A method for installing a suspended flexible anchor ring at height

By using a suspended flexible anchor ring high-altitude installation method, the precise positioning of the flexible anchor ring is achieved by utilizing a limiting bracket and a Beidou positioning device. This solves the difficulties and safety issues of high-altitude installation of flexible anchor rings, improves construction accuracy and safety, and is suitable for bridge construction in complex environments.

CN122190135APending Publication Date: 2026-06-12CCCC SECOND HARBOR ENGINEERING CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
CCCC SECOND HARBOR ENGINEERING CO LTD
Filing Date
2026-04-20
Publication Date
2026-06-12

Smart Images

  • Figure CN122190135A_ABST
    Figure CN122190135A_ABST
Patent Text Reader

Abstract

The application provides a kind of high-altitude installation method of suspension type flexible anchor ring, comprising the following steps: placing flexible anchor ring on limiting support, lifting the limiting support so that the flexible anchor ring moves to the design position, and fixing the limiting support;Unscrew the bolt between the upper connecting plate and the corresponding end block, symmetrically install and tension the multiple tower ring cables close to the upper connecting plate, until the gap between the end blocks of the upper ends of the two half rings reaches the design gap, then lock the bolt between the upper connecting plate and the end block;Symmetrically install and tension the multiple tower ring cables close to the lower connecting plate, and unscrew the bolt between the lower connecting plate and the corresponding end block;Complete the installation and tension of the remaining tower beam cables and tower ring cables;After the completion of the bridge deck system construction, lock the bolt between the lower connecting plate and the end block.The application significantly improves the precision of high-altitude installation and the safety of construction process.