Avionics test management system

By designing an avionics integrated testing and management system, the problems of time-consuming and labor-intensive manual operation and ineffective data utilization in existing technologies have been solved. The system realizes automated management and real-time data acquisition for avionics integrated testing and generates electronic reports, thereby improving testing efficiency and data utilization efficiency.

CN121810192APending Publication Date: 2026-04-07WUHU STATE-OWNED FACTORY OF MACHINING
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-12-18
Publication Date
2026-04-07

AI Technical Summary

Technical Problem

The existing avionics system joint testing management suffers from time-consuming and labor-intensive manual operations, is prone to errors, lacks effective data storage and utilization, and lacks remote control and automatic test report generation functions.

Method used

An avionics integrated test management system was designed, including a test main control system, a data management center, and a test simulation network. The main control software realizes the control of the test process, the data management software stores and analyzes data, and the script management software provides script editing functions to generate electronic test reports.

Benefits of technology

It has enabled automated management of avionics testing, improved operational efficiency, reduced human error, achieved real-time data acquisition and management, generated electronic test reports, and simplified the verification process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121810192A_ABST
    Figure CN121810192A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of avionics system testing, in particular to an avionics test management system which comprises a test master control system, a data management center and a test simulation network. The test master control system comprises an industrial personal computer, a display, a keyboard mouse, master control software and script management software; the data management center comprises a disk array, a display, a keyboard mouse, product information management software, test data management software, data retrieval software and test report output software; the test simulation network comprises an Ethernet switch, simulation interface definition software and a network communication library. According to the invention, control of the test process and the state of the test equipment and management of the test script are realized through the master control software for the test simulation network, the data of the test process can be collected, judged, stored and managed in real time, the application is simple, an electronic test report is output, a paper test report is cancelled, the verification process is simplified, and the verification efficiency is improved. And the operation efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of avionics system testing technology, specifically to an avionics integrated testing and management system. Background Technology

[0002] The avionics system of a certain type of aircraft is a crucial component. Before installation, avionics system products must undergo integrated testing. This testing process involves numerous procedures and a large amount of data. Currently, integrated testing management primarily relies on multiple people operating relevant testing equipment, manually reading test results to determine pass / fail status, and manually filling out related paper test reports. This method is time-consuming, labor-intensive, and prone to errors. Furthermore, the large amount of data generated during testing is not effectively stored and utilized, resulting in significant resource waste and hindering subsequent product failure tracing and root cause analysis. While similar test management systems exist on the market, their functions generally meet the testing requirements of avionics systems, but they do not fully satisfy user needs. They lack functions for managing information on the tested products, cannot remotely control the status of testing equipment, and do not automatically generate and output test reports. Summary of the Invention

[0003] To address the aforementioned technical problems, this invention proposes an avionics integrated testing and management system.

[0004] The technical problem to be solved by this invention is achieved by the following technical solution:

[0005] An avionics integrated testing and management system includes a test main control system, a data management center, and a test simulation network, wherein the test simulation network is connected to the test equipment via a network cable interface;

[0006] The test main control system includes an industrial computer, a monitor, a keyboard and mouse, main control software, and script management software. The main control software is connected to the test simulation network via an Ethernet interface.

[0007] The data management center includes a disk array, monitor, keyboard and mouse, product information management software, test data management software, data retrieval software, and test report output software;

[0008] The experimental simulation network includes an Ethernet switch, simulation interface definition software, and a network communication library.

[0009] Preferably, the main control software is used to issue control commands and monitor communication data.

[0010] Preferably, the main control software includes a process management module, a network monitoring module, and a display module.

[0011] Preferably, the script management software is used to provide dedicated script editing functions during the test preparation stage, guiding users to improve the initial conditions, operation prompts and test criteria of the test script, and finally to complete the script verification and output it to a shared folder.

[0012] Preferably, the product information management software is used to register the product's history and maintenance information when the product enters and exits the test.

[0013] Preferably, the test data management software is based on the FTP protocol and receives process record files uploaded by each test system via an Ethernet interface.

[0014] Preferably, the data retrieval software is used to quickly query the data table and draw signal change curves based on the values.

[0015] Preferably, the test report output software is connected to the test simulation network via an Ethernet interface to receive the criterion detection results reported by each test node of the integrated test system.

[0016] Preferably, the simulation interface definition software is used to set the name, node ID, and IP address of the network node to generate a network node configuration file for use by the network communication library.

[0017] Preferably, the network communication library is used in conjunction with the simulation interface definition software to implement data communication, data monitoring, time synchronization, and status monitoring functions.

[0018] The beneficial effects of this invention are:

[0019] This invention provides an avionics integrated testing and management system that allows for the editing of test scripts for avionics integrated testing. Through a test simulation network, the main control software controls the test process and the status of test equipment, as well as manages the test scripts. It can collect, judge, store, and manage test process data in real time. The system is simple to use, outputs electronic test reports, eliminates paper test reports, simplifies the verification process, and improves work efficiency. Attached Figure Description

[0020] The present invention will be further described below with reference to the accompanying drawings and embodiments:

[0021] Figure 1 This is a system structure block diagram of the present invention. Detailed Implementation

[0022] To make the technical means, creative features, objectives and effects of this invention easier to understand, the invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0023] like Figure 1As shown, an avionics integrated testing and management system includes a test main control system, a data management center, and a test simulation network.

[0024] The test control system consists of an industrial computer, a monitor, a keyboard and mouse, as well as main control software and script management software.

[0025] The industrial control computer and monitor provide the necessary development and operation environment and external interfaces for the main control software and script management software.

[0026] The main control software consists of a process management module, a network monitoring module, and a display module. It connects to the test simulation network via an Ethernet interface to issue control commands and monitor communication data. The definition of the communication interface is implemented by the dedicated software of the test simulation network.

[0027] The main functions of each module are as follows:

[0028] Process Management Module: Manages the entire experimental process by issuing control commands through the experimental simulation network, including commands for initialization, running, pausing, and ending; controlling script selection and loading, execution steps of experimental items, and generation of test reports;

[0029] Network monitoring module: Real-time monitoring of the network status and communication data of each node on the test simulation network, parsing and displaying the monitoring data according to the test simulation network interface control file, helping developers to debug the test environment and helping users to grasp the working status information of each test equipment;

[0030] Display module: It rationally divides the screen display area, provides users with detailed operation prompts and current data interpretation results; and provides control buttons and dialog boxes for switching on / off the test equipment software, controlling the test process, modifying flight simulation parameters, and displaying network monitoring data.

[0031] The script management software provides dedicated script editing functions during the test preparation phase, guiding users to refine the initial conditions, operation prompts, and test criteria of the test script. Finally, it verifies the script and outputs it to a shared folder, which can be accessed by simulation and test nodes within the network according to the test procedures. The software must ensure that the output test script format conforms to XML syntax specifications, that the initial conditions can be recognized by the test equipment, and that the test criteria meet the value range specified in the avionics system interface control document.

[0032] The data management center consists of a disk array, a monitor, a keyboard and mouse, as well as product information management software, test data management software, data retrieval software, and test report output software.

[0033] The disk array and monitor provide the necessary development and operation environment, large amount of data storage space, and external interfaces for the product information management software, test data management software, data retrieval software, and test report output software.

[0034] The product information management software has no communication interface with the outside world. The test report output software connects to the test simulation network via an Ethernet interface to receive the criterion test results reported by each test node of the integrated test system. The definition of the communication interface is implemented by the dedicated software of the test simulation network. The test data management software is based on the FTP protocol and receives process record files uploaded by each test system via an Ethernet interface.

[0035] The main functions of each software are as follows:

[0036] Product information management software: Used when products enter and exit testing. It registers product history and maintenance information through a dedicated database, including product name, quantity, model, entry and exit dates, and fault descriptions. The software also needs to provide users with product information retrieval and export functions based on various criteria.

[0037] Test data management software: After the test is completed, it receives the process data recorded by the integrated test system through the test simulation network. In the post-test analysis phase, users can view the test data by steps, time, equipment, and other elements. The playback format is data source code or physical meaning, and the data can also be converted into curves, allowing users to directly view the data change process, gain a macroscopic understanding of the signal interconnection relationships between all devices, and understand the working principle of the avionics system;

[0038] Data retrieval software: It can quickly query data tables according to user needs by using various combinations of conditions such as step number, time, device, and data type, and draw signal change curves based on the values.

[0039] Test report output software: Used during the test, it receives the criterion detection results reported by the integrated test system through the test simulation network, including GJB289A bus data, FC bus data, etc., and provides real-time feedback to the user on the operational conclusions of each step of the test. After the test, it generates a test report based on the test script content and the above interpretation results, and gives the test conclusions.

[0040] The experimental simulation network consists of an Ethernet switch, simulation interface definition software, and a network communication library. It utilizes a packaged network communication library paired with a high-performance Ethernet switch to construct an information transmission network for control commands, simulation data, and test data. The main functions of each software component are as follows:

[0041] Simulation interface definition software:

[0042] It can set the name, node ID, IP address, etc. of network nodes, and finally generate network node configuration files for use by the network communication library; it can define the communication interface between each node using a dedicated editing tool, and set attributes such as variable name, type, sender, receiver, message block ID, etc., and finally save it to a header file, which is output to each network node for development and debugging.

[0043] Network communication library: It encapsulates a set of functions in the form of a dynamic link library, which, together with node configuration files and communication interface header files, enables data communication, data monitoring, time synchronization and status monitoring functions.

[0044] Operating procedures for product testing:

[0045] Connect the power supplies to the industrial control computer of the test main control system, the disk array of the data management center, the Ethernet switch, and the relevant test equipment. After the test main control system and the data management center enter the Windows system, click on the main control software of the test main control system and the product information management software and test report output software on the desktop of the data management center. In the product information management software, register the product's history and maintenance information, including product name, quantity, model, date of entry and exit from the factory, and fault description. In the main control software, click "Initialize," and the system will perform a self-test. After the self-test is successful, the software will enter the main interface. Click the "Device Status" button to bring up the device status interface, select the device to be used, and remotely start its test software. On the main interface, click the "Script Selection" button. Select the script to be tested and load it, then click "Run". The system will automatically start the test. At this time, the network monitoring module in the main control software monitors the network status and communication data of each node on the test simulation network in real time, and parses and displays the monitoring data according to the test simulation network interface control file. Meanwhile, the test report output software in the data management center receives the judgment test results reported by the integrated test system through the test simulation network, including GJB289A bus data, FC bus data, etc., and provides real-time feedback to the user on the operation conclusions of each step of the test. After the test is completed, click "End" in the main control software, and the test report output software in the data management center will generate a test report based on the test script content and the above judgment results, and give the test conclusions.

[0046] How to edit a script:

[0047] After booting into the Windows system on the industrial control computer of the test main control system, click the script management software on the desktop. Once in the main interface of the script management software, click "File" in the upper left corner menu bar, then click "New" in the drop-down menu. On the blank page that opens, write the code according to XML syntax. The code should include the initial conditions, operation prompts, and test criteria for the test script. Finally, after verifying the script, save it and output it to a shared folder, which can then be accessed by various simulation and test nodes within the network according to the test steps. After entering the main interface of the script management software, click "File" in the upper left corner menu bar, then click "Open" in the drop-down menu. Browse the save path of the completed script in the dialog box, select it, open it, and then modify the script. After modification, verify the script and save it.

[0048] Operating procedures for managing experimental data:

[0049] After opening the data management center and entering the Windows system, click on the experimental data management software and data retrieval software on the desktop. In the experimental data management software, click "File" in the upper left corner menu bar, then click "Decode" in the drop-down menu. Locate the corresponding source code file and decode it to convert it into a readable data format. Then click "File" again in the upper left corner menu bar, then click "Playback" in the drop-down menu to locate the decoded file. Users can view the experimental data by steps, time, equipment, and other elements. In the data retrieval software, open the decoded data file and, according to user needs, select various combinations of conditions such as step number, time, equipment, and data type to quickly query the data table and plot signal change curves based on the values.

[0050] The foregoing has shown and described the basic principles, main features, and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The embodiments and descriptions in the specification are merely prisms of the invention. Various changes and modifications can be made to the invention without departing from its spirit and scope, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of protection of this invention is defined by the appended claims and their equivalents.

Claims

1. A test management system for avionics integrated testing, characterized in that: It includes a test control system, a data management center, and a test simulation network, wherein the test simulation network is connected to the test equipment via a network cable interface; The test main control system includes an industrial computer, a monitor, a keyboard and mouse, main control software, and script management software. The main control software is connected to the test simulation network via an Ethernet interface. The data management center includes a disk array, monitor, keyboard and mouse, product information management software, test data management software, data retrieval software, and test report output software; The experimental simulation network includes an Ethernet switch, simulation interface definition software, and a network communication library.

2. The avionics integrated testing and management system according to claim 1, characterized in that: The main control software is used to issue control commands and monitor communication data.

3. The avionics integrated testing and management system according to claim 1, characterized in that: The main control software includes a process management module, a network monitoring module, and a display module.

4. The avionics integrated testing and management system according to claim 1, characterized in that: The script management software is used to provide dedicated script editing functions during the test preparation stage, guiding users to improve the initial conditions, operation prompts and test criteria of the test script, and finally to complete the script verification and output to the shared folder.

5. The avionics integrated testing and management system according to claim 1, characterized in that: The product information management software is used to register the product's history and maintenance information when the product enters and exits testing.

6. The avionics integrated testing and management system according to claim 1, characterized in that: The test data management software is based on the FTP protocol and receives process record files uploaded by each test system via an Ethernet interface.

7. The avionics integrated testing and management system according to claim 1, characterized in that: The data retrieval software is used to quickly query data tables and plot signal change curves based on the values.

8. The avionics integrated testing and management system according to claim 1, characterized in that: The test report output software is connected to the test simulation network via an Ethernet interface to receive the criterion detection results reported by each test node of the integrated test system.

9. The avionics integrated testing and management system according to claim 1, characterized in that: The simulation interface definition software is used to set the name, node ID, and IP address of network nodes to generate network node configuration files for use by the network communication library.

10. The avionics integrated testing and management system according to claim 1, characterized in that: The network communication library is used in conjunction with the simulation interface definition software to implement data communication, data monitoring, time synchronization, and status monitoring functions.