Electric power project full life cycle management method and system based on digital twinning
By establishing the association between task units and components in the digital twin model, calculating vector deviations and risk coefficients in real time, adjusting construction plans, and storing data, the problem of the disconnect between the digital twin model and the construction plan is solved, improving the predictability and data integrity of project management.
Patent Information
- Application Number
- CN202511467834.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-15
- Publication Date
- 2025-11-14
- Estimated Expiration
- 2045-10-15
AI Technical Summary
In existing technologies, digital twin models are disconnected from construction plans, lacking real-time data-driven risk assessment and permanent data assetization mechanisms. This results in construction plans failing to reflect the physical state, lagging management, and data loss, affecting the collaborative efficiency and decision-making accuracy of project management.
By establishing the association between task units and components, collecting on-site entity status information, calculating vector deviations and risk coefficients, adjusting construction plans, generating construction process data bound to components, and storing it as a permanent attribute of the digital twin model.
It enables real-time mapping between construction plans and digital twin models, improving the predictability and collaborative efficiency of project management, ensuring the integrity and traceability of process data, and supporting operation and maintenance and accountability throughout the entire project lifecycle.