Floating type tourism wharf structure and construction method and wave resisting method thereof

By weakening the wave structure through a tiered system of outer breakwater, inner breakwater, and secondary floating bridges, combined with flexible connections and modular design, the problems of insufficient wave protection performance and complex construction of floating tourist wharves have been solved, achieving wharf stability and efficient resource utilization.

CN122039580APending Publication Date: 2026-05-15NO 2 ENG CO LTD OF CCCC FIRST HARBOR ENG +2
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202610499574.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-04-16
Publication Date
2026-05-15

AI Technical Summary

Technical Problem

Existing floating tourist wharves are relatively weak in terms of wave protection, making them susceptible to swaying caused by wave impacts. Furthermore, their construction is complex, making it difficult to adapt to changes in water level, which affects passenger safety and comfort. In addition, the construction costs are high.

Method used

The structure employs a tiered wave-reducing structure consisting of an outer breakwater, an inner breakwater, and a secondary floating bridge. Combined with flexible connections and modular design, it is connected to underwater anchor blocks via tension springs to form an elastic mooring system, enabling automatic raising and lowering as well as wave protection.

Benefits of technology

It effectively suppresses the swaying of the floating body, enhances passenger safety and dock adaptability, reduces construction difficulty and cost, and improves resource utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122039580A_ABST
    Figure CN122039580A_ABST
Patent Text Reader

Abstract

The invention relates to a floating type tourism wharf structure and a construction method and a wave resisting method thereof, and belongs to the technical field of wharf construction. The floating type tourism wharf structure comprises a main floating bridge, a secondary floating bridge, an inner breakwater, a branch floating bridge and an outer breakwater; one end of the main floating bridge is connected with a shoreside through a steel approach bridge, and the other end of the main floating bridge is arranged in the direction away from the shoreside; the secondary floating bridges are correspondingly arranged on the two sides of the main floating bridge; the inner breakwater is arranged at the end, away from the shoreside, of the main floating bridge. Part of the branch floating bridges are located on the side, facing the main floating bridge, of the inner breakwater and arranged in the length direction of the breakwater. Part of the branch floating bridges are arranged in the length direction of the secondary floating bridge and located on the two sides of the secondary floating bridge. The outer breakwater is located on the side, away from the main floating bridge, of the inner breakwater, and a gap is formed between the outer breakwater and the inner breakwater. The outer breakwater blocks and dissipates the sea waves, the remaining sea wave energy is further weakened by the inner breakwater, and therefore the double wave prevention effect is achieved, and meanwhile the secondary floating bridge can also weaken the sea wave energy to continue to be transmitted towards the shore.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application belongs to the technical field of wharf construction, and in particular relates to a floating tourist wharf structure and its construction method and wave protection method. Background Technology

[0002] With the sustained growth of the national economy and the continuous improvement of residents' leisure consumption demands, the water tourism industry has entered a period of rapid development. As a node connecting water transportation and land sightseeing, the scale of tourist wharves is expanding year by year. Tourist wharves are mostly located in near-shore harbors, inland waterways, lakes and reservoirs, and these areas generally have characteristics such as seasonal fluctuations in water levels, frequent wave disturbances, and complex geological conditions.

[0003] Traditional fixed wharves typically employ rigid structures such as pile foundations and concrete caissons. This requires large-scale underwater foundation construction, demands high-quality site geology, and is ill-suited to significant water level fluctuations, leading to issues like berth-to-water level imbalances and difficulties in berthing tourist boats. In contrast, floating tourist wharves rely on a floating structure for buoyancy support, eliminating the need for underwater foundation construction and automatically rising and falling with water levels, thus improving berth adaptability. However, existing floating tourist wharves are relatively weak in wave resistance, with most relying solely on their own weight for stability. In rough seas or when passing vessels generate large waves, they are prone to violent swaying and heaving, affecting passenger safety and comfort, and even posing a risk of passengers falling overboard. Furthermore, the construction process for existing floating wharves is complex, involving the transportation, assembly, and securing of pontoons, which is cumbersome and increases the difficulty and cost of implementation, hindering the widespread application of floating tourist wharves. Summary of the Invention

[0004] This application addresses, to at least some extent, one of the technical problems in the related art.

[0005] Therefore, this application aims to provide a floating tourist wharf structure and its construction method and wave protection method. By setting up an outer breakwater, an inner breakwater and a secondary floating bridge, the energy of the waves is weakened in stages, thereby avoiding the impact of waves on the moored tourist boats and passengers. Furthermore, berths are set up on the side of the inner breakwater facing the main floating bridge to arrange as many berths as possible in a limited space, thereby improving the utilization rate of resources.

[0006] To achieve the above objectives, this application provides a floating tourist pier structure, comprising: The main floating bridge has one end connected to the shore via a steel approach bridge along its length, while the other end of the main floating bridge is set away from the shore. There are multiple secondary floating bridges, which are located on both sides of the main floating bridge and arranged along the length of the main floating bridge. The inner breakwater is located at the end of the main floating bridge furthest from the shore; the inner breakwater intersects with the length of the main floating bridge. The system consists of multiple pontoon bridges. Some pontoon bridges are located on the side of the inner breakwater facing the main pontoon bridge and are arranged along the length of the breakwater. Other pontoon bridges are arranged along the length of the secondary pontoon bridge and are located on both sides of the secondary pontoon bridge. The outer breakwater is located on the side of the inner breakwater away from the main floating bridge, and there is a gap between the outer breakwater and the inner breakwater. In the arrangement of the pontoon bridges, there are gaps between adjacent pontoon bridges to form berths for ships; in the length direction of the main pontoon bridge, there are gaps between adjacent secondary pontoon bridges to form a waterway for ships to pass through.

[0007] The technical solution constructs a three-dimensional platform with graded wave dissipation and functional zoning through the spatial layout of the main floating bridge, secondary floating bridge, inner breakwater, auxiliary floating bridge, and outer breakwater. The outer breakwater, inner breakwater, and secondary floating bridge are arranged from the direction away from the shore towards the shore, so that the outer breakwater acts as the first line of defense to attenuate the incoming sea waves, the inner breakwater forms a secondary barrier, and the secondary floating bridge forms a tertiary barrier, thereby weakening the transmission of sea waves towards the shore in a graded manner and preventing sea waves from impacting ships in the wharf and passengers. At the same time, auxiliary floating bridges are set up on the side of the inner breakwater facing the main floating bridge to form berths, so that the inner breakwater also has the function of allowing passengers to pass through, and more berths can be arranged in a limited space. Moreover, the overall structure does not require complex underwater foundation construction and can automatically rise and fall with the water level, adapting to areas with significant seasonal changes in water level, such as nearshore harbors and inland waterways, further improving the environmental adaptability of the wharf.

[0008] In some embodiments of this application, the main floating bridge, the secondary floating bridge, the inner breakwater, and the outer breakwater are respectively connected to the corresponding anchor blocks on the seabed by tension springs.

[0009] In the technical solution, the main floating bridge, secondary floating bridge, inner breakwater, and outer breakwater are connected to underwater anchor blocks via tension springs, forming an elastic mooring system that combines flexibility and restraint. The extension and contraction characteristics of the tension springs allow each floating body to automatically rise and fall with the water level, avoiding the problem of berth and water surface height imbalance caused by water level changes in traditional fixed wharves. At the same time, the elastic deformation absorbs the impact energy of the waves, effectively suppressing the violent swaying and heaving of the floating bodies. Thus, while ensuring the safety and comfort of passengers boarding the ship, it avoids structural stress damage caused by rigid constraints.

[0010] In some embodiments of this application, there is a gap between the inner breakwater and the main floating bridge, and the main floating bridge is rotatably connected with a steel plate that overlaps the inner breakwater to allow passengers to walk between the inner breakwater and the main floating bridge.

[0011] In the technical solution, a gap is created between the inner breakwater and the main floating bridge to prevent the inner breakwater from colliding with the main floating bridge when blocking waves. The inner breakwater and the main floating bridge are connected by overlapping steel plates, and the steel plates are rotatably connected to the main floating bridge. This not only allows the steel plates to absorb relative displacement through swinging and sliding when the two floating bodies rise and fall asynchronously due to waves, avoiding stress concentration caused by rigid connection, but also allows passengers to walk on the inner breakwater and board and disembark at the berths on the side of the inner breakwater facing the main floating bridge.

[0012] In some embodiments of this application, the main floating bridge, the secondary floating bridge, the inner breakwater, and the outer breakwater each include multiple pontoons, and at least some of the pontoons are arranged along the same straight line to be spliced ​​together to form the main floating bridge, the secondary floating bridge, the inner breakwater, or the outer breakwater.

[0013] In the technical solution, the main floating bridge, secondary floating bridge, inner breakwater and outer breakwater are all made of multiple floating boxes arranged and spliced ​​in a straight line. This modular design disassembles the large floating body into standardized units, which greatly reduces the difficulty of transportation and hoisting. The length and layout of each part can be flexibly adjusted according to the on-site water conditions and berth requirements, so that the construction of the wharf changes from "geology-determined" to "modular adaptation", while providing convenience for later maintenance and functional expansion.

[0014] In some embodiments of this application, the top of the pontoon is provided with an installation hole, which is recessed into the top of the pontoon; the side wall of the pontoon is provided with a receiving groove, and the bottom of the receiving groove is provided with a connecting hole, which penetrates the bottom of the receiving groove along the arrangement direction of the pontoon and communicates with the installation hole. Two adjacent pontoons are connected to each other by a flexible connecting rod, and a rubber block is provided between the two adjacent pontoons. At least part of the structure of the rubber block is located in the receiving groove. The two ends of the flexible connecting rod pass through the connection holes of the corresponding pontoons and extend into the corresponding mounting holes. Then, the nuts are screwed into the corresponding ends of the flexible connecting rods from the corresponding mounting holes.

[0015] In the technical solution, mounting holes are set on the top of the pontoon, and receiving grooves and connecting holes are set on the side wall of the pontoon. Adjacent pontoons are connected by flexible connecting rods, and nuts are locked in the mounting holes. A rubber block is placed between the two pontoons. This connection method conceals the ends of the nuts and flexible connecting rods inside the pontoons, avoiding the safety risks and corrosion problems caused by the ends of the nuts and flexible connecting rods. At the same time, the rubber block absorbs the relative movement impact between the pontoons through elastic deformation, effectively preventing collisions between adjacent pontoons and ensuring the service life and reliability of the pontoons.

[0016] Secondly, this application provides a construction method for a floating tourist wharf structure, used to construct the floating tourist wharf structure of the first aspect; the construction method includes the following steps: Install the main floating bridge at the construction site, connecting one end of the main floating bridge along its length to the shore via a steel approach bridge; connect the main floating bridge to the corresponding anchor blocks on the seabed via tension springs. Secondary floating bridges are installed on both sides of the main floating bridge, with the length direction of the secondary floating bridge perpendicular to the length direction of the main floating bridge; the secondary floating bridges are connected to the corresponding anchor blocks on the bottom of the water by tension springs; Supporting floating bridges are installed on both sides of the secondary floating bridge, with the length direction of the supporting floating bridge perpendicular to the length direction of the secondary floating bridge; and there are gaps between adjacent supporting floating bridges connected to the same secondary floating bridge, so as to jointly define the berthing position for ships. An inner breakwater is installed at the end of the main floating bridge furthest from the shore, with its length direction intersecting the length direction of the main floating bridge; the inner breakwater is then connected to the corresponding anchor block on the seabed via tension springs. A pontoon bridge is connected to the inner breakwater on the side facing the main pontoon bridge to set up a mooring position on the inner breakwater facing the main pontoon bridge. An outer breakwater is installed on the side of the inner breakwater away from the main floating bridge, with a gap between the outer and inner breakwaters; the outer breakwater is connected to the corresponding anchor block on the seabed by a tension spring.

[0017] In the technical solution, the main floating bridge, secondary floating bridge, branch floating bridge, inner breakwater, and outer breakwater are towed to the construction position in sequence and connected and anchored with tension springs. This transforms the traditional underwater foundation construction into floating body splicing operation on the water, reducing dependence on site geological conditions. At the same time, the phased construction ensures that each step is positioned based on the already in place structure, reducing mutual interference from the simultaneous hoisting of multiple components and effectively improving construction safety, efficiency, and controllability of project implementation.

[0018] In some embodiments of this application, when transporting pontoons used to assemble into a main pontoon bridge, a secondary pontoon bridge, an inner breakwater, or an outer breakwater, the transport ship transports two or three pontoons at a time. The pontoons are temporarily fixedly connected by rigid screws to prevent them from colliding with each other during transport.

[0019] In the technical solution, the pontoons are temporarily fixed during transportation using rigid screws, which can effectively prevent the pontoons from shifting or colliding during transportation, reduce transportation losses, and lower subsequent maintenance costs. At the same time, the temporary fixing method is simple and convenient, does not affect the subsequent splicing operation of the pontoons, and ensures a smooth connection between transportation and construction.

[0020] In some embodiments of this application, during transportation, the two ends of a rigid screw are passed through the connection holes of the corresponding pontoon and inserted into the mounting holes. Then, a nut is screwed into the end of the rigid screw from the mounting hole to achieve a temporary fixed connection between adjacent pontoons. After the pontoons are transported to the construction site, the rigid screws are removed, the fastening connections between adjacent pontoons are released, the flexible connecting rods are passed through the rubber pads, and both ends of the flexible connecting rods are passed through the connection holes of the corresponding pontoons and extended into the mounting holes. Then, the nuts are screwed into the ends of the flexible connecting rods from the mounting holes to achieve the splicing of adjacent pontoons.

[0021] In this technical solution, rigid bolts are used for temporary fixation of the pontoons during transportation to ensure their stability, prevent displacement and collisions, and guarantee transportation safety. During on-site assembly, flexible connecting rods and rubber pads are used instead. This allows for tight assembly of the pontoons while also accommodating displacement due to water level fluctuations, buffering the impact of wind and waves, reducing structural stress, and improving the overall stability and service life of the structure. This design achieves efficient integration of temporary transportation and formal assembly, simplifies construction steps, and avoids the problem of a single rigid bolt failing to balance transportation stability and operational flexibility.

[0022] In some embodiments of this application, the side wall of the pontoon is provided with a protrusion, and the connecting hole is opened in the protrusion. The side of the protrusion that protrudes from the side wall of the pontoon is a plane, so that the protrusion surfaces of the two pontoons can contact each other when adjacent pontoons are temporarily fixed.

[0023] In this technical solution, a protrusion is provided on the side wall of the pontoon, with one side of the protrusion being flat. This allows for surface contact when adjacent pontoons are temporarily fixed, resulting in tighter contact and more even force distribution. This effectively reduces shaking and collisions during transportation, preventing damage to the pontoons. The receiving groove is located within the protrusion, making efficient use of the pontoon's structural space. This avoids the receiving groove affecting the overall buoyancy and structural strength of the pontoon, while also facilitating the installation and removal of rigid bolts. This further optimizes the temporary fixing operation of the pontoons, ensuring safety and stability during transportation and laying a solid foundation for subsequent assembly construction.

[0024] Thirdly, this application also provides a wave-proofing method for a floating tourist wharf structure, used to protect the floating tourist wharf structure of the first aspect from waves; the wave-proofing method includes: The main floating bridge, secondary floating bridge, inner breakwater, and outer breakwater are connected to corresponding anchor blocks on the seabed via tension springs; Arrange at least some of the secondary floating bridges from the direction away from the shore toward the direction closer to the shore, in order to reduce the transmission of waves toward the shore; An inner breakwater is constructed at the end of the main floating bridge furthest from the shore, with a gap between the inner breakwater and the main floating bridge. An outer breakwater is constructed on the side of the inner breakwater away from the main pontoon bridge, with a gap between the outer and inner breakwaters.

[0025] In the technical solution, an outer breakwater and an inner breakwater are set up sequentially in the direction close to the shore. The outer breakwater serves as the first barrier to initially weaken the energy of the waves. Subsequently, the inner breakwater serves as the second barrier to further absorb the impact of the waves, thereby reducing the intensity of the waves in the waters inside the wharf and effectively suppressing the swaying of the main floating bridge, secondary floating bridge, and auxiliary floating bridge. At the same time, the secondary floating bridges are arranged in the direction close to the shore to serve as the third barrier to absorb the impact of the waves again, so as to prevent the waves from impacting the ships in the berths and the passengers on the auxiliary floating bridges.

[0026] The floating tourist wharf structure and its construction method and wave protection method provided in this application involve sequentially setting an outer breakwater and an inner breakwater in the direction close to the shore. The outer breakwater serves as the first barrier to initially weaken the energy of the waves, while the inner breakwater serves as the second barrier to further absorb the impact of the waves, thereby reducing the intensity of the waves in the waters inside the wharf and effectively suppressing the swaying of the main floating bridge, secondary floating bridge and auxiliary floating bridge. At the same time, the secondary floating bridges are arranged in the direction close to the shore to serve as the third barrier to absorb the impact of the waves again, so as to prevent the waves from impacting the ships in the berth and the passengers on the auxiliary floating bridges.

[0027] As can be seen from the above technical solutions, additional aspects and advantages of this application will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of this application. Attached Figure Description

[0028] Figure 1 This is a structural schematic diagram of a floating tourist terminal structure according to an embodiment of this application; Figure 2 This is a schematic diagram of the structure of a floating tourist wharf according to an embodiment of this application, in which the outer breakwater and the inner breakwater are respectively connected to the corresponding anchor blocks on the bottom of the water by tension springs. Figure 3 This is a schematic diagram of adjacent pontoons connected by a flexible connecting rod according to an embodiment of this application.

[0029] In the above diagrams: 1. Outer breakwater; 2. Inner breakwater; 3. Main floating bridge; 4. Secondary floating bridge; 5. Supporting floating bridge; 6. Steel approach bridge; 7. Shoreline; 8. Tension spring; 9. Anchor block; 10. Rubber block; 11. Flexible connecting rod; 101. Float; 102. Protrusion; 103. Mounting hole; 31. Steel plate; 501. Berth; 502. Channel. Detailed Implementation

[0030] In the description of this application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc., indicating the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this application. In this application, unless otherwise expressly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection, an electrical connection, or a connection that allows communication between components; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication between two components or the interaction between two components, unless otherwise expressly limited. Those skilled in the art can understand the specific meaning of the above terms in this application based on the specific circumstances. In this application, unless otherwise expressly specified and limited, "above" or "below" the second feature can mean that the first feature is in direct contact with the second feature, or that the first feature is in indirect contact with the second feature through an intermediate medium. Furthermore, "above," "on top of," and "over" the second feature can mean that the first feature is directly above or diagonally above the second feature, or simply that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature can mean that the first feature is directly below or diagonally below the second feature, or simply that the first feature is at a lower horizontal level than the second feature. In this application, the terms "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., refer to a specific feature, structure, material, or characteristic described in connection with that embodiment or example, which is included in at least one embodiment or example of this application. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.

[0031] The present application will now be described in detail through exemplary embodiments. However, it should be understood that, without further description, elements, structures, and features in one embodiment may be advantageously incorporated into other embodiments.

[0032] Floating tourist wharves are mostly located in nearshore harbors, inland waterways, lakes, and reservoirs. These areas generally feature seasonal water level fluctuations, frequent wave disturbances, and complex geological conditions. Some nearshore harbors are also affected by large waves, which not only increases the difficulty of wharf construction but also causes continuous impacts on the wharf structure after completion and operation. In addition, existing floating tourist wharves have poor stability in severe sea conditions, are easily disturbed by waves, and generally have an insufficient number of berths available for ships.

[0033] Based on this, this application provides a floating tourist wharf structure and its construction method and wave protection method. By setting up an outer breakwater 1 and an inner breakwater 2, the waves are doubly blocked, thereby reducing the impact of the waves on the wharf. Furthermore, a berth 501 for ships is set up on the side of the inner breakwater 2 facing the shore 7, so that passengers can walk from the inner breakwater 2, thereby arranging as many berths 501 as possible in the effective space. At the same time, the secondary floating bridge 4 is arranged along the direction close to the shore 7 to further attenuate the energy of the waves.

[0034] As attached Figures 1-3 As shown in an illustrative embodiment of the floating tourist wharf structure of this application, the floating tourist wharf structure includes a main floating bridge 3, a secondary floating bridge 4, an inner breakwater 2, a branch floating bridge 5, and an outer breakwater 1.

[0035] The main floating bridge 3 is the core component of the floating tourist wharf structure. It is typically long and narrow, connecting the shore 7 and extending into the water, providing the main passage and structural support for the entire wharf. The length of the main floating bridge 3 is set along the direction close to the shore 7; one end of the main floating bridge 3 is connected to the shore 7 via a steel approach bridge 6 to ensure that personnel and goods can safely and conveniently enter the wharf area from land; the other end of the main floating bridge 3 is set away from the shore 7 to facilitate the expansion of the wharf's functions into deeper waters.

[0036] It should be noted that the steel approach bridge 6 can be connected to the shore 7 and the main floating bridge 3 by means of hinged or sliding connection to cope with vertical displacement caused by tides or changes in reservoir water level and ensure a stable connection between the land and the floating bridge. The steel approach bridge 6 is a conventional technology in this field and will not be described in detail here.

[0037] Secondary floating bridges 4 are located on both sides of the main floating bridge 3, and together with the main floating bridge 3, they form the main framework of the wharf. Multiple secondary floating bridges 4 are configured, corresponding to each other on both sides of the main floating bridge 3 and arranged along its length. That is, at least some of the secondary floating bridges 4 are arranged along the direction closest to the shoreline 7. The secondary floating bridges 4 not only provide passage for passengers but also impede waves, preventing them from further propagating towards the shoreline 7.

[0038] The inner breakwater 2 is located at the end of the main floating bridge 3 furthest from the shoreline 7. The length of the inner breakwater 2 intersects the length of the main floating bridge 3, so that the main floating bridge 3, secondary floating bridge 4, and auxiliary floating bridge 5 are located on the side of the inner breakwater 2 facing the main floating bridge 3. This allows the inner breakwater 2 to effectively protect the main floating bridge 3, secondary floating bridge 4, and auxiliary floating bridge 5. The main function of the inner breakwater 2 is to act as a barrier, weakening the energy of waves from the depths of the water, thereby protecting the main floating bridge 3 and its internal area from wave impact and improving the stability of the wharf. Simultaneously, the inner breakwater 2 also provides passage for passengers, allowing them to board vessels located on the side of the inner breakwater 2 opposite to the outer breakwater 1.

[0039] The floating bridges 5 form berths 501 for berthing vessels. They also provide pedestrian access for passengers to disembark at the berths. Adjacent floating bridges 5 are spaced apart to collectively create berths 501. A number of floating bridges 5 are used to create multiple berths 501. These berths 501 effectively organize vessel berthing and improve the utilization efficiency of the wharf.

[0040] In this application, some of the pontoon bridges 5 are arranged along the length of the secondary pontoon bridge 4 and located on the inner and outer sides of the secondary pontoon bridge 4, so as to form berths 501 on the inner and outer sides of the secondary pontoon bridge 4 respectively; some of the pontoon bridges 5 are located on the side of the inner breakwater 2 facing the main pontoon bridge 3 and are arranged along the length of the inner breakwater 2, so as to form berths 501 on the inner side of the inner breakwater 2.

[0041] It should be noted that, along the length of the main floating bridge 3, adjacent secondary floating bridges 4 are spaced apart to collectively form a channel 502 for vessel passage, ensuring the safe entry, exit, and movement of vessels within the dock area. The width of channel 502 can be designed according to the expected vessel size and navigation requirements; for example, it can be set to allow two medium-sized cruise ships to pass side by side.

[0042] The outer breakwater 1, as the first line of breakwater protection for the wharf, primarily functions to initially block and weaken waves from the external waters, providing protection for the inner breakwater 2 and jointly enhancing the overall wave protection performance of the wharf structure. The outer breakwater 1 is located on the side of the inner breakwater 2 away from the main floating bridge 3. The outer breakwater 1 and the inner breakwater 2 are independently positioned in the water, maintaining a certain distance between them to prevent collisions when the outer breakwater 1 sways under the influence of waves.

[0043] For ease of description, the side of the inner breakwater 2 facing the shore 7 is referred to as the inner side of the inner breakwater 2, and the side of the inner breakwater 2 away from the shore 7 is referred to as the outer side of the inner breakwater 2. Similarly, the side of the outer breakwater 1 facing the shore 7 is referred to as the inner side of the outer breakwater 1, and the side of the outer breakwater 1 away from the shore 7 is referred to as the outer side of the outer breakwater 1. In this application, the outer breakwater 1 is located outside the inner breakwater 2, and the main floating bridge 3, the secondary floating bridge 4, and the auxiliary floating bridge 5 are located inside the inner breakwater 2.

[0044] In the aforementioned floating tourist wharf structure, the spatial layout of the main floating bridge 3, secondary floating bridge 4, inner breakwater 2, branch floating bridge 5, and outer breakwater 1 constructs a three-dimensional platform with graded wave dissipation and functional zoning coordination. The outer breakwater 1 serves as the first barrier, initially weakening the energy of the waves. Subsequently, the inner breakwater 2 serves as the second barrier, further absorbing the impact of the waves, thereby reducing the wave intensity in the waters inside the wharf and effectively suppressing the swaying of the main floating bridge 3, secondary floating bridge 4, and branch floating bridge 5. At the same time, the secondary floating bridge 4, as a barrier in the waters inside the wharf, further absorbs the impact of the waves, effectively suppressing the impact of the waves on ships and passengers inside the wharf and ensuring the safety of passengers disembarking from ships. In addition, berths 501 are set up on the inner side of the inner breakwater 2, allowing passengers to board ships located on the inner side of the inner breakwater 2. More berths 501 can be arranged in the limited water area. Moreover, the overall structure does not require complex underwater foundation construction and can automatically rise and fall with the water level, making it suitable for areas with significant seasonal changes in water level, such as nearshore harbors and inland waterways 502, further enhancing the environmental adaptability of the terminal.

[0045] Along the length of the main floating bridge 3, there is a gap between the inner breakwater 2 and the main floating bridge 3 to avoid collision between the inner breakwater 2 and the main floating bridge 3 when blocking waves; the inner breakwater 2 and the main floating bridge 3 are connected by steel plate 31 to allow passengers to pass through the gap between the inner breakwater 2 and the main floating bridge 3.

[0046] In some embodiments, the steel plate 31 is rotatably connected to the main floating bridge 3, and the steel plate 31 overlaps on the inner breakwater 2. This not only allows the steel plate 31 to absorb relative displacement through swinging and sliding when the inner breakwater 2 and the main floating bridge 3 rise and fall asynchronously due to sea waves, thus avoiding stress concentration caused by rigid connection, but also allows passengers to pass through the gaps where the steel plate 31 is placed, enabling passengers to walk on the inner breakwater 2 and board and disembark ships at the berth 501 on the side of the inner breakwater 2 facing the main floating bridge 3.

[0047] The main floating bridge 3, the secondary floating bridge 4, the inner breakwater 2 and the outer breakwater 1 are connected to the corresponding anchor blocks 9 on the bottom of the water by tension springs 8.

[0048] For ease of description, the main floating bridge 3, the secondary floating bridge 4, the inner breakwater 2, and the outer breakwater 1 are collectively referred to as the floating structure.

[0049] The tension spring 8 is an elastic element whose main function is to provide elastic support and absorb external impact forces. The tension spring 8 can take many forms. For example, it can be a helical tension spring, which provides elasticity through the expansion and contraction of its spring body; it can also be a disc spring assembly, which provides greater elastic stiffness and load-bearing capacity through the stacking of multiple disc springs; or it can be a rubber tension spring, which absorbs energy by utilizing the elastic deformation of the rubber material.

[0050] The elastic properties of the tension spring 8 allow the floating structure to rise and fall freely with the water level, ensuring that the berth maintains a suitable height difference with the water surface and improving the wharf's adaptability to water level changes. Simultaneously, the tension spring 8 provides a certain elastic restoring force in the horizontal direction, effectively absorbing and buffering external impacts such as wind, waves, and ship wakes, suppressing violent swaying and heaving of the floating structure. The anchor block 9 is a weight used to fix the floating structure to the seabed to prevent it from drifting. The anchor block 9 can be implemented in various ways; for example, it can be a precast concrete block with embedded steel bars to increase strength and durability; it can also be a reinforced concrete block with a steel mesh to enhance its crack resistance and integrity; or it can be a natural stone block used as counterweight, fixed by appropriate rigid bolts.

[0051] It should be noted that the floating bridge 5 is a metal frame structure and is not connected to the underwater anchor block 9.

[0052] In this application, the floating structure is not a single integral structure, but rather composed of several independent pontoons 101. This modular design allows each pontoon 101 to be manufactured, transported, and installed independently, greatly simplifying the construction process of large structures.

[0053] That is, the main floating bridge 3 is a spliced ​​structure consisting of multiple pontoons 101. When installing the main floating bridge 3, the pontoons 101 used to splice and form the main floating bridge 3 are first transported to the construction site, and then the main floating bridge 3 is spliced ​​and installed at the construction site to form the main floating bridge 3.

[0054] The secondary floating bridge 4 is a spliced ​​structure consisting of multiple pontoons 101. When installing the secondary floating bridge 4, the pontoons 101 used to splice and form the secondary floating bridge 4 are first transported to the construction site, and then the secondary floating bridge 4 is spliced ​​and installed at the construction site to form the secondary floating bridge 4.

[0055] The inner breakwater 2 is a spliced ​​structure consisting of multiple pontoons 101. When installing the inner breakwater 2, the pontoons 101 used to splice and form the inner breakwater 2 are first transported to the construction location, and then the inner breakwater 2 is spliced ​​and installed at the construction location to form the inner breakwater 2.

[0056] The outer breakwater 1 is a spliced ​​structure comprising multiple pontoons 101. When installing the outer breakwater 1, the pontoons 101 used to splice and form the outer breakwater 1 are first transported to the construction location, and then the outer breakwater 1 is spliced ​​and installed at the construction location to form the outer breakwater 1.

[0057] It should be noted that the structures of the pontoon 101 used to form the main pontoon bridge 3, the pontoon 101 used to form the secondary pontoon bridge 4, the pontoon 101 used to form the inner breakwater 2, and the pontoon 101 used to form the outer breakwater 1 can be completely identical or different, which will not be described in detail here.

[0058] By incorporating multiple pontoons 101 into the main floating bridge 3, secondary floating bridge 4, inner breakwater 2, and outer breakwater 1, the main floating bridge 3, secondary floating bridge 4, inner breakwater 2, and outer breakwater 1 are designed in a modular fashion. This reduces the difficulty of transporting and hoisting the floating structure and allows for flexible adjustment of the length and layout of each part according to the site's water conditions and berth requirements. This transforms the construction of the wharf from being "geologically determined" to being "modularly adaptable," while also providing convenience for later maintenance and functional expansion.

[0059] Float 101 is the basic unit constituting the floating structure. It is typically a hollow box or a box filled with buoyancy material, providing good buoyancy and stability. Its material can be high-strength polyethylene, fiberglass, steel, or concrete, to adapt to different aquatic environments and load-bearing requirements. The shape of float 101 can be rectangular, square, circular, or irregular, and its size and load-bearing capacity can be customized according to design requirements.

[0060] To prevent collisions between adjacent pontoons 101, rubber blocks 10 are provided between adjacent pontoons 101 to absorb the impact force generated when pontoons 101 collide.

[0061] In some embodiments, the side wall of the float 101 is provided with a receiving groove, and at least part of the structure of the rubber block 10 is located in the receiving groove. The two sides of the rubber block 10 are respectively provided in the receiving grooves of two adjacent floats 101, so as to use the receiving groove to position the rubber block 10.

[0062] like Figure 3 As shown, the top of the float 101 is provided with a mounting hole 103, which is recessed into the top of the float 101; the bottom of the receiving tank is provided with a connecting hole, which passes through the bottom of the receiving tank along the arrangement direction of the floats 101 and communicates with the mounting hole 103; two adjacent floats 101 are connected to each other by a flexible connecting rod 11, and the two ends of the flexible connecting rod 11 pass through the connecting holes of the corresponding floats 101 and extend into the corresponding mounting holes 103. Then, the nut is screwed from the corresponding mounting hole 103 into the corresponding end of the flexible connecting rod 11 to realize the splicing of adjacent floats 101.

[0063] It should be noted that the flexible connecting rod 11 is installed through the rubber block 10 between two adjacent floats 101.

[0064] It should also be noted that the flexible connecting rod 11 can deform along its length. The flexible connecting rod 11 is a conventional technology in this field and will not be described in detail here.

[0065] By providing mounting holes 103 on the top of the pontoon 101 and receiving grooves and connecting holes on the side walls of the pontoon 101, adjacent pontoons 101 are connected by flexible connecting rods 11, and nuts are locked in the mounting holes 103. This connection method not only conceals the ends of the nuts and flexible connecting rods 11 inside the pontoon 101, avoiding the safety risks and corrosion problems caused by the exposed ends of the nuts and flexible connecting rods 11, but also allows the rubber block 10 to absorb the relative motion impact between the pontoons 101 through elastic deformation, effectively preventing plastic deformation of the connecting holes and fatigue failure of the flexible connecting rods 11. This achieves long-term fatigue resistance of the joint while ensuring the overall rigidity of the splice.

[0066] In addition, it should be noted that the pontoon 101 is connected by a flexible connecting rod 11. This is mainly because the flexible connecting rod 11 can adapt to the relative displacement, undulation, swaying and torsional deformation between the pontoons 101 under the action of waves and water flow, effectively buffering the impact load brought by wind and waves, and avoiding the problem of stress concentration and structural fracture caused by the rigid connecting rod being unable to adapt to the relative movement between the floats, thereby improving the overall stability, safety and service life of the pontoon 101.

[0067] Based on the above-mentioned floating tourist wharf structure, this application also provides a construction method for the floating tourist wharf structure, the construction method including the following steps: Install the main floating bridge 3 at the construction site, and connect one end of the main floating bridge 3 along its length to the shore 7 via a steel approach bridge 6; connect the main floating bridge 3 to the corresponding anchor block 9 on the bottom of the water via a tension spring 8. Secondary floating bridges 4 are installed on both sides of the main floating bridge 3, with the length direction of the secondary floating bridge 4 perpendicular to the length direction of the main floating bridge 3; the secondary floating bridge 4 is connected to the corresponding anchor block 9 on the bottom of the water by a tension spring 8; On both sides of the secondary floating bridge 4, auxiliary floating bridges 5 are installed, with the length direction of the auxiliary floating bridge 5 perpendicular to the length direction of the secondary floating bridge 4; and there is a gap between adjacent auxiliary floating bridges 5 connected to the same secondary floating bridge 4, so as to jointly define the berthing position 501 for ships to moor. An inner breakwater 2 is installed at the end of the main floating bridge 3 away from the shore 7, so that the length direction of the inner breakwater 2 intersects the length direction of the main floating bridge 3; the inner breakwater 2 is connected to the corresponding anchor block 9 on the bottom of the water by a tension spring 8; A pontoon bridge 5 is connected to the side of the inner breakwater 2 facing the main pontoon bridge 3, so that a mooring position 501 is set up on the side of the inner breakwater 2 facing the main pontoon bridge 3. An outer breakwater 1 is installed on the side of the inner breakwater 2 away from the main floating bridge 3, with a gap between the outer breakwater 1 and the inner breakwater 2; the outer breakwater 1 is connected to the corresponding anchor block 9 on the bottom of the water via a tension spring 8.

[0068] The above construction method transforms traditional underwater foundation construction into floating body assembly operations, reducing dependence on site geological conditions. At the same time, the phased construction allows each step to be positioned based on the already in place structure, reducing mutual interference from the simultaneous hoisting of multiple components and effectively improving construction safety, efficiency, and controllability of project implementation.

[0069] It should be noted that, when transporting the main floating bridge 3, the pontoon boxes 101 used to assemble the main floating bridge 3 are transported first. After the pontoon boxes 101 are transported to the construction position, they are assembled to achieve the installation of the main floating bridge 3. When transporting the secondary floating bridge 4, the pontoon boxes 101 used to assemble the secondary floating bridge 4 are transported first. After the pontoon boxes 101 are transported to the construction position, they are assembled to achieve the installation of the secondary floating bridge 4. When transporting the inner breakwater 2, the pontoon boxes 101 used to assemble the inner breakwater 2 are transported first. After the pontoon boxes 101 are transported to the construction position, they are assembled to achieve the installation of the inner breakwater 2. When transporting the outer breakwater 1, the pontoon boxes 101 used to assemble the outer breakwater 1 are transported first. After the pontoon boxes 101 are transported to the construction position, they are assembled to achieve the installation of the outer breakwater 1.

[0070] The method of "transporting pontoon 101 first and then assembling it on-site" avoids the inconvenience of transporting large structures such as the main pontoon bridge 3 and secondary pontoon bridge 4 as a whole, adapts to different transportation scenarios, and reduces structural damage during transportation. On-site assembly allows for flexible adjustment of the arrangement and assembly sequence of pontoon 101 according to the actual water conditions at the construction site, improving the adaptability and flexibility of construction. At the same time, the modular assembly method facilitates operation by construction personnel, reduces construction intensity, further improves construction efficiency, and ensures the orderly progress of the construction process.

[0071] It should also be noted that when transporting the pontoons 101, the transport ship transports two or three pontoons 101 at a time. The pontoons 101 are temporarily fixed together by rigid screws to prevent them from colliding with each other during transportation, reduce transportation losses, and lower subsequent maintenance costs.

[0072] In addition, during transportation, the two ends of the rigid screw of the float 101 pass through the connection hole of the corresponding float 101 and extend into the mounting hole 103. Nuts are screwed into the ends of the rigid screw through the mounting hole 103 to achieve temporary fixed connection of adjacent floats 101. After the float 101 is transported to the construction position, the rigid screw is removed, the fastening connection of adjacent floats 101 is released, the flexible connecting rod 11 is set through the rubber pad, and the two ends of the flexible connecting rod 11 pass through the connection hole of the corresponding float 101 and extend into the mounting hole 103. Nuts are screwed into the ends of the flexible connecting rod 11 through the mounting hole 103 to achieve splicing of adjacent floats 101.

[0073] During transportation, the pontoon 101 is temporarily secured with rigid bolts to ensure its stability, prevent displacement and collisions, and guarantee transportation safety. During on-site assembly, flexible connecting rods 11 and rubber pads are used instead. This allows for a tighter connection of the pontoon 101 while also accommodating its displacement due to water level fluctuations, buffering the impact of wind and waves, reducing structural stress, and improving the overall stability and service life of the structure. This design achieves efficient integration between temporary transportation and formal assembly, simplifies construction steps, and avoids the problem of a single rigid bolt failing to balance transportation stability and operational flexibility.

[0074] In some embodiments, the side wall of the float 101 is provided with a protrusion 102, and a receiving groove is opened in the protrusion 102. The side of the protrusion 102 that protrudes from the side wall of the float 101 is a plane, so that when adjacent floats 101 are temporarily fixed, the protrusions 102 of the two floats 101 are in contact, which effectively reduces shaking and collision during transportation and avoids damage to the floats 101.

[0075] The following section uses the Qingdao Bay (Erzhong Bay) Wharf project as an example to detail the construction method of the above-mentioned floating tourist wharf structure.

[0076] The Qingdao Bay (Erzhong Bay) Wharf Project is located on the coast of Shinan District, Qingdao City, within Qingdao Bay. It is bordered by Zhanqiao Pier to the west and Xiaoqingdao Island and the Naval Museum to the south. The wharf is adjacent to Laixi Road and Taiping Road. Geographic coordinates: 36°03′36″N, 120°18′54″E. The project plans to construct berthing facilities to accommodate passenger ships and other vessels.

[0077] The construction method for a floating tourist terminal structure includes the following steps: First, the seabed is dredged, and then anchor blocks 9 are set at the required locations to fix the main floating bridge 3, secondary floating bridge 4, inner breakwater 2 and outer breakwater 1.

[0078] The pontoons 101 used to form the main floating bridge 3 are transported to the construction location. The transport ship transports three pontoons 101 at a time. The three pontoons 101 are temporarily fixed by rigid screws. After the pontoons 101 are transported to the construction location, the temporary fixing between the pontoons 101 is released, and then they are connected to each other using flexible connecting rods 11. Rubber blocks 10 are placed between adjacent pontoons 101 so that multiple pontoons 101 are spliced ​​together to form the main floating bridge 3. The main floating bridge 3 is connected to the corresponding anchor blocks 9 on the bottom of the water by tension springs 8 to achieve the anchoring of the main floating bridge 3. The main floating bridge 3 is then connected to the shore 7 by steel approach bridges 6.

[0079] After multiple pontoons 101 are spliced ​​together to form the main floating bridge 3, the pontoons 101 used to form the secondary floating bridge 4 are transported to the construction location. Similarly, the transport ship transports three pontoons 101 at a time. The three pontoons 101 are temporarily fixed by rigid screws. After the pontoons 101 are transported to the construction location, the temporary fixing between the pontoons 101 is released, and then they are connected to each other using flexible connecting rods 11. Rubber blocks 10 are set between adjacent pontoons 101 so that multiple pontoons 101 are spliced ​​together to form the secondary floating bridge 4. The multiple secondary floating bridges 4 are correspondingly set on both sides of the width direction of the main floating bridge 3. The secondary floating bridges 4 are connected to the corresponding anchor blocks 9 on the bottom of the water by tension springs 8 to achieve the anchoring of the secondary floating bridges 4.

[0080] After assembling multiple pontoons 101 to form the secondary floating bridge 4, the supporting floating bridge 5 is transported. Once transported to the construction location, the supporting floating bridge 5 is installed on opposite sides of the secondary floating bridge 4 in the width direction. It should be noted that since some of the secondary floating bridge 4 is installed on the inner breakwater 2, but the inner breakwater 2 has not yet been installed, some supporting floating bridge 5 will remain uninstalled at the construction location.

[0081] The pontoons 101 used to form the inner breakwater 2 are transported to the construction location. Similarly, the transport ship transports three pontoons 101 at a time. The three pontoons 101 are temporarily fixed by rigid bolts. After the pontoons 101 are transported to the construction location, the temporary fixing between the pontoons 101 is released, and then they are connected to each other using flexible connecting rods 11. Rubber blocks 10 are placed between adjacent pontoons 101, so that multiple pontoons 101 are spliced ​​together to form the inner breakwater 2. The inner breakwater 2 is located at the end of the main floating bridge 3 away from the shore 7, and there is a gap between the inner breakwater 2 and the main floating bridge 3 to prevent the inner breakwater 2 from swaying under the action of waves and causing the main floating bridge 3 to sway or collide with the main floating bridge 3. The inner breakwater 2 is connected to the corresponding anchor block 9 on the seabed by tension springs 8 to achieve the anchoring of the inner breakwater 2. The remaining secondary floating bridges 5 are installed on the side of the inner breakwater 2 facing the main floating bridge 3, and there is a gap between adjacent secondary floating bridges 4 to form a mooring position 501.

[0082] The pontoons 101 used to form the outer breakwater 1 are transported to the construction location. Similarly, the transport ship transports three pontoons 101 at a time. The three pontoons 101 are temporarily fixed by rigid screws. After the pontoons 101 are transported to the construction location, the temporary fixing between the pontoons 101 is released, and then they are connected to each other using flexible connecting rods 11. Rubber blocks 10 are placed between adjacent pontoons 101 so that multiple pontoons 101 are spliced ​​together to form the outer breakwater 1. The outer breakwater 1 is set on the side of the inner breakwater 2 away from the main floating bridge 3, and there is a gap between the outer breakwater 1 and the inner breakwater 2 to avoid the outer breakwater 1 colliding with the inner breakwater 2 when it sways under the action of waves. The outer breakwater 1 is connected to the corresponding anchor block 9 on the seabed by tension spring 8 to achieve the anchoring of the outer breakwater 1.

[0083] Based on the floating tourist wharf structure, this application also provides a wave protection method for the floating tourist wharf structure, used to protect the floating tourist wharf structure from waves; the wave protection method includes: The main floating bridge 3, the secondary floating bridge 4, the inner breakwater 2 and the outer breakwater 1 are respectively connected to the corresponding anchor blocks 9 on the bottom of the water by tension springs 8; At least some of the secondary floating bridges 4 are arranged from the direction away from the shore 7 toward the direction closer to the shore 7, so as to reduce the transmission of waves toward the shore 7. An inner breakwater 2 is set at the end of the main floating bridge 3 that is far from the shore 7, and there is a gap between the inner breakwater 2 and the main floating bridge 3. An outer breakwater 1 is set on the side of the inner breakwater 2 away from the main floating bridge 3, and there is a gap between the outer breakwater 1 and the inner breakwater 2.

[0084] It should be noted that at least some of the berths 501 are arranged from the direction away from the shore 7 towards the direction closer to the shore 7. The closer the berth 501 is to the shore, the less it is affected by the impact of the waves. When there are waves in the water and the waves are impacting the inner breakwater 2, if passengers still need to take the cruise ship due to other factors, they can take the cruise ship from the berth 501 closest to the shore 7 to reduce the impact of the waves on passengers on the pontoon bridge 5 and prevent passengers from falling into the water due to the impact of the waves.

[0085] The aforementioned floating tourist wharf structure and its construction method and wave protection method involve sequentially setting an outer breakwater 1 and an inner breakwater 2 in the direction close to the shore 7. The outer breakwater 1 serves as the first barrier to initially weaken the energy of the waves. Subsequently, the inner breakwater 2 serves as the second barrier to further absorb the impact of the waves, thereby reducing the intensity of the waves in the waters inside the wharf and effectively suppressing the swaying of the main floating bridge 3, the secondary floating bridge 4, and the auxiliary floating bridge 5. At the same time, the secondary floating bridge 4 is arranged in the direction close to the shore 7 to serve as the third barrier to absorb the impact of the waves again, thus preventing the waves from impacting the ships in the berth 501 and the passengers on the auxiliary floating bridge 5.

[0086] Although embodiments of this application have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting this application. Those skilled in the art can make changes, modifications, substitutions and variations to the above embodiments within the scope of this application.

Claims

1. A floating tourist wharf structure, characterized in that, include: The main floating bridge has one end connected to the shore via a steel approach bridge along its length, and the other end of the main floating bridge is set away from the shore along its length. The secondary floating bridges are configured in multiple ways, and the multiple secondary floating bridges are correspondingly arranged on both sides of the main floating bridge and along the length direction of the main floating bridge; An inner breakwater is located at the end of the main floating bridge furthest from the shore; the inner breakwater intersects with the length direction of the main floating bridge. The floating bridges are configured in multiple ways. Some of the floating bridges are located on the side of the inner breakwater facing the main floating bridge and are arranged along the length of the breakwater; some of the floating bridges are arranged along the length of the secondary floating bridges and are located on both sides of the secondary floating bridges. An outer breakwater is located on the side of the inner breakwater away from the main floating bridge, and there is a gap between the outer breakwater and the inner breakwater. In the arrangement direction of the pontoon bridges, there is a gap between adjacent pontoon bridges to form a berthing position for ships. Along the length of the main pontoon bridge, adjacent secondary pontoon bridges are spaced apart to collectively form a waterway for ships to pass through.

2. The floating tourist wharf structure according to claim 1, characterized in that, The main floating bridge, the secondary floating bridge, the inner breakwater, and the outer breakwater are respectively connected to the corresponding anchor blocks on the seabed by tension springs.

3. The floating tourist wharf structure according to claim 1, characterized in that, There is a gap between the inner breakwater and the main floating bridge. The main floating bridge is rotatably connected with steel plates, which are laid on the inner breakwater to allow passengers to walk between the inner breakwater and the main floating bridge.

4. The floating tourist wharf structure according to claim 1, characterized in that, The main floating bridge, the secondary floating bridge, the inner breakwater, and the outer breakwater each include multiple pontoons, and at least some of the pontoons are arranged along the same straight line to be spliced ​​together to form the main floating bridge, the secondary floating bridge, the inner breakwater, or the outer breakwater.

5. The floating tourist wharf structure according to claim 4, characterized in that, The top of the pontoon is provided with an installation hole, which is recessed into the top of the pontoon; the side wall of the pontoon is provided with a receiving groove, and the bottom of the receiving groove is provided with a connecting hole, which penetrates the bottom of the receiving groove along the arrangement direction of the pontoon and communicates with the installation hole. Two adjacent pontoons are connected to each other by a flexible connecting rod, and a rubber block is provided between the two adjacent pontoons. At least part of the structure of the rubber block is located in the receiving groove. The two ends of the flexible connecting rod pass through the connecting holes of the corresponding pontoons and extend into the corresponding mounting holes. Then, a nut is screwed into the corresponding end of the flexible connecting rod from the corresponding mounting hole.

6. A construction method for a floating tourist wharf structure, used to construct the floating tourist wharf structure as described in any one of claims 1-5; characterized in that, The construction method includes the following steps: Install the main floating bridge at the construction location, connecting one end of the main floating bridge along its length to the shore via the steel approach bridge; connect the main floating bridge to the corresponding anchor blocks on the seabed via tension springs; The secondary floating bridges are installed on both sides of the main floating bridge, with the length direction of the secondary floating bridge perpendicular to the length direction of the main floating bridge; the secondary floating bridges are connected to the corresponding anchor blocks on the bottom of the water by tension springs; The secondary floating bridge is installed on both sides of the auxiliary floating bridge, with the length direction of the auxiliary floating bridge perpendicular to the length direction of the secondary floating bridge; and there is a gap between adjacent auxiliary floating bridges connected to the same secondary floating bridge, so as to jointly define a berthing position for ships to moor. The inner breakwater is installed at the end of the main floating bridge away from the shore, such that the length direction of the inner breakwater intersects the length direction of the main floating bridge; the inner breakwater is connected to the corresponding anchor block on the bottom of the water by a tension spring; The auxiliary floating bridge is connected to the side of the inner breakwater facing the main floating bridge, so that the berth is set on the side of the inner breakwater facing the main floating bridge; An outer breakwater is installed on the side of the inner breakwater away from the main floating bridge, with a gap between the outer breakwater and the inner breakwater; the outer breakwater is connected to a corresponding anchor block on the seabed via a tension spring.

7. The construction method of the floating tourist wharf structure according to claim 6, characterized in that, When transporting pontoons used to assemble the main pontoon, the secondary pontoon, the inner breakwater, or the outer breakwater, the transport vessel transports two or three pontoons at a time. The pontoons are temporarily fixed together by rigid screws to prevent them from colliding with each other during transport.

8. The construction method of the floating tourist wharf structure according to claim 7, characterized in that, During transportation, the two ends of the rigid screw are inserted through the connection holes of the corresponding floats into the mounting holes, and then the nuts are screwed into the ends of the rigid screws from the mounting holes to achieve a temporary fixed connection between adjacent floats. After the pontoons are transported to the construction location, the rigid screws are removed, the fastening connections between adjacent pontoons are released, the flexible connecting rods are passed through the rubber pads, and both ends of the flexible connecting rods are passed through the connection holes of the corresponding pontoons and inserted into the mounting holes. Then, nuts are screwed into the ends of the flexible connecting rods from the mounting holes to achieve the splicing of adjacent pontoons.

9. The construction method of the floating tourist wharf structure according to claim 8, characterized in that, The side wall of the pontoon is provided with a protrusion, and the connecting hole is opened in the protrusion. The side of the protrusion that protrudes from the side wall of the pontoon is a plane, so that the protrusion surfaces of the two pontoons can contact each other when the adjacent pontoons are temporarily fixed.

10. A wave-proofing method for a floating tourist wharf structure, used for wave protection of the floating tourist wharf structure as described in any one of claims 1-4; characterized in that, The wave protection method includes: The main floating bridge, the secondary floating bridge, the inner breakwater, and the outer breakwater are respectively connected to the corresponding anchor blocks on the seabed via tension springs; Arrange at least some of the secondary floating bridges from the direction away from the shore toward the direction closer to the shore to reduce the transmission of waves toward the shore; An inner breakwater is constructed at the end of the main floating bridge furthest from the shore, with a gap between the inner breakwater and the main floating bridge. The outer breakwater is installed on the side of the inner breakwater away from the main pontoon bridge, with a gap between the outer breakwater and the inner breakwater.