devices, an electronic device, and a storage medium. Background Art

[0002] With the deepening of digital transformation, the scale of network infrastructure has been increasing day by day, and the number of various devices and their accessories has shown an explosive growth. Subsequently, the continuous upgrading of management specifications has posed unprecedented challenges to the meticulousness and efficiency of resource management. Traditional management models focus on static records and passive management of devices, making it difficult to cope with the rapid changes and large-scale deployment requirements of devices in modern network environments, resulting in uneven resource allocation, low utilization rates, and a significant increase in management costs.

[0003] In the current management system, there are multiple independently operating systems, each undertaking different functions: The resource management system, as the guardian of the device ledger, details the inbound and outbound history, usage status, and geographical location information of devices, providing basic data support for daily operations; The network management system is like a keen scout, responsible for automatically capturing the configurations of online network devices, monitoring the device status at any time, and ensuring the high efficiency and stability of the network; The configuration management system is the "archivist" after the device goes online, responsible for archiving and updating the online configuration information of the device, providing a basis for subsequent maintenance and upgrades. However, the independence of these systems has also brought about the phenomenon of data islands. The manual transfer of information between systems not only consumes time and effort but also is extremely prone to information distortion and omission, reducing the overall management efficiency and response speed and becoming a bottleneck in modern resource management.

[0004] For the above problems, no effective solutions have been proposed yet. Summary of the Invention

[0005] The main objective of this application is to provide a resource management method and apparatus for network devices, an electronic device, and a storage medium, so as to at least solve the technical problem that in the existing multi-system management architecture in related technologies, each information system operates independently, and the information transfer between systems relies on manual operations, resulting in information islands and severely reducing the device management response speed.

[0006] To achieve the above object, according to one aspect of the present application, a resource management method for a network device is provided, which is applied to a network management system. The method includes: when detecting that a status change occurs in a target network device, obtaining status change information; determining a target associated system among N associated systems based on the status change information, where the N associated systems at least include: a configuration management system, an enterprise resource management system, and a department asset approval system, and N is an integer greater than or equal to 3; generating a device change request and sending the device change request to the target associated system, where the target associated system triggers a device change process based on the device change request and performs a device change operation.

[0007] Further, before detecting whether a status change occurs in the target network device, the resource management method for the network device further includes: receiving a target device identifier and a status change request, where the status change request is a request submitted by a target user through the network management system to change the status of the target network device, and the types of the status change request include: an online request or an offline request; obtaining the current status of the target network device, and generating the status change information based on the current status and the status change request.

[0008] Further, the step of generating the status change information based on the current status and the status change request includes: when the current status indicates that the target network device is in an online state and the status change request is an offline request, setting the status change information to be pending offline; or when the current status indicates that the target network device is in an offline state and the status change request is an online request, setting the status change information to be pending online.

[0009] Further, before receiving the status change request, the resource management method for the network device further includes: receiving device inventory information transmitted by the department asset approval system, where the device inventory information is device information of the stocked devices regularly updated by the department asset approval system based on device inbound and outbound operations; updating a device registration list in the network management system based on the device inventory information, where the device registration list is used to record the device identifiers of all the stocked devices.

[0010] Further, the step of determining a target associated system among N associated systems based on the status change information includes: when the status change information is pending offline, determining the target associated system as the configuration management system; or when the status change information is pending online, determining that the target associated system includes the configuration management system, the enterprise resource management system, and / or the department asset approval system.

[0011] Further, in the case where the status change information is to be taken offline, after determining that the target associated system is the configuration management system, the steps of generating a device change request include: obtaining the online operating status of the target network device, where the online operating status at least includes: currently occupied network resources and currently occupied system configuration; generating a network resource release sub-request based on the currently occupied network resource configuration, and generating a system configuration revocation sub-request based on the currently occupied system configuration; generating the device change request corresponding to the offline change operation based on the network resource release sub-request and the system configuration revocation sub-request.

[0012] Further, in the case where the status change information is to be taken online, after determining that the target associated systems include the configuration management system, the enterprise resource management system, and the department asset approval system, the steps of generating a device change request include: obtaining the device online process and the device information of the target network device, and generating an online configuration plan based on the device online process and the device information, where the online configuration plan at least includes: network resource configuration and system resource configuration; generating an online configuration request based on the network resource configuration and the system resource configuration, and using the online configuration request as the device change request sent to the configuration management system.

[0013] Further, after using the online configuration request as the device change request sent to the configuration management system, the resource management method of the network device further includes: sending the online configuration request to the configuration management system, and receiving device ledger information, where the configuration management system is used to perform the device online operation and generate the device ledger information, and the device ledger information at least includes: the configuration information of the target network device after going online; generating an online approval request based on the device ledger information, and using the online approval request as the device change request sent to the enterprise resource management system and the department asset approval system.

[0014] To achieve the above object, according to another aspect of the present application, there is also provided a resource management device for a network device, which is applied to a network management system. The device includes: an acquisition unit, configured to obtain status change information when detecting a status change of a target network device; a determination unit, configured to determine a target associated system from N associated systems based on the status change information, where the N associated systems at least include: a configuration management system, an enterprise resource management system, and a department asset approval system, and N is an integer greater than or equal to 3; a sending unit, configured to generate a device change request and send the device change request to the target associated system, where the target associated system triggers a device change process based on the device change request and performs a device change operation.

[0015] Further, the resource management device of the network device further includes: a first receiving module, configured to receive a target device identifier and a status change request before detecting whether the target network device has a status change, where the status change request is a request submitted by a target user through a network management system to change the status of the target network device, and the types of the status change request include: an online request or an offline request; a first generating module, configured to obtain the current status of the target network device, and generate the status change information based on the current status and the status change request.

[0016] Further, the first generating module includes: a first setting sub-module, configured to set the status change information to be to-be-offlined when the current status indicates that the target network device is in an online state and the status change request is an offline request; a second setting sub-module, configured to set the status change information to be to-be-onlined when the current status indicates that the target network device is in an offline state and the status change request is an online request.

[0017] Further, the resource management device of the network device further includes: a second receiving module, configured to receive device inventory information transmitted by the department asset approval system before receiving the status change request, where the device inventory information is device information of the stocked devices regularly updated by the department asset approval system based on device in-and-out operations; an updating module, configured to update a device registration list in the network management system based on the device inventory information, where the device registration list is used to record the device identifiers of all the stocked devices.

[0018] Further, the determining unit includes: a first determining module, configured to determine that the target associated system is a configuration management system when the status change information is to-be-offlined; a second determining module, configured to determine that the target associated system includes a configuration management system, an enterprise resource management system, and / or a department asset approval system when the status change information is to-be-onlined.

[0019] Further, the sending unit includes: a first obtaining module, configured to obtain the online operating status of the target network device after determining that the target associated system is a configuration management system when the status change information is to-be-offlined, where the online operating status at least includes: currently occupied network resources and currently occupied system configurations; a second generating module, configured to generate a network resource release sub-request based on the currently occupied network resources configuration, and generate a system configuration revocation sub-request based on the currently occupied system configuration; a third generating module, configured to generate the device change request corresponding to the offline change operation based on the network resource release sub-request and the system configuration revocation sub-request.

[0020] Further, the sending unit further includes: a second obtaining module, configured to, when the status change information is to be put on line, after determining that the target associated systems include a configuration management system, an enterprise resource management system, and a department asset approval system, obtain a device on-line process and device information of a target network device, and generate an on-line configuration plan based on the device on-line process and the device information, where the on-line configuration plan at least includes: network resource configuration and system resource configuration; a first sending module, configured to generate an on-line configuration request based on the network resource configuration and the system resource configuration, and use the on-line configuration request as the device change request sent to the configuration management system.

[0021] Further, the resource management device of the network device further includes: a second sending module, configured to, after using the on-line configuration request as the device change request sent to the configuration management system, send the on-line configuration request to the configuration management system, and receive device ledger information, where the configuration management system is configured to perform a device on-line operation and generate the device ledger information, and the device ledger information at least includes: configuration information of the target network device after being put on line; a fourth generating module, configured to generate an on-line approval request based on the device ledger information, and use the on-line approval request as the device change request sent to the enterprise resource management system and the department asset approval system.

[0022] To achieve the above object, according to another aspect of the present application, there is also provided a computer-readable storage medium, where the computer-readable storage medium includes a stored computer program, and when the computer program runs, it controls a device where the computer-readable storage medium is located to execute the resource management method of the network device described in any one of the above.

[0023] To achieve the above object, according to another aspect of the present application, there is also provided an electronic device, including one or more processors and a memory, where the memory is configured to store one or more programs, and when the one or more programs are executed by the one or more processors, the one or more processors are caused to implement the resource management method of the network device described in any one of the above.

[0024] A resource management method of a network device is proposed in the present invention. First, when it is detected that a status change of a target network device occurs, status change information is obtained, and then a target associated system is determined from N associated systems based on the status change information. The N associated systems at least include: a configuration management system, an enterprise resource management system, and a department asset approval system, and N is an integer greater than or equal to 3. Then, a device change request is generated and sent to the target associated system, where the target associated system triggers a device change process based on the device change request and performs a device change operation.

[0025] In the present invention, an automated information synchronization method is adopted. By establishing an intelligent linkage means between the network management system and the configuration management system, the enterprise resource management system, and the department asset approval system, the purpose of real-time updating and managing the device status information is achieved, thereby realizing the technical effects of automating and optimizing the device resource management process. Specifically, the network management system automatically detects the status changes of target network devices, intelligently analyzes the status change information, and automatically determines the associated systems that need to interact with it. When a device goes offline, it interacts with the configuration management system to automatically generate and send a configuration request for offline, realizing the rapid recovery of network resources and configuration adjustment. When a device goes online, it collaborates with the configuration management system, the enterprise resource management system, and the department asset approval system to automatically complete the device configuration, resource allocation, and asset approval processes, ensuring the efficiency and compliance of device online. The above automated and intelligent management mechanism significantly improves the efficiency of device resource management, reduces human errors, enhances the real-time response ability and information accuracy of network device management, and thus solves the technical problem in the related art that in the existing multi-system management architecture, each information system operates independently, and the information transmission between systems depends on manual operations, resulting in information islands and seriously reducing the response speed of device management. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The drawings forming a part of this application are used to provide a further understanding of this application. The schematic embodiments of this application and their descriptions are used to explain this application and do not constitute an improper limitation to this application. In the drawings:

[0027] Figure 1 shows a hardware structure block diagram of a computer terminal for implementing a method for managing resources of network devices;

[0028] Figure 2 is a flowchart of an optional method for managing resources of network devices according to an embodiment of the present invention;

[0029] Figure 3 is an optional multi-system device resource management architecture diagram according to an embodiment of the present invention;

[0030] Figure 4 is an execution flowchart of an optional device offline scenario according to an embodiment of the present invention;

[0031] Figure 5 is an execution flowchart of an optional device online scenario according to an embodiment of the present invention;

[0032] Figure 6 is a schematic diagram of an optional device resource management device for network devices according to an embodiment of the present invention;

[0033] Figure 7 It is a structural block diagram of an electronic device for implementing a resource management method of a network device according to an embodiment of the present invention. Detailed implementation manners

[0034] In order to enable those skilled in the art to better understand the solution of the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

[0035] It should be noted that the terms "first", "second", etc. in the description and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged under appropriate circumstances so that the embodiments of the present invention described herein can be implemented in an order different from those illustrated or described herein. In addition, the terms "comprising" and "having" and any variations thereof are intended to cover non-exclusive inclusion. For example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units not clearly listed or inherent to these processes, methods, products or devices.

[0036] To facilitate the understanding of the present invention by those skilled in the art, some terms or nouns involved in the embodiments of the present invention are explained below:

[0037] Network Management System, NMS, a network management system, a software platform for managing devices (such as routers, switches, firewalls, etc.) in an enterprise or organizational network, capable of monitoring network status, configuring and adjusting network parameters, and collecting and analyzing operation data of network devices to centrally manage network devices.

[0038] Configuration Management System, CMS, a system for managing and controlling configuration items such as hardware, software, and documents in an IT environment, ensuring the accuracy and consistency of configuration information, and supporting pre-configuration before device online and post-configuration cleanup after device offline.

[0039] Enterprise Resource Planning, ERP, is an integrated management software used to integrate and manage all resources within an enterprise, including finance, supply chain, human resources, and equipment assets, etc., to achieve optimal allocation and efficient management of resources.

[0040] Departmental Asset Approval System, DAPS, is an approval process system within an enterprise for equipment procurement, allocation, use, and recycling, ensuring that equipment usage complies with asset management regulations and process standards.

[0041] It should be noted that the resource management method and device for network equipment in this application can be used in the field of fintech when optimizing and enhancing the automated management of network infrastructure, and can also be used in any field other than fintech when optimizing and enhancing the automated management of network infrastructure. The application fields of the resource management method and device for network equipment in this application are not limited.

[0042] It should be noted that the relevant information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by users or fully authorized by all parties. Moreover, the collection, storage, processing, transmission, provision, disclosure, use, and handling of relevant data all comply with the laws, regulations, and standards of the relevant region, adopt necessary confidentiality measures, do not violate public order and good customs, and provide corresponding operation entrances for users to choose to authorize or refuse. For example, there is an interface between this system and relevant users or institutions. Before obtaining relevant information, a request for acquisition needs to be sent to the aforementioned users or institutions through the interface, and relevant information can be obtained after receiving the consent information feedback from the aforementioned users or institutions.

[0043] For the information collection (such as user voice, video, text collection) and analysis operations involved in this application, corresponding operation entrances have been provided for users to choose to agree or refuse the automated decision-making results when they are executed; if the user chooses to refuse, the expert decision-making process will be entered.

[0044] The following embodiments of the present invention can be applied to various systems / applications / devices that require equipment resource management and automated configuration and monitoring, and can achieve automation of resource management and process optimization. The present invention uses a network management system for device self-discovery and configuration capture, and then synchronizes information to the resource management system and the configuration management system through an automated process, which can better improve the accuracy and timeliness of resource management, reduce errors and complexities of manual operations, achieve data consistency across systems, and thus improve the overall resource management efficiency.

[0045] The present invention also dynamically monitors and precisely locates suspected vulnerabilities / suspicious codes, inserts interruption stubs into the codes, making the testing process convenient and fast, and locating vulnerabilities quickly and accurately.

[0046] The present invention will be described in detail below in conjunction with each embodiment.

[0047] Embodiment 1

[0048] According to an embodiment of the present invention, an embodiment of a resource management method for a network device is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer-executable instructions, and although the logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in a different order than here.

[0049] The embodiment of the resource management method for the network device provided by the first embodiment of the present invention can be executed in a mobile terminal, a computer terminal, or a similar computing device. Figure 1 A hardware structure block diagram of a computer terminal (or mobile device) for implementing the resource management method for a network device is shown. As Figure 1 shown, the computer terminal 10 (or mobile device) may include one or more (shown as 102a, 102b,..., 102n in the figure) processors 102 (the processor 102 may include, but is not limited to, a processing device such as a microprocessor MCU or a programmable logic device FPGA), a memory 104 for storing data, and a transmission device 106 for communication functions. In addition, it may further include: a display, an input / output interface (I / O interface), a universal serial bus (USB) port (which can be included as one of the ports of the BUS bus), a network interface, a power supply, and / or a camera. Those of ordinary skill in the art can understand that Figure 1 the structure shown is only schematic and does not limit the structure of the above-mentioned electronic device. For example, the computer terminal 10 may further include more or fewer components than Figure 1 shown, or have a different configuration from Figure 1 shown.

[0050] It should be noted that the above one or more processors 102 and / or other data processing circuits are generally referred to as "data processing circuits" in this article. The data processing circuit may be embodied in software, hardware, firmware, or any combination thereof in whole or in part. In addition, the data processing circuit may be a single independent processing module, or be incorporated in whole or in part into any one of the other elements in the computer terminal 10 (or mobile device). As involved in the embodiments of the present application, the data processing circuit is a processor control (such as the selection of a variable resistor terminal path connected to an interface).

[0051] The memory 104 can be used to store software programs and modules of application software, such as the program instruction / data storage device corresponding to the resource management method of the network device in the embodiments of the present application. The processor 102 executes various functional applications and data processing by running the software programs and modules stored in the memory 104, that is, implements the above-mentioned resource management method of the network device. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memories, or other non-volatile solid-state memories. In some instances, the memory 104 may further include a memory remotely disposed relative to the processor 102, and these remote memories can be connected to the computer terminal 10 through a network. Examples of the above networks include, but are not limited to, the Internet, enterprise intranets, local area networks, mobile communication networks, and combinations thereof.

[0052] The transmission device 106 is used to receive or send data via a network. Specific examples of the above network may include a wireless network provided by a communication provider of the computer terminal 10. In one instance, the transmission device 106 includes a network adapter (Network Interface Controller, NIC), which can be connected to other network devices through a base station and thus communicate with the Internet. In one instance, the transmission device 106 can be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.

[0053] The display can be, for example, a touch-screen liquid crystal display (LCD), which enables a user to interact with the user interface of the computer terminal 10 (or mobile device).

[0054] Under the above operating environment, the present invention provides a resource management method for a network device as shown in Figure 2 The implementation subject of this method is a network management system. Combining automated configuration scraping and recognition technologies, it is used in the financial technology innovation management scenario, especially to solve the problems of untimely update of device resource information and cross-system data consistency. Through means of automated information scraping and cross-system data synchronization, it aims to achieve efficient automation of device resource management and real-time update and accuracy of information.

[0055] The following will describe the embodiments of the present invention in detail in combination with each specific step.

[0056] Figure 2 is a flowchart of an optional resource management method for a network device according to an embodiment of the present invention, as shown in Figure 2 The method includes the following steps:

[0057] Step S201, when it is detected that the status of the target network device has changed, obtain the status change information.

[0058] Specifically, the target network device refers to network infrastructure devices monitored and managed by the network management system, including but not limited to: routers, switches, firewalls, servers, storage devices, etc.

[0059] It should be noted that the status change information is triggered after the change request (including online / offline change, configuration change, location change, etc.) submitted by the target user for the target network device is approved. When the network management system monitors that such a change request has been approved, it will track the process of the target network device changing from the original state to the new state, for example, changing from "online" to "pending offline" or from "not online" to "pending online".

[0060] Optionally, before detecting whether the status of the target network device has changed, the resource management method of the network device further includes: receiving the target device identifier and the status change request, where the status change request is a request submitted by the target user through the network management system to change the status of the target network device, and the types of the status change request include: online request or offline request; obtaining the current status of the target network device, and generating status change information based on the current status and the status change request.

[0061] It should be noted that the network management system receives a request submitted by the target user to change the status of the target network device. Among them, the target user refers to technical personnel or asset managers of financial institutions. The status change request contains the unique identifier (for example, serial number) of the target network device and the request type, which can be an online request or an offline request. Then, by querying the internal database or communicating with the resource management system, the current status information of the target network device is obtained, including: whether the device is online, configuration information, location information, accessory information, etc.

[0062] Through the above steps, the network management system can ensure that each change operation is targeted at the correct target device, reducing the possibility of operation errors. After obtaining the current status of the target network device, it intelligently generates status change information, effectively avoiding inappropriate changes to the device status, such as preventing an online request from being sent to an already online device or an offline request from being sent to an already offline device, thereby improving the rationality and security of the operation.

[0063] In addition, the subsequent steps of the automated process are also triggered, including detecting device status changes, generating change information, etc., ensuring the data synchronization update of the resource management system and the configuration management system, realizing the automated processing of device status changes, and improving management efficiency and accuracy.

[0064] Optionally, the step of generating status change information based on the current status and the status change request includes: when the current status indicates that the target network device is in the online state and the status change request is a request to go offline, setting the status change information to pending offline; or, when the current status indicates that the target network device is in the offline state and the status change request is a request to go online, setting the status change information to pending online.

[0065] Specifically, if the current status indicates that the target network device is in the online state and the status change request is a request to go offline, the network management system sets the status change information to pending offline, indicating that the target network device is about to be removed from the network. The configuration management system is ready to perform the offline operation and update the records in the resource management system and the configuration management system after the device goes offline.

[0066] Conversely, if the current status indicates that the target network device is in the offline state and the status change request is a request to go online, the network management system sets the status change information to pending online, indicating that the target network device is about to be connected to the network. The configuration management system starts to prepare for the online operation, including capturing and parsing the device configuration, and updating the relevant information in the resource management system and the configuration management system.

[0067] Through the above logical judgment steps, invalid or incorrect status change operations are avoided. For example, an online request will not be sent to an online device, nor will an offline request be sent to an offline device, improving the rationality of the operation and ensuring the accuracy of the device status change operation. At the same time, standardizing the status change information into the form of "pending online" or "pending offline" helps the unified processing of the automated process, realizes the standardized generation of the status change information and the guarantee of the cross-system data consistency, and improves the operation efficiency.

[0068] More importantly, the state-based intelligent judgment and information generation mechanism ensure the consistency of the device status information in the resource management system and the configuration management system, avoiding resource management chaos and configuration errors caused by inconsistent information, and providing stable, efficient, and accurate technical support for the device resource management of financial institutions in a large-scale network environment.

[0069] To enhance the comprehensiveness and accuracy of network device resource management, optionally, before receiving the status change request, the resource management method of the network device further includes: receiving the device inventory information transmitted by the department asset approval system, where the device inventory information is the device information of the stock devices regularly updated by the department asset approval system based on the device inbound and outbound operations; updating the device registration list in the network management system based on the device inventory information, where the device registration list is used to record the device identifiers of all stock devices.

[0070] Specifically, the purpose of receiving the equipment inventory information transmitted by the department asset approval system is to ensure that the equipment registration list in the network management system is synchronized with the actual equipment inventory status. Among them, the equipment inventory information is regularly updated by the department asset approval system according to the incoming and outgoing operations of the equipment, and includes detailed equipment information of all stocked equipment, including but not limited to equipment serial numbers, models, locations, statuses, etc.

[0071] It should be noted that the department asset approval system, as the core system for equipment process approval, is responsible for approving the incoming and outgoing applications of equipment and updating the equipment inventory information after the application is approved. In order to update the equipment registration list in a timely manner, the updated equipment inventory information is subsequently synchronously transmitted to the network management system and the enterprise resource management system. The equipment registration list is an important database in the network management system that records the identifiers of all stocked equipment, ensuring that the network management system can comprehensively grasp all the equipment in the bank network, including equipment that has not been put into operation or has been taken out of service but is still in stock.

[0072] By regularly receiving and updating the equipment inventory information, the network management system can accurately maintain the equipment registration list, ensuring that the recorded equipment identifiers match the actual inventory status. Thus, when receiving a status change request, it can process the request based on the accurate and error-free equipment registration list, avoiding status change operations on non-existent or already processed equipment, and improving management efficiency and accuracy.

[0073] Exemplarily, in the equipment incoming and outgoing process, the applicant (i.e., the target user) first submits an equipment outgoing or incoming application in the department asset approval system. After the approval process, the actual status of the equipment will change accordingly (for example, change to "in stock"). At this time, the department asset approval system synchronously transmits the updated equipment inventory information to the network management system, which updates the equipment registration list to ensure that the equipment identifiers included in the list are consistent with the equipment actually owned in the financial institution's equipment library; further, when the network management system receives a request for equipment to go online or offline, it first checks the equipment registration list to confirm whether the equipment identifier in the request exists in the list, thereby judging the legality of the request; if the equipment identifier exists in the equipment registration list, the network management system will continue to execute the subsequent automated processes according to the request type, such as equipment online / offline operations, and data updates in the resource management system and the configuration management system.

[0074] The above steps achieve the real-time synchronization of equipment inventory information and network equipment status through the close cooperation between the department asset approval system and the network management system, ensuring the accuracy of the equipment registration list, providing a solid data foundation for subsequent status change request processing, and further enhancing the automation level and management efficiency of the entire network equipment resource management system.

[0075] Step S202: Determine a target associated system among N associated systems based on the status change information. The N associated systems at least include: a configuration management system, an enterprise resource management system, and a department asset approval system, where N is an integer greater than or equal to 3.

[0076] Specifically, an associated system refers to multiple information systems that interact with the network management system and share device status information in the network device resource management process. Each associated system undertakes different management responsibilities, but there are data dependencies and process connections among them, jointly constituting a complete system for the network device resource management of financial institutions.

[0077] It should be noted that the implementation entity's network management system has at least pre-established an information exchange relationship with the associated systems, such as Figure 3 shown Figure 3 is an optional multi-system device resource management architecture diagram according to an embodiment of the present invention. Figure 3 The network management system in it is respectively pre-connected to the configuration management system, the enterprise resource management system, and the department asset approval system. Secondly, there is also a pre-established information synchronization relationship between the enterprise resource management system and the department asset approval system.

[0078] Specifically, the configuration management system is mainly responsible for managing the configuration information of network devices, including the software version, configuration parameters, etc. of the devices. When the device status changes, especially when the device goes online or offline, the configuration management system needs to update the configuration status of the device to reflect the actual device configuration in the network; the enterprise resource management system is usually used to track and manage various resources within the enterprise, including hardware devices, software, human resources, etc. In the resource management of network devices, the ERMS is responsible for the equipment ledger management, recording the full life cycle information of the devices, such as the status of purchase, use, maintenance, and scrapping. The change of the device status will directly affect the update of the device ledger in the ERMS to ensure the accuracy and timeliness of the resource information; the department asset approval system is the approval platform for processes such as equipment receipt, purchase, and scrapping, managing the entire approval process from equipment purchase and receipt to scrapping and departure, and is the control point in the entire resource management process.

[0079] In addition to the above three systems, the associated systems may also include, but are not limited to: a security management system, an operation and maintenance management system, a fault management system, etc., which receive device status change information according to their respective functional requirements to adjust their management strategies or perform corresponding operations. For example, the security management system can update the security policy according to the online status of the device to ensure that the newly online device meets the security standards; the operation and maintenance management system can adjust the maintenance plan after the device goes offline to avoid performing ineffective maintenance operations on the offline device.

[0080] The existence and close cooperation of the above-mentioned association system are crucial for realizing the automation, high efficiency, and refinement of network device resource management. Through information sharing and process linkage between the network management system and the association system, operations for changing the device state can be automatically triggered and executed, reducing manual intervention and improving the processing speed. At the same time, the above-mentioned integrated management method ensures the consistency of cross-system data, avoids information silos and data conflicts, and makes resource management more reliable and accurate.

[0081] Optionally, the step of determining the target association system among N association systems based on the state change information includes: when the state change information is "to be taken offline", determining the target association system as the configuration management system; or, when the state change information is "to be taken online", determining that the target association system includes the configuration management system, the enterprise resource management system, and / or the department asset approval system. The above steps further refine the logic of determining the target association system based on the state change information, ensuring that when the device state changes, the system responsible for the corresponding operation can be accurately notified, improving the automation degree and efficiency of the entire process.

[0082] Specifically, when the state change information is marked as "to be taken offline", the network management system determines the configuration management system as the target association system because the primary task when a device is taken offline from the network is to update the device configuration status in the configuration management system to ensure the consistency and security of the network configuration;

[0083] When the state change information is marked as "to be taken online", the network management system needs to determine multiple target association systems, including but not limited to: the configuration management system, the enterprise resource management system, and the department asset approval system, because the management level involved in device online is more complex and requires the collaborative work of multiple systems.

[0084] For example, Figure 4 is the execution flow chart of an optional device offline scenario according to an embodiment of the present invention. As Figure 4 shown, when the network management system receives a take-offline request for a certain target network device and confirms through logical judgment that the current state of the device is online, it first generates state change information of "to be taken offline", and then notifies the configuration management system that the device is about to be taken offline. The configuration management system will automatically delete or mark the configuration information of the device as the offline state. The above operations simplify the device offline process, avoid the update notification to all associated systems, improve the efficiency, and at the same time ensure the accuracy and security of the network configuration information.

[0085] Another optional embodiment, Figure 5 is the execution flow chart of an optional device online scenario according to an embodiment of the present invention. As Figure 5As shown, when the network management system confirms that the device status change request is an online request and the current status is offline, it first generates status change information of "pending online", and then notifies multiple associated systems, including but not limited to: the configuration management system, the enterprise resource management system, and the department asset approval system. Among them, the configuration management system is responsible for capturing the latest configuration of the device and parsing to obtain the accessory information on the target network device, and then performing corresponding configuration management; the enterprise resource management system is responsible for allocating or adjusting device resources and updating the online status of the device; the department asset approval system is responsible for updating the device ledger information and confirming that the device online approval process has been completed. Through the above collaborative operations, while the network device goes online smoothly, it ensures that the device information in all associated systems is updated synchronously, achieving the full automation and high efficiency of device resource management.

[0086] Step S203: Generate a device change request and send the device change request to the target associated system. Among them, the target associated system triggers a device change process based on the device change request and performs a device change operation.

[0087] Specifically, different from status changes, device changes refer to actual device status changes, including but not limited to the following: 1. Device online (new device accesses the network). When a new device requests to go online, the network management system starts monitoring and collecting connection information, configuration details, location, etc., and performs configuration capture and synchronization between systems; 2. Device offline (device is removed from the network). When an online device is requested to go offline, the network management system records it as an inactive state and removes the corresponding device records from the resource management system and the configuration management system after the device goes offline; 3. Configuration change, which means that the configuration parameters of the network device change. The network management system detects the configuration change and automatically captures the new configuration information and updates it to the configuration management system, and at the same time updates the device status in the resource management system; 4. Location change, the physical location of the network device changes. The network management system updates the device location information in the resource management system to ensure the accuracy of the ledger data; 5. Accessory change, including the addition or subtraction of modules, hard disks, or other additional accessories on the device. When the network management system detects an accessory change, it synchronously updates the accessory ledger in the resource management system and the device accessory information in the configuration management system.

[0088] It should be noted that the device change request is an instruction or information generated and sent by the network management system to achieve the actual change of the device status after determining the target associated system, and contains the key information required for performing the device change operation, such as device identification, change type (online or offline), change time, changed status, etc. The purpose is to trigger the device change process inside the target associated system to perform the corresponding device change operation.

[0089] In the scenario of a device going offline, the generated device change request clearly indicates the serial number or other unique identifier of the device and the request type as "offline". The network management system sends this request to the configuration management system, which triggers an internal offline process based on the received request and performs operations such as deleting device configuration information and updating the system status to reflect the fact that the device has gone offline from the network.

[0090] Optionally, when the status change information is pending offline, after determining that the target associated system is the configuration management system, the steps for generating a device change request include: obtaining the online operating status of the target network device, where the online operating status at least includes: currently occupied network resources and currently occupied system configuration; generating a network resource release sub-request based on the currently occupied network resource configuration, and generating a system configuration revocation sub-request based on the currently occupied system configuration; generating a device change request corresponding to the offline change operation based on the network resource release sub-request and the system configuration revocation sub-request.

[0091] It should be noted that the data of the online operating status can be directly read from the monitoring data of the network management system or obtained by querying the configuration management system. The currently occupied network resources include: the IP addresses, ports, bandwidth, etc. allocated to the target network device, and the currently occupied system configuration involves the software version of the device, running services, security policies, etc. The purpose of obtaining the above information is to generate specific resource release and configuration revocation requests subsequently to ensure that the device does not occupy any network or system resources after going offline.

[0092] Furthermore, the network resource release sub-request is used to specifically describe the type and quantity of network resources to be released, such as the IP address used by the target network device, closing ports, releasing bandwidth, etc.; the system configuration revocation sub-request is used to elaborate on the configuration items to be revoked, such as stopping running services, deleting security policies, uninstalling software versions, etc.

[0093] Furthermore, integrating the network resource release sub-request and the system configuration revocation sub-request generates a complete device change request corresponding to the offline change operation. This request contains all the specific steps required to perform the device offline operation, from resource release to configuration revocation, ensuring the comprehensiveness and security of the device offline operation. After the device change request is sent to the configuration management system, it triggers an internal offline process and performs resource release and configuration revocation operations to complete the offline processing of the device.

[0094] The above steps can ensure that resources are released in a timely manner after the device goes offline by clearly indicating the network resources to be released and the system configurations to be revoked. Among them, the generation of the system configuration revocation sub-request ensures that the configuration information of the offline device is deleted from the configuration management system, preventing configuration conflicts and data redundancy. The sending and receiving of the device change request guarantee the data synchronization between the network management system and the configuration management system, ensuring the accuracy and consistency of the device status in multiple systems and providing a solid foundation for cross-system resource management.

[0095] In the scenario of device online, the generated device change request includes the device identifier and the request type "online". This request is sent to multiple target associated systems, including the configuration management system, enterprise resource management system, department asset approval system, etc., to complete the closed-loop of resource management.

[0096] Optionally, in the case where the status change information is pending online, after determining that the target associated systems include the configuration management system, enterprise resource management system, and department asset approval system, the steps for generating the device change request include: obtaining the device online process and the device information of the target network device, and generating an online configuration plan based on the device online process and the device information. Among them, the online configuration plan at least includes: network resource configuration and system resource configuration; generating an online configuration request based on the network resource configuration and the system resource configuration, and using the online configuration request as the device change request sent to the configuration management system.

[0097] It should be noted that in the preparation stage before the device goes online, detailed device information is obtained, including: device model, serial number, planned network location, expected online time, etc. The above information source is the approval result of the department asset approval system. At the same time, according to the network architecture and security policy of the financial institution, the online process applicable to this network device is obtained, including the allocation rules of network resources, initial configuration templates, security inspection processes, etc. The generated online configuration plan covers the network resource configuration required for device online, such as allocating specific IP addresses, subnet masks, gateways, etc., and system resource configuration, setting the administrator account of the device, installing necessary software modules, configuring security policies, etc. Generating the online configuration plan is the core of the device online operation, which is used to ensure that the device can be safely connected to the network according to the predetermined rules and configurations.

[0098] In the operation stage of device online, an online configuration request specific to each resource and configuration is generated according to the online configuration plan, detailing the network resources and system resource configurations to be allocated when the device goes online, ensuring that the configuration management system can accurately execute the device online operation. The network management system sends the online configuration request as part of the device change request to the configuration management system.

[0099] Optionally, after sending the online configuration request as a device change request to the configuration management system, the resource management method of the network device further includes: sending the online configuration request to the configuration management system and receiving device ledger information, where the configuration management system is used to perform device online operations and generate device ledger information, and the device ledger information at least includes: the configuration information of the target network device after going online; generating an online approval request based on the device ledger information and sending the online approval request as a device change request to the enterprise resource management system and the department asset approval system.

[0100] In the operation stage of device online, further, after receiving the online configuration request, the configuration management system performs device online operations, including automatically configuring the network resources and system resources of the device to ensure that the device can access the network and start running according to the requirements of the online configuration plan. After the device goes online successfully, the configuration management system generates device ledger information, including but not limited to: the serial number, model, network location, online time, configuration information, etc. of the device.

[0101] In the update stage of the resource management system and the asset approval system after the device goes online, the network management system receives the device ledger information from the configuration management system and generates an online approval request to notify the enterprise resource management system and the department asset approval system that the device has gone online and needs to update its status and information in the system. The network management system sends the online approval request as a device change request to these two systems to trigger the internal update process.

[0102] After receiving the online approval request, the enterprise resource management system and the department asset approval system each perform corresponding update operations. Among them, the enterprise resource management system updates the network location and status information of the device, marks it as "online", and at the same time records the configuration information, etc. of the device after going online. The department asset approval system updates the device ledger to reflect the fact that the device has gone online successfully, records the approval process and operation records of the device going online to meet the requirements of internal audit and management.

[0103] The above steps of the embodiments of the present invention realize the automation of the device online process by generating and sending specific device change requests, reduce the steps of manual intervention, and significantly improve the efficiency of device online. Specifically, the generation and sending of device change requests promote data synchronization and process collaboration among the configuration management system, the enterprise resource management system, and the department asset approval system, ensure the accurate execution of device online operations at multiple levels, enhance the consistency and security of resource management. After the device goes online, the device ledger information generated by the configuration management system and the updates of the enterprise resource management system and the department asset approval system accurately record the status of the network resources and system resources of the device. The record of the device online approval process in the department asset approval system ensures that all online operations comply with the internal management system and provides necessary tracking information for audit and compliance.

[0104] Through the above steps S201 to S203, it is possible to first obtain status change information when it is detected that the target network device has a status change, and then determine the target associated system among N associated systems based on the status change information. The N associated systems at least include: a configuration management system, an enterprise resource management system, and a department asset approval system, where N is an integer greater than or equal to 3. Then, a device change request is generated and sent to the target associated system, where the target associated system triggers a device change process based on the device change request and performs a device change operation.

[0105] In the embodiment of the present invention, an automated information synchronization method is adopted. By establishing an intelligent linkage between the network management system and the configuration management system, the enterprise resource management system, and the department asset approval system, the purpose of real-time updating and managing device status information is achieved, thereby realizing the technical effects of automation and high efficiency of the device resource management process. Specifically, the network management system automatically detects the status change of the target network device, intelligently analyzes the status change information, and automatically determines the associated system that needs to interact with it. When the device goes offline, it interacts with the configuration management system, automatically generates and sends a downline configuration request, realizing the rapid recovery and configuration adjustment of network resources. When the device goes online, it collaborates with the configuration management system, the enterprise resource management system, and the department asset approval system to automatically complete the device configuration, resource allocation, and asset approval processes, ensuring the high efficiency and compliance of device online. The above automated and intelligent management mechanism significantly improves the efficiency of device resource management, reduces human errors, enhances the real-time response ability and information accuracy of network device management, and thus solves the technical problem in the related art that in the existing multi-system management architecture, each information system operates independently, and the information transmission between systems depends on manual operations, resulting in information islands and seriously reducing the device management response speed.

[0106] The following describes the present invention with reference to another optional embodiment.

[0107] Embodiment 2

[0108] The embodiment of the present invention further provides a resource management device for a network device. It should be noted that the resource management device for a network device in the embodiment of the present invention includes multiple implementation units, which can be used to execute the resource management method for a network device provided in the above Embodiment 1, and each implementation unit corresponds to each implementation step in the above Embodiment 1.

[0109] Figure 6 is a schematic diagram of an optional resource management device for a network device according to an embodiment of the present invention. As Figure 6 shown, the device may include: an acquisition unit 61, a determination unit 62, and a sending unit 63.

[0110] Among them, an acquisition unit 61 is configured to acquire status change information when detecting that a target network device has a status change.

[0111] A determination unit 62 is configured to determine a target associated system from N associated systems based on the status change information. The N associated systems at least include: a configuration management system, an enterprise resource management system, and a department asset approval system, where N is an integer greater than or equal to 3.

[0112] A sending unit 63 is configured to generate a device change request and send the device change request to the target associated system, where the target associated system triggers a device change process based on the device change request and performs a device change operation.

[0113] For the above-mentioned resource management device of the network device, the acquisition unit 61 can first acquire status change information when detecting that the target network device has a status change, and then the determination unit 62 determines a target associated system from N associated systems based on the status change information. The N associated systems at least include: a configuration management system, an enterprise resource management system, and a department asset approval system, where N is an integer greater than or equal to 3. Then, the sending unit 63 generates a device change request and sends the device change request to the target associated system, where the target associated system triggers a device change process based on the device change request and performs a device change operation.

[0114] In an embodiment of the present invention, an automated information synchronization method is adopted. By establishing an intelligent linkage between the network management system and the configuration management system, the enterprise resource management system, and the department asset approval system, the purpose of real-time updating and managing device status information is achieved, thereby realizing the technical effects of automation and high efficiency of the device resource management process. Specifically, the network management system automatically detects the status change of the target network device, intelligently analyzes the status change information, and automatically determines the associated system that needs to interact with it. When the device goes offline, it interacts with the configuration management system, automatically generates and sends a decommissioning configuration request to realize the rapid recovery and configuration adjustment of network resources. When the device goes online, it collaborates with the configuration management system, the enterprise resource management system, and the department asset approval system to automatically complete the device configuration, resource allocation, and asset approval processes to ensure the high efficiency and compliance of the device going online. The above-mentioned automated and intelligent management mechanism significantly improves the efficiency of device resource management, reduces human errors, enhances the real-time response ability and information accuracy of network device management, and thus solves the technical problem in the related art that in the existing multi-system management architecture, each information system runs independently, and the information transmission between systems depends on manual operations, resulting in information silos and seriously reducing the device management response speed.

[0115] Optionally, the resource management device of the network device further includes: a first receiving module, configured to receive a target device identifier and a status change request before detecting whether the target network device has a status change, where the status change request is a request submitted by a target user through a network management system to change the status of the target network device, and the types of the status change request include: an online request or an offline request; a first generating module, configured to obtain the current status of the target network device and generate status change information based on the current status and the status change request.

[0116] Optionally, the first generating module includes: a first setting sub-module, configured to set the status change information to be pending offline when the current status indicates that the target network device is in an online state and the status change request is an offline request; a second setting sub-module, configured to set the status change information to be pending online when the current status indicates that the target network device is in an offline state and the status change request is an online request.

[0117] Optionally, the resource management device of the network device further includes: a second receiving module, configured to receive device inventory information transmitted by a department asset approval system before receiving the status change request, where the device inventory information is device information of stocked devices regularly updated by the department asset approval system based on device inbound and outbound operations; an updating module, configured to update a device registration list in the network management system based on the device inventory information, where the device registration list is used to record the device identifiers of all stocked devices.

[0118] Optionally, the determining unit includes: a first determining module, configured to determine that the target associated system is a configuration management system when the status change information is pending offline; a second determining module, configured to determine that the target associated system includes a configuration management system, an enterprise resource management system, and / or a department asset approval system when the status change information is pending online.

[0119] Optionally, the sending unit includes: a first obtaining module, configured to obtain the online operating status of the target network device after determining that the target associated system is a configuration management system when the status change information is pending offline, where the online operating status at least includes: currently occupied network resources and currently occupied system configurations; a second generating module, configured to generate a network resource release sub-request based on the currently occupied network resources configuration and generate a system configuration revocation sub-request based on the currently occupied system configuration; a third generating module, configured to generate a device change request corresponding to the offline change operation based on the network resource release sub-request and the system configuration revocation sub-request.

[0120] Optionally, the sending unit further includes: a second obtaining module, configured to, when the status change information is to be put on line, after determining that the target associated systems include a configuration management system, an enterprise resource management system, and a department asset approval system, obtain the device on-line process and the device information of the target network device, and generate an on-line configuration plan based on the device on-line process and the device information, where the on-line configuration plan at least includes: network resource configuration and system resource configuration; a first sending module, configured to generate an on-line configuration request based on the network resource configuration and the system resource configuration, and use the on-line configuration request as a device change request sent to the configuration management system.

[0121] Optionally, the resource management device of the network device further includes: a second sending module, configured to, after using the on-line configuration request as a device change request sent to the configuration management system, send the on-line configuration request to the configuration management system, and receive device ledger information, where the configuration management system is configured to perform device on-line operations and generate device ledger information, and the device ledger information at least includes: the configuration information of the target network device after being put on line; a fourth generating module, configured to generate an on-line approval request based on the device ledger information, and use the on-line approval request as a device change request sent to the enterprise resource management system and the department asset approval system.

[0122] It should be noted here that the above obtaining unit 61, determining unit 62, and sending unit 63 correspond to steps S201 to S203 in Embodiment 1. The examples and application scenarios implemented by the above units and the corresponding steps are the same, but are not limited to the content disclosed in Embodiment 1 above. It should be noted that the above modules or units may be hardware components or software components stored in a memory (for example, memory 104) and processed by one or more processors (for example, processors 102a, 102b,..., 102n), and the above modules or units may also be part of a device and can run in the computer terminal 10 provided in Embodiment 1.

[0123] The present invention will be described below in conjunction with another optional embodiment.

[0124] Embodiment 3

[0125] The embodiment of the present invention may further provide an electronic device, Figure 7 which is a structural block diagram of an electronic device for executing the resource management method of a network device according to an embodiment of the present invention, as Figure 7 shown. The electronic device may include: one or more ( Figure 7 only one is shown in the figure) processors 702, a memory 704, a storage controller, and a peripheral interface, where the peripheral interface is connected to a radio frequency module, an audio module, and a display.

[0126] Among them, the memory can be used to store software programs and modules, such as the program instructions / modules corresponding to the resource management method and device of the network device in the embodiments of the present application. The processor executes various functional applications and data processing by running the software programs and modules stored in the memory, that is, implements the above-mentioned resource management method of the network device. The memory may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memories, or other non-volatile solid-state memories. In some instances, the memory may further include a memory remotely set relative to the processor, and these remote memories can be connected to the terminal through a network. Examples of the above-mentioned network include but are not limited to the Internet, enterprise intranets, local area networks, mobile communication networks, and combinations thereof.

[0127] The processor can call the information and application programs stored in the memory through the transmission device to perform the following steps: when it is detected that the target network device has a status change, obtain the status change information; based on the status change information, determine the target associated system among N associated systems, where the N associated systems at least include: a configuration management system, an enterprise resource management system, and a department asset approval system, and N is an integer greater than or equal to 3; generate a device change request and send the device change request to the target associated system, where the target associated system triggers a device change process based on the device change request and performs a device change operation.

[0128] The processor can also call the information and application programs stored in the memory through the transmission device to perform the following steps: receive a target device identifier and a status change request, where the status change request is a request submitted by the target user through the network management system to change the status of the target network device, and the types of the status change request include: an online request or an offline request; obtain the current status of the target network device, and generate status change information based on the current status and the status change request.

[0129] The processor can also call the information and application programs stored in the memory through the transmission device to perform the following steps: when the current status indicates that the target network device is in an online state and the status change request is an offline request, set the status change information to be pending offline; or, when the current status indicates that the target network device is in an offline state and the status change request is an online request, set the status change information to be pending online.

[0130] The processor can also call the information and application programs stored in the memory through the transmission device to perform the following steps: receiving the device inventory information transmitted by the department asset approval system, where the device inventory information is the device information of the stocked devices regularly updated by the department asset approval system based on the device inbound and outbound operations; updating the device registration list in the network management system based on the device inventory information, where the device registration list is used to record the device identifiers of all stocked devices.

[0131] The processor can also call the information and application programs stored in the memory through the transmission device to perform the following steps: when the status change information is to be taken offline, determining that the target associated system is the configuration management system; or, when the status change information is to be taken online, determining that the target associated system includes the configuration management system, the enterprise resource management system, and / or the department asset approval system.

[0132] The processor can also call the information and application programs stored in the memory through the transmission device to perform the following steps: obtaining the online operation status of the target network device, where the online operation status at least includes: the currently occupied network resources and the currently occupied system configuration; generating a network resource release sub-request based on the currently occupied network resources configuration, and generating a system configuration revocation sub-request based on the currently occupied system configuration; generating a device change request corresponding to the take-offline change operation based on the network resource release sub-request and the system configuration revocation sub-request.

[0133] The processor can also call the information and application programs stored in the memory through the transmission device to perform the following steps: obtaining the device online process and the device information of the target network device, and generating an online configuration plan based on the device online process and the device information, where the online configuration plan at least includes: network resource configuration and system resource configuration; generating an online configuration request based on the network resource configuration and the system resource configuration, and taking the online configuration request as the device change request sent to the configuration management system.

[0134] The processor can also call the information and application programs stored in the memory through the transmission device to perform the following steps: sending the online configuration request to the configuration management system and receiving the device ledger information, where the configuration management system is used to perform the device online operation and generate the device ledger information, and the device ledger information at least includes: the configuration information of the target network device after going online; generating an online approval request based on the device ledger information, and taking the online approval request as the device change request sent to the enterprise resource management system and the department asset approval system.

[0135] An embodiment of the present invention provides a resource management solution for network devices. By adopting an automated information synchronization method and establishing an intelligent linkage means between a network management system, a configuration management system, an enterprise resource management system, and a department asset approval system, the purpose of real-time updating and managing device status information is achieved, thereby realizing the technical effects of automation and high efficiency of the device resource management process. Specifically, the network management system automatically detects status changes of target network devices, intelligently analyzes the status change information, and automatically determines the associated systems that need to interact with them. When a device goes offline, it interacts with the configuration management system, automatically generates and sends a offline configuration request to achieve rapid recovery of network resources and configuration adjustment. When a device goes online, it collaborates with the configuration management system, the enterprise resource management system, and the department asset approval system to automatically complete the device configuration, resource allocation, and asset approval processes, ensuring the high efficiency and compliance of device online. The above-mentioned automated and intelligent management mechanism significantly improves the efficiency of device resource management, reduces human errors, enhances the real-time response ability and information accuracy of network device management, and thus solves the technical problem in the related art that in the existing multi-system management architecture, each information system operates independently, and the information transfer between systems relies on manual operations, resulting in information islands and seriously reducing the device management response speed.

[0136] Those of ordinary skill in the art can understand that Figure 7 the structure shown is only schematic, and the electronic device can also be a terminal device such as a smart phone, a tablet computer, a handheld computer, and a Mobile Internet Device (MID), a PAD, etc. Figure 7 It does not limit the structure of the above-mentioned electronic device. For example, the electronic device may further include more or fewer components (such as a network interface, a display device, etc.) than those shown Figure 7 in the figure, or have a different configuration from that shown Figure 7 in the figure.

[0137] Those of ordinary skill in the art can understand that all or part of the steps in the various methods of the above embodiments can be completed by instructing the relevant hardware of the terminal device through a program, and the program can be stored in a computer-readable storage medium. The storage medium may include: a flash drive, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk, or an optical disc, etc.

[0138] The following describes the present invention in conjunction with another optional embodiment.

[0139] Embodiment 4

[0140] An embodiment of the present invention also provides a computer-readable storage medium. Optionally, in the embodiment of the present invention, the above computer-readable storage medium may be used to store the program code executed by the resource management method of the network device provided in the first embodiment above.

[0141] Optionally, in the embodiment of the present invention, the above storage medium may be located in any one of the computer terminals in the computer terminal group in the computer network, or in any one of the mobile terminals in the mobile terminal group.

[0142] An embodiment of the present invention also provides a computer program product. When executed on a data processing device, it is adapted to execute a program for the steps of the resource management method of the network device: when a status change of a target network device is detected, obtain status change information; determine a target associated system among N associated systems based on the status change information, where the N associated systems at least include: a configuration management system, an enterprise resource management system, and a department asset approval system, and N is an integer greater than or equal to 3; generate a device change request, and send the device change request to the target associated system, where the target associated system triggers a device change process based on the device change request and performs a device change operation.

[0143] The serial numbers of the above embodiments of the present application are only for description and do not represent the advantages and disadvantages of the embodiments.

[0144] In the above embodiments of the present application, the descriptions of the various embodiments have their own emphases. For the parts not detailed in a certain embodiment, reference may be made to the relevant descriptions of other embodiments.

[0145] In the several embodiments provided by the present application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only illustrative. For example, the division of the units is only a logical function division. In actual implementation, there may be other division methods. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the couplings or direct couplings or communication connections shown or discussed with each other can be through some interfaces, and the indirect couplings or communication connections of the units or modules can be in an electrical or other form.

[0146] The units described as separate components may or may not be physically separated. The components shown as units may or may not be physical units, that is, they may be located in one place, or may be distributed to multiple network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0147] In addition, in each embodiment of the present application, the functional units can be integrated into one processing unit, or each unit can exist physically alone, or two or more units can be integrated into one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of a software functional unit.

[0148] If the above-mentioned integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on such an understanding, the technical solution of the present application, in essence, or the part that contributes to the prior art, or all or part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium and includes several instructions for causing a computer device (which can be a personal computer, a server, or a network device, etc.) to execute all or part of the steps of the methods described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as USB flash drives, read-only memories (ROMs), random access memories (RAMs), mobile hard disks, magnetic disks, or optical discs.

[0149] The above are only the preferred embodiments of the present application. It should be noted that for those of ordinary skill in the art, without departing from the principle of the present application, several improvements and refinements can be made, and these improvements and refinements should also be regarded as the protection scope of the present application.

Claims

1. A resource management method for a network device, characterized in that: Applied to a network management system, the resource management method of the network device includes: When a state change of a target network device is detected, obtaining state change information; Determining a target associated system from N associated systems based on the state change information, the N associated systems at least including: a configuration management system, an enterprise resource management system, and a department asset approval system, where N is an integer greater than or equal to 3; A device change request is generated and sent to the target associated system, wherein the target associated system triggers a device change process based on the device change request and performs a device change operation.

2. The resource management method according to claim 1, characterized in that: Before detecting whether a state change occurs in the target network device, the resource management method of the network device further includes: Receiving a target device identification and a state change request, wherein the state change request is a request submitted by a target user through a network management system to change the state of the target network device, and the type of the state change request includes: an online request or an offline request; The current state of the target network device is acquired, and the state change information is generated based on the current state and the state change request.

3. The resource management method according to claim 2, characterized in that: The step of generating the state change information based on the current state and the state change request comprises: When the current state indicates that the target network device is online and the state change request is an offline request, the state change information is set to be offline; or When the current state indicates that the target network device is offline and the state change request is an online request, the state change information is set to pending online.

4. The resource management method according to claim 2, characterized in that: Before receiving the state change request, the resource management method of the network device further includes: Receiving equipment inventory information transmitted by the department asset approval system, wherein the equipment inventory information is equipment information of stock equipment regularly updated by the department asset approval system based on equipment in and out operations; The device registration list in the network management system is updated based on the device inventory information, wherein the device registration list is used to record device identifications of all the stock devices.

5. The resource management method according to claim 3, characterized in that: The step of determining a target associated system from the N associated systems based on the state change information includes: In the case where the state change information is to be offline, determining that the target associated system is a configuration management system; or, In the case that the status change information is to be put online, it is determined that the target associated system includes a configuration management system, an enterprise resource management system and / or a department asset approval system.

6. The resource management method according to claim 5, characterized in that: In the case where the status change information is to be offline, after determining that the target associated system is a configuration management system, the step of generating a device change request includes: Acquire the online operation status of the target network device, wherein the online operation status at least includes: currently occupied network resources and currently occupied system configuration; Generate a network resource release sub-request based on the currently occupied network resource configuration, and generate a system configuration cancellation sub-request based on the currently occupied system configuration; The device change request corresponding to the offline change operation is generated based on the network resource release sub-request and the system configuration cancellation sub-request.

7. The resource management method according to claim 5, characterized in that: In the case where the status change information is to be put online, after determining that the target associated system includes a configuration management system, an enterprise resource management system, and a department asset approval system, the step of generating a device change request includes: Acquire the device online process and device information of the target network device, and generate an online configuration plan based on the device online process and the device information, wherein the online configuration plan at least includes: network resource configuration and system resource configuration; An online configuration request is generated based on the network resource configuration and the system resource configuration, and the online configuration request is used as the device change request sent to the configuration management system.

8. The resource management method according to claim 7, characterized in that: After the online configuration request is used as the device change request sent to the configuration management system, the resource management method of the network device further includes: Sending the online configuration request to the configuration management system and receiving device ledger information, wherein the configuration management system is used to perform the device online operation and generate the device ledger information, and the device ledger information at least includes: configuration information of the target network device after it goes online; An online approval request is generated based on the equipment ledger information, and the online approval request is used as the equipment change request sent to the enterprise resource management system and the department asset approval system.

9. A resource management device for a network device, characterized in that: Applied to a network management system, the resource management device of the network equipment comprises: An acquisition unit, configured to acquire state change information when a state change of a target network device is detected; A determination unit, configured to determine a target associated system from N associated systems based on the state change information, wherein the N associated systems at least include: a configuration management system, an enterprise resource management system, and a department asset approval system, and N is an integer greater than or equal to 3; The sending unit is used to generate a device change request and send the device change request to the target associated system, wherein the target associated system triggers a device change process based on the device change request and performs a device change operation.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored computer program, wherein when the computer program is executed, the device where the computer-readable storage medium is located is controlled to execute the resource management method for a network device according to any one of claims 1 to 8.

11. An electronic device, characterized in that: It includes one or more processors and a memory, wherein the memory is used to store one or more programs, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement the resource management method of the network device described in any one of claims 1 to 8.

12. A computer program product, characterized in that The method comprises computer instructions, wherein when the computer instructions are executed by a processor, the steps of the resource management method for a network device as claimed in any one of claims 1 to 8 are implemented.

Citation Information

Patent Citations

  • Service publishing method and device, equipment and storage medium

    CN113190440A

  • Automatic network change method and device thereof, equipment and storage medium

    CN113660118A

  • Equipment management method and device, equipment and storage medium

    CN115001966A

  • Equipment asset change management and control method and operation and maintenance platform

    CN116126623A

  • Network equipment full life cycle management method and device and computer equipment

    CN117112347A