Construction tunnel surrounding rock stability evaluation method based on digital twinning and related device

By constructing a digital twin model and combining geological forecasting and UWB positioning technology, the stability assessment of the surrounding rock of the tunnel is updated in real time, which solves the blind spot problem in the stability assessment of the surrounding rock in the existing technology and realizes dynamic safety management and risk prediction in the tunnel construction process.

CN121480252APending Publication Date: 2026-02-06HUBEI JIAOTONG CONSTR GRP CO LTD +2
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202511525750.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-10-23
Publication Date
2026-02-06

AI Technical Summary

Technical Problem

Existing methods for assessing the stability of surrounding rock in tunnels during the construction phase have blind spots in time and space, making it difficult to meet the needs of dynamic process control for tunnel construction safety. Furthermore, on-site monitoring and measurement consume a lot of manpower and resources, and it is impossible to obtain the structural status after excavation in a timely manner.

Method used

A method for assessing the stability of surrounding rock in construction tunnels based on digital twins is constructed. A digital twin model is established using the finite element method, combined with geological forecasting and UWB positioning technology, to obtain real-time geological conditions and construction progress information, dynamically update the state of soil and support structure units, extract surrounding rock stability indicators, and assess the stability of tunnel surrounding rock in combination with safety thresholds.

Benefits of technology

It enables process-based dynamic assessment of tunnel surrounding rock stability, enhances the real-time perception of structural status, can predict potential risks in advance, improves construction safety management, is highly adaptable, and provides accurate assessment results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure SMS_1
    Figure SMS_1
  • Figure SMS_2
    Figure SMS_2
  • Figure SMS_3
    Figure SMS_3
Patent Text Reader

Abstract

The invention provides a construction tunnel surrounding rock stability evaluation method based on digital twinning and a related device. The method comprises the following steps: constructing a tunnel digital twinning model of a tunnel construction section; geological data and real-time progress position data of a target mileage segment in the construction process are obtained; mapping the geological data to a digital twinborn model, and updating soil body unit parameters; according to the real-time progress position data, synchronously updating activation states of a soil body unit and a supporting structure unit in the model by adopting a state change method; and extracting a surrounding rock stability index based on the updated digital twinborn model, evaluating the stability of the current construction tunnel surrounding rock in combination with a safety threshold to obtain a construction tunnel surrounding rock stability evaluation result, and constructing a tunnel construction process dynamic mapping-oriented digital twinborn model by utilizing the description capability of a finite element method on structural mechanical behaviors. Geological conditions and construction progress information which are obtained in real time on site are used as input, and the construction period structure safety risk of the drilling and blasting method tunnel is evaluated and predicted.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of digital twinning, in particular to a construction tunnel surrounding rock stability evaluation method based on digital twinning and related device. BACKGROUND

[0002] In the drill and blast method construction, the surrounding rock stability is the core factor to determine the construction safety and engineering progress. The existing surrounding rock stability guarantee of the tunnel during construction is mostly based on the threshold determination, that is, the deformation, stress and other parameters of the tunnel surrounding rock and supporting structure are monitored and measured by installing sensors, and the pre-determined threshold system is compared for evaluation and management. However, due to the complexity of the drill and blast method construction, a large amount of manpower and material resources are needed for on-site monitoring and measurement, and the structure state after excavation cannot be obtained in the first time; in addition, due to many uncertain factors in tunnel surveying and construction, the monitoring points are difficult to completely cover the actual structure risk positions.

[0003] Therefore, the existing surrounding rock stability evaluation mode inevitably has a blind area in time and space, and it is difficult to meet the process dynamic control requirements of tunnel construction safety. SUMMARY

[0004] The embodiment of the present application provides a construction tunnel surrounding rock stability evaluation method based on digital twinning and related device, which can utilize the description ability of the finite element method for structural mechanics behavior, construct a digital twinning model for dynamic mapping of the tunnel construction process, take the geological conditions and construction progress information obtained in real time on site as input, and evaluate and predict the structural safety risk of the drill and blast method tunnel during construction.

[0005] The first aspect of the embodiment of the present application provides a construction tunnel surrounding rock stability evaluation method based on digital twinning and related device, and the method comprises: constructing a tunnel digital twinning model of a tunnel construction section, wherein the tunnel digital twinning model comprises dynamically associated soil units and supporting structure units; obtaining geological data and real-time progress position data of a target mileage section during construction; mapping the geological data to the digital twinning model and updating the soil unit parameters; According to the real-time progress position data, the state changing method is used to synchronously update the activation state of the soil units and the supporting structure units in the model; Based on the updated digital twinning model, the surrounding rock stability index is extracted, the stability of the current construction tunnel surrounding rock is evaluated in combination with the safety threshold, and the construction tunnel surrounding rock stability evaluation result is obtained.

[0006] In one possible implementation, the obtaining of the geological data and the real-time progress position data of the target mileage section during construction comprises: Advanced geological prediction methods combining geophysical exploration and drilling are used to obtain real-time information on the surrounding rock grade, the distribution range of adverse geological conditions, and three-dimensional geological information in front of the tunnel face. Based on the dynamic correction of surrounding rock parameters according to the detection location mileage, a geological mapping dataset for the target mileage segment is generated; A first mobile UWB base station is installed on the top of the rock drilling rig, and a second mobile UWB base station is installed on the top of the secondary lining rig. The first label is placed at the front end of the invert arch construction face, and the second label is placed in the middle of each step construction face; The characteristic distances between each base station and the tag are obtained by UWB ranging, and the ranging is corrected by combining the installation height. The corrected feature distances are subjected to redundant data averaging to eliminate random errors. Based on the reference mileage and correction distance of the rock drilling rig, the absolute mileage of each label position is calculated to generate real-time construction progress location data.

[0007] In one possible implementation, mapping the geological data to a digital twin model and updating the soil element parameters includes: Based on the surrounding rock grade correction data and adverse geological distribution information obtained from advanced geological forecasting, and combined with the mileage of the detection location, the range of soil units that need to be updated within the target mileage segment is determined. Based on the preset mapping relationship between surrounding rock grade and mechanical parameters, the elastic modulus, Poisson's ratio, internal friction angle and cohesion parameters of the corresponding soil unit in the digital twin model are updated by parameter adjustment method to simulate the changes in actual geological conditions.

[0008] In one possible implementation, the step of synchronously updating the activation state of soil elements and support structure elements in the model using a state change method based on the real-time progress location data includes: Based on the absolute mileage of the excavation face in the real-time construction progress location data, a set of soil units matching the current excavation face location is selected from the digital twin model. The soil elements are rendered ineffective by the element stiffness zeroing method to simulate soil removal behavior. Based on the absolute mileage of the support construction face in the real-time construction progress location data, a set of support structure units matching the construction positions of the invert arch, primary support and secondary lining are selected from the digital twin model. Based on the construction method type, the absolute mileage of the excavation face in the real-time construction progress location data is dynamically adjusted, and a set of soil elements matching the current excavation face location is selected from the digital twin model. This set is then used to simulate the soil removal behavior steps by using the element stiffness zeroing method to make the soil elements fail.

[0009] In one possible implementation, the step of dynamically adjusting the absolute mileage of the excavation face based on the real-time construction progress location data, selecting a set of soil elements matching the current excavation face location from the digital twin model, and then using the element stiffness zeroing method to make the soil elements fail to simulate soil removal behavior, includes the following: During full-section construction, the full-section soil unit fails simultaneously. When using the stepped construction method, the soil units that fail in stages according to the progress of the upper, middle, and lower steps are considered as corresponding soil units.

[0010] In one possible implementation, the extraction of surrounding rock stability indices based on the updated digital twin model, combined with a safety threshold to assess the stability of the surrounding rock of the current construction tunnel, yields the construction tunnel surrounding rock stability assessment result, including: After each construction cycle is completed, the net displacement, convergence rate and plastic zone distribution parameters output by the digital twin model are extracted as core indicators of surrounding rock stability. Based on the surrounding rock grade of the target mileage section, a preset differentiated safety threshold library is invoked, wherein the differentiated safety threshold library includes: Class III surrounding rock: net displacement threshold ≤30mm, convergence rate threshold ≤5mm / d; Class IV surrounding rock: net displacement threshold ≤20mm, convergence rate threshold ≤3mm / d; Class V surrounding rock: net displacement threshold ≤ 10 mm, convergence rate threshold ≤ 1 mm / d; When any indicator exceeds the threshold, the corresponding location is marked as a high-risk area; The construction plan for the next cycle of advance is input into the updated digital twin model to simulate the mechanical response of the excavation and support processes, predict the expansion trend of the plastic zone and the displacement increment, and generate a construction safety risk early warning map for the next stage.

[0011] This example provides a digital twin-based method for assessing the stability of surrounding rock in construction tunnels. Based on the finite element method, this example constructs a digital twin model that dynamically maps the tunnel construction process. Combining design and construction plans, it determines the soil excavation outline and the proposed installation location of the support structure, and rationally sets the longitudinal grid dimensions for both the soil and the support structure. Utilizing multi-source sensing methods such as drilling, geophysical exploration, and UWB positioning, it collects real-time information on the geological conditions and construction progress around the tunnel during the construction period. By integrating this information, the digital twin model outputs the current rock stability status during construction, overcoming the shortcomings of traditional monitoring-based assessment methods in dynamic process control. It also intuitively predicts the construction risks for the next cycle of advance. Leveraging the finite element method's ability to describe structural mechanical behavior, it constructs a digital twin model that dynamically maps the tunnel construction process, using real-time geological conditions and construction progress information as input to assess and predict the structural safety risks during the construction period of drill-and-blast tunnels.

[0012] A second aspect of this application provides a digital twin-based device for assessing the stability of surrounding rock in construction tunnels, the device comprising: Model building unit, used to build digital twin models of tunnels in tunnel construction sections; The acquisition unit is used to acquire geological data and real-time progress location data of the target mileage section during the construction process; The mapping unit is used to map the geological data to the digital twin model and update the soil unit parameters; The synchronous update unit is used to synchronously update the activation status of soil elements and support structure elements in the model according to the real-time progress position data using a state change method. The evaluation unit is used to extract surrounding rock stability indicators based on the updated digital twin model, and combine them with safety thresholds to evaluate the stability of the surrounding rock of the tunnel under construction, thereby obtaining the stability evaluation results of the surrounding rock of the tunnel under construction.

[0013] In one possible implementation, regarding the acquisition of geological data and real-time progress location data for the target mileage segment during construction, the acquisition unit is used for: Advanced geological prediction methods combining geophysical exploration and drilling are used to obtain real-time information on the surrounding rock grade, the distribution range of adverse geological conditions, and three-dimensional geological information in front of the tunnel face. Based on the dynamic correction of surrounding rock parameters according to the detection location mileage, a geological mapping dataset for the target mileage segment is generated; A first mobile UWB base station is installed on the top of the rock drilling rig, and a second mobile UWB base station is installed on the top of the secondary lining rig. The first label is placed at the front end of the invert arch construction face, and the second label is placed in the middle of each step construction face; The characteristic distances between each base station and the tag are obtained by UWB ranging, and the ranging is corrected by combining the installation height. The corrected feature distances are subjected to redundant data averaging to eliminate random errors. Based on the reference mileage and correction distance of the rock drilling rig, the absolute mileage of each label position is calculated to generate real-time construction progress location data.

[0014] In one possible implementation, regarding the aspect of mapping the geological data to a digital twin model and updating the soil element parameters, the mapping unit is used for: Based on the surrounding rock grade correction data and adverse geological distribution information obtained from advanced geological forecasting, and combined with the mileage of the detection location, the range of soil units that need to be updated within the target mileage segment is determined. Based on the preset mapping relationship between surrounding rock grade and mechanical parameters, the elastic modulus, Poisson's ratio, internal friction angle and cohesion parameters of the corresponding soil unit in the digital twin model are updated by parameter adjustment method to simulate the changes in actual geological conditions.

[0015] In one possible implementation, regarding the aspect of synchronously updating the activation states of soil elements and support structure elements in the model using a state change method based on the real-time progress location data, the synchronous update unit is used for: Based on the absolute mileage of the excavation face in the real-time construction progress location data, a set of soil units matching the current excavation face location is selected from the digital twin model. The soil elements are rendered ineffective by the element stiffness zeroing method to simulate soil removal behavior. Based on the absolute mileage of the support construction face in the real-time construction progress location data, a set of support structure units matching the construction positions of the invert arch, primary support and secondary lining are selected from the digital twin model. Based on the construction method type, the absolute mileage of the excavation face in the real-time construction progress location data is dynamically adjusted, and a set of soil elements matching the current excavation face location is selected from the digital twin model. This set is then used to simulate the soil removal behavior steps by using the element stiffness zeroing method to make the soil elements fail.

[0016] In one possible implementation, regarding the aspect of dynamically adjusting the absolute mileage of the excavation face based on the real-time construction progress location data, and selecting a set of soil elements matching the current excavation face location from the digital twin model to the range of elements selected for the step of simulating soil removal behavior by using the element stiffness zeroing method to invalidate the soil elements, the synchronous update unit is used for: During full-section construction, the full-section soil unit fails simultaneously. When using the stepped construction method, the soil units that fail in stages according to the progress of the upper, middle, and lower steps are considered as corresponding soil units.

[0017] In one possible implementation, the assessment unit, in the aspect of extracting surrounding rock stability indices based on the updated digital twin model and combining them with safety thresholds to assess the stability of the surrounding rock of the current construction tunnel, to obtain the stability assessment result of the surrounding rock of the construction tunnel, is used for: After each construction cycle is completed, the net displacement, convergence rate and plastic zone distribution parameters output by the digital twin model are extracted as core indicators of surrounding rock stability. Based on the surrounding rock grade of the target mileage section, a preset differentiated safety threshold library is invoked, wherein the differentiated safety threshold library includes: Class III surrounding rock: net displacement threshold ≤30mm, convergence rate threshold ≤5mm / d; Class IV surrounding rock: net displacement threshold ≤20mm, convergence rate threshold ≤3mm / d; Class V surrounding rock: net displacement threshold ≤ 10 mm, convergence rate threshold ≤ 1 mm / d; When any indicator exceeds the threshold, the corresponding location is marked as a high-risk area; The construction plan for the next cycle of advance is input into the updated digital twin model to simulate the mechanical response of the excavation and support processes, predict the expansion trend of the plastic zone and the displacement increment, and generate a construction safety risk early warning map for the next stage.

[0018] A third aspect of this application provides a terminal including a processor, an input device, an output device, and a memory, wherein the processor, input device, output device, and memory are interconnected, wherein the memory is used to store a computer program, the computer program including program instructions, and the processor is configured to invoke the program instructions to execute the steps of the method for assessing the surrounding rock stability of construction tunnels based on digital twins in the first aspect of this application.

[0019] A fourth aspect of this application provides a computer-readable storage medium storing a computer program for electronic data interchange, wherein the computer program causes a computer to perform some or all of the steps described in the digital twin-based method for assessing the stability of surrounding rock in a construction tunnel in the first aspect of this application.

[0020] A fifth aspect of this application provides a computer program product, comprising a non-transitory computer-readable storage medium storing a computer program operable to cause a computer to perform some or all of the steps described in the digital twin-based method for assessing the stability of surrounding rock in construction tunnels in the first aspect of this application. The computer program product may be a software installation package. Attached Figure Description

[0021] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0022] Figure 1 This application provides a schematic diagram of the overall process for a digital twin-based method for assessing the stability of surrounding rock in construction tunnels. Figure 2 This application provides a flowchart illustrating an example of constructing a twin model for a digital twin-based method for assessing the stability of surrounding rock in construction tunnels. Figure 3 This application provides a schematic diagram of a UWB base station and tag deployment scheme for a digital twin-based method for assessing the stability of surrounding rock in construction tunnels. Figure 4 This application provides a schematic diagram of the structure of a construction tunnel surrounding rock stability assessment device based on digital twins; Figure 5 This application provides a schematic diagram of the structure of a terminal. Figure label: Model building unit-1, acquisition unit-2, mapping unit-3, synchronization update unit-4, evaluation unit-5. Detailed Implementation

[0023] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0024] The terms "first," "second," etc., in the specification, claims, and accompanying drawings of this application are used to distinguish different objects, not to describe a specific order. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion. For example, a process, method, system, product, or apparatus that includes a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units not listed, or may optionally include other steps or units inherent to these processes, methods, products, or apparatuses.

[0025] In this application, the reference to "embodiment" means that a specific feature, structure, or characteristic described in connection with an embodiment may be included in at least one embodiment of this application. The appearance of this phrase in various places throughout the specification does not necessarily refer to the same embodiment, nor is it a mutually exclusive, independent, or alternative embodiment. It will be explicitly and implicitly understood by those skilled in the art that the embodiments described in this application can be combined with other embodiments.

[0026] To better understand the digital twin-based method for assessing the stability of surrounding rock in construction tunnels provided in this application, a brief introduction to the application scenarios of this method is given below. In tunnel construction projects, due to the complexity of drill-and-blast methods, on-site monitoring and measurement require significant manpower and resources, and it is impossible to obtain the structural state after excavation in a timely manner. Furthermore, due to numerous uncertainties in tunnel surveying and construction, monitoring points cannot fully cover the actual structural risk areas.

[0027] Figure 1 A schematic diagram of the overall process for a digital twin-based method for assessing the stability of surrounding rock in construction tunnels is shown. Figure 1 As shown, it includes: S1. Construct a digital twin model of the tunnel construction section, wherein the digital twin model of the tunnel includes dynamically related soil units and support structure units. S2. Obtain geological data and real-time progress location data of the target mileage section during construction; S3. Map the geological data to the digital twin model and update the soil element parameters; S4. Based on the real-time progress location data, the activation status of the soil elements and support structure elements in the model is updated synchronously using the state change method. S5. Extract the surrounding rock stability index based on the updated digital twin model, and combine it with the safety threshold to assess the stability of the surrounding rock of the current construction tunnel, so as to obtain the stability assessment result of the surrounding rock of the construction tunnel.

[0028] The process involves constructing a digital twin model of the tunnel construction section, wherein the digital twin model includes dynamically related soil units and support structure units; acquiring geological data and real-time progress location data of the target mileage section during construction; mapping the geological data to the digital twin model and updating the soil unit parameters; synchronously updating the activation status of the soil units and support structure units in the model using a state change method based on the real-time progress location data; extracting surrounding rock stability indicators based on the updated digital twin model, and assessing the stability of the surrounding rock of the current construction tunnel in combination with safety thresholds to obtain the stability assessment result of the surrounding rock of the construction tunnel.

[0029] This implementation method simulates the mechanical behavior of a tunnel structure by constructing a three-dimensional digital twin model containing soil elements and support structure elements. The model is built using the finite element method, converting actual tunnel design parameters and geological conditions into simulation element meshes. During construction, geological information ahead of the target construction section is obtained using geological forecasting methods, and real-time construction progress location data is acquired using a UWB ranging system. The obtained geological data is dynamically mapped into the model, adjusting the mechanical parameters of the corresponding soil elements, including elastic modulus, Poisson's ratio, internal friction angle, and cohesion. Simultaneously, the locations of the excavation face and support construction face are identified based on real-time progress data. The stiffness zeroing method is used to handle the failure of soil elements in the excavated area, and the corresponding support structure elements are activated. Subsequently, indicators such as displacement, convergence rate, and plastic zone distribution of each element in the model are extracted and compared with a safety threshold library corresponding to the surrounding rock grade to determine the stability state of the surrounding rock of the construction tunnel, ultimately outputting the stability assessment results.

[0030] This method enables dynamic, process-oriented assessment of surrounding rock stability, enhancing real-time perception of structural conditions under complex geological circumstances. Through dynamic model updates and real-time simulation, potential structural risks can be predicted in advance, effectively improving construction safety management. Furthermore, combined with a differentiated safety threshold library, the assessment results are more accurate and adaptable, suitable for assessing different types of surrounding rock and construction methods.

[0031] In the above implementation, the mesh division of soil elements and support structure elements can be flexibly adjusted according to the tunnel diameter, excavation method, and design method. Geological data can be obtained from advanced geological drilling, ground-penetrating radar, and other equipment, and is not limited to a single detection method. In the model activation strategy, in addition to the stiffness zeroing method, the node constraint release method or element reduction method can also be used to simulate excavation behavior. The stability index can be expanded to more parameters such as the rate of change of ground stress and the stress state of the support as needed, improving the model's adaptability and evaluation accuracy. This method is also applicable to various excavation modes such as the full-section method and the bench method, and has good versatility and scalability.

[0032] This example provides a digital twin-based method for assessing the stability of surrounding rock in construction tunnels. Based on the finite element method, this example constructs a digital twin model that dynamically maps the tunnel construction process. Combining design and construction plans, it determines the soil excavation outline and the proposed installation location of the support structure, and rationally sets the longitudinal grid dimensions for both the soil and the support structure. Utilizing multi-source sensing methods such as drilling, geophysical exploration, and UWB positioning, it collects real-time information on the geological conditions and construction progress around the tunnel during the construction period. By integrating this information, the digital twin model outputs the current rock stability status during construction, overcoming the shortcomings of traditional monitoring-based assessment methods in dynamic process control. It also intuitively predicts the construction risks for the next cycle of advance. Leveraging the finite element method's ability to describe structural mechanical behavior, it constructs a digital twin model that dynamically maps the tunnel construction process, using real-time geological conditions and construction progress information as input to assess and predict the structural safety risks during the construction period of drill-and-blast tunnels.

[0033] In one possible implementation, acquiring the geological data and real-time progress location data of the target mileage segment during construction includes: S201. Employ advanced geological prediction methods that combine geophysical exploration and drilling to obtain real-time information on the surrounding rock grade, distribution range of adverse geological conditions, and three-dimensional geological information in front of the tunnel face. S202. Based on the detection location mileage, dynamically correct the surrounding rock parameters and generate a geological mapping dataset for the target mileage segment; S203. A first mobile UWB base station is set on the top of the rock drilling rig, and a second mobile UWB base station is set on the top of the secondary lining rig. S204. Place the first label at the front end of the invert arch construction face and place the second label in the middle of each step working face; S205. Obtain the characteristic distance between each base station and the tag through UWB ranging, and perform ranging correction in combination with the installation height; S206. Perform redundant data averaging on the corrected feature distances to eliminate random errors; S207. Based on the reference mileage and correction distance of the rock drilling rig, calculate the absolute mileage of each label position and generate real-time construction progress location data.

[0034] The acquisition of geological data and real-time progress location data for the target mileage section during construction includes: using advanced geological prediction methods combining geophysical exploration and drilling to acquire in real-time the surrounding rock grade, distribution range of adverse geological conditions, and three-dimensional geological information in front of the tunnel face; dynamically correcting the surrounding rock parameters based on the detection location mileage to generate a geological mapping dataset for the target mileage section; setting up a first mobile UWB base station on the top of the drilling rig and a second mobile UWB base station on the top of the secondary lining rig; deploying a first tag at the front end of the invert arch working face and a second tag at the middle position of each step working face; acquiring the characteristic distance between each base station and the tag through UWB ranging, and correcting the ranging based on the installation height; performing redundant data averaging on the corrected characteristic distance to eliminate random errors; calculating the absolute mileage of each tag position based on the drilling rig's reference mileage and the corrected distance to generate real-time construction progress location data.

[0035] This implementation method combines advanced geological forecasting with a UWB high-precision positioning system to achieve precise acquisition of both the geological conditions of the surrounding rock ahead of the tunnel face and the construction location. For geological data acquisition, geophysical exploration (such as ground-penetrating radar and electrical resistivity tomography) and drilling methods are used to obtain geological information ahead of the tunnel. This information is then analyzed using specialized software to create a three-dimensional geological model, identifying the surrounding rock grade and adverse geological areas. Based on this, and combined with the mileage locations of the measuring points, the original design surrounding rock parameters are dynamically corrected, generating a corresponding geological mapping dataset as the basis for updating the soil unit parameters of the digital twin model.

[0036] For acquiring progress location data, mobile UWB base stations were installed on the tops of the drilling rig and the secondary lining rig, while fixed tags were deployed at key locations on the invert arch and step working faces. Continuous two-way distance measurement was performed between the UWB base stations and the tags, and distance measurement errors were corrected using preset installation height parameters to obtain accurate spatial characteristic distances. Multiple distance measurement results were averaged after redundancy processing to effectively reduce the impact of environmental interference and measurement errors. Combined with the initial reference mileage of the drilling rig, the absolute mileage position of each tag was calculated using the characteristic distance, thus forming real-time progress location data covering the entire construction section.

[0037] This method improves the timeliness and spatial resolution of geological information, significantly enhancing the ability to perceive the state of the surrounding rock ahead of the tunnel face in advance. Meanwhile, the UWB-based method for acquiring construction locations is highly accurate and flexible in deployment, capable of stable operation in complex tunnel environments, providing precise input for the real-time synchronous updates of the digital twin model, and ensuring that the model responds to the actual construction conditions.

[0038] In the above implementation, geological exploration methods can be expanded to high-density seismic wave exploration, advanced geological borehole imaging, etc., according to project needs to enhance the accuracy of geological identification; the UWB system can adopt a multi-base station joint positioning mode to adapt to complex structural surfaces and the parallel operation of multiple processes; in the progress data correction stage, multi-sensor data fusion algorithms, such as Kalman filtering and particle filtering, can be introduced to improve the accuracy of mileage estimation and system robustness.

[0039] In one possible implementation, mapping the geological data to a digital twin model and updating the soil element parameters includes: S301. Based on the surrounding rock level correction data and adverse geological distribution information obtained from advanced geological forecasting, and combined with the mileage of the detection location, determine the range of soil units that need to be updated within the target mileage segment. S302. Based on the preset mapping relationship between the surrounding rock grade and mechanical parameters, the elastic modulus, Poisson's ratio, internal friction angle and cohesion parameters of the corresponding soil unit in the digital twin model are updated using parameter adjustment methods to simulate the changes in actual geological conditions.

[0040] The step of mapping the geological data to a digital twin model and updating the soil unit parameters includes: determining the range of soil units that need to be updated within the target mileage segment based on the surrounding rock grade correction data and adverse geological distribution information obtained from advanced geological forecasts, combined with the mileage of the detection location; and updating the elastic modulus, Poisson's ratio, internal friction angle, and cohesion parameters of the corresponding soil units in the digital twin model using parameter adjustment methods based on the preset mapping relationship between surrounding rock grade and mechanical parameters, in order to simulate the changes in actual geological conditions.

[0041] This implementation method reflects geological changes in a digital twin model based on dynamic geological information acquired on-site, through parameter correction. In practical applications, the geological prediction system provides correction values ​​for surrounding rock grades and the distribution range of unfavorable geological areas that differ from the design data. Based on the absolute mileage and three-dimensional spatial distribution of the detection points obtained during exploration, these are spatially mapped to the soil unit grid in the digital twin model to determine which units are affected by new geological information and require updating.

[0042] Subsequently, based on the preset mapping relationship between surrounding rock grade and rock mechanics parameters (such as elastic modulus, Poisson's ratio, internal friction angle, and cohesion), parameter values ​​matching the actual surrounding rock grade are retrieved from the parameter library. Through the model parameter adjustment mechanism, these parameters are updated to the corresponding soil units, achieving accurate simulation of the current actual geological conditions by the digital twin model. This process supports batch updates of multiple adjacent units, improving model synchronization efficiency.

[0043] This approach enables the digital twin model to dynamically reflect the actual geological environment, resulting in a high degree of consistency between structural simulation and reality, which helps improve the accuracy of subsequent surrounding rock stability assessments. Particularly in tunnel sections where the surrounding rock grade changes frequently or where there is localized adverse geological development, real-time parameter adjustments significantly enhance the model's adaptability and expressive power.

[0044] In the above implementation, the parameter mapping relationship can be constructed based on project experience or laboratory test results, or it can be adaptively optimized by combining inversion algorithms; the granularity of soil element division can be adjusted according to construction progress, frequency of geological changes, or risk sensitivity; the parameter update process can be integrated with the script interface of the finite element platform to achieve automated and continuous model updates. In addition, the model can also be extended to support the dynamic adjustment of multi-physics coupling parameters such as temperature and seepage, meeting the more comprehensive simulation needs of high-risk sections.

[0045] In one possible implementation, the step of synchronously updating the activation state of soil elements and support structure elements in the model using a state change method based on the real-time progress location data includes: S401. Based on the absolute mileage of the excavation face in the real-time construction progress location data, select a set of soil units from the digital twin model that match the current excavation face location. S402. The soil element is rendered ineffective by the element stiffness zeroing method to simulate soil removal behavior. S403. Based on the absolute mileage of the support construction face in the real-time construction progress location data, select a set of support structure units from the digital twin model that match the construction positions of the invert arch, primary support and secondary lining. S404. Based on the construction method type, dynamically adjust the absolute mileage of the excavation face in the real-time construction progress location data, select a set of soil elements matching the current excavation face location from the digital twin model, and include them in the unit selection range of the step of simulating soil removal behavior by using the unit stiffness zeroing method to make the soil elements fail.

[0046] The step of synchronously updating the activation status of soil elements and support structure elements in the model using a state change method based on the real-time progress location data includes: selecting a set of soil elements matching the current excavation face location from the digital twin model based on the absolute mileage of the excavation face in the real-time construction progress location data; invalidating the soil elements using a zero-stiffness method to simulate soil removal behavior; selecting a set of support structure elements matching the invert arch, primary support, and secondary lining construction locations from the digital twin model based on the absolute mileage of the support construction face in the real-time construction progress location data; and dynamically adjusting the unit selection range from the step of selecting the set of soil elements matching the current excavation face location from the digital twin model based on the absolute mileage of the excavation face in the real-time construction progress location data to the step of invalidating the soil elements using a zero-stiffness method to simulate soil removal behavior, based on the construction method type.

[0047] This implementation method achieves continuous simulation representation of the construction process by dynamically controlling the activation and failure states of soil and structural elements. During construction, the set of soil elements corresponding to the current construction position is first identified in the digital twin model based on the absolute mileage value of the excavation face in the real-time construction progress location data. After identification, the element stiffness zeroing method is used to set the relevant terms in the stiffness matrix of these elements to zero, simulating the state of being excavated and removed, ensuring that the structural response analysis only applies to the currently existing material area.

[0048] Simultaneously, for support structures such as the invert arch, initial support, and secondary lining, structural units matching their positions are selected in the model based on the absolute mileage information corresponding to the support construction face, and activated to enter the calculation state. The activation process of the support structure units is controlled according to the construction sequence; for example, the initial support is activated before the secondary lining, and the invert arch may be activated a certain distance after the excavation face. This activation sequence is closely related to the construction method and needs to be dynamically adjusted and synchronized with construction.

[0049] To accommodate different construction methods, such as the full-section method or the bench method, this scheme allows for automatic adjustment of the element selection range corresponding to the excavation face based on the construction method. For example, in the bench method, only soil elements at a certain height are zeroed out, while the full-section method processes all cross-sectional elements at once, ensuring that the simulation accuracy is consistent with the actual field behavior.

[0050] This method ensures that the digital twin model is synchronized with the actual construction process in both spatial and temporal dimensions, improving the model's responsiveness and the accuracy of structural behavior prediction. By switching between the states of soil and structural units, the construction behavior and structural state at different stages can be continuously reflected, providing reliable input for subsequent surrounding rock stability assessment.

[0051] In the above implementation, the activation and failure control mechanism can be automated by combining the user subroutine interface of commercial finite element platforms such as ABAQUS and MIDAS; in addition to the stiffness zeroing method, the failure mode of soil elements can also be the element removal method, the material weakening method, etc.; the activation timing of the support unit can be customized according to the structural durability and the rhythm of on-site operation; the construction method adaptation mechanism can be automatically switched by linking the rule base with the real-time scheduling system; in addition, this mechanism can also be extended to the dynamic response simulation of multi-section parallel construction scenarios or multi-mode construction (such as the alternation of the New Austrian Tunneling Method and the step method).

[0052] In one possible implementation, the step of dynamically adjusting the absolute mileage of the excavation face based on the real-time construction progress location data, selecting a set of soil elements matching the current excavation face location from the digital twin model, and then using the element stiffness zeroing method to make the soil elements fail to simulate soil removal behavior, includes the following: S4041. During full-section construction, the full-section soil unit fails simultaneously. S4042. When using the step method for construction, the soil units that fail in stages according to the progress of the upper, middle and lower steps shall correspond to the failures.

[0053] The process of dynamically adjusting the absolute mileage of the excavation face based on the real-time construction progress location data, selecting a set of soil elements matching the current excavation face location from the digital twin model, and then using the element stiffness zeroing method to make the soil elements fail, simulates the soil removal behavior steps. The element selection range includes: when using the full-section method, the full-section soil elements fail simultaneously; when using the step method, the corresponding soil elements fail step by step according to the progress of the upper, middle, and lower steps.

[0054] This implementation provides a soil element state control mechanism adapted to different tunnel construction methods to more realistically reflect the excavation process in actual construction. Under the full-section method, excavation operations typically complete the entire tunnel cross-section in one go. Therefore, in the model, it is necessary to simultaneously screen and invalidate all soil element sets within the entire cross-section that match the absolute mileage of the excavation face. By uniformly executing the element stiffness zeroing operation, the complete removal of soil can be simulated in one go, reflecting the rapid prototyping characteristics of the construction.

[0055] In bench-type construction, tunnel excavation is typically divided into three sections: upper bench, middle bench, and lower bench, progressing step by step according to the construction schedule. To ensure consistency between the model behavior and reality, the corresponding unit set should be determined based on the progress position of each bench, and failure operations should be executed sequentially. This process relies on matching real-time location data with the construction method parameter library to determine the current bench level and position to be executed, ensuring that stiffness zeroing is only applied to areas under construction to avoid abnormal structural response.

[0056] This method links construction method identification with failure control strategies, enabling the digital twin model to accurately respond to on-site process behaviors in both time and space dimensions. This improves the model's structural representation ability and behavioral simulation accuracy, and is of great significance, especially in the construction of tunnels with multiple construction methods or complex cross-sections.

[0057] In the above implementation, the construction method type can be dynamically issued by the construction management platform or automatically identified through the construction method discrimination logic built into the model; the division ratio and progress criteria of each layer of the step method can be set according to the design parameters and corrected in real time; in addition to zeroing the stiffness, the failure control method can also use the stiffness reduction or damage factor model to simulate the partial loosening state; in addition, this mechanism can also be applied to customized simulation under special working conditions such as non-standard cross sections, sub-section construction or inverted arch construction, to achieve higher precision construction behavior modeling.

[0058] In one possible implementation, the extraction of surrounding rock stability indices based on the updated digital twin model, combined with a safety threshold to assess the stability of the surrounding rock of the current construction tunnel, yields the construction tunnel surrounding rock stability assessment result, including: S501. After each construction cycle is completed, the net displacement, convergence rate and plastic zone distribution parameters output by the digital twin model are extracted as core indicators of surrounding rock stability. S502. Based on the surrounding rock grade of the target mileage section, a preset differentiated safety threshold library is invoked, wherein the differentiated safety threshold library includes: Class III surrounding rock: net displacement threshold ≤30mm, convergence rate threshold ≤5mm / d; Class IV surrounding rock: net displacement threshold ≤20mm, convergence rate threshold ≤3mm / d; Class V surrounding rock: net displacement threshold ≤ 10 mm, convergence rate threshold ≤ 1 mm / d; S503. When any indicator exceeds the threshold, the corresponding location is marked as a high-risk area. S504. Input the construction plan for the next cycle of advance into the updated digital twin model, simulate the mechanical response of the excavation and support process, predict the expansion trend of the plastic zone and the displacement increment, and generate a construction safety risk early warning map for the next stage.

[0059] The process involves extracting surrounding rock stability indicators based on the updated digital twin model and assessing the stability of the surrounding rock in the current construction tunnel using safety thresholds. This results in a comprehensive assessment of the surrounding rock stability of the construction tunnel. Specifically, after each construction cycle, the net displacement, convergence rate, and plastic zone distribution parameters output by the digital twin model are extracted as core indicators of surrounding rock stability. Based on the surrounding rock grade of the target mileage section, a pre-defined differentiated safety threshold library is invoked. This library includes: Grade III surrounding rock: net displacement threshold ≤ 30mm, convergence rate threshold ≤ 5mm / d; Grade IV surrounding rock: net displacement threshold ≤ 20mm, convergence rate threshold ≤ 3mm / d; Grade V surrounding rock: net displacement threshold ≤ 10mm, convergence rate threshold ≤ 1mm / d. When any indicator exceeds the threshold, the corresponding location is marked as a high-risk area. The construction plan for the next construction cycle is input into the updated digital twin model to simulate the mechanical response of the excavation and support processes, predict the expansion trend of the plastic zone and the displacement increment, and generate a safety risk warning map for the next stage of construction.

[0060] This implementation method achieves dynamic assessment and risk prediction of surrounding rock stability through continuous monitoring and simulation analysis. Specifically, after each construction cycle (e.g., 1m or 2m), the latest updated digital twin model is invoked to extract key structural response indicators, including: net displacement reflecting the overall deformation degree of the support structure; convergence rate reflecting the deformation development rate; and plastic zone distribution revealing potential instability areas and their expansion trends. These parameters serve as the primary reference for judging the current surrounding rock stability.

[0061] The system matches corresponding safety thresholds based on the surrounding rock grade (e.g., Grade III, IV, or V) of the target mileage section: the maximum net displacement of Grade III surrounding rock should not exceed 30 mm, and the convergence rate should not exceed 5 mm / d; the corresponding parameters for Grade IV and V surrounding rock are more stringent. When any stability index exceeds the corresponding safety threshold, it is determined that there is a potential structural risk at that location, and a high-risk marker is added to the assessment results.

[0062] To achieve proactive risk management, the construction progress plan for the next cycle (including the expected excavation length, excavation location, and support construction sequence) is input into the current model state to simulate the structural response evolution trend under this process, predict the potential expansion area of ​​the plastic zone and displacement increment, generate a safety risk early warning map for the next stage, and assist the construction unit in formulating control measures, such as adjusting construction methods, strengthening support, and phased excavation.

[0063] In the above implementation, the extraction of stability indicators can be completed based on model post-processing functions or automated scripts; the safety threshold library can be constructed based on design specifications, historical data or expert experience, and has scalability; the early warning map can be output in a three-dimensional visualization manner and supports linkage with the BIM platform; in addition, the indicator system can be expanded to include more comprehensive parameters such as stress concentration degree, support stress state, and deformation rate change rate, to achieve multi-dimensional safety situation awareness.

[0064] As a preferred embodiment of this application, this example provides an instance, such as... Figures 2-3 As shown, Figure 2 A flowchart illustrating an example of twin model construction for a digital twin-based method for assessing the stability of surrounding rock in construction tunnels is shown. Figure 3 A schematic diagram of a UWB base station and tag deployment scheme for a construction tunnel surrounding rock stability assessment method based on digital twins is shown, including: Taking a drill-and-blast tunnel approximately 2.7 kilometers long as an example, the tunnel is divided into 14 consecutive segments (less than 200 meters is divided according to the remaining length) at 200-meter intervals, named S1, S2, ..., S14 sequentially along the mileage direction. The implementation steps of this invention will be further described in detail below in conjunction with the above project.

[0065] S1. Based on the tunnel design scheme and geological survey data, initial digital twin models of sections S1 to S14 are constructed using the finite element method, as follows: Figure 2 As shown, the tunnel adopts a three-centered circular curved wall cross section with a net area of ​​48.37m2. Based on the design cross section, the outline to be excavated in the digital twin model is segmented out, and its internal soil units are retained.

[0066] According to geological data, the tunnel is mainly composed of Class III and IV surrounding rock, accounting for 38.3% and 49.4% respectively, while Class V surrounding rock accounts for 11.2%. In the initial digital twin model, different constitutive parameters were used to simulate the differences in surrounding rock conditions, as shown in Table 1.

[0067] According to the design scheme, assembled components of the support structure (primary support and secondary lining) are constructed at corresponding locations in the initial digital twin model. Specifically, the shotcrete of the primary support is simulated using solid elements, the steel arch frame using beam elements, the prestressed anchors using non-bending rod elements, and the secondary lining concrete structure using solid elements. The dimensions and material parameters of each assembled component remain consistent with the design scheme.

[0068] The birth and death element method is adopted. The element stiffness of the soil within the outline to be excavated is set to the design value, which can generate stress and deformation behavior, representing the initial rock mass state before excavation. The element stiffness of the support structure is set to 0, so that it cannot participate in the calculation, which means that it has not been installed and cannot play a normal load-bearing role.

[0069] S2. According to the construction plan, the tunnel adopts the full-face method in the Class III surrounding rock section, with a blasting cycle advance of 3.5m; the two-stage method is adopted in the Class IV surrounding rock section, with a blasting cycle advance of 3m, and the upper stage advances the lower stage by 30-50m; the three-stage method is adopted in the Class V surrounding rock section, with a blasting cycle advance of 1.5m, and the upper stage advances the middle stage by no less than 15m, and the middle stage advances the lower stage by no less than 15m.

[0070] Based on the construction methods and cyclic advance of each tunnel section, the reasonable longitudinal dimensions of the soil units in the digital twin model were determined to be 1 / 10 of the planned cyclic advance length of the section, i.e., 0.35m, 0.3m, and 0.15m for Class III, IV, and V surrounding rock, respectively. This ensures that when there are certain deviations in the actual excavation progress, the digital twin model can accurately match the tunnel face's advance distance in a single construction cycle by reasonably adjusting the combination of excavation units.

[0071] S3. Based on the cyclic advance and plan layout of each tunnel section, determine the reasonable longitudinal dimensions of the support structure in the digital twin model. For the initial support structure, the length of its shotcrete application is directly related to the distance of each blast (1.5m, 3m, 3.5m) and is usually consistent. The anchor bolts and steel arch frames are set with three types of longitudinal spacing: 0.5m, 0.8m, and 1m. To ensure that the digital twin model can accurately match the construction progress of the initial support structure, the longitudinal dimension of the initial support concrete unit is taken as the common divisor of the above distances, i.e., 0.1m.

[0072] For the secondary lining structure, a 12m lining trolley is used, and modular concrete pouring is carried out in 12m units. Therefore, the longitudinal grid size of the secondary lining structure is set to 12m in the digital twin model to meet the dynamic mapping requirements of the tunnel secondary lining structure construction.

[0073] S4. During the entire construction phase, geological advance prediction methods were adopted for the tunnel. Geophysical exploration and advanced geological drilling were combined to predict the state of the surrounding rock in front of and around the tunnel face.

[0074] During excavation, the tunnel center pile was used as a reference, and a total station was used to locate the excavation mileage in real time. A tunnel seismic probe (TSP) was used for medium- and long-range geological prediction at intervals of 100-150m; a ground-penetrating radar (GPR) was used for short-range geological prediction at intervals of 20m. By combining medium-, long-, and short-range measurements, the lithology, geological structure, adverse geological conditions, and groundwater distribution were perceived and preliminarily inferred. Based on this, for areas with inferred fault zones, water-rich sections, karst development, or other geological anomalies, advance boreholes were used to conduct detailed verification of the geological prediction results. Combining geophysical and drilling results, the BQ method was used to dynamically correct the surrounding rock grade in front of and around the tunnel face, and the impact range of the correction was determined based on the drilling depth. Simultaneously, the detection location mileage was integrated, and three-dimensional geological information along the tunnel excavation route was summarized.

[0075] S5. UWB technology is used to monitor the progress of tunnel face excavation and support construction in real time. The UWB ranging system mainly consists of a mobile base station, electronic tags, a wireless relay router, and a host computer, enabling 10-centimeter-level positioning at distances of hundreds of meters between the base station and the tags. The mobile base station is the core of the ranging system, used to send and receive pulse signals conforming to the UWB standard to achieve positioning and ranging of the electronic tags. The electronic tag is a miniaturized wireless device with communication capabilities with the base station. The wireless relay router receives wireless signals from the front-end device and relays them to an external data center. The host computer is a computing device with data processing and display functions, integrated into a data center outside the tunnel.

[0076] like Figure 3 As shown, positioning base stations are respectively set on the top (D) of the drilling rig (A) and the secondary lining rig, serving as movable reference points. Electronic tags are placed at characteristic locations of the tunnel construction progress, including the foremost point (C) of the invert arch working face and the middle position (B) of each step working face. After each work cycle, the absolute mileage of the working face is determined using a total station, based on the tunnel centerline mileage information. Since the drilling rig is located behind the working face, the absolute mileage SA of drilling rig A is obtained by subtracting the drill arm length from the working face mileage.

[0077] The mobile base stations on both sides transmit pulse signals to the electronic tags inside the tunnel. When the signal reaches the electronic tag, the tag immediately reflects a response signal carrying its own ID. By accurately measuring the time difference between the round trip of the signal, the characteristic distances LA-B, LA-C, and LA-D from A to B, C, and D, and the characteristic distances LD-C, LD-B, and LD-A from D to C, B, and A are calculated.

[0078] S6. The distance test results in step S6 are transmitted to the host computer in the data center for fusion processing via a wireless relay router. Since A, B, C, and D are on the same axis, the angular deviation caused by height can be corrected using trigonometric functions. Assuming the installation heights of A, B, C, and D from the bottom of the tunnel are hA, hB, hC, and hD respectively, and using points A and D as references, the corrected characteristic distance is: Considering that UWB ranging data in tunnels may be affected by multipath effects and electromagnetic interference, the redundant ranging results of base stations A and D are averaged to reduce random errors. The relative distances between AB, BC, and CD after mean correction are: The corrected feature distances are approximately linearly distributed. By correlating the absolute mileage and relative distance at point A, the relative distances can be converted into the absolute mileages at points B, C, and D, as follows: Steps S7 and S4 used geophysical exploration and drilling to correct the grade of the surrounding rock in front of the tunnel face, and determined the effective range of the correction by combining the sensing capabilities of the detection methods. During construction, after each geological advance prediction was completed, the collected geological condition information was mapped into the digital twin model of the corresponding segment. By adjusting the mechanical parameters of the corresponding soil units in the digital twin model, the distribution and severity of adverse geological conditions were simulated.

[0079] S8. Using the birth and death element method, the construction progress information obtained in steps S5 and S6 is mapped into the digital twin model. For each excavation face, based on the actual advance distance between points A and B, the soil element with the closest range is selected from the corresponding segment's digital twin model. By setting its stiffness to 0, it loses its normal bearing capacity, thereby dynamically simulating the excavation situation of each face.

[0080] For the support structure, based on the real-time absolute mileage of points C and D, the invert arch and secondary lining structural units with the closest range are selected from the corresponding segment's digital twin model. Their stiffness is set from 0 to the design value, making them active again to simulate the construction of the support structure. Since the initial support is usually constructed immediately after blasting and muck removal at the working face and is consistent with the advancement of the working face, the initial support structural units in the digital twin model are also set to active after the excavation simulation is completed.

[0081] S9. After each advance cycle, steps S7 and S8 are executed to ensure good consistency between the digital twin model and the on-site geological conditions and real-time construction progress. Utilizing the simulation and analysis capabilities of the digital twin model, the mechanical behavior response of the tunnel structure after the current advance cycle is output, including key risk indicators such as net displacement, convergence rate, and plastic zone distribution. Combined with the safety thresholds established during the design phase, the stability of the surrounding rock of the tunnel structure at the current stage is analyzed, providing guidance for on-site inspection and reinforcement of risk areas.

[0082] Based on this, by inputting the construction plan for the next cycle of advance into the digital twin model, it is possible to predict the safety risks of the next stage of construction.

[0083] For those consistent with the above, please refer to Figure 4 , Figure 4 This application provides a schematic diagram of the structure of a construction tunnel surrounding rock stability assessment device based on digital twin technology. (See attached diagram.) Figure 4 As shown, the device includes: Model building unit 1 is used to build a digital twin model of the tunnel in the tunnel construction section; Acquisition Unit 2 is used to acquire geological data and real-time progress location data of the target mileage section during construction; Mapping unit 3 is used to map the geological data to the digital twin model and update the soil unit parameters; Synchronous update unit 4 is used to synchronously update the activation status of soil elements and support structure elements in the model according to the real-time progress position data using a state change method. Evaluation unit 5 is used to extract surrounding rock stability indicators based on the updated digital twin model, and combine them with safety thresholds to evaluate the stability of the surrounding rock of the current construction tunnel, thereby obtaining the stability evaluation results of the surrounding rock of the construction tunnel.

[0084] In one possible implementation, regarding the acquisition of geological data and real-time progress location data for the target mileage segment during construction, the acquisition unit 2 is used for: Advanced geological prediction methods combining geophysical exploration and drilling are used to obtain real-time information on the surrounding rock grade, the distribution range of adverse geological conditions, and three-dimensional geological information in front of the tunnel face. Based on the dynamic correction of surrounding rock parameters according to the detection location mileage, a geological mapping dataset for the target mileage segment is generated; A first mobile UWB base station is installed on the top of the rock drilling rig, and a second mobile UWB base station is installed on the top of the secondary lining rig. The first label is placed at the front end of the invert arch construction face, and the second label is placed in the middle of each step construction face; The characteristic distances between each base station and the tag are obtained by UWB ranging, and the ranging is corrected by combining the installation height. The corrected feature distances are subjected to redundant data averaging to eliminate random errors. Based on the reference mileage and correction distance of the rock drilling rig, the absolute mileage of each label position is calculated to generate real-time construction progress location data.

[0085] In one possible implementation, regarding the mapping of the geological data to a digital twin model and updating the soil element parameters, the mapping unit 3 is used for: Based on the surrounding rock grade correction data and adverse geological distribution information obtained from advanced geological forecasting, and combined with the mileage of the detection location, the range of soil units that need to be updated within the target mileage segment is determined. Based on the preset mapping relationship between surrounding rock grade and mechanical parameters, the elastic modulus, Poisson's ratio, internal friction angle and cohesion parameters of the corresponding soil unit in the digital twin model are updated by parameter adjustment method to simulate the changes in actual geological conditions.

[0086] In one possible implementation, regarding the aspect of synchronously updating the activation states of soil elements and support structure elements in the model using a state change method based on the real-time progress location data, the synchronization update unit 4 is used for: Based on the absolute mileage of the excavation face in the real-time construction progress location data, a set of soil units matching the current excavation face location is selected from the digital twin model. The soil elements are rendered ineffective by the element stiffness zeroing method to simulate soil removal behavior. Based on the absolute mileage of the support construction face in the real-time construction progress location data, a set of support structure units matching the construction positions of the invert arch, primary support and secondary lining are selected from the digital twin model. Based on the construction method type, the absolute mileage of the excavation face in the real-time construction progress location data is dynamically adjusted, and a set of soil elements matching the current excavation face location is selected from the digital twin model. This set is then used to simulate the soil removal behavior steps by using the element stiffness zeroing method to make the soil elements fail.

[0087] In one possible implementation, regarding the aspect of dynamically adjusting the absolute mileage of the excavation face based on the real-time construction progress location data according to the construction method type, and selecting a set of soil elements matching the current excavation face location from the digital twin model to the range of elements selected for the step of simulating soil removal behavior by using the element stiffness zeroing method to invalidate the soil elements, the synchronous update unit 4 is used for: During full-section construction, the full-section soil unit fails simultaneously. When using the stepped construction method, the soil units that fail in stages according to the progress of the upper, middle, and lower steps are considered as corresponding soil units.

[0088] In one possible implementation, in the aspect of extracting surrounding rock stability indices based on the updated digital twin model and combining them with safety thresholds to assess the stability of the surrounding rock of the current construction tunnel, thereby obtaining the stability assessment result of the surrounding rock of the construction tunnel, the assessment unit 5 is used for: After each construction cycle is completed, the net displacement, convergence rate and plastic zone distribution parameters output by the digital twin model are extracted as core indicators of surrounding rock stability. Based on the surrounding rock grade of the target mileage section, a preset differentiated safety threshold library is invoked, wherein the differentiated safety threshold library includes: Class III surrounding rock: net displacement threshold ≤30mm, convergence rate threshold ≤5mm / d; Class IV surrounding rock: net displacement threshold ≤20mm, convergence rate threshold ≤3mm / d; Class V surrounding rock: net displacement threshold ≤ 10 mm, convergence rate threshold ≤ 1 mm / d; When any indicator exceeds the threshold, the corresponding location is marked as a high-risk area; The construction plan for the next cycle of advance is input into the updated digital twin model to simulate the mechanical response of the excavation and support processes, predict the expansion trend of the plastic zone and the displacement increment, and generate a construction safety risk early warning map for the next stage.

[0089] For examples consistent with the above embodiments, please refer to... Figure 4 , Figure 4 A schematic diagram of a terminal structure provided in an embodiment of this application is shown in the figure. It includes a processor, an input device, an output device, and a memory. The processor, input device, output device, and memory are interconnected. The memory is used to store a computer program, which includes program instructions. The processor is configured to call the program instructions. The program includes instructions for performing the following steps. Construct a digital twin model of the tunnel construction section, wherein the digital twin model of the tunnel includes dynamically related soil elements and support structure elements; Acquire geological data and real-time progress location data for the target mileage section during construction; The geological data is mapped to a digital twin model to update the soil element parameters; Based on the real-time progress location data, the activation status of soil elements and support structure elements in the model is updated synchronously using a state change method. Based on the updated digital twin model, the surrounding rock stability index is extracted, and the stability of the surrounding rock of the tunnel under construction is assessed by combining the safety threshold, thus obtaining the stability assessment result of the surrounding rock of the tunnel under construction.

[0090] This example provides a digital twin-based method for assessing the stability of surrounding rock in construction tunnels. Based on the finite element method, this example constructs a digital twin model that dynamically maps the tunnel construction process. Combining design and construction plans, it determines the soil excavation outline and the proposed installation location of the support structure, and rationally sets the longitudinal grid dimensions for both the soil and the support structure. Utilizing multi-source sensing methods such as drilling, geophysical exploration, and UWB positioning, it collects real-time information on the geological conditions and construction progress around the tunnel during the construction period. By integrating this information, the digital twin model outputs the current rock stability status during construction, overcoming the shortcomings of traditional monitoring-based assessment methods in dynamic process control. It also intuitively predicts the construction risks for the next cycle of advance. Leveraging the finite element method's ability to describe structural mechanical behavior, it constructs a digital twin model that dynamically maps the tunnel construction process, using real-time geological conditions and construction progress information as input to assess and predict the structural safety risks during the construction period of drill-and-blast tunnels.

[0091] The above mainly describes the solutions of the embodiments of this application from the perspective of the method execution process. It is understood that, in order to achieve the above functions, the terminal includes the corresponding hardware structure and / or software modules for executing each function. Those skilled in the art should readily recognize that, in conjunction with the units and algorithm steps of the various examples described in the embodiments provided herein, this application can be implemented in hardware or a combination of hardware and computer software. Whether a function is executed in hardware or by computer software driving hardware depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.

[0092] This application embodiment can divide the terminal into functional units according to the above method example. For example, each function can be divided into a separate functional unit, or two or more functions can be integrated into one processing unit. The integrated unit can be implemented in hardware or as a software functional unit. It should be noted that the unit division in this application embodiment is illustrative and only represents one logical functional division. In actual implementation, there may be other division methods.

[0093] This application also provides a computer storage medium storing a computer program for electronic data interchange, which causes a computer to perform some or all of the steps of any of the digital twin-based methods for assessing the stability of surrounding rock in construction tunnels as described in the above method embodiments.

[0094] This application also provides a computer program product, which includes a non-transitory computer-readable storage medium storing a computer program that causes a computer to perform some or all of the steps of any of the digital twin-based methods for assessing the stability of surrounding rock in construction tunnels as described in the above method embodiments.

[0095] It should be noted that, for the sake of simplicity, the foregoing method embodiments are all described as a series of actions. However, those skilled in the art should understand that this application is not limited to the described order of actions, as some steps may be performed in other orders or simultaneously according to this application. Furthermore, those skilled in the art should also understand that the embodiments described in the specification are preferred embodiments, and the actions and modules involved are not necessarily essential to this application.

[0096] In the above embodiments, the descriptions of each embodiment have different focuses. For parts not described in detail in a certain embodiment, please refer to the relevant descriptions in other embodiments.

[0097] In the several embodiments provided in this application, it should be understood that the disclosed apparatus can be implemented in other ways. For example, the apparatus embodiments described above are merely illustrative; for instance, the division of units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be through some interfaces; the indirect coupling or communication connection between devices or units may be electrical or other forms.

[0098] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.

[0099] Furthermore, the functional units in the various embodiments of the application can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated unit can be implemented in hardware or as a software program module.

[0100] If the integrated unit is implemented as a software program module and sold or used as an independent product, it can be stored in a computer-readable storage device (CMD). Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, or all or part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a memory and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of this application. The aforementioned memory includes various media capable of storing program code, such as USB flash drives, read-only memory (ROM), random access memory (RAM), portable hard drives, magnetic disks, or optical disks.

[0101] Those skilled in the art will understand that all or part of the steps in the various methods of the above embodiments can be implemented by a program instructing related hardware. The program can be stored in a computer-readable storage device, which may include: a flash drive, a read-only memory, a random access memory, a magnetic disk, or an optical disk, etc.

[0102] The embodiments of this application have been described in detail above. Specific examples have been used to illustrate the principles and implementation methods of this application. The description of the above embodiments is only for the purpose of helping to understand the method and core ideas of this application. At the same time, for those skilled in the art, there will be changes in the specific implementation methods and application scope based on the ideas of this application. Therefore, the content of this specification should not be construed as a limitation of this application.

Claims

1. A method for assessing the stability of surrounding rock in construction tunnels based on digital twins, characterized in that, include: Construct a digital twin model of the tunnel construction section, wherein the digital twin model of the tunnel includes dynamically related soil elements and support structure elements; Acquire geological data and real-time progress location data for the target mileage section during construction; The geological data is mapped to a digital twin model to update the soil element parameters; Based on the real-time progress location data, the activation status of soil elements and support structure elements in the model is updated synchronously using a state change method. Based on the updated digital twin model, the surrounding rock stability index is extracted, and the stability of the surrounding rock of the tunnel under construction is assessed by combining the safety threshold, thus obtaining the stability assessment result of the surrounding rock of the tunnel under construction.

2. The method for assessing the stability of surrounding rock in construction tunnels based on digital twins according to claim 1, characterized in that, The acquisition of geological data and real-time progress location data for the target mileage section during construction includes: Advanced geological prediction methods combining geophysical exploration and drilling are used to obtain real-time information on the surrounding rock grade, the distribution range of adverse geological conditions, and three-dimensional geological information in front of the tunnel face. Based on the dynamic correction of surrounding rock parameters according to the detection location mileage, a geological mapping dataset for the target mileage segment is generated; A first mobile UWB base station is installed on the top of the rock drilling rig, and a second mobile UWB base station is installed on the top of the secondary lining rig. The first label is placed at the front end of the invert arch construction face, and the second label is placed in the middle of each step construction face; The characteristic distances between each base station and the tag are obtained by UWB ranging, and the ranging is corrected by combining the installation height. The corrected feature distances are subjected to redundant data averaging to eliminate random errors. Based on the reference mileage and correction distance of the rock drilling rig, the absolute mileage of each label position is calculated to generate real-time construction progress location data.

3. The method for assessing the stability of surrounding rock in construction tunnels based on digital twins according to claim 1, characterized in that, The step of mapping the geological data to a digital twin model and updating the soil element parameters includes: Based on the surrounding rock grade correction data and adverse geological distribution information obtained from advanced geological forecasting, and combined with the mileage of the detection location, the range of soil units that need to be updated within the target mileage segment is determined. Based on the preset mapping relationship between surrounding rock grade and mechanical parameters, the elastic modulus, Poisson's ratio, internal friction angle and cohesion parameters of the corresponding soil unit in the digital twin model are updated by parameter adjustment method to simulate the changes in actual geological conditions.

4. The method for assessing the stability of surrounding rock in construction tunnels based on digital twins according to claim 1, characterized in that, The step of synchronously updating the activation state of soil elements and support structure elements in the model using a state change method based on the real-time progress location data includes: Based on the absolute mileage of the excavation face in the real-time construction progress location data, a set of soil units matching the current excavation face location is selected from the digital twin model. The soil elements are rendered ineffective by the element stiffness zeroing method to simulate soil removal behavior. Based on the absolute mileage of the support construction face in the real-time construction progress location data, a set of support structure units matching the construction positions of the invert arch, primary support and secondary lining are selected from the digital twin model. Based on the construction method type, the absolute mileage of the excavation face in the real-time construction progress location data is dynamically adjusted, and a set of soil elements matching the current excavation face location is selected from the digital twin model. This set is then used to simulate the soil removal behavior steps by using the element stiffness zeroing method to make the soil elements fail.

5. The method for assessing the stability of surrounding rock in construction tunnels based on digital twins according to claim 4, characterized in that, The step of dynamically adjusting the absolute mileage of the excavation face based on the real-time construction progress location data, selecting a set of soil elements matching the current excavation face location from the digital twin model, and then using the element stiffness zeroing method to make the soil elements fail, to simulate the soil removal behavior step includes: During full-section construction, the full-section soil unit fails simultaneously. When using the stepped construction method, the soil units that fail in stages according to the progress of the upper, middle, and lower steps are considered as corresponding soil units.

6. The method for assessing the stability of surrounding rock in construction tunnels based on digital twins according to claim 1, characterized in that, The method involves extracting surrounding rock stability indices based on the updated digital twin model, combining these indices with safety thresholds to assess the stability of the surrounding rock in the current construction tunnel, and obtaining the stability assessment results for the surrounding rock of the construction tunnel, including: After each construction cycle is completed, the net displacement, convergence rate and plastic zone distribution parameters output by the digital twin model are extracted as core indicators of surrounding rock stability. Based on the surrounding rock grade of the target mileage section, a preset differentiated safety threshold library is invoked, wherein the differentiated safety threshold library includes: Class III surrounding rock: net displacement threshold ≤30mm, convergence rate threshold ≤5mm / d; Class IV surrounding rock: net displacement threshold ≤20mm, convergence rate threshold ≤3mm / d; Class V surrounding rock: net displacement threshold ≤ 10 mm, convergence rate threshold ≤ 1 mm / d; When any indicator exceeds the threshold, the corresponding location is marked as a high-risk area; The construction plan for the next cycle of advance is input into the updated digital twin model to simulate the mechanical response of the excavation and support processes, predict the expansion trend of the plastic zone and the displacement increment, and generate a construction safety risk early warning map for the next stage.

7. A device for assessing the stability of surrounding rock in construction tunnels based on digital twins, characterized in that, include: Model building unit, used to build digital twin models of tunnels in tunnel construction sections; The acquisition unit is used to acquire geological data and real-time progress location data of the target mileage section during the construction process; The mapping unit is used to map the geological data to the digital twin model and update the soil unit parameters; The synchronous update unit is used to synchronously update the activation status of soil elements and support structure elements in the model according to the real-time progress position data using a state change method. The evaluation unit is used to extract surrounding rock stability indicators based on the updated digital twin model, and combine them with safety thresholds to evaluate the stability of the surrounding rock of the tunnel under construction, thereby obtaining the stability evaluation results of the surrounding rock of the tunnel under construction.

8. The digital twin-based construction tunnel surrounding rock stability assessment device according to claim 7, characterized in that, In terms of acquiring geological data and real-time progress location data for the target mileage section during construction, the acquisition unit is used for: Advanced geological prediction methods combining geophysical exploration and drilling are used to obtain real-time information on the surrounding rock grade, the distribution range of adverse geological conditions, and three-dimensional geological information in front of the tunnel face. Based on the dynamic correction of surrounding rock parameters according to the detection location mileage, a geological mapping dataset for the target mileage segment is generated; A first mobile UWB base station is installed on the top of the rock drilling rig, and a second mobile UWB base station is installed on the top of the secondary lining rig. The first label is placed at the front end of the invert arch construction face, and the second label is placed in the middle of each step construction face; The characteristic distances between each base station and the tag are obtained by UWB ranging, and the ranging is corrected by combining the installation height. The corrected feature distances are subjected to redundant data averaging to eliminate random errors. Based on the reference mileage and correction distance of the rock drilling rig, the absolute mileage of each label position is calculated to generate real-time construction progress location data.

9. A terminal, characterized in that, The system includes a processor, an input device, an output device, and a memory, which are interconnected. The memory stores a computer program, which includes program instructions. The processor is configured to invoke the program instructions to execute the digital twin-based method for assessing the stability of surrounding rock in construction tunnels as described in any one of claims 1-6.

10. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores a computer program, the computer program including program instructions, which, when executed by a processor, cause the processor to perform the method for assessing the stability of surrounding rock in construction tunnels based on digital twins as described in any one of claims 1-6.

Citation Information

Cited By

  • Surrounding rock stress field visualization method and system based on digital twinning

    CN121881490A

  • Dynamic monitoring method for building deep foundation pit supporting construction method fused with digital twinning

    CN122174321A