A multi-chip simultaneous testing system and method based on cross-network triggering
By constructing an independent trigger signal line and self-calibration module for each chip under test through a multi-chip simultaneous testing system based on cross-network triggering, the problem of low testing efficiency in multi-chip simultaneous testing is solved, and efficient test process control and dynamic resource allocation are realized, thereby improving mass production testing efficiency.
Patent Information
- Application Number
- CN202611152064.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-31
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2046-07-31
AI Technical Summary
Existing multi-chip simultaneous testing trigger network structures are simple, and each chip cannot be tested completely independently, resulting in low testing efficiency and increased redundancy waiting time.
A multi-chip simultaneous test system based on cross-network triggering is adopted. Through the cross-network connection between the control board and the test module, an independent trigger signal line is built for each chip under test, realizing dynamic control of test start, ready and test stop signals. Combined with self-calibration and synchronization correction modules, the latency consistency of the trigger network is optimized.
It enables independent control and efficient scheduling in multi-chip testing scenarios, reduces invalid testing steps, improves mass production testing efficiency, reduces redundant waiting time, and adapts to dynamic resource allocation for different chip numbers and testing strategies.
Smart Images

Figure CN122671844B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of chip testing technology, and in particular to a multi-chip simultaneous testing system and method based on cross-network triggering. Background Technology
[0002] In the process of mass production testing of integrated circuits, in order to improve the test throughput and equipment utilization, the test system usually adopts the method of testing multiple chips at the same time, which can shorten the average test time of a single chip to a certain extent. This is a common technical means in large-scale mass production testing.
[0003] During test execution, some chips may fail certain tests. To improve testing efficiency, the testing system introduces a test termination strategy upon error, thereby saving chip testing time. However, in scenarios involving multiple chips being tested simultaneously, if multiple chips share the same trigger or control channel, independent control of the testing process for a single chip cannot be achieved. This can easily lead to an anomaly in one chip affecting the normal testing of other chips. Alternatively, a chip that prematurely exits the testing process may still need to wait for all tests of other chips to complete before it can enter the next batch of chip testing, thus failing to effectively save testing time.
[0004] Furthermore, the trigger network structure in existing testing systems is relatively simple, initiating the test process only through a single trigger signal, lacking an effective feedback mechanism for the test module's preparation status and test interruption conditions. To ensure the reliability of trigger execution, testing systems often set a large waiting redundancy time before triggering to ensure that the test module completes initialization and preprocessing operations, thereby further increasing the test time overhead.
[0005] In the process of realizing this invention, the inventors discovered at least the following problems in the prior art: Existing multi-chip simultaneous testing trigger network structures are simple, and each chip cannot be tested completely independently, resulting in low testing efficiency. Summary of the Invention
[0006] The purpose of this invention is to provide a multi-chip simultaneous testing system and method based on cross-network triggering, to solve the technical problems of existing multi-chip simultaneous testing triggering network structures being simple, individual chips not being able to be tested completely independently, and low testing efficiency. The various technical effects of the preferred solutions among the many technical solutions provided by this invention are detailed below.
[0007] To achieve the above objectives, the present invention provides the following technical solution: This invention provides a multi-chip simultaneous testing system based on cross-network triggering, comprising a control board and multiple test modules electrically connected to each other. The control board receives test commands from a host computer and controls the triggering and interruption of the multiple test modules through a configurable cross-network, as well as the dynamic mapping between trigger input channels and output channels, and constructs a set of independent trigger signal lines for each chip under test. Each test module corresponds to one or more chips under test and is used to execute test programs. The independent trigger signal lines constructed for each chip under test transmit at least a test start signal, a ready signal, and a test stop signal, enabling the control board to confirm the readiness status of the test modules before the test begins and to respond to abnormal situations in real time during the test to stop the test.
[0008] Preferably, the test start signal is sent by the control board to the corresponding test module to instruct the test module to start the test program; the ready signal is returned by the test module to the control board to indicate that the test module has completed initialization and preprocessing operations and is ready to start the test; the test stop signal is sent by the test module or the test machine to the control board to indicate that the chip under test has failed a test item during the test process, or has completed the entire test process, and the current test process can be terminated and the test of other chips under test can be started.
[0009] Preferably, the multi-chip simultaneous testing system includes Each test module supports a maximum of [number] tests. Multiple chips under test are tested simultaneously; the cross-network includes at least... Group input channels Group output channels: Each group of input channels corresponds to one chip under test, and inputs three types of signals: test start, ready, and test stop; each group of output channels corresponds to one test module, and outputs three types of signals: test start, ready, and test stop.
[0010] Preferably, the cross-network is obtained based on a complex programmable logic device (CPLD) with metal wire interconnects, and the cross-network is controlled by decoding to... Each output channel is divided into The test module and the chip under test are grouped and mapped to their respective input channels to achieve dynamic binding between the test module and the chip under test.
[0011] Preferably, the multi-chip simultaneous testing system further includes a trigger network calibration and compensation module for self-calibration and synchronization correction of the cross-network. The trigger network calibration and compensation module selects a fixed reference acquisition channel. Consistency measurements were performed on the trigger arrival delay of all channels under test, and the relative arrival delay of each channel under test to a fixed reference acquisition channel was extracted. latency difference Furthermore, during the test vector generation stage, the edges of the test code pattern are compensated by either forward or backward shifting.
[0012] Preferably, the trigger network calibration and compensation module includes a fixed reference acquisition channel. The fixed reference acquisition channel includes a channel selection and multiplexing unit, a calibration and compensation calculation unit, and a channel selection and multiplexing unit. The channel selection and multiplexing unit is used to sequentially acquire trigger signals or equivalent flag signals of all channels under test; the channel selection and multiplexing unit sequentially connects the trigger-related output test code signals of the channels under test to the fixed reference acquisition channel. The calibration and compensation calculation unit is used to calculate the trigger arrival delay. and latency difference Generate or update the test vector edge compensation amount The compensation parameters will then be applied to subsequent test vector generation or trigger timing control.
[0013] A method for simultaneous testing of multiple chips based on cross-network triggering, operating through the aforementioned multi-chip simultaneous testing system based on cross-network triggering, includes the following steps: S100: The control board configures the cross-network mapping according to the resource allocation requirements issued by the host computer, establishes the trigger signal mapping relationship between the chip under test and the test module, and performs calibration preparation; S200: The trigger delay of each channel under test is measured, the relative delay difference between channels is calculated, compensation is generated and calibrated, and a calibration table is obtained; S300: The control board receives the test configuration command issued by the host computer, and the test module performs data preprocessing and initialization operations based on the test configuration command and calibration table, and feeds back the ready status to the control board through a ready signal, waiting for triggering; S400: The control board sends a test start signal, which is propagated to the corresponding test module through the cross-network, triggering the execution of the test program of the chip under test; During the test, if a chip under test fails a test item, or has completed all test items, the corresponding test module notifies the control board through a test stop signal, and the control board terminates the test process of the chip under test.
[0014] Preferably, in step S100, calibration preparation is performed by specifying a fixed reference acquisition channel. As the sole acquisition channel, the control board drives the channel selection and multiplexing unit, connecting each channel under test sequentially to a fixed reference acquisition channel. The acquisition port is set, and the number of calibrations is set. .
[0015] Preferably, step S200 specifically includes: S210: The control board temporarily stops the execution of normal test vectors and only outputs a trigger flag signal or calibration code for calibration; S220: Fix the reference acquisition channel. Acquire the signal waveform or rising edge marker of the currently selected channel under test, and calculate the trigger arrival delay of the channel under test by taking multiple measurements and calculating the average or median. S230: Calculate the delay difference of the channel under test. The delay difference Converted into test vector edge compensation amount used to shift the test pattern edge forward or backward of the channel under test. The calibration table is generated and stored in the control board or host computer.
[0016] Implementing one of the above-described technical solutions of the present invention has the following advantages or beneficial effects: In this application, an independent trigger signal line is constructed for each chip under test (DUT), facilitating individual triggering and interruption operations. This allows the testing process to be immediately terminated if any chip fails a test item during testing, without affecting the normal testing of other chips. This enables independent control and efficient scheduling of the testing process in multi-chip testing scenarios, avoiding invalid test steps and significantly improving mass production testing efficiency. A cross-network structure is introduced into the control board to adapt to the dynamic allocation of test resources during multi-chip testing. It can dynamically configure the correspondence between test modules and DUTs according to the user's test engineering requirements, freeing test resource allocation from the limitations of fixed channel structures and adapting to different numbers of chips, different combinations of test modules, and different testing strategies. Simultaneously, the test start signal, ready signal, and test stop signal, while ensuring trigger reliability, reduce the redundant waiting time introduced by traditional test systems to adapt to preprocessing. Attached Figure Description
[0017] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort. In the drawings: Figure 1 This is a schematic diagram of the trigger network of a multi-chip simultaneous testing system based on cross-network triggering according to Embodiment 1 of the present invention; Figure 2 This is a schematic diagram of the trigger bus of a multi-chip simultaneous testing system based on cross-network triggering according to an embodiment of the present invention; Figure 3 This is a timing diagram of the trigger network calibration of a multi-chip simultaneous testing system based on cross-network triggering according to an embodiment of the present invention; Figure 4 This is a schematic diagram illustrating the working process of a multi-chip simultaneous testing method based on cross-network triggering according to Embodiment 2 of the present invention; Figure 5 This is a flowchart of a multi-chip simultaneous testing method based on cross-network triggering according to Embodiment 2 of the present invention; Figure 6 This is a flowchart of step S200 in a multi-chip simultaneous testing method based on cross-network triggering according to Embodiment 2 of the present invention. Detailed Implementation
[0018] To make the objectives, technical solutions, and advantages of the present invention clearer, various exemplary embodiments described below will be referenced to the accompanying drawings, which form part of the exemplary embodiments, illustrating various exemplary embodiments that may be used to implement the present invention. Unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with this disclosure. It should be understood that they are merely examples of processes, methods, and apparatuses consistent with some aspects of the present invention disclosed as detailed in the appended claims, and other embodiments may be used, or structural and functional modifications may be made to the embodiments listed herein without departing from the scope and spirit of the present invention.
[0019] In the description of this invention, it should be understood that the terms "center," "longitudinal," "lateral," etc., indicate the orientation or positional relationship based on the accompanying drawings, and are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the referred element must have a specific orientation, or be constructed and operated in a specific orientation. The terms "first," "second," etc., are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. The term "multiple" means two or more. The terms "connected" and "linked" should be interpreted broadly, for example, they can be fixed connections, detachable connections, integral connections, mechanical connections, electrical connections, communication connections, direct connections, indirect connections through an intermediate medium, and can be the internal connection of two elements or the interaction relationship between two elements. The term "and / or" includes any and all combinations of one or more of the related listed items. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.
[0020] To illustrate the technical solution described in this invention, specific embodiments are described below, showing only the parts related to the embodiments of this invention.
[0021] Example 1: like Figure 1 , Figure 2As shown, this invention provides a multi-chip simultaneous testing system based on cross-network triggering, including a control board and multiple test modules electrically connected to each other. The control board receives test commands from a host computer and controls the triggering and interruption of multiple test modules through a configurable cross-network, as well as the dynamic mapping between trigger input channels and output channels. It also constructs a set of independent trigger signal lines for each chip under test. Each test module corresponds to one or more chips under test and is used to execute test programs. The independent trigger signal lines constructed for each chip under test transmit at least a test start signal (START), a readiness signal (READY), and a test stop signal (STOP), enabling the control board to confirm the readiness status of the test modules before the test begins and to respond in real time to abnormal situations during the test to stop the test. In this embodiment, an independent trigger signal line is constructed for each chip under test (DUT), facilitating individual triggering and interruption operations. This allows the testing process to be immediately terminated if any chip fails a test item during testing, without affecting the normal testing of other chips. This enables independent control and efficient scheduling of the testing process in multi-chip testing scenarios, avoiding invalid test steps and significantly improving mass production testing efficiency. A cross-network structure is introduced into the control board to adapt to the dynamic allocation of test resources during multi-chip testing. It can dynamically configure the correspondence between test modules and DUTs according to the user's test engineering requirements, freeing test resource allocation from the limitations of fixed channel structures and adapting to different numbers of chips, different combinations of test modules, and different testing strategies. Simultaneously, the test start signal, ready signal, and test stop signal, while ensuring trigger reliability, reduce the redundant waiting time introduced by traditional test systems to adapt to preprocessing.
[0022] As an optional implementation, a test start signal is sent from the control board to the corresponding test module, instructing the test module to start the test program; a ready signal is returned from the test module to the control board, indicating that the test module has completed initialization and preprocessing operations and is ready to start testing; a test stop signal is sent from the test module or the test equipment to the control board, indicating that the chip under test has failed any test items during the test process, or that the entire test process has been completed, and the current test process can be terminated and testing of other chips under test can be started. Through the above three-wire triggering mechanism, the control board can confirm the readiness status of the test module before the test starts and respond to abnormal situations in real time during the test, realizing a "terminate upon error" test strategy.
[0023] As an optional implementation, the multi-chip simultaneous testing system includes Each test module supports a maximum of [number] tests. Simultaneous testing of multiple chips under test, typically < Cross-networks include at least Group input channels Group output channels: Each group of input channels corresponds to one chip under test (DUT), and inputs three types of signals: test start, ready, and test stop. Each group of input channels is... Figure 2 In the DUT1_trig_in and DUT2_trig_in networks, DUT1_trig_in represents the network for chip under test 1, and DUT2_trig_in represents the network for chip under test 2. In this embodiment, DUT1_trig_in and DUT2_trig_in indicate that two chips are being tested simultaneously at any given time. Each set of output trigger channel networks includes three types of signals: output test start, ready, and test stop. Figure 2 The Trig_out in the context of the test module. Each test module trigger network is configured according to user requirements and is obtained by fanning out the signals from the DUT1_trig_in network or the DUT2_trig_in network, respectively, and fanned out to all the test modules required by each chip under test. Figure 2 The diagram only shows two chips being tested simultaneously; similarly, this can be extended to... The situation is as follows for each chip. Each test module applies a test procedure to the chip under test based on the Trig_out signal, specifying when to start the test, when to stop the test, and when to start the test for the next chip. Cross-networks are used to... Group input channels Establish configurable connections between group output channels. For example... Figure 2 As shown, the cross-connect network is based on a complex programmable logic device (CPLD) with metal wire interconnects to ensure low latency, low jitter, and high consistency of trigger signals across different channels. Test resources on test modules 1 and 4, and test modules 2 and 3, are used to test chip 1 and chip 2 under test, respectively, to achieve simultaneous testing of both chips. The CPLD internally uses fixed-length metal wires to interconnect logic units, forming an interconnection matrix. Depending on the configuration of different test resources, different cross-connection points are selected within the cross-connect network of the CPLD to interconnect different trigger channels, thereby specifically implementing the NM decoding operation, i.e., grouping output channels and connecting them to input channels. The cross-connect network, through decoding control, converts... Each output channel is divided into The test module and the chip under test are grouped and mapped to their respective input channels to achieve dynamic binding between the test module and the chip under test. The cross-network is implemented using a complex programmable logic device (CPLD) with low latency jitter, low cost, and strong logic determinism. This ensures consistent trigger timing and reliability while reducing system implementation costs, making it suitable for large-scale mass production testing environments.
[0024] As an optional implementation, the multi-chip simultaneous testing system also includes a trigger network calibration and compensation module for self-calibration and synchronization correction of cross-networks. The trigger network calibration and compensation module selects a fixed reference acquisition channel. Consistency measurements were performed on the trigger arrival delay of all channels under test, and the relative arrival delay of each channel under test to a fixed reference acquisition channel was extracted. latency difference Furthermore, during the test vector generation stage, the test code pattern edges are compensated by either forward or backward shifting. This embodiment improves trigger synchronization in multi-chip simultaneous testing scenarios by measuring the relative trigger delay of each test channel and compensating for the trigger edges during the test vector generation stage, enabling different test modules to maintain a high degree of consistent trigger timing under dynamic resource mapping conditions.
[0025] As an optional implementation method, such as Figure 3 As shown, the network calibration and compensation module includes a fixed reference acquisition channel. (Fixed measurement channel on the test bench or acquisition board), channel selection and multiplexing unit (can be implemented on the test bench or control board), calibration and compensation calculation unit (can be implemented on the host computer / control board / test module); fixed reference acquisition channel This is the sole acquisition channel used during calibration, sequentially acquiring trigger signals or equivalent flag signals from all channels under test to eliminate errors introduced by asynchronous acquisition channels, thus ensuring consistent measurement standards. The channel selection and multiplexing unit sequentially connects the trigger-related output test code signals of the channels under test to the fixed reference acquisition channel. This can be achieved through a switch matrix, multiplexer, or equivalent selection structure; the calibration and compensation calculation unit is used to calculate the trigger arrival delay. and latency difference Generate or update the test vector edge compensation amount The compensation parameters are then applied to subsequent test vector generation or trigger timing control. Since all channels use the same fixed reference acquisition channel... Get Therefore, the inconsistency between channels in the acquisition link itself is effectively eliminated; the delay difference between any channels This primarily reflects the relative delay error between the triggering network path and the triggering unit of the test module. In this embodiment, a fixed reference acquisition channel is used. Connect to the output of the channel selection and multiplexing unit; the input of the channel selection and multiplexing unit is connected to each test channel in sequence. ( The trigger-related signals are generated; the control board distributes the trigger signals to each test module through a cross network, and controls which channel enters the fixed reference acquisition channel during the calibration process. Data acquisition is performed; after calibration, the calibration and compensation calculation unit writes the compensation amount to the test vector generation module or the timing register of the control board / test module. Common test modules include edge control functions for the code pattern, with common implementation methods including delay lines and high-speed transceivers. In delay line-based digital code generation modules, synchronous calibration is triggered by applying an initial delay bias to different channels; similarly, in high-speed transceiver-based schemes, the same effect can be achieved by applying invalid data of different lengths to different channels. Furthermore, the calibration measurement resolution is determined by the minimum delay unit of the delay line or the sampling rate of the high-speed transceiver, ensuring that the implementation of dynamically triggered channels does not sacrifice the accuracy of edge positioning and other aspects of the system test module. In this embodiment, the parameters are defined as follows: Fixed reference acquisition channel; : No. One channel to be tested (corresponding to a certain test module or its trigger output port); : Trigger start time (e.g., the START edge time issued by the control board or a unified trigger reference point); : In a fixed reference acquisition channel The measured "starting from trigger" To collect data from the channel to be tested The delay of the rising edge; Channel to be tested Compared to a fixed reference acquisition channel The delay difference; : The relative delay difference between any two channels under test.
[0026] The embodiment is merely a specific example and does not indicate that this is the only way to implement the present invention.
[0027] Example 2: A multi-chip simultaneous testing method based on cross-network triggering is implemented through a multi-chip simultaneous testing system based on cross-network triggering in Embodiment 1, such as... Figure 4 , Figure 5 As shown, the process includes the following steps: S100: The control board configures the cross-network mapping according to the resource allocation requirements issued by the host computer, establishes the trigger signal mapping relationship between the chip under test and the test module, and enables the system to form... The tested chip and Establish the binding relationship between test modules and prepare for calibration. Input the following parameters: maximum number of simultaneous tests. Number of test modules (In total including) (Number of test channels); Current mapping table (Map); Number of calibrations S200: Measure the trigger delay for each channel under test, calculate the relative delay difference between channels, generate compensation, perform calibration compensation, and obtain a calibration table. S300: The control board receives test configuration instructions from the host computer. The test module performs data preprocessing and initialization operations based on the test configuration instructions (including test code information, number of chips under test, test module allocation scheme, etc.) and the calibration table. It then sends a readiness signal (READY signal) to the control board, indicating readiness to be triggered. S400: The control board sends a test start signal (START signal) and propagates it to the corresponding test module through the cross-network, triggering the execution of the chip under test's test program. During the test, if a chip under test fails a test item or completes all test items, the corresponding test module notifies the control board via a test stop signal (STOP signal), and the control board terminates the test process for that chip under test. Test modules that have been terminated or stopped can be reassigned to new chips under test to continue executing subsequent test tasks. In this embodiment, an independent cross network is built for each chip under test, and multiple chips independently terminate the test upon error, thereby improving the overall testing efficiency. The multi-signal line triggering mechanism reduces unnecessary waiting time and enables flexible mapping between test resources and chips under test, improving system adaptability and achieving high-precision calibration of the dynamic triggering unit.
[0028] As an optional implementation, in step S100, calibration preparation is performed by specifying a fixed reference acquisition channel. As the sole acquisition channel, the control board drives the channel selection and multiplexing unit to enable each channel under test ( , ) are connected sequentially to the fixed reference acquisition channel The acquisition port is set, and the number of calibrations is set. The acquisition channel remains unchanged throughout the entire process; only the trigger signal entering the fixed reference acquisition channel is changed. .
[0029] As an optional implementation method, such as Figure 6 As shown, step S200 specifically includes: S210: The control board temporarily stops the execution of normal test vectors and only outputs the trigger flag signal or calibration code for calibration; S220: Fix the reference acquisition channel. Acquire the signal waveform or rising edge marker of the currently selected channel under test, and calculate the trigger arrival delay of the channel under test by taking multiple measurements and calculating the average or median. Specifically, for each channel to be tested Repeat the following steps: The control board generates a uniform trigger reference event (e.g., START signal edge or calibration trigger flag); fix the reference acquisition channel. Collect the currently selected channel to be tested. Signal waveform or rising edge indicator; calculate the channel under test. Trigger arrival delay ,in In order to be in Detected above To reduce the impact of noise and jitter at the rising edge, it is preferable to measure each channel under test. Then take the average or median. S230: Calculate the delay difference of the channel under test. The delay difference Converted into test vector edge compensation amount used to shift the test pattern edge forward or backward of the channel under test. The calibration table is generated and stored in the control board or host computer. Specifically, a fixed reference acquisition channel is used. For reference, calculate the delay difference for each channel under test: , This refers to the time delay error of the trigger path of this channel relative to the reference channel; according to the compensation strategy, Convert to test vector edge compensation amount , used to transfer the first The test pattern edge of the channel is shifted forward or backward to correct for trigger imbalance; common strategy examples (no specific implementation is limited): If , indicating the channel If the trigger is slower, bring forward the edge of its test code pattern. ;like This indicates the channel under test. If the trigger is faster, then delay the edge of its test pattern. ; Form a calibration table, that is - and will Stored in the control board or host computer, edge compensation self-calibration is implemented during the test vector generation stage, and each test channel is generated. When processing the corresponding test vector, compensation is applied to its critical edge moments: compensation is added to the rising edge, falling edge, or sampling window edge of the test code pattern. This creates an independent edge timetable or delay compensation register configuration for each channel. When the trigger network mapping changes or test resources are reallocated, the compensation table can be updated to achieve adaptive calibration under a dynamic trigger network.
[0030] The above description is merely a preferred embodiment of the present invention. Those skilled in the art will understand that various changes or equivalent substitutions can be made to these features and embodiments without departing from the spirit and scope of the present invention. Furthermore, under the teachings of the present invention, these features and embodiments can be modified to adapt to specific situations and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application are within the protection scope of the present invention.
Claims
1. A multi-chip simultaneous testing system based on cross-network triggering, characterized in that, It includes a control board and multiple test modules that are electrically connected to each other; the control board is used to receive test commands issued by the host computer, and to trigger and interrupt multiple test modules through a configurable cross network, as well as to dynamically map the input and output channels, and to build a set of independent trigger signal lines for each chip under test; each test module corresponds to one or more chips under test and is used to execute test programs. Each chip under test is equipped with an independent set of trigger signal lines to transmit at least a test start signal, a ready signal, and a test stop signal. This allows the control board to confirm the readiness status of the test module before the test begins and to respond in real time to abnormal situations during the test to stop the test. The multi-chip simultaneous testing system includes... Each test module supports a maximum of [number] tests. Multiple chips under test are tested simultaneously; the cross-network includes at least... Group input channels Group output channels: Each group of input channels corresponds to one chip under test, and inputs three types of signals: test start, ready, and test stop; each group of output channels corresponds to one test module, and outputs three types of signals: test start, ready, and test stop.
2. The multi-chip simultaneous testing system based on cross-network triggering according to claim 1, characterized in that, The test start signal is sent by the control board to the corresponding test module to instruct the test module to start the test program; the ready signal is returned by the test module to the control board to indicate that the test module has completed initialization and preprocessing operations and can start the test; the test stop signal is sent by the test module or the test machine to the control board to indicate that the chip under test has failed any test items during the test process, or that the entire test process has been completed, and the current test process can be terminated and the test of other chips under test can be started.
3. The multi-chip simultaneous testing system based on cross-network triggering according to claim 1, characterized in that, The cross-network is obtained based on a complex programmable logic device (CPLD) with metal wire interconnects. The cross-network is controlled by decoding... Each output channel is divided into The test module and the chip under test are grouped and mapped to their respective input channels to achieve dynamic binding between the test module and the chip under test.
4. A multi-chip simultaneous testing system based on cross-network triggering according to any one of claims 1-3, characterized in that, The multi-chip simultaneous testing system also includes a trigger network calibration and compensation module for self-calibration and synchronization correction of the cross-network. The trigger network calibration and compensation module selects a fixed reference acquisition channel. Consistency measurements were performed on the trigger arrival delay of all channels under test, and the delay of each channel under test relative to a fixed reference acquisition channel was extracted. latency difference Furthermore, during the test vector generation stage, the edges of the test code pattern are compensated by either forward or backward shifting.
5. A multi-chip simultaneous testing system based on cross-network triggering according to claim 4, characterized in that, The trigger network calibration and compensation module includes a fixed reference acquisition channel. The fixed reference acquisition channel includes a channel selection and multiplexing unit, a calibration and compensation calculation unit, and a channel selection and multiplexing unit. The channel selection and multiplexing unit is used to sequentially acquire trigger signals or equivalent flag signals of all channels under test; the channel selection and multiplexing unit sequentially connects the trigger-related output test code signals of the channels under test to the fixed reference acquisition channel. The calibration and compensation calculation unit is used to calculate the trigger arrival delay. and latency difference Generate or update the edge compensation amount of the test vector. The compensation parameters will then be applied to subsequent test vector generation or trigger timing control.
6. A multi-chip simultaneous testing method based on cross-network triggering, characterized in that, The operation of the multi-chip simultaneous testing system based on cross-network triggering as described in claim 5 includes the following steps: S100: The control board configures the cross-network mapping according to the resource allocation requirements issued by the host computer, establishes the trigger signal mapping relationship between the chip under test and the test module, and prepares for calibration. S200: Measure the trigger delay for each channel under test, calculate the relative delay difference between channels, generate compensation amount and perform calibration compensation, and obtain a calibration table; S300: The control board receives the test configuration command issued by the host computer. The test module performs data preprocessing and initialization operations based on the test configuration command and calibration table. It then sends a ready signal to the control board to indicate that it is ready and waiting to be triggered. S400: The control board sends a test start signal and propagates it to the corresponding test module through the cross network, triggering the execution of the test program for the chip under test. During the test, if a chip under test fails a test item or has completed all test items, the corresponding test module notifies the control board through a test stop signal, and the control board terminates the test process for that chip under test.
7. The multi-chip simultaneous testing method based on cross-network triggering according to claim 6, characterized in that, In step S100, calibration preparation is performed by specifying a fixed reference acquisition channel. As the sole acquisition channel, the control board drives the channel selection and multiplexing unit, connecting each channel under test sequentially to a fixed reference acquisition channel. The acquisition port is set, and the number of calibrations is set. .
8. A multi-chip simultaneous testing method based on cross-network triggering according to claim 6, characterized in that, The S200 steps specifically include: S210: The control board temporarily stops executing normal test vectors and only outputs trigger flag signals or calibration codes for calibration. S220: Fixed Reference Acquisition Channel Acquire the signal waveform or rising edge marker of the currently selected channel under test, and calculate the trigger arrival delay of the channel under test by taking multiple measurements and calculating the average or median. ; S230: Calculate the delay difference of the channel under test. The delay difference Converted into test vector edge compensation amount used to shift the test pattern edge forward or backward of the channel under test. The calibration table is generated and stored in the control board or host computer.
Citation Information
Patent Citations
Device for testing multiple chips simultaneouslly and single chip tester
CN2872379Y