Groove type hybrid girder three-way prestressed system structure and construction method
The three-dimensional prestressed structure of the trough-shaped hybrid beam system solves the problem of insufficient control over the bridge alignment and stress state in traditional construction by using segmented tensioning and real-time monitoring, combined with weighing tests and coordinated control of the support legs and ball joints, thus achieving high-precision and high-safety bridge construction.
CN122147768APending Publication Date: 2026-06-05CHINA RAILWAY FIRST GRP FIRST CONSTR CO LTD +2
View PDF 0 Cites 0 Cited by
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CHINA RAILWAY FIRST GRP FIRST CONSTR CO LTD
- Filing Date
- 2026-03-03
- Publication Date
- 2026-06-05
Smart Images

Figure CN122147768A_ABST
Abstract
The application discloses a slot type hybrid girder three-way prestress system structure and a construction method, and particularly relates to the technical field of building construction. The structure comprises a girder structure, a longitudinal prestress system, a transverse prestress system, a vertical prestress system and a node reinforcing structure. Different section combinations and prestress steel beam optimized arrangements are adopted to ensure uniform stress and integrity. The construction method adopts support cast-in-situ, stage prestress tension, pipe pressure grouting and whole-process linear and stress monitoring, combines with pre-camber calculation and pier bottom swivel technology to realize dynamic adjustment. On the technical effect, a closed-loop control system is established through real-time monitoring to ensure that the bridge linear and internal force are highly consistent with the design. The balance problem is solved by the cooperation of pre-swivel weighing test and support foot ball hinge control, and the construction safety is improved. The node reinforcing structure and the three-way prestress system are in cooperation to enhance the durability and minimize the interference to the existing line.