Low-latency control method and system for bucket wheel excavators based on edge computing

By using edge computing networks to perform multi-dimensional on-site monitoring and simulation of bucket wheel excavators, the problem of large delay in issuing control commands for bucket wheel excavators has been solved, achieving fast response and low-latency control.

CN120887245BActive Publication Date: 2026-11-10INNER MONGOLIA GUOHUA ZHUNGEER POWER GENERATION
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202510860205.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-06-25
Publication Date
2026-11-10
Estimated Expiration
2045-06-25

AI Technical Summary

Technical Problem

Traditional bucket wheel excavator control systems suffer from long delays in issuing control commands and slow response speeds due to their remote centralized processing architecture, making it difficult to meet the needs of rapid operation and dynamic adjustment.

Method used

Edge computing networks are used for multi-dimensional on-site monitoring to build a virtual model of the bucket wheel excavator. Simulation and edge sampling verification mechanisms are used to extract simulated operation characteristic parameters, generate verification results, and determine the target control scheme to achieve low-latency control.

Benefits of technology

By analyzing the control scheme in real time through the edge computing network, commands are quickly sent to the bucket wheel excavator mechanism, reducing control link latency, improving command response speed, and achieving low-latency control of the bucket wheel excavator.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120887245B_ABST
    Figure CN120887245B_ABST
Patent Text Reader

Abstract

This invention discloses a low-latency control method and system for bucket wheel excavators based on edge computing, belonging to the field of intelligent control technology. The method includes: performing multi-dimensional on-site monitoring of the bucket wheel excavator through an edge computing network to obtain real-time on-site information; constructing a virtual model of the bucket wheel excavator and simulating the virtual model in conjunction with the real-time on-site information to obtain simulation records; extracting simulated operation characteristic parameters from the simulation records and performing verification analysis on the simulated operation characteristic parameters according to an edge sampling verification mechanism to obtain verification results; determining target control analysis information based on the verification results and analyzing the target control analysis information to obtain a target control scheme; and performing low-latency control of the bucket wheel excavator according to the target control scheme. This invention solves the technical problems of large delays and slow response speeds in the issuance of control commands for bucket wheel excavators in existing technologies, achieving the technical effect of shortening control link delays, improving command response speed, and realizing low-latency control of bucket wheel excavators.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of intelligent control technology, specifically to a low-latency control method and system for bucket wheel excavators based on edge computing. Background Technology

[0002] Bucket wheel excavators, as crucial equipment for continuous material handling and stacking operations, are widely used in large coal yards, port storage yards, and power plant material conveying systems. With the continuous expansion of bucket wheel excavator operations and the increasing complexity of operating environments, higher demands are placed on real-time monitoring and rapid response to equipment operating conditions. Traditional bucket wheel excavator control systems typically rely on a remote centralized processing architecture. The command generation and issuance process involves multiple transmission links, making them susceptible to network congestion and computational queuing, resulting in significant delays in control command issuance and insufficient execution response speed, making it difficult to meet the actual needs of rapid operation and dynamic adjustment. Summary of the Invention

[0003] This application provides a low-latency control method and system for bucket wheel excavators based on edge computing, which is used to address the technical problems of large delay in issuing control commands and slow response speed in existing bucket wheel excavators.

[0004] In view of the above problems, this application provides a low-latency control method and system for bucket wheel excavators based on edge computing.

[0005] The first aspect of this application provides a low-latency control method for a bucket wheel excavator based on edge computing. The method includes: performing multi-dimensional on-site monitoring of the bucket wheel excavator via an edge computing network to obtain real-time on-site information; constructing a virtual model of the bucket wheel excavator and simulating the virtual model using the real-time on-site information to obtain a simulation record; extracting simulated operation characteristic parameters from the simulation record and performing verification analysis on the simulated operation characteristic parameters according to an edge sampling verification mechanism to obtain verification results; determining target control analysis information based on the verification results and analyzing the target control analysis information to obtain a target control scheme; and performing low-latency control on the bucket wheel excavator according to the target control scheme.

[0006] A second aspect of this application provides a low-latency control system for a bucket wheel excavator based on edge computing. The system includes: a monitoring module for multi-dimensional on-site monitoring of the bucket wheel excavator via an edge computing network to obtain real-time on-site information; a simulation module for constructing a virtual model of the bucket wheel excavator and simulating the virtual model using the real-time on-site information to obtain simulation records; a verification and analysis module for extracting simulated operation characteristic parameters from the simulation records and performing verification and analysis on the simulated operation characteristic parameters according to an edge sampling verification mechanism to obtain verification results; a target control scheme determination module for determining target control analysis information based on the verification results and analyzing the target control analysis information to obtain a target control scheme; and a low-latency control module for performing low-latency control on the bucket wheel excavator according to the target control scheme.

[0007] One or more technical solutions provided in this application have at least the following technical effects or advantages: This application utilizes an edge computing network to perform multi-dimensional on-site monitoring of a bucket wheel excavator, obtaining real-time on-site information. A virtual model of the bucket wheel excavator is constructed, and the virtual model is simulated using the real-time on-site information to obtain simulation records. Simulated operation characteristic parameters are extracted from the simulation records, and these parameters are verified and analyzed using an edge sampling verification mechanism to obtain verification results. Target control analysis information is determined based on the verification results, and a target control scheme is obtained by analyzing this information. The bucket wheel excavator is then controlled with low latency according to the target control scheme. This invention solves the technical problems of large delays and slow response speeds in the issuance of control commands for bucket wheel excavators in the prior art. By parsing the target control scheme in real-time in an edge computing network and rapidly issuing control commands to various mechanisms of the bucket wheel excavator, the technical effect of shortening control link latency, improving command response speed, and achieving low-latency control of the bucket wheel excavator is achieved. Attached Figure Description

[0008] To more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0009] Figure 1 A schematic flowchart of a low-latency control method for bucket wheel excavators based on edge computing provided in this application embodiment; Figure 2 A schematic diagram of the low-latency control system for a bucket wheel excavator based on edge computing, provided in an embodiment of this application.

[0010] Explanation of reference numerals in the attached diagram: Monitoring module 11, Simulation module 12, Verification and analysis module 13, Target control scheme determination module 14, Low-latency control module 15. Detailed Implementation

[0011] This application provides a low-latency control method and system for bucket wheel excavators based on edge computing. It addresses the technical problems of large delays and slow response speeds in the issuance of control commands for bucket wheel excavators in the prior art. By analyzing the target control scheme in real time in the edge computing network and quickly issuing control commands to various mechanisms of the bucket wheel excavator, it achieves the technical effect of shortening the control link delay, improving the command response speed, and realizing low-latency control of the bucket wheel excavator.

[0012] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of them. All other embodiments obtained by those skilled in the art based on the embodiments of this application without creative effort are within the scope of protection of this application.

[0013] It should be noted that any variation of the terms "comprising" and "having" is intended to cover non-exclusive inclusion, for example, a process, method, system, product, or server that includes a series of steps or units is not necessarily limited to those steps or units that are explicitly listed, but may include other steps or modules that are not explicitly listed or that are inherent to such processes, methods, products, or devices.

[0014] Example 1, as Figure 1 As shown, this application provides a low-latency control method for bucket wheel excavators based on edge computing, the method comprising: Step S100: Perform multi-dimensional on-site monitoring of the bucket wheel excavator through an edge computing network to obtain real-time on-site information.

[0015] In this embodiment, the edge computing network comprises environmental monitoring equipment and operational monitoring equipment, enabling multi-dimensional on-site monitoring of the bucket wheel excavator. Specifically, the environmental monitoring equipment acquires relevant parameters of the bucket wheel excavator's operating environment to form actual operating environment parameters; the operational monitoring equipment acquires various characteristic data of the bucket wheel excavator's own operating status to form actual operational characteristic parameters. Subsequently, the actual operating environment parameters and the actual operational characteristic parameters are integrated to form real-time on-site information.

[0016] Furthermore, in the method provided in the application embodiment, the edge computing network includes environmental monitoring equipment and operation monitoring equipment. The edge computing network performs multi-dimensional on-site monitoring of the bucket wheel excavator to obtain real-time on-site information. The method also includes: monitoring the actual operating environment parameters of the bucket wheel excavator through the environmental monitoring equipment; monitoring the actual operating characteristic parameters of the bucket wheel excavator through the operation monitoring equipment; and the actual operating environment parameters and the actual operating characteristic parameters constitute the real-time on-site information.

[0017] In this embodiment, an edge computing network consisting of environmental monitoring equipment and operational monitoring equipment is first deployed to achieve comprehensive perception and data processing of the bucket wheel excavator's operating environment and status. The environmental monitoring equipment mainly refers to a group of sensor nodes installed in the bucket wheel excavator's operating area, such as temperature and humidity sensors, wind speed and direction sensors, and dust concentration detectors, responsible for real-time collection of external environmental conditions and generating actual operating environment parameters. Simultaneously, the operational monitoring equipment, including vibration sensors, speed sensors, current sensors, and attitude detection devices, is directly installed on key parts of the bucket wheel excavator to collect its dynamic characteristics and structural state during operation, forming actual operational characteristic parameters. Subsequently, the edge computing nodes integrate these two types of parameters, combining the actual operating environment parameters from the environmental monitoring equipment with the actual operational characteristic parameters from the operational monitoring equipment, and processing them into structured real-time field information.

[0018] Step S200: Construct a virtual model of the bucket wheel excavator and simulate the virtual model in conjunction with the real-time field information to obtain a simulation record.

[0019] In this embodiment, based on the design drawings, structural parameters, and historical operating data of the bucket wheel excavator, finite element modeling technology is first used to mesh and assign physical properties to the main mechanical structural parts of the bucket wheel excavator (such as the rotating boom, bucket wheel disc, and conveying system), constructing a basic mechanical response model. Furthermore, multibody dynamics modeling is combined to model the overall kinematic behavior of the bucket wheel excavator, including motion units such as rotation, lifting, and walking, thus establishing a complete virtual model of the bucket wheel excavator—a digital twin capable of dynamically responding to external inputs. Subsequently, the real-time field information collected in the previous step, including actual operating environment parameters (such as wind speed, temperature, and dust concentration) and actual operating characteristic parameters (such as motor load, track speed, and bucket wheel rotation speed), is injected into the virtual model through a real-time data mapping mechanism. This real-time data mapping mechanism refers to the real-time assignment of various environmental and operational indicators collected from the real world to corresponding variables in the simulation environment according to timestamp synchronization and physical attribute matching. After data mapping is completed, a real-time physical simulation engine deployed on edge nodes is used to simulate and extrapolate the virtual model of the bucket wheel excavator with the injected data, simulating its dynamic evolution under the current working environment and operating conditions. During the simulation, the output response of each sub-module within the model is continuously monitored, such as changes in structural stress, transmission system load, and overall machine attitude. These simulation outputs are recorded in time series form according to a predetermined sampling period, and finally, standardized simulation records are generated.

[0020] Step S300: Extract the simulation operation feature parameters from the simulation record, and perform verification analysis on the simulation operation feature parameters according to the edge sampling verification mechanism to obtain the verification result.

[0021] In this embodiment, the simulation operation feature parameter extraction is first performed. Based on a preset real-time time, the simulation operation feature parameters at the corresponding time are located and extracted from existing simulation records to ensure that the simulation data is synchronized with real-time monitoring requirements. Subsequently, to verify the accuracy and reliability of the simulation data, an edge sampling verification mechanism is introduced to conduct verification analysis on the simulation operation feature parameters. Specifically, historical monitoring times are first obtained from the operation monitoring equipment, and a continuous time series of actual parameters is constructed based on the correlation between the monitoring times and the actual operation feature parameters. Based on the actual parameter time series, the predicted operation feature parameters corresponding to the real-time time are further analyzed to construct a reference for the actual operation trend. Next, based on any selected operation indicator, any corresponding predicted parameter is extracted from the predicted operation feature parameters. Using the edge sampling verification mechanism as a benchmark, error verification and consistency analysis are performed on the extracted simulation operation feature parameters. Finally, based on the comparison analysis results, standardized verification results are generated.

[0022] Furthermore, the method provided in the application embodiments also includes: Extracting simulation operation feature parameters from the simulation record includes determining the real-time moment and matching the simulation operation feature parameters at the real-time moment in the simulation record.

[0023] In this embodiment, the real-time moment for data extraction is first determined using an edge time synchronization method. This real-time moment is dynamically generated based on the current operating state of the bucket wheel excavator or the edge node clock synchronization signal. Then, a timestamp matching method is used to retrieve the data node closest to the real-time moment from the previously generated simulation records. The simulation records refer to the sequence data of equipment states output according to a fixed sampling period during the simulation of the bucket wheel excavator virtual model, covering various dynamic and kinematic characteristics. Through the aforementioned timestamp matching, the simulation operation characteristic parameters corresponding to the real-time moment are extracted, i.e., the operating state data of the bucket wheel excavator at that moment in the virtual simulation environment.

[0024] Furthermore, the method provided in the application embodiment, which extracts simulated operation feature parameters from the simulated records and performs verification analysis on the simulated operation feature parameters according to the edge sampling verification mechanism to obtain verification results, further includes: obtaining the monitoring time of the operation monitoring device, wherein the monitoring time is earlier than the real-time time; forming an actual parameter time series according to the correspondence between the monitoring time and the actual operation feature parameters; analyzing the actual parameter time series to obtain the predicted operation feature parameters at the real-time time; obtaining an arbitrary operation index and matching the arbitrary predicted parameter corresponding to the arbitrary operation index in the predicted operation feature parameters; and verifying the simulated operation feature parameters with the arbitrary predicted parameter according to the edge sampling verification mechanism to form the verification result.

[0025] In this embodiment, a data retrieval method is first employed to read historical data from operational monitoring devices deployed at key locations of the bucket wheel excavator. These data records include timestamps and corresponding equipment status parameters. By traversing the monitoring dataset, all monitoring times earlier than the current real-time moment are filtered out; that is, all historical nodes whose recording time is less than the current real-time moment.

[0026] After the monitoring time is extracted, a time series mapping method is used to map each monitoring time to the actual operating characteristic parameters recorded at that time, forming a set of data sequences arranged continuously in time, namely the actual parameter time series.

[0027] Based on the established actual parameter time series, a random sampling regression fitting analysis method is used to model the time series data. Specifically, sample points are randomly selected from the actual parameter time series, and regression fitting is performed to generate an actual fitting polynomial describing the changing patterns of the equipment state. Subsequently, the determined real-time moment is used as the input variable of the actual fitting polynomial, the output value is calculated, and the predicted operating characteristic parameters at the real-time moment are constructed based on the output value.

[0028] After generating the predicted operational characteristic parameters, specific arbitrary operational indicators, such as boom pitch angle, bucket wheel speed, and motor current, are selected based on preset control objectives or monitoring requirements using an indicator extraction method. The predicted value corresponding to this indicator is then retrieved from the set of predicted operational characteristic parameters and extracted as an arbitrary predicted parameter.

[0029] Finally, based on the edge sampling verification mechanism, the simulated operation characteristic parameters are verified using arbitrary predicted parameters. In this step, a first sampling verification curve is first constructed based on arbitrary operation indicators and arbitrary predicted parameters. Then, the corresponding arbitrary simulated parameters are extracted from the simulated operation characteristic parameters to construct a second sampling verification curve. Subsequently, according to a preset sampling comparison mechanism, the two sampling curves are compared, the sampling distance between them is calculated, and this sampling distance is used as the standardized verification result.

[0030] Furthermore, in the method provided in the application embodiments, analyzing the actual parameter time series to obtain the predicted operating characteristic parameters at the real-time moment further includes: The actual parameters are subjected to regression fitting analysis based on the principle of random sampling to obtain the actual fitting polynomial; the real time is used as the input value of the actual fitting polynomial to obtain the output value, and the predicted running characteristic parameters are composed based on the output value.

[0031] In this embodiment, a random sampling regression analysis method is first employed to model the established time series of actual parameters. Specifically, based on the principle of random sampling, a representative subset of data points is selected from the actual parameter time series to reduce computational complexity and avoid overfitting issues that may occur in overall data fitting. Based on the selected sample data, a regression fitting algorithm, such as linear regression or polynomial regression, is applied to fit an actual fitting polynomial describing the trend of equipment state changes over time. This polynomial can approximate the evolution of the bucket wheel excavator's operating characteristics over time with a high degree of fit. Subsequently, the real-time moment determined in the previous step is substituted into the actual fitting polynomial as the input value, and the corresponding predicted output value is obtained through calculation, which is the state estimation result of the equipment at that moment. Finally, based on this predicted output value, a set of predicted operating characteristic parameters reflecting the current operating state of the bucket wheel excavator is organized. These predicted operating characteristic parameters include, but are not limited to, operating indicators such as equipment pitch angle, horizontal rotation angle, and conveyor arm extension displacement.

[0032] Furthermore, the method provided in the application embodiment, which extracts the simulated operation feature parameters from the simulated records and performs verification analysis on the simulated operation feature parameters according to the edge sampling verification mechanism to obtain the verification result, further includes: constructing a first sampling verification curve according to the correspondence between the arbitrary operation index and the arbitrary prediction parameter; matching the arbitrary simulation parameter corresponding to the arbitrary operation index in the simulated operation feature parameters; constructing a second sampling verification curve according to the correspondence between the arbitrary operation index and the arbitrary simulation parameter; comparing the first sampling verification curve and the second sampling verification curve according to the edge sampling verification mechanism to obtain the sampling distance; and using the sampling distance as the verification result.

[0033] In this embodiment of the application, the index mapping and curve generation method is first applied. Based on the set arbitrary operating index, the corresponding arbitrary prediction parameter is located in the set of predicted operating feature parameters. Then, the prediction parameter values ​​of each sampling point are connected point by point according to the time order or sampling order to construct the first sampling verification curve.

[0034] Subsequently, an index matching extraction method was employed to retrieve and match any simulation parameter corresponding to any of the aforementioned operational indices from the extracted simulation operation feature parameters. During the matching process, multi-condition verification was performed based on index name, unit type, and sampling time sequence to ensure that the data extracted from the simulation side and the data from the prediction side remained consistent in physical meaning and sampling rhythm.

[0035] After successfully matching the simulation parameters, the simulation parameter curve construction method is used to connect the extracted arbitrary simulation parameters point by point according to the time sequence to generate a second sampling verification curve describing the trend of equipment status changes during the simulation operation of the bucket wheel excavator.

[0036] Subsequently, based on the edge sampling verification mechanism, the first and second sampling verification curves are compared. In this process, a predetermined sampling frequency is first obtained, and based on this frequency, both the first and second sampling verification curves are simultaneously sampled to generate a set of point pairs with clearly defined correspondences. Then, a distance decision scheme is introduced, and point-to-point distance analysis is performed on each of the formed point pairs. By calculating the numerical differences between corresponding points, the analysis results are finally summarized to obtain the sampling distance used to measure the consistency of the two curves. Finally, the sampling distance is used as the verification result.

[0037] Furthermore, in the method provided in the application embodiment, the sampling distance is obtained by comparing the first sampling verification curve and the second sampling verification curve according to the edge sampling verification mechanism, and the method further includes: A predetermined sampling frequency is obtained, and the first sampling verification curve and the second sampling verification curve are sampled based on the predetermined sampling frequency to form a point pair set; a distance decision scheme is introduced to perform point-to-point distance analysis on the point pair set to obtain the sampling distance.

[0038] In this embodiment, a predetermined sampling frequency, pre-set by technical experts, is first obtained. Then, based on this frequency, the first and second sampling verification curves are sampled. By synchronously extracting data points at the same time points, a set of sampling points strictly aligned in time is formed. Subsequently, corresponding data points sampled from the two curves are paired one-to-one to generate a time-consistent data set, i.e., a standardized point-pair set. Each pair contains a prediction-side data point and a simulation-side data point.

[0039] Next, a distance decision-making scheme is introduced to perform point-to-point distance analysis on the point-to-point set. In this process, a predetermined distance grid is first obtained. Then, in the point-to-point set obtained through synchronous sampling, corresponding sampling points for each pair are selected; that is, the first and second sampling points are extracted from the first and second sampling verification curves, respectively, and the distance between them is calculated based on the values ​​of the two points. According to the preset distance decision-making scheme, the distance values ​​calculated for each pair are filled into the predetermined distance grid according to the corresponding relationship, forming a complete filling result. Finally, according to predetermined rules, the filling value of the target grid position is extracted from the filling result as the final sampling distance.

[0040] Furthermore, in the method provided in the application embodiments, the sampling distance is obtained by performing point-to-point distance analysis on the point-to-point set using a distance decision scheme. The method further includes: Obtain a predetermined distance grid; obtain a first point pair, the first point pair including a first sample point in the first sampling verification curve and a second sample point in the second sampling verification curve; obtain the distance between the first sample point and the second sample point, and fill the distance into the predetermined distance grid according to the distance decision plan to obtain a filling result; take the filling value of the predetermined grid in the filling result as the sampling distance.

[0041] In this embodiment, a distance grid pre-setting method is first adopted. Technical experts pre-define a fixed-size distance grid according to the analysis requirements to store the calculated distance values ​​between each pair of sampling points. The pre-set distance grid is designed as a one-dimensional array or a simple matrix, and its size is determined based on the number of point pairs obtained from synchronous sampling. For example, if 100 point pairs are formed in one synchronous sampling process, the distance grid will be pre-set to contain 100 cells to ensure that it can accommodate all subsequent point pair distance filling data.

[0042] Next, a synchronous sampling point pair extraction method is used to extract sampling points sequentially from the first and second sampling verification curves that have been synchronously sampled, according to the timestamp order, and combine them to form the first point pair. Each first point pair contains a first sample point from the first sampling verification curve and a second sample point from the second sampling verification curve. The two are strictly corresponding in time to ensure that the formed data pair has temporal consistency and physical meaning correspondence.

[0043] Subsequently, a point-to-point distance calculation method is employed. For each extracted point pair, the vertical distance between the first and second sample points is calculated. Specifically, the Euclidean distance formula is used, which involves taking the square root of the square of the difference between the two point values. For example, if the first sample point value is 42 and the second sample point value is 40, the distance between the corresponding point pair is 2. This method accurately quantifies the instantaneous differences between each set of synchronously sampled data points.

[0044] After calculating the point-to-point distances, a distance-filling method is used to fill each calculated point-to-point distance into a pre-defined distance grid according to the sampling order. During the filling process, the principle of one-to-one correspondence between the sampling number and the grid cell position is strictly followed. Each point-to-point distance value is filled into the corresponding grid position; for example, the distance of the first sampled point-to-point pair is filled into the first grid cell, the distance of the second sampled point-to-point pair is filled into the second cell, and so on, until all point-to-point distances are filled, forming a complete filling result.

[0045] Finally, a sampling distance extraction method is used. Based on the set extraction strategy, target data is extracted from the filled distance grid to generate the final sampling distance. The extraction strategy can vary depending on business needs. For example, the average distance value of all point pairs can be selected as the sampling distance to reflect the overall consistency level; alternatively, the maximum distance value can be selected to focus on outlier deviations. Through this process, the final sampling distance is obtained.

[0046] Step S400: Determine the target control analysis information based on the verification results, and analyze the target control analysis information to obtain the target control scheme.

[0047] In this embodiment, the method for constructing the target control analysis information is first determined based on the verification result to determine whether it meets the predetermined verification constraints. When the verification result meets the predetermined verification constraints, the target control analysis information is constructed based on the simulated operation characteristic parameters and the actual operating environment parameters; when the verification result does not meet the predetermined verification constraints, the target control analysis information is constructed based on the predicted operation characteristic parameters and the actual operating environment parameters.

[0048] Subsequently, a target control scheme reasoning method is employed. Based on the established target control analysis information, a rule-based reasoning control scheme generation method is used for comprehensive analysis. Specifically, firstly, a standard rule set stored in the control knowledge base is invoked. This rule set is pre-defined based on historical equipment operating data, typical environmental characteristics, and control experience, covering the mapping relationship between different operating states and corresponding control actions. Based on key features in the current target control analysis information, such as equipment operating condition parameters, environmental change trend parameters, and prediction deviation characteristics, each pre-defined rule is matched to select the rule entry that best matches the current equipment state. During the matching process, a strict conditional matching strategy is applied; that is, a rule is considered a valid match only when all key fields in the target control analysis information meet the triggering conditions of a certain rule. After rule matching is completed, a complete target control scheme is generated based on the matched control instruction template, including the equipment action instructions to be adjusted and the corrected operating parameter values.

[0049] Furthermore, the method provided in the application embodiments also includes: The target control analysis information is determined based on the verification results, and the target control analysis information is analyzed to obtain a target control scheme, including: when the verification results meet the predetermined verification constraints, the target control analysis information is constructed based on the simulated operation characteristic parameters and the actual operating environment parameters; when the verification results do not meet the predetermined verification constraints, the target control analysis information is constructed based on the predicted operation characteristic parameters and the actual operating environment parameters.

[0050] In this embodiment, a verification result determination method is first employed. Based on the generated verification result—the sampling distance calculated in the preceding steps—it is compared and analyzed with a preset predetermined verification constraint. Specifically, a verification threshold is set according to consistency requirements, and numerical comparison is used to determine whether the current sampling distance is within the allowable range. If the sampling distance is less than or equal to the predetermined verification constraint, it indicates that the simulation data is highly consistent with the actual state; if the sampling distance exceeds the predetermined threshold, it is considered to have a significant deviation.

[0051] When the determination result indicates that the verification result meets the predetermined verification constraints, a simulated feature parameter construction method is adopted. This method fuses the simulated operating feature parameters acquired synchronously with the actual operating environment parameters at the corresponding time to form target control analysis information. Specifically, data items characterizing the equipment's operating status, such as pitch angle, torque load, and speed response, are extracted from the simulated operating feature parameters. These are then synchronously correlated with external conditions in the actual operating environment parameters, such as temperature, humidity, wind speed, and terrain changes. Through parameter alignment, data mapping, and other processing methods, a complete target control analysis information reflecting the current equipment operation and environmental adaptability characteristics is constructed.

[0052] When the verification result does not meet the predetermined verification constraints, the predicted operating characteristic parameters generated in the previous step are combined with the actual operating environment parameters. Using the data association method, the predicted state parameters of the equipment and the external environmental condition parameters are integrated into a new set of target control analysis information according to the time sequence alignment and feature mapping method.

[0053] Step S500: Perform low-delay control on the bucket wheel excavator according to the target control scheme.

[0054] In this embodiment, based on the generated target control scheme, specific control commands are parsed and obtained. Through a rapid command distribution mechanism, these commands are synchronously distributed to the bucket wheel excavator's pitching mechanism, slewing mechanism, conveyor boom extension mechanism, and power system, and coordinated and adjusted according to the action requirements set in the target control scheme. By completing command parsing and distribution at a local edge computing node, command processing and response time are shortened, achieving rapid control and low-latency response of the bucket wheel excavator.

[0055] In summary, the embodiments of this application have at least the following technical effects: This application utilizes an edge computing network to perform multi-dimensional on-site monitoring of a bucket wheel excavator, obtaining real-time on-site information. A virtual model of the bucket wheel excavator is constructed, and the virtual model is simulated using the real-time on-site information to obtain simulation records. Simulated operation characteristic parameters are extracted from the simulation records, and these parameters are verified and analyzed using an edge sampling verification mechanism to obtain verification results. Target control analysis information is determined based on the verification results, and a target control scheme is obtained by analyzing this information. The bucket wheel excavator is then controlled with low latency according to the target control scheme. This invention solves the technical problems of large delays and slow response speeds in the issuance of control commands for bucket wheel excavators in the prior art. By parsing the target control scheme in real-time in an edge computing network and rapidly issuing control commands to various mechanisms of the bucket wheel excavator, the technical effect of shortening control link latency, improving command response speed, and achieving low-latency control of the bucket wheel excavator is achieved.

[0056] Example 2 is based on the same inventive concept as the edge computing-based low-latency control method for bucket wheel excavators in the previous examples, such as... Figure 2 As shown, this application provides a low-latency control system for bucket wheel excavators based on edge computing. The system and method embodiments in this application are based on the same inventive concept. The system includes: The monitoring module 11 is used to perform multi-dimensional on-site monitoring of the bucket wheel excavator through an edge computing network to obtain real-time on-site information; the simulation module 12 is used to construct a virtual model of the bucket wheel excavator and perform simulation on the virtual model in combination with the real-time on-site information to obtain simulation records; the verification and analysis module 13 is used to extract the simulation operation feature parameters in the simulation records and perform verification and analysis on the simulation operation feature parameters according to the edge sampling verification mechanism to obtain verification results; the target control scheme determination module 14 is used to determine the target control analysis information based on the verification results and analyze the target control analysis information to obtain a target control scheme; and the low-latency control module 15 is used to perform low-latency control on the bucket wheel excavator according to the target control scheme.

[0057] Furthermore, the system is also used to implement the following functions: The actual operating environment parameters of the bucket wheel excavator are obtained by monitoring the environmental monitoring equipment; the actual operating characteristic parameters of the bucket wheel excavator are obtained by monitoring the operation monitoring equipment; the actual operating environment parameters and the actual operating characteristic parameters constitute the real-time field information.

[0058] Furthermore, the system is also used to implement the following functions: Extracting simulation operation feature parameters from the simulation record includes determining the real-time moment and matching the simulation operation feature parameters at the real-time moment in the simulation record.

[0059] Furthermore, the system is also used to implement the following functions: The monitoring time of the operation monitoring equipment is obtained, wherein the monitoring time is earlier than the real-time time; an actual parameter time series is formed according to the correspondence between the monitoring time and the actual operation characteristic parameters; the actual parameter time series is analyzed to obtain the predicted operation characteristic parameters at the real-time time; an arbitrary operation index is obtained, and an arbitrary predicted parameter corresponding to the arbitrary operation index is matched in the predicted operation characteristic parameters; the simulated operation characteristic parameters are verified with the arbitrary predicted parameters according to the edge sampling verification mechanism, and the verification result is formed.

[0060] Furthermore, the system is also used to implement the following functions: The actual parameters are subjected to regression fitting analysis based on the principle of random sampling to obtain the actual fitting polynomial; the real time is used as the input value of the actual fitting polynomial to obtain the output value, and the predicted running characteristic parameters are composed based on the output value.

[0061] Furthermore, the system is also used to implement the following functions: Based on the correspondence between the arbitrary operating index and the arbitrary predicted parameter, a first sampling verification curve is constructed; any simulated parameter corresponding to the arbitrary operating index is matched in the simulated operating feature parameters; based on the correspondence between the arbitrary operating index and the arbitrary simulated parameter, a second sampling verification curve is constructed; based on the edge sampling verification mechanism, the first sampling verification curve and the second sampling verification curve are compared to obtain the sampling distance; the sampling distance is used as the verification result.

[0062] Furthermore, the system is also used to implement the following functions: A predetermined sampling frequency is obtained, and the first sampling verification curve and the second sampling verification curve are sampled based on the predetermined sampling frequency to form a point pair set; a distance decision scheme is introduced to perform point-to-point distance analysis on the point pair set to obtain the sampling distance.

[0063] Furthermore, the system is also used to implement the following functions: Obtain a predetermined distance grid; obtain a first point pair, the first point pair including a first sample point in the first sampling verification curve and a second sample point in the second sampling verification curve; obtain the distance between the first sample point and the second sample point, and fill the distance into the predetermined distance grid according to the distance decision plan to obtain a filling result; take the filling value of the predetermined grid in the filling result as the sampling distance.

[0064] Furthermore, the system is also used to implement the following functions: The target control analysis information is determined based on the verification results, and the target control analysis information is analyzed to obtain a target control scheme, including: when the verification results meet the predetermined verification constraints, the target control analysis information is constructed based on the simulated operation characteristic parameters and the actual operating environment parameters; when the verification results do not meet the predetermined verification constraints, the target control analysis information is constructed based on the predicted operation characteristic parameters and the actual operating environment parameters.

[0065] It should be noted that the order of the embodiments described above is merely for descriptive purposes and does not represent the superiority or inferiority of the embodiments. Furthermore, the above description focuses on specific embodiments of this specification. The processes depicted in the accompanying drawings do not necessarily require a specific or sequential order to achieve the desired results. In some implementations, multitasking and parallel processing are possible or may be advantageous.

[0066] The above description is only a preferred embodiment of this application and is not intended to limit this application. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the protection scope of this application.

[0067] This specification and accompanying drawings are merely illustrative examples of this application and are intended to cover any and all modifications, variations, combinations, or equivalents within the scope of this application. Clearly, those skilled in the art can make various alterations and modifications to this application without departing from its scope. Therefore, if such modifications and modifications fall within the scope of this application and its equivalents, this application intends to include such modifications and modifications.

Claims

1. A low-latency control method for bucket wheel excavators based on edge computing, characterized in that, include: Multi-dimensional on-site monitoring of the bucket wheel excavator is performed through an edge computing network to obtain real-time on-site information; A virtual model of the bucket wheel excavator is constructed, and the virtual model is simulated using the real-time field information to obtain a simulation record; Extract the simulation operation feature parameters from the simulation record, and perform verification analysis on the simulation operation feature parameters according to the edge sampling verification mechanism to obtain the verification results; Based on the verification results, target control analysis information is determined, and the target control scheme is obtained by analyzing the target control analysis information. The bucket wheel excavator is controlled with low delay according to the target control scheme; The edge computing network includes environmental monitoring equipment and operational monitoring equipment. It performs multi-dimensional on-site monitoring of the bucket wheel excavator to obtain real-time on-site information, including: The actual operating environment parameters of the bucket wheel excavator are obtained by monitoring the environmental monitoring equipment. The actual operating characteristic parameters of the bucket wheel excavator are obtained by monitoring the operation monitoring equipment. The actual operating environment parameters and the actual operating characteristic parameters constitute the real-time field information; Extracting simulation operation feature parameters from the simulation record includes determining the real-time moment and matching the simulation operation feature parameters at the real-time moment in the simulation record; Specifically, the simulation operation feature parameters are extracted from the simulation records, and the simulation operation feature parameters are verified and analyzed according to the edge sampling verification mechanism to obtain the verification results, including: The monitoring time of the operation monitoring equipment is obtained, wherein the monitoring time is earlier than the real-time time; The actual parameter time series is formed based on the correspondence between the monitoring time and the actual operating characteristic parameters; Analyzing the time series of the actual parameters yields the predicted operational characteristic parameters at the real-time moment; Obtain any operational indicator and match any prediction parameter corresponding to the arbitrary operational indicator in the predicted operational feature parameters; According to the edge sampling verification mechanism, the simulated running feature parameters are verified using the arbitrary prediction parameters, and the verification result is formed. Specifically, the simulation operation feature parameters are extracted from the simulation records, and the simulation operation feature parameters are verified and analyzed according to the edge sampling verification mechanism to obtain the verification results, including: Based on the correspondence between the arbitrary operating indicators and the arbitrary prediction parameters, a first sampling verification curve is constructed; Match any simulation parameter corresponding to any operational index among the simulated operational characteristic parameters; Based on the correspondence between the arbitrary operating index and the arbitrary simulation parameter, a second sampling verification curve is constructed; Based on the edge sampling verification mechanism, the sampling distance is obtained by comparing the first sampling verification curve with the second sampling verification curve. The sampling distance is used as the verification result.

2. The low-latency control method for bucket wheel excavators based on edge computing as described in claim 1, characterized in that, Analyzing the actual parameter time series yields the predicted operational characteristic parameters at the real-time moment, including: Based on the principle of random sampling, a regression fitting analysis is performed on the time series of the actual parameters to obtain the actual fitting polynomial. The real-time moment is used as the input value of the actual fitting polynomial to obtain the output value, and the predicted running feature parameters are composed based on the output value.

3. The low-latency control method for bucket wheel excavators based on edge computing as described in claim 1, characterized in that, According to the edge sampling verification mechanism, the sampling distance is obtained by comparing the first sampling verification curve and the second sampling verification curve, including: A predetermined sampling frequency is obtained, and the first sampling verification curve and the second sampling verification curve are sampled based on the predetermined sampling frequency to form a point pair set; The sampling distance is obtained by performing point-to-point distance analysis on the point-to-point set using a distance decision scheme.

4. The low-latency control method for bucket wheel excavators based on edge computing as described in claim 3, characterized in that, The sampling distance is obtained by performing point-to-point distance analysis on the point-to-point set using a distance decision-making scheme, including: Obtain the grid at the predetermined distance; Obtain the first point pair, which includes the first sample point in the first sampling verification curve and the second sample point in the second sampling verification curve; Obtain the distance between the first sample point and the second sample point, and fill the distance into the predetermined distance grid according to the distance decision plan to obtain the filling result; The filling value of the predetermined grid in the filling result is taken as the sampling distance.

5. The low-latency control method for bucket wheel excavators based on edge computing as described in claim 1, characterized in that, The target control analysis information is determined based on the verification results, and the target control analysis information is analyzed to obtain a target control scheme, including: when the verification results meet the predetermined verification constraints, the target control analysis information is constructed based on the simulated operation characteristic parameters and the actual operating environment parameters; when the verification results do not meet the predetermined verification constraints, the target control analysis information is constructed based on the predicted operation characteristic parameters and the actual operating environment parameters.

6. A low-latency control system for bucket wheel excavators based on edge computing, characterized in that, The system is used to perform the method as described in any one of claims 1-5, the system comprising: The monitoring module is used to perform multi-dimensional on-site monitoring of the bucket wheel excavator through an edge computing network to obtain real-time on-site information; The simulation module is used to construct a virtual model of the bucket wheel excavator and to simulate the virtual model in conjunction with the real-time field information to obtain simulation records; The verification analysis module is used to extract the simulation operation feature parameters from the simulation record, and perform verification analysis on the simulation operation feature parameters according to the edge sampling verification mechanism to obtain the verification results; The target control scheme determination module is used to determine target control analysis information based on the verification results, and analyze the target control analysis information to obtain a target control scheme. A low-latency control module is used to perform low-latency control on the bucket wheel excavator according to the target control scheme.

Citation Information

Patent Citations

  • Equipment key force-bearing structural member health monitoring system based on edge calculation and updated sample intelligent identification

    CN112216085A

  • Full-automatic stacking control system of bucket-wheel stacker-reclaimer

    CN114873295A