Resource scheduling method and device, electronic equipment, storage medium and product
By employing a resource scheduling method based on a multi-objective optimization model, which jointly schedules time-frequency resources, spatial resources, and power resources, the problem of unconsidered resource coupling relationships in NR is solved, achieving efficient resource utilization and improved communication performance.
Patent Information
- Application Number
- CN202512040808.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-31
- Publication Date
- 2026-02-03
- Estimated Expiration
- 2045-12-31
AI Technical Summary
In existing technologies, New Radio (NR) resource scheduling does not take into account the coupling relationship between different types of resources, resulting in low resource utilization and poor communication performance. Especially in high mobility and service diversity scenarios, problems such as scheduling delay, increased interference, and energy waste occur.
By collecting multi-dimensional input parameters and generating resource scheduling schemes based on a multi-objective optimization model, resource utilization, user experience, and base station power consumption are optimized through joint scheduling of time-frequency resources, spatial resources, and power resources.
It improves resource utilization, balances user experience, reduces base station power consumption, enhances overall communication performance, and adapts to scheduling response speed in dynamic scenarios.
Smart Images

Figure CN121463247A_ABST
Abstract
Description
TECHNICAL FIELD
[0001] Embodiments of the present application relate to the technical field of wireless communication, and in particular to a resource scheduling method and device, electronic equipment, storage medium and product. BACKGROUND
[0002] In New Radio (NR), multiple different types of resources, such as time-frequency resources, spatial resources (beams), and power resources, need to be scheduled. The scheduling manner and scheduling model of different types of resources are different, and thus need to be optimized independently in different dimensions. In this case, due to the neglect of the coupling relationship of different types of resources, the resource utilization or overall communication performance is low.
[0003] For example, when scheduling time-frequency resources, the beam coverage range is not considered, and the frequency point corresponding to the resource block (RB) resource allocated to the user equipment (UE) may be covered by a beam that does not include the current location of the UE, which requires additional triggering of beam switching and increases the scheduling delay (the actual delay can reach 5-10 ms); for another example, when adjusting the beam, the power parameter is not considered, and when switching to a narrow beam to improve the signal quality of the UE, if the transmission power of the adjacent beam is not reduced synchronously, the interference in the overlapping area of the narrow beam and the adjacent beam will be enhanced (the actual interference power is increased by 2-3 dB), which reduces the signal to interference plus noise ratio (SINR) of the UE; for another example, when adjusting the power, the time-frequency resource load is not considered, and in an area where the time-frequency resource is tight (such as RB occupancy rate > 90%), increasing the power alone cannot increase the effective rate, but causes energy waste (the actual power utilization rate is reduced by 15-20%). In addition, the optimization period and parameter update of different types of resources may not be synchronized, for example, the time-frequency scheduling period (such as 1 ms) is shorter than the beam adjustment period (such as 5-10 ms), when the UE moves quickly (such as a high-speed train scenario, moving speed > 300 km / h), the time-frequency resource has been allocated but the beam has not been timely followed, which causes the UE to be frequently disconnected (the actual disconnection rate is increased by 8-12%); for another example, the power adjustment only relies on the TPC feedback of a single UE and does not consider the priority of multiple services, so for high-priority services (such as ultra-reliable & low-latency communication (URLLC) services), if the beam area power corresponding to the high-priority services is occupied by low-priority services (such as enhanced mobile broadband (eMBB) services), the delay of the high-priority services will exceed the requirement (the actual delay non-compliance rate is increased by 10-15%); for another example, to improve the coverage of edge UEs, the base station transmission power is blindly increased, which can increase the rate of edge UEs by 5-8%, but the overall power consumption of the base station is increased by 20-25%; for another example, the time-frequency resource scheduling is only based on short-term channel quality and does not combine long-term beam and power efficiency, and the actual utilization rate of part of the RB resources is only 60-70% due to poor beam coverage or power interference, which is much lower than the theoretical upper limit (more than 90%).
[0004] In summary, how to jointly schedule different types of resources to improve resource utilization and comprehensive communication performance is a problem to be solved. SUMMARY
[0005] The present application provides a resource scheduling method and device, electronic equipment, storage medium and product to improve resource utilization and comprehensive communication performance.
[0006] In a first aspect, embodiments of the present application provide a resource scheduling method, comprising:
[0007] collecting multi-dimensional input parameters, the multi-dimensional input parameters comprising user-side parameters, network-side parameters and environment parameters;
[0008] generating a resource scheduling scheme based on a multi-objective optimization model according to the multi-dimensional input parameters, the optimization objectives of the multi-objective optimization model comprising: maximizing resource utilization, maximizing user experience balance of different services and minimizing base station power consumption;
[0009] jointly scheduling time-frequency resources, spatial resources and power resources according to the resource scheduling scheme. In a second aspect, embodiments of the present application further provide a resource scheduling apparatus, comprising:
[0010] a collecting module configured to collect multi-dimensional input parameters, the multi-dimensional input parameters comprising user-side parameters, network-side parameters and environment parameters;
[0011] an optimization module configured to generate a resource scheduling scheme based on a multi-objective optimization model according to the multi-dimensional input parameters, the optimization objectives of the multi-objective optimization model comprising: maximizing resource utilization, maximizing user experience balance of different services and minimizing base station power consumption;
[0012] a scheduling module configured to jointly schedule time-frequency resources, spatial resources and power resources according to the resource scheduling scheme. In a third aspect, embodiments of the present application provide an electronic device, comprising:
[0013] one or more processors;
[0014] a storage device configured to store one or more programs;
[0015] when the one or more programs are executed by the one or more processors, the one or more processors implement the resource scheduling method according to the first aspect.
[0016] In a fourth aspect, embodiments of the present application further provide a computer-readable storage medium having a computer program stored thereon, the program being executed by a processor to implement the resource scheduling method according to the first aspect.
[0017] In a fifth aspect, embodiments of the present application further provide a computer program product comprising a computer program and / or instructions, the computer program and / or instructions being executed by a processor to implement the resource scheduling method according to any of the above embodiments.
[0018] The embodiment of the present application provides a resource scheduling method, device, electronic equipment, storage medium and product, the resource scheduling method comprises the following steps: collecting multi-dimensional input parameters, the multi-dimensional input parameters comprise user side parameters, network side parameters and environment parameters; according to the multi-dimensional input parameters, a resource scheduling scheme is generated based on a multi-objective optimization model, and the optimization target of the multi-objective optimization model comprises: maximizing resource utilization, maximizing the balance degree of user experience of different services and minimizing base station power consumption; according to the resource scheduling scheme, time-frequency resources, space resources and power resources are jointly scheduled. The above technical scheme can find the optimal compromise scheduling scheme with high resource utilization, balanced user experience and low base station power consumption based on considering the coupling relationship and mutual influence among different types of resources by using the multi-objective optimization model, realizes the joint scheduling of time-frequency resources, space resources and power resources, and improves the resource utilization and comprehensive communication performance. BRIEF DESCRIPTION OF DRAWINGS
[0019] The above and other features, advantages and aspects of the embodiments of the present disclosure will become more apparent by describing in detail the following specific embodiments with reference to the attached drawings. Throughout the drawings, the same or similar reference numerals refer to the same or similar elements. It should be understood that the drawings are schematic, and the original and elements are not necessarily drawn according to the scale.
[0020] Figure 1 A flowchart of a resource scheduling method provided by an embodiment of the present application is shown in FIG. 1.
[0021] Figure 2 A structural schematic diagram of a resource scheduling system provided by an embodiment is shown in FIG. 2.
[0022] Figure 3 A schematic diagram of a resource scheduling process provided by an embodiment is shown in FIG. 3.
[0023] Figure 4 A structural schematic diagram of a resource scheduling device provided by an embodiment of the present application is shown in FIG. 4.
[0024] Figure 5 A structural schematic diagram of an electronic equipment provided by an embodiment of the present application is shown in FIG. 5. DETAILED DESCRIPTION
[0025] The present application will be further described in detail below with reference to the drawings and embodiments. It can be understood that the specific embodiments described herein are only used to explain the present application, but not to limit the present application. In addition, it should be noted that, for the convenience of description, only the parts related to the present application are shown in the drawings, but not all the structures.
[0026] Before any examples are described in further detail, it should be noted that some examples are described as processes or methods depicted as flowcharts. Although the processes are described in a particular sequential order, many of the processes described can be performed concurrently, in parallel, or simultaneously. In addition, the order of the processes can be re-arranged. The processes can be terminated when their operations are completed, but the processes can also end in response to events that are external to the processes. The processes can correspond to methods, functions, procedures, subroutines, subprograms, etc.
[0027] It should be noted that the terms "first", "second", etc. mentioned in the embodiments of the present application are only used to distinguish different devices, modules, units or other objects, and do not limit the order or interdependence of the functions performed by these devices, modules, units or other objects.
[0028] In addition, the embodiments in the present application and the features in the embodiments can be combined with each other without conflict.
[0029] In the technical solutions of the present application, the acquisition, storage, use, processing, etc. of data comply with the relevant provisions of national laws and regulations.
[0030] It should be noted that in the embodiments of the present application, some existing industry solutions, components, models, etc. may be mentioned, which should be considered as exemplary, and the purpose is only to illustrate the feasibility of the implementation of the technical solutions of the present application, but it does not mean that the applicant has or will necessarily use the related content of the solution.
[0031] In the prior art, the scheduling of time-frequency resources, spatial resources and power resources is independently optimized in different dimensions.
[0032] For time-frequency resource scheduling, the main algorithm is mainly based on RB allocation, including proportional fairness (PF) algorithm, round robin (RR) algorithm, maximum carrier-to-interference ratio (Max-C / I) algorithm, etc. For example, according to the basic scheduling framework defined in the protocol, through the media access control (Media Access Control Layer, MAC) layer scheduler on the base station side, based on the channel quality indication (Channel Quality Indication, CQI) of the user equipment (UE), buffer status report (Buffer Status Reports, BSR), service priority and other parameters, the UE is allocated subframe or symbol in time domain or RB resource in frequency domain within each scheduling period (such as 1ms). This process does not associate the dynamic adjustment of spatial beams and power parameters.
[0033] For spatial resource scheduling, relying on beamforming technology, it is divided into static beam configuration and semi-dynamic beam adjustment. In the static scheme, the base station pre-configures a set of fixed direction beams (such as wide beams covering different sectors of the cell), and the UE selects the beam according to the initial measurement of the reference signal receiving power (RSRP) when accessing, and only triggers beam switching when the beam quality is lower than the threshold (such as RSRP < -105dBm) in the future. The switching process is independent of the time-frequency resource allocation at that time; the semi-dynamic scheme supports beam prediction based on UE moving track (such as adjusting beam direction through historical location information), but the prediction model only relies on spatial dimension data (such as the azimuth angle and elevation angle of the UE), without combining time-frequency resource load (such as the RB occupancy rate of the target beam coverage area) and power loss, which is easy to cause the problem of insufficient time-frequency resources or power interference in the beam overlap area after beam switching.
[0034] For power scheduling, a hierarchical strategy of open-loop power control + closed-loop power adjustment is adopted. In the open-loop stage, the base station calculates the initial transmission power according to the path loss (PL) and shadow fading of the UE, etc. according to the formula in the protocol; in the closed-loop stage, the base station adjusts the power through the power control (TPC) command fed back by the UE, but the adjustment range is limited to ±3dB, and only the signal quality (such as the signal-to-noise ratio SINR) of a single UE is optimized, without considering the power coupling between multiple UEs. For example, when two UEs share the same time-frequency resource block and the beams overlap, increasing the power of a certain UE will increase the interference to another UE, and the existing scheme cannot synchronize and coordinate the power allocation of the two.
[0035] Figure 1 A flowchart of a resource scheduling method provided by an embodiment of the present application, which can be applicable to the case of acquiring an eye image. Specifically, the resource scheduling method can be executed by a resource scheduling device, which can be realized by software and / or hardware and integrated in an electronic device. The electronic device includes but is not limited to a computer, a smart phone, an upper computer or a server, and other devices with control functions.
[0036] As shown in Figure 1 , the method specifically includes the following steps:
[0037] S110, collect multi-dimensional input parameters, the multi-dimensional input parameters including user side parameters, network side parameters and environment parameters;
[0038] In this embodiment, the multi-dimensional input parameters can be used as the input data of joint scheduling, that is, the input data of the multi-objective optimization model.
[0039] Exemplarily, the user-side parameters can include CQI of the UE, BSR, traffic type (such as URLLC or eMBB or Massive Machine Type Communications (mMTC), etc.), location information (such as longitude and latitude information and / or distance relative to the base station), and / or moving speed, etc. The network-side parameters can include coverage of each beam of the base station (such as azimuth angle, elevation angle and / or half-power angle), interference power of the beam overlap area, beam overlap interference coefficient, occupation rate of resources (such as RB), and / or current total transmission power of the base station, etc. The environmental parameters can include path loss, shadow fading coefficient, and / or noise power spectral density, etc. By taking the user moving speed, beam overlap interference coefficient, traffic priority weight, etc. as the collection parameters, comprehensive data support can be provided for the joint optimization. Optionally, the multi-dimensional input parameters can be collected periodically, and the collection period is, for example, 1 ms.
[0040] In S120, a resource scheduling scheme is generated based on a multi-objective optimization model according to the multi-dimensional input parameters, and the optimization objectives of the multi-objective optimization model include: maximizing resource utilization, maximizing user experience balance of different traffics, and minimizing base station power consumption.
[0041] In this embodiment, the multi-objective optimization model can be used to simultaneously process multiple conflicting optimization objectives, which usually cannot be simultaneously optimized, and the solving process mainly finds the best compromise scheme, i.e., the resource scheduling scheme, between different optimization objectives.
[0042] Exemplarily, the optimization objectives of the multi-objective optimization model include:
[0043] Maximizing resource utilization, such as allocating as many RBs as possible and making the number of UEs covered by the beam as large as possible;
[0044] Maximizing user experience balance of different traffics, such as trying to ensure that the time delay requirement of the user is met for low-delay traffic, trying to ensure that the rate requirement of the user is met for edge UEs, and the corresponding weight can be adjusted according to the priority of different traffics;
[0045] Minimizing base station power consumption, such as trying to increase the total beam transmission power as much as possible, trying to reduce the difference between the total base station transmission power and the total beam transmission power, etc.
[0046] On this basis, the best compromise resource scheduling scheme can be found.
[0047] In S130, time-frequency resources, spatial resources and power resources are jointly scheduled according to the resource scheduling scheme.
[0048] In this embodiment, according to the resource scheduling scheme, joint scheduling of time-frequency resources, spatial resources and power resources can be implemented. For example, the MAC layer scheduler can determine the RB allocation instruction according to the resource scheduling scheme, and allocate the time domain symbol and the frequency domain RB for the UE according to the RB allocation instruction; the beamforming module can determine the beam index and the weight according to the resource scheduling scheme, and adjust the phase and amplitude of the antenna array to generate the target beam according to the beam index and the weight; the power amplifier can determine the power instruction according to the resource scheduling scheme, and adjust the transmission power of the corresponding beam while avoiding exceeding the total power constraint.
[0049] The resource scheduling method of the embodiment of the application can eliminate the coupling conflict between the dimensions by establishing a multi-objective joint optimization model of time-frequency resources, spatial beams and power parameters, can improve the scheduling response speed in a dynamic scenario (such as high-speed movement or traffic tide, etc.), balance the experience of users with different priorities, and reduce the power consumption of the base station, improve the resource utilization and the comprehensive communication performance under the premise of guaranteeing the user rate and coverage.
[0050] In an embodiment, according to the multi-dimensional input parameters, a resource scheduling scheme is generated based on a multi-objective optimization model, including:
[0051] According to the multi-dimensional input parameters, an optimization variable of the multi-objective optimization model is determined.
[0052] The multi-objective optimization model is solved based on a non-dominated sorting genetic algorithm (NSGA) to obtain the resource scheduling scheme.
[0053] For example, the multi-objective function is iteratively solved by the NSGA-III algorithm, the number of iterations is set to 50 times, 100 candidate solutions are generated each time, and the Pareto optimal solution is finally output, the optimal balance between the three optimization objectives is found, and the resource allocation instruction is generated accordingly.
[0054] On this basis, a multi-objective optimization problem can be established and efficiently and accurately solved, and the best compromise resource scheduling scheme is found considering all optimization objectives.
[0055] In an embodiment, the optimization variable of the multi-objective optimization model includes a time-frequency variable, a spatial variable and a power variable.
[0056] The time-frequency variable includes the number of RB allocations and the number of scheduled time domain symbols, wherein the number of RB allocations is, for example, 0-100, which can be determined according to the NR frequency band bandwidth, and the number of scheduled time domain symbols (which can also be the number of subframes) can be 1-14;
[0057] The spatial variables include a beam selection index and a beamforming weight, wherein the beam selection index is, for example, an index of one beam selected from 32 preset beams of the base station, and the beamforming weight is a real number, and the value range can be [0, 1];
[0058] The power variable includes a transmission power of the beam, and the value range is, for example, 10-43 dBm, and the step can be 0.1 dBm.
[0059] The resource utilization rate is represented based on a product of a first ratio and a second ratio, the first ratio is a ratio of the number of allocated RBs to the total number of RBs, and the second ratio is a ratio of the number of UEs effectively covered by the beam to the total number of UEs in the coverage area of the beam, for example, the resource utilization rate can be represented as U = (the number of allocated RBs / the total number of RBs) x (the number of UEs effectively covered by the beam / the total number of UEs in the coverage area of the beam);
[0060] The balance degree of user experience of different services is represented based on a weighted sum of a time delay compliance rate of a service with a time delay requirement and an edge UE rate compliance rate, for example, the balance degree of user experience can be represented as E = (a high-priority service time delay compliance rate x 0.6) + (an edge UE rate compliance rate x 0.4), wherein the time delay requirement of the high-priority service is, for example, URLLC≤5 ms and eMBB≤100 ms, and the rate requirement of the edge UE is, for example, UE≥100 Mbps;
[0061] The base station power consumption is represented based on a difference between the total transmission power of the base station and the total transmission power of the beam, the total transmission power of the beam is a sum of actual transmission powers of each beam, and the actual transmission power is a product of an initial transmission power of the corresponding beam and a corresponding beam interference coefficient, for example, the base station power consumption can be represented as P = the total transmission power of the base station - ∑(transmission power of each beam x beam interference coefficient), and the interference coefficient can be calculated according to an overlapping area of the beams, for example, the larger the overlapping area, the larger the interference coefficient, and the value range can be 0.1-0.8.
[0062] On this basis, the resource utilization rate, the balance degree of user experience, and the base station power consumption can be quantified, thereby providing a basis for solving the multi-objective optimization problem.
[0063] In an embodiment, the constraint conditions of the multi-objective optimization model include:
[0064] The time-frequency constraint condition is that the number of RBs allocated to a single UE is less than or equal to a set proportion of the total number of RBs, for example, less than or equal to 10% of the total number of RBs, thereby avoiding resource monopoly;
[0065] The spatial constraint condition is that the beam switching time delay is less than or equal to a time delay threshold, for example, the beam switching time delay is less than or equal to 2 ms, thereby adapting to a high-speed scene;
[0066] The power constraint condition is that the total transmission power of the base station is less than or equal to a power threshold, for example, less than or equal to 43 dBm, so as to meet the power standard of the NR base station in actual application, and the signal to interference plus noise ratio (SINR) of the UE is greater than or equal to a set value, for example, greater than or equal to -3 dB, so as to ensure the signal quality.
[0067] On this basis, it can be ensured that the multi-objective optimization model meets the actual application scene and demand, and an effective resource scheduling scheme is obtained.
[0068] In an embodiment, after the time-frequency resource, the spatial resource and the power resource are jointly scheduled according to the resource scheduling scheme, the method further comprises:
[0069] S140, obtaining a monitoring value of the UE performance after joint scheduling;
[0070] S150, generating a correction instruction according to the deviation between the monitoring value and the target value;
[0071] S160, updating the multi-objective optimization model according to the correction instruction.
[0072] In this embodiment, based on the feedback mechanism, that is, according to the deviation between the UE performance and the expected performance, the multi-objective optimization model can be corrected, such as reconstructing the multi-objective optimization model or adjusting the parameters of the multi-objective optimization model or updating the collected input parameters, and re-solved to obtain a resource scheduling scheme that meets the actual demand more. For example, when the latency deviation of high-priority traffic is large, the latency weight can be increased; when the rate deviation of the edge UE is large, the rate weight can be increased.
[0073] Optionally, the effect of resource allocation can be monitored periodically, and the feedback period is, for example, 1 ms.
[0074] In an embodiment, the monitoring value includes the actual latency, the actual rate and the actual SINR, and the actual power consumption and the RB utilization rate of the base station; and the correction instruction is generated according to the deviation between the monitoring value and the target value, which includes that if the deviation between any one monitoring value and the corresponding target value exceeds a preset threshold, the correction instruction is generated.
[0075] For example, compared with the monitoring value and the target value preset according to the target function (for example, the target value of the latency compliance rate is 99%), the deviation between the monitoring value and the target value can be the monitoring value minus the target value. If the deviation value exceeds the preset threshold, for example, is greater than 5%, the correction instruction can be generated, which can be used to indicate adjusting the weight of the target function, updating the constraint condition and / or adjusting the parameters of the algorithm, so as to trigger the next round of optimization. On this basis, the multi-objective optimization model can be updated in time to meet the latest actual demand.
[0076] The embodiment of the application further provides a resource scheduling system, as shown in the figure Figure 2 The resource scheduling system comprises an information collection layer, a joint optimization layer of time-frequency-space power and a resource execution layer, wherein the layers can realize synchronous scheduling of multi-dimensional resources through bidirectional or unidirectional data interaction of a set period (such as 1 ms).
[0077] For example, the information collection layer can input the collected multi-dimensional input parameters to the joint optimization layer; the joint optimization layer can obtain a resource scheduling scheme based on a multi-objective optimization model, and output a resource allocation instruction according to the resource scheduling scheme to the resource execution layer; and the resource execution layer can execute the resource allocation.
[0078] In addition, the resource scheduling system can further comprise a dynamic feedback layer, the resource execution layer can transmit actual performance data (such as UE rate and / or interference value) after resource allocation to the dynamic feedback layer, so that the dynamic feedback layer determines whether to trigger feedback correction; if the feedback correction is triggered, the dynamic feedback layer can send a correction instruction to the joint optimization layer according to the performance deviation; the joint optimization layer can generate the correction instruction to update the multi-objective optimization model, and further feed back a parameter update requirement to the collection layer to update the type of collected parameters.
[0079] Figure 3 A schematic diagram of a resource scheduling process is provided for an embodiment. As shown in the figure Figure 3 Through parameter collection, parameter input, model construction, algorithm solving, resource execution, performance feedback and deviation judgment, dynamic adaptive joint resource scheduling can be realized.
[0080] The resource scheduling method is described below through some specific embodiments.
[0081] In one embodiment, the resource scheduling scenario is as follows:
[0082] User density: 500 UE / km², wherein the proportion of URLLC service is 10% (such as industrial control) and the proportion of eMBB service is 90% (such as high-definition video);
[0083] Network parameters: the base station adopts a 64-antenna array, 32 preset beams, a total of 100 RBs, and a total transmit power of 43 dBm;
[0084] Environment parameters: path loss PL=120 dB, shadow fading coefficient = 8 dB, and noise power spectral density =-174 dBm / Hz. The scheduling process is as follows:
[0085] Step1: Information collection layer collects: UE1 (URLLC service, located 500m northeast of the base station, SINR=-2dB), UE2 (eMBB service, located 300m southeast of the base station, SINR=5dB), the current RB utilization rate is 80%, and the interference power in the overlapping area of beam 1 and beam 2 is 3dBm;
[0086] Step2: Joint optimization layer constructs a model:
[0087] Optimization variables: allocate 10 RBs and 14 time-domain symbols to UE1, select beam 1 (covering the northeast direction), and set the power to 35dBm; allocate 8 RBs and 12 time-domain symbols to UE2, select beam 2 (covering the southeast direction), and set the power to 30dBm;
[0088] Objective function: U=(18 / 100)×(2 / 2)=18% (simplified calculation here), E=(URLLC latency compliance rate 99%×0.6)+(edge UE rate compliance rate 98%×0.4)=98.6%, P=43-(35×0.3+30×0.3)=43-19.5=23.5dBm;
[0089] Constraint conditions include: RB allocation is not more than 10%, beam switching delay is not more than 1.5ms, and total power is not more than 43dBm; Step3: After the resource allocation of the execution layer, the feedback layer monitors: UE1 latency 3ms (compliant), UE2 rate 150Mbps (compliant), RB utilization rate 88%, and power consumption 38dBm (lower than the target);
[0090] Step4: Calculate the deviation value: δ=(88%-85%)=3%, which is less than the preset threshold of 5%, and enter the next round of scheduling.
[0091] On this basis, in the dense urban scenario, the RB utilization rate can be improved from 70% to 88%, the URLLC latency compliance rate can be improved from 85% to 99%, and the base station power consumption can be reduced from 43dBm to 38dBm.
[0092] In one embodiment, the resource scheduling scenario is as follows:
[0093] User density: 100UE / km² (all eMBB services, such as high-speed rail passenger video calls), moving speed 350km / h;
[0094] Network parameters: the base station uses a 32-antenna array, has a preset 16 beams, a total of 50 RBs, and a total transmit power of 40dBm;
[0095] Environmental parameters: path loss PL = 130 dB (high train carriage penetration loss), shadow fading coefficient = 10 dB, noise power spectral density is -174 dBm / Hz.
[0096] The scheduling process is as follows:
[0097] Step 1: The information collection layer collects: UE3 (located 1 km north of the base station, moving towards the base station at a speed of 350 km / h, CQI = 6), UE4 (located 1.2 km north of the base station, moving away from the base station, CQI = 4), RB utilization rate 60%, beam 3 (covering the north direction) and beam 4 (covering the northeast direction) overlap area interference power = 2 dBm;
[0098] Step 2: The joint optimization layer constructs a model:
[0099] Optimization variables: allocate 5 RBs and 10 time domain symbols to UE3, select beam 3 and power 38 dBm (because UE is close to the base station, the power is moderately reduced); allocate 6 RBs and 12 time domain symbols to UE4, select beam 3 (to avoid switching delay) and power 40 dBm (because UE is far away and the penetration loss is large, the power is increased);
[0100] Objective function: U = (11 / 50) x (2 / 2) = 22%, E = (eMBB delay compliance rate 98% x 0.6) + (edge UE rate compliance rate 95% x 0.4) = 97.2%, P = 40 - (38 x 0.2 + 40 x 0.2) = 40 - 15.6 = 24.4 dBm; Constraints are met: RB allocation is not more than 10%, beam switching delay is 1.8 ms, total power is 40 dBm;
[0101] Step 3: After the resource allocation of the execution layer, the feedback layer monitors: UE3 rate 120 Mbps (compliant), UE4 rate 105 Mbps (compliant), RB utilization rate 72%, power consumption 39 dBm;
[0102] Step 4: Calculate the deviation value: δ = (72% - 70%) = 2% ≤ 5%, enter the next round of scheduling.
[0103] On this basis, in the high-speed rail scenario, the UE disconnection rate is reduced from 10% to 2%, the edge UE rate compliance rate is increased from 75% to 95%, and the beam switching delay is reduced from 5 ms to 1.8 ms.
[0104] The resource scheduling method of the embodiment of the application realizes overall optimization of time-frequency-space power, breaks through dimension isolation, and through constructing a multi-objective optimization model, takes time-frequency resources, spatial beams and power parameters as unified variables, and synchronously considers the coupling relationship of the three (such as the matching of beam coverage and RB allocation, the correlation of power and interference), so that the mismatch of time-frequency resource allocation and beam coverage can be avoided, RB allocation will not be wasted due to non-coverage of beams, and therefore the RB utilization rate can be improved by 15%-20%. Meanwhile, through the correlation calculation of the power and beam interference coefficient, the invalid power consumption in the overlapping area of beams can be reduced, and the power utilization rate can be improved by 25%-30%.
[0105] The method can adapt to dynamic scenarios: for example, through a 1ms acquisition and feedback cycle and a beam switching delay of no more than 2ms, user movement and service change are monitored in real time, the beam switching delay is controlled within 2ms, the real-time requirement of high-speed movement and service tide scenarios can be met, the UE disconnection rate in the high-speed movement scenario is reduced by 6-9 percentage points, and based on the deviation correction mechanism of the feedback layer, the target function weight can be adjusted in time, such as increasing the delay weight when the delay deviation of high-priority services is large, so that the URLLC service delay compliance rate is improved by 8-13 percentage points. In addition, the method can balance multi-objective requirements: through a multi-objective optimization algorithm and a weighted target function, an optimal balance among resource utilization rate, user experience and power consumption is found, the dimension coupling is eliminated, the phenomenon of blindly increasing power to improve experience is avoided, the edge UE rate is improved by 15%-20% while the power consumption is increased by 5%-8%, and through the selection of a Pareto optimal solution, a balance among resource utilization rate, experience and power consumption is found, so that the overall power consumption of the base station is reduced by 18%-22% without sacrificing user experience, and finally the resource utilization rate and comprehensive communication performance are improved.
[0106] Figure 4 A structural schematic diagram of a resource scheduling device provided by the embodiment of the application is shown in FIG. 1. Figure 4 As shown in the figure, the resource scheduling device provided by the embodiment includes:
[0107] The acquisition module 210 is configured to acquire multi-dimensional input parameters, and the multi-dimensional input parameters include user-side parameters, network-side parameters and environment parameters.
[0108] The optimization module 220 is configured to generate a resource scheduling scheme based on a multi-objective optimization model according to the multi-dimensional input parameters, and the optimization objectives of the multi-objective optimization model include maximizing resource utilization rate, maximizing the balance degree of user experience of different services and minimizing base station power consumption.
[0109] The scheduling module 230 is configured to jointly schedule time-frequency resources, spatial resources and power resources according to the resource scheduling scheme.
[0110] The device can find an optimal compromise scheduling scheme with high resource utilization, balanced user experience and low base station power consumption by using a multi-objective optimization model on the basis of considering the coupling relationship and mutual influence between different types of resources, realizes joint scheduling of time-frequency resources, spatial resources and power resources, and improves resource utilization and comprehensive communication performance.
[0111] On the basis of any of the above embodiments, the optimization module 220 is specifically configured to: determine optimization variables of the multi-objective optimization model according to the multi-dimensional input parameters; and solve the multi-objective optimization model based on a non-dominated sorting genetic algorithm to obtain the resource scheduling scheme.
[0112] On the basis of any of the above embodiments, the optimization variables include:
[0113] a time-frequency variable including a resource block (RB) allocation number and a scheduling time domain symbol number;
[0114] a spatial variable including a beam selection index and a beamforming weight;
[0115] a power variable including a beam transmit power;
[0116] The resource utilization is represented based on a product of a first ratio and a second ratio, the first ratio being a ratio of an allocated RB number to a total RB number, and the second ratio being a ratio of a number of UEs covered by an effective beam to a total number of UEs in a coverage area of the beam;
[0117] The balanced degree of the user experience of the different services is represented based on a weighted sum of a time delay compliance rate of a service with a time delay requirement and an edge UE rate compliance rate;
[0118] The base station power consumption is represented based on a difference between a total base station transmit power and a total beam transmit power, the total beam transmit power being a sum of actual transmit powers of each beam, and the actual transmit power being a product of an initial transmit power of the corresponding beam and a corresponding beam interference coefficient.
[0119] On the basis of any of the above embodiments, the constraint conditions of the multi-objective optimization model include:
[0120] a time-frequency constraint condition: a number of RBs allocated to a single UE is less than or equal to a set proportion of a total RB number;
[0121] a spatial constraint: a beam switching time delay does not exceed a time delay threshold;
[0122] a power constraint condition: a total base station transmit power does not exceed a power threshold, and a signal to interference plus noise ratio (SINR) of a UE is not lower than a set value.
[0123] On the basis of any of the above embodiments, the apparatus further comprises a correction module configured to: obtain a monitoring value of UE performance after jointly scheduling the time-frequency resources, the spatial resources, and the power resources according to the resource scheduling scheme; generate a correction instruction according to a deviation between the monitoring value and a target value; and update the multi-objective optimization model according to the correction instruction.
[0124] On the basis of any of the above embodiments, the monitoring value comprises an actual time delay, an actual rate, and an actual SINR, and an actual power consumption and an RB utilization rate of the base station; and the correction module comprises a generation unit configured to generate a correction instruction if a deviation between any one of the monitoring values and a corresponding target value exceeds a preset threshold. The resource scheduling apparatus provided by the embodiments of the present application can be used to execute the resource scheduling method provided by any of the above embodiments, and has the corresponding functions and beneficial effects.
[0125] Figure 5 A structural schematic diagram of an electronic device 10 that can be used to implement embodiments of the present application is shown. The electronic device 10 is intended to represent various forms of digital computers, such as laptops, desktops, tablets, personal digital assistants, servers, blade servers, mainframes, and other appropriate computers. The electronic device 10 can also represent various forms of mobile devices, such as personal digital processors, cellular telephones, smart phones, user equipment, and other similar computing devices. The components shown here, their connections and relationships, and their functions, are meant to be examples only, and are not intended to limit the implementations of the present application described and / or claimed in this document.
[0126] As shown in Figure 5 The electronic device 10 includes at least one processor 11 and a memory, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, and the like, which is communicatively connected to the at least one processor 11, wherein the memory stores a computer program that can be executed by the at least one processor. The processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 into the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0127] A plurality of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a magnetic disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network, such as the Internet, and / or various telecommunication networks, wireless networks.
[0128] The processor 11 can be various general and / or special purpose processing components having processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various specialized artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 performs various methods and processes described above.
[0129] In some embodiments, the methods of the above-described embodiments can be implemented as a computer program tangibly embodied in a computer readable storage medium, such as the storage unit 18. In some embodiments, part or all of the computer program can be loaded and / or installed onto the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded onto the RAM 13 and executed by the processor 11, one or more steps of the methods described above can be performed. Alternatively, in other embodiments, the processor 11 can be configured to perform any of the above-described embodiment methods by other any appropriate means, such as by means of firmware.
[0130] The various implementations of the systems and techniques described above can be realized in digital electronic circuitry, integrated circuitry, specially designed application specific integrated circuits (ASICs), field programmable gate arrays (FPGAs) computer hardware, firmware, software, and / or combinations thereof. These various implementations can include implementation in one or more computer programs that are executable and / or interpretable on a programmable system including at least one programmable processor, which can be special or general purpose, coupled to receive data and instructions from, and to transmit data and instructions to, a storage system, at least one input device, and at least one output device.
[0131] A computer program for implementing the methods of the present application can be written in any combination of one or more programming languages. The computer program can be provided to a processor of a general purpose computer, special purpose computer, or other programmable data processing apparatus to produce a machine, such that the computer program, when executed by the processor, produces the functions / operations specified in the flowcharts and / or the block diagrams. The computer program can be executed entirely on a machine, partially on a machine, partially on a machine as part of a standalone software package, or entirely on a remote machine or server.
[0132] In the context of the present application, a computer-readable storage medium can be a tangible medium that can contain or store the computer program for use by or in connection with an instruction execution system, apparatus, or device. The computer-readable storage medium can include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any suitable combination of the foregoing. Alternatively, the computer-readable storage medium can be a machine-readable signal medium. More specific examples of the machine-readable storage medium will include one or more lines of electrical connections, portable computer disks, hard disk drives, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or Flash memory), optical fibers, portable compact disc read-only memory (CD-ROM), optical storage devices, magnetic storage devices, or any suitable combination of the foregoing.
[0133] To provide for interaction with a user, the systems and techniques described here can be implemented on an electronic device 10 having a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user and a keyboard and a pointing device (e.g., a mouse or a trackball) by which the user can provide input to the electronic device 10. Other kinds of devices can be used to provide for interaction with a user as well; for example, feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form, including acoustic, speech, or tactile input.
[0134] The systems and techniques described herein can be implemented in a computing system that includes a back end component (e.g., as a data server), or that includes a middleware component (e.g., an application server), or that includes a front end component (e.g., a user computer having a graphical user interface or a Web browser through which a user can interact with an implementation of the systems and techniques described herein), or any combination of such back end, middleware, or front end components. The components of the system can be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include a local area network (LAN), a wide area network (WAN), blockchain network, and the Internet.
[0135] The computing system can include clients and servers. A client and server are generally remote from each other and typically interact through a communication network. The relationship of client and server arises by virtue of computer programs running on the respective computers and having a client-server relationship to each other. A server can be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system, to solve the defects of large management difficulty and weak business scalability in traditional physical host and VPS service.
[0136] The embodiments of the present application also provide a computer program product, comprising a computer program and / or instructions, which, when executed by a processor, implement the resource scheduling method according to any of the above embodiments.
[0137] It should be understood that the various forms of flow shown above can be used to reorder, add, or delete steps. For example, the steps described in the present application can be executed in parallel, sequentially, or in different orders, as long as the desired results of the technical solutions of the present application can be achieved, and the present application is not limited herein.
[0138] The above detailed description does not constitute a limitation on the protection scope of the present application. Those skilled in the art should understand that various modifications, combinations, sub-combinations, and substitutions can be made according to design requirements and other factors. Any modifications, equivalent replacements, and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A resource scheduling method, characterized in that, include: Collect multi-dimensional input parameters, including user-side parameters, network-side parameters, and environmental parameters; Based on the multi-dimensional input parameters, a resource scheduling scheme is generated using a multi-objective optimization model. The optimization objectives of the multi-objective optimization model include: maximizing resource utilization, maximizing the balance of user experience for different services, and minimizing base station power consumption. According to the resource scheduling scheme, time-frequency resources, spatial resources, and power resources are jointly scheduled.
2. The method according to claim 1, characterized in that, Based on the multi-dimensional input parameters and a multi-objective optimization model, a resource scheduling scheme is generated, including: Based on the multi-dimensional input parameters, the optimization variables of the multi-objective optimization model are determined; The multi-objective optimization model is solved using a non-dominated sorting genetic algorithm to obtain a resource scheduling scheme.
3. The method according to claim 2, characterized in that, The optimization variables include: Time-frequency variables include the number of resource block (RB) allocations and the number of scheduling time-domain symbols; Spatial variables, including beam selection index and beamforming weights; Power variables, including the beam's transmit power; The resource utilization rate is represented by the product of a first ratio and a second ratio, where the first ratio is the ratio of the number of allocated RBs to the total number of RBs, and the second ratio is the ratio of the number of UEs effectively covered by the beam to the total number of UEs in the beam coverage area. The balance of user experience across different services is represented by a weighted sum of the latency compliance rate and the edge UE rate compliance rate for services with latency requirements. The power consumption of the base station is represented by the difference between the total transmit power of the base station and the total transmit power of the beam. The total transmit power of the beam is the sum of the actual transmit power of each beam, and the actual transmit power is the product of the initial transmit power of the corresponding beam and the interference coefficient of the corresponding beam.
4. The method according to claim 3, characterized in that, The constraints of the multi-objective optimization model include: Time-frequency constraint: The number of RBs allocated to a single UE is less than or equal to a set proportion of the total number of RBs; Spatial constraints: Beam switching delay does not exceed the delay threshold; Power constraints: The total transmit power of the base station shall not exceed the power threshold, and the signal-to-interference-plus-noise ratio (SINR) of the UE shall not be lower than the set value.
5. The method according to claim 1, characterized in that, After jointly scheduling time-frequency resources, spatial resources, and power resources according to the resource scheduling scheme, the method further includes: Obtain monitoring values of UE performance after joint scheduling; A correction instruction is generated based on the deviation between the monitored value and the target value; The multi-objective optimization model is updated according to the correction instructions.
6. The method according to claim 5, characterized in that, The monitored values include actual latency, actual data rate, and actual SINR, as well as the actual power consumption and RB utilization of the base station; Based on the deviation between the monitored value and the target value, a correction instruction is generated, including: If any monitored value deviates from the corresponding target value by more than a preset threshold, a correction instruction will be generated.
7. A resource scheduling device, characterized in that, include: The acquisition module is used to acquire multi-dimensional input parameters, including user-side parameters, network-side parameters, and environmental parameters. The optimization module is used to generate a resource scheduling scheme based on the multi-dimensional input parameters and a multi-objective optimization model. The optimization objectives of the multi-objective optimization model include: maximizing resource utilization, maximizing the balance of user experience for different services, and minimizing base station power consumption. The scheduling module is used to jointly schedule time-frequency resources, spatial resources, and power resources according to the resource scheduling scheme.
8. An electronic device, characterized in that, include: At least one processor; A memory communicatively connected to the at least one processor; wherein, The memory stores a computer program that can be executed by the at least one processor, the computer program being executed by the at least one processor to enable the at least one processor to perform the resource scheduling method as described in any one of claims 1-6.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the program is executed by the processor, it implements the resource scheduling method as described in any one of claims 1-6.
10. A computer program product comprising a computer program and / or instructions, characterized in that, When the computer program and / or instructions are executed by the processor, they implement the resource scheduling method as described in any one of claims 1-6.
Citation Information
Patent Citations
Downlink beam resource allocation method and device for multi-beam communication satellite
CN112039580A
Resource allocation method based on multi-strategy multi-target joint optimization in dense heterogeneous network
CN114698105A
Satellite Internet of Things online resource joint allocation method based on meta reinforcement learning
CN115629540A
RAN slice resource allocation method and device, equipment, storage medium and program product
CN119012391A
Resource allocation method for secure communication of multi-beam low-orbit satellites
CN119324731A
Cited By
Self-adaptive load resource scheduling method and device for embedded GPU (Graphics Processing Unit)
CN121807504A
An adaptive load resource scheduling method and device for embedded GPU
CN121807504B