Combined revetment for channel reinforcement and construction method thereof
By combining load-bearing piles and sheet piles in the revetment structure, the problems of large workload and high cost in waterway reinforcement projects have been solved, achieving efficient and safe waterway reinforcement and ecological protection.
Patent Information
- Application Number
- CN202510913295.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-03
- Publication Date
- 2025-11-07
AI Technical Summary
Existing waterway reinforcement solutions involve large-scale engineering projects, high costs, and affect vessel passage; therefore, there is a lack of effective waterway reinforcement methods.
The revetment structure adopts a combination of load-bearing piles and sheet piles. The load-bearing piles are stably connected through the design of anchor holes and anchor rods. Stops and insertion slots are set on the sheet piles to restrict their movement. Combined with ecological channels and planting frames, the ecological environment is improved.
It enables rapid reinforcement of waterways, reduces engineering workload and costs, improves construction efficiency and safety, protects the ecological environment, and does not affect the passage of existing waterways.
Smart Images

Figure CN120906093A_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of revetment, in particular to a combined revetment for channel reinforcement and a construction method thereof. BACKGROUND
[0002] Water transportation is an important part of the transportation industry due to its high transportation capacity and low transportation cost. It plays an important role in the development of modern industry and agriculture, improvement of people's life and promotion of international trade and cultural exchange. In the world, the water transportation industry is relatively developed in countries with relatively developed industry and agriculture. For example, the United States, Germany, the Netherlands and Russia have basically built a four-way river channel network, and the freight turnover is second only to railway transportation. With the continuous development of industry, water transportation is becoming more and more developed, and the tonnage of ships is becoming larger and larger, which leads to the fact that the water depth of many existing inland waterways cannot meet the operation of larger tonnage ships. Therefore, channel reinforcement is imminent.
[0003] The scheme of channel reinforcement is to deepen the depth of the channel, and then excavate the channel. However, the existing construction scheme is to rebuild the revetment, that is, to demolish the original revetment and then to build a new revetment according to the excavation depth. However, the reconstruction of the revetment not only has large engineering quantity and high cost, but also affects the normal passage of ships. Therefore, a channel and revetment reinforcement scheme is proposed for channel reinforcement and upgrading, but there is still no good scheme at present. SUMMARY
[0004] The purpose of the present application is to provide a combined revetment for channel reinforcement and a construction method thereof to solve the problems in the background art.
[0005] To achieve the above-mentioned purpose, the present application provides the following technical scheme: a combined revetment for channel reinforcement, comprising a stress pile and a plug-in pile, the stress pile is inserted along the edge of the channel, one plug-in pile is inserted between two adjacent stress piles, each stress pile is connected with at least one anchor rod for fixing, the stress pile is provided with an anchor hole corresponding to the anchor rod, the anchor hole is in a converging structure from the water-facing surface of the stress pile to the backwater surface of the stress pile and forms an installation guide and a limit for the anchor rod, and the two side edges of the stress pile connected with the plug-in pile are provided with a stopper for limiting the movement of the plug-in pile towards the water-facing surface thereof.
[0006] Further optimization, the anchor hole comprises a guide hole and a limiting hole, the guide hole is close to the water-facing surface of the stress pile, and the limiting hole is connected with the bottom of the guide hole and penetrates through the backwater surface of the stress pile, the guide hole and the limiting hole are in a converging structure, and the installation guide and the limit for the anchor rod are realized.
[0007] Further optimization, the height of the guide hole and the limiting hole near the water surface of the force pile is higher than that near the backwater surface of the force pile, forming a downward inclined hole structure, so that the anchor rod generates an inclined tension on the force pile, which can be decomposed into a transverse and a longitudinal force acting on the force pile, ensuring the stable installation of the force pile.
[0008] Further optimization, the cross section of the guide hole near the limiting hole end is larger than the cross section of the limiting hole near the guide hole end, forming a step, which can better limit the end anchor of the anchor rod.
[0009] Further optimization, the cross section of the guide hole is circular or polygonal, diversified in structure, easy to process and without interference; the cross section of the limiting hole is circular, facilitating the insertion of the anchor rod and avoiding interference with the anchor rod, and the circular hole cross section can more evenly transmit the friction and adhesion between the anchor rod and the force pile under stress, and has stronger resistance to shear failure, especially in complex geological conditions.
[0010] Further optimization, a first insertion slot is provided on the inner side of the force pile near the stopper, and the slot opening direction faces the backwater surface of the force pile, both ends of the inserted pile are provided with an insertion protrusion matched with the first insertion slot, and the stopper and the insertion protrusion form transverse limiting in the arrangement direction of the force pile and the inserted pile, realizing the connection and limiting of the force pile and the inserted pile.
[0011] Further optimization, an elastic deformation member is arranged in the first insertion slot, which can fill the gap between the first insertion slot and the insertion protrusion, improving the soil retaining and water stopping ability.
[0012] Further optimization, the first insertion slot is a semicircular groove and penetrates the force pile from top to bottom, the side of the first insertion slot away from the inserted pile is a straight side and perpendicular to the water surface of the force pile, and the insertion protrusion is a semicircular protrusion matched with the first insertion slot, and the side of the insertion protrusion near the force pile is a straight side matched with the side of the first insertion slot, facilitating the connection of the inserted pile and the force pile.
[0013] Further optimization, the inner side of the inserted pile near the insertion protrusion is provided with a second insertion slot, and the slot opening direction faces the water surface of the inserted pile, and the second insertion slot is matched with the end of the stopper, realizing double limiting in the connection direction of the force pile and the inserted pile, and improving the connection stability.
[0014] Further optimization, the first plug-in slot is a semicircular groove and penetrates the force pile up and down, the slot depth direction of the first plug-in slot is inclined towards the middle of the force pile, the angle between the slot depth direction of the first plug-in slot and the water surface of the force pile is greater than 0° and less than 90°, the side of the first plug-in slot away from the plug-in pile is an arc-shaped side curved towards the center of the first plug-in slot, and the plug-in protrusion is a semicircular protrusion matched with the first plug-in slot, and the side close to the force pile is an arc-shaped side matched with the side of the first plug-in slot, so that the water surface and the backwater surface of the plug-in pile are abutted, and the installation stability is improved.
[0015] Further optimization, the upper half of the plug-in pile is provided with a plurality of transversely arranged through holes penetrating the water surface and the backwater surface of the plug-in pile, and a plurality of ecological channel warehouses and / or ecological planting frames are arranged in the through holes, so that ecological planting and aquatic animal survival are realized, and the wave dissipation effect is achieved to improve the ecological environment of the waterway.
[0016] Further optimization, the lower half of the force pile is provided with a downwardly penetrating long groove, and the long groove is arranged on the water surface of the force pile, so that the installation of the force pile is facilitated, the vortex erosion around the pile body is reduced, the soil around the force pile is protected, and the water energy collision caused by ship navigation can be dispersed.
[0017] Based on the same inventive concept, the application also discloses a combined revetment construction method for waterway reinforcement, which is applied to the combined revetment for waterway reinforcement and comprises the following steps:
[0018] Step 1), a force pile is driven into a predetermined position on the edge of a waterway by using a pile driving device, the straightness is ensured, then the plug-in pile is driven, and the force pile and the plug-in pile are alternately driven into the waterway along the edge of the waterway, at this time, the plug-in protrusions on the two sides of the plug-in pile are inserted into the first plug-in slots of the adjacent two force piles;
[0019] Step 2), a drilling device on a construction ship is used to drill a hole in the concrete of the waterway, the anchor hole on the force pile is used for guidance and positioning, then the anchor hole is drilled into the concrete of the waterway and penetrates the concrete of the waterway and reaches the soil behind the waterway to form an anchor rod installation hole;
[0020] Step 3), the steel strand of the anchor rod is inserted into the anchor rod installation hole formed in step 2), and then grouting is performed;
[0021] Step 4), after the grout solidifies, the anchor rod is tensioned and tightened by using an anchor device in the anchor hole on the force pile, and is locked after reaching a set tension value, so that the construction of the combined revetment is completed.
[0022] Further optimization, before drilling in the step 2), support columns are poured between the bank and the force pile, and then drilling is carried out, and the formed anchor rod mounting hole comprises the support column section.
[0023] Further optimization, before tensioning the anchor rod in the step 4), support columns are poured between the bank and the force pile, and a sleeve is sleeved on the section of the anchor rod between the bank and the force pile before pouring.
[0024] Further optimization, after tensioning the anchor rod in the step 4), an anchor sealing process is carried out in the anchor hole.
[0025] Further optimization, the anchor sealing process comprises sealing the hole by using cementing material or foaming agent to isolate the anchor rod from water.
[0026] Compared with the prior art, the present application has the following beneficial effects:
[0027] 1、The combined bank protection for waterway reinforcement of the present application realizes the combination of the combined bank protection and the bank by the alternative connection of the force pile and the inserted pile and the insertion of the combined bank protection at the edge of the bank, can strengthen the bank protection function, and the reinforcement of the waterway is simple, the original bank does not need to be removed, only the combined bank protection with higher height needs to be added at the edge of the original bank, which is not only beneficial to the rapid reinforcement and upgrading of the waterway, but also can be used for the reinforcement of the newly-built waterway, has small engineering quantity and low cost, strong bank protection capacity, small construction range, small cross-sectional width of the combined bank protection, minimizes the adverse effect of the formed reinforcement structure on the water width, and does not affect the operation of the ship in the existing waterway.
[0028] 2、The setting of the anchor hole facilitates the installation and guidance of the anchor rod, can be constructed under the condition that the underwater vision is not clear, has small influence on navigation, effectively improves the construction efficiency and safety, and can further strengthen the stability of the force pile and improve the stability of the combined bank protection by installing the anchor rod in the anchor hole.
[0029] 3、The anchoring of the force pile on the pile body can weaken the stress requirement of the cap beam and the inserted pile, and the cap beam and the inserted pile can better adapt to the ecological and landscape requirements; the setting of the stopper can form good limiting of the inserted pile, guarantee and cooperate with the abutment of the bank, can guarantee the installation stability of the inserted pile without external fixing structure; and cooperating with the first inserted slot and the inserted protrusion can make the force pile and the inserted pile form mutual transverse limiting, improve the stability of the combined bank protection, and improve the leakage prevention effect of the combined bank protection formed by the force pile and the inserted pile.
[0030] 4. By arranging the ecological channel bin and / or ecological planting frame in the through hole, the planting of aquatic plants is facilitated, and the effect of flow resistance and wave dissipation is achieved, forming a stable and benign ecological area, combined with vegetation ecology, which is conducive to forming a good water animal community living environment, promoting the stability of the local water biological community structure, effectively controlling the ecological condition of the inland river channel bank, and ensuring the smoothness and safety of the inland river channel;
[0031] 5. The force receiving pile and the inserted plate pile are both made of concrete, have high structural strength, regular structure, are easy to mass-produce quickly, can improve the structure assembly rate, and reduce carbon emissions;
[0032] 6. The combined revetment for channel reinforcement has a simple construction method, high construction efficiency and low cost, high stability of the combined revetment, and does not damage the ecological environment of the channel near the construction area. BRIEF DESCRIPTION OF DRAWINGS
[0033] Figure 1 The axial structure schematic diagram of the combined revetment for channel reinforcement disclosed by the embodiment of the present application;
[0034] Figure 2 The axial structure schematic diagram of the combined revetment for channel reinforcement disclosed by the embodiment of the present application;
[0035] Figure 3 The axial structure schematic diagram of the combined revetment for channel reinforcement disclosed by the embodiment of the present application;
[0036] Figure 4 The axial structure schematic diagram of the combined revetment for channel reinforcement disclosed by the embodiment of the present application;
[0037] Figure 5 The axial structure schematic diagram of the combined revetment for channel reinforcement disclosed by the embodiment of the present application;
[0038] Figure 6 The axial structure schematic diagram of the combined revetment for channel reinforcement disclosed by the embodiment of the present application;
[0039] Figure 7 The axial structure schematic diagram of the combined revetment for channel reinforcement disclosed by the embodiment of the present application;
[0040] The axial structure schematic diagram of the combined revetment for channel reinforcement disclosed by the embodiment of the present application; DETAILED DESCRIPTION
[0041] In order to make the objects, technical solutions and advantages of the present application clearer, the present application will be further described in detail below with reference to specific embodiments and drawings.
[0042] It should be noted that, unless otherwise defined, technical terms or scientific terms used in the embodiments of the present application should be understood as their common meanings to those of ordinary skill in the art to which the present application pertains. The terms "first", "second" and similar terms used in the embodiments of the present application do not denote any order, quantity or importance, but are only used to distinguish different components. The terms "comprising" or "including" and similar terms mean that the elements or objects before the terms encompass the elements or objects listed after the terms and their equivalents, and do not exclude other elements or objects. The terms "connected" or "linked" and similar terms do not mean physical or mechanical connection, but can include electrical connection, whether direct or indirect. The terms "upper", "lower", "left", "right" and the like only represent relative positional relationships, which can change when the absolute positions of the described objects change.
[0043] Please refer to Figure 1 , Figure 2 and Figure 3 and Figure 7 , a combined revetment for channel reinforcement includes force piles 1 and plate piles 2, the force piles 1 are inserted along the edge of the channel bank, and a plate pile 2 is inserted between two adjacent force piles 1, each force pile 1 is connected with at least one anchor rod 3 for its fixation, the force pile 1 is provided with an anchor hole 13 corresponding to the installation of the anchor rod 3, the anchor hole 13 is in a tapered structure from the water-facing surface of the force pile 1 to the land-facing surface of the force pile 1 and forms an installation guide and a position limit for the anchor rod 3, and both sides of the force pile 1 connected with the plate pile 2 are provided with a stop portion 11 for limiting the movement of the plate pile 2 towards the water-facing surface thereof. The "tapered structure" of the anchor hole 13 means that the cross section of the anchor hole 13 near the water-facing surface is larger than that far from the water-facing surface, so that the cross section of the anchor hole 13 gradually shrinks from large to small in the "water-land" direction, which plays a guiding role when the anchor rod 3 is installed; the term "tapered" appearing in the present application should be understood according to the above explanation.
[0044] In the application, the combined revetment is used in the reinforcement and reconstruction of the waterway, can protect the waterway in the deepening reconstruction of the waterway, including the upgrading, new construction and reinforcement of the waterway, realizes the revetment function of the water bank 4 by inserting the force pile 1 and the plate pile 2 at the edges of the water bank 4 on both sides of the waterway. The force pile 1 and the plate pile 2 are both made of concrete, have high structural strength and regular structure, and are easy to mass-produce quickly. The force pile 1 is connected with the anchor rod 3, realizes the tensioning and fixing of the force pile 1 through the anchor rod 3, and ensures that the force pile 1 will not tilt towards the water surface. The anchor rod 3 is installed through the anchor hole 13 of the force pile 1 and pulls the force pile 1, and the anchor hole 13 is located at the middle upper part of the force pile 1, which ensures the stability of the insertion of the force pile 1. The number of anchor rods 3 connected with each force pile 1 is at least one, preferably two, one is located at the middle part of the force pile 1, and the other is located at the upper half of the force pile 1 below the normal water level, which ensures the stability of the force pile 1, and at the same time, the installation of the anchor rod 3 at the middle upper part of the force pile 1 is also convenient for the installation of the anchor rod 3. The anchor hole 13 adopts a constricted structure, which is convenient for guiding the anchor rod 3 to be inserted into the anchor hole 13, and with the decrease of the hole diameter of the anchor hole 13, the anchor rod 3 is limited, which ensures that the end of the anchor rod 3 can be fixed relative to the position of the force pile 3, ensures the effective tension of the anchor rod 3 to the force pile 1, and facilitates the guidance and installation of the anchor rod 3 under water. The drill bit end of the anchor rod 3 is inserted into the soil behind the water bank 4 and the water bank 4, which connects the combined revetment and the water bank 4 into a whole, can strengthen the revetment function, and the reinforcement of the waterway is simple, without the need to remove the original water bank 4, only need to increase the combined revetment with higher height at the edge of the original water bank 4, which realizes the optimization of the structural stress condition, the small cross-sectional width, and the maximum reduction of the adverse effects of the combined revetment on the water width, which not only is conducive to the rapid reinforcement of the waterway, but also has low cost, strong revetment capacity and small construction range, without affecting the operation of the existing ships in the waterway.
[0045] In the application, the two sides of the force pile 1 and the plate pile 2 are both provided with a stop part 11 for limiting the movement of the plate pile 2 towards the water surface, which realizes the limiting of the plate pile 2 and ensures the longitudinal installation and installation stability of the plate pile 2. In this structure, the force pile 1 is stably fixed by the support of the water bank 4 at the edge of the waterway and the fixing of the anchor rod 3, at this time, the backwater surface and the water surface of the plate pile 2 are realized by the abutting fixing of the water bank 4 and the stop part 11, which ensures the installation stability of the plate pile 2.
[0046] Please refer to Figure 2 , Figure 3As shown, in an embodiment related to the anchor hole 13, the anchor hole 13 comprises a guide hole 131 close to the water-facing surface of the force pile 1 and a limiting hole 132 connected to the bottom of the guide hole 131 and penetrating through the backwater surface of the force pile 1, both the guide hole 131 and the limiting hole 132 are of a constricted structure. That is, the anchor hole 13 is divided into two parts, the guide hole 131 and the limiting hole 132, wherein the guide hole 131 is used for guiding the installation of the anchor rod 3, because the opening of the guide hole 131 is large, it is convenient for the insertion of the anchor rod 3, and at the same time, with the gradual shrinkage of the guide hole 131, the anchor rod 3 is guided to be inserted into the limiting hole 132, which is convenient for guiding the anchor rod 3 to be inserted into the limiting hole 132 under the condition that the underwater field of view is not clear. The limiting hole 132 is used for limiting the installation of the anchor rod 3, which can prevent the end anchor of the anchor rod 3 from penetrating through the limiting hole 132, and ensure the effective fixation of the anchor rod 3 to the force pile 1. And the limiting hole 132 also adopts a constricted structure, which is convenient for guiding the anchor rod 3, limiting the end anchor of the anchor rod 3, limiting the position of the anchor rod 3, preventing the anchor rod 3 from moving horizontally or vertically relative to the force pile 1, resulting in insufficient installation stability of the force pile 1; fourthly, by setting the anchor hole 13 on the force pile 1 and anchoring the force pile 1, the stress requirement of the cap beam and the plug-in pile can be weakened, and the cap beam and the plug-in pile can better adapt to the ecological and landscape requirements.
[0047] Further, the height of the guide hole 131 and the limiting hole 132 close to the water-facing surface of the force pile 1 is higher than that close to the backwater surface of the force pile 1, that is, the guide hole 131 and the limiting hole 132 are both downwardly inclined structures, which are inclined downward from the water-facing surface of the force pile 1 to the backwater surface, which is convenient for pulling the force pile 1 downward to the downstream of the navigation bank 4, forming a downwardly inclined tensile stress, which can generate a downward pulling force and a pulling force in the direction of the backwater surface to the force pile 1, improving the installation stability of the force pile 1.
[0048] Further, the hole cross section of the guide hole 131 close to the limiting hole 132 is larger than that of the limiting hole 132 close to the guide hole 131, at this time, the guide hole 131 and the limiting hole 132 form a stepped hole, which limits the end anchor of the anchor rod 3 through the step in the hole, and the limiting effect is good.
[0049] Further, the cross section of the guide hole 131 is circular or polygonal, and the cross section of the limiting hole 132 is circular, that is, the guide hole 131 can have various shapes and structures, and there is no special requirement, as long as it meets the production process requirements and does not interfere with the installation of the anchor rod 3, it can be a circular shrinkage hole, or a rectangular shrinkage hole, a pentagonal shrinkage hole, etc. The limiting hole 132 adopts a circular structure, on the one hand, it is convenient for production, on the other hand, the hole wall is circular, which is convenient for the insertion of the anchor rod 3 and does not interfere with the anchor rod 3, and the cross section of the circular hole can more evenly transmit the friction and bonding force between the anchor rod 3 and the stressed pile 1 under stress, and the geometric shape of the circular hole has stronger resistance to shear failure, especially in complex geological conditions, it can better maintain the integrity of the anchoring section.
[0050] Please refer to Figure 4 , Figure 5 and Figure 6 , in one embodiment related to the stressed pile 1 and the inserted pile 2, the inner side of the stressed pile 1 close to the stopper 11 is provided with a first insertion slot 12, and the slot opening direction faces the backwater surface of the stressed pile 1, and the two ends of the inserted pile 2 are provided with insertion protrusions 21 matched with the first insertion slot 12, and the stopper 11 and the insertion protrusions 21 form transverse limiting in the arrangement direction of the stressed pile 1 and the inserted pile 2.
[0051] In this embodiment, by providing the first insertion slot 12 on the stressed pile 1 and the insertion protrusions 21 on the two sides of the inserted pile 2, by inserting the insertion protrusions 21 into the first insertion slot 12, the mutual insertion connection of the stressed pile 1 and the inserted pile 2 is realized, and the stressed pile 1 can abut and limit the inserted pile 2, prevent the inserted pile 2 from tilting towards the water surface, and at the same time prevent the inserted pile 2 from being skewed towards one of the two stressed piles 1 connected thereto, causing the inserted pile 2 to be skewed, reducing or losing the ability of the revetment. And the first insertion slot 12 and the insertion protrusions 21 cooperate to guide the installation of one inserted pile 2 connected to the first stressed pile 1 after the installation of the first stressed pile 1, and when the inserted pile 2 is installed, the insertion protrusions 21 on the inserted pile 2 can guide the installation of the second stressed pile 1, and so on, which can guide the sequential, orderly and accurate installation of the stressed pile 1 and the inserted pile 2, without the need for positioning before installation and calibration during installation, etc. It can speed up the installation efficiency and installation accuracy of the combined revetment.
[0052] Further, the first insertion slot 12 is provided with an elastic deformation piece, which can fill the gap between the first insertion slot 12 and the matched insertion protrusions 21, and has better effect of retaining soil and stopping water. The elastic deformation piece can be independent, or combined with the stressed pile 1 or the inserted pile 2.
[0053] Please refer to Figure 4 , Figure 5As shown, the first insertion slot 12 is a semicircular groove and penetrates the stress pile 1 vertically, the side of the first insertion slot 12 away from the insertion pile 2 is a straight edge and perpendicular to the water-facing surface of the stress pile 1, the insertion protrusion 21 is a semicircular protrusion matching the first insertion slot 12 and the side close to the stress pile 1 is a straight edge matching the side of the first insertion slot 12. First, the first insertion slot 12 and the insertion protrusion 21 adopt a semicircular structure, which facilitates the matching and insertion of the first insertion slot 12 and the insertion protrusion 21, avoids the interference of the edges with the insertion protrusion 21 during insertion, and increases the difficulty of insertion. The side of the first insertion slot 12 away from the insertion pile 2 and the corresponding side of the insertion protrusion 21 are straight edges, which facilitates the insertion of the insertion protrusion 21 into the first insertion slot 12 and the connection of the insertion pile 2 and the stress pile 1.
[0054] As shown in the drawings, Figure 5 Preferably, the inner side of the insertion pile 2 close to the insertion protrusion 21 is provided with a second insertion slot 22 and the slot opening direction faces the water-facing surface of the insertion pile 2, the second insertion slot 22 matches the end of the stopper 11, that is, through the double-slot structure of the first insertion slot 12 and the second insertion slot 22, the stress pile 1 and the insertion pile 2 are limited in the connection direction, which can reduce the installation gap of the stress pile 1 and the insertion pile 2, improve the installation precision and stability.
[0055] As shown in the drawings, Figure 6As shown, preferably, the first insertion slot 12 is a semicircular groove and extends through the stress pile 1 vertically, the depth direction of the first insertion slot 12 is inclined towards the middle of the stress pile 1, the angle between the depth direction of the first insertion slot 12 and the water-facing surface of the stress pile 1 is greater than 0° and less than 90°, the side of the first insertion slot 12 away from the insertion pile 2 is an arc-shaped side curved towards the center of the first insertion slot 12, and the insertion protrusion 21 is a semicircular protrusion matched with the first insertion slot 12, and the side of the insertion protrusion 21 close to the stress pile 1 is an arc-shaped side matched with the side of the first insertion slot 12. The first insertion slot 12 is a hole arranged obliquely, which can limit the insertion protrusion 21 on both the water-facing surface and the backwater surface of the insertion pile 2, prevent the insertion pile 2 from being inclined towards the water-facing surface or the backwater surface relative to the stress pile 1, improve the installation accuracy, and thus make the insertion of the stress pile 1 and the insertion pile 2 of the combined revetment more stable. The side of the first insertion slot 12 away from the insertion pile 2 and the corresponding side of the insertion protrusion 21 are both arc-shaped, which makes the first insertion slot 12 and the insertion protrusion 21 form a hook effect, further increasing the abutting and limiting effect. The angle between the depth direction of the first insertion slot 12 and the water-facing surface of the stress pile 1 is greater than 0° and less than 90°, which ensures that the first insertion slot 12 can limit the insertion protrusion 21 on both the water-facing surface and the backwater surface, and limit the connection direction of the stress pile 1 and the insertion pile 2, i.e., the first insertion slot 12 can limit the insertion protrusion in four directions of front, back, left and right, improve the connection effect of the stress pile 1 and the insertion pile 2, and thus improve the stability of the combined revetment and the anti-soil-leakage effect of the combined revetment.
[0056] Please refer to Figure 1 , Figure 2 and Figure 7 As shown, in one embodiment related to the through hole 23, the upper half of the insertion pile 2 is provided with a plurality of transversely arranged through holes 23, the through holes 23 extend through the water-facing surface and the backwater surface of the insertion pile 2, and the through holes 23 are internally provided with ecological channel bins and / or ecological planting frames. That is, through the structure of the through hole 23, the through hole 23 can be used as a mounting space for the ecological channel bin and / or the ecological planting frame, which is convenient for the planting of aquatic plants and plays a role in resisting flow and dissipating waves, forming a stable and healthy ecological area. In addition, the combination of vegetation and ecology is conducive to the formation of a good living environment for aquatic animal communities, promotes the stability of the local aquatic biological community structure, effectively controls the ecological conditions of the inland waterway bank, and ensures the smoothness and safety of the inland waterway.
[0057] Please refer to Figure 3As shown, in one embodiment associated with the long slot 14, the lower half of the force pile 1 is provided with a downwardly penetrating long slot 14, which is arranged on the water-facing surface of the force pile 1. The structure of the long slot 14 can reduce the resistance of the force pile 1 when inserted into the soil, facilitate the piling of the force pile 1; secondly, it can reduce the vortex erosion around the pile body, protect the soil around the force pile; at the same time, it can also disperse the water energy collision caused by the ship navigation, reduce the risk of local damage of the pile body; it can also provide living space for small aquatic organisms.
[0058] Please refer to Figure 1 and Figure 7 Based on the same inventive concept, another embodiment of the application also discloses a combined revetment construction method for channel reinforcement, which is applied to the combined revetment for channel reinforcement in the above-mentioned embodiment, and comprises the following steps:
[0059] Step 1), a force pile 1 is driven into a predetermined position on the edge of the revetment 4 by using a piling device to ensure its straightness, and then a plug-in pile 2 is driven in, so that the force pile 1 and the plug-in pile 2 are alternately driven into the channel along the edge of the revetment 4, at this time, the plug-in protrusions 21 on the two sides of the plug-in pile 2 are inserted into the first plug-in slots 12 of the adjacent two force piles 1;
[0060] Step 2), a drilling device on a construction ship is used to drill holes in the concrete of the revetment 4, the anchor hole 13 on the force pile 1 is used for guidance and positioning, then the anchor hole 13 is drilled into the concrete of the revetment 4 and drilled through the revetment 4 until the soil behind the revetment 4, and an anchor rod installation hole is formed;
[0061] Step 3), the steel strand of the anchor rod 3 is inserted into the anchor rod installation hole formed in step 2), and then grouting is performed;
[0062] Step 4), after the grout solidifies, the anchor rod 3 is tensioned and tightened by using an anchor device in the anchor hole 13 on the force pile 1, and is locked after reaching the set tension value, thereby completing the construction of the combined revetment.
[0063] In this embodiment, the combined revetment is used for the reinforcement of the channel, without the need to remove the structure of the original revetment 4, and without the need to carry out water blocking and water cutting operations, which can save a large amount of material cost and operation time, has high operation efficiency and low cost, and will not affect the passage of the existing channel.
[0064] In step 1), the installation of the force pile 1 and the inserted pile 2 only needs to take the original navigation bank 4 as the installation boundary. After the first force pile 1 is positioned and installed, the subsequent inserted pile 2 and force pile 1 can be installed with the first force pile 1 as the standard. The positioning of the subsequent inserted pile 2 and force pile 1 is realized through the cooperation of the first inserted slot 12 on the force pile 1 and the inserted protrusion 21 on the inserted pile 2. During the piling process, the installation straightness of the force pile 1 and the inserted pile 2 can be quickly corrected, which can effectively improve the installation efficiency and installation accuracy.
[0065] In one embodiment of the process of supporting the force pile 1 with the pouring support column 5, before drilling in step 2), a support column 5 is poured between the navigation bank 4 and the force pile 1, and then drilling is performed. The formed anchor rod installation hole includes the support column 5 section. That is, after the force pile 1 and the inserted pile 2 are completed, a support column 5 is poured between each force pile 1 and the corresponding navigation bank 4. The support column 5 can support the force pile 1 and prevent the force pile 1 from being skewed towards the navigation bank 4.
[0066] In another embodiment of the process of supporting the force pile 1 with the pouring support column 5, before the anchor rod 3 is tensioned and tightened in step 4), a support column 5 is poured between the navigation bank 4 and the force pile 1, and a sleeve is fitted on the anchor rod 3 between the navigation bank 4 and the force pile 1 before pouring. That is, in this embodiment, the support column 5 is poured after drilling and before tensioning and tightening. The support column 5 supports the force pile 1. Before pouring the support column 5, a sleeve needs to be fitted on the anchor rod 3 in the pouring section of the support column 5. The sleeve can prevent the concrete of the pouring support column 5 from pouring the anchor rod 3 together, which prevents the anchor rod 3 from being tensioned and tightened.
[0067] In this embodiment, the sleeve can be fitted when the steel strand of the anchor rod 3 is inserted. After the steel strand of the anchor rod 3 passes through the anchor hole 13, the sleeve is fitted on the steel strand of the anchor rod 3. Another way is to fit the sleeve before the anchor rod 3 is tensioned and tightened after grouting the anchor rod installation hole, which can prevent the concrete of the pouring support column 5 from fixing the anchor rod 3.
[0068] In one embodiment related to sealing the anchor, after the anchor rod 3 is tensioned and tightened in step 4), the anchor sealing process is performed in the anchor hole 13. The anchor sealing process can prevent the end of the anchor rod 3, i.e., the anchor tool, from being immersed in water, which can cause the anchor rod 3 and the anchor tool to rust.
[0069] Further, the sealing process includes using cementing material or foaming agent to seal the hole, and isolate the anchor rod 3 from water. The cementing material has certain waterproof performance. The cementing material can form a solid stone body after curing, and has good sealing performance and waterproof performance. The foaming agent, especially the waterproof foaming glue, has certain waterproof effect. It is mainly used for filling and sealing, can prevent water penetration, reduce the risk of water leakage, is suitable for various substrates including concrete, wood, metal, etc., and its expansion characteristics enable it to closely fit irregular surfaces, thereby improving the waterproof ability. Therefore, the anchor rod 3 and the anchor device can be sealed by using the cementing material or the foaming agent to prevent rust caused by long-term immersion in water.
[0070] In the above embodiment, after the combined revetment construction is completed, the ecological channel bin and / or the ecological planting frame can be installed in the through hole thereof, and the step ladder, the railing, the planting frame, etc. can also be installed above the stress pile 1 and the inserted plate pile 2.
[0071] Although the present application has been described in conjunction with the specific embodiments thereof, it is evident that many alternatives, modifications and variations will be apparent to those skilled in the art in light of the foregoing description.
[0072] It should be noted that some embodiments of the present application have been described above. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recited in the claims can be performed in a different order and still achieve desirable results. Additionally, the process depicted in the figures does not necessarily require the particular order shown, or sequential order, to achieve the desired results. In certain implementations, multitasking and parallel processing can be advantageous.
[0073] The embodiments of the present application are intended to cover all such alternatives, modifications and variations as falling within the scope of the appended claims. Accordingly, any and all such modifications, variations or equivalents that fall within the spirit and scope of the embodiments of the present application are intended to be included herein.
Claims
1. A combined revetment for channel reinforcement, comprising a force receiving pile and a sheet pile, the force receiving pile being inserted along the edge of a channel, and one sheet pile being inserted between two adjacent force receiving piles, characterized in that: Each of the force piles is connected with at least one anchor rod for tension fixation, the force pile is provided with an anchor hole corresponding to the anchor rod, the anchor hole is in a converging structure from the water-facing surface of the force pile to the backwater surface of the force pile and forms installation guide and limiting for the anchor rod, and both sides of the force pile connected with the inserted pile are provided with a stopper for limiting the inserted pile from moving towards the water-facing surface thereof.
2. The combined seawall for channel reinforcement according to claim 1, characterized by: The anchor hole comprises a guide hole and a limiting hole, the guide hole is close to the water-facing surface of the force pile, and the limiting hole is connected with the bottom of the guide hole and penetrates through the backwater surface of the force pile, and both the guide hole and the limiting hole are in a converging structure.
3. The composite revetment for channel reinforcement according to claim 2, characterized in that: The height of the guide hole and the limiting hole close to the water-facing surface of the force pile is higher than that close to the backwater surface of the force pile.
4. The composite revetment for channel reinforcement according to claim 3, characterized in that: The hole section close to the limiting hole end of the guide hole is larger than the hole section close to the guide hole end of the limiting hole.
5. The combined seawall for channel reinforcement according to claim 2 or 3 or 4, characterized by: The cross section of the guide hole is circular or polygonal, and the cross section of the limiting hole is circular.
6. The combined seawall for channel reinforcement according to claim 1, wherein: The inner side of the force pile close to the stopper is provided with a first insertion slot, the slot opening direction of which is towards the backwater surface of the force pile, both ends of the inserted pile are provided with an insertion protrusion matched with the first insertion slot, and the stopper and the insertion protrusion form transverse limiting in the arrangement direction of the force pile and the inserted pile.
7. The combined seawall for channel reinforcement according to claim 6, characterized in that: The first insertion slot is provided with an elastic deformation member.
8. The combined seawall for waterway reinforcement according to claim 6 or 7, characterized in that: The first insertion slot is a semicircular groove and penetrates through the force pile from top to bottom, the side of the first insertion slot away from the inserted pile is a straight side and is perpendicular to the water-facing surface of the force pile, and the insertion protrusion is a semicircular protrusion matched with the first insertion slot and the side close to the force pile is a straight side matched with the side of the first insertion slot.
9. The combined seawall for channel reinforcement according to claim 8, characterized in that: The inner side of the inserted pile close to the insertion protrusion is provided with a second insertion slot, the slot opening direction of which is towards the water-facing surface of the inserted pile, and the second insertion slot is matched with the end of the stopper.
10. The combined shore for channel reinforcement according to claim 6 or 7, characterized by: The first insertion slot is a semicircular groove and penetrates through the force pile from top to bottom, the slot depth direction of the first insertion slot is inclined towards the middle of the force pile, the included angle between the slot depth direction of the first insertion slot and the water-facing surface of the force pile is greater than 0° and less than 90°, the side of the first insertion slot away from the inserted pile is an arc-shaped side curved towards the center of the first insertion slot, and the insertion protrusion is a semicircular protrusion matched with the first insertion slot and the side close to the force pile is an arc-shaped side matched with the side of the first insertion slot.
11. The combined shore for channel reinforcement according to claim 1, wherein: The upper half of the inserted pile is provided with a plurality of transversely arranged through holes, the through holes penetrate through the water-facing surface and the backwater surface of the inserted pile, and a plurality of ecological channel bins and / or ecological planting frames are arranged in the through holes.
12. The combined seawall for channel reinforcement according to claim 1, characterized by: The lower half of the force pile is provided with a long groove penetrating downwards, and the long groove is arranged on the water-facing surface of the force pile.
13. A method for constructing a combined shore protection for waterway reinforcement, applied to the combined shore protection for waterway reinforcement according to any one of claims 1 to 12, characterized in that, The method comprises the following steps: Step 1), using a pile driving device to drive one of the force piles into a predetermined position at the water-shore edge, ensuring its straightness, and then driving the plate pile, so that the force piles and the plate piles are alternately driven into the waterway along the water-shore edge, at this time, the two side edges of the plate pile are inserted into the first insertion slot of the adjacent two force piles; Step 2), using a drilling device on the construction ship to drill a hole in the concrete of the water-shore, guiding and positioning through the anchor hole on the force pile, and then drilling along the anchor hole towards the concrete of the water-shore and drilling through the water-shore until the soil behind the water-shore, forming an anchor rod installation hole; Step 3), the anchor rod is inserted into the anchor rod installation hole formed in step 2), and then grouting is performed; Step 4), after the grout solidifies, the anchor rod is tensioned and tightened through the anchor device in the anchor hole on the force pile, and is locked after reaching the set tension value, completing the construction of the combined revetment.
14. The method for combined seawall construction for waterway reinforcement according to Claim 13, characterized in that: Before the drilling in step 2), a support column is poured between the water-shore and the force pile, and then drilling is performed, and the formed anchor rod installation hole includes the support column section.
15. The method for combined seawall construction for waterway reinforcement according to Claim 13, characterized in that: Before the anchor rod is tensioned and tightened in step 4), a support column is poured between the water-shore and the force pile, and a sleeve is sleeved on the section of the anchor rod between the water-shore and the force pile before pouring.
16. The method according to claim 14 or 15, wherein: After the anchor rod is tensioned and tightened in step 4), an anchor sealing process is performed in the anchor hole.
17. The method for combined seawall construction for waterway reinforcement according to Claim 16, characterized in that: The anchor sealing process includes sealing the hole using cementing materials or foaming agents to isolate the anchor rod from water.
Citation Information
Patent Citations
Ecological landscape combination revetment
CN107366254A
Prefabricated sheet pile combined bank revetment and construction method thereof
CN109056650A
Self-anchored light bank protection system
CN111877264A
Ecological revetment structure and construction method thereof
CN112376493A
Prestressed concrete H-shaped sheet pile and construction method
CN120174825A
Cited By
Cofferdam-free assembly type bank protection reinforcing structure and construction method thereof
CN122147819A