Water diversion channel for water conservancy project and capable of avoiding blockage
The scraper structure driven by the electric push rod and servo motor solves the blockage problem of the water diversion channel, realizes automatic cleaning and real-time monitoring of debris in the channel, and ensures smooth water flow.
Patent Information
- Application Number
- CN202510995846.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-18
- Publication Date
- 2025-09-19
AI Technical Summary
Existing water diversion channels are easily blocked due to the accumulation of debris such as leaves and mud.
It adopts a telescopic arm and fixed bucket structure driven by an electric push rod, combined with a scraper driven by a servo motor and a monitoring camera to achieve automatic cleaning and real-time monitoring of debris in the channel.
Effectively prevent channel blockage, regularly clean impurities through automated equipment to ensure smooth water flow and reduce manual intervention.
Smart Images

Figure CN120666700A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water conservancy projects, in particular to a water diversion channel for water conservancy projects that can avoid blockage. Background Art
[0002] Water conservancy projects are various types of projects constructed to control, regulate, and utilize natural surface and groundwater to eliminate harm and promote benefits. They primarily include reservoirs, sluice gates, levees, water diversion projects, and river regulation. In water conservancy projects, diversion channels are used to optimize water transport efficiency in order to guide water flow for transport and increase water utilization.
[0003] During the use of water diversion channels, a channel is constructed between the water source and the location where the water flow is required to ensure the normal transportation of water. However, during the use of existing water diversion channels, debris such as leaves and sand are easily accumulated inside the channels during long-term use, resulting in channel blockage. Therefore, a water diversion channel for water conservancy projects that does not block is proposed to solve the above problem. Summary of the Invention
[0004] The purpose of the present invention is to provide a water diversion channel for water conservancy projects that avoids blockage, so as to solve the problem that the existing water diversion channels proposed in the above background technology are prone to accumulation of leaves, mud and other debris inside the channels during long-term use, thereby causing channel blockage.
[0005] To achieve the above-mentioned object, the present invention provides the following technical solution: a water diversion channel for a water conservancy project that avoids clogging, comprising a water diversion channel, wherein the water diversion channel is provided with an electric push rod on one side of the outer wall, and the electric push rod is provided with a telescopic arm above, the telescopic arm is provided with a fixed plate at the upper end, and the fixed plate is provided with a connecting rod at the lower end, the connecting rod is provided with a fixed bucket at the lower end, and an inclined plate is provided on one side of the fixed bucket on the inner wall of the water diversion channel;
[0006] The fixing plate is provided with a mounting frame on the upper end surface, and a monitoring camera is provided on the mounting frame. A protective plate is provided on the upper end of the monitoring camera on the mounting frame. The water diversion channel is provided with a solar panel on the outer wall, and a wire is provided on the solar panel.
[0007] A fixing frame is provided at the upper end of the water diversion channel on one side of the fixed bucket, and a servo motor is provided inside the fixing frame. One end of the output shaft of the servo motor is connected to a screw through a coupling, and a sliding rod is provided on one side of the screw. A movable block is inserted into the screw and the sliding rod, and a scraper is provided on the movable block. A material receiving plate is provided on the outer wall of the water diversion channel on one side of the fixed bucket.
[0008] Preferably, the fixed plate forms a vertical lifting structure with the water diversion channel through a telescopic arm under the action of the electric push rod.
[0009] Preferably, the solar panel is connected to a connector and related power supply components via a wire, and the solar panel forms an electrical connection structure with the power supply equipment of the surveillance camera via the wire, the connector and related power supply components.
[0010] Preferably, the scraper forms a limited sliding structure with the fixed frame through a screw, a slide rod, a movable block and the fixed frame under the action of a servo motor.
[0011] Compared with the prior art, the beneficial effects of the present invention are as follows: the fixed plate of the water diversion channel for the water conservancy project for avoiding blockage forms a vertical lifting structure with the water diversion channel through the telescopic arm under the action of the electric push rod, so that the debris in the water diversion channel can be collected by the liftable fixed bucket, and it can be lifted and cleaned by the electric push rod assembly. The solar panel of the device is connected to the connector and its related power supply components through a wire, and the solar panel forms an electrical connection structure with the monitoring camera through the wire, the connector and its related power supply components, so that the monitoring camera can be powered by the solar panel and its related components, so that the situation of the fixed bucket in the water diversion channel can be viewed in real time through the monitoring camera. The scraper of the device forms a limited sliding structure with the fixed frame through the screw, the slide rod, the movable block under the action of the servo motor, so that the inside of the fixed bucket can be cleaned regularly by the limited sliding scraper, so as to ensure the use effect of the fixed bucket and avoid the accumulation of more impurities causing blockage inside the water diversion channel. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a schematic diagram of a water diversion channel structure for a water conservancy project to avoid blockage according to the present invention;
[0013] Figure 2 This is a schematic diagram of a fixed bucket rising structure for a water diversion channel used in a water conservancy project to avoid blockage according to the present invention;
[0014] Figure 3 This is a schematic side view of the structure of a water diversion channel for a water conservancy project to avoid blockage according to the present invention;
[0015] Figure 4 This is a schematic diagram of a top view of a water diversion channel for a water conservancy project to avoid blockage according to the present invention;
[0016] Figure 5 The present invention is a schematic diagram of a top view of the internal components of a water diversion channel fixing frame for water conservancy projects to avoid blockage.
[0017] In the figure: 1. Water diversion channel, 2. Electric push rod, 3. Telescopic arm, 4. Fixed plate, 5. Connecting rod, 6. Fixed bucket, 7. Mounting frame, 8. Surveillance camera, 9. Solar panel, 10. Fixed frame, 11. Servo motor, 12. Screw, 13. Sliding rod, 14. Movable block, 15. Scraper, 16. Feeding plate, 17. Protective plate, 18. Inclined plate. DETAILED DESCRIPTION
[0018] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0019] See also Figure 1-5 The present invention provides a technical solution: a water diversion channel for water conservancy projects to avoid blockage, comprising a water diversion channel 1, an electric push rod 2 is provided on the outer wall of one side of the water diversion channel 1, and the electric push rod 2 is provided with a telescopic arm 3 on the top, the telescopic arm 3 is provided with a fixed plate 4 at the upper end, and the fixed plate 4 is provided with a connecting rod 5 at the lower end, the connecting rod 5 is provided with a fixed bucket 6 at the lower end, and an inclined plate 18 is provided on one side of the fixed bucket 6 on the inner wall of the water diversion channel 1. It should be additionally noted that the electric push rod 2 in the device can be remotely started by a remote control or a wireless communication module, so that the fixed bucket 6 can be cleaned regularly.
[0020] Furthermore, under the action of the electric push rod 2, the fixed plate 4 forms a vertical lifting structure with the water diversion channel 1 through the telescopic arm 3, thereby driving the fixed bucket 6 to rise and fall through the electric push rod 2, so that the fixed bucket 6 can collect impurities in the water diversion channel 1 and facilitate regular processing of the impurities inside it.
[0021] The fixing plate 4 is provided with a mounting frame 7 on the upper end surface, and a monitoring camera 8 is provided on the mounting frame 7. A protective plate 17 is provided on the upper end of the monitoring camera 8 on the mounting frame 7. The water diversion channel 1 is provided with a solar panel 9 on the outer wall, and a wire is provided on the solar panel 9. It should be additionally noted that the monitoring camera 8 is remotely connected to the display through a wireless or other connection method, so that the situation inside the fixed bucket 6 can be remotely viewed through the monitoring camera 8.
[0022] Furthermore, the solar panel 9 is connected to a connector and related power supply components through wires, and the solar panel 9 forms an electrical connection structure with the power supply equipment of the monitoring camera 8 through the wires, connectors and related power supply components, so that the monitoring camera 8 can grasp the situation of impurities contained in the fixed bucket 6 in real time, so as to regularly clean the inside of the fixed bucket 6.
[0023] A fixing frame 10 is provided on the upper end of the water diversion channel 1 on one side of the fixed bucket 6, and a servo motor 11 is provided inside the fixing frame 10. One end of the output shaft of the servo motor 11 is connected to a screw 12 through a coupling, and a slide bar 13 is provided on one side of the screw 12. A movable block 14 is inserted on the screw 12 and the slide bar 13, and a scraper 15 is provided on the movable block 14. A material receiving plate 16 is provided on the outer wall of the water diversion channel 1 on one side of the fixed bucket 6. It should be noted that the servo motor 11 in the device can be remotely started by an AC contactor or other device, so as to ensure that the fixed bucket 6 can be automatically and regularly For cleaning, the present invention is a water diversion channel for water conservancy projects to avoid blockage. The components are all Chinese standard parts or components known to those skilled in the art. The structure and principle are known to those skilled in the art through technical manuals or conventional experimental methods. In addition, all the above-mentioned electrical components in this device refer to power elements, electrical components, and adapted monitoring computers and power supplies connected by wires. The specific connection means should refer to the above-mentioned working principle. The electrical connection is completed in the order of working between the electrical components. The detailed connection means are well-known technologies in this field.
[0024] Furthermore, under the action of the servo motor 11, the scraper 15 forms a limited sliding structure with the fixed frame 10 through the screw 12, the slide rod 13, the movable block 14, so that under the action of the servo motor 11, the scraper 15 that can slide through the limited position can regularly clean the inside of the fixed bucket 6.
[0025] Working principle: When using a water diversion channel for a water conservancy project to avoid blockage, first, during the use of the water diversion channel 1, a fixed bucket 6 and its related components can be added at a fixed distance, so that the impurities in the water diversion channel 1 can be intercepted at different positions by the fixed bucket 6. At the same time, the situation in the fixed bucket 6 can be monitored in real time by the monitoring camera 8, so that the fixed bucket 6 can be cleaned regularly to avoid blockage of the water diversion channel 1; after the staff sees through the display that a certain amount of impurities have accumulated in the fixed bucket 6, the electric push rod 2 can be remotely started, and the electric push rod 2 drives the fixed bucket 6 to rise through the telescopic arm 3, so that the scraper 15 can be inserted into the fixed bucket 6; then The servo motor 11 in the fixed frame 10 is remotely started, and one end of the output shaft of the servo motor 11 drives the screw 12 to rotate through the coupling. The rotating screw 12 drives the movable block 14 to slide, and the movable block 14 is limited by the slide bar 13, so that the movable block 14 that slides by the limited position drives the scraper 15 to move in the fixed bucket 6, so that the impurities in the fixed bucket 6 are processed by the scraper 15, and the impurities are unloaded through the receiving plate 16 on the side of the water diversion channel 1, thereby ensuring that the fixed bucket 6 can continue to be used, and regular cleaning is performed to prevent impurities in the fixed bucket 6 from causing blockage in the water diversion channel 1. This is the use process of the water diversion channel for water conservancy projects that avoids blockage.
[0026] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A water diversion channel for a water conservancy project for preventing blockage, comprising a water diversion channel (1), characterized in that: The water diversion channel (1) is provided with an electric push rod (2) on one side of the outer wall, and the electric push rod (2) is provided with a telescopic arm (3) on the upper end, the telescopic arm (3) is provided with a fixed plate (4) at the upper end, and the fixed plate (4) is provided with a connecting rod (5) at the lower end, the connecting rod (5) is provided with a fixed bucket (6) at the lower end, and a slanted plate (18) is provided on one side of the fixed bucket (6) on the inner wall of the water diversion channel (1); The fixing plate (4) is provided with a mounting frame (7) on the upper end surface, and a monitoring camera (8) is provided on the mounting frame (7), and a protective plate (17) is provided on the upper end of the monitoring camera (8) on the mounting frame (7); the water diversion channel (1) is provided with a solar panel (9) on the outer wall, and a wire is provided on the solar panel (9); One side of the fixed bucket (6) is provided with a fixed frame (10) at the upper end of the water diversion channel (1), and the fixed frame (10) is provided with a servo motor (11) inside. One end of the output shaft of the servo motor (11) is connected to a screw rod (12) through a coupling, and a sliding rod (13) is provided on one side of the screw rod (12). A movable block (14) is inserted into the screw rod (12) and the sliding rod (13), and a scraper (15) is provided on the movable block (14). One side of the fixed bucket (6) is provided with a material receiving plate (16) on the outer wall of the water diversion channel (1).
2. A water diversion channel for a water conservancy project that avoids blockage according to claim 1, characterized in that: The fixed plate (4) forms a vertical lifting structure with the water diversion channel (1) through the telescopic arm (3) under the action of the electric push rod (2).
3. The water diversion channel for water conservancy projects that avoids blockage according to claim 1, characterized in that: The solar panel (9) is connected to a connector and related power supply components via a wire, and the solar panel (9) forms an electrical connection structure with the power supply equipment of the surveillance camera (8) via the wire, the connector and related power supply components.
4. The water diversion channel for water conservancy projects that avoids blockage according to claim 1, characterized in that: The scraper (15) forms a limited sliding structure with the fixed frame (10) through the screw (12), the slide rod (13), the movable block (14) under the action of the servo motor (11).