A method and system for remote scheduling of roadbed and pavement construction equipment

CN121481084BActive Publication Date: 2026-06-26XINGXINGSHENG (BEIJING) CONSTRUCTION ENGINEERING CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
XINGXINGSHENG (BEIJING) CONSTRUCTION ENGINEERING CO LTD
Filing Date
2025-11-07
Publication Date
2026-06-26

AI Technical Summary

Technical Problem

In existing technologies, remote scheduling of roadbed and pavement construction equipment relies on manual collection of equipment location and operating status. The lack of real-time and systematic data monitoring and analysis leads to inaccurate task allocation, uneven resource utilization, and difficulty in timely detection of abnormal equipment behavior, which affects construction efficiency and quality.

Method used

By analyzing the equipment operation trajectory and work status based on task units, abnormal equipment states are identified, areas where equipment behavior deviates are screened, load balance and work frequency consistency are evaluated, a data table for evaluating the efficiency of linked task scheduling is generated, and a risk rating table for remote scheduling decisions is output, thereby achieving intelligent collaborative scheduling.

Benefits of technology

Effectively identify abnormal equipment behavior intervals, optimize resource allocation, improve construction balance and consistency, detect potential problems in advance, enhance the accuracy and flexibility of scheduling decisions, and ensure efficient and smooth construction processes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121481084B_ABST
    Figure CN121481084B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of remote scheduling, in particular to a kind of roadbed pavement construction equipment remote scheduling method and system, comprising the following steps: based on task unit division, identify device trajectory inflection point and operation state conversion mutation interval, analyze device running direction consistency and operation state distribution, assess linkage task scheduling efficiency, analyze construction area stress distribution trend, calibrate abnormal grade, identify corresponding number, output construction equipment intelligent collaborative scheduling instruction set.In the present application, by accurately extracting and analyzing the running track and operation state of the equipment, the abnormal interval and deviation area can be effectively identified, which helps to balance resource allocation, improve operation consistency, avoid resource waste and low efficiency caused by improper task allocation, and realize risk level calibration of task unit, so as to find potential problems in advance and take effective measures, improve scheduling decision accuracy and flexibility, and ensure efficient and smooth execution of construction tasks.