Hard rock roadway wedge-shaped working face blasting construction method
By adopting a wedge-shaped working face blasting method in hard rock roadways, increasing the free face and optimizing the blasting sequence and charging method, the problems of low borehole utilization and poor blasting effect in hard rock roadway excavation were solved, achieving more efficient roadway forming and excavation.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- YUNNAN PHOSPHATE CHEM GROUP CORP
- Filing Date
- 2026-05-19
- Publication Date
- 2026-07-17
AI Technical Summary
In hard rock tunnel excavation, conventional smooth blasting technology results in low borehole utilization, poor blasting effect, and severe disturbance of the surrounding rock by blasting vibration, affecting the tunnel forming quality and stability control.
The wedge-shaped working face blasting method is adopted, which divides the working face of the roadway into two symmetrical wedge-shaped faces and arranges blast holes on the wedge-shaped faces. Reverse charging and electronic detonators are used for segmented delayed detonation to control the blasting sequence and charging method, increase the free face, and weaken the high resistance of hard rock.
It improved the utilization rate of blast holes and blasting efficiency, stabilized the single-cycle advance, reduced over-excavation and under-excavation, and improved the roadway forming quality and tunneling efficiency.