Land full-process management method and system, electronic equipment and storage medium
Through the full-process land management method of the collection, approval and inspection modules, the problem of incomplete information of homesteads and collective construction land is solved, the accuracy of information and targeted inspections are achieved, and management efficiency and accuracy are improved.
Patent Information
- Application Number
- CN202510276616.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-10
- Publication Date
- 2025-07-25
AI Technical Summary
In urban-rural fringe areas and urban village areas, the information of homesteads and collective construction land is incomplete, and the means of safety hazard investigation and rectification are single, resulting in the inability to trace the source and omission of cross-operation, problems.
By collecting land information, approving based on preset information approval process, and patroling based on inspection templates, combining automatic judgment on whether rectification is needed and sending data to the review node to achieve full process management.
Ensure the accuracy of land information and the pertinence of inspection work, improve the accuracy and efficiency of the entire land process management, reduce manual intervention, and achieve timely discovery and precise positioning of rectification needs.
Smart Images

Figure CN120374025A_ABST
Abstract
Description
Background Art
[0002] With the progress of urbanization, a large number of people have flocked into cities, and more housing is needed to accommodate the large population. Therefore, there are behaviors such as new construction, reconstruction, and expansion of houses on homesteads and collective construction lands in special areas such as the urban-rural fringe and urban villages. At the same time, there are also behaviors such as unauthorized change of the use function of houses and illegal use for production and operation, especially the self-built houses that are reconstructed and converted into crowded places. Once any safety hazard occurs and is not discovered in time, it may cause serious losses to people's lives and property.
[0003] Currently, the information of homesteads and collective construction lands in the urban-rural fringe and urban village areas is still recorded in traditional paper books, resulting in unclear bases and incomplete information records. Moreover, the means of investigating and rectifying potential safety hazards are single, that is, discovering and rectifying one by one. Therefore, there are problems such as cross-operation, inability to trace problems, and easy omission. Therefore, there is an urgent need to provide a technical solution to solve the above problems. Summary of the Invention
[0004] To solve the above technical problems, the present invention provides a land full-process management method, system, electronic device, and storage medium.
[0005] In the first aspect, the present invention provides a land full-process management method, and the technical solution of this method is as follows: Collect land information of the land to be managed according to the land type of the land to be managed; Approve the land information based on a preset information approval process to obtain an approval result; When the approval result passes, conduct inspections on the land to be managed according to the inspection template corresponding to the land to be managed, so as to realize the full-process management of the land to be managed.
[0006] The beneficial effects of a land full-process management method of the present invention are as follows: The method of the present invention ensures the accuracy of land information. At the same time, relying on the inspection template for inspections improves the pertinence of inspection work, thereby overall improving the accuracy and efficiency of land full-process management.
[0007] On the basis of the above solution, a land full-process management method of the present invention can also be improved as follows.
[0008] In an optional manner, the land full-process management method further includes: Judge whether to rectify the land to be managed according to the inspection result of the land to be managed to obtain a judgment result; When the judgment result is yes, according to the inspection result, determine the data to be rectified for the land to be managed, and send the data to be rectified to the target audit node for audit.
[0009] In the above optional method, by automatically judging whether rectification is needed and determining the data to be rectified, manual intervention is reduced, timely discovery and accurate positioning of rectification requirements are ensured, and at the same time, the data to be rectified is sent to the audit node to realize the closed-loop management of the rectification process, improving the efficiency and accuracy of the rectification work.
[0010] In an optional way, the land types include: homesteads and collective construction lands; the land information corresponding to the demolished bases includes at least one of the following information: basic information, family member information, house rental information, and house details information; the land information corresponding to the collective construction lands includes at least one of the following information: basic ownership information and production and operation information.
[0011] In the above optional method, providing a clear distinction between land types and the land information corresponding to the land types makes information collection and management more refined and systematic, helps to carry out precise management and decision-making support for different types of land, and improves the effectiveness and pertinence of land management.
[0012] In an optional way, the steps of approving the land information include: Determine the change information of the land information, and send the change information to the target approval node for approval.
[0013] In the above optional method, by determining the change information of the land information and sending it to the target approval node, the transparency and traceability of the approval process are ensured, which helps to timely discover and correct potential problems in the change of land information, and improves the accuracy and efficiency of approval.
[0014] In an optional way, the steps of inspecting the land to be managed according to the inspection template corresponding to the land to be managed to realize the whole-process management of the land to be managed include: Configure the inspection content according to the inspection template corresponding to the land to be managed; Inspect the land to be managed according to the inspection content to obtain an inspection result, so as to realize the whole-process management of the land to be managed; among them, the inspection content includes at least one of the following inspection contents: land information verification, land boundary verification, land use situation inspection, facility and structure verification, abnormal situation recording, environmental condition inspection, and safety measure verification.
[0015] In the above optional method, by configuring detailed inspection content and conducting comprehensive inspections, the comprehensiveness and systematicness of the inspection work are ensured, which helps to promptly discover and solve various problems in land management, improve the pertinence and effectiveness of the inspection work, and achieve refined management of the entire process.
[0016] Second, the present invention provides a land full-process management system, and the technical solution of this system is as follows: The land full-process management system includes: a collection module, an approval module, and an inspection module; The collection module is used to: collect land information of the land to be managed according to the land type of the land to be managed; The approval module is used to: approve the land information based on a preset information approval process to obtain an approval result; The inspection module is used to: when the approval result passes, inspect the land to be managed according to the inspection template corresponding to the land to be managed, so as to realize the full-process management of the land to be managed.
[0017] The beneficial effects of a land full-process management system of the present invention are as follows: The system of the present invention ensures the accuracy of land information. At the same time, relying on the inspection template for inspections improves the pertinence of the inspection work, thereby overall improving the accuracy and efficiency of land full-process management.
[0018] On the basis of the above solution, a land full-process management system of the present invention can also be improved as follows.
[0019] In an optional method, the land full-process management system further includes a rectification module, and the rectification module is used to: Judge whether to rectify the land to be managed according to the inspection result of the land to be managed to obtain a judgment result; When the judgment result is yes, determine the data to be rectified for the land to be managed according to the inspection result, and send the data to be rectified to a target review node for review.
[0020] In the above optional method, by automatically judging whether rectification is needed and determining the data to be rectified, manual intervention is reduced, timely discovery and accurate positioning of rectification requirements are ensured, and at the same time, the data to be rectified is sent to the review node to realize the closed-loop management of the rectification process, improving the efficiency and accuracy of the rectification work.
[0021] In an alternative embodiment, the land types include: homesteads and collective construction land; the land information corresponding to the demolished homesteads includes at least one of the following: basic information, family member information, house rental information, and house details information; the land information corresponding to the collective construction land includes at least one of the following: basic ownership information and production and operation information.
[0022] In the above alternative embodiment, clearly distinguishing the land types and the land information corresponding to the land types makes information collection and management more refined and systematic, helps to conduct precise management and decision support for different types of land, and improves the effectiveness and pertinence of land management.
[0023] In a third aspect, a technical solution of an electronic device according to the present invention is as follows: It includes a memory, a processor, and a program stored on the memory and running on the processor. When the processor executes the program, it implements the steps of the land full-process management method of the present invention.
[0024] In a fourth aspect, a technical solution of a computer-readable storage medium provided by the present invention is as follows: Instructions are stored in the computer-readable storage medium. When the computer-readable storage medium reads the instructions, it causes the computer-readable storage medium to execute the steps of the land full-process management method of the present invention.
[0025] The above description is only an overview of the technical solution of the present invention. In order to be able to understand the technical means of the present invention more clearly, it can be implemented according to the content of the specification. And in order to make the above and other objects, features, and advantages of the present invention more obvious and understandable, the following specific embodiments of the present invention are given. Description of the Drawings
[0026] The drawings are only used to illustrate the embodiments and are not considered to be a limitation of the present invention. Moreover, throughout the drawings, the same reference numerals are used to represent the same components. In the drawings: Figure 1 is a flowchart of an embodiment of a land full-process management method of the present invention; Figure 2 is a flowchart for configuring an inspection template; Figure 3 is a schematic diagram of the principle of a land full-process management method of the present invention; Figure 4 is a schematic structural diagram of an embodiment of a land full-process management system of the present invention; Figure 5 is a schematic structural diagram of an embodiment of an electronic device of the present invention. Detailed Embodiments
[0027] Exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments set forth herein.
[0028] Figure 1 The flowchart of an embodiment of a full-process land management method provided by the present invention is shown. This method is executed by a controller. As Figure 1 shown, it includes the following steps: S1. According to the land type of the land to be managed, collect the land information of the land to be managed. In S1: 1) The land types are divided into homesteads and collective construction land.
[0029] 2) The land information of the homestead includes at least one of the following information: ① Basic information: household head's name, ID number, contact phone number, place of household registration, household nature, occupation. ② Family member information: number, member's name, member's ID number. ③ House rental information: name of the lessee, ID number, place of household registration, contact phone number. ④ Details of the homestead and the house: house structure, number of above-ground and underground floors.
[0030] The land information of the collective construction land includes: ① Basic ownership information: information of the land contractor, house builder, and house lessee (if any). ② Production and operation information: unit name, contact phone number, industry classification, supervision category.
[0031] 3) All the collected land information will be integrated into the developed data collection template to ensure that all key data points are covered. The following requirements are for the land information in the data collection template: ① Required fields: In the land information of the homestead, the household head's name, ID number, etc. are the basis for identifying the household head's identity and subsequent management, so they are set as required fields; at the same time, if the house involves rental behavior, the ID number, name, and contact information of the lessee are set as required fields for the management of the floating population.
[0032] In the land information of the collective construction land, it is found through research that there may be overlapping situations among the land contractor, house builder, and house lessee. Therefore, the land contractor information is set as a required field. ② Data types: For names, addresses, unit names, etc., they are stored in string form; for ages, number of above-ground and underground floors, etc., they are stored in numerical form. ③ Format requirements: Specify the specific format of data input, such as the 18-digit ID number format and the 11-digit phone number format, to reduce errors. ④ Create a form based on JavaScript and set the required fields, data types, and validation rules according to the content in ①, ②, and ③. Among them, the ID number is of string type, and a regular expression is set to validate the 18-digit format; the phone number is of string type, and a regular expression is set to validate the 11-digit numeric format.
[0033] Specifically, the controller collects the land information of the land to be managed according to the land type of the land to be managed.
[0034] S2. Based on a preset information approval process, approve the land information to obtain an approval result. In S2: 1) The preset information approval process involves efficient approval at multiple levels of approval nodes. Each piece of information that needs to be approved can be uploaded level by level to the corresponding approval nodes for approval. For example, the levels are the first approval node and the second approval node from low to high. The land information that needs to be approved will first be uploaded to the first approval node for approval. When the uploaded information meets the corresponding requirements or conditions for the land information of the homestead and collective construction land and can be judged by the first approval node, the approval result will be returned. If the first approval node cannot make a judgment, it will be uploaded to the second approval node at a higher level for approval. After the approval is completed, the approval result will be returned level by level.
[0035] Specifically, the controller further approves the land information based on the preset information approval process to obtain an approval result.
[0036] S3. When the approval result passes, conduct inspections on the land to be managed according to the inspection template corresponding to the land to be managed to achieve full-process management of the land to be managed. In S3: 1) The inspection templates include the homestead inspection template and the collective construction land inspection template. Each template corresponds to the content that needs to be configured (homestead inspection content and collective construction land inspection content). Among them, if the collective construction land involves production and operation, inspection content related to the industry needs to be configured (including but not limited to: inspection of land use compliance, environmental protection inspection, work safety inspection, construction planning inspection, health and epidemic prevention inspection, labor protection inspection, tax and business qualification inspection, infrastructure and public service inspection, fire safety inspection, industry special requirement inspection). If the collective construction land does not involve production and operation, skip the configuration of inspection content related to the industry and directly conduct the same inspection content configuration as the homestead (including but not limited to: land information verification, land boundary verification, land use situation inspection, facility and structure verification, abnormal situation recording, environmental condition inspection, and safety measure verification).
[0037] Specifically, when the approval result passes, the controller further conducts inspections on the land to be managed according to the inspection template corresponding to the land to be managed to obtain an inspection result, so as to achieve full-process management of the land to be managed.
[0038] The technical solution of this embodiment ensures the accuracy of land information. At the same time, relying on the inspection template for inspections improves the pertinence of inspection work, thereby overall enhancing the accuracy and efficiency of the entire land management process.
[0039] It should be noted that through the integration of API interfaces, the automatic filling and verification of some land information data can be achieved. The specific content is as follows: ① Interface docking: First, clarify the acquisition of land-related information from the natural resources department, including information such as household heads and ID cards; obtain information such as place of household registration and family members from the civil affairs department; obtain enterprise production and operation information from the market supervision department. Furthermore, clarify the interfaces for obtaining information. Since the interface docking requirements of the civil affairs department require HTTPS communication and use the OAuth2 authentication mechanism for access control, an effective access token is obtained according to the above requirements; the market supervision department needs to provide the unified social credit code of the calling party as a query parameter. Therefore, different API interface call codes are written for different data docking and integrated into a unified data collection template. When the user enters relevant information, the JavaScript code will call the corresponding API interface, process the returned data, and set reasonable access permissions. Administrators can access all interfaces and perform queries but cannot edit. Ordinary users can only access some data interfaces according to their functional scopes. ② Automatic filling: In the data collection template, functions are written for the fixed fields that need to be automatically filled to retrieve the verification results and required data by calling the corresponding API interfaces. When the user enters the ID number, the front-end captures the form input event, calls the API interface of the natural resources department, passes the ID number as a parameter to the verification function. The verification function constructs the request parameters and sends an HTTP request to the natural resources department interface, and parses the ISON data after the interface response to verify the authenticity of the ID number. If the ID number is valid, the verification function further calls another function to obtain the place of household registration information of the ID card, and finally fills the obtained information into the corresponding fields of the data collection template to reduce the repeatability and error rate of manual entry.
[0040] In addition, in this embodiment, a map application is developed using the uniApp mobile application development framework in combination with leaflet. Specifically, the base map URL of the third-party map service is configured as the map source in the leaflet map using the online map source (Tianditu). The display style of the map can be adjusted through the leaflet style editor.
[0041] For determining the boundary layer of houses. Further, based on the basic surveying and mapping data of the 1:2000 topographic map and the 0.2-meter orthophoto image, the spatial information of houses and courtyards in the oblique three-dimensional model is extracted to extract the house boundary and courtyard boundary, and the house primitives are uniquely coded. In adjusting the spatial topological relationship between courtyard data and house data: The courtyard data must include but not be limited to the house data, but cannot cross the road, and the house data cannot exceed the courtyard data. There should be no overlapping or self-intersection between courtyard data.
[0042] Obtain the distributed service address of the house boundary data through an HTTP request, and the data format is GeoJSON. Use leaflet-vectorTile to convert the vector and attributes of the house boundary data into the supported Polygon or MultiPolygon format. Overlay the Polygon object on the base map through addTo of leaflet. Ensure the clarity of the house boundary by adjusting the z-index, transparency, boundary color, and fill color attributes of the layer.
[0043] Integrate leaflet controls to listen for touch events (click, long press, drag, etc.) on the map to achieve interaction with the house boundary layer. When the user clicks on a certain house boundary, the click event handling function is triggered. Determine whether the coordinates of the click event intersect with the features of the house boundary layer. If confirmed, obtain the household head's name, ID number, and other land information of the house from the background according to the ID of the clicked house, and display the above land information in a pop-up window on the map for the collection personnel to input and edit information.
[0044] This embodiment is implemented with the help of mobile intelligent devices (smartphones, tablets). After the collector logs in, the terminal judges the user's permissions, such as: village level, town level, district level. Thus, the content within the permission range is automatically loaded. And based on the data collection template and the data content formed by automatic data filling verification, combined with touch events, display the list that has passed the verification and is automatically filled. The collector supplements various information according to the actual rental situation and production and operation situation of the homestead or collective construction land, and confirms the location through the GPS / Beidou positioning of the mobile device. The terminal checks the integrity and rationality of the data in real time. Give prompts for data that does not meet the requirements and require re-entry.
[0045] Based on the above work, the terminal receives a submission request at this time as the trigger condition for color change. According to the status of information collection (submitted, not collected, selected), the terminal sets different color coding rules. The patches corresponding to the information that has been submitted and passed the verification are changed to green to indicate that the status of this area has been updated and the data is complete and valid; the patches corresponding to the information that has been filled but not submitted, i.e., the pending submission status, are orange-yellow. Based on the above color coding rules, the terminal uses a graphics rendering engine to dynamically update the colors of the patches on the map. After the change is completed, the collector continues to collect information in other areas, and the terminal continuously monitors and processes new submission requests to ensure the smooth progress of the entire information collection process.
[0046] In an alternative approach, the land full-process management method further includes: judging whether to rectify the land to be managed according to the inspection results of the land to be managed, to obtain a judgment result; When the judgment result is yes, according to the inspection results, determine the data to be rectified for the land to be managed, and send the data to be rectified to the target audit node for audit.
[0047] It should be noted that the process of sending the data to be rectified to the target audit node for audit is similar to the approval process. Further, the audit process involves multiple levels of audit nodes for efficient audit, and each piece of information to be audited can be uploaded level by level to the corresponding level of audit nodes for audit. For example, the levels are the first audit node and the second audit node from low to high. The land information to be audited will first be uploaded to the first audit node for audit. When the uploaded information meets the above requirements or conditions corresponding to the land information of homesteads and collective construction land and can be judged by the first audit node, the audit result will be returned. If the first audit node cannot make a judgment, it will be uploaded to the second audit node at a higher level for audit. After the audit is completed, the audit result will be returned level by level.
[0048] In the reporting and review of problems, the specific process is as follows: ① The auditor receives the problem: The auditor logs in to the terminal and checks the inspection results (problem spots and inspection records) submitted by the inspector. ② Analysis and judgment: The auditor judges whether to rectify the land to be managed based on the inspection results, analyzes the nature and severity of the problem, gives the judgment result and issues rectification opinions containing the data to be rectified, and selects the responsible unit and rectification period. ③ Problem transfer: After the review is completed, the terminal sends the data to be rectified to the target review node (such as the corresponding responsible unit for rectification) for review, and notifies the relevant responsible person. Because the review is divided into multiple levels (such as village level, town level, district level). When it comes to village-level problems: first push it to the town to which it belongs for review; if the town can judge and handle it, the town level will directly review and rectify it based on the data to be rectified; if the town cannot judge or handle it, the data to be rectified will be pushed to the district-level committee, office and bureau for further review and rectification, and so on to complete the flow of problems.
[0049] In addition, the process of carrying out rectification includes: ① On-site rectification: The responsible unit for rectification organizes personnel to carry out on-site rectification according to the audit opinions, and takes photos and records of the rectification process and the on-site situation after the rectification. ② Rectification feedback: After the rectification is completed, the responsible unit for rectification uploads the rectification photos and rectification report to the terminal and submits them to the auditor for review. The review process is: The auditor analyzes and determines whether the rectification is in place based on the photos and rectification reports before and after the rectification. If the rectification is in place, the problem is closed-loop solved; if the rectification is not in place, it will be returned to the rectification department for further rectification until the problem is completely resolved.
[0050] Specifically, the controller further determines whether to rectify the land to be managed based on the inspection results of the land to be managed, and obtains a judgment result; when the judgment result is yes, the data to be rectified of the land to be managed is determined based on the inspection results, and the data to be rectified is sent to the target review node for review.
[0051] In an optional manner, the steps for approving land information include: Determine changes to land information and send the change information to the target approval node for approval.
[0052] It should be noted that the target approval node is the approval node at the level corresponding to the uploaded approval information (such as change information) or review information (such as inspection results).
[0053] In this embodiment, after the land information is collected, in order to ensure that the approval unit can obtain the latest change information (collection record information) in a timely manner, database triggers are used to achieve automatic data push and update. Monitor data operation events such as INSERT, UPDATE, or DELETE on the collection record table. Once the above operation events occur, the database trigger immediately executes the "API interface for screening submitted collection records". The above API interface is responsible for screening the submitted change information from the database and organizing the screened change information into the format required by the approval unit. Then, the screened information is pushed to the table required by the approval unit, and the view is updated based on the above table to achieve data update.
[0054] The terminal defines the approval process model through the process engine, including start events, task nodes (preliminary review, re-review), conditional branches, and end event elements, and configures corresponding personnel and roles for each node. The content of the corresponding approval forms and approval rules for the preliminary review and re-review is the same as the land information requirements in the data collection template. The personnel corresponding to the preliminary review node are the town-level approval personnel, who are responsible for receiving and reviewing the submitted change information; the re-review node is still the town-level approval personnel responsible for further reviewing the change information that fails the preliminary review. When each node or process instance in the process ends, an event listener is configured to synchronize the approval result to the relevant terminal or push it to the superior department. When the town-level preliminary review node passes, the terminal can automatically push the approval result to the relevant district-level department through API calls and message queues, and update the corresponding change information in the database.
[0055] Based on the automatic data push and update and the approval process model, the approval personnel log in to the terminal, enter the approval interface, and automatically generate a list of information to be reviewed according to the role permissions. And set status fields such as to be reviewed, under review, approved, and rejected for each approval record. The approval personnel review the information according to review criteria such as the mobile phone number cannot be 11 consecutive repeated digits, the ID number must be 18 digits, and verify whether the household registration location is consistent with the location of the house. If the information is complete and correct, click to approve; otherwise, click to reject and indicate the reason, and the terminal updates the approval record status in the database according to the result of the click event.
[0056] Through the above operations, complete and accurate land information content of homesteads and collective construction lands is formed.
[0057] Specifically, the controller further determines the change information of the land information and sends the change information to the target approval node for approval.
[0058] In an alternative manner, the steps of inspecting the land to be managed according to the inspection template corresponding to the land to be managed to achieve the full-process management of the land to be managed include: Configure the inspection content according to the inspection template corresponding to the land to be managed; Inspect the land to be managed according to the inspection content to obtain inspection results, so as to realize the full-process management of the land to be managed; among them, the inspection content includes at least one of the following: land information verification, land boundary verification, land use situation inspection, facility and structure verification, abnormal situation recording, environmental condition inspection, and safety measure verification.
[0059] In this embodiment, satellite images are used to regularly monitor and extract housing changes. The change monitoring content includes various visible changes on the ground surface, such as new construction, demolition of construction, process changes during construction, leveling conditions, vegetation and water system changes, etc., to comprehensively supervise people, land and houses. The data extracted from the change monitoring is used as clue data for inspections. Using a database trigger, when the auditing unit updates the table in the database, the terminal automatically executes the "API interface for screening approved records", and imports the land information of approved homesteads and collective construction lands into the terminal database as the basic data for inspections.
[0060] As Figure 2 shown, for the inspection template configuration: according to the different requirements of homesteads and collective construction lands, configure inspection content, inspection cycle, inspection personnel, inspection results and other templates. For homesteads, it is necessary to inspect whether there are housing construction behaviors, check whether there are newly built, rebuilt or expanded houses without approval; check whether there are illegal rental behaviors, whether the houses on the homestead are used for illegal rental, including group renting and over-area renting; check whether there are fire safety hazard behaviors, whether the homestead houses are equipped with necessary fire-fighting facilities and whether flammable items are stacked. For collective construction lands, it is necessary to inspect whether there are production and operation units. At the same time, according to the different industries of the production and operation units, the inspection content is different. For manufacturing: check safety production measures, operation of environmental protection facilities, etc.; for service industries: check fire safety, sanitation conditions, service quality, etc. The inspection cycle is set differently according to the use and type of houses: for under-construction houses on homesteads, the village conducts daily inspections, the town conducts weekly inspections, and the district conducts monthly inspections; for rented houses on homesteads, monthly full-coverage inspections are carried out; for operating houses on collective construction lands, weekly full-coverage inspections are carried out; for non-operating houses on collective construction lands, monthly full-coverage inspections are carried out. The more complex the inspection content and the higher the risk, the shorter the corresponding inspection cycle. Conversely, the inspection cycle can be appropriately extended.
[0061] The inspection process uses a process engine to define the inspection process model. The process includes a start event, task nodes (problem discovery, problem reporting, rectification and handling, post-rectification review), conditional branches and an end event. And assign the roles in each node, set overdue reminders, and form a closed-loop management.
[0062] For the inspection of homesteads and collective construction lands. The inspector ensures that the inspection management terminal application is installed on the mobile phone or tablet and the positioning function is turned on, and obtains the inspector's location information through the GPS function of the mobile intelligent device, so as to ensure the inspection within the designated area. The inspector logs in to the terminal with a personal account to view the to-do items, which include: ① Checking land information: Before starting the inspection, the inspector needs to check the land information of the current inspection area to confirm its integrity and accuracy. If there are any changes, update them in the terminal in a timely manner. ② On-site inspection: The inspector conducts on-site inspections of homesteads and collective construction lands according to the configured inspection content and cycle. ③ Problem recording and photographing: During the inspection, if any problems are found, the inspector needs to record the problem details in detail and take on-site photos of the problem points to ensure the accuracy of the problem description and the traceability of the evidence. ④ Submitting inspection results: After the inspection is completed, the inspector submits the inspection results (inspection records and problem photos) to the terminal, and the terminal automatically pushes the problem patches to the to-do items of the target review node for review.
[0063] Specifically, the controller further configures the inspection content according to the inspection template corresponding to the land to be managed; and conducts inspections on the land to be managed according to the inspection content to obtain inspection results, so as to realize the full-process management of the land to be managed.
[0064] As Figure 3 shown, the full-process management of land collects land information through the data collection unit of the terminal, and approves the land information through the information approval unit. If there are problems, it returns to the data collection unit for re-collection of land information; if there are no problems, it is transferred to the inspection unit for subsequent inspections. The inspection unit reviews the data to be rectified uploaded by the inspection unit. If there are no problems, the process ends; if there are problems, the data to be rectified is uploaded to the rectification unit for subsequent rectification processes.
[0065] Figure 4 shows a schematic structural diagram of an embodiment of a land full-process management system 200 provided by the present invention. As Figure 4 shown, the system 200 includes: a collection module 210, an approval module 220, and an inspection module 230.
[0066] The collection module 210 is used to: collect land information of the land to be managed according to the land type of the land to be managed; The approval module 220 is used to: approve the land information based on a preset information approval process to obtain an approval result; The inspection module 230 is used to: when the approval result passes, conduct inspections on the land to be managed according to the inspection template corresponding to the land to be managed, so as to realize the full-process management of the land to be managed.
[0067] In an alternative manner, the land full-process management system further includes a rectification module, and the rectification module is used for: Based on the inspection results of the land to be managed, determine whether to rectify the land to be managed, and obtain a judgment result; When the judgment result is yes, based on the inspection results, determine the data to be rectified for the land to be managed, and send the data to be rectified to the target review node for review.
[0068] In an alternative manner, the land types include: homesteads and collective construction land; the land information corresponding to the demolished land includes at least one of the following information: basic information, family member information, house rental information, and house details information; the land information corresponding to the collective construction land includes at least one of the following information: basic ownership information and production and operation information.
[0069] The technical solution of this embodiment ensures the accuracy of land information. At the same time, relying on the inspection template for inspections improves the pertinence of inspection work, thereby overall improving the accuracy and efficiency of land full-process management.
[0070] For the above parameters and the steps for each module in the land full-process management system 200 of this embodiment to implement corresponding functions, reference can be made to the parameters and steps in the embodiment of the land full-process management method described above, and details are not elaborated here.
[0071] As Figure 5 shown, an electronic device 300 according to an embodiment of the present invention, the electronic device 300 includes a processor 320, the processor 320 is coupled to a memory 310, and at least one computer program 330 is stored in the memory 310. The at least one computer program 330 is loaded and executed by the processor 320 so that the electronic device 300 implements any one of the above land full-process management methods. Specifically: The electronic device 300 may vary greatly due to configuration or performance differences, and may include one or more processors 320 (Central Processing Units, CPUs) and one or more memories 310. Among them, at least one computer program 330 is stored in the one or more memories 310, and the at least one computer program 330 is loaded and executed by the one or more processors 320 so that the electronic device 300 implements any one of the land full-process management methods provided in the above embodiments. Of course, the electronic device 300 may also have components such as wired or wireless network interfaces, keyboards, and input / output interfaces for input / output. The electronic device 300 may also include other components for implementing device functions, which are not elaborated here.
[0072] A computer-readable storage medium according to an embodiment of the present invention stores at least one computer program. The at least one computer program is loaded and executed by a processor to enable a computer to implement any one of the above-mentioned land full-process management methods.
[0073] Optionally, the computer-readable storage medium may be a read-only memory (ROM), a random access memory (RAM), a compact disc read-only memory (CD-ROM), a magnetic tape, a floppy disk, an optical data storage device, etc.
[0074] In an exemplary embodiment, there is also provided a computer program product or a computer program. The computer program product or the computer program includes computer instructions, and the computer instructions are stored in a computer-readable storage medium. A processor of an electronic device reads the computer instructions from the computer-readable storage medium, and the processor executes the computer instructions to enable the electronic device to execute any one of the above-mentioned land full-process management methods.
[0075] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and do not represent a limitation on a specific order or sequence. In appropriate cases, the use order of similar objects may be interchanged so that the embodiments of the present application described herein can be implemented in an order other than the illustrated or described order.
[0076] Those skilled in the art of the relevant art know that the present invention can be implemented as a system, a method, or a computer program product. Therefore, the present disclosure can be specifically implemented in the following forms: it can be all hardware, can be all software (including firmware, resident software, microcode, etc.), or can be a combination of hardware and software, which is generally referred to as "circuit", "module", or "system" in this article. In addition, in some embodiments, the present invention can also be implemented in the form of a computer program product in one or more computer-readable media, and the computer-readable media contain computer-readable program codes.
[0077] Any combination of one or more computer-readable media may be employed. The computer-readable media may be a computer-readable signal medium or a computer-readable storage medium. A computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any combination of the foregoing. More specific examples (a non-exhaustive list) of the computer-readable storage medium include: an electrical connection having one or more wires, a portable computer diskette, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or Flash memory), an optical fiber, a portable compact disc read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing. In the present application, the computer-readable storage medium may be any tangible medium that contains or stores a program which can be used by or in connection with an instruction execution system, apparatus, or device.
[0078] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and should not be construed as limiting the present invention. Those of ordinary skill in the art may make variations, modifications, substitutions, and alterations to the above embodiments within the scope of the present invention.
Claims
1. A full-process land management method, characterized in that, Including: Collect the land information of the land to be managed according to the land type of the land to be managed; Approve the land information based on a preset information approval process to obtain an approval result; When the approval result passes, conduct inspections on the land to be managed according to the inspection template corresponding to the land to be managed, so as to realize the full-process management of the land to be managed.
2. The land full-process management method according to claim 1, wherein It also includes: Judge whether to rectify the land to be managed according to the inspection result of the land to be managed to obtain a judgment result; When the judgment result is yes, determine the data to be rectified for the land to be managed according to the inspection result, and send the data to be rectified to the target audit node for auditing.
3. The land full-process management method according to claim 1, wherein The land types include: homesteads and collective construction land; the land information corresponding to the demolished bases includes at least one of basic information, family member information, house rental information, and house details information; the land information corresponding to the collective construction land includes at least one of basic ownership information and production and operation information.
4. The land full-process management method according to claim 1, characterized in that The steps for approving the land information include: Determine the change information of the land information and send the change information to the target approval node for approval.
5. The land full-process management method according to claim 1, characterized in that The steps for conducting inspections on the land to be managed according to the inspection template corresponding to the land to be managed to realize the full-process management of the land to be managed include: Configure the inspection content according to the inspection template corresponding to the land to be managed; Conduct inspections on the land to be managed according to the inspection content to obtain an inspection result, so as to realize the full-process management of the land to be managed; among them, the inspection content includes at least one of land information verification, land boundary verification, land use situation inspection, facility and structure verification, abnormal situation recording, environmental condition inspection, and safety measure verification.
6. A land full-process management system, characterized in that, Including: A collection module, an approval module, and an inspection module; The collection module is used for: collecting the land information of the land to be managed according to the land type of the land to be managed; The approval module is used for: approving the land information based on a preset information approval process to obtain an approval result; The inspection module is used for: when the approval result passes, conducting inspections on the land to be managed according to the inspection template corresponding to the land to be managed, so as to realize the full-process management of the land to be managed.
7. The land full-process management system according to claim 6, characterized in that It also includes a rectification module, and the rectification module is used for: Judge whether to rectify the land to be managed according to the inspection result of the land to be managed to obtain a judgment result; When the judgment result is yes, determine the data to be rectified for the land to be managed according to the inspection result, and send the data to be rectified to the target audit node for auditing.
8. The land full-process management system according to claim 6, wherein The land types include: homesteads and collective construction land; the land information corresponding to the demolished bases includes at least one of basic information, family member information, house rental information, and house details information; the land information corresponding to the collective construction land includes at least one of basic ownership information and production and operation information.
9. An electronic device, characterized in that, The electronic device includes a processor, the processor is coupled to a memory, and at least one computer program is stored in the memory. The at least one computer program is loaded and executed by the processor so that the electronic device implements the land full-process management method according to any one of claims 1 to 5.
10. A computer-readable storage medium, characterized in that, At least one computer program is stored in the computer-readable storage medium. The at least one computer program is loaded and executed by a processor so that the computer-readable storage medium implements the land full-process management method according to any one of claims 1 to 5.
Citation Information
Patent Citations
On-line modular system and method for assisting examination and approval of countryside homestead
CN101067853A
Method for global positioning system to realize land patrol and real monitoring based on network relay
CN101106816A
Land patrol management system
CN108764711A
Homestead resource information management system
CN113988679A
Land comprehensive improvement project supervision method and management information system
CN115439100A