Water conservancy slope gradient drainage cooperative construction process

By using a double-layer flow equalization filter distributor and a check valve in the hydraulic slope drainage system, the problems of siltation and uneven hydraulics were solved, achieving hydraulic balance across the entire slope and improving construction safety.

CN122406702APending Publication Date: 2026-07-17ZHONGBAIFU CONSTR CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
ZHONGBAIFU CONSTR CO LTD
Filing Date
2026-05-25
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In existing technologies, the effluent from rainwater wells contains silt and sand, which causes siltation and blockage in drainage pipes, and the uneven stress on different parts of the drainage ditch causes localized erosion.

Method used

A dual-layer flow equalization filter distributor is adopted, including a porous filter plate and a micro needle rib filter, combined with a check valve and a control valve, to achieve uniform distribution of deep groundwater and prevent sediment deposition, forming a unidirectional hydraulic connection.

Benefits of technology

It achieves a balanced distribution of hydraulics across the entire slope, preventing localized scouring and siltation, reducing operation and maintenance costs, and improving construction safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122406702A_ABST
    Figure CN122406702A_ABST
Patent Text Reader

Abstract

本发明公开了一种水利坡降排水协同施工工艺,涉及水利工程边坡治理技术领域,以解决现有技术中降水井出水含有泥沙,导致排水管道中泥沙淤积堵塞管道、坡面排水沟不同位置受力不均,造成局部冲刷的问题。施工降水井并安装逆止阀与阀门;开挖排水沟槽,沟底夯实并铺设碎石垫层;将预制混凝土支墩按设计坡降安装;敷设排水主管道,管节承插或热熔连接;降水井出水管的液体经分流结构接入排水主管道;排水主管道内安装双层均流过滤分配器,双层均流过滤分配器进行流体均衡和泥沙过滤;调试系统,调节阀门使水流均匀。