A method for in-situ remediation of contaminated soil from mines
By creating a vertical pollution profile record in the contaminated soil of a mine and injecting reactive remediation slurry at the stratum boundaries, the problem of the difficulty in matching the delivery range and injection location of the agent with the vertical stratification differences of the contaminated soil in existing technologies has been solved, thus achieving a precise and stable remediation process.
Patent Information
- Application Number
- CN202611120771.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-27
- Publication Date
- 2026-11-17
AI Technical Summary
Existing in-situ remediation technologies for contaminated soil in mines are difficult to effectively match the contamination status of different layers. This results in the inability of the agent delivery range, dosage range, and injection location to match the vertical stratification differences of contaminated soil in mines, leading to problems such as excessive disturbance of the surface layer, insufficient agents in the middle migration channel, and unstable control of the bottom groundwater risk interface.
By setting up profile verification wells along the mine pollution source area, rainwater runoff area, and downstream groundwater area, a vertical pollution profile record is formed. The surface pollution load layer, leaching migration channel layer, and bottom risk barrier layer are delineated. The remediation dose boundary value is determined, and reactive remediation slurry is injected according to the layer boundary record to form interlayer barrier thin bands. Layer verification and replenishment are then carried out.
It achieves precise delivery of remediation agents, reduces problems such as excessive surface disturbance, insufficient agents in the middle migration channel, and unstable control of the bottom groundwater risk interface, and improves the traceability and stability of in-situ remediation of mine contaminated soil.
Smart Images

Figure CN123102732A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of mine soil remediation technology, specifically a method for in-situ remediation of contaminated mine soil through stratification. Background Technology
[0002] During mining, mineral processing, tailings storage, and waste rock dumping, heavy metal-containing particles, acidic leachates, and surface runoff from mining areas can easily enter the surrounding soil, forming mine-contaminated soils dominated by heavy metals such as lead, cadmium, arsenic, zinc, and copper. For such contaminated sites, existing remediation methods typically include ex-situ excavation, in-situ solidification and stabilization, in-situ injection, in-situ mixing, leaching remediation, and phytoremediation. Among these, in-situ remediation is widely used in mine-contaminated soil remediation projects because it can reduce large-scale excavation, decrease soil transportation volume, and meet the remediation needs of some deep-contaminated soils.
[0003] In existing in-situ remediation projects for contaminated soil in mines, the type, dosage, and injection depth of remediation agents are typically determined based on the results of surface-level monitoring, pollution concentration zoning, or overall risk level. The agents are then injected into the contaminated soil through drilling, shallow mixing, or localized solidification and stabilization. While this method can treat contaminated soil within a certain area, mine sites are significantly affected by tailings leaching, rainwater runoff, waste rock slope erosion, and groundwater level fluctuations. The available content, pH, moisture content, and permeability of soil layers at different depths within the same borehole often vary, and the surface contamination load, the intermediate leaching migration pathways, and the bottom groundwater risk interface are not entirely consistent.
[0004] Therefore, in actual construction, if in-situ injection is still carried out according to a uniform depth range or average dosage, problems such as excessive disturbance of the surface contaminated layer, insufficient delivery of the agent to the middle high-permeability migration layer, and unstable control of migration in the bottom layer near the groundwater level may easily occur. During post-remediation verification, it may only be possible to obtain the overall site compliance status, making it difficult to determine the specific layers that have not been reached and their remaining reaction requirements. Thus, when facing the vertical stratification differences of mine contaminated soil, existing technologies still have the problem of not being able to match the remediation agent delivery range, dosage range, and injection location with the contamination status of different layers. Summary of the Invention
[0005] To address the shortcomings of existing technologies, this invention provides a layered in-situ remediation method for contaminated soil in mines, thereby resolving the problems mentioned in the background section.
[0006] To achieve the above objectives, the present invention provides the following technical solution: a method for in-situ remediation of contaminated soil in mines, comprising: S1. Set up profile verification wells along the mine pollution source area, rainwater runoff area and downstream groundwater area, collect soil samples and pore water samples according to depth section to form a vertical pollution profile record. S2. Based on the available content, pH, water content, permeability, and groundwater level in the vertical pollution profile record, delineate the surface pollution load layer, leaching migration channel layer, and bottom risk barrier layer, and generate the layer boundary record. S3. Based on the reaction capacity measurement results of representative soil samples from each layer, and combined with the porosity, water content, and permeability of that layer, determine the boundary value of the remediation dose. S4. Enter the target layer in order from deep to shallow, and limit the injection interval by sealing the upper and lower layers. First, inject low-permeability migration-resistant slurry at the lower boundary of the target layer to form an interlayer migration-resistant thin band. S5. Inject reactive repair grout according to the repair dose boundary value of the target layer, and record the injection pressure, injection volume and injection depth according to the layer boundary. S6. After curing, collect samples from the corresponding layers in the verification wells and generate a layer verification record. If the layer is not reached, supplement it according to the remaining reaction capacity. If the layer is reached, write it into the repair version record.
[0007] Furthermore, S1 includes: The source areas of mine pollution were identified by historical stockpiling boundaries, surface slag residues, and portable heavy metal screening readings. The rainwater catchment area was identified by mapping elevation lines, post-rain gully traces, and water accumulation boundaries using drones. The downstream area of groundwater was identified based on hydrogeological data, existing monitoring well water levels, and the slope of the site. A vertical contamination profile record is generated based on the region, well location number, depth range, sample number, and sampling time.
[0008] Furthermore, S2 includes: Retrieve the vertical contamination profile records from the submitted version; Read the available content, pH, water content, permeability, and groundwater level according to the borehole number, region, and depth. Organize the boreholes from shallow to deep according to the same location, and exclude boreholes with gaps in depth, where the test report number does not correspond to the sample number, and where the source of the groundwater level is unknown.
[0009] Furthermore, S2 also includes: The surface pollution load layer is determined based on the available state content, pH, and moisture content of the surface depth section. The leaching migration channel layer is defined based on the permeability, water content, pH, and effective content of the depth section below it; The bottom risk barrier layer is delineated based on the effective content, pH and permeability of the depth section above the groundwater level, and a layer boundary record is generated.
[0010] Furthermore, S3 includes: Based on the stratigraphic boundary records, the representative soil samples of the stratigraphic units were identified; The representative soil sample of the stratum is a soil sample that has been included in the vertical pollution profile record and whose sample number, depth range and sealing status are intact; The reaction capacity was determined on representative soil samples from the stratigraphic level. The boundary values for the repair dosage are determined by combining porosity, water content, and permeability, and then written into the repair project record library.
[0011] Furthermore, S4 includes: Determine the target stratigraphic level based on stratigraphic boundary records; Enter the target layer in the order of bottom risk barrier layer, leaching migration channel layer, and surface pollution load layer; Lower the injection drill pipe to the lower boundary of the target layer; The injection interval is defined by the upper and lower partitions.
[0012] Furthermore, S4 also includes: Inject low-permeability, migration-resistant grout into the lower boundary of the target layer within the injection zone; Based on the cumulative injection volume, the state of sealing and maintaining the seal, the location of grout return, and the state of grout flow, the formation of interlayer migration thin bands is confirmed, and the confirmation conclusion is written into the repair project record database.
[0013] Furthermore, S5 includes: After confirming the formation of interlayer migration thin bands, reactive remediation slurry was prepared according to the main pollutants and remediation dose boundary values of the target layer; The permissible injection volume is determined based on the locked repair dose boundary values; Injection pressure and depth are determined based on stratigraphic boundary records; Generate a reactive repair grout injection record that includes the actual injection volume, injection pressure, injection depth, and grout batch number.
[0014] Furthermore, S6 includes: Verification boreholes were laid out based on the reactive repair grout injection records and layer boundary records; Collect samples from the corresponding stratigraphic level in the verification well and generate a stratigraphic verification record; The target layers that do not meet the target layer repair objectives are identified as unreached layers, and supplemented with additional reaction capacity according to the remaining reaction capacity; The target layer that meets the target layer repair objective is identified as the reached layer and written into the repair version record.
[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. By creating vertical pollution profile records along the mine pollution source area, rainwater runoff area, and downstream groundwater area, and delineating the surface pollution load layer, leaching migration channel layer, and bottom risk barrier layer based on the available content, pH, water content, permeability, and groundwater level, the remediation dosage boundary values are determined, interlayer barrier thin bands are set, and reactive remediation slurry is injected according to the layer boundary records. This achieves the effect of matching the delivery range, dosage range, and injection location of the remediation agent with the vertical stratification differences of the mine contaminated soil, reducing the problems of excessive disturbance on the surface, insufficient agent in the middle migration channel, and unstable control of the bottom groundwater risk interface.
[0016] 2. By continuously associating vertical pollution profile records, stratigraphic boundary records, remediation dose boundary values, confirmation of interlayer migration thin band formation, reactive remediation slurry injection records, stratigraphic verification records, and remediation version records by stratigraphic level, and by supplementing unreached stratigraphic levels with remaining reactive capacity and writing reached stratigraphic levels into the remediation version records, the remediation process can be tracked by stratigraphic level, the remediation status can be verified by stratigraphic level, and remediation agents can be supplemented by stratigraphic level. This improves the traceability, verifiability, and stability of continuous on-site implementation of in-situ remediation of mine contaminated soil. Attached Figure Description
[0017] Figure 1 This is a schematic diagram of the layout of the cross-sectional verification wells and the stratified sampling site. Figure 2 This is a schematic diagram illustrating the reading and processing of fields in a vertical pollution profile record. Figure 3 Generate schematic diagrams for stratigraphic delineation and stratigraphic boundary records; Figure 4 Schematic diagram for determining the repair dose boundary value; Figure 5 This is a schematic diagram illustrating the formation of a thin band of sealing injection and interlayer migration barrier from deep to shallow. Figure 6 Schematic diagram of reactive repair grout injection control; Figure 7 This is a schematic diagram illustrating the closed loop of layer-level review, annotation, and repair version write-back. Detailed Implementation
[0018] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0019] Example: Combined with Appendix Figures 1-7 This embodiment provides a method for in-situ remediation of contaminated soil in mines through stratification, including: S1. Construct verification boreholes along the mine pollution source area, rainwater runoff area, and downstream groundwater area. Collect soil and pore water samples at different depths to form a vertical pollution profile record. The specific implementation is as follows: After verifying the mine area reconnaissance map, pollution source distribution map, topographic drainage map, and existing groundwater flow data, the sampling team of the on-site remediation construction unit sequentially deployed profile verification boreholes along the mine pollution source area, rainwater runoff area, and downstream groundwater area. The mine pollution source area includes the soil areas around tailings dumps, waste rock pile slopes, and wastewater drainage ditches that can directly contact pollutants. This area was confirmed on-site through historical storage boundaries, surface slag residue traces, and portable heavy metal screening readings. Temporary material storage areas were not included in the mine pollution source area. The rainwater runoff area is the area where rainfall... The valleys, drainage ditches, and slope toe sedimentary zones through which surface runoff is concentrated are grouped on-site using drone mapping of elevation lines, post-rain scouring marks, and water accumulation boundaries. Water accumulation points formed by short-term construction drainage are not considered rainwater catchment areas. The downstream area of groundwater is the area on the downstream side of the groundwater flow direction jointly confirmed by hydrogeological data, existing monitoring well water levels, and on-site terrain slope. If water level data is missing, the downstream direction is first determined by the synchronous water level readings of adjacent monitoring wells. If a stable flow direction cannot be formed, the well location is marked as pending verification and is not included in this vertical pollution profile record.
[0020] The verification wells were completed using a small drilling rig, casing sampler, and pore water sampling tube. The well location number, wellhead coordinates, wellhead elevation, drilling date, personnel, drilling tool model, and inner diameter of the sampling casing were simultaneously recorded in the field sampling record. The wellhead coordinates were based on the unified coordinates of the site, with the coordinate unit being meters, the depth unit being meters, the soil sample mass unit being kilograms, and the pore water sample volume unit being milliliters. Well locations within the same profile were first located in the field sequence of mining pollution source area, rainwater runoff area, and downstream groundwater area, and then drilled in the order of well location number. Well locations with existing sampling records must not be overwritten by subsequent well locations. Only additional revision records are allowed. When making additional revisions, the original record, the revising personnel, and the revision time must be retained.
[0021] When collecting soil and pore water samples at different depths, the borehole elevation should be used as the unified starting point. After drilling to the predetermined depth, disturbance should be stopped and the corresponding soil column should be removed. The soil within the same depth should be packaged and sealed according to its original strata. The top and bottom depths, soil color, water content, inclusions of stones, odor, and sample number of each layer should be recorded. Pore water samples should be obtained through pore water sampling tubes at the corresponding depth of the same borehole. Before collection, any water remaining in the sampling tubes should be removed. After collection, the water sampling depth, sampling time, site temperature, and sample number should be recorded. If pore water cannot be collected, it should not be automatically replaced by water samples from adjacent depths. The reason for not obtaining pore water at that depth should be recorded.
[0022] On-site records are first categorized by well location number, then arranged from shallowest to deepest depth. Soil and pore water samples are linked by well location number, depth, and sampling time. During processing, well location coordinates and depth ranges are checked first, then samples with the same number that are clearly duplicated are removed. Subsequently, traceable on-site fields such as the personnel involved, sampling container number, and sealing time are added. Pollutant detection values, depth, and pore water acquisition status should not be automatically added. If well location coordinates are missing, depths overlap, sample numbers cannot be matched with physical bottles, or sealing labels are damaged and cannot be confirmed by on-site photos, the well location is moved to pending recording and is not included in the current round of vertical pollution profile records.
[0023] Vertical pollution profile records are stored in the remediation project record database using well locations as the basic unit. Each record includes at least the area it belongs to in the mine pollution source area, rainwater runoff area, and downstream groundwater area, well location number, wellhead coordinates, wellhead elevation, depth range, soil sample number, pore water sample number, sampling time, sealing status, on-site remarks, and record version number. After a record is submitted, an incremental-only trace is generated. The next step only calls the well location number, area, depth range, and sample correspondence in the submitted version and does not read the well locations to be added.
[0024] To ensure uninterrupted continuous construction on site, when a single borehole record fails to be submitted, a local signed copy is retained on the site terminal. The retry interval can be set to 5 minutes. If three consecutive submissions fail, the record will be moved to the synchronization list without affecting drilling at other boreholes. When the same borehole at the same depth is submitted repeatedly, the first sealing time will be used as the valid order, and the later submitted record will be saved as an additional description.
[0025] Preferably, four well sites are set up in the mine pollution source area, three well sites in the rainwater runoff area, and three well sites in the downstream groundwater area within the remediation site downstream of the tailings dam. The sampling depth is 0 to 3 meters, with a depth interval of 0.5 meters and an allowable depth deviation of 0.05 meters. Each soil sample should weigh no less than 0.5 kg, and each pore water sample should weigh no less than 100 ml. The on-site sampling rate is 20% of the total number of well sites. The sampling content is to check the consistency of the wellhead coordinates, depth label, and physical sample number. If the gravel content in the site is high, making it difficult to use casing sampling, it can be replaced by drilling with a spiral drill and then collecting samples with a layered sampling tube. However, the vertical pollution profile record is still formed according to the same well site number, depth segment, and sample number.
[0026] S2. Based on the available content, pH, water content, permeability, and groundwater level in the vertical pollution profile record, delineate the surface pollution load layer, leaching migration channel layer, and bottom risk barrier layer, and generate a stratigraphic boundary record. The specific implementation is as follows: On-site technicians retrieved the submitted version of the vertical contamination profile record from the remediation project record database. They first read the available content, pH, moisture content, permeability, and groundwater level in the order of borehole number, region, and depth. Available content refers to the content of migratable heavy metals obtained from laboratory extraction testing of soil samples at the corresponding depth, expressed in milligrams per kilogram. It is associated with the depth by sample number and is not automatically replaced by values from adjacent depths. pH is the on-site verification reading of the soil leachate at the corresponding depth, recorded as a dimensionless value. If the deviation between the on-site reading and the laboratory reading exceeds a set range, [further action is taken]. The depth range is now subject to verification; the moisture content is the percentage of the difference in soil sample mass before and after drying at the corresponding depth range. Samples that are damaged during sealing or whose sampling layers are unclear are not included in the stratification; permeability is the record of the seepage capacity of the soil at this depth range in undisturbed samples or simple on-site permeability measurements, and the unit can be centimeters per second. If gravel interlayers cause measurement instability, the on-site notes should be retained and confirmed by records from adjacent wells at the same layer; the groundwater level is the depth after converting the stable water level of the monitoring well or profile verification well relative to the wellhead elevation, and the unit is meters. Water level records from the same processing date should be used, and records from different seasons should not be mixed.
[0027] The above fields are first arranged from shallowest to deep within the same well site, and then grouped by mining pollution source area, rainwater runoff area, and downstream groundwater area. During the sorting process, duplicate entries with the same sample number are first removed, then the continuity of depth segments is checked, and then traceable fields such as the region, wellhead elevation, and test report number are added. Effective content, pH, water content, permeability, and groundwater level should not be automatically added. Well sites with depth segment gaps, test report numbers that cannot correspond to sample numbers, or groundwater level sources that are unknown are marked as pending addition and will not participate in this round of stratigraphic delineation.
[0028] When delineating the surface pollution load layer, the depth range with continuously high available content close to the surface is used as the candidate range. Then, the pH and water content are combined to confirm that it belongs to the upper soil directly affected by the deposition of mine dust and the leaching residue of waste rock. If the available content in the upper depth range of the same borehole drops suddenly and the soil color and water content change significantly, the surface pollution load layer ends at the point of change, and the lower soil is not mechanically incorporated.
[0029] When delineating the leaching migration channel layer, continue to check the linkage changes of permeability, water content, pH and available content below the surface pollution load layer. If a continuous depth segment is encountered where permeability increases, water content increases, and available content still maintains the migration characteristics, this continuous depth segment is classified as the leaching migration channel layer. For example, in the drainage ditch slope toe well, if the middle gravel interlayer has a high water content and the available content has not decreased, this interlayer is not recorded as an ordinary transition soil layer, but is used as the basis for determining the boundary of the leaching migration channel layer.
[0030] When delineating the bottom risk barrier layer, the depth segment near the groundwater level is used as the confirmation interval. The superposition of groundwater level, available content, pH, and permeability is checked. If there are still migratable heavy metals and seepage channels near the groundwater level, the depth segment is included in the bottom risk barrier layer. If the groundwater level data is unstable or pore water samples are missing, the bottom depth segment of that pore location remains to be verified and no bottom risk barrier layer boundary is generated.
[0031] The stratigraphic boundary record is generated with the stratigraphic level as the basic unit. Each record includes the region to which it belongs, borehole number, stratigraphic level name, top depth, bottom depth, effective content of the species involved in the stratigraphic delineation, pH, water content, permeability, groundwater level, source version of the field, delineation personnel, and delineation time. The same borehole at the same depth can only be assigned to one stratigraphic level. Subsequent revisions only add new versions and do not overwrite old versions. The next step only calls the locked stratigraphic level name, top depth, bottom depth, and source version of the field.
[0032] Preferably, in the tailings dam downstream area, a surface contamination load layer is defined as one where the available lead content is higher than 150 mg / kg and continuously present from 0 m to 0.8 m; a leaching migration channel layer is defined as one where the permeability reaches 1.0 x 10⁻⁴ cm / s and the water content is higher than 25% in the 0.8 m to 1.8 m depth range; and a bottom risk barrier layer is defined as one where the available lead content is still higher than 80 mg / kg in the 1.8 m to 2.4 m depth range, less than 0.5 m from the groundwater level. If the site uses in-situ layered sensing probes to obtain pH, water content, and groundwater level, it can replace manual recording. However, the available lead content should still be based on the test results of soil samples at the corresponding depth and recorded according to the same layer boundary.
[0033] S3. Based on the reaction capacity determination results of representative soil samples from each layer, combined with the porosity, water content, and permeability of that layer, determine the boundary value of the remediation dosage. The specific implementation is as follows: On-site technicians retrieved the locked stratum boundary records from the remediation project record database and confirmed the representative soil samples of each stratum in the order of stratum name, region, borehole number, top depth, and bottom depth. The representative soil samples of each stratum are soil samples that can correspond to the actual pollution state of the surface pollution load layer, leaching migration channel layer, and bottom risk barrier layer. Their sources are limited to soil samples that have been included in the vertical pollution profile record and have complete sample numbers, depth ranges, and sealing status. On-site, samples with available content, pH, moisture content, and permeability close to the main distribution state of the same stratum are selected. Soil samples with damaged sealing labels, unknown depth ranges, or untraceable test reports are not used.
[0034] The reaction capacity determination results were completed by the laboratory on representative soil samples of the corresponding strata. The reaction capacity is the agent consumption capacity of a unit mass of representative soil sample after adding the remediation grout and completing curing, so that the effective content reaches the remediation target of that stratum. During the determination, the samples were grouped and compared according to the same batch of remediation grout, the same curing container, and the same curing period. The batch number of the remediation grout, the representative soil sample number, the amount added, the curing time, the effective content after curing, and the change in pH were recorded. If the pH after curing exceeds the allowable range for that stratum, even if the effective content decreases, the results of that group will not be used as the basis for determining the boundary value of the remediation dosage.
[0035] Porosity is calculated from the undisturbed volume and dry mass of the representative soil sample at the corresponding stratum. It represents the pore space that the stratum can accommodate the grout. The data is derived from the undisturbed sampling volume record and the laboratory dry density record. Moisture content is obtained from the moisture content field of the corresponding depth segment in the stratum boundary record and is verified against the retest value of the representative soil sample. If the difference between the retest value and the original record exceeds the allowable range on site, the determination of the remediation dose boundary value for that stratum is suspended and the stratum is transferred to the pending verification stage. Permeability is obtained from the permeability field of the corresponding stratum in the stratum boundary record. It represents the ease with which the remediation grout diffuses within the stratum. If the permeability difference within the same stratum crosses a set level, the remediation dose boundary value is determined according to the lower permeability range to avoid the need for excessive injection in the future.
[0036] When determining the remediation dose boundary value, first determine the basic dose that can achieve the remediation target of the layer without causing pH exceedance based on the reaction capacity measurement results. Then, combine porosity to confirm the volume of slurry that the layer can accommodate, combine water content to confirm the dilution state of the slurry after entering, and combine permeability to confirm the difficulty of slurry delivery within the layer. Finally, form the remediation dose boundary value that can be used for the layer. The remediation dose boundary value is recorded separately according to the layer name and is not averaged among different layers. The measurement results of the surface pollution load layer are not used to replace the leaching migration channel layer, nor is the conservative dose of the bottom risk barrier layer used to back-calculate the upper layer.
[0037] The repair dose boundary value record is written into the repair project record database. The record content includes the layer name, representative soil sample number, reaction capacity measurement result, porosity, water content, permeability, basic dose, repair dose boundary value, repair grout batch number, measurement personnel, review personnel, and record version number. When the same layer is submitted repeatedly, the version that has been reviewed for the first time is used as the current valid version. Subsequent submissions are only saved as supplementary versions, and old versions must not be overwritten.
[0038] If the soil sample number is duplicated, the reaction capacity measurement result is missing, the porosity source is unknown, the moisture content verification fails, or the permeability record is not locked, then the remediation dose boundary value will not be generated for that layer, and it will be marked as pending record in the record library. This will not affect the formation of corresponding records for other layers.
[0039] The next step only calls the layer name, layer top depth, layer bottom depth, repair dose boundary value, and repair slurry batch number in the locked version, so that subsequent injection actions can be performed according to the layer.
[0040] Preferably, in the tailings dam downstream site, the surface contaminated load layer represents soil samples with an available lead content of 210 mg / kg, porosity of 42%, water content of 18%, and permeability of 3.0 x 10⁻⁵ cm / s. After reaction capacity determination, the remediation dose boundary value is determined to be 85 kg of remediation slurry per ton of soil. The leaching migration channel layer represents soil samples with an available lead content of 130 mg / kg, porosity of 48%, water content of 27%, and permeability of 1.0 x 10⁻⁴ cm / s. The remediation dose boundary value is determined to be 70 kg of remediation slurry per ton of soil. If a portable porosity measuring device is used on-site to obtain porosity, it can replace the laboratory dry density conversion method, but the porosity field must still be associated with the representative soil sample number and written into the same remediation dose boundary value record.
[0041] S4. Enter the target layer in order from deep to shallow, and limit the injection interval by upper and lower sealing. First, inject low-permeability migration-resistant grout at the lower boundary of the target layer to form an interlayer migration-resistant thin band. The specific implementation is as follows: The on-site injection team determines the target layer for this round of drilling based on the locked layer boundary records, and arranges the drilling operations in the order of bottom risk-resistant layer, leaching migration channel layer, and surface contamination load layer from deep to shallow. The target layer is the layer where low-permeability anti-migration grout injection is to be carried out in this round. Its top depth, bottom depth and corresponding borehole position are all obtained from the layer boundary records. On-site, the layer name shall not be temporarily adjusted based on drilling feel. The borehole position can only be paused and written into the record to be reviewed when the drilling depth deviation exceeds the allowable range on site.
[0042] When entering the target stratum, the drill pipe is lowered along the pre-positioned borehole to near the lower boundary of the target stratum. The drill pipe depth reading is based on the borehole elevation. The drill pipe depth reached, the name of the target stratum, the borehole number, and the operation time are recorded on site. When there are multiple target strata at the same borehole, the lower boundary operation of the deeper target stratum is completed first, and then the drill pipe is raised to enter the next target stratum. The deeper target stratum that has been completed must not be re-penetrated due to the operation of the upper stratum.
[0043] When defining the injection interval by upper and lower isolation sections, an upper isolation section and a lower isolation section are set on the injection drill pipe. The upper isolation section is close to the upper boundary of the target layer, and the lower isolation section is close to the lower boundary of the target layer. After expansion, the two sections clamp each other to form the injection interval. The physical meaning of upper and lower isolation is to use expandable capsules, mechanical expansion sleeves, or hydraulic expansion seals to fit the borehole wall, so that the low-permeability barrier grout can only enter the soil near the lower boundary of the target layer from the clamped interval. The isolation is confirmed by maintaining the isolation pressure, the state of grout return at the borehole opening, and the absence of grout leakage in adjacent depth sections.
[0044] After defining the injection range, low-permeability anti-migration grout is first injected at the lower boundary of the target layer. The low-permeability anti-migration grout is a low-flow grout prepared in a mixing tank on site according to the registered batch number. After the grout enters the lower boundary of the target layer, it fills the pores, gravel gaps and local seepage channels. The entry position is confirmed on site by pumping pressure, instantaneous flow rate, cumulative injection volume, grout return situation and wellhead settlement changes. Injection must not be started before a stable sealing state is formed.
[0045] During the injection process, the pump station operators establish an operation record according to the borehole number, target layer name, lower boundary depth, and low-permeability barrier grout batch number. First, start the low-speed pump to allow the grout to reach the soil around the lower boundary, and then gradually advance according to the on-site pressure. If the sealing pressure drops, the borehole continuously returns grout, the adjacent borehole leaks grout, or the pump pressure suddenly becomes unstable, stop the injection at that borehole and keep the upper and lower seals in place. Record the reason for stopping, the amount injected, and the stopping time. After verification, decide whether to continue the operation at the same borehole.
[0046] Interlayer migration barrier thin bands are formed after the low-permeability migration barrier grout is injected and undergoes initial setting and retention. This corresponds to the interlayer migration barrier thin band in the independent claim. On-site, it is manifested as a continuous low-permeability grout-soil bonded zone near the lower boundary of the target layer. The recording is not based solely on visual observation, but is confirmed by the injection volume reaching the set range, the pump pressure stabilizing, the return grout position not exceeding the upper isolation section, and the absence of grout cross-flow in adjacent depth sections. This record is written into the remediation project record library and includes at least the borehole number, target layer name, layer top depth, layer bottom depth, injection interval, low-permeability migration barrier grout batch number, start time, end time, cumulative injection volume, isolation retention status, formation confirmation conclusion, and record version number.
[0047] The record submission adopts an incremental-only trailing method. When the same target layer is submitted repeatedly at the same well location, the record that is first completed and confirmed is used as the current valid record, and subsequent records are saved as supplementary descriptions. Old records must not be overwritten. The next step only calls the confirmed target layer name, injection interval, low-permeability migration-resistant slurry batch number, and interlayer migration-resistant thin band formation confirmation conclusion.
[0048] Preferably, in the tailings dam downstream area, the target strata are entered in the following order: bottom risk-resistant layer, leaching migration channel layer, and surface contamination load layer. The allowable deviation of drill pipe depth is set to 0.05 meters, the upper and lower sealing pressure is set to 0.4 MPa to 0.8 MPa, the injection interval height is set to 0.2 meters to 0.4 meters, the water-cement ratio of low-permeability slurry is set to 0.8 to 1.2, the cumulative injection volume per hole per layer is set to 20 liters to 60 liters, and the initial setting time is set to 30 minutes to 90 minutes. If the borehole wall stability is poor, double-casing sealing can be used instead of capsule sealing, but the target strata are still entered in the order from deep to shallow, and a thin interlayer resistant band of the same diameter is formed at the lower boundary of the target strata.
[0049] S5. Inject reactive repair grout according to the repair dose boundary value of the target layer, and record the injection pressure, injection volume, and injection depth according to the layer boundary. The specific implementation is as follows: After confirming the formation of the interlayer barrier thin zone at the target stratum, the on-site injection team retrieves the locked repair dose boundary values and stratum boundary records. A record for this round of injection operations is established in the order of borehole number, target stratum name, top stratum depth, bottom stratum depth, and reactive repair grout batch number. The target stratum retains the name of the stratum that has already entered and completed lower boundary barrier in the previous record, without changing the stratum affiliation. The repair dose boundary values are the upper and lower limits of the permissible unit soil agent dosage for the corresponding target stratum, derived from the locked version of the repair dose boundary value record. Adjacent stratum dosages must not be substituted on-site.
[0050] Reactive remediation slurry is prepared according to the main pollutants and remediation dose boundary values of the target layer. On-site, water, material, circulation and mixing, and batch number registration are completed in the mixing tank. After mixing, the slurry batch number, preparation time, mixing time, slurry density, and pore location used are recorded. If the slurry batch number cannot correspond to the remediation dose boundary value recorded, or if the remaining slurry in the mixing tank exceeds the allowable residence time, then the batch of slurry shall not be allowed to enter the target layer.
[0051] Before injection, the operator positions the injection drill rod within the injection depth range specified in the layer boundary record. The injection depth is calculated based on the borehole elevation and confirmed on-site by checking the drill rod scale, measuring tape, and drilling rig displacement readings. When the injection depth is lower than the bottom layer depth or higher than the top layer depth, the pump station remains shut down, and the borehole position record is transferred to pending verification.
[0052] After injection begins, the pump station calculates the allowable injection volume for this target layer at this borehole position according to the repair dose boundary value. The allowable injection volume is recorded in liters or kilograms and compared synchronously with the cumulative flow meter reading of the pump station. When the cumulative injection volume reaches the upper limit of the allowable injection volume, the injection at this layer is stopped immediately. If the lower limit of the allowable injection volume has not been reached but the borehole continues to return slurry, the pressure in the sealing section is unstable, or slurry emerges from adjacent borehole positions, the current drill rod position is maintained and the reason for stopping is recorded. The injection is not forcibly replenished.
[0053] The injection pressure is limited by the layer boundary record, and the pressure unit is megapascal. It is collected synchronously by the pump station pressure gauge and electronic pressure recorder. On-site, continuous and stable readings are used as the basis for operation. For instantaneous reading jumps, the pipeline vibration and pump valve opening and closing status are checked first. When the injection pressure exceeds the upper limit of the layer boundary record, the pump speed is reduced. If the pressure still exceeds the upper limit after reducing the pump speed, the injection at that borehole and target layer is stopped to avoid reactive repair grout from breaking through the layer boundary.
[0054] The injection volume is determined based on the repair dose boundary value and the soil range corresponding to the target layer thickness. On-site, only one currently valid injection record is generated for the same borehole and the same target layer. When submitting repeatedly, the record that first reaches the stop condition is the currently valid record. Subsequent submissions are only saved as additional explanations, and old records must not be overwritten. When there are multiple injection points for the same target layer, the injection is carried out in the order of borehole number, and the remaining amount of the completed injection point is not transferred to the incomplete injection point.
[0055] The injection depth is limited by the top and bottom depths of the layer recorded at the layer boundary. Before raising or lowering the drill pipe, the depth before adjustment, the depth after adjustment, and the personnel involved must be recorded. The pump station must not be started before the depth is confirmed.
[0056] After this step is completed, a reactive repair grout injection record is generated in the repair project record library. It includes at least the well site number, target layer name, repair dose boundary value version, layer boundary record version, injection pressure, injection volume, injection depth, grout batch number, start time, end time, stop reason, and record version number. The next step only reads the target layer name, injection completion status, actual injection volume, and record version number from the submitted version.
[0057] Preferably, in the tailings dam downstream area, the top depth of the leaching migration channel layer is 0.8 meters and the bottom depth is 1.8 meters. The remediation dose boundary value is 60 to 70 kg of reactive remediation grout per ton of soil, the injection pressure is limited to 0.3 MPa to 0.7 MPa, the allowable injection volume per hole is 45 to 55 liters, and the injection depth is controlled between 1.0 and 1.6 meters. If segmented jet drill rods are used on site instead of ordinary injection drill rods, the injection pressure, injection volume, and injection depth are still limited according to the same remediation dose boundary value and the same layer boundary record, and a reactive remediation grout injection record of the same diameter is formed.
[0058] S6. After curing, collect samples from the corresponding stratigraphic layers in the verification wells and generate a stratigraphic verification record. For layers not yet reached, supplement with the remaining reaction capacity; for layers already reached, write the repair version record. The specific implementation is as follows: After the reactive repair grout has been injected and cured, the on-site verification team will set up verification holes based on the submitted reactive repair grout injection record and layer boundary record. Verification holes are verification sampling holes that do not disrupt the original injection hole's closed state and can obtain samples from the corresponding layer. The hole location is determined by the completed injection hole number, target layer name, layer top depth, and layer bottom depth. If there are existing monitoring holes on site that correspond to the same target layer, they can also be used as verification holes, but the grout returned from the original injection hole must not be used to replace the corresponding layer sample.
[0059] When collecting samples from the corresponding strata after curing, the end time in the reactive remediation slurry injection record is used as the curing start time. The sampling depth is limited by the top and bottom depths in the stratum boundary record. Sampling personnel collect soil samples layer by layer in the verification well according to the target stratum. Pore water samples are collected simultaneously in strata containing pore water. During collection, the verification well number, target stratum name, sampling depth, sampling time, sample number, sealing status, and changes in on-site odor, color, and humidity are recorded. If the sampling depth deviates from the target stratum boundary, the sample is mixed with soil from adjacent strata, or the sealing label does not correspond to the physical container, the sample will not be included in the stratum verification record.
[0060] The layer verification record is formed by the test results of the corresponding layer samples obtained from the verification wells. The record includes the verification well number, target layer name, sample number, actual injection volume, repair dose boundary value version, effective content, pH, water content, pore water test result, sampling time, test report number, and record version number. Among them, the effective content is recorded in milligrams per kilogram, pH is recorded as a dimensionless value, water content is recorded as a percentage, and pore water test result is recorded in milligrams per liter. The test report number must be traceable to the corresponding layer sample, and the test value must not be automatically supplemented by adjacent verification wells or adjacent layers.
[0061] A layer that has not been reached is one whose effective content, pore water test results, or pH level in the layer verification record do not meet the repair target for that layer. When making the determination, the verification samples of the same target layer are merged, and the results of other target layers are not mixed in. The layer that has not been reached is replenished with the remaining reaction capacity. The remaining reaction capacity is the repair grout capacity that the layer that has not been reached still needs to consume after the injection is completed. Its formation process is to compare the layer verification record, the original reaction capacity test results, and the actual injection volume. First, the target layer corresponding to the project that has not been reached is identified, and then the reaction capacity corresponding to the completed injection is deducted to obtain the remaining amount boundary required for replenishment. The replenishment record shall at least include the name of the layer that has not been reached, the remaining reaction capacity, the replenishment hole location, the replenishment grout batch number, the replenishment volume, and the replenishment time. If the layer that has not been reached also has pH exceeding the limit and pore water test results rising, the layer is marked as pending verification and no additional replenishment is directly added.
[0062] The reached stratum refers to the stratum whose samples in the stratum verification record meet the target stratum repair objectives and do not exhibit sampling depth errors, sample mixing, or missing test reports. The on-site technical supervisor will write the reached stratum into the repair version record. The repair version record is established by stratum and is not covered by the entire site at once. The content includes the target stratum name, verification well number, stratum verification record version, actual injection volume, supplementary injection record, reached stratum confirmation time, and confirmation personnel. When the same target stratum is submitted repeatedly, the record of the first confirmed reached stratum will be the current valid version, and subsequent content will be saved as additional explanations. Old versions must not be overwritten.
[0063] Preferably, in the tailings dam downstream site, the curing time can be set to 28 days, the spacing between verification boreholes can be set to 4 to 6 meters, and no less than 3 soil samples should be collected for each target layer, with each soil sample weighing no less than 0.5 kg and each pore water sample weighing no less than 100 ml. When the available lead content in the surface contamination load layer decreases from 210 mg / kg to 60 mg / kg, it is recorded as a reached layer. When the available lead content in the leaching migration channel layer is 95 mg / kg after verification and the remediation target is 80 mg / kg, 15 kg / ton of soil is added according to the remaining reaction capacity. If a direct-push sampling device is used on site to replace the drilling verification borehole sampling, the same target layer, the same sample number, and the same layer verification record caliber should still be used.
[0064] In the operational scenario shown in this embodiment: the site to be remediated is located downstream of a tailings dam and drainage ditch in a lead-zinc mine. The site surface shows residual tailings, erosion deposits at the toe of waste rock slopes, and post-rainwater runoff channels. The remediation unit first divided the site into a mine pollution source area, a rainwater runoff area, and a downstream groundwater area. The sampling team then deployed four verification boreholes in the mine pollution source area, three in the rainwater runoff area, and three in the downstream groundwater area. Each verification borehole was measured from the borehole elevation, and soil and pore water samples were collected at depths of 0.5 meters from 0 to 3 meters. The borehole number, area, depth, soil sample number, pore water sample number, and sealing status were recorded on-site, forming the first version of the vertical pollution profile record. The test results showed that the available lead content in the 0-0.8 meter depth range of the mine pollution source area was concentrated between 180 mg / kg and 230 mg / kg. The alkalinity ranges from 5.2 to 5.8, and the water content ranges from 16% to 20%, indicating that this depth is significantly affected by the leaching residues of tailings and waste rock. On-site technicians have designated this as a surface pollution load layer. In the 0.8-1.8 meter depth range, there are gravel interlayers with permeability reaching 1.0 x 10⁻⁴ cm / s and a water content of 25% to 30%. The available lead content remains at 110 mg / kg to 140 mg / kg. The pore water lead concentration in adjacent wells in the rainwater catchment area increases synchronously in this depth range. On-site technicians have designated this as a leaching migration channel layer. In the 1.8-2.4 meter depth range, the distance from the stable groundwater level is less than 0.5 meters, and the available lead content is 80 mg / kg to 95 mg / kg. Moreover, the local permeability has not decreased to the background level. On-site technicians have designated this as a bottom risk barrier layer and have written the top and bottom depths of each layer, the participating stratification fields, and the source version of the fields into the stratum boundary record.
[0065] Subsequently, the laboratory selected representative soil samples from the surface contamination load layer, leaching migration channel layer, and bottom risk barrier layer for reaction capacity determination. The representative soil sample from the surface contamination load layer had a porosity of 42%, a water content of 18%, and a permeability of 3.0 x 10⁻⁵ cm / s, with a remediation dose boundary value of 85 kg of reactive remediation slurry per ton of soil. The representative soil sample from the leaching migration channel layer had a porosity of 48%, a water content of 27%, and a permeability of 1.0 x 10⁻⁴ cm / s, with a remediation dose boundary value of 70 kg of reactive remediation slurry per ton of soil. The representative soil sample from the bottom risk barrier layer had a porosity of 39%, a water content of 31%, and a permeability of 6.0 x 10⁻⁵ cm / s, with a remediation dose boundary value of 60 kg of reactive remediation slurry per ton of soil. Each remediation dose boundary value was associated with the representative soil sample number and the remediation slurry batch number and then entered into the remediation project record database.
[0066] The on-site injection team entered the target layer in descending order of depth, following the sequence of bottom risk-repellent layer, leaching migration channel layer, and surface contamination load layer. First, the injection drill pipe was lowered to near the lower boundary of the bottom risk-repellent layer. An injection interval of 0.2 to 0.4 meters was defined by the upper and lower sealing sections. Low-permeability slurry was injected at the lower boundary of the target layer to form an interlayer slurry barrier. After completing the interlayer slurry barrier of the bottom risk-repellent layer at the same borehole, the drill pipe was then raised to the lower boundary of the leaching migration channel layer, and finally to the lower boundary of the surface contamination load layer. Throughout the process, the formation status of the interlayer slurry barrier was confirmed by maintaining the sealing pressure, the return slurry position, and the cumulative injection volume.
[0067] After confirming the formation of the interlayer migration barrier thin band, the injection team injects reactive repair grout according to the repair dosage boundary value of the corresponding target layer. The injection pressure of the leaching migration channel layer is limited to 0.3 MPa to 0.7 MPa, the allowable injection volume per hole is 45 liters to 55 liters, and the injection depth is controlled between 1.0 m and 1.6 m. When the cumulative injection volume reaches the upper limit of the allowable injection volume, the injection of this layer is stopped. If continuous grout return occurs at the wellhead or the pressure of the sealing section becomes unstable, the drill rod position is maintained and the reason for stopping is recorded. The remaining injection volume is not transferred to other target layers.
[0068] After the reactive remediation slurry was injected and cured for 28 days, the verification team set up verification holes between the original injection holes and collected samples from the corresponding layers according to the surface contamination load layer, leaching migration channel layer, and bottom risk barrier layer, generating layer verification records. The verification results showed that the available lead content in the surface contamination load layer decreased to 60 mg / kg, and the available lead content in the bottom risk barrier layer decreased to 45 mg / kg. Both were recorded in the remediation version record. After verification, the available lead content in the leaching migration channel layer was 95 mg / kg, which did not reach the target value of 80 mg / kg. The on-site technicians generated a supplementary injection record based on the remaining reactive capacity of the layer and quantitatively supplemented it with 15 kg of reactive remediation slurry per ton of soil. After supplementary injection, the layer was cured and verified again. After reaching the target value, the layer was recorded in the remediation version record, thus forming a complete on-site operation chain from vertical contamination profile record, layer boundary record, remediation dose boundary value, interlayer barrier thin band, reactive remediation slurry injection record to remediation version record.
[0069] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.
Claims
1. A method for in-situ remediation of contaminated soil from mines, characterized in that, include: S1. Set up profile verification wells along the mine pollution source area, rainwater runoff area and downstream groundwater area, collect soil samples and pore water samples according to depth section to form a vertical pollution profile record. S2. Based on the available content, pH, water content, permeability, and groundwater level in the vertical pollution profile record, delineate the surface pollution load layer, leaching migration channel layer, and bottom risk barrier layer, and generate the layer boundary record. S3. Based on the reaction capacity measurement results of representative soil samples from each layer, and combined with the porosity, water content, and permeability of that layer, determine the boundary value of the remediation dose. S4. Enter the target layer in order from deep to shallow, and limit the injection interval by sealing the upper and lower layers. First, inject low-permeability migration-resistant slurry at the lower boundary of the target layer to form an interlayer migration-resistant thin band. S5. Inject reactive repair grout according to the repair dose boundary value of the target layer, and record the injection pressure, injection volume and injection depth according to the layer boundary. S6. After curing, collect samples from the corresponding layers in the verification wells and generate a layer verification record. If the layer is not reached, supplement it according to the remaining reaction capacity. If the layer is reached, write it into the repair version record.
2. The method for in-situ remediation of contaminated mine soil by layering according to claim 1, characterized in that, S1 includes: The source areas of mine pollution were identified by historical stockpiling boundaries, surface slag residues, and portable heavy metal screening readings. The rainwater catchment area was identified by mapping elevation lines, post-rain gully traces, and water accumulation boundaries using drones. The downstream area of groundwater was identified based on hydrogeological data, existing monitoring well water levels, and the slope of the site. A vertical contamination profile record is generated based on the region, well location number, depth range, sample number, and sampling time.
3. The method for in-situ remediation of mine-contaminated soil by layering according to claim 1, characterized in that, S2 include: Retrieve the vertical contamination profile records from the submitted version; Read the available content, pH, water content, permeability, and groundwater level according to the borehole number, region, and depth. Organize the boreholes from shallow to deep according to the same location, and exclude boreholes with gaps in depth, where the test report number does not correspond to the sample number, and where the source of the groundwater level is unknown.
4. The method for in-situ remediation of contaminated mine soil by layering according to claim 3, characterized in that, S2 also includes: The surface pollution load layer is determined based on the available state content, pH, and moisture content of the surface depth section. The leaching migration channel layer is defined based on the permeability, water content, pH, and effective content of the depth section below it; The bottom risk barrier layer is delineated based on the effective content, pH and permeability of the depth section above the groundwater level, and a layer boundary record is generated.
5. The method for in-situ remediation of contaminated mine soil by layering according to claim 1, characterized in that, S3 includes: Based on the stratigraphic boundary records, the representative soil samples of the stratigraphic units were identified; The representative soil sample of the stratum is a soil sample that has been included in the vertical pollution profile record and whose sample number, depth range and sealing status are intact; The reaction capacity was determined on representative soil samples from the stratigraphic level. The boundary values for the repair dosage are determined by combining porosity, water content, and permeability, and then written into the repair project record library.
6. The method for in-situ remediation of contaminated mine soil by layering according to claim 1, characterized in that, S4 includes: Determine the target stratigraphic level based on stratigraphic boundary records; Enter the target layer in the order of bottom risk barrier layer, leaching migration channel layer, and surface pollution load layer; Lower the injection drill pipe to the lower boundary of the target layer; The injection interval is defined by the upper and lower partitions.
7. The method for in-situ remediation of contaminated soil in mines according to claim 6, characterized in that, S4 also includes: Inject low-permeability, migration-resistant grout into the lower boundary of the target layer within the injection zone; Based on the cumulative injection volume, the state of sealing and maintaining the seal, the location of grout return, and the state of grout flow, the formation of interlayer migration thin bands is confirmed, and the confirmation conclusion is written into the repair project record database.
8. The method for in-situ remediation of contaminated soil in mines according to claim 1, characterized in that, S5 include: After confirming the formation of interlayer migration thin bands, reactive remediation slurry was prepared according to the main pollutants and remediation dose boundary values of the target layer; The permissible injection volume is determined based on the locked repair dose boundary values; Injection pressure and depth are determined based on stratigraphic boundary records; Generate a reactive repair grout injection record that includes the actual injection volume, injection pressure, injection depth, and grout batch number.
9. A method for in-situ remediation of contaminated soil in mines according to claim 1, characterized in that, S6 include: Verification boreholes were laid out based on the reactive repair grout injection records and layer boundary records; Collect samples from the corresponding stratigraphic level in the verification well and generate a stratigraphic verification record; The target layers that do not meet the target layer repair objectives are identified as unreached layers, and supplemented with additional reaction capacity according to the remaining reaction capacity; The target layer that meets the target layer repair objective is identified as the reached layer and written into the repair version record.