A method for regional condensation conditioning and non-condensation rice hulling of cold-state rice.
By using zoned condensation conditioning and displacement treatment, the condensation on the surface of rice and the gas between particles are controlled, which solves the problem of condensation risk in cold rice during the hulling process and achieves a low-damage rice hulling effect.
Patent Information
- Application Number
- CN202611451506.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-18
- Publication Date
- 2026-11-17
AI Technical Summary
Existing technologies fail to adequately address the combined effects of increased moisture content in the material and high humidity between grains on the subsequent hulling process after conditioning cold-state rice, leading to an increased risk of condensation and impacting hulling efficiency and quality.
The method of zoned condensation conditioning is adopted. After condensation forms on the surface of rice, the high-humidity gas in the intergranular space is discharged through the displacement treatment zone, and a low-humidity hulling gas environment is established before the rice hulling. The dew point temperature of the brown rice first exposure area is controlled to ensure the hulling process under non-condensation conditions.
It effectively coordinates the conditioning and hulling processes of cold-state rice, reduces the risk of condensation, maintains the water content of rice, ensures that brown rice is processed in a non-condensing state, and improves hulling efficiency and quality.
Smart Images

Figure CN123102441A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of post-harvest processing technology for rice, and more specifically, to a method for zonal condensation conditioning and non-condensation hulling of cold-state rice. Background Technology
[0002] The quality of rice hulling is closely related to the moisture content and temperature of the raw grain, as well as the temperature and humidity of the processing environment. Under low-temperature or near-low-temperature storage conditions, rice may enter subsequent processing stages at a lower grain temperature. When low-temperature grains come into contact with surrounding air of different temperature and humidity, heat and moisture migration will occur, and condensation may even occur on the surface under unfavorable conditions. For rice with low moisture content or low hulling rate under conventional hulling conditions, appropriate humidification before or during hulling is already a practice in existing processing technologies.
[0003] The existing publicly available dissertation (Research on Fluid Flow and Heat and Moisture Transfer Mechanism in Grain Pile Based on Pore Scale, 2024) takes the grain particle stacking system as the research object and uses a method that couples discrete element method with computational fluid dynamics to study the pore structure, airflow, and heat and moisture coupling transfer law of the grain pile. The study shows that the inlet air temperature and relative humidity have a significant impact on the heat and moisture transfer of the grain pile; the particle shape of irregular grains such as rice and barley also changes the pore distribution near the wall and increases the fluid flow resistance in the grain pile.
[0004] Existing patent CN211537872U discloses a rapid humidification device for rice hulling. It uses nozzles, water, air, and a centrifugal fan to rapidly humidify the rice within a humidification pipe before it passes through a separator and enters subsequent conveying stages. Its purpose is to slightly humidify the outer shell of the rice while keeping the inner grains dry. CN108745451A discloses a low-temperature rice processing method. When the moisture content of the raw grain meets set conditions, high-pressure air spray is used during the hulling process to wet the rice. Simultaneously, a corresponding suction air volume is configured, and it is proposed that the suction air volume is positively correlated with the amount of water sprayed per unit time.
[0005] The aforementioned disclosures focus on rapid humidification of paddy rice and moisture absorption and removal from the husk after watering the rice hull. However, for cold paddy rice that has undergone humidification and simultaneously experiences increased moisture content in the material and high humidity between grains, existing technologies lack coordinated solutions to address the different impacts of these two factors on subsequent continuous hulling. In particular, while maintaining the pre-humidification state of the rice hull, further improvements are needed to reduce the vaporous moisture entering the hulling area with the material and to prevent it from causing adverse thermal and moisture effects on newly exposed, low-temperature brown rice.
[0006] Therefore, there is still a need in the field for a rice hulling method that is suitable for continuous processing of cold rice and can coordinate the pre-hulling moisture conditioning state with the requirements for preventing condensation of brown rice during the hulling process. Summary of the Invention
[0007] To overcome the aforementioned deficiencies of the prior art, this invention provides a method for cold-state rice hulling with zoned condensation conditioning and non-condensation processing. After condensation forms on the surface of whole rice grains, the gas in the intergranular spaces is replaced without homogenization or conditioning storage, ensuring that the replaced whole rice grains retain a net increase in moisture compared to before condensation. Low-humidity hulling gas conditions are set based on the material moisture load formed by the net increase in moisture per unit mass of the replaced whole rice grains and the residual gas phase moisture load carried into the hulling zone by the intergranular gas. This low-humidity hulling gas environment is established before mechanical separation of the hulls and maintained during the hulling process, ensuring that the gas dew point in the area where brown rice is first exposed is lower than a predetermined low-end control temperature for brown rice. This coordinates the condensation conditioning of cold-state rice before hulling with the non-condensation processing after hulling, thus solving the problems mentioned in the background art.
[0008] To achieve the above objectives, the present invention provides the following technical solution: A method for regional condensation conditioning and non-condensation hulling of cold-state rice includes the following steps: Step 1: Cold rice with intact husks is sent into the condensation treatment zone upstream of the hulling area, so that the inlet dew point temperature of the moist gas entering the condensation treatment zone and contacting the intact rice is higher than the upper limit of the surface temperature of the intact rice entering the zone, thus forming condensation on the outer surface of the intact rice. Step 2: After condensation, without uniform wetting or conditioning storage, whole rice grains are continuously fed into a replacement treatment zone isolated from the atmosphere of the condensation treatment zone. This allows buffer gas to pass through the gaps between rice grains and then be discharged. The dew point temperature of the buffer gas is lower than the lower limit of the surface temperature of the whole rice grains entering the replacement treatment zone and higher than the inlet dew point temperature of the subsequent low-humidity rice hulling gas. This ensures that the replaced whole rice grains still retain a net increase in moisture compared to before condensation. Step 3: Determine the material moisture load based on the net increase in water per unit mass of the whole rice after replacement, the rice mass flow rate, and the predetermined upper limit of the proportion of net increase in water transferred to the gas phase before the hull is discharged. Use the water vapor mass flow rate carried into the hulling area with the gas between the particles as the residual gas phase moisture load, and set the gas supply flow rate and inlet moisture content of the low-humidity hulling gas accordingly. Step four: Before mechanical separation of the hulls, establish and maintain the low-humidity hulling gas environment during the hulling process, so that the gas dew point temperature of the area where the brown rice is first exposed is lower than the low-end control temperature of the brown rice determined in advance based on the temperature range of the cold paddy entering the hulling area, and perform roller hulling in this environment.
[0009] As a further aspect of the present invention, in step one, the humid gas entering the condensation treatment zone undergoes gas-liquid separation treatment before contacting the whole rice grains, and liquid water is not directly sprayed into the whole rice grains during the condensation treatment.
[0010] As a further embodiment of the present invention, in step two, the dry bulb temperature of the buffer gas is not lower than the lower limit of the surface temperature of the intact rice entering the replacement treatment zone and not higher than the upper limit of its surface temperature; the gas discharged from the replacement treatment zone is discharged through an exhaust passage independent of the gas supply passage of the low-humidity rice hulling.
[0011] As a further aspect of the present invention, the low-humidity hulling gas is introduced into the area where brown rice is first exposed in the hulling zone, and the humid gas is extracted from the hull discharge side. The humid gas is discharged through an exhaust passage independent of the low-humidity hulling gas supply passage.
[0012] As a further aspect of the present invention, after the brown rice obtained from the hulling process leaves the hulling area, it continues to be in contact with a gas whose dew point temperature is lower than the surface temperature of the brown rice, until the brown rice enters a subsequent processing area that meets the non-condensation conditions, or the surface temperature of the brown rice is not lower than the dew point temperature of the subsequent processing environment.
[0013] The technical effects and advantages of the present invention regarding the cold-state rice hulling method with zoned condensation conditioning and non-condensation hulling: This invention addresses the issue of treating the net increase in moisture and the high-humidity gas carried in the intergranular spaces of whole rice grains after cold-state whole rice grains have undergone condensation conditioning. The invention employs an intermediate displacement treatment to preferentially reduce the high-humidity gas carried into the hulling area by the material, while simultaneously maintaining the net increase in moisture relative to the state before condensation. Furthermore, the moisture load that may be transferred to the gas phase during the dehulling process, along with the residual gas phase moisture load, is incorporated into the moisture carrying capacity check of the low-humidity hulling gas, thus establishing a low-humidity hulling environment before the mechanical separation of the hull.
[0014] This invention eliminates the need to completely remove the moisture added to the material caused by pre-condensation conditioning before hulling. It also reduces the possibility of high-humidity intergranular gas and subsequent moisture release causing the gas phase near the newly exposed low-temperature brown rice to reach saturation and surface condensation. Furthermore, it ensures that the brown rice maintains non-condensation conditions from the initial exposure area to the subsequent safe processing environment, providing process conditions for stable thermal and moisture conditions and low-damage processing during the continuous hulling of cold paddy rice. Attached Figure Description
[0015] Figure 1 This is a process flow diagram of a cold-state rice hulling method with zoned condensation conditioning and non-condensation hulling according to the present invention.
[0016] Figure 2 This is a schematic diagram of the partition processing device and independent gas path connection of the present invention.
[0017] Figure 3 This is a schematic diagram of the structure of the hulling section of the rubber roller and the area where brown rice is first exposed according to the present invention.
[0018] Figure 4 The image shows a physical diagram of the rubber roller and the gap structure applicable to this embodiment. Detailed Implementation
[0019] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0020] Example 1
[0021] This embodiment takes a continuous processing capacity of 500 kg / h for cold-processed japonica rice as an example. The raw material is commercial rice that has undergone conventional drying and low-temperature or near-low-temperature storage, with an input moisture content of 13.2% ± 0.3% (wet basis). Before feeding, the rice undergoes vibration cleaning, magnetic separation, and dust removal to remove impurities, bare brown rice, and obviously broken grains, ensuring that the main material entering this processing path retains intact husks, hereinafter referred to as whole rice. The whole rice enters the continuous weighing feeder through a steady-flow hopper, with the mass flow rate maintained at 500 kg / h.
[0022] A bypass temperature measuring box is installed at the entrance of the condensation treatment area. Approximately 200g of whole rice grains are collected every 2 minutes and spread into a single-grain layer. The outer surface temperature of at least 100 whole rice grains is measured using an infrared thermal imager calibrated with a contact temperature probe. After five consecutive samples are obtained, the lowest effective temperature minus 0.3℃ is used as the upper limit of the surface temperature, and the highest effective temperature plus 0.3℃ is used as the upper limit. This embodiment operates within the inlet whole rice grain surface temperature range of 7.5–9.5℃; if the temperature exceeds this range, the condensation feeding is paused, and the condensation treatment gas conditions are redefined.
[0023] The continuous processing flow in this embodiment is as follows: Figure 1 As shown, cold, intact paddy rice first enters the condensation treatment zone to form surface condensation. Then, without homogenization or conditioning storage, it continuously enters a displacement treatment zone isolated from the condensation treatment zone atmosphere. This displacement treatment buffers the high-humidity gas within the interparticle spaces, ensuring that the replaced intact paddy rice retains a net increase in moisture compared to before condensation. Low-humidity hulling gas conditions are set based on the material moisture load resulting from this net increase in moisture and the residual gas phase moisture load carried into the hulling zone by the interparticle gas. This low-humidity hulling gas environment is established before the mechanical separation of the hull and maintained during the hulling process, ensuring that the initial exposure area of the brown rice remains non-condensing.
[0024] The condensation treatment area employs a closed three-layer perforated vibrating trough, with each layer having an effective length of 1.30m, a width of 0.30m, and a material layer thickness of 25mm. The calculation uses a paddy bulk density of 570kg / m³, resulting in a total material holding capacity of approximately 16.7kg across the three layers. At a mass flow rate of 500kg / h, the average residence time is approximately 120s. Before formal operation, the bulk density of the current batch of paddy was determined using the fixed volume method, and the material holding capacity was adjusted accordingly. A pressure equalization chamber is installed below each perforated plate, and the three chambers are connected in parallel to the main condensation treatment gas pipe, with a total circulating air volume of 250m³ / h. Each layer's branch is balanced via regulating valves and flow meters, resulting in a single-layer air volume of approximately 83m³ / h, corresponding to an apparent air velocity of approximately 0.059m / s for a 0.39m² material surface. Differential pressure measuring points are installed before and after each material layer. The perforated plates and screen surfaces are cleaned when the differential pressure increases by 30% compared to the clean material layer baseline.
[0025] The humid gas, hereinafter referred to as the condensation treatment gas, is formed by humidifying filtered air with adjusted temperature and clean steam. Before entering each layer of equalizing chambers, it passes sequentially through a cyclone gas-liquid separator and a wire mesh demister, with a drain port at the bottom of the demister. During the condensation treatment, liquid water is not directly sprayed onto the intact rice grains. The inner wall of the condensation treatment area and the supporting components are equipped with condensate drainage slopes and collection tanks to allow the condensate on the surface of the equipment structure to be discharged independently.
[0026] In this embodiment, the inlet dry-bulb temperature of the gas used for condensation treatment is set to 14.0℃, and the inlet dew point temperature is set to 12.0℃. Based on a standard atmospheric pressure of 101.325 kPa, the relative humidity is approximately 87.8%. Since the inlet dew point temperature is higher than the upper limit of the surface temperature of intact rice grains (7.5–9.5℃), the outer surface of the intact husks is suitable for condensation. During condensation, the moisture content of the gas decreases as water vapor condenses, and the surface temperature of the intact rice grains also changes with sensible heat exchange and condensation heat release. Therefore, it is not required that the local gas at all locations in the condensation treatment area maintain a dew point of 12.0℃; instead, the net increase in water content per unit mass of the treated intact rice grains is used as the verification index for the condensation effect.
[0027] The average material residence time in the condensation treatment zone is 120 seconds. During operation, the surface temperature of intact rice grains at the outlet of each layer is checked, and the difference between the inlet dew point temperature of the condensation treatment gas and the upper limit of the surface temperature of the intact rice grains at the outlet of the corresponding layer is not less than 0.5℃. If the temperature difference is less than 0.5℃, the vibration conveyor speed is increased first to shorten the contact time. If this still cannot be met, feeding is suspended and the inlet dew point temperature of the condensation treatment gas and / or the incoming material temperature are readjusted.
[0028] A closed calibration unit is installed alongside the production line, connected in parallel to the condensation gas path of the production section. A perforated, weighable tray is used, with 5,000 kg of whole rice from the same batch loaded each time. The total mass M0 of the tray and sample before processing is recorded. An empty tray and a sealed hood are operated under the same gas conditions and processing time at the same temperature, with the condensate from structural components used as a blank value. Condensation is performed on the loaded tray at an inlet dry-bulb temperature of 14.0℃, an inlet dew point of 12.0℃, the same apparent gas velocity as the production section, and a processing time of 120 s. After processing, the mass M1 is recorded at a weighing position isolated from the outside air. Dust is collected from the exhaust gas via a detachable fine filter bag. After correcting for the blank value and dry matter loss, the net increase in water per unit mass after condensation is calculated based on the increase in mass relative to M0. Three parallel calibrations are performed under the same operating conditions, and the average value is taken. In this embodiment, the target for net water increase per unit mass after condensation is set at 1.00 g / kg. If this target cannot be met, the inlet dew point temperature, circulating air volume, and / or residence time should be adjusted and recalibrated.
[0029] A first double-flip valve is installed between the outlet of the condensation treatment zone and the inlet of the replacement treatment zone. The two flaps operate alternately, with at least one flap remaining closed. The transition cavity between the two flaps is connected to the exhaust branch of the replacement treatment zone to restrict the entry of high-humidity gas from the condensation treatment zone into the replacement treatment zone. The transfer time of whole rice grains through this valve is controlled to be within 8 seconds. A bypass temperature measuring box is installed at the outlet of the first double-flip valve. The surface temperature range of the whole rice grains entering the replacement treatment zone is determined according to the aforementioned sampling and temperature measurement methods. In this embodiment, 8.2–9.4℃ is used as the subsequent operating parameters.
[0030] The replacement treatment zone employs a single-layer perforated vibrating trough with an effective length of 0.80m, a width of 0.30m, and a material layer thickness of 25mm. Based on a bulk density of 570kg / m³, the material holding capacity is approximately 3.42kg, and the average residence time at a processing rate of 500kg / h is approximately 24.6s. Buffer gas is supplied via an independent air handling branch. The inlet dry bulb temperature is set at 8.6℃, falling within the intact paddy surface temperature range of 8.2–9.4℃; the inlet dew point temperature is set at 6.5℃, below the lower limit of the surface temperature of 8.2℃ and higher than the inlet dew point temperature of the subsequent low-humidity hulled rice gas. The buffer gas flow rate is 40m³ / h, passing upwards through the material layer from below the 0.24m² perforated surface, with an apparent gas velocity of approximately 0.046m / s. The exhaust gas passes through a hydrophobic dust filter and a dust collector before being discharged through an independent exhaust passage, without entering the low-humidity hulled rice gas supply path.
[0031] A suction-type dew point sampling pipe is installed at the outlet of the displacement treatment zone. The sampling port extends into the middle of the moving material layer, and the sampling pipe is insulated. In this embodiment, the dew point of the gas between particles at the outlet of the displacement treatment zone is stably not higher than 7.0℃ as the criterion for displacement gas phase. The same perforated material tray that has completed condensation calibration enters the displacement calibration chamber within 8 seconds. The displacement is completed under the conditions of 8.6℃ dry bulb temperature, 6.5℃ dew point, the same apparent gas velocity as the production section, and a processing time of 24.6 seconds. Subsequently, the mass M2 is recorded. After M2 is corrected for cumulative dry matter loss and corresponding blank value, the net increase in water per unit mass after displacement is calculated based on its mass increase relative to M0, and three parallel calibrations are performed. In this embodiment, 0.98 g / kg is used as the subsequent wet load calculation value. For continuous production, the actual calibration value of the current batch is used.
[0032] Based on a buffer gas flow rate of 40 m³ / h, the volume of buffer gas passing through the material bed in 24.6 s is approximately 0.273 m³; the total volume of the material bed is approximately 0.006 m³. With a porosity of 0.54, the nominal interparticle gas volume is approximately 0.00324 m³. Therefore, the volume of buffer gas passing through the material bed in one average residence time is approximately 84 nominal pore gas volumes. This value is only used to verify the theoretical gas exchange capacity; the actual degree of replacement is determined by the measured dew point of the interparticle gas at the outlet of the replacement treatment zone.
[0033] During continuous operation, when the dew point of the gas between particles at the outlet of the replacement treatment zone is higher than 7.0℃, the buffer gas flow rate and / or replacement time are increased. When the net increase in water content per unit mass after replacement is lower than the current batch's control lower limit, the buffer gas inlet dew point is increased and / or the flow rate is reduced, and the replacement time is shortened, provided that the dew point at the buffer gas inlet is still lower than the lower limit of the surface temperature of the intact rice entering the replacement treatment zone. The control lower limit is determined based on the current batch's condensation conditioning target and the subsequent wet load capacity of the rice hulling area. After adjustment, the outlet dew point of the gas between particles and the net increase in water content per unit mass are re-verified.
[0034] like Figure 2 As shown, the condensation treatment zone, the replacement treatment zone, and the enclosed rubber roller hulling zone are arranged sequentially along the material conveying direction, and each uses an independent air path; the enclosed rubber roller hulling zone will be referred to as the hulling zone below. A second double-flip airlock valve is installed between the replacement treatment zone and the hulling zone to prevent back-mixing of the buffer gas and the low-humidity hulling gas. The low-humidity hulling gas is introduced from the brown rice side of the initial brown rice exposure area, and the humid gas is extracted from the husk discharge side and discharged through an independent dust collection and exhaust passage.
[0035] like Figure 3As shown, the hulling section of this embodiment includes a fast roller and a slow roller arranged adjacent to each other, a brown rice initial exposure area located downstream of the two rollers, a low-humidity hulling gas inlet located on the brown rice side of this area, and a hull-side exhaust channel on the hull discharge side. Whole paddy rice enters between the fast roller and the slow roller through the feeding channel. The speed difference between the two rollers causes the hulls to crack, shift, and separate from the brown rice. The hulled brown rice moves downstream along the hulling material channel, and the hulls enter the hull-side exhaust channel under the action of the hull-side exhaust.
[0036] Both the fast and slow rollers are rubber rollers with a diameter of 222 mm and a working width of 101.6 mm. The initial speed of the fast roller is 1200 r / min; the slow roller is driven by a frequency converter and can be adjusted within the range of 830 to 900 r / min. In this embodiment, 900 r / min is used as the initial value. The initial distance between the two rubber rollers is 0.65 mm, and it is finely adjusted according to the rice grain shape, hulling rate, and the roughness of the under-hulled material. Figure 4 The differential rubber roller and the gap structure applicable to this embodiment are shown. The rubber roller size, the speed of the fast and slow rollers and the gap in this embodiment are set according to the aforementioned parameters.
[0037] In this embodiment, the enclosed transition space between the outlet of the two rubber rollers and the guide plate of the first hulled material is defined as the initial exposure area of the brown rice. After the whole paddy passes through the rubber rollers, the husks crack, shift, or detach, and the surface of the brown rice, originally covered by the husks, begins to directly contact the surrounding gas from the moment it enters this area. Before the mechanical separation of the husks, the supply of low-humidity hulling gas and the exhaust on the husk side are activated and maintained continuously during the hulling process, so that the low-humidity hulling gas flows from the brown rice side through the initial exposure area of the brown rice and then flows towards the husk discharge side.
[0038] A rice hull inlet temperature measuring box is installed at the outlet of the second double-flip airlock valve and before the whole rice grains enter the rubber roller. This box is used to determine the surface temperature range of the cold, whole rice grains entering the hulling area and to pre-determine the low-end control temperature of the brown rice. During calibration, representative whole rice grains covering the low, medium, and high temperature ranges at the hulling inlet are selected. Hulling is performed using the same or equivalent rubber roller specifications, roller spacing, fast and slow roller speeds, and low-humidity hulling gas conditions as in formal production. The resulting brown rice is immediately subjected to infrared thermography after falling onto the blackbody calibration plate. At least 100 grains of brown rice are analyzed for each temperature range. Invalid measuring points with abnormal reflections or incomplete obstruction are discarded. The 5th percentile of the effective brown rice surface temperature distribution, minus 0.3℃, is used as the low-end control temperature of the brown rice under the corresponding operating conditions. A correspondence between the temperature range of the whole rice grains at the hulling inlet and the low-end control temperature of the brown rice is established. In this embodiment, 6.5℃ is used as the low-end control temperature of the brown rice when the relevant conditions are within the calibrated range; recalibration is performed when the conditions exceed the calibrated range.
[0039] The net increase in water content in the replaced whole paddy retains a portion that may transfer to the gas phase before the hull is discharged, which is considered as the material moisture load. The upper limit of the proportion of net increase in water transferred to the gas phase before the hull is discharged can be calibrated by integrating the moisture content of the low-humidity hull gas inlet and outlet under stable operating conditions and the water loss of the material during the same period; when there is insufficient batch data, 1.00 is used. The residual gas phase moisture load is estimated based on the water vapor mass flow rate entering the hulling zone through the interparticle gaps. In the calculation, the paddy bulk density is taken as 570 kg / m³, the porosity is 0.54, and the corresponding bulk volume flow rate for 500 kg / h paddy is approximately 0.877 m³ / h; when all nominal pore gas is considered to exceed the conservative upper limit of the second double-flip valve, the interparticle gas flow rate is approximately 0.474 m³ / h, and the water vapor mass flow rate is approximately 0.0037 kg / h based on the most unfavorable dew point of 7.0℃ allowed at the outlet of the replacement treatment zone.
[0040] The minimum dry air mass flow rate for low-humidity rice hull gas is checked using the following formula: In the formula, The dry air mass flow rate in the low-humidity rice hull gas is expressed in kg / h. Moisture content of saturated air at a given temperature, in kg / kg dry air; Temperature control for brown rice at the lower end, ℃; The safe temperature difference for non-condensation is ℃; is the moisture content of the low-humidity rice hull gas inlet, kg / kg dry air; K is the moisture load safety factor. The mass flow rate of rice is kg / h; The net increase in water content per unit mass after water replacement is expressed in kg / kg of rice. This represents the upper limit of the proportion of net water transferred to the gas phase before the husk is discharged. The residual gas phase moisture load is kg / h.
[0041] In this embodiment, ΔTs = 1.5℃ is used. At 6.5℃, the highest permissible operating dew point for the initial exposure area of brown rice is 5.0℃. Among the candidate low-humidity rice hulling gas conditions that meet this upper limit of the non-condensing dew point, the combination of inlet moisture content and gas supply flow rate is checked for moisture load according to the above inequality. In this embodiment, the inlet dry-bulb temperature is set to 10.0℃ and the inlet dew point temperature is set to -3.0℃, corresponding to an inlet moisture content of approximately 0.003025 kg / kg dry air; the moisture content of saturated air at 5.0℃ is approximately 0.005398 kg / kg dry air. Combined with the net increase in water per unit mass after replacement of 0.00098 kg / kg and a rice mass flow rate of 500 kg / h, =1.00 and residual gas phase moisture load 0.0037 kg / h, material moisture load 0.490 kg / h; after taking K=1.30, the checked wet load is approximately 0.642 kg / h. The minimum dry air mass flow rate obtained from the above-mentioned inlet moisture content and wet load is approximately 271 kg / h. In this embodiment, the lower operating limit is set to 280 kg / h. When the wet load changes, the above check conditions are met again by increasing the air supply flow rate and / or decreasing the inlet moisture content.
[0042] The actual gas volume in the hulling area is determined based on both moisture carrying capacity requirements and hull extraction requirements. In this embodiment, a total gas supply of 620 m³ / h for low-humidity hulling is used. Under conditions of a dry-bulb temperature of 10.0℃ and an inlet dew point of -3.0℃, the equivalent dry air mass flow rate is approximately 769 kg / h. Calculated based on the upper limit of the operating dew point of 5.0℃, the usable moisture carrying capacity is approximately 1.82 kg / h, which is higher than the check moisture load of 0.642 kg / h. The exhaust fan on the hull discharge side uses frequency conversion regulation to create a stable airflow from the brown rice side to the hull discharge side in the area where brown rice is first exposed. The dust extraction ventilation around the equipment uses an independent air path and is not included in the aforementioned moisture carrying capacity.
[0043] During the commissioning phase, nine temporary dew point sampling positions were set up along the left, center, and right sides of the working width and along the front, center, and rear of the material movement direction. The dew point at each position was recorded over at least three stable material scanning cycles. The positions were then sorted from highest to lowest based on their average dew point over the scanning cycle, and the three positions with the highest average dew point were selected as fixed sampling points. The fixed sampling ports were equipped with hydrophobic and dustproof filters and used insulated short tubes for sampling. The highest dew point among the three fixed sampling points was used as the operational control value for the initial exposure area of the brown rice.
[0044] Before formal feeding, first activate the low-humidity hull gas supply and the hull side exhaust to stabilize the inlet dew point below -3.0℃ and ensure that the dew points at all three fixed sampling points are below 5.0℃. Then, activate the rubber roller and the air paths of the aforementioned processing zones. After the temperature, dew point, and gas flow rate stabilize, start continuous feeding at 500 kg / h. During operation, when the highest dew point among the three fixed sampling points reaches 5.0℃, increase the low-humidity hull gas supply and / or decrease the inlet moisture content. If the temperature cannot be restored to below 5.0℃ after 10 seconds of continuous adjustment, suspend hull feeding. If the highest dew point reaches or exceeds the currently calibrated low-end control temperature of brown rice, immediately close the hull feeding gate and maintain the operation of the rubber roller, low-humidity hull gas, and hull side exhaust until the temperature at all three fixed sampling points is below 5.0℃ again before resuming feeding. The net increase in water per unit mass after condensation and replacement should be verified at least once per shift; if the raw material temperature range or moisture content exceeds the calibrated range, recalibrate and update the low-humidity hull gas moisture load verification parameters.
[0045] After the brown rice obtained from the hulling process leaves the initial exposure area, it directly enters a low-humidity protective conveying channel that is sealed to the hulling area. In this embodiment, the channel is 1.5m long. Gas dew point measuring points and brown rice surface temperature detection areas are set at the inlet, middle, and outlet along the conveying direction. The highest dew point among the three gas dew point measuring points is used as the gas phase control value, and the lowest temperature at the bottom of the brown rice surface at the three locations is used as the material temperature control value, ensuring that the former is always lower than the latter. When the gas dew point at any location reaches or exceeds the corresponding bottom temperature of the brown rice surface, the flow rate of the low-humidity protective gas is increased and / or its inlet moisture content is reduced. If the non-condensation conditions cannot be restored after adjustment, conveying to subsequent areas is suspended while maintaining the supply of low-humidity protective gas.
[0046] Under normal operating conditions, brown rice continues to enter the closed paddy-brown separation zone, which also meets the non-condensation conditions, until it enters the subsequent processing zone, which also meets the non-condensation conditions. Unhulled paddy produced during paddy-brown separation returns to the hulling section via a return channel under non-condensation conditions, without re-entering the condensation treatment zone. If the subsequent processing zone cannot maintain non-condensation conditions, a reheating section is set after the low-humidity protection conveyor channel. Clean gas with a dew point temperature lower than the current brown rice surface temperature and a dry-bulb temperature higher than the current brown rice surface temperature is introduced into the reheating section, allowing the brown rice to gradually heat up under non-condensation conditions. When the lower limit of the brown rice surface temperature at the outlet of the reheating section is at least 0.5°C higher than the dew point temperature of the subsequent processing environment, the discharge channel to the subsequent processing zone is opened, and the low-humidity protection is terminated.
[0047] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.
Claims
1. A method for regional condensation conditioning and non-condensation rice hulling of cold-state rice, characterized in that, Includes the following steps: Step 1: Cold rice with intact husks is sent into the condensation treatment zone upstream of the hulling area, so that the inlet dew point temperature of the moist gas entering the condensation treatment zone and contacting the intact rice is higher than the upper limit of the surface temperature of the intact rice entering the zone, thus forming condensation on the outer surface of the intact rice. Step 2: After condensation, without uniform wetting or conditioning storage, whole rice grains are continuously fed into a replacement treatment zone isolated from the atmosphere of the condensation treatment zone. This allows buffer gas to pass through the gaps between rice grains and then be discharged. The dew point temperature of the buffer gas is lower than the lower limit of the surface temperature of the whole rice grains entering the replacement treatment zone and higher than the inlet dew point temperature of the subsequent low-humidity rice hulling gas. This ensures that the replaced whole rice grains still retain a net increase in moisture compared to before condensation. Step 3: Determine the material moisture load based on the net increase in water per unit mass of the whole rice after replacement, the rice mass flow rate, and the predetermined upper limit of the proportion of net increase in water transferred to the gas phase before the hull is discharged. Use the water vapor mass flow rate carried into the hulling area with the gas between the particles as the residual gas phase moisture load, and set the gas supply flow rate and inlet moisture content of the low-humidity hulling gas accordingly. Step four: Before mechanical separation of the hulls, establish and maintain the low-humidity hulling gas environment during the hulling process, so that the gas dew point temperature of the area where the brown rice is first exposed is lower than the low-end control temperature of the brown rice determined in advance based on the temperature range of the cold paddy entering the hulling area, and perform roller hulling in this environment.
2. The method for cold-state rice hulling with regional condensation conditioning and non-condensation processing according to claim 1, characterized in that, In step one, the humid gas entering the condensation treatment area undergoes gas-liquid separation treatment before contacting the whole rice grains, and liquid water is not directly sprayed into the whole rice grains during the condensation treatment.
3. The method for cold-state rice hulling with regional condensation conditioning and non-condensation hulling according to claim 1, characterized in that, In step two, the dry bulb temperature of the buffer gas is not lower than the lower limit of the surface temperature of the intact rice entering the replacement treatment zone and not higher than the upper limit of its surface temperature; the gas discharged from the replacement treatment zone is discharged through an exhaust passage independent of the low-humidity rice hulling gas supply passage.
4. The method for cold-state rice hulling with regional condensation conditioning and non-condensation hulling according to claim 1, characterized in that, The low-humidity hulling gas is introduced into the area where brown rice is first exposed in the hulling zone, and the humid gas is extracted from the hull discharge side. The humid gas is discharged through an exhaust passage independent of the low-humidity hulling gas supply passage.
5. The method for cold-state rice hulling with regional condensation conditioning and non-condensation processing according to claim 1, characterized in that, After leaving the hulling area, the brown rice continues to come into contact with gases whose dew point temperature is lower than the surface temperature of the brown rice, until the brown rice enters a subsequent processing area that meets the non-condensation conditions, or the surface temperature of the brown rice is not lower than the dew point temperature of the subsequent processing environment.
Citation Information
Patent Citations
Low-temperature-increase rice processing technical method
CN108745451A
Rapid humidifying facility for rice husking
CN211537872U
