Ammeter installation processing method and device

By introducing the installation and processing methods and devices of the meter in the power system, and the automatic flow is achieved by scanning equipment, the problem of cumbersome installation processes of the existing meter is solved, and the process efficiency and performance of the power system are improved.

CN120146787APending Publication Date: 2025-06-13MEIZHOU POWER SUPPLY BUREAU OF GUANGDONG POWER GRID CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510191345.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-20
Publication Date
2025-06-13

AI Technical Summary

Technical Problem

The installation and replacement of electricity meters in the existing power system is complicated, resulting in waste of human resources and prone to errors, and is unable to effectively respond to emergencies, affecting the performance of the power system.

Method used

Through a method and device for installation and processing of electricity meter, scanning equipment and power system are used to interact in real time to realize the automatic flow of meter collection and meter installation processes, and simplify the meter installation and processing process.

Benefits of technology

It realizes the rapid and accurate entry of data collected in new meters, avoids manual errors, simplifies the installation and processing process of the meter, and improves the performance of the power system and the ability to respond to emergency faults.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120146787A_ABST
    Figure CN120146787A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides an ammeter installation processing method and device, and relates to the technical field of power systems. The method comprises the steps that after first scanning information sent by second equipment is received, new table receiving data is determined according to the first scanning information; after second scanning information sent by the second equipment is received, according to the second scanning information, electricity meter related information is determined; and according to the ammeter related information, under the condition that it is determined that the ammeter to be replaced includes a new ammeter, matching the ammeter related information with the new ammeter receiving data, and under the condition of successful matching, filing the ammeter replacement process of the received ammeter to complete installation processing of the ammeter. According to the method, the ammeter installation processing flow can be simplified, and the accuracy, the stability and the high efficiency of power system operation are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the technical field of power systems, and particularly to a method and device for processing electricity meter installation. Background Art

[0002] With the popularization and deepening of electricity, the business of installing and replacing electricity meters is increasing.

[0003] Under the existing operation mode of the power system, when there is a need to install and replace an electricity meter, generally, the business personnel first determine the electricity meter installation work order, and after advancing the process to the electricity meter installation stage, then arrange the corresponding electricity meter installer to pick up and install the meter, so as to complete the installation and processing of the electricity meter.

[0004] This implementation method requires business personnel to perform statistics and filing of electricity meters, which not only consumes a lot of human resources but also prone to errors. Moreover, this implementation method, due to its cumbersome process, cannot effectively respond to emergencies, thus affecting the performance of the power system. Summary of the Invention

[0005] The embodiments of this application provide a method and device for processing electricity meter installation, so as to achieve the effect of simplifying the electricity meter installation processing flow, saving the labor cost and time cost in the electricity meter installation process, and thus improving the performance of the power system.

[0006] In a first aspect, the embodiments of this application provide a method for processing electricity meter installation, which is applied to a first device; the method includes:

[0007] After receiving the first scan information sent by the second device, according to the first scan information, determine the new meter pickup data; wherein, the first scan information at least indicates the scan information of the picked-up electricity meter; the new meter pickup data at least includes the electricity meter identification information and the electricity meter pickup status of the picked-up electricity meter;

[0008] After receiving the second scan information sent by the second device, according to the second scan information, determine the electricity meter related information; wherein, the second scan information indicates the scan information of the electricity meter to be replaced; the electricity meter related information at least includes the basic attribute information and the electricity meter usage information of the electricity meter to be replaced;

[0009] When it is determined that the electricity meter to be replaced includes a new electricity meter according to the electricity meter related information, match the electricity meter related information with the new meter pickup data, and in the case of successful matching, file the meter replacement process of the picked-up electricity meter to complete the installation processing of the electricity meter.

[0010] Optionally, determining the electricity meter related information according to the second scan information includes:

[0011] Determine the scene identification information corresponding to the second scan information;

[0012] According to the scene identification information, determine the electricity meter requirement information that matches the scene identification information;

[0013] According to the electricity meter requirement information and the second scan information, determine the electricity meter related information.

[0014] Optionally, the scene identification information indicates an electricity meter replacement scene; the electricity meter requirement information includes new meter requirement information and old meter requirement information; according to the electricity meter requirement information and the second scan information, determining the electricity meter related information includes:

[0015] Determine the scan information of the new electricity meter and the scan information of the old electricity meter from the second scan information;

[0016] According to the scan information of the new electricity meter and the new meter requirement information, determine the first related information;

[0017] According to the scan information of the old electricity meter and the old meter requirement information, determine the second related information;

[0018] According to the first related information and the second related information, determine the electricity meter related information.

[0019] Optionally, the scene identification information indicates a first installation scene; the electricity meter requirement information includes new meter requirement information; according to the electricity meter requirement information and the second scan information, determining the electricity meter related information includes:

[0020] Determine the third related information that matches the new meter requirement information from the second scan information;

[0021] According to the third related information, determine the electricity meter related information.

[0022] Optionally, the method further includes:

[0023] Receive the third scan information sent by the second device; wherein, the third scan information indicates the identity information of the electricity meter installer;

[0024] Perform an audit process on the third scan information, and after the audit passes, receive the first scan information sent by the second device.

[0025] Optionally, according to the electricity meter related information, determining that the electricity meters to be replaced include new electricity meters includes:

[0026] Detect the meter address information included in the electricity meter related information, and when it is determined that there is a new meter address, determine that the electricity meters to be replaced include new electricity meters; and / or,

[0027] Obtain the meter code data within a preset time period, and when it is determined that the meter code data has a preset abnormality, determine that the meter to be replaced includes a new meter.

[0028] Optionally, the number of the second devices is multiple; the first scan information indicates the scan information of the received meter and the identification information of the second device.

[0029] In a second aspect, an embodiment of the present application provides a method for processing meter installation, which is applied to a second device. The method includes:

[0030] In response to an initiated information scanning instruction, display an information scanning interface;

[0031] Perform a scanning process on a target object based on the information scanning interface to obtain target scanning information; wherein, the target scanning information at least includes: first scanning information, second scanning information, and third scanning information; the first scanning information at least indicates the scanning information of the received meter; the second scanning information indicates the scanning information of the meter to be replaced; the third scanning information indicates the identity information of the meter installer.

[0032] Send the target scanning information to a first device.

[0033] In a third aspect, an embodiment of the present application provides a device for processing meter installation, which is applied to a first device; the device includes:

[0034] A first receiving module, configured to, after receiving the first scanning information sent by a second device, determine new meter receiving data according to the first scanning information; wherein, the first scanning information at least indicates the scanning information of the received meter; the new meter receiving data at least includes the meter identification information and the meter receiving status of the received meter.

[0035] A second receiving module, configured to, after receiving the second scanning information sent by the second device, determine meter-related information according to the second scanning information; wherein, the second scanning information indicates the scanning information of the meter to be replaced; the meter-related information at least includes the basic attribute information and the meter usage information of the meter to be replaced.

[0036] An archiving module, configured to, when it is determined that the meter to be replaced includes a new meter according to the meter-related information, match the meter-related information with the new meter receiving data, and when the matching is successful, archive the meter replacement process of the received meter to complete the meter installation process.

[0037] Optionally, the second receiving module is configured to:

[0038] Determine the scenario identification information corresponding to the second scan information;

[0039] According to the scenario identification information, determine the electricity meter requirement information that matches the scenario identification information;

[0040] According to the electricity meter requirement information and the second scan information, determine the electricity meter related information.

[0041] Optionally, the scenario identification information indicates an electricity meter replacement scenario; the electricity meter requirement information includes new meter requirement information and old meter requirement information; at this time, the second receiving module is used for:

[0042] Determine the scan information of the new electricity meter and the scan information of the old electricity meter from the second scan information;

[0043] According to the scan information of the new electricity meter and the new meter requirement information, determine the first related information;

[0044] According to the scan information of the old electricity meter and the old meter requirement information, determine the second related information;

[0045] According to the first related information and the second related information, determine the electricity meter related information.

[0046] Optionally, the scenario identification information indicates a first installation scenario; the electricity meter requirement information includes new meter requirement information; at this time, the second receiving module is used for:

[0047] Determine the third related information that matches the new meter requirement information from the second scan information;

[0048] According to the third related information, determine the electricity meter related information.

[0049] Optionally, the device further includes: a third receiving module, which is used for:

[0050] Receive the third scan information sent by the second device; wherein, the third scan information indicates the identity information of the electricity meter installer;

[0051] Audit and process the third scan information, and after the audit passes, receive the first scan information sent by the second device.

[0052] Optionally, the archiving module is used for:

[0053] Detect the meter address information included in the electricity meter related information, and when it is determined that there is a new meter address, determine that the electricity meter to be replaced includes a new electricity meter; and / or,

[0054] Obtain the meter code data within a preset time period, and determine that the meter to be replaced includes a new meter when it is determined that the meter code data has a preset anomaly.

[0055] Optionally, the number of the second devices is multiple; the first scan information indicates the scan information of the received meter and the identification information of the second device.

[0056] Fourthly, an embodiment of the present application provides a meter installation processing device, which is applied to a second device. The device includes:

[0057] A response module, configured to display an information scan interface in response to an initiated information scan instruction;

[0058] A scan module, configured to perform a scan process on a target object based on the information scan interface to obtain target scan information; wherein, the target scan information at least includes: first scan information, second scan information, and third scan information; the first scan information at least indicates the scan information of the received meter; the second scan information indicates the scan information of the meter to be replaced; the third scan information indicates the identity information of the meter installer;

[0059] A sending module, configured to send the target scan information to a first device.

[0060] Fifthly, an embodiment of the present application provides a computer device, including: a memory and a processor;

[0061] The memory stores computer execution instructions;

[0062] The processor executes the computer execution instructions stored in the memory, so that the processor executes the above first aspect and / or various possible implementation manners of the first aspect, or executes the implementation manner of the second aspect as described above.

[0063] Sixthly, an embodiment of the present application provides a computer-readable storage medium, in which computer execution instructions are stored, and when the computer execution instructions are executed by a processor, they are used to implement the above first aspect and / or various possible implementation manners of the first aspect, or implement the implementation manner of the second aspect as described above.

[0064] Seventhly, an embodiment of the present application provides a computer program product, including a computer program, and when the computer program is executed by a processor, it implements the above first aspect and / or various possible implementation manners of the first aspect, or implements the implementation manner of the second aspect as described above.

[0065] The method and device for processing electricity meter installation provided by the embodiments of the present application can, after receiving the first scan information sent by the second device, determine the new meter receiving data according to the first scan information, so as to realize the rapid and accurate entry of the new meter receiving data, not only ensuring the timeliness and accuracy of the entry, thus being able to update the receiving status of the received electricity meter in a timely manner, but also avoiding the mistakes that may occur in manual entry. Subsequently, after receiving the second scan information sent by the second device, the electricity meter related information can be determined according to the second scan information, and when it is determined that the electricity meter to be replaced includes a new electricity meter according to the electricity meter related information, the electricity meter related information and the new meter receiving data can be matched, and when the matching is successful, the meter replacement process of the received electricity meter can be archived to complete the installation process of the electricity meter. This implementation method can archive the meter replacement process of the received electricity meter when the new electricity meter installed during on-site meter replacement matches the received electricity meter, thereby completing the closed-loop management of the electricity meter replacement process. This reverse process design of first receiving and installing the electricity meter and then archiving the meter replacement process simplifies the electricity meter installation process in the power system, making the electricity meter installation process in the power system more efficient and convenient, enabling the power system to effectively respond to emergency failures, and thus enabling the power system to operate stably and reliably. BRIEF DESCRIPTION OF THE DRAWINGS

[0066] The accompanying drawings herein are incorporated into and constitute a part of this specification, showing embodiments consistent with the present application and, together with the specification, are used to explain the principles of the present application.

[0067] Figure 1 Schematic flowchart of a method for processing electricity meter installation provided by an embodiment of the present application Figure 1 ;

[0068] Figure 2 Schematic flowchart of a method for processing electricity meter installation provided by an embodiment of the present application Figure 2 ;

[0069] Figure 3 Schematic structural diagram of a system for processing electricity meter installation provided by an embodiment of the present application;

[0070] Figure 4 Schematic flowchart of a method for processing electricity meter installation provided by an embodiment of the present application Figure 3 ;

[0071] Figure 5 Schematic structural diagram of a device for processing electricity meter installation provided by an embodiment of the present application;

[0072] Figure 6 Schematic structural diagram of another device for processing electricity meter installation provided by an embodiment of the present application;

[0073] Figure 7A schematic structural diagram of a computer device provided by an embodiment of the present application.

[0074] Through the above-mentioned drawings, specific embodiments of the present application have been shown, and more detailed descriptions will be provided hereinafter. These drawings and textual descriptions are not intended to limit the scope of the concept of the present application in any way, but to illustrate the concept of the present application to those skilled in the art by referring to specific embodiments. Detailed implementation manners

[0075] Exemplary embodiments will be described in detail herein, and examples are shown in the drawings. When the following description refers to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The implementation manners described in the following exemplary embodiments do not represent all implementation manners consistent with the present application. On the contrary, they are merely examples of devices and methods consistent with some aspects of the present application as detailed in the appended claims.

[0076] Under the existing operation mode of the power system, when there is a need for installation and replacement of electricity meters, generally, after business personnel determine the electricity meter installation work order and push the process to the electricity meter installation stage, corresponding electricity meter installers are then arranged to pick up the meters for installation, thus completing the installation and processing of the electricity meters.

[0077] This implementation manner requires business personnel to conduct statistics and filing of electricity meters, which not only consumes a large amount of human resources but also is prone to human errors, thus affecting the performance of the power system.

[0078] Moreover, in this implementation manner, before the electricity meter installation, it is necessary to go through multiple processes of layer-by-layer transfer, resulting in a rather cumbersome electricity meter installation process. In the face of emergencies, it is impossible to wait for multiple processes to be transferred and completed before conducting electricity meter installation processing. Therefore, usually, emergency situations are first handled on-site, and then the processes are supplemented later. At this time, it is easy to have information omission or errors, thus increasing the complexity and uncertainty of power system management and further affecting the efficient and stable operation of the power system.

[0079] The electricity meter installation processing method provided by the present application can achieve automatic transfer processing of the meter picking-up and installation processes through real-time interactive communication between a scanning device (i.e., the second device) and the power system (i.e., the first device), thereby eliminating the cumbersome processes before meter picking-up and installation, and thus solving the above technical problems.

[0080] The technical solution of the present application and how the technical solution of the present application solves the above technical problems will be described in detail below with specific embodiments. The following several specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments. The embodiments of the present application will be described below with reference to the drawings.

[0081] Figure 1 Flow schematic of a method for installing and processing an electric meter provided by an embodiment of the present application Figure 1 , applied to a first device, such as Figure 1 shown, the method includes:

[0082] S101. After receiving the first scan information sent by the second device, determine the new meter receiving data according to the first scan information.

[0083] Among them, the first scan information at least indicates the scan information of the received electric meter; the new meter receiving data at least includes the electric meter identification information and the electric meter receiving status of the received electric meter.

[0084] In one example, this step can correspond to the link where the electric meter installer receives the meter in the warehouse. At this time, the automatic entry process of the received electric meter can be performed by receiving the first scan information sent by the second device.

[0085] In one example, the scan information of the received electric meter indicated by the first scan information can be understood as the scan information obtained after scanning the meter asset number of the received electric meter according to the second device. Among them, the meter asset number can be displayed in the form of a graphic code. For example, the meter asset code can be a barcode, a QR code, etc.

[0086] At this time, the interaction process between the first device and the second device can be described as follows: The electric meter installer can initiate a new meter scan instruction on the second device and display a new meter scan interface. At this time, the new electric meter can be placed on the new meter scan interface to scan the meter asset number of the new electric meter to obtain the first scan information. At this time, the new electric meter is the received electric meter mentioned above.

[0087] At this time, the scan information of the received electric meter at least includes the unique identification information (i.e., the electric meter identification information) of the received electric meter. For example, the serial number, so that the corresponding electric meter receiving identification can be generated according to the electric meter identification information, and then the new meter receiving data can be determined according to the electric meter identification information and the electric meter receiving identification of the received electric meter.

[0088] At this time, the new meter receiving data can be used to locate the storage location according to the electric meter identification information of the received electric meter, and update the electric meter receiving status of the received electric meter in the database according to the receiving identification, so as to realize the automatic and rapid entry of the meter receiving data and avoid the mistakes of manual operation.

[0089] In a possible implementation manner, if the number of the second devices is multiple, the first scanning information sent by the second devices may further include the identification information of the second devices in addition to the scanning information of the received electricity meters. At this time, the new meter receiving data can be determined according to the scanning information of the received electricity meters and the identification information of the second devices, so that the second devices and the electricity meters scanned and processed by the second devices can be associated and recorded, and thus the installation process of the electricity meters can be realized according to multiple second devices, improving the efficiency of the electricity meter installation process. At the same time, it is also possible to perform statistical analysis on the electricity meters installed and processed by each second device, which is convenient for business adjustment, thereby improving the performance of the power system.

[0090] S102. After receiving the second scanning information sent by the second device, determine the electricity meter related information according to the second scanning information.

[0091] Wherein, the second scanning information indicates the scanning information of the electricity meter to be replaced; the electricity meter related information at least includes the basic attribute information and the electricity meter usage information of the electricity meter to be replaced.

[0092] In one example, this step may correspond to the electricity meter installer performing the electricity meter replacement link on site. At this time, the relevant information of the electricity meter to be replaced, that is, the electricity meter related information, can be determined by receiving the second scanning information sent by the second device, and thus the relevant information of the electricity meter to be replaced can be recorded and verified according to the electricity meter related information.

[0093] In one example, the second scanning information may be the scanning information obtained after photographing and identifying the electricity meter to be replaced. At this time, after photographing the electricity meter to be replaced, the obtained photo may at least include the following information of the electricity meter: meter asset number, meter code, seal data, etc. At this time, the electricity meter related information determined according to the second scanning information may include, but is not limited to, the following information of the electricity meter to be replaced: serial number, model, specification, manufacturer, meter code, seal data, installation information (such as installation location code), check code, etc.

[0094] At this time, the interaction process between the first device and the second device can be described as follows: The electricity meter installer can initiate a meter replacement scanning instruction on site and display a meter replacement scanning interface. At this time, the electricity meter to be replaced can be placed on the meter replacement scanning interface to obtain the second scanning information after photographing and identifying the electricity meter to be replaced.

[0095] S103. When it is determined that the electricity meter to be replaced includes a new electricity meter according to the electricity meter related information, match the electricity meter related information with the new meter receiving data, and when the matching is successful, file the meter replacement process of the received electricity meter to complete the installation process of the electricity meter.

[0096] In one example, in the electricity meter related information, when it is determined that the electricity meter to be replaced includes a new electricity meter, it means that during the electricity meter replacement process on site, a new electricity meter needs to be installed. At this time, the electricity meter replacement process can be triggered. At this time, the electricity meter related information can be matched with the new meter receiving data. When the matching is successful, it is determined that the new electricity meter installed on site matches the received electricity meter. At this time, the replacement process of the received electricity meter can be archived, thus completing the installation process of the electricity meter.

[0097] The electricity meter installation processing method provided by the embodiments of the present application can, after receiving the first scan information sent by the second device, determine the new meter receiving data according to the first scan information, thereby enabling the quick and accurate entry of the new meter receiving data. This not only ensures the timeliness and accuracy of the entry, and can timely update the receiving status of the received electricity meter, but also avoids the mistakes that may occur in manual entry. After that, after receiving the second scan information sent by the second device, the electricity meter related information can be determined according to the second scan information. When it is determined that the electricity meter to be replaced includes a new electricity meter according to the electricity meter related information, the electricity meter related information can be matched with the new meter receiving data. When the matching is successful, the replacement process of the received electricity meter can be archived to complete the installation process of the electricity meter. This implementation method can archive the replacement process of the received electricity meter when the new electricity meter installed during the on-site meter replacement matches the received electricity meter, thereby completing the closed-loop management of the electricity meter replacement process. This reverse process design of first receiving the electricity meter for installation and then archiving the meter replacement process simplifies the electricity meter installation processing process of the power system, makes the electricity meter installation process of the power system more efficient and convenient, enables the power system to effectively respond to emergency faults, and enables the power system to operate stably and reliably.

[0098] Figure 2 It is a flowchart illustration of an electricity meter installation processing method provided by the embodiments of the present application Figure 2 , such as Figure 2 shown. Based on the Figure 1 embodiment, the electricity meter installation processing method is described in detail. The method includes:

[0099] S201. Receive the third scan information sent by the second device.

[0100] Among them, the third scan information indicates the identity information of the electricity meter installer.

[0101] In one example, the embodiments of the present application can verify the identity of the electricity meter installer before the electricity meter installer receives the meter, thereby ensuring the authenticity and reliability of the identity of the electricity meter installer and avoiding property losses.

[0102] Based on this, in a possible implementation, the identity information of the electricity meter installer can be audited and processed according to the second device. At this time, the interaction process between the first device and the second device can be described as follows: After the electricity meter installer initiates a meter replacement scan instruction on-site, the identity scan interface (for example, a face recognition interface) can be displayed first, so as to obtain the identity information (for example, a face image) of the electricity meter installer who receives the electricity meter according to this identity scan interface, that is, the third scan information, and send the obtained identity information of the electricity meter installer to the first device for identity verification according to this identity information of the electricity meter installer.

[0103] S202. Audit and process the third scan information, and after the audit passes, receive the first scan information sent by the second device.

[0104] In an example, after the identity verification of the electricity meter installer passes, the verification passed information can be sent to the second device to display the meter replacement scan interface on the second device. At this time, the electricity meter to be replaced can be placed on the meter replacement scan interface to obtain the second scan information after photographing and identifying the electricity meter to be replaced. Among them, after photographing the electricity meter to be replaced, the obtained photo can at least include the above: meter asset number, meter code, seal data, etc.

[0105] In another possible implementation, an identity verification device can also be set up at the site where the electricity meter is received to audit the identity of the electricity meter installer who receives the electricity meter according to this identity verification device.

[0106] S203. After receiving the first scan information sent by the second device, determine the new meter receiving data according to the first scan information.

[0107] Among them, the first scan information at least indicates the scan information of the received electricity meter; the new meter receiving data at least includes the meter identification information and the meter receiving status of the received electricity meter.

[0108] In an example, this step can refer to the content described in S101 above and will not be elaborated here.

[0109] S204. After receiving the second scan information sent by the second device, determine the scene identification information corresponding to the second scan information.

[0110] Among them, the second scan information indicates the scan information of the electricity meter to be replaced.

[0111] In an example, the scene identification information can indicate the specific scene of the electricity meter replacement on-site. For example, the scene identification information can be used to indicate the electricity meter replacement scene or the first installation scene.

[0112] In one example, while sending the second scan information, the second device can also send the scene identifier corresponding to the second scan information. At this time, the way for the second device to determine the scene identifier corresponding to the second scan information is as follows: If the meter replacement scan instruction initiated in the second device is a meter replacement instruction, then the corresponding scene identifier is used to indicate the meter replacement scene; if the meter replacement scan instruction initiated in the second device is a meter first installation instruction, then the corresponding scene identifier is used to indicate the first installation scene.

[0113] At this time, the application scenario corresponding to the embodiment of the present application can be broadened through the scene identifier information, so as to meet the requirements of various meter installation scenarios.

[0114] S205. Determine the meter demand information that matches the scene identifier information according to the scene identifier information.

[0115] S206. Determine the meter-related information according to the meter demand information and the second scan information.

[0116] Among them, the meter-related information at least includes the basic attribute information of the meter to be replaced and the meter usage information.

[0117] In one example, the basic attribute information of the meter to be replaced may include, but is not limited to, the serial number, model, specification, manufacturer, installation information (such as installation location code), check code, etc. of the meter; the meter usage information may include, but is not limited to, the meter reading, seal data, etc.

[0118] In one example, when the scene identifier information indicates the meter replacement scene, it can be determined that the meter demand information that matches the scene identifier information includes new meter demand information and old meter demand information.

[0119] Optionally, the new meter demand information is used to indicate the basic attribute information and the meter usage information of the new meter, and the old meter demand information is used to indicate the basic attribute information and the meter usage information of the old meter.

[0120] At this time, the scan information of the new meter and the scan information of the old meter can be determined from the second scan information; then, according to the scan information of the new meter and the new meter demand information, the first related information is determined; and according to the scan information of the old meter and the old meter demand information, the second related information is determined; after that, the meter-related information can be determined according to the first related information and the second related information.

[0121] In one example, when the scene identifier information indicates the first installation scene, it can be determined that the meter demand information that matches the scene identifier information includes new meter demand information. Optionally, the new meter demand information is used to indicate the basic attribute information and the meter usage information of the new meter.

[0122] At this time, the third relevant information matching the new meter requirement information can be determined from the second scan information; then, the meter-related information can be determined according to the third relevant information.

[0123] In the above embodiments, the meter-related information can be determined according to the requirement information in different scenarios, so that different meter-related information can be obtained for recording and verification processing in different scenarios, thereby ensuring the stable and accurate operation of the power system.

[0124] S207. Detect the meter address information included in the meter-related information, and when it is determined that there is a new meter address, determine that the meter to be replaced includes a new meter; and / or, obtain the meter code data within a preset time period, and when it is determined that the meter code data has a preset anomaly, determine that the meter to be replaced includes a new meter.

[0125] In one example, the meter address information can be used to locate and identify the meter. At this time, the meter address information can be determined according to the meter-related information. For example, the meter address information may include, but is not limited to, the following in the meter-related information: serial number, manufacturer, installation information (such as installation location code), check code, etc. At this time, if it is determined that there is a new meter address in the meter-related information, it is determined that the meter to be replaced includes a new meter.

[0126] In one example, the preset time period can indicate the time interval for checking the meter code data at the installation site. For example, the preset time period can be 15 minutes or 30 minutes, etc. The value of the preset time period is not limited here and is subject to actual needs.

[0127] In one example, the preset anomaly can be understood as a situation where the meter code data mutates. For example, the meter code data suddenly becomes zero.

[0128] In the above embodiments, it is possible to determine whether there is a new meter to be replaced according to the meter-related information, and / or determine whether there is a new meter to be replaced by analyzing the meter code data at the installation site, so that it is possible to more accurately determine whether there is an act of replacing a new meter, thereby ensuring the accuracy of the filing process.

[0129] S208. When it is determined that the meter to be replaced includes a new meter according to the meter-related information, match the meter-related information with the new meter receiving data, and when the matching is successful, file the meter replacement process of the received meter to complete the installation process of the meter.

[0130] In one example, this step can refer to the content described in S103 above and will not be elaborated here.

[0131] Figure 3Schematic diagram of a structure of an electric meter installation processing system provided by an embodiment of the present application. As Figure 3 shown, the electric meter installation processing system may include a first device and a second device. Among them, the first device may include a metering production system, a metering automation system, and a marketing system. After the process starts, during the stage of receiving meters from the warehouse, an electric meter installer may scan the meter asset number of the received electric meter according to the second device to obtain first scan information, and upload the first scan information to the metering production system. Then, the metering production system may generate new meter receiving data according to the first scan information.

[0132] When the electric meter installer arrives at the site to start installing the electric meter, the electric meter installer may use the second device to scan and process the electric meter to be replaced (for example, in the first installation scenario, the electric meter to be replaced includes a new electric meter; in the electric meter replacement scenario, the electric meter to be replaced includes a new electric meter and an old electric meter) to obtain second scan information, and upload the second scan information to the metering automation system.

[0133] After receiving the second scan information, the metering automation system may generate a meter replacement event record, determine electric meter related information according to the second scan information, and determine whether the electric meter to be replaced includes a new electric meter according to the electric meter related information. If it is determined that it includes, it triggers the meter replacement process and sends the electric meter related information to the marketing system.

[0134] The marketing system may perform matching processing according to the electric meter related information and the new meter receiving data generated in the metering production system, and in the case of successful matching, file the meter replacement process of the received electric meter, thereby completing the closed-loop management of the electric meter installation processing process.

[0135] Figure 4 Flow schematic of an electric meter installation processing method provided by an embodiment of the present application Figure 3 , applied to the second device. As Figure 4 shown, the method includes:

[0136] S301. In response to an initiated information scanning instruction, display an information scanning interface.

[0137] In one example, the information scanning instruction may be the above-mentioned new meter scanning instruction, and the corresponding information scanning interface to be displayed may be the above-mentioned new meter scanning interface. The information scanning instruction may also be the above-mentioned meter replacement scanning instruction. At this time, the corresponding information scanning interface to be displayed may be the above-mentioned meter replacement scanning interface, which will not be elaborated in detail here.

[0138] S302. Based on the information scanning interface, perform scanning processing on a target object to obtain target scan information.

[0139] Among them, the target scan information at least includes: first scan information, second scan information, and third scan information; the first scan information at least indicates the scan information of the received electricity meter; the second scan information indicates the scan information of the electricity meter to be replaced; the third scan information indicates the identity information of the electricity meter installer.

[0140] In one example, when the information scan interface is the new meter scan interface, the target object can be the received electricity meter; when the information scan interface is the meter replacement scan interface, the target object can be the electricity meter to be replaced.

[0141] S303. Send the target scan information to the first device.

[0142] Figure 5 The structural schematic diagram of an electricity meter installation processing device provided by an embodiment of the present application is as Figure 5 shown. The electricity meter installation processing device 500 provided in this embodiment is applied to the first device and includes:

[0143] The first receiving module 501 is configured to, after receiving the first scan information sent by the second device, determine the new meter receiving data according to the first scan information; wherein, the first scan information at least indicates the scan information of the received electricity meter; the new meter receiving data at least includes the electricity meter identification information and the electricity meter receiving status of the received electricity meter;

[0144] The second receiving module 502 is configured to, after receiving the second scan information sent by the second device, determine the electricity meter related information according to the second scan information; wherein, the second scan information indicates the scan information of the electricity meter to be replaced; the electricity meter related information at least includes the basic attribute information and the electricity meter usage information of the electricity meter to be replaced;

[0145] The filing module 503 is configured to, when it is determined that the electricity meter to be replaced includes a new electricity meter according to the electricity meter related information, match the electricity meter related information with the new meter receiving data, and when the matching is successful, file the meter replacement process of the received electricity meter to complete the installation processing of the electricity meter.

[0146] Optionally, the second receiving module 502 is configured to:

[0147] Determine the scenario identification information corresponding to the second scan information;

[0148] Determine the electricity meter requirement information matching the scenario identification information according to the scenario identification information;

[0149] Determine the electricity meter related information according to the electricity meter requirement information and the second scan information.

[0150] Optionally, the scenario identification information indicates the electricity meter replacement scenario; the electricity meter requirement information includes new meter requirement information and old meter requirement information; at this time, the second receiving module 502 is configured to:

[0151] Determine the scanning information of the new electric meter and the scanning information of the old electric meter from the second scanning information;

[0152] Determine the first relevant information according to the scanning information of the new electric meter and the new meter requirement information;

[0153] Determine the second relevant information according to the scanning information of the old electric meter and the old meter requirement information;

[0154] Determine the electric meter relevant information according to the first relevant information and the second relevant information.

[0155] Optionally, the scenario identification information indicates the first installation scenario; the electric meter requirement information includes the new meter requirement information; at this time, the second receiving module 502 is used for:

[0156] Determine the third relevant information matching the new meter requirement information from the second scanning information;

[0157] Determine the electric meter relevant information according to the third relevant information.

[0158] Optionally, the device further includes: a third receiving module 504, configured to:

[0159] Receive the third scanning information sent by the second device; wherein, the third scanning information indicates the identity information of the electric meter installer;

[0160] Audit and process the third scanning information, and after the audit is passed, receive the first scanning information sent by the second device.

[0161] Optionally, the filing module 503 is used for:

[0162] Detect the meter address information included in the electric meter relevant information, and determine that the new electric meter is included in the electric meter to be replaced when a new meter address exists; and / or,

[0163] Obtain the meter code data within a preset time period, and determine that the new electric meter is included in the electric meter to be replaced when it is determined that the meter code data has a preset anomaly.

[0164] Optionally, the number of the second devices is multiple; the first scanning information indicates the scanning information of the received electric meter and the identification information of the second device.

[0165] Figure 6 This is a schematic structural diagram of another electric meter installation processing device provided by an embodiment of the present application. As Figure 6 shown, the electric meter installation processing device 600 provided in this embodiment is applied to the second device and includes:

[0166] A response module 601, configured to display an information scanning interface in response to an initiated information scanning instruction;

[0167] A scanning module 602, configured to perform a scanning process on a target object based on the information scanning interface to obtain target scanning information; wherein, the target scanning information at least includes: first scanning information, second scanning information, and third scanning information; the first scanning information at least indicates the scanning information of the received electricity meter; the second scanning information indicates the scanning information of the electricity meter to be replaced; the third scanning information indicates the identity information of the electricity meter installer;

[0168] A sending module 603, configured to send the target scanning information to a first device.

[0169] The electricity meter installation processing device provided in this embodiment can execute the method provided in the above method embodiment, and its implementation principle and technical effect are similar, which will not be elaborated here in this embodiment.

[0170] Figure 7 It is a schematic structural diagram of a computer device provided in an embodiment of the present application. As Figure 7 shown, the computer device 700 provided in this embodiment includes: at least one processor 701 and a memory 702. Optionally, the computer device 700 further includes a communication component 703. Among them, the processor 701, the memory 702, and the communication component 703 are connected through a bus 704.

[0171] In a specific implementation process, at least one processor 701 executes computer execution instructions stored in the memory 702, so that at least one processor 701 executes the above method.

[0172] The specific implementation process of the processor 701 can be referred to in the above method embodiment, and its implementation principle and technical effect are similar, which will not be elaborated here in this embodiment.

[0173] In the above embodiment, it should be understood that the processor may be a central processing unit (English: Central Processing Unit, abbreviated: CPU), or may also be other general-purpose processors, digital signal processors (English: Digital Signal Processor, abbreviated: DSP), application specific integrated circuits (English: Application Specific Integrated Circuit, abbreviated: ASIC), etc. The general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc. The steps of the method disclosed in combination with the invention can be directly embodied as being executed by a hardware processor, or executed by a combination of hardware and software modules in the processor.

[0174] The memory may include a Random Access Memory (RAM), and may also include a Non-volatile Memory (NVM), such as at least one disk memory.

[0175] The bus may be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus, an Extended Industry Standard Architecture (EISA) bus, etc. The bus can be divided into an address bus, a data bus, a control bus, etc. For the sake of convenience in representation, the buses in the drawings of this application are not limited to only one bus or one type of bus.

[0176] This application also provides a computer program product, including a computer program which, when executed by a processor, implements the above method.

[0177] This application also provides a computer-readable storage medium storing computer-executable instructions, and when the processor executes the computer-executable instructions, the above method is implemented.

[0178] The above-readable storage medium can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as Static Random Access Memory (SRAM), Electrically Erasable Programmable Read-Only Memory (EEPROM), Erasable Programmable Read-Only Memory (EPROM), Programmable Read-Only Memory (PROM), Read-Only Memory (ROM), magnetic memory, flash memory, a disk or an optical disc. The readable storage medium can be any available medium accessible by a general-purpose or special-purpose computer.

[0179] An exemplary readable storage medium is coupled to the processor, enabling the processor to read information from the readable storage medium and write information to the readable storage medium. Of course, the readable storage medium can also be a component of the processor. The processor and the readable storage medium can be located in an Application Specific Integrated Circuit (ASIC). Of course, the processor and the readable storage medium can also exist as discrete components in a device.

[0180] The division of units is only a logical function division. In actual implementation, there may be other division methods. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the couplings or direct couplings or communication connections shown or discussed among each other can be indirect couplings or communication connections through some interfaces, devices or units, and can be in electrical, mechanical or other forms.

[0181] The units described as separate components may or may not be physically separated. The components shown as units may or may not be physical units, that is, they can be located in one place, or can be distributed to multiple network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0182] In addition, in each embodiment of the present invention, each functional unit can be integrated in a processing unit, or each unit can exist physically alone, or two or more units can be integrated in one unit.

[0183] If the function is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or this part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions for causing a computer device (which can be a personal computer, a server, or a network device, etc.) to execute all or part of the steps of the methods in each embodiment of the present invention. And the aforementioned storage medium includes: USB flash drives, mobile hard disks, read-only memories (ROM, Read-Only Memory), random access memories (RAM, Random Access Memory), magnetic disks or optical discs and other various media that can store program codes.

[0184] Those of ordinary skill in the art can understand that all or part of the steps of implementing the above method embodiments can be completed by hardware related to program instructions. The aforementioned program can be stored in a computer-readable storage medium. When the program is executed, it executes the steps including the above method embodiments; and the aforementioned storage medium includes: ROM, RAM, magnetic disks or optical discs and other various media that can store program codes.

[0185] Finally, it should be noted that those skilled in the art will readily conceive of other embodiments of the present invention after considering the specification and practicing the invention disclosed herein. The present invention is intended to cover any variations, uses, or adaptations of the present invention, which follow the general principles of the present invention and include known common knowledge or conventional technical means in the technical field not disclosed in the present invention. It is not limited to the exact structures described above and shown in the drawings, and various modifications and changes can be made without departing from its scope. The scope of the present invention is only limited by the appended claims.

Claims

1. A method for installing an electric meter, characterized in that: Applied to a first device; the method comprises: After receiving the first scanning information sent by the second device, determine the new meter collection data according to the first scanning information; wherein the first scanning information at least indicates the scanning information of the collected meter; the new meter collection data at least includes the meter identification information and the meter collection status of the collected meter; After receiving the second scanning information sent by the second device, determining the electric meter related information according to the second scanning information; wherein the second scanning information indicates the scanning information of the electric meter to be replaced; the electric meter related information includes at least the basic attribute information and the electric meter usage information of the electric meter to be replaced; According to the meter-related information, when it is determined that the meter to be replaced includes a new meter, the meter-related information is matched with the new meter collection data, and when the match is successful, the meter replacement process of the collected meter is archived to complete the installation of the meter.

2. The method according to claim 1, characterized in that Determining the electric meter related information according to the second scanning information includes: Determining scene identification information corresponding to the second scanning information; Determining, according to the scene identification information, electric meter demand information matching the scene identification information; The electricity meter related information is determined according to the electricity meter demand information and the second scanning information.

3. The method according to claim 2, characterized in that The scenario identification information indicates an electric meter replacement scenario; the electric meter requirement information includes new meter requirement information and old meter requirement information; and determining the electric meter related information according to the electric meter requirement information and the second scanning information, including: Determining scanning information of a new electric meter and scanning information of an old electric meter from the second scanning information; Determining first relevant information according to the scanning information of the new electricity meter and the new meter requirement information; Determine second related information according to the scanning information of the old meter and the demand information of the old meter; The electric meter related information is determined according to the first related information and the second related information.

4. The method according to claim 2, characterized in that: The scenario identification information indicates a first installation scenario; the electric meter requirement information includes new meter requirement information; and determining the electric meter related information according to the electric meter requirement information and the second scanning information includes: Determining, from the second scan information, third relevant information that matches the new table requirement information; The electric meter related information is determined according to the third related information.

5. The method according to claim 1, characterized in that The method further comprises: Receiving third scanning information sent by the second device; wherein the third scanning information indicates identity information of an electric meter installer; The third scanning information is audited and processed, and after the audit is passed, the first scanning information sent by the second device is received.

6. The method according to claim 1, characterized in that Determining, based on the relevant information of the electric meter, that the electric meter to be replaced includes a new electric meter includes: Detecting the meter address information included in the meter-related information, and determining that the to-be-replaced meter includes a new meter when a new meter address exists; and / or, The meter code data within a preset time period is acquired, and when it is determined that a preset abnormality occurs in the meter code data, it is determined that the to-be-replaced electric meter includes a new electric meter.

7. The method according to any one of claims 1 to 6, characterized in that There are multiple second devices; the first scanning information indicates the scanning information of the received electricity meter and the identification information of the second device.

8. A method for installing an electric meter, characterized in that: Applied to the second device, the method includes: In response to the initiated information scanning instruction, displaying the information scanning interface; Scanning the target object based on the information scanning interface to obtain target scanning information; wherein the target scanning information at least includes: first scanning information, second scanning information and third scanning information; the first scanning information at least indicates the scanning information of the received electric meter; the second scanning information indicates the scanning information of the electric meter to be replaced; the third scanning information indicates the identity information of the person who installed the electric meter; The target scanning information is sent to the first device.

9. An electric meter installation processing device, characterized in that: Applied to a first device; the device comprises: A first receiving module, configured to determine new meter collection data according to the first scanning information after receiving the first scanning information sent by the second device; wherein the first scanning information at least indicates scanning information of the collected meter; and the new meter collection data at least includes meter identification information and meter collection status of the collected meter; A second receiving module, configured to determine the information related to the electric meter according to the second scanning information after receiving the second scanning information sent by the second device; wherein the second scanning information indicates the scanning information of the electric meter to be replaced; and the information related to the electric meter at least includes basic attribute information and usage information of the electric meter to be replaced; The archiving module is used to determine, based on the relevant information of the meter, that the meter to be replaced includes a new meter, match the relevant information of the meter with the data for receiving the new meter, and if the match is successful, archive the meter replacement process of the received meter to complete the installation process of the meter.

10. An electric meter installation processing device, characterized in that: Applied to a second device, the apparatus comprises: A response module, used to respond to the initiated information scanning instruction and display the information scanning interface; A scanning module, configured to scan the target object based on the information scanning interface to obtain target scanning information; wherein the target scanning information at least includes: first scanning information, second scanning information and third scanning information; the first scanning information at least indicates scanning information of the received electric meter; the second scanning information indicates scanning information of the electric meter to be replaced; the third scanning information indicates identity information of the person who installs the electric meter; A sending module is used to send the target scanning information to the first device.