A seven-stage cost id-based building engineering full-life-cycle cost intelligent management and control method

By using a seven-level tree-structured cost ID and AI semantic recognition algorithm, the problem of data fragmentation and isolation in cost management in construction projects has been solved, realizing closed-loop cost management and data unification throughout the entire life cycle, thereby improving management efficiency and accuracy.

CN122415147APending Publication Date: 2026-07-17

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Filing Date
2026-04-25
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Existing construction project cost management suffers from problems such as inconsistent cost categories, fragmented data, susceptibility to errors in manual operations, isolated data, and the inability to form a closed-loop management system throughout the entire process.

Method used

By employing a seven-level tree-structured cost ID coding system and AI semantic recognition algorithm, unique digital identification and traceability of cost elements are achieved, and a closed-loop cost management system is formed throughout the entire lifecycle through automatic data collection.

Benefits of technology

It enables unified management and drill-down query of cost data, improves data accuracy and efficiency, and supports cost management and control throughout the entire process.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

本发明公开了一种基于七级成本ID的建筑工程全生命周期成本智能管控方法及系统,通过构建七级树状成本ID实现成本唯一标识与穿透溯源;利用AI语义识别完成清单与ID的自动匹配;将分包、物资、调拨、库存、签证、间接费等数据按ID统一归集;自动完成三算对比、主材损耗分析、无效成本预警;并通过三级ID自动生成合约包,实现投标测算、标价分离、施工管控、竣工复盘全流程闭环。本发明可大幅提升成本核算效率,实现数据同源、实时管控与指标沉淀,适用于各类建筑工程的数字化成本管控。