System and method for collecting temporary electricity consumption of construction site
By installing current transformers and wireless network modules on the power distribution boxes at construction sites, real-time collection and visualization of power consumption data at construction sites have been achieved, solving the data lag problem caused by traditional manual meter reading and improving the precision and intelligence of energy management.
Patent Information
- Application Number
- CN202511711155.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-20
- Publication Date
- 2026-02-27
AI Technical Summary
Construction site electricity consumption data relies on manual meter reading, resulting in severe data lag, making it impossible to grasp key electricity consumption data in real time and lacking decision support.
Current transformers and wireless network modules are installed on the power distribution boxes at the construction site. The current transformers collect power consumption data, which is then transmitted to the processor in real time using the wireless network module. The data is then displayed and managed in conjunction with the equipment deployment diagram.
It enables real-time collection and visualization of electricity consumption data at construction sites, improving the precision, intelligence, and safety of energy management.
Smart Images

Figure CN121577959A_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of power consumption collection, in particular to a construction site temporary power consumption collection system and method. BACKGROUND
[0002] In the traditional mode, the site power consumption relies on manual periodic meter reading, the data is fragmented and seriously lagging, and the management personnel cannot master the key data such as total power consumption, instantaneous energy consumption and power factor of each branch line or large equipment in real time, and the decision lacks data support. SUMMARY
[0003] The present application aims to overcome the defects of the prior art, provide a construction site temporary power consumption collection system and method, and solve the problem that the existing site power consumption relies on manual meter reading, which causes the data to be seriously lagging and thus leads to the lack of data support for decision-making.
[0004] The technical solution to achieve the above-mentioned purpose is:
[0005] The present application provides a construction site temporary power consumption collection method, comprising the following steps:
[0006] Providing a mutual inductor, and installing the mutual inductor on each distribution box of the site;
[0007] Collecting the power consumption data of the corresponding distribution box by using the installed mutual inductor, and sending the collected power consumption data to a processor for storage and management.
[0008] The construction site temporary power consumption collection method of the present application is further improved in that it further comprises:
[0009] Providing a wireless network module, and installing the wireless network module on each distribution box of the site;
[0010] Sending the power consumption data collected by the mutual inductor to the processor by using the wireless network module.
[0011] The construction site temporary power consumption collection method of the present application is further improved in that the power consumption data collected by the mutual inductor includes voltage data and current data of each level of circuit in the distribution box.
[0012] The construction site temporary power consumption collection method of the present application is further improved in that the power consumption data received by the processor is displayed in real time.
[0013] The construction site temporary power consumption collection method of the present application is further improved in that it further comprises:
[0014] Displaying the site power consumption equipment deployment diagram as a background;
[0015] Display the device name and its real-time power consumption situation beside the power-using equipment.
[0016] The application also provides a construction site temporary power consumption collection system, comprising:
[0017] A mutual inductor is arranged on each distribution box of the construction site, and is used to collect power consumption data of the corresponding distribution box.
[0018] A collection module is connected with the mutual inductor, and is used to receive the power consumption data collected by the mutual inductor.
[0019] A processor is connected with the collection module, and is used to receive the power consumption data sent by the collection module and store and manage the received power consumption data.
[0020] The application further improves the construction site temporary power consumption collection system, and further comprises a wireless network module installed on each distribution box, wherein the wireless network module is connected with the collection module at each distribution box.
[0021] The collection module sends the power consumption data to the processor through the wireless network module.
[0022] The application further improves the construction site temporary power consumption collection system, and the power consumption data collected by the mutual inductor comprises voltage data and current data of each level of loop in the distribution box.
[0023] The application further improves the construction site temporary power consumption collection system, and the processor is further used to display the received power consumption data in real time.
[0024] The application further improves the construction site temporary power consumption collection system, and the processor is further used to display the construction site power equipment deployment diagram as a background, and display the device name and its real-time power consumption situation beside the power-using equipment.
[0025] The application has the following advantages:
[0026] The application realizes uninterrupted collection and remote transmission of parameters such as voltage, current, power and electric energy of each level of loop by arranging the mutual inductor on each distribution box, converts intangible power consumption into visual data flow, and lays a solid foundation for energy consumption monitoring and analysis.
[0027] The application effectively solves the core pain point of unclear traditional power consumption data, and realizes fine, intelligent and safe energy management. BRIEF DESCRIPTION OF DRAWINGS
[0028] Figure 1It is a structure schematic view of the distribution box in the construction site temporary power consumption acquisition system and method of the application.
[0029] Figure 2 It is a design drawing of the internal components of the distribution box in the construction site temporary power consumption acquisition system and method of the application.
[0030] Figure 3 It is a display interface diagram in the construction site temporary power consumption acquisition system and method of the application.
[0031] Figure 4 It is another display interface diagram in the construction site temporary power consumption acquisition system and method of the application.
[0032] Figure 5 It is a flow chart of the construction site temporary power consumption acquisition method of the application. DETAILED DESCRIPTION
[0033] The application will be further described below in combination with the drawings and specific embodiments.
[0034] Referring to Figure 1 , the application provides a construction site temporary power consumption acquisition system and method, which is used for solving many technical problems existing in traditional site power management, realizing fine, intelligent and safe energy management, and effectively solving the core pain point of unclear traditional power data. The construction site temporary power consumption acquisition system and method of the application will be described below in combination with the drawings.
[0035] It should be noted that the embodiments in the application and the features in the embodiments can be combined with each other without conflict.
[0036] The application provides a construction site temporary power consumption acquisition system, and the structure of the construction site temporary power consumption acquisition system will be described below.
[0037] The construction site temporary power consumption acquisition system of the application comprises a mutual inductor, an acquisition module and a processor, the mutual inductor is arranged on each distribution box of the site, and is used for acquiring power consumption data of the corresponding distribution box; the acquisition module is connected with the mutual inductor, and is also arranged on each distribution box of the site, and is used for receiving the power consumption data acquired by the mutual inductor; and the processor is connected with the acquisition module, and is used for receiving the power consumption data sent by the acquisition module and storing and managing the received power consumption data.
[0038] As shown in Figure 1 , the distribution box 20 of the construction site is arranged at a specified position through a support leg, the distribution box 20 is used for supplying power for corresponding power equipment, and in combination with Figure 2As shown, the power distribution box 20 is provided with a circuit protection module 21, a first signal conversion module 22, a second signal conversion module 23 and a power supply circuit module 24, the circuit protection module 21 is provided with a circuit breaker for realizing over-current protection function, the power supply circuit module 24 includes a plurality of power supply ports, each power supply port is used for connecting a mutual inductor, so that the mutual inductor can collect the power consumption data of each circuit; the first signal conversion module 22 is used for converting the mutual inductor signal into a standard analog signal; the second signal conversion module 23 is used for converting the standard analog signal into a wireless signal, and then sending to the processor through the wireless network.
[0039] Further, the construction site temporary power consumption collection system of the present application further comprises a wireless network module 25 installed on each power distribution box 20, the wireless network module 25 is connected with the collection module at each power distribution box 20; the collection module sends the power consumption data to the processor through the wireless network module 25.
[0040] Still further, the power consumption data collected by the mutual inductor includes voltage data and current data of each stage circuit in the power distribution box. Preferably, the mutual inductor is a voltage mutual inductor and a current mutual inductor.
[0041] The collection system of the present application further comprises an electric energy metering module connected with the collection module, the electric energy metering module is used for calculating power data and electric energy data according to the voltage data and current data collected by the mutual inductor, and then the collection module sends the voltage data, current data, power data and electric energy data to the processor.
[0042] The present application deploys the collection module and the mutual inductor on each power distribution box of the construction site, the collection module collects the power consumption data in the power distribution box in real time through the mutual inductor and converts it into a wireless signal to send to the processor, the processor can be set in the central control room to collect the energy consumption data uniformly.
[0043] In one specific embodiment of the present application, the processor is further used for displaying the received power consumption data in real time.
[0044] Further, a man-machine interaction system is integrated in the processor, and the man-machine interaction system provides the real-time data and historical data of the power consumption data for the construction personnel.
[0045] Still further, as shown in Figure 3 The processor is further used for displaying the power consumption equipment deployment map of the construction site as a background and displaying the equipment name and the real-time power consumption situation of the equipment beside the equipment.
[0046] Still further, as shown in Figure 4 The processor is further used for providing a display frame, each display frame is provided with the equipment name and the real-time power consumption of the equipment.
[0047] Further, a historical query button is provided on the display interface, so that the operator can query the historical power consumption data of the corresponding device by clicking the historical query button.
[0048] The collection system of the present application collects the power consumption and use function of the construction site, and improves the management level of the energy of the construction site.
[0049] The present application also provides a construction site temporary power consumption collection method, which will be described below.
[0050] As shown in Figure 5 The construction site temporary power consumption collection method of the present application comprises the following steps:
[0051] Step S11 is performed to provide a mutual inductor, and the mutual inductor is installed on each distribution box of the construction site; then step S12 is performed;
[0052] Step S12 is performed to collect the power consumption data of the corresponding distribution box by using the installed mutual inductor, and the collected power consumption data is sent to the processor for storage and management.
[0053] In one embodiment of the present application, the construction site temporary power consumption collection method of the present application further comprises:
[0054] A wireless network module is provided, and the wireless network module is installed on each distribution box of the construction site;
[0055] The power consumption data collected by the mutual inductor is sent to the processor by using the wireless network module.
[0056] In one embodiment of the present application, the power consumption data collected by the mutual inductor includes voltage data and current data of each level of loop in the distribution box.
[0057] In one embodiment of the present application, the power consumption data received by the processor is displayed in real time.
[0058] In one embodiment of the present application, the construction site temporary power consumption collection method of the present application further comprises: displaying the deployment diagram of the power consumption equipment of the construction site as a background;
[0059] The name of the equipment and the real-time power consumption situation of the equipment are displayed beside the equipment.
[0060] In one embodiment of the present application, a historical query function is provided, and the historical power consumption data of the corresponding equipment is provided by the historical query instruction, so as to facilitate the management of the energy.
[0061] The application is described in detail above with reference to the drawings. Those skilled in the art can make various changes to the application according to the above description. Therefore, some details in the embodiments should not be regarded as limiting the application, and the scope of protection of the application is defined by the appended claims.
Claims
1. A method for collecting temporary power consumption data at a construction site, characterized in that, Includes the following steps: Provide current transformers and install them on each distribution box at the construction site; The installed current transformers are used to collect the power consumption data of the corresponding distribution boxes, and the collected power consumption data is sent to the processor for storage and management.
2. The method for collecting temporary power consumption data at construction sites as described in claim 1, characterized in that, Also includes: Provide wireless network modules and install the wireless network modules on each distribution box at the construction site; The wireless network module is used to send the power consumption data collected by the current transformer to the processor.
3. The method for collecting temporary power consumption data at construction sites as described in claim 1, characterized in that, The power consumption data collected using instrument transformers includes voltage and current data for each circuit in the distribution box.
4. The method for collecting temporary power consumption data at construction sites as described in claim 1, characterized in that, The power consumption data received by the processor is displayed in real time.
5. The method for collecting temporary power consumption data at construction sites as described in claim 1, characterized in that, Also includes: Display the construction site electrical equipment deployment diagram as the background; The device name and its real-time power consumption are displayed next to the electrical equipment.
6. A temporary power consumption data collection system for construction sites, characterized in that, include: Instrument transformers are installed on each distribution box on the construction site. The instrument transformers are used to collect the power consumption data of the corresponding distribution box. A data acquisition module, connected to the current transformer, is used to receive the power consumption data collected by the current transformer. The processor, connected to the acquisition module, is used to receive power consumption data sent by the acquisition module and to store and manage the received power consumption data.
7. The construction site temporary power consumption collection system as described in claim 6, characterized in that, It also includes a wireless network module, which is installed on each distribution box and is connected to the acquisition module at each distribution box. The data acquisition module sends the power consumption data to the processor via the wireless network module.
8. The construction site temporary power consumption collection system as described in claim 6, characterized in that, The power consumption data collected by the current transformer includes voltage and current data for each circuit in the distribution box.
9. The construction site temporary power consumption collection system as described in claim 6, characterized in that, The processor is also used to display the received power consumption data in real time.
10. The construction site temporary power consumption collection system as described in claim 6, characterized in that, The processor is also used to display the deployment map of electrical equipment at the construction site as a background, and to display the equipment name and its real-time power consumption next to the electrical equipment.
Citation Information
Patent Citations
Power consumption monitoring system and method
CN108594736A
Temporary power utilization supervision and safety risk management and control system for building construction site
CN111555459A
Data center energy monitoring system
CN206894354U
Equipment energy consumption is gathered and status monitoring device
CN208705398U
Intelligent construction site power distribution monitoring system
CN219039608U