A method for planting Coreopsis grandiflora on medium-coarse sandy bank slopes

By carrying out drainage construction and soil improvement on medium-coarse sand slopes, combined with the planting of sword-leaf golden coreopsis and erosion-resistant protective materials, the problems of loose medium-coarse sand slopes and low shear strength were solved, achieving stable plant growth and ecological restoration.

CN123100463APending Publication Date: 2026-11-17SHANDONG DAYU WATER CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611489554.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-23
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Medium-coarse sandy bank slopes are loose and have low shear strength, making them prone to landslides and sand loss. They also have poor water retention and fertilizer retention capacity, making it difficult for plants to take root and establish themselves, and thus making ecological restoration very difficult.

Method used

Drainage construction was carried out on the medium-coarse sandy bank slope to improve the soil, and sword-leaved coreopsis was planted. A soil stabilization barrier was formed by using erosion-resistant protective materials such as three-dimensional vegetation nets and ecological bags. Combined with fine mist slow irrigation technology, the root system was promoted and the shear strength was improved.

Benefits of technology

It effectively prevents water erosion and landslides, ensures a stable growing environment for plants, improves survival rate, enhances the shear strength and water retention and fertilization performance of medium and coarse sandy banks, forms a biological anchoring network, and promotes rapid rooting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123100463A_ABST
    Figure CN123100463A_ABST
Patent Text Reader

Abstract

This invention belongs to the field of medium-coarse sand slope greening technology, specifically involving a method for planting Coreopsis grandiflora on medium-coarse sand slopes, including the following steps: Step 1: Prepare Coreopsis grandiflora planting materials, soil amendment materials, erosion protection materials, and auxiliary materials; Step 2: Drainage construction of the medium-coarse sand slope; Step 3: Soil amendment of the medium-coarse sand; Step 4: Planting of Coreopsis grandiflora; Step 5: Erosion protection construction; Step 6: Maintenance of Coreopsis grandiflora. Compared with existing technologies, this invention can establish a smooth drainage system in advance, eliminating the erosion of the medium-coarse sand slope by water flow at the source, and ensuring that the mixed amendment soil laid for subsequent soil amendment of the medium-coarse sand slope can adhere firmly to the slope surface; through the robust root system and abundant fibrous root group of Coreopsis grandiflora, it can penetrate the loose pores of the medium-coarse sand and tightly bind the medium-coarse sand, effectively inhibiting water erosion and landslides on the medium-coarse sand slope.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of greening technology for medium-coarse sandy bank slopes, specifically relating to a method for planting Coreopsis grandiflora on medium-coarse sandy bank slopes. Background Technology

[0002] Currently, medium-coarse sand slopes are common in water conservancy projects such as rivers, reservoirs, and artificial lakes. Medium-coarse sand is loose in texture, lacks cohesion between particles, and has low shear strength. It is prone to landslides and sand loss under rainfall erosion and water flow. At the same time, medium-coarse sand has poor water retention and fertilizer retention capacity, which makes it difficult for plants to take root and stand, thus increasing the difficulty of ecological restoration.

[0003] Existing planting methods on medium-coarse sandy banks mostly involve direct soil covering and sowing or direct planting without altering the slope. When it rains, rainwater can wash away the medium-coarse sand layer and cause the plants to be washed away. After heavy rain, water can easily accumulate and seep slowly, causing the roots to be soaked and rot. Furthermore, direct soil covering and sowing cannot be well integrated with the underlying medium-coarse sand, making it easy for the soil covering and medium-coarse sand to slip and be lost. Summary of the Invention

[0004] To address the aforementioned problems, this invention provides a method for planting Coreopsis grandiflora on medium-coarse sandy bank slopes.

[0005] To achieve the above objectives, the technical solution adopted by this invention is as follows: a method for planting Coreopsis grandiflora on medium-coarse sandy bank slopes, comprising the following steps: Step 1: Prepare planting materials for sword-leaf golden coreopsis, soil amendment materials, erosion protection materials, and auxiliary materials; Step 2: Drainage construction of medium-coarse sand bank slope; Step 3: Soil improvement of medium to coarse sand; Step 4: Planting of Coreopsis grandiflora; Step 5: Erosion Protection Construction; Step Six: Care of Coreopsis grandiflora.

[0006] Preferably, step one includes: selecting robust, disease-free, and root-integrated container seedlings of Coreopsis grandiflora as the planting material, with the seedling height between 15-20 cm; soil amendment materials include well-rotted organic fertilizer, fine loam, peat moss, water-retaining agent, and rooting powder; and erosion protection materials include three-dimensional vegetation nets, ecological bags, geotextiles, gabion cages, straw mats, and soil stabilization grids.

[0007] Preferably, step two includes: first, clearing weeds, stones, garbage and loose sand from the medium-coarse sand bank slope; leveling the medium-coarse sand bank slope; clearing steep slopes and steep embankments; marking the locations of the intercepting ditch at the top of the medium-coarse sand bank slope and the drainage ditch at the bottom of the slope; and carrying out drainage construction on the medium-coarse sand bank slope.

[0008] Preferably, the drainage construction of the medium-coarse sand bank slope includes: excavating a 30 cm wide and 25 cm deep intercepting ditch along the outer side of the top of the medium-coarse sand bank slope, with geotextile laid at the bottom of the intercepting ditch, and diversion outlets opened every 5 meters in the intercepting ditch; excavating shallow diversion ditches every 2 meters along the vertical direction of the medium-coarse sand bank slope, and excavating horizontal diversion ditches every 3 meters along the transverse direction of the medium-coarse sand bank slope, with the shallow diversion ditches and horizontal diversion ditches forming a grid-like water guiding system, and filling the bottom of both shallow diversion ditches and horizontal diversion ditches with gravel; excavating a main drainage ditch 40 cm wide and 30 cm deep at the bottom of the medium-coarse sand bank slope, with geotextile and gravel laid sequentially from bottom to top at the bottom of the main drainage ditch, and the diversion outlets, grid-like water guiding system and main drainage ditch connected, with the end of the main drainage ditch connected to a municipal drainage system or a natural drainage system.

[0009] Preferably, step three includes: laying a 10 cm thick layer of mixed improved soil on the medium-coarse sandy bank slope. The mixed improved soil includes: medium-coarse sand, fine loam, decomposed organic fertilizer and peat moss, wherein the ratio is medium-coarse sand: fine loam: decomposed organic fertilizer: peat moss = 5:3:1:1. Add 50 grams of water-retaining agent and 20 grams of rooting powder to each cubic meter of mixed improved soil and mix evenly.

[0010] As a preferred option, after the mixed improved soil is laid, the mixed improved soil is mixed with the original medium-coarse sand on the medium-coarse sand bank slope to a depth of 15-20 cm using a loosening rake, and the medium-coarse sand bank slope is lightly compacted to a compaction degree of 70%.

[0011] Preferably, step four includes: planting 20 Coreopsis lanceolata seedlings per square meter, digging planting holes, removing seedling containers, placing the Coreopsis lanceolata seedlings with soil balls into the planting holes, backfilling with mixed improved soil, compacting the mixed improved soil in layers so that the compacted soil surface is 1-2 cm lower than the medium-coarse sandy bank slope, and watering the Coreopsis lanceolata seedlings with a fine mist slow watering method after planting.

[0012] Preferably, step five includes: laying a three-dimensional vegetation net to fully cover the medium-coarse sandy bank slope after planting; the three-dimensional vegetation net is closely attached to the slope and fixed by wooden stakes and wires; stacking straw mats in the middle of the medium-coarse sandy bank slope; piling 2-3 layers of ecological bags at the toe of the medium-coarse sandy bank slope to form a soil stabilization zone at the toe of the slope; reinforcing the outside of the ecological bags with gabion stone cages; and laying geotextile between the top of the medium-coarse sandy bank slope and the edge of the planting area for planting sword-leaf golden chrysanthemum.

[0013] As a preferred option, step six includes: watering the sword-leaf coreopsis with fine mist every morning and evening for one week after planting; watering the sword-leaf coreopsis with fine mist every two days for two to four weeks; and inspecting the medium-coarse sandy bank slope on the 10th and 30th days after planting.

[0014] As a preferred method, a diluted foliar fertilizer should be sprayed 30 days after planting the sword-leaf golden coreopsis, and a well-rotted organic fertilizer should be applied 60 days after planting, i.e., 50 grams of fertilizer per square meter.

[0015] Compared with the prior art, the advantages and positive effects of the present invention are as follows: (1) Existing planting methods for medium and coarse sandy banks are mostly direct soil covering and sowing or direct cutting and planting. However, this invention first carries out drainage construction on the medium and coarse sandy bank slope, then improves the soil of the medium and coarse sandy bank slope, and then plants the plants. Through the drainage construction of the medium and coarse sandy bank slope, a smooth drainage system can be opened in advance, which eliminates the scouring of the medium and coarse sandy bank slope by water flow from the source, and ensures that the mixed improved soil laid for the subsequent soil improvement of the medium and coarse sandy bank slope can adhere firmly to the slope surface. (2) First, drainage construction is carried out on the medium and coarse sand bank slope to ensure that the mixed improved soil laid later is in a suitable air permeability state. Furthermore, planting after soil improvement provides the plants with an environment free from the risk of waterlogging, thus eliminating the root suffocation and root rot caused by the imbalance of substrate moisture from a physiological perspective. (3) Planting sword-leaf golden coreopsis on the medium-coarse sand bank slope can penetrate the loose medium-coarse sand pores and tightly bind the medium-coarse sand through the robust root system and lush fibrous root group of sword-leaf golden coreopsis, thereby significantly improving the shear strength of the shallow medium-coarse sand on the medium-coarse sand bank slope and forming a biological anchoring net on the medium-coarse sand bank slope, effectively inhibiting water flow erosion and landslides on the medium-coarse sand bank slope. (4) Excavate a water interception ditch on the outer side of the top of the medium-coarse sand bank slope, and lay geotextile at the bottom of the water interception ditch. Open multiple diversion outlets in the water interception ditch. Excavate a shallow water diversion ditch in the vertical direction of the medium-coarse sand bank slope and a horizontal water diversion ditch in the transverse direction of the medium-coarse sand bank slope. The bottom of the shallow water diversion ditch and the horizontal water diversion ditch are filled with gravel. Excavate a main drainage ditch at the bottom of the medium-coarse sand bank slope. The bottom of the main drainage ditch is laid with geotextile and gravel from bottom to top. Through the water interception ditch, shallow water diversion ditch, horizontal water diversion ditch and main drainage ditch, the scouring of water flow on the loose medium-coarse sand bank slope can be greatly reduced. It can also ensure the drainage of water during rainstorms and flood seasons, prevent water accumulation and root rot at the bottom, and provide a stable mechanical and water environment for the seedlings of sword-leaf golden chrysanthemum. (5) Lay a 10 cm thick layer of mixed improved soil on the medium-coarse sand bank slope, and mix the mixed improved soil with the original medium-coarse sand on the medium-coarse sand bank slope to a depth of 15-20 cm using a soil loosening rake, so that the mixed improved soil and the original medium-coarse sand on the medium-coarse sand bank slope are integrated, thereby completely breaking the traditional upper and lower sliding interface formed by the slope, significantly improving the aggregate structure and water-holding and fertilization performance of the medium-coarse sand, and also providing a nutrient substrate for the seedlings of sword-leaf golden chrysanthemum to quickly recover and develop roots, promoting the new roots of sword-leaf golden chrysanthemum to take root in the original medium-coarse sand on the medium-coarse sand bank slope, and enhancing the shear strength of the medium-coarse sand bank slope. (6) After planting, a three-dimensional vegetation net is laid to cover the entire medium-coarse sandy bank slope. A straw curtain is laid in the middle of the medium-coarse sandy bank slope. Ecological bags are piled up at the foot of the medium-coarse sandy bank slope. Before the seedlings of sword-leaf golden coreopsis have taken root and have new roots, the three-dimensional vegetation net, straw curtain and ecological bags can form a soil-fixing barrier, effectively resist the erosion of surface water and wind blowing sand, and provide a stable growth environment for sword-leaf golden coreopsis. (7) After planting sword-leaf golden coreopsis, the method of slow watering with fine mist is adopted. This is to avoid the rough spraying that damages the flatness of the medium and coarse sand slope, which is sensitive to water and fertilizer. (8) For areas with high water levels or steep slopes, 2-3 layers of interlocking ecological bags are stacked together, and gabion stone cages are added for reinforcement, providing a solid growing environment for sword-leaf golden chrysanthemums at the foot of medium-coarse sandy banks. (9) The mixed improved soil uses medium and coarse sand as the skeleton to ensure permeability, and mixes fine loam to fill the large pores of medium and coarse sand to increase soil cohesion. Well-rotted organic fertilizer and peat soil construct a micro-aggregate structure rich in organic matter, which can significantly reduce the rate of rainwater infiltration and loss, forming a water and fertilizer reservoir with both air permeability and storage capacity. (10) Add 50 grams of water-retaining agent and 20 grams of rooting powder per cubic meter. The water-retaining agent can quickly absorb water and expand after rain or when watering and release water slowly to prevent water from seeping into the sand base. The rooting powder can significantly stimulate the synthesis of endogenous auxin in sword-leaf golden chrysanthemum, promote the rapid germination, deep rooting and penetration of its fibrous roots to anchor the bottom original sand, greatly shorten the seedling recovery period and significantly improve the survival rate. Attached Figure Description

[0016] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below: Figure 1 The flowchart shows the construction method for planting Coreopsis grandiflora on a medium-coarse sandy bank slope provided in Example 1. Detailed Implementation

[0017] To better understand the above-mentioned objectives, features and advantages of the present invention, the present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0018] Numerous specific details are set forth in the following description in order to provide a full understanding of the invention. However, the invention may also be practiced in other ways than those described herein, and therefore the invention is not limited to the specific embodiments disclosed in the following specification.

[0019] Example 1 The following is in conjunction with the appendix Figure 1 To further describe the present invention, a method for planting Coreopsis grandiflora on a medium-coarse sandy bank slope is provided, such as... Figure 1 As shown, it includes the following steps: Step 1: Prepare planting materials for sword-leaf golden coreopsis, soil amendment materials, erosion protection materials, and auxiliary materials; Step 2: Drainage construction of medium-coarse sand bank slope; Step 3: Soil improvement of medium to coarse sand; Step 4: Planting of Coreopsis grandiflora; Step 5: Erosion Protection Construction; Step Six: Care of Coreopsis grandiflora.

[0020] In this invention, step one includes: selecting robust, disease-free, and root-complete container seedlings of Coreopsis grandiflora as the planting material, with the seedling height between 15-20 cm; soil amendment materials include well-rotted organic fertilizer, fine loam, peat moss, water-retaining agent, and rooting powder; erosion protection materials include three-dimensional vegetation nets, ecological bags, geotextiles, gabion cages, straw mats, and soil stabilization grids; auxiliary materials include wooden stakes, wire, watering equipment, and soil loosening rakes.

[0021] In this invention, step two includes: first, clearing weeds, stones, garbage and loose sand from the medium-coarse sand bank slope; leveling the medium-coarse sand bank slope; clearing steep slopes and steep embankments; marking the positions of the intercepting ditch at the top of the medium-coarse sand bank slope and the drainage ditch at the bottom of the slope; and carrying out drainage construction on the medium-coarse sand bank slope.

[0022] Excavate a 30 cm wide and 25 cm deep intercepting ditch along the outer side of the top of the medium-coarse sand bank slope, with geotextile lining the bottom of the ditch. Diversion outlets are set up every 5 meters within the intercepting ditch. Excavate shallow diversion ditches every 2 meters vertically along the medium-coarse sand bank slope, and horizontal diversion ditches every 3 meters horizontally along the medium-coarse sand bank slope. The shallow and horizontal diversion ditches form a grid-like water diversion system. The bottoms of both shallow and horizontal diversion ditches are filled with gravel. Excavate a 40 cm wide and 30 cm deep main drainage ditch at the bottom of the medium-coarse sand bank slope. The bottom of the main drainage ditch is lined with geotextile and gravel from bottom to top. The diversion outlets, grid-like water diversion system, and main drainage ditch are connected. The end of the main drainage ditch is connected to a municipal drainage system or a natural drainage system.

[0023] In this invention, step three includes: laying a 10 cm thick layer of mixed improved soil on the medium-coarse sand bank slope. The mixed improved soil includes medium-coarse sand, fine loam, decomposed organic fertilizer, and peat moss, with a ratio of medium-coarse sand: fine loam: decomposed organic fertilizer: peat moss = 5:3:1:1. 50 g of water-retaining agent and 20 g of rooting powder are added to each cubic meter of mixed improved soil and mixed evenly. After the mixed improved soil is laid, the mixed improved soil is mixed with the original medium-coarse sand on the medium-coarse sand bank slope to a depth of 15-20 cm using a soil loosening rake. The medium-coarse sand bank slope is then lightly compacted to a compaction degree of 70%.

[0024] In this invention, step four includes: planting 20 Coreopsis lanceolata seedlings per square meter, digging planting holes, removing seedling containers, placing Coreopsis lanceolata seedlings with soil balls into the planting holes, backfilling with mixed improved soil, compacting the mixed improved soil in layers so that the compacted soil surface is 1-2 cm lower than the medium-coarse sandy bank slope, and watering the Coreopsis lanceolata seedlings with fine mist slow watering after planting.

[0025] In this invention, step five includes: laying a three-dimensional vegetation net to fully cover the medium-coarse sandy bank slope after planting; the three-dimensional vegetation net is closely attached to the slope and fixed by wooden stakes and iron wires; stacking straw mats in the middle of the medium-coarse sandy bank slope; piling 2-3 layers of ecological bags at the toe of the medium-coarse sandy bank slope to form a soil stabilization zone at the toe of the slope; reinforcing the outside of the ecological bags with gabion stone cages; and laying geotextile between the top of the medium-coarse sandy bank slope and the edge of the planting area of ​​Coreopsis lanceolata.

[0026] In this invention, step six includes: watering the sword-leaf coreopsis with fine mist every morning and evening for one week after planting; watering the sword-leaf coreopsis with fine mist every two days for two to four weeks; inspecting the medium-coarse sandy bank slope on the 10th and 30th days after planting; spraying diluted foliar fertilizer 30 days after planting; and applying well-rotted organic fertilizer 50 grams per square meter 60 days after planting.

[0027] In this invention, the medium-coarse sand bank slope needs to be lightly moistened with water the day before construction.

[0028] In this invention, when the wooden stakes are used to fix the three-dimensional vegetation net, the spacing between the wooden stakes is 1 meter * 1 meter, and the overlap width of adjacent three-dimensional vegetation nets is greater than or equal to 10 centimeters. The three-dimensional vegetation net can effectively intercept sand bodies, slow down runoff speed, and at the same time protect the surface wood root system of Coreopsis lanceolata from being washed away.

[0029] In this invention, the straw curtain superimposed in the middle of the medium-coarse sandy bank slope is located above the three-dimensional vegetation net, which can further buffer the impact of rainwater, and the straw curtain can also improve soil fertility after corrosion.

[0030] In this invention, the interlocking of the ecological bags piled up at the foot of the medium-coarse sandy bank can prevent the loss of sand at the foot of the bank and provide a stable growth foundation for the sword-leaf golden chrysanthemum seedlings planted at the foot of the medium-coarse sandy bank.

[0031] In this invention, the area reinforced with gabion cages on the outside of the ecological bag is an area with a steep slope of medium-coarse sand or a high water level during the flood season.

[0032] In this invention, the water-retaining agent is polyacrylamide, and the decomposed organic fertilizer is sheep manure or compost.

[0033] In this invention, construction is preferably carried out during non-flood seasons, on cloudy days, or after light rain, with the optimal temperature being 15-25℃. High temperatures, strong winds, and heavy rain should be avoided. If heavy rain occurs after construction, a rainproof film should be immediately covered. After the rain, the seedlings of sword-leaf golden chrysanthemum, the three-dimensional vegetation net, the ecological bags, and the gabion cages should be checked in a timely manner.

[0034] In this invention, after planting Coreopsis lanceolata, if it encounters the flood season, it is necessary to drain the water in time after the rain to avoid soaking the roots of Coreopsis lanceolata.

[0035] In this invention, the planted Coreopsis lanceolata is inspected on the 10th and 30th days. If any seedlings are found to be lodged, dead, or with exposed roots, they need to be replanted with Coreopsis lanceolata of the same size in a timely manner to ensure the planting density of Coreopsis lanceolata on the medium-coarse sandy slope.

[0036] In this invention, daily inspections are required during the flood season to check whether the three-dimensional vegetation net, ecological bags, shallow drainage ditches, horizontal drainage ditches and main drainage ditches are damaged or blocked.

[0037] In this invention, after planting Coreopsis lanceolata, weeds need to be removed regularly to prevent weeds from competing for nutrients from Coreopsis lanceolata. In addition, the soil of Coreopsis lanceolata needs to be loosened slightly to prevent soil compaction on medium and coarse sandy slopes.

[0038] In this invention, during the fertilization process of Coreopsis lanceolata, it is necessary to prune diseased and weak branches to promote branching growth and increase vegetation coverage, thereby enhancing the soil stabilization and erosion resistance. It is also necessary to regularly inspect Coreopsis lanceolata for pests and diseases. If aphids and leaf spot disease are found, low-toxicity biological pesticides should be used in time to prevent the spread of pests and diseases and death.

[0039] In this invention, if the flood season is approaching, before the rainstorm, the three-dimensional vegetation net and straw curtain are reinforced, and the drainage of the intercepting ditch, shallow diversion ditch, horizontal diversion ditch and main drainage ditch is checked. Debris in the intercepting ditch, shallow diversion ditch, horizontal diversion ditch and main drainage ditch is cleared in advance. After the rainstorm, the erosion of the medium and coarse sand slope is checked immediately, and the exposed roots of the sword-leaf golden coreopsis are backfilled with mixed improved soil in time, and the fallen seedlings are straightened. After the flood season ends, the dead branches and fallen leaves on the medium and coarse sand slope are completely cleared, and the damaged sword-leaf golden coreopsis are replanted.

[0040] In this invention, after the sword-leaf golden coreopsis survives, its drought resistance is enhanced, which can reduce the frequency of watering. It can grow by relying on natural rainfall. It needs to be fertilized once a year in spring and pruned regularly to maintain the greening effect on the medium-coarse sandy bank slope. It is also necessary to continuously monitor the soil and water conservation situation to ensure long-term stability.

[0041] As a technical solution of this invention, the provided hardware configuration is merely for facilitating the implementation of specific braking control based on the hardware facilities. How to specifically implement braking control and the braking control method are not the technical problems to be solved or the objects of protection of this invention. Furthermore, the communication methods between the devices all employ existing communication methods and are not the inventive point of this invention.

[0042] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention in any other way. Any person skilled in the art may make changes or modifications to the above-disclosed technical content to create equivalent embodiments that can be applied to other fields. However, any simple modifications or equivalent changes made to the above embodiments based on the technical essence of the present invention without departing from the scope of the present invention shall still fall within the protection scope of the present invention.

Claims

1. A method for planting Coreopsis grandiflora on medium-coarse sandy bank slopes, characterized in that, Includes the following steps: Step 1: Prepare planting materials for sword-leaf golden coreopsis, soil amendment materials, erosion protection materials, and auxiliary materials; Step 2: Drainage construction of medium-coarse sand bank slope; Step 3: Soil improvement of medium to coarse sand; Step 4: Planting of Coreopsis grandiflora; Step 5: Anti-erosion protection construction; Step Six: Care of Coreopsis grandiflora.

2. The method for planting Coreopsis grandiflora on medium-coarse sandy bank slopes according to claim 1, characterized in that, Step one includes: Selecting robust, disease-free, and root-integrated container seedlings of Coreopsis lanceolata as the planting material, with the seedling height between 15-20 cm. Soil amendment materials include well-rotted organic fertilizer, fine loam, peat moss, water-retaining agents, and rooting powder; Erosion-resistant protective materials include three-dimensional vegetation nets, eco-bags, geotextiles, gabion baskets, straw mats, and soil stabilization grids.

3. The method for planting Coreopsis grandiflora on medium-coarse sandy bank slopes according to claim 2, characterized in that, Step two includes: first, clearing weeds, stones, garbage and loose sand from the medium-coarse sand bank slope; leveling the medium-coarse sand bank slope; clearing steep slopes and steep embankments; marking the locations of the intercepting ditch at the top of the medium-coarse sand bank slope and the drainage ditch at the bottom of the slope; and then carrying out drainage construction on the medium-coarse sand bank slope.

4. The method for planting Coreopsis grandiflora on medium-coarse sandy bank slopes according to claim 3, characterized in that, The drainage construction of the medium-coarse sand bank slope includes: excavating a 30 cm wide and 25 cm deep intercepting ditch along the outer side of the top of the medium-coarse sand bank slope, and laying geotextile at the bottom of the intercepting ditch, and opening a diversion outlet every 5 meters in the intercepting ditch. Shallow drainage ditches are excavated every 2 meters along the vertical direction of the medium-coarse sand bank slope, and horizontal drainage ditches are excavated every 3 meters along the transverse direction of the medium-coarse sand bank slope. The shallow drainage ditches and horizontal drainage ditches form a grid-like drainage system. The bottom of both shallow drainage ditches and horizontal drainage ditches is filled with gravel. Excavate a main drainage ditch 40 cm wide and 30 cm deep at the bottom of the medium-coarse sand bank slope. The bottom of the main drainage ditch is laid with geotextile and gravel from bottom to top. The diversion outlet, the grid-like water diversion system and the main drainage ditch are connected. The end of the main drainage ditch is connected to the municipal drainage system or the natural drainage system.

5. The method for planting Coreopsis grandiflora on medium-coarse sandy bank slopes according to claim 2, characterized in that, Step three includes: laying a 10 cm thick layer of mixed improved soil on the medium-coarse sandy bank slope. The mixed improved soil includes medium-coarse sand, fine loam, decomposed organic fertilizer and peat moss, with a ratio of medium-coarse sand: fine loam: decomposed organic fertilizer: peat moss = 5:3:1:

1. Add 50 grams of water-retaining agent and 20 grams of rooting powder to each cubic meter of mixed improved soil and mix well.

6. The method for planting Coreopsis grandiflora on medium-coarse sandy bank slopes according to claim 5, characterized in that, After the mixed improved soil is laid, the mixed improved soil is mixed with the original medium-coarse sand on the medium-coarse sand bank slope to a depth of 15-20 cm using a loosening rake. The medium-coarse sand bank slope is then lightly compacted to a compaction degree of 70%.

7. The method for planting Coreopsis grandiflora on medium-coarse sandy bank slopes according to claim 6, characterized in that, Step four includes: planting 20 Coreopsis lanceolata seedlings per square meter, digging planting holes, removing seedling containers, placing the Coreopsis lanceolata seedlings with soil balls into the planting holes, backfilling with mixed improved soil, compacting the mixed improved soil in layers so that the compacted soil surface is 1-2 cm lower than the medium-coarse sandy bank slope, and watering the Coreopsis lanceolata seedlings with a fine mist slow watering method after planting.

8. The method for planting Coreopsis grandiflora on medium-coarse sandy bank slopes according to claim 7, characterized in that, Step five includes: laying a three-dimensional vegetation net to fully cover the medium-coarse sandy bank slope after planting. The three-dimensional vegetation net is closely attached to the slope and fixed with wooden stakes and wires. Straw mats are laid in the middle of the medium-coarse sandy bank slope. 2-3 layers of ecological bags are piled up at the toe of the medium-coarse sandy bank slope to form a soil stabilization zone at the toe of the slope. The outside of the ecological bags is reinforced with gabion stone cages. Geotextile is laid between the top of the medium-coarse sandy bank slope and the edge of the planting area of ​​sword-leaf golden chrysanthemum.

9. The method for planting Coreopsis grandiflora on medium-coarse sandy bank slopes according to claim 8, characterized in that, Step six includes: within one week after planting the sword-leaf coreopsis, water the sword-leaf coreopsis with a fine mist every morning and evening. From two to four weeks, water the sword-leaf coreopsis with a fine mist every two days. On the 10th and 30th day after planting the sword-leaf coreopsis, the medium-coarse sandy bank slope needs to be inspected.

10. The method for planting Coreopsis grandiflora on medium-coarse sandy bank slopes according to claim 9, characterized in that, Thirty days after planting Coreopsis lanceolata, a diluted foliar fertilizer should be sprayed. Sixty days after planting, a top dressing of well-rotted organic fertilizer should be applied, at a rate of 50 grams per square meter.