Virtual power plant resource flexibility aggregation method and device based on linear programming projection

By using the linear programming projection method, the problems of existing technologies, such as the inability to simultaneously aggregate the energy-feasible domain and adjustment cost of massive heterogeneous resources, the inability to embed network security constraints, and the large high-dimensional aggregation error, are solved, thus achieving higher computational efficiency and compatibility.

CN121457092AActive Publication Date: 2026-02-03TSINGHUA UNIVERSITY
4 Cites 2 Cited by

Patent Information

Application Number
CN202511540386.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-10-27
Publication Date
2026-02-03
Estimated Expiration
2045-10-27

AI Technical Summary

Technical Problem

Existing technologies cannot simultaneously aggregate the energy-feasible domain and adjustment costs of massive heterogeneous resources, and cannot embed network security constraints, resulting in large errors in high-dimensional aggregation.

Method used

By using a linear programming projection method, a linear state equation is constructed for each resource to be aggregated, and a linear transformation is performed to unify the energy-use flexible and feasible domain to a preset standard space. Network security constraints are also embedded to construct a multi-parameter programming model to incorporate the aggregation cost function.

Benefits of technology

It achieves higher computational efficiency and compatibility, and can accurately and efficiently aggregate the energy-feasible domain and adjustment cost of massive heterogeneous resources. At the same time, it embeds network security constraints to reduce high-dimensional aggregation errors.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention relates to a virtual power plant resource flexible aggregation method and device based on linear programming projection, and the method comprises the steps: constructing a linear state equation corresponding to each to-be-aggregated resource according to the resource characteristic data of each to-be-aggregated resource, and carrying out the linear transformation; aggregating the energy use flexible feasible region of each to-be-aggregated resource, and solving a coordinate projection problem to obtain a preliminary aggregated energy use feasible region; constructing a network security constraint and embedding a solution process of the preliminary aggregation energy use feasible region to obtain an aggregation energy use feasible region considering the network security constraint; and constructing a multi-parameter planning model, and fusing an aggregation cost function into a solving process of an aggregation energy use feasible region considering network security constraints to obtain a virtual power plant resource flexibility aggregation result. Therefore, the problems that in the prior art, energy use feasible regions and adjustment cost of massive heterogeneous resources cannot be aggregated at the same time, network security constraints cannot be embedded, and high-dimensional aggregation errors are large are solved, and higher calculation efficiency and compatibility are achieved.