Progressive calculation method and system for project budget second-class cost difference rating

By using specific calculation formulas and systems, the system automatically identifies interval conditions and calculates the second category of engineering budget costs, solving the problems of low calculation complexity and accuracy in existing technologies and achieving simple and efficient cost calculation.

CN121883104APending Publication Date: 2026-04-17FENGJIE COUNTY GOVERNMENT INVESTMENT PROJECT BUDGET AFFAIRS CENTER
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
FENGJIE COUNTY GOVERNMENT INVESTMENT PROJECT BUDGET AFFAIRS CENTER
Filing Date
2023-12-15
Publication Date
2026-04-17

AI Technical Summary

Technical Problem

The existing methods for calculating the second category of costs in engineering estimates are complex and have low accuracy.

Method used

Using specific calculation formulas and systems, by inputting the total investment amount H of the project, the system automatically identifies the interval conditions and calculates the values ​​of A, B, C, and D, directly calculating the second category of project budget costs K, simplifying it into a one-time calculation.

Benefits of technology

It has improved the simplicity and accuracy of calculating the second category of engineering budget costs, avoided the complexity of tiered classification calculations, and improved calculation efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure BDA0004608358910000011
    Figure BDA0004608358910000011
Patent Text Reader

Abstract

The invention discloses a progressive calculation method for a project budget second-class cost difference rating, and the method comprises the steps: S1, building a calculation formula of project budget second-class cost; S2, obtaining a project total investment amount H; s3, accessing the acquired total investment amount H of the project in a second-class cost calculation formula; and S4, calculating a project budget second-class cost K. The invention further provides a progressive calculation system for the project budget second-class cost difference rating. According to the method, the required cost can be calculated at a time only through one calculation formula, stepped classification calculation is not needed, and the method is simpler, higher in accuracy and worthy of wide popularization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of engineering cost estimation, specifically to a progressive calculation method and system for the differential rate of two types of costs in engineering cost estimation. Background Technology

[0002] In calculating the total investment of a construction project's budget, construction and installation costs are calculated based on the nationally stipulated pricing quotas and bases. Other construction costs (commonly known as "Category II costs") are calculated based on the construction and installation costs, or the sum of these costs and a portion of other construction costs, at a certain rate. However, many of these costs are calculated using a progressive differential rate based on the construction and installation costs or the sum of these costs and a portion of other construction costs, such as project bidding agency service fees, engineering design fees, engineering cost consulting fees, and project construction management fees. Therefore, it is necessary to list the calculation formulas for each interval and then summarize them to obtain the final result.

[0003] The "2021 Budget Quota - Construction and Installation Compilation Method" stipulates that the total project investment approved by the project approval department (approved dynamic investment, excluding project construction management fees) is used as the base for calculating costs incurred in obtaining or leasing land use rights, such as land acquisition and relocation compensation, and is tiered (progressive differential rates). The calculation method is shown in the table below:

[0004]

[0005] Following the calculation steps and formulas above, any given total project budget requires segmented calculations, which are then summed to arrive at the final result. Let's assume the total project investment (excluding land acquisition and compensation) is H ten thousand yuan, and the second category of project budget costs is K. Based on the data in the table above, the calculation rates for each investment segment (above 100,000, 50,001-100,000, 50,001-100,000, 5,001-10,000, 1,001-5,000, below 1,000) are 0.4%, 0.8%, 1.2%, 1.5%, and 2.0%, respectively.

[0006] Therefore, the above calculation method requires tiered classification, separate calculations using different rates, and then summation. The calculation method is complex and has low accuracy. Summary of the Invention

[0007] In view of the above-mentioned shortcomings of the existing technology, the purpose of this invention is to provide a progressive calculation method and system for the differential rate of the two types of costs in engineering budget, which solves the problems of complex calculation methods and low accuracy of the two types of costs in engineering budget in the existing technology.

[0008] To achieve the above objectives, the present invention adopts the following technical solution:

[0009] A progressive calculation method for the differential rate of two types of costs in an engineering budget includes the following steps:

[0010] S1. Establish the calculation formula for Category II costs in the project budget. The calculation formula is as follows:

[0011] K=(H-100001)×(H-100000)×0.4%+(H-100001)×50000×0.8%+(E-50000)×(H-50001)×0.8%+(H-50001)×40000×1%+(D-10000)×(H-10001) ×1%+(H-10001)×5000×1.2%+(C-5000)×1.2%×(H-5001)+(H-5001)×4000×1.5%+(B-1000)×(H-1001)×1.5%+(H-1001)×1000×2%+(HA)×2%;

[0012] Among them, K-Project Budget Estimate Category II Costs, unit: 10,000 yuan;

[0013] H - Total investment amount for the project, in ten thousand yuan;

[0014] A, B, C, D - The number of values ​​that can be taken under specific conditions;

[0015] 1000, 1001, 5000, 5001, 10000, 10001, 50000, 50001, and 100000 represent the range values ​​for the interval-based fee calculation of the total investment amount of the project.

[0016] 2%, 1.5%, 1.2%, 1%, 0.8%, and 0.4% are the corresponding rates for management fees within each range.

[0017] S2. Obtain the total investment amount H of the project;

[0018] S3. Match the obtained total investment amount H of the project with the data taking conditions in the formula for calculating the second type of cost, and take the data for A, B, C, and D in the formula;

[0019] S4. Substitute the determined values ​​of A, B, C, and D into the formula to calculate the second category of project cost K.

[0020] Preferably, the two types of fees are categorized based on the total investment amount H of the project and then calculated according to different fee rates.

[0021] Preferably, the method for obtaining numbers from A, B, C, and D in step S3 is as follows:

[0022] S31. When (H-50001), (H-10001), (H-5001), (H-1001) ≤ 0, take the value 0;

[0023] S32. When (H-100001), (H-50001), (H-10001), (H-5001), and (H-1001) are greater than 0, take the value 1;

[0024] S33. When (H-100001) is greater than 0, E = 50000; when it is less than 0, E = H.

[0025] When (H-50001) is greater than 0, D = 10000; when it is less than 0, D = H.

[0026] When (H-10001) is greater than 0, C = 5000; when it is less than 0, C = H.

[0027] When (H-5001) is greater than 0, B = 1000; when it is less than 0, B = H.

[0028] When (H-1001) is greater than 0, A = H; when it is less than 0, A = 0.

[0029] To achieve the above objectives, the present invention adopts the following technical solution:

[0030] A progressive calculation system for the differential rate of two types of costs in engineering budget estimates, based on the above calculation method, includes:

[0031] The storage module is used to store the progressive calculation formulas for the second category of costs in the project budget;

[0032] The input module is used to input the total investment amount H in the calculation formula;

[0033] The calculation module automatically categorizes and calculates the values ​​of A, B, C, and D in the formula after inputting the total investment amount H of the project. At the same time, it automatically substitutes the values ​​of the second category of project cost K into the formula, and displays and stores them.

[0034] Preferably, the calculation module can automatically identify when (H-50001), (H-10001), (H-5001), (H-1001)≤0 and take 0; when (H-100001), (H-50001), (H-10001), (H-5001), (H-1001)>0 and take 1; at the same time, it calculates the values ​​of A, B, C, and D and automatically substitutes them into the calculation formula for calculation.

[0035] Compared with the prior art, the present invention has the following beneficial effects:

[0036] This invention provides a progressive calculation method and system for the differential rate of two types of costs in engineering budget estimates. Through a specific calculation formula, by inputting the total investment amount H of the project, it identifies when (H-50001), (H-10001), (H-5001), (H-1001) ≤ 0 and takes the value 0; when (H-100001), (H-50001), (H-10001), (H-5001), (H-1001) are greater than 0 and take the value 1. At the same time, it calculates the values ​​of A, B, C, and D and substitutes them into the calculation formula to finally calculate the two types of costs in the engineering budget estimate. This method only requires a single calculation formula to calculate the required costs at once, without the need for step-by-step classification calculations, making it simpler and more accurate, and worthy of widespread promotion. Detailed Implementation

[0037] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0038] A progressive calculation method for the differential rate of two types of costs in an engineering budget includes the following steps:

[0039] S1. Establish the calculation formula for Category II costs in the project budget. The calculation formula is as follows:

[0040] K=(H-100001)×(H-100000)×0.4%+(H-100001)×50000×0.8%+(E-50000)×(H-50001)×0.8%+(H-50001)×40000×1%+(D-10000)×(H-10001) ×1%+(H-10001)×5000×1.2%+(C-5000)×1.2%×(H-5001)+(H-5001)×4000×1.5%+(B-1000)×(H-1001)×1.5%+(H-1001)×1000×2%+(HA)×2%;

[0041] Among them, K-Project Budget Estimate Category II Costs, unit: 10,000 yuan;

[0042] H - Total investment amount for the project, in ten thousand yuan;

[0043] A, B, C, D - The number of values ​​that can be taken under specific conditions;

[0044] 1000, 1001, 5000, 5001, 10000, 10001, 50000, 50001, and 100000 represent the range values ​​for the interval-based fee calculation of the total investment amount of the project.

[0045] 2%, 1.5%, 1.2%, 1%, 0.8%, and 0.4% are the corresponding rates for management fees within each range.

[0046] S2. Obtain the total investment amount H of the project;

[0047] S3. Match the obtained total project investment amount H with the data extraction conditions in the formula for calculating the second type of cost, and extract the data from A, B, C, and D in the formula; the data extraction method is as follows:

[0048] S31. When (H-50001), (H-10001), (H-5001), (H-1001) ≤ 0, take the value 0;

[0049] S32. When (H-100001), (H-50001), (H-10001), (H-5001), and (H-1001) are greater than 0, take the value 1;

[0050] S33. When (H-100001) is greater than 0, E = 50000; when it is less than 0, E = H.

[0051] When (H-50001) is greater than 0, D = 10000; when it is less than 0, D = H.

[0052] When (H-10001) is greater than 0, C = 5000; when it is less than 0, C = H.

[0053] When (H-5001) is greater than 0, B = 1000; when it is less than 0, B = H.

[0054] When (H-1001) is greater than 0, A = H; when it is less than 0, A = 0.

[0055] S4. Substitute the determined values ​​of A, B, C, and D into the formula to calculate the second category of project cost K.

[0056] The two types of fees are calculated based on different rates after being categorized according to the total investment amount H of the project.

[0057] The calculation method of this invention only requires knowing the total investment amount H of the project. That is, the size of (H-50001), (H-10001), (H-5001), and (H-1001) in the formula is determined according to the range of H. At the same time, the values ​​of A, B, C, and D are determined. Then, the required second-class cost K of the project estimate can be obtained by substituting it into the formula. It does not require splitting the total investment amount H of the project into multiple tiers and calculating according to different rates. Therefore, the calculation is more convenient and faster, and the accuracy is higher.

[0058] This invention also provides a progressive calculation system for the differential rate of two types of costs in engineering estimates. This system, based on the calculation method described in this invention, can be applied to a mini-program for automatic input and calculation. The system includes:

[0059] The storage module is used to store the progressive calculation formulas for the second category of costs in the project budget;

[0060] The input module is used to input the total investment amount H in the calculation formula;

[0061] The calculation module automatically categorizes and calculates the values ​​of A, B, C, and D in the formula after inputting the total investment amount H of the project. At the same time, it automatically substitutes the values ​​of the second category of project cost K into the formula, and displays and stores them.

[0062] The calculation module can automatically identify when (H-50001), (H-10001), (H-5001), (H-1001) ≤ 0 and set it to 0; and when (H-100001), (H-50001), (H-10001), (H-5001), (H-1001) ≥ 0 and set it to 1. At the same time, it calculates the values ​​of A, B, C, and D and automatically substitutes them into the calculation formula for calculation.

[0063] Based on the disclosure and teachings of the above specification, those skilled in the art can make changes and modifications to the above embodiments. Therefore, the present invention is not limited to the specific embodiments disclosed and described above, and some modifications and changes to the present invention should also fall within the protection scope of the claims of the present invention. Furthermore, although some specific terms are used in this specification, these terms are only for convenience of explanation and do not constitute any limitation on the present invention. Other devices that are the same as or similar to these terms are all within the protection scope of the present invention.

Claims

1. A progressive calculation method for the difference in two types of costs in an engineering budget, characterized in that, Includes the following steps: S1. Establish the calculation formula for Category II costs in the project budget. The calculation formula is as follows: K=(H-100001)×(H-100000)×0.4%+(H-100001)×50000×0.8%+(E-50000)×(H-50001)×0.8%+(H-50001)×40000×1%+(D-10000)×(H-10001) ×1%+(H-10001)×5000×1.2%+(C-5000)×1.2%×(H-5001)+(H-5001)×4000×1.5%+(B-1000)×(H-1001)×1.5%+(H-1001)×1000×2%+(HA)×2%; Among them, K-Project Budget Estimate Category II Costs, unit: 10,000 yuan; H - Total investment amount for the project, in ten thousand yuan; A, B, C, D - The number of values ​​that can be taken under specific conditions; 1000, 1001, 5000, 5001, 10000, 10001, 50000, 50001, and 100000 represent the range values ​​for the interval-based fee calculation of the total investment amount of the project. 2%, 1.5%, 1.2%, 1%, 0.8%, and 0.4% are the corresponding rates for management fees within each range. S2. Obtain the total investment amount H of the project; S3. Match the obtained total investment amount H of the project with the data taking conditions in the formula for calculating the second type of cost, and take the data for A, B, C, and D in the formula; S4. Substitute the determined values ​​of A, B, C, and D into the formula to calculate the second category of project cost K.

2. The progressive calculation method for the difference in two types of costs in an engineering budget as described in claim 1, characterized in that, The two types of fees are categorized based on the total investment amount H of the project and then calculated according to different rates.

3. The progressive calculation method for the difference in two types of costs in an engineering budget as described in claim 1, characterized in that, The method for obtaining numbers from A, B, C, and D in step S3 is as follows: S31. When (H-50001), (H-10001), (H-5001), (H-1001) ≤ 0, take the value 0; S32. When (H-100001), (H-50001), (H-10001), (H-5001), and (H-1001) are greater than 0, take the value 1; S33. When (H-100001) is greater than 0, E = 50000; when it is less than 0, E = H. When (H-50001) is greater than 0, D = 10000; when it is less than 0, D = H. When (H-10001) is greater than 0, C = 5000; when it is less than 0, C = H. When (H-5001) is greater than 0, B = 1000; when it is less than 0, B = H. When (H-1001) is greater than 0, A = H; when it is less than 0, A = 0.

4. A progressive calculation system for the difference in two types of costs in an engineering budget, comprising the calculation method according to any one of claims 1-3, characterized in that, include: The storage module is used to store the progressive calculation formulas for the second category of costs in the project budget; The input module is used to input the total investment amount H in the calculation formula; The calculation module automatically categorizes and calculates the values ​​of A, B, C, and D in the formula after inputting the total investment amount H of the project. At the same time, it automatically substitutes the values ​​of the second category of project cost K into the formula, and displays and stores them.

5. The progressive calculation system for the difference in two types of costs in engineering budget as described in claim 4, characterized in that, The calculation module can automatically identify when (H-50001), (H-10001), (H-5001), (H-1001) ≤ 0 and set it to 0; and when (H-100001), (H-50001), (H-10001), (H-5001), (H-1001) ≥ 0 and set it to 1. At the same time, it calculates the values ​​of A, B, C, and D and automatically substitutes them into the calculation formula for calculation.