Railway wagon floor renovation maintenance production line and renovation maintenance method
By using a linear flow structure that combines the transport rails and trailers, along with the precise positioning and flipping of the tilting frame, and combined with intelligent cutting and welding mechanisms, the problem of vehicle transfer difficulties in the maintenance of railcar floors has been solved, achieving an efficient and stable floor renovation process.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CRRC SHIJIAZHUANG CO LTD
- Filing Date
- 2026-04-27
- Publication Date
- 2026-07-17
AI Technical Summary
In existing technologies, when maintaining the floor of rail freight cars, it is difficult for vehicles to move between different processes. The reliance on hoisting equipment leads to high equipment utilization and increased wear. When maintaining multiple vehicles, scheduling conflicts and waiting times are serious, making it difficult to achieve efficient and continuous operation.
It adopts a linear flow structure that combines a conveyor rail with a trailer, and achieves precise positioning and tilting of the truck through a tilting frame. It eliminates the workstation transfer and posture adjustment of traditional hoisting equipment, and combines intelligent cutting and welding mechanisms to achieve automated removal of old flooring and precise welding of new flooring.
This enabled the orderly and rapid transfer of vehicles between various processes, reduced the full-load occupancy and wear of hoisting equipment, avoided scheduling conflicts and waiting time, and improved the overall efficiency of multi-vehicle parallel maintenance and the stability of floor renovation quality.
Smart Images

Figure CN122401092A_ABST