A construction method for an integrated anti-leakage drainage ground expansion joint

By using an integrated construction method that combines waterproofing and drainage, the problem of water seepage in expansion joints was solved, enabling timely drainage of accumulated water and improving building quality, thus ensuring the building's waterproofness, airtightness, and structural stability.

CN123064306APending Publication Date: 2026-11-10CHONGQING NO 3 CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611536033.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-30
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

In existing technologies, the gaps in expansion joints allow water to seep in and accumulate over time, causing quality problems such as peeling of the lower wall surface, mold growth on the ceiling, and paint peeling, which affect the quality of the building.

Method used

The construction method adopts an integrated approach to prevent leakage and drainage, which includes cleaning gaps, installing downpipes and waterstops, laying waterstops, installing bases and covers, and sealing the joints. Combined with vertical pipe drainage, rubber materials and shock-absorbing strips are used to enhance sealing and stability.

Benefits of technology

It effectively reduces the possibility of water seeping into the expansion joint, drains water in time, prevents problems such as peeling of the lower wall surface and mold growth of the ceiling, and improves the waterproofness, airtightness and structural stability of the building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123064306A_ABST
    Figure CN123064306A_ABST
Patent Text Reader

Abstract

This invention relates to the field of anti-seepage technology, specifically to a construction method for an integrated anti-seepage drainage and drainage system for ground expansion joints, comprising the following steps: S1: Cleaning the interior of the expansion joint and grinding and repairing the base layer on both sides of the expansion joint; S2: Pre-embedding and installing downpipes inside the vertical expansion joint, and installing downpipe hoppers at the ends of the downpipes; S3: Laying a waterstop strip inside the horizontal expansion joint, and overlapping the end of the waterstop strip with the inlet of the downpipe hopper; S4: Installing a base on the top surface of the waterstop strip; S5: Installing a cover plate on the top surface of the base; S6: Sealing and closing the gaps in the expansion joint; This invention can reduce the possibility of water seeping into the interior of the expansion joint along the gaps, and can also drain water in a timely manner, reducing the possibility of quality problems such as peeling of the lower wall surface, mold growth on the ceiling, paint peeling, and damage to indoor facilities.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of anti-seepage technology, specifically to a construction method for an integrated anti-seepage drainage and drainage ground expansion joint. Background Technology

[0002] Expansion joints are structural gaps reserved to prevent buildings from deforming, cracking, or even being damaged by external factors. They are a general term for expansion joints, settlement joints, and seismic joints. Currently, the conventional treatment for floor expansion joints is to install a V-shaped galvanized iron sheet at the bottom of the expansion joint and a metal cover plate on the floor surface to cover and seal the expansion joint.

[0003] However, gaps exist between the metal cover plate and the floor, between adjacent cover plates, and at the ends of the cover plates. When water is sprinkled, washed, or when water accumulates on the floor, it can easily seep into the expansion joint through these gaps. The water that seeps into the joint cannot be drained in time, and after a long period of accumulation, it can easily leak down to the lower floor along the bottom and walls of the joint and weak points in the underlying structure. This can easily cause quality problems such as peeling of the walls, mold growth on the ceiling, paint peeling, and damage to indoor facilities, seriously affecting the quality of the building. Summary of the Invention

[0004] To address the aforementioned shortcomings in the existing technology, this invention provides a construction method for an integrated anti-leakage and drainage ground expansion joint, thereby solving the above problems.

[0005] To solve the above-mentioned technical problems, the present invention adopts the following technical solution: A construction method for an integrated anti-leakage and drainage ground expansion joint includes the following steps: S1: Clean the inside of the expansion joint and grind and repair the base layer on both sides of the expansion joint; S2: Pre-embed downpipes inside the vertical expansion joints and install downpipe buckets at the ends of the downpipes; S3: Lay a waterstop in the horizontal expansion joint and overlap the end of the waterstop with the inlet of the drain bucket; S4: Install a base on the top surface of the waterstop; S5: Install a cover plate on the top surface of the base; S6: Seal and close the gaps within the expansion joint.

[0006] In this way, by sealing the surface with a cover plate and setting a waterstop at the bottom to intercept water, and coordinating with vertical pipes to drain water, the gaps are sealed and closed. This method can reduce the possibility of water seeping into the expansion joint along the gaps, and at the same time, it can drain the water in time, reducing the possibility of quality problems such as peeling of the lower wall, mold growth on the ceiling, paint peeling, and damage to indoor facilities.

[0007] Furthermore, the overlap length between the end of the S3 waterstop and the inlet of the drain bucket is not less than 50mm, and neutral weather-resistant waterproof sealant is evenly applied at the overlap joints and gaps.

[0008] Furthermore, the S3 waterstop is made of rubber and its width is twice the width of the expansion joint, thereby providing sufficient deformation allowance to adapt to building expansion, settlement, and seismic deformation, and reducing the possibility of structural deformation tearing of the waterstop.

[0009] Furthermore, the slope of the S3 waterstop is 3-5‰, which can improve the stability of the waterstop in the process of receiving ground seepage and water flowing into the downpipe.

[0010] Furthermore, a rubber pad is provided between the waterstop and the base in S4, which can protect the waterstop and reduce the noise generated when walking on the cover plate.

[0011] Furthermore, in S5, a shock-absorbing rubber strip is provided between the base and the cover plate, thereby reducing the possibility of damage caused by the collision between the base and the cover plate.

[0012] Furthermore, a sliding rod is provided between the base and the cover plate in S5, which can reduce the possibility of cover plate displacement.

[0013] Furthermore, in step S2, a fixing clip is used to fix the downpipe, with a fixing interval of less than 500mm, which can improve the stability of the downpipe during the process of collecting accumulated water. Attached Figure Description

[0014] Figure 1 This is a three-dimensional structural schematic diagram of an embodiment of the construction method of an integrated anti-leakage and drainage ground expansion joint according to the present invention; Figure 2 This is a cross-sectional structural schematic diagram of an embodiment of the construction method of an integrated anti-leakage and drainage ground expansion joint according to the present invention; Reference numerals in the accompanying drawings: Downpipe 1, downspout 101; Waterstop strip 2, rubber gasket 201; Base 3, anti-vibration rubber strip 301; Cover plate 4, sliding rod 401; 5. Sealing strip. Detailed Implementation

[0015] To enable those skilled in the art to better understand the present invention, the technical solution of the present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0016] The accompanying drawings are for illustrative purposes only and are schematic diagrams, not actual images. They should not be construed as limiting the scope of this patent. To better illustrate the embodiments of the present invention, some parts in the drawings may be omitted, enlarged, or reduced, and do not represent the actual dimensions of the product. It is understandable to those skilled in the art that some well-known structures and their descriptions may be omitted in the drawings.

[0017] Example 1: like Figures 1-2 As shown, the present invention provides a construction method for an integrated anti-leakage and drainage ground expansion joint, comprising the following steps: S1: Clean the inside of the expansion joint and grind and repair the base layer on both sides of the expansion joint. The allowable deviation of the flatness of the base layer surface is ≤5mm. S2: Pre-embed and install downpipe 1 inside the vertical expansion joint, and install downpipe hopper 101 at the end of downpipe; S3: Lay waterstop 2 in the horizontal expansion joint and overlap the end of waterstop 2 with the inlet of the drain hopper 101; S4: Install base 3 on the top surface of waterstop 2; S5: Install cover plate 4 on the top surface of base 3; S6: Seal and close the gaps within the expansion joint.

[0018] In this embodiment, downpipe 1 is uniformly fixedly installed in the vertical wall column expansion joint. Downpipe 1 is fixedly connected to the end of downpipe 1 and downpipe 101. A U-shaped connector is provided on one side of downpipe 101. Specifically, when installing downpipe 101, U-shaped fixing clips are used to fix downpipe 101, and the fixing interval is within 500mm.

[0019] Waterstop 2 is laid inside the horizontal ground expansion joint. Waterstop 2 is made of rubber and its width is twice the width of the expansion joint. It provides sufficient deformation margin to adapt to building expansion, settlement and seismic deformation, and reduce the possibility of structural deformation cracking of waterstop 2. Specifically, the end of the waterstop 2 overlaps with the inner side of the U-shaped joint, with an overlap length of not less than 50mm. Neutral weather-resistant waterproof sealant is evenly applied to the overlap joints and gaps. The sealant is full, continuous, without bubbles or breaks. The slope of the bottom of the waterstop 2 towards the downpipe 1 is set to 3-5‰ to improve the stability of the waterstop 2 in the process of bearing ground seepage and water flowing into the downpipe 1.

[0020] A 100mm wide and 5mm thick rubber pad strip 201 is laid on the bottom surface of the waterstop 2 and in the gap between the waterstop 2 and the base 3 to protect the waterstop 2 and reduce the noise generated when walking on the cover plate 4.

[0021] The base 3 and cover plate 4 are made of aluminum alloy. When installing the base 3, chemical expansion bolts are used to fix the base 3, waterstop 2 and rubber pad 201 to the ground. Anti-vibration rubber strip 301 is installed at the connection between the base 3 and cover plate 4.

[0022] After the base 3 is installed, fine stone concrete is poured on both sides to seal and fix it. The concrete is poured to the bottom of the ground surface layer. The top of the ground surface layer is flush with the top of the base 3. A 20mm wide × 20mm high gap is reserved in the ground surface layer near the base 3. The gap is filled with sealing strip 5. Specifically, the ground subbase is usually made of ordinary mortar / loose subbase, which has low strength and is prone to cracking. If the chemical expansion bolts are used to fix the base 3 and the waterstop 2 directly on the subbase, they are easy to pull up and loosen under stress. The second pouring of micro-expansion fine stone concrete forms a ring of high-strength rigid support, and the bolts are anchored in this layer of concrete to reduce the possibility of the base 3 being loosened or tilted due to being stepped on. At the same time, fine aggregate concrete can expand slightly to compensate for shrinkage, and the concrete is tightly bonded to the original subbase and concrete base, reducing interface cracks and further blocking the seepage path.

[0023] A sliding rod 401 is provided at the center line of the top surface of the cover plate 4. The cover plate 4 is connected to the base 3 through the sliding rod 401. Specifically, when the expansion joint undergoes thermal expansion and contraction, the sliding rod 401 presses the cover plate 4 downward to keep the cover plate 4 and the base 3 in close contact with the expansion joint. When vertical settlement deformation occurs on both sides of the expansion joint, the base 3 and the cover plate 4 are hinged by a pin, which can rotate to adapt to slight height differences and improve the ability to resist the settlement deformation of the expansion joint.

[0024] After the cover plate 4 is installed, neutral weather-resistant waterproof sealant is used to fill and seal all the details of the base 3, the gap between the cover plate 4 and the ground surface, the edge of the waterstop 2, and the joint between the drain hopper 101 and the wall column. During the construction process, it is necessary to ensure that the sealant is continuous, full, uniform in thickness, without cracks or bubbles, and to completely seal all kinds of tiny water seepage channels to improve the overall waterproof and airtightness. After the construction is completed, let it stand for curing to ensure that the sealant is completely cured.

[0025] Example 2: The other features of this embodiment are the same as those of Embodiment 1, except that: After the sealant has fully cured, conduct a simulated water test on site, simulating daily cleaning and watering conditions, continuously and evenly spraying water on the expansion joint area, keeping the surface moist for more than 30 minutes. Observe the condition of the interior of the expansion joint, the ceiling below, and the walls throughout the process, and check whether the drainage pipes are unobstructed. If there is no water seepage, no dampness, and no water accumulation, the test is considered passed.

[0026] The above are merely embodiments of the present invention. Commonly known structures and characteristics are not described in detail here. Those skilled in the art are aware of all common technical knowledge in the field prior to the application date or priority date, and are capable of using conventional experimental methods prior to that date. They can improve and implement the present invention based on the guidance provided in this application and their own capabilities. Typical known structures or methods should not be obstacles for those skilled in the art to implement this application. It should be noted that those skilled in the art can make various modifications and improvements without departing from the structure of the present invention. These modifications and improvements should also be considered within the scope of protection of the present invention, and will not affect the effectiveness of the invention or the practicality of the patent.

Claims

1. A construction method for an integrated anti-leakage and drainage ground expansion joint, characterized in that, Includes the following steps: S1: Clean the inside of the expansion joint and grind and repair the base layer on both sides of the expansion joint; S2: Pre-embed downpipes inside the vertical expansion joints and install downpipe buckets at the ends of the downpipes; S3: Lay a waterstop in the horizontal expansion joint and overlap the end of the waterstop with the inlet of the drain bucket; S4: Install a base on the top surface of the waterstop; S5: Install a cover plate on the top surface of the base; S6: Seal and close the gaps within the expansion joint.

2. The construction method of an integrated anti-leakage and drainage ground expansion joint according to claim 1, characterized in that: The overlap length between the end of the S3 waterstop and the inlet of the drain bucket shall not be less than 50mm, and neutral weather-resistant waterproof sealant shall be evenly applied at the overlap joints and gaps.

3. The construction method of an integrated anti-leakage and drainage ground expansion joint according to claim 2, characterized in that: The S3 waterstop is made of rubber and its width is twice the width of the expansion joint.

4. The construction method of an integrated anti-leakage and drainage ground expansion joint according to claim 3, characterized in that: The slope of the S3 waterstop is 3-5‰.

5. The construction method of an integrated anti-leakage and drainage ground expansion joint according to claim 4, characterized in that: A rubber pad is provided between the waterstop and the base in the S4 section.

6. The construction method of an integrated anti-leakage and drainage ground expansion joint according to claim 5, characterized in that: In the S5, a shock-absorbing rubber strip is provided between the base and the cover plate.

7. The construction method of an integrated anti-leakage and drainage ground expansion joint according to claim 6, characterized in that: A sliding rod is provided between the base and the cover plate in S5.

8. The construction method of an integrated anti-leakage and drainage ground expansion joint according to claim 7, characterized in that: In S2, a fixing clip is used to fix the downpipe, with a fixing interval of less than 500mm.