A mobile battery swapping method and system for cross-device battery reconfiguration
By using a cross-equipment battery reconfiguration mobile battery swapping method and system, the problem of improper use of battery resources during drilling and blasting operations has been solved. This has enabled efficient allocation of battery resources among different equipment, reduced refueling travel and waiting time, and improved the continuity of construction and resource utilization efficiency.
Patent Information
- Application Number
- CN202611607246.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-16
- Publication Date
- 2026-11-17
AI Technical Summary
Existing technologies cannot effectively utilize the differences in task applicability between equipment during drilling and blasting operations. This results in the need to return for refueling even when the total energy of the vehicle's battery is still usable. Furthermore, the impact of battery selection between the preceding and following equipment on subsequent services is not considered, increasing equipment waiting time and process delays.
By establishing a cross-equipment battery reconfiguration mobile battery swapping method and system, based on the construction task progress, process dependencies, and work site permitting conditions, the available battery packs are determined, and the feasibility is verified through the driving of the mobile battery swapping vehicle and the battery swapping sequence, ensuring the reasonable allocation of battery resources among different equipment and avoiding equipment waiting and process delays.
It enables efficient allocation of battery resources among different devices, reduces unnecessary refueling travel and waiting time, improves the continuity of drilling and blasting operations and resource utilization efficiency, and avoids power outages caused by improper battery selection.
Smart Images

Figure CN123104458A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of battery swapping scheduling for electric engineering machinery, and specifically to a mobile battery swapping method and system for cross-equipment battery reconfiguration. Background Technology
[0002] Drill-and-blast construction includes drilling, charging and blasting, ventilation and safety inspection, and muck removal. Specific procedures, durations, and permissible entry conditions are determined by the construction organization and on-site safety management. Drilling rigs, excavators, and loaders can operate sequentially on the same working face or in parallel on different working faces. This method relies on actual task requirements and working face opening signals, and does not assume all equipment operates simultaneously at the same location, nor does it use a battery swapping and dispatching system to shorten necessary intervals for ventilation and safety inspections.
[0003] Mobile battery swapping vehicles can carry several universal battery packs to locations permitted by the equipment for battery installation and removal. Vehicle travel, bay space, battery compatibility, loading / unloading times, and equipment power cutoff times all collectively limit the feasible service plans. Whether a multi-pack trolley can accept a particular battery depends not only on the total energy but also on the original machine's permitted battery combination, bus or branch circuit structure, power capacity, and BMS approval.
[0004] In construction operations where rock drilling rigs use multiple independently replaceable batteries, while excavators or loaders use a single replaceable battery, the remaining operating energy requirements and interruptible periods differ among the different pieces of equipment. A single battery may not be sufficient to independently support the next work segment of a single piece of equipment, but can still work together with the rig's reserve battery to meet the rig's tasks; it may also no longer be suitable for a long work segment of the rig, but is sufficient to support a short work segment of another piece of equipment.
[0005] Existing technologies, when deciding on battery replacement based solely on a uniform state of charge threshold or minimum charge principle, fail to take advantage of the differences in task applicability between the aforementioned devices. This results in the vehicle battery having usable total energy but still needing to be returned for refueling. When scheduling services based solely on the urgency and distance of the current power shortage, the factors of which battery was retrieved previously are not considered in determining whether service can be provided in the future, causing subsequent equipment to wait due to the lack of suitable batteries. When battery swapping time is separated from processes such as drilling, hole relocation, site transfer, and loading, it is easy to increase the interruption of critical processes and the delays that propagate to subsequent operations. Summary of the Invention
[0006] To address the problem that existing drilling and blasting operations lack a correlation between the selection of batteries for preceding equipment and the operational needs of subsequent equipment, making it difficult to continue using recycled batteries while meeting the continued operation requirements of each piece of equipment and the constraints of the process sequence, thus increasing equipment waiting time and return for resupply, this invention proposes a cross-equipment battery reconfiguration mobile battery swapping method and system.
[0007] Firstly, a mobile battery swapping method for cross-device battery reconfiguration is provided, comprising: Based on the construction task progress, process dependencies and work surface permitting conditions, the remaining working sections and allowable battery swapping windows for each of the multiple construction equipment before the next refueling opportunity are determined. Based on the power supply requirements of the remaining work section after the battery swap of the preceding construction equipment and the power supply requirements of the remaining work section of the subsequent construction equipment, a reusable battery pack is determined from the candidate battery packs of the preceding construction equipment, and the reusable battery pack is associated with the preceding battery swap action and the subsequent battery swap action to establish a candidate service chain. Based on the driving and battery swapping sequence of the mobile battery swapping vehicle, the battery resource status, and the allowed battery swapping window, the executability of the candidate service chains is verified, the service chains to be executed are determined, and the reusable battery packs that have not yet been actually recovered in the service chains to be executed are marked as battery resources to be confirmed. According to the service chain to be executed, the preceding battery swapping action is performed. The identity and availability status of the actually recovered reusable battery pack are verified. If the verification is successful, it is updated as a deliverable battery resource, and the mobile battery swapping vehicle directly transfers it to the subsequent construction equipment without charging to perform the subsequent battery swapping action. If the verification fails, the subsequent battery swapping action associated with the reusable battery pack is canceled, and the service chain to be executed is re-determined.
[0008] Secondly, a mobile battery swapping system for cross-device battery reconfiguration is provided, comprising: The determination module is used to determine the remaining working section and allowed battery swapping window for each of the multiple construction equipment before the next refueling opportunity, based on the construction task progress, process dependencies and work surface permit conditions. A construction module is used to determine a reusable battery pack from the candidate battery packs of the preceding construction equipment based on the power supply requirements of the remaining working section after the battery swap of the preceding construction equipment and the power supply requirements of the remaining working section of the subsequent construction equipment, and to establish a candidate service chain by associating the reusable battery pack with the preceding battery swap action and the subsequent battery swap action. The marking module is used to perform executability verification on the candidate service chains based on the driving and battery swapping sequence of the mobile battery swapping vehicle, the battery resource status and the allowed battery swapping window, determine the service chains to be executed, and mark the reusable battery packs in the service chains to be executed that have not yet been actually recovered as battery resources to be confirmed. The verification module is used to perform the preceding battery swapping action according to the service chain to be executed, to verify the identity and availability status of the actually recovered reusable battery pack, and after the verification is passed, update it as a deliverable battery resource, and the mobile battery swapping vehicle directly transfers it to the subsequent construction equipment to perform the subsequent battery swapping action without charging. If the verification fails, cancel the subsequent battery swapping action associated with the reusable battery pack, and re-determine the service chain to be executed.
[0009] In another aspect, the present invention also provides an electronic device, comprising: at least one processor and a memory; the memory and the processor are connected via a bus; The memory is used to store one or more programs; When the one or more programs are executed by the at least one processor, a cross-device battery reconfiguration mobile battery swapping method as described above is implemented.
[0010] In another aspect, the present invention also provides a computer-readable storage medium having a computer program thereon, which, when executed, implements a cross-device battery reconfiguration mobile battery swapping method as described above.
[0011] Compared with the prior art, the beneficial effects of the present invention are as follows: This invention provides a mobile battery swapping method and system for cross-device battery reconfiguration. It filters reusable battery packs by combining the remaining power supply needs of preceding and subsequent construction equipment, and generates and verifies candidate service chains based on the allowed battery swapping window, the mobile battery swapping vehicle's operation, and onboard battery inventory. During the battery swapping process, it continuously updates subsequent service arrangements based on the actual status of the recovered battery packs, thereby achieving coordinated allocation between construction equipment, battery resources, and the mobile battery swapping vehicle. Specifically, it includes: (1) Based on the power supply configuration after the preceding construction equipment replaces the battery pack and the power supply requirements after the subsequent construction equipment replaces the battery pack, the present invention performs bidirectional screening of the reusable battery pack, so that the selected battery pack can simultaneously meet the requirements of the preceding construction equipment to continue operation and the subsequent construction equipment to continue operation, avoiding the power supply gap of any construction equipment caused by selecting the recycling battery pack only based on the battery charge status, and improving the rationality and verifiability of cross-equipment battery conversion decision.
[0012] (2) This invention utilizes the differences in battery configuration and task requirements between multi-battery pack devices and single-battery pack devices to match the remaining usable energy swapped out by preceding construction equipment with the reserved battery packs or power supply requirements of subsequent construction equipment, enabling the recycled battery packs to be reused between different types of construction equipment. This improves the adaptability of existing battery resources to the current task and supports mobile battery swapping vehicles in providing follow-up services using their carried, partially charged battery packs and battery packs recycled during operations.
[0013] (3) The present invention arranges battery swapping services according to the allowable battery swapping window of the construction equipment, the travel time of the mobile battery swapping vehicle between different service locations and the power supply cutoff constraints of the construction equipment, so that the battery swapping action can be embedded as much as possible into the original work gaps such as process completion, equipment relocation or process waiting, and eliminates service schemes that cannot arrive on time or may cause power outages through the feasibility verification of candidate service chains, thereby reducing additional downtime and key process delays caused by battery swapping.
[0014] (4) The present invention confirms the actual status of the recycled battery pack during the execution of the candidate service chain and updates the vehicle battery inventory and subsequent service arrangements accordingly, which can reduce the risk of subsequent supply interruption caused by the inconsistency between the planned inventory and the actual battery resources; at the same time, by verifying the energy and power requirements of the construction equipment before and after the arrival of the mobile battery swapping vehicle, it avoids the problem of equipment being unable to supply power normally in the middle operation stage due to the judgment based solely on the total available power.
[0015] (5) This invention improves the availability of battery packs for specified tasks by reallocating existing battery resources across equipment, reducing unnecessary recharging of construction equipment before the start of the current work section and the return recharge of mobile battery swapping vehicles to obtain suitable battery packs. Its technical effect is not to reduce the physical electrical energy required for construction equipment to complete the same task, but to reduce avoidable recharge travel and waiting time and corresponding transportation energy consumption, thereby improving the continuity and resource utilization efficiency of drilling and blasting construction battery swapping services. Attached Figure Description
[0016] Figure 1 This is a flowchart of the cross-device battery reconfiguration mobile battery swapping method of the present invention; Figure 2 This is a schematic diagram illustrating the system composition and bidirectional battery flow principle of the cross-device battery reconfiguration mobile battery swapping method of the present invention. Figure 3 This is a schematic diagram of the mobile battery swapping scheduling method of the cross-device battery reconfiguration mobile battery swapping method of the present invention; Figure 4 This is a schematic diagram of the battery flow and service timing of the cross-device battery reconfiguration mobile battery swapping method of the present invention. Figure 5 This is a schematic diagram illustrating the safe execution and inventory confirmation status of the cross-device battery reconfiguration mobile battery swapping method of the present invention; Figure 6 This is a schematic diagram of the cross-device battery reconfiguration mobile battery swapping system of the present invention; Figure 7 This is a schematic diagram of an electronic device structure according to the present invention. Detailed Implementation
[0017] This invention provides a mobile battery swapping method and system for cross-device battery reconfiguration. It establishes a battery suitability assessment based on remaining work segments, allowing the same battery to be evaluated separately in different devices and reserved battery combinations. The task requirements of subsequent devices conversely limit the batteries that can be swapped out by the trolley and the recovery time. By jointly calculating service sequence, vehicle travel, and process windows, it reduces waiting times for critical processes due to untimely energy preparation and avoids unnecessary return replenishment. Through physical identification, combined power supply checks, and plan recalculation, it ensures that each swapping step has feasible tasks and safety conditions. Two physical constraints uniquely limit the selection space for swapped-out batteries: the battery is a single unit and cannot be divided; when a battery is transferred without charging, its charge will only decrease. Therefore, the transferable range becomes a physically unsolvable criterion for determining whether the tasks of two devices can be simultaneously fulfilled.
[0018] To better understand the present invention, the following description, in conjunction with the accompanying drawings and embodiments, will further illustrate the content of the present invention.
[0019] Example 1: A mobile battery swapping method for cross-device battery reconfiguration, such as Figure 1 As shown, it includes: Step 1: Based on the construction task progress, process dependencies, and work surface permitting conditions, determine the remaining working sections and permitted battery swapping windows for each of the multiple construction equipment before the next refueling opportunity; Step 2: Based on the power supply requirements of the remaining work section after the battery swap of the preceding construction equipment and the power supply requirements of the remaining work section of the subsequent construction equipment, determine the reusable battery packs from the candidate battery packs of the preceding construction equipment, and associate the preceding battery swapping action and the subsequent battery swapping action with the reusable battery packs to establish a candidate service chain. Step 3: Based on the driving and battery swapping sequence of the mobile battery swapping vehicle, the battery resource status, and the allowed battery swapping window, perform executability verification on the candidate service chains, determine the service chains to be executed, and mark the reusable battery packs that have not yet been actually recovered in the service chains to be executed as battery resources to be confirmed. Step 4: Perform the preceding battery swapping action according to the service chain to be executed. Verify the identity and availability of the actually recovered reusable battery pack. If the verification is successful, update it as a deliverable battery resource, and the mobile battery swapping vehicle will directly transfer it to the subsequent construction equipment without charging to perform the subsequent battery swapping action. If the verification fails, cancel the subsequent battery swapping action associated with the reusable battery pack and re-determine the service chain to be executed.
[0020] The method in this embodiment is executed by a dispatch controller, which dispatches mobile battery swapping vehicles to provide battery swapping services to a construction work group. The construction work group includes at least one of a rock drilling rig with multiple replaceable battery packs, and an excavator and a loader powered by a single battery pack; the battery packs used by different construction equipment have corresponding equipment-approved interchangeability, thereby enabling the battery packs to be used across equipment while meeting compatibility and permissible power supply conditions.
[0021] During the execution of the above steps, the scheduling controller acquires the process progress, remaining tasks, current location, and battery status of each construction device, as well as the current location and onboard battery inventory of the mobile battery swapping vehicle. The battery status includes at least the unique identity of the battery pack, available energy, and permitted power supply status. Based on this information, the scheduling controller generates corresponding battery swapping service actions and updates the relevant information when the construction task progress, battery status, or mobile battery swapping vehicle status changes.
[0022] Specifically, the system uses mobile battery swapping vehicles as the transportation and exchange carriers for batteries. It takes the construction task status and battery status as inputs to generate service actions that include the equipment, time, location, delivery package, and return package identity. For candidate actions, it not only determines whether the current equipment can continue operating after swapping, but also whether the return package can fulfill the specified tasks of subsequent equipment without requiring recharging. Based on this, it jointly selects the preceding swapping package, subsequent receiving equipment, and service route.
[0023] Cross-equipment reconfiguration operates on a two-way mechanism: the trolley battery can be allocated to the excavator or loader; batteries removed from the excavator or loader can also be sent to the trolley to share power with the batteries retained on the trolley. These two directions can occur at different task stages or on different work surfaces, without requiring the same pair of equipment to immediately complete a closed-loop swap. The mobile battery swapping vehicle can simultaneously use the batteries it carries at departure and the batteries actually recovered during the service process.
[0024] In this embodiment, when performing step 1 to determine the remaining work segments and permitted battery swapping windows for each construction device, it is necessary to further clarify the endpoints of the remaining work segments and their power supply requirements. By using refueling opportunities, designated process completion points, or safe stopping points as the basis for dividing work segments, the power supply requirements can correspond to the actual tasks that the construction equipment must complete in the next stage, avoiding the allocation of battery resources based on excessively long or short task ranges. Simultaneously, characterizing the power supply requirements from both energy and power perspectives avoids judging the suitability of the battery pack solely based on the total capacity. Specifically, this includes: Based on the execution sequence of the construction tasks, the next target node is determined from the next energy replenishment opportunity confirmed by the arrival time of battery resources and mobile battery swapping vehicles, the designated process completion point or safe stopping point, and the tasks that the construction equipment must complete from the current time to the next target node are determined as the remaining work segments of the construction equipment. The energy required for the remaining work segment is obtained by adding the power consumption of the remaining work segment, the power consumption of driving (not included in the power consumption of the work segment), the power consumption of auxiliary power consumption during waiting, and the safety reserve. The power demand is determined based on the expected power of each task in the remaining work segment, and the energy and power demand required for the remaining work segment are determined as the power supply demand for the remaining work segment.
[0025] Specifically, according to the execution sequence of construction tasks, identify refueling opportunities, designated process completion points, and safe stopping points located after the current moment of the construction equipment, and determine the next target node to define the current planning scope. The refueling opportunities need to be confirmed in conjunction with available battery resources and the arrival time of the mobile battery swapping vehicle.
[0026] Furthermore, the tasks that the construction equipment must perform from the current moment until the next target node are categorized into the remaining work segment. For this remaining work segment, the power consumption required for the equipment to perform the work, the power consumption for travel not included in the work power consumption, the auxiliary power consumption required to maintain the operation of auxiliary systems during the waiting period, and the safety reserve reserved to ensure safe operation are determined separately. These energy requirements are then combined into the energy required for the remaining work segment. At the same time, the corresponding power requirements are determined based on the expected power of each task in the remaining work segment. The energy required for the remaining work segment and the power requirements together constitute the power supply requirements for the remaining work segment, which serve as the basis for selecting battery packs and verifying the service chain.
[0027] In this embodiment, when performing step 2, which involves determining a reusable battery pack from the candidate battery packs of the preceding construction equipment and establishing a candidate service chain, it is necessary to simultaneously consider whether the preceding construction equipment can continue operating after the battery pack is replaced, and whether the battery pack can support the operation of subsequent construction equipment after being transferred. By implementing bidirectional constraints on the power supply requirements of both preceding and following construction equipment, it is possible to avoid insufficient power supply to the preceding construction equipment due to selecting battery packs solely based on the needs of subsequent construction equipment, and also to prevent the replaced battery packs from being effectively utilized by subsequent construction equipment. Specifically, this includes: Based on whether the power supply configuration formed after the preceding construction equipment replaces the candidate battery pack with the battery pack carried by the mobile battery swapping vehicle meets the power supply requirements of the remaining working section of the preceding construction equipment, the first candidate battery pack set is determined. Based on whether the selected battery packs, after deducting the energy loss during the period from collection to delivery, meet the power supply requirements of the remaining working section after the subsequent construction equipment has been swapped when powered alone or when powered together with the reserved battery packs of the subsequent construction equipment, a second set of candidate battery packs is determined. Select candidate battery packs from the intersection of the first candidate battery pack set and the second candidate battery pack set, and verify whether the power supply configuration of the preceding construction equipment and the subsequent construction equipment after battery swapping meets the battery compatibility and allowable power supply conditions. The candidate battery packs that pass the verification are determined as reusable battery packs.
[0028] Specifically, for each candidate battery pack in the preceding construction equipment, the power supply configuration after the candidate battery pack is replaced by a battery pack carried by a mobile battery swapping vehicle is simulated. If the power supply configuration formed after the battery swap can meet the power supply needs of the remaining working section of the preceding construction equipment, the corresponding candidate battery pack is included in the first candidate battery pack set.
[0029] Further estimates are made regarding the potential energy loss of the candidate battery pack during the period from its return to the preceding construction equipment to its delivery to the subsequent construction equipment. Based on the state after deducting energy loss, it is determined whether the battery pack, whether supplying power independently or jointly with the reserved battery pack of the subsequent construction equipment, can meet the power supply requirements of the remaining work section after the battery swap. Candidate battery packs that meet this condition are included in the second candidate battery pack set. After taking the intersection of the two candidate battery pack sets, it is further verified whether the power supply configuration after the battery swap meets the corresponding battery compatibility and permissible power supply conditions. Candidate battery packs that pass the verification are determined as reusable battery packs.
[0030] In this embodiment, when determining the usable battery pack in step 2, if the battery pack is switched from a multi-battery-pack-powered rock drilling rig to a single-battery-pack-powered excavator or loader, it is necessary to ensure that the rock drilling rig can still complete the remaining tasks after the battery pack is replaced, while also ensuring that the replaced battery pack can independently support the operation of subsequent equipment. Therefore, by determining the lower and upper limits of the available energy of the candidate battery packs, an energy screening range that takes into account the needs of both preceding and subsequent construction equipment can be formed, specifically including: The lower limit of the available energy of the selected battery pack is determined by the sum of the energy required for the remaining operation section after the subsequent construction equipment battery swap and the energy loss of the selected battery pack from the time of collection to delivery. Add the total available energy of the battery pack of the preceding construction equipment at the start of the candidate battery swap to the available energy of the battery pack to be installed, and then subtract the energy required for the remaining operation section after the preceding construction equipment swaps the battery, as well as the power consumption of the battery swap process undertaken by the preceding construction equipment that has not yet been included in the energy required for the remaining operation section, to obtain the upper limit of the available energy of the candidate battery pack. From the candidate battery packs of the preceding construction equipment, select battery packs whose available energy is not lower than the lower limit of available energy and not higher than the upper limit of available energy, and determine the candidate battery packs that pass the battery compatibility and allowable power supply conditions verification as reusable battery packs.
[0031] Specifically, if the preceding construction equipment is a rock drilling rig with multiple replaceable battery packs, and the subsequent construction equipment is an excavator or loader powered by a single battery pack, and when the preceding battery swapping operation replaces one battery pack, the minimum available energy that the candidate battery pack should possess is first determined based on the energy required for the remaining working section after the subsequent construction equipment's battery swap and the energy loss of the candidate battery pack during the period from its return to delivery. This minimum available energy is used to ensure that the candidate battery pack can still meet the operational needs of the subsequent construction equipment after delivery.
[0032] Then, using the sum of the total available energy of each battery pack of the preceding construction equipment at the start of the candidate battery swap and the available energy of the battery pack to be installed as the basis for available energy, and deducting the energy required for the remaining work section after the preceding construction equipment's battery swap, as well as the power consumption during the battery swap process that has not yet been included in this demand, the upper limit of available energy of the battery pack that can be swapped out from the preceding construction equipment is obtained. Finally, battery packs with available energy between the above upper and lower limits are selected from the candidate battery packs of the preceding construction equipment, and battery packs that pass the compatibility and allowable power supply condition verification are identified as reusable battery packs.
[0033] In one specific implementation, the preceding construction equipment is denoted as rock drilling rig A, the subsequent construction equipment is denoted as equipment B powered by a single battery pack, and the candidate battery pack in rock drilling rig A is denoted as battery pack. The battery pack is determined according to the following formula. The corresponding process sequence can be transferred to the following range:
[0034] in, The energy required for the remaining work section after equipment B completes the subsequent battery swap; For battery pack Energy loss during the period from when it is retrieved to when it is delivered to device B; For battery pack Available energy before the preceding battery swap begins; The total available energy of each battery pack of the rock drilling rig A before the preceding battery swap begins; The available energy of the battery pack c of the rock drilling rig A to be delivered before the start of the preceding battery swap; The energy required for the remaining work section after the preceding power swap for rock drilling rig A; The power supply system of the rock drilling rig A was used during the previous battery swapping process and has not yet been included in the calculation. Energy consumption.
[0035] When the available range for the above-mentioned process is empty, or when there is no actual battery pack in the rock drilling rig A that has available energy in that range and passes the allowable power supply condition verification, it indicates that the corresponding preceding battery swapping action cannot simultaneously meet the power supply needs of the preceding construction equipment and the subsequent construction equipment, and therefore the candidate service chain containing the preceding battery swapping action is excluded.
[0036] Furthermore, to reduce the impact of battery available energy estimation errors and task energy consumption prediction errors on the battery pack selection results, the lower bound of available energy, the upper bound of energy required for the remaining work segment, and the upper bound of energy loss during transportation were determined for each battery pack. The selected battery packs were then evaluated according to the following formula. Review:
[0037] in, This refers to the battery pack assembly of rock drilling rig A before the preceding battery swap. This indicates the battery pack that will be retained after the rock drilling rig A undergoes a battery swap; , and These represent the available energy of the respective battery packs; superscript Indicates the lower bound of the corresponding parameter, superscript Indicates the upper bound of the corresponding parameter; This is the upper bound of the additional energy consumption during the preceding battery swapping process; For battery pack The upper bound of energy loss during transport; and These are the upper limits of the energy required for the remaining working sections of the rock drilling rig A and equipment B, respectively.
[0038] Based on meeting the above energy verification conditions, the corresponding power supply configuration is verified according to the time sequence of the candidate service chains at the start of the process, the end of the process, the start of battery swapping, the end of battery swapping, and before the next arrival of the mobile battery swapping vehicle. The verification includes the allowable output power of the power supply configuration, the allowable voltage and current of each battery pack, temperature, and protection status; if the power supply requirements are not met at any verification point, the corresponding candidate service chain is excluded. Therefore, it is possible not only to determine whether the total available energy before and after battery swapping is sufficient, but also to determine whether the power supply configuration can continuously provide power at each critical moment during task execution.
[0039] In this embodiment, when determining the reusable battery pack in step 2, if the battery pack is switched from being used in an excavator or loader powered by a single battery pack to a rock drilling rig powered by multiple battery packs, the battery resources can be reallocated by utilizing the differences in battery configuration between the two types of equipment. By using a lower available energy battery pack carried by a mobile battery swapping vehicle to meet the short remaining tasks of the preceding equipment, and using the higher available energy battery pack swapped out by the preceding equipment for subsequent multi-battery pack equipment, the adaptability between different remaining energy battery packs and construction tasks can be improved. Specifically, this includes: From the battery packs carried by the mobile battery swapping vehicle, select the battery packs whose available energy is lower than that of the candidate battery packs of the preceding construction equipment, and which meet the power supply needs of the remaining work section after the preceding construction equipment has swapped batteries, and use them as the battery packs to be delivered to the preceding construction equipment. For the battery packs to be replaced by subsequent construction equipment, verify whether the power supply configuration formed by the selected battery pack after deducting the energy loss from the time of collection to delivery, together with the retained battery pack of the subsequent construction equipment, meets the power supply requirements and allowable power supply conditions for the remaining working section of the subsequent construction equipment. If the verification is passed, the selected battery pack is determined as a reusable battery pack.
[0040] Specifically, when the preceding construction equipment is an excavator or loader powered by a single battery pack, and the subsequent construction equipment is a rock drilling rig with multiple replaceable battery packs, the battery pack to be delivered to the preceding construction equipment is first selected from the battery packs currently carried by the mobile battery swapping vehicle. The available energy of the selected battery pack is lower than the available energy of the alternative battery packs in the preceding construction equipment, but it should be sufficient to meet the power supply needs of the remaining work section after the preceding construction equipment has swapped its battery.
[0041] After the preceding battery swap is completed, the candidate battery packs swapped out by the preceding construction equipment will be used as battery resources for subsequent construction equipment. For different candidate battery packs to be swapped out by subsequent construction equipment, the configuration of battery packs to be retained on the equipment after the swap will be determined. It will be assessed whether the power supply configuration formed by the candidate battery pack, after deducting energy losses during transport, and the retained battery pack, can meet the power supply requirements and permissible power supply conditions for the remaining working section of the subsequent construction equipment. Only when all the above conditions are met will the candidate battery pack be determined as a reusable battery pack.
[0042] In this embodiment, when performing step 1 to determine the allowable battery swapping window, the battery swapping service needs to be scheduled during a period when the construction equipment can be shut down without disrupting the continuity of the work process, and the window needs to be updated promptly when the battery swapping action causes changes in the task progress. This allows the battery swapping action to utilize the normal gaps formed by work process completion, equipment relocation, or work process waiting as much as possible, reducing additional downtime, while avoiding the continued use of expired battery swapping windows for subsequent services. Specifically, this includes: The time periods during which construction equipment is permitted to stop after a process is completed, during site relocation, or during process waiting are selected as candidate time periods. Uninterrupted operation periods and prohibited shutdown periods are excluded from the candidate time periods to obtain the allowed battery swapping window. When the completion time of a task is changed by a preceding or subsequent battery swapping action, the start and end times of the affected task and the allowed battery swapping window are updated according to the process dependency relationship and necessary safety intervals.
[0043] Specifically, based on the construction task schedule, the time periods during which construction equipment can be shut down after a process is completed, during site relocation, or while waiting for the next process are identified, and those time periods with approved shutdowns are designated as candidate time periods. For each candidate time period, periods where the task is in an uninterrupted state and periods where the construction schedule explicitly prohibits equipment shutdown are further excluded, and the remaining time periods are determined as the permissible power swapping windows for the construction equipment. When the completion time of related tasks changes due to actual or planned preceding or subsequent power swapping actions, the start and end times of the affected tasks are adjusted according to the process dependencies between tasks and the safety intervals required for adjacent processes, and the permissible power swapping windows for the corresponding construction equipment are updated accordingly.
[0044] For rock drilling rigs, the shutdown boundary at the end of drilling or the completion of a drilling group, as well as the permitted shutdown periods during equipment relocation or process waiting, can be considered as candidate ranges for power swapping times. The scheduling controller calculates the earliest start time of subsequent tasks based on the sequential dependencies between tasks, task durations, and construction safety process intervals; when a candidate power swapping action changes the completion time of a preceding task, the start and end times of the affected task and the corresponding permitted power swapping window are recalculated.
[0045] The work site permitting conditions also constrain the travel path and service location of the mobile battery swapping vehicle. Areas under blasting warning, ventilation, or safety inspection phases where the mobile battery swapping vehicle is not permitted to enter are excluded from the feasible paths and service locations for the mobile battery swapping vehicle. These path and service location restrictions are not part of the permitted battery swapping window, but rather serve as spatial constraints for subsequent candidate service chain generation and executability verification.
[0046] When forming a candidate service chain, the scheduling controller generates candidate service times based on the task boundaries and allowed time grids of each construction equipment. For each candidate service time, it enumerates the next construction equipment to be served, the onboard battery pack to be delivered by the mobile battery swapping vehicle, and the battery pack to be swapped out from that construction equipment. For each candidate battery swapping action, the available energy and task status of the corresponding construction equipment, the candidate onboard battery inventory of the mobile battery swapping vehicle, and its expected location are updated in chronological order. Based on the updated status, subsequent battery swapping actions continue, thus forming a candidate service chain containing multiple sequentially related battery swapping actions. Branches where the mobile battery swapping vehicle has exceeded its expiration date, the candidate onboard battery inventory is insufficient, or the power supply requirements after battery swapping cannot be met are not further developed.
[0047] In this embodiment, when performing the executability verification of candidate service chains and determining the service chain to be executed in step 3, judging the feasibility of each battery swapping action individually cannot guarantee that there will still be sufficient time and battery resources after multiple battery swapping actions are executed sequentially. Therefore, it is necessary to simulate the location of the mobile battery swapping vehicle, the onboard battery inventory, and the status of the construction equipment step by step according to the service order of the candidate service chains, in order to eliminate service chains that prevent subsequent actions from being executed due to the time consumed or battery resources occupied by previous actions. Specifically, this includes: Simulate each battery swapping action according to the service sequence, taking into account the duration of each battery swapping action and the travel time between adjacent battery swapping actions, and update the expected location of the mobile battery swapping vehicle, the inventory of candidate on-board batteries, and the expected task status of the serviced construction equipment one by one. Verify whether each battery swapping action is within the corresponding allowed battery swapping window, and whether the construction equipment meets the power supply requirements of the corresponding stage before and after the arrival of the mobile battery swapping vehicle, and exclude candidate service chains that do not arrive on time, lack deliverable battery packs, or whose power supply requirements are not met.
[0048] Specifically, each battery swapping action is simulated sequentially according to the service order specified in the candidate service chain. After each simulated battery swap is completed, the duration of the battery swapping action and the travel time required for the mobile battery swapping vehicle to reach the next service location are recorded. Based on the simulation results, the expected location of the mobile battery swapping vehicle, the inventory of candidate on-board batteries, and the expected task status of the corresponding construction equipment are updated.
[0049] Based on this, each step is assessed to determine whether the mobile battery swapping vehicle can arrive and complete the swap within the corresponding permitted swapping window, and whether the corresponding service location and travel route meet the current work area's permitting conditions; whether the construction equipment can rely on the existing power supply configuration to sustain itself until the swapping time before the mobile battery swapping vehicle arrives, and whether the power supply configuration formed after the swapping can meet the power supply needs of its subsequent work stages. Candidate service chains where the mobile battery swapping vehicle cannot arrive on time, the service location or travel route does not meet the work area's permitting conditions, there is a lack of the required deliverable battery pack when reaching the corresponding node, or the power supply needs of the construction equipment cannot be met at any stage are all excluded.
[0050] In this embodiment, when determining the service chain to be executed from the candidate service chains that have passed the executability verification in step 3, there may be multiple service chains that can complete the battery swapping task. It is necessary to further determine the comparison order between various optimization objectives. By adopting a step-by-step priority comparison method, the timely completion of the specified construction tasks can be prioritized. Furthermore, based on the same task completion status, additional battery swapping occupation, return replenishment, and energy consumption of mobile battery swapping services can be reduced. This avoids the simple superposition of different evaluation indicators, which could lead to the primary construction objective being offset by secondary indicators. Specifically, this includes: Among the candidate service chains that have passed the executability verification, the candidate service chains with smaller corresponding values are selected in order of the latest completion time of the specified construction task, the cumulative new battery swapping time, the number of times the mobile battery swapping vehicle returns for replenishment, and the energy consumption of the mobile battery swapping vehicle's travel and battery swapping execution. If the previous comparison item is the same, the next comparison item is compared to determine the service chain to be executed. The cumulative time occupied by the battery swapping is the sum of the time taken for each battery swapping session after deducting the time that overlaps with the original normal gap of the construction equipment.
[0051] Specifically, the latest completion time of the specified construction tasks corresponding to each executable candidate service chain is compared first, and the candidate service chain with the earlier completion time is prioritized. When the latest completion time of the specified construction tasks of multiple candidate service chains is the same, the cumulative additional battery swapping time is compared. When the cumulative additional battery swapping time is still the same, the number of times the mobile battery swapping vehicle returns for replenishment and the energy consumption generated by the mobile battery swapping vehicle during travel and battery swapping are compared in turn, and the priority is determined according to the corresponding values from smallest to largest. The cumulative additional battery swapping time is not a direct summation of the duration of each battery swap, but rather, for each battery swap, the portion of the battery swapping time that overlaps with the original normal gap of the construction equipment is deducted, and only the time that exceeds the original normal gap and actually increases the equipment occupancy is accumulated. After the above item-by-item comparison, one candidate service chain is selected as the service chain to be executed.
[0052] The latest completion time of the specified construction task corresponding to each candidate service chain is recalculated based on the task time changes caused by the candidate battery swapping action and the sequential dependencies between tasks. When a battery swapping action delays the completion time of a preceding task, the time change is propagated backward according to the task dependencies, and the completion time of the affected construction task is determined accordingly, avoiding the use of the original task time before the battery swapping arrangement was implemented to evaluate the candidate service chain.
[0053] Once the service chain to be executed is determined, the dispatch controller generates a battery swapping instruction based on the service chain. This instruction includes the equipment being serviced, the service time, the service location, the identity of the delivered battery pack, and the identity of the retrieved battery pack. For battery swapping actions that need to be performed soon, the dispatch controller assigns an action number and a plan version, and locks the corresponding construction equipment, delivered battery pack, retrieved battery pack, and service time period. After obtaining confirmation from both the equipment being serviced and the mobile battery swapping vehicle, the battery swapping action enters the execution preparation state.
[0054] During battery swapping, the following checks are performed sequentially: whether the equipment being serviced is safely shut down, whether the operating mechanism is in a safe state, whether the main circuit current meets the isolation requirements, and whether the contactor is in the specified state. After the electrical isolation conditions are met, the battery swapping execution control unit controls the battery swapping execution mechanism to perform battery pack removal and installation. After confirming that the battery connection is in place, the mechanical lock is engaged, and the battery identity and battery management system communication are verified, power supply to the construction equipment is restored.
[0055] In this embodiment, when performing step 4 to verify the actual recovered reusable battery packs and implement subsequent battery swapping, the battery identity and status used in the planning stage are still predictive information. The actual recovered battery packs may have inconsistent identities or deviate from the planned availability. Therefore, it is necessary to re-verify the actual battery resources after the preceding battery swapping is completed and update the service arrangements based on the verification results to avoid delivering unqualified battery packs to subsequent construction equipment, which could cause power outages. Specifically, this includes: Verify whether the identity of the actual recovered battery pack is consistent with the identity of the reusable battery pack specified in the service chain to be executed, and based on the available energy, allowable output power, temperature and fault status of the actual recovered reusable battery pack, re-determine whether the actual recovered reusable battery pack meets the power supply requirements and allowable power supply conditions of the remaining working section of the subsequent construction equipment when it is used to supply power independently or together with the reserved battery pack of the subsequent construction equipment after delivery. Only when the identity is consistent and the reassessment result meets the requirements will the actually recovered reusable battery pack be updated as a deliverable battery resource; Otherwise, mark it as a battery pack to be inspected or charged, and redetermine the service chain to be executed using the updated actual on-board battery inventory.
[0056] Specifically, after the mobile battery swapping vehicle completes the preceding battery swapping action and obtains the actual recycled battery pack, it first reads and verifies the battery pack's identity information to determine if it matches the reusable battery pack specified in the service chain to be executed. If the identity matches, it further obtains the available energy, allowable output power, temperature, and fault status of the actual recycled battery pack, and uses these actual statuses to reassess whether the battery pack, after delivery, can provide power independently or jointly with the reserved battery packs of subsequent construction equipment to meet the power supply needs and allowable power supply conditions for the remaining working section of the subsequent construction equipment. Only when the battery pack's identity matches and its actual usability meets the delivery requirements is it updated from a pending confirmation battery resource to a deliverable battery resource. If the identity does not match or the actual usability does not meet the delivery requirements, the battery pack will not be used to perform the originally planned subsequent battery swapping action. Instead, it will be marked as a battery pack to be inspected or a battery pack to be charged, and the service chain to be executed will be re-screened and determined based on the battery resources actually carried by the mobile battery swapping vehicle at this time.
[0057] To ensure that planned battery resources correspond to actual battery entities, the system records a unique identity and current location for each battery pack. The location status of a battery pack includes one of the following: power supply position within the construction equipment, onboard storage location in the mobile battery swapping vehicle, temporary storage location, or disassembly / reassembly transition location. At any given time, the same battery pack corresponds to only one location status. Battery packs that have not yet been actually retrieved by the preceding construction equipment can only be marked as unconfirmed battery resources dependent on the successful completion of the preceding battery swapping operation, and cannot be directly used as actual deliverable onboard inventory.
[0058] In practice, battery packs already delivered to construction equipment are removed from the deliverable on-board inventory. Battery packs returned from construction equipment are only added to the deliverable on-board inventory after their identity and status have been verified. Battery packs in transitional disassembly / reassembly positions are not counted in the available power supply configuration of the construction equipment, nor in the deliverable on-board inventory of the mobile battery swapping vehicle. Before each battery swap and transfer, the on-board compartments, allowable load capacity, and temporary storage locations for battery pack disassembly / reassembly on the mobile battery swapping vehicle are verified to ensure that changes in the physical location of the batteries are consistent with changes in the resource status within the battery swapping service chain.
[0059] When a construction task is completed ahead of schedule or delayed, the actual energy consumption deviates from the predicted result, the road for the mobile battery swapping vehicle is closed, or the actual status of the retrieved battery pack changes, the dispatch controller recalculates the subsequent service chain based on the updated construction task status, the location of the mobile battery swapping vehicle, and the actual onboard battery inventory. For battery swapping operations that have already entered the disassembly and assembly stage, they are not directly canceled due to the recalculation of the service chain. Instead, the local battery swapping execution control unit completes the current battery swapping operation or safely terminates it based on the safety interlock status.
[0060] Example 2: like Figure 2As shown, the system includes a dispatch controller 1, a mobile battery swapping vehicle 2, an on-board battery compartment and identification unit 3, a battery swapping actuator 4, a multi-box rock drilling rig 5, a single-box excavator 6, a single-box loader 7, a universal battery pack 8, an equipment controller 9, a construction task interface 10, a power supply isolation and lockout confirmation unit 11, and an operation log unit 12.
[0061] The dispatch controller 1 is responsible for making battery swapping arrangements. It can be located either in the onboard computer of the mobile battery swapping vehicle or in a field server. The construction task interface 10 provides it with information such as what the equipment is currently doing, how much work remains, when shutdown is permitted, and which work areas are allowed to be accessed. The equipment controller 9 provides the equipment location, battery status, and the battery combinations permitted for use. The dispatch controller combines this information with the location of the battery swapping vehicle, its onboard batteries, and travel time to calculate specific battery swapping instructions.
[0062] Mobile battery swapping vehicle 2 is responsible for transporting batteries. The onboard battery compartment and identification unit 3 records which battery is in each compartment and reads its status. The battery swapping actuator 4 removes and inserts the designated battery according to instructions. The power supply isolation and locking confirmation unit 11 checks whether the equipment has disconnected the power supply circuit that needs to be isolated, and whether the battery connection and mechanical locking are in place. The operation log unit 12 records task changes, calculation results, battery swapping instructions, and actual execution results, facilitating verification of the destination of each battery.
[0063] The electrical connection is divided into two parts: power supply connection and control communication. The power terminal of battery pack 8 is connected to the equipment's DC bus through the fuses, contactors, or power management branches configured in the original machine, and then supplies power to the travel motor, hydraulic pump driver, and auxiliary loads. The multi-box trolley still adopts the power supply structure approved by the original machine; for batteries directly connected in parallel, the differential voltage and branch current conditions specified by the original machine must be met.
[0064] The Battery Management System (BMS) provides the device controller and vehicle identification unit with battery number, available power, allowable output power, and fault status via CAN or other industrial communication interfaces. Signals such as connector positioning, mechanical locking, contactor position, and main circuit current are sent to the battery swapping execution control unit via digital input or communication interface. This unit then controls the battery swapping mechanism via a motor driver or hydraulic valve drive module, which is powered by the vehicle's rated power supply.
[0065] The remote dispatch controller can determine the battery swapping sequence, but the actual installation and removal are always controlled by the vehicle's local safety interlock. The actuator must not forcibly swap batteries simply because it receives a dispatch instruction, unless the equipment has been safely shut down, the power supply circuit is not isolated as required, or the mechanical locking state does not meet the requirements.
[0066] This method uses existing compatible batteries and battery swapping mechanisms, and does not require the design of a new mechanical interface. Battery interchangeability depends on the installation and locking interface, rated voltage, communication protocol, and power supply capacity; non-interchangeable batteries will not be used in cross-device distribution.
[0067] 2.1 Information Acquisition by the System: First, establish three types of records.
[0068] The first category is equipment task records, including equipment number, working face, current location, current process, remaining workload, start conditions for the next process, and permitted downtime location or period. For example, the trolley records the number of holes completed, remaining hole depth, and hole group completion status; the loader records the remaining loading cycles and travel tasks. The sequence of drilling, blasting, ventilation, safety inspection, and slag removal is recorded according to the on-site construction plan, without assuming that all equipment can operate simultaneously on the same working face.
[0069] The second category is battery records, including a unique serial number, current location, available capacity, allowed output power, temperature, health status, and fault status. Even if two batteries are of the same model, they should be recorded separately; it is not acceptable to only record the total capacity of a particular model. The available capacity here refers to the actual amount of electricity that can be used within the discharge range allowed by the BMS, and is not equivalent to the battery's nameplate capacity.
[0070] The third category is mobile battery swapping vehicle records, including vehicle location, onboard battery number and location, available battery compartments, rated load, battery swapping time, travel time between service points, and information on road closures and work site access.
[0071] Equipment power consumption can be calculated from voltage and current measurements and correlated with the amount of work already completed. When predicting subsequent tasks, power consumption per meter of borehole under similar rock conditions, power consumption per loading cycle over similar transport distances, or a power consumption estimate directly provided by the equipment controller can be used. Predicted values are adjusted for historical errors with a reasonable margin, and available battery power is corrected for temperature, health status, and the BMS's allowable discharge limit.
[0072] Each record retains both the collection time and the data version. If the task has changed, the data has expired, or communication has been interrupted, the data should be updated first before deciding whether to schedule a new cross-device battery transfer. The safety reserve is included once in the task requirement and is not deducted twice from both the available power and task requirements.
[0073] For clarity in subsequent calculations, j represents the equipment, k represents the battery, q represents the task, and t represents the time; D, X, and L represent the trolley, excavator, and loader, respectively, and M represents the mobile battery swapping vehicle. The table below lists commonly used symbols; other symbols are explained after their corresponding formulas.
[0074]
[0075] 2.2 Determine if the equipment needs power before the next power swap: To determine whether a piece of equipment needs a battery swap, it's crucial to first identify its next task. For example, a trolley might need to complete a non-interrupted drilling operation before moving to a location where a battery swap is permitted; a loader might need to complete its current loading cycle before waiting for the swap vehicle. The order of service cannot be determined solely by the remaining battery percentage of the two pieces of equipment.
[0076] This method defines a work segment as the tasks that the equipment must complete between the current moment and the next confirmed refueling time, the designated completion point of the process, or the permitted safe stopping point. Confirmed refueling means that the planned battery delivery has a source, the vehicle can reach the site, and the site allows for battery swapping. A battery swap that has not yet been implemented cannot be considered as a guaranteed refueling for the equipment.
[0077] The electricity required for the work segment includes the remaining power consumption for the operation, the power consumption for travel, the power consumption for auxiliary equipment during the waiting period, and the safety reserve. Simply put, it means calculating all the electricity that must be used during this period and then leaving a necessary margin. When the expected power of the equipment changes over time, it can be calculated according to formula (1).
[0078] (1) In the formula, The amount of electricity required for device j to complete this work segment starting from time t; This is the end time of this work segment; The estimated power consumption of the work and auxiliary equipment; the integral represents the cumulative power consumption over this period. This refers to the driving power consumption not yet included in the aforementioned power curve. For safety reserves, when power is measured in kW and time in h, the result is in kWh. Power consumption during driving or waiting, if already included in the power curve, will not be added separately.
[0079] When a continuous power curve is unavailable, the remaining number of holes, drilling meters, loading times, and travel distance can be estimated individually and then summed. Both calculation methods are used to obtain the same task requirements, and the equipment is not required to use a particular prediction algorithm.
[0080] After receiving the task requirements, it is necessary to check the power supply conditions before and after the battery swap. Before the swap, the existing battery must be able to support the equipment's operation or safely wait for the vehicle to arrive; after the swap, the newly installed battery and the retained battery must be able to support the next work segment. The check includes whether the power is sufficient and whether the power supply capacity meets the requirements, as shown in equation (2).
[0081]
[0082] (2) In the formula, Let represent the set of batteries installed on device j at time t and capable of supplying power. Sum represents adding up the available power of these batteries. For mission requirements. This indicates the actual allowable output power of the battery pack. Indicates equipment The required power at any given time. The two lines of formulas respectively express whether the battery capacity is sufficient to complete the task and whether the output power is sufficient to drive the equipment. When the power output allowed by the battery pack is lower than the power required by the equipment at that time, the main circuit of the equipment cannot operate. This is a failure to meet electrical constraints, not a discount to the optimization objective, and this solution is directly eliminated.
[0083] For example, if the existing battery has a total capacity of 55 kWh and the newly installed battery has a capacity of 28 kWh, totaling 83 kWh, but subsequent tasks, including safety reserves, require 88 kWh, then this solution cannot be used. Even if the total capacity is sufficient, it cannot be used if the allowable output power of the battery pack does not meet the drilling requirements.
[0084] 2.3 Select the battery to replace based on the task of the next device: Taking the example of a battery swapping cart first serving a multi-box cart A and then a single-box device B, when selecting a cart to swap batteries, it is necessary to take care of both devices simultaneously: the battery taken away cannot have too little power, otherwise there will not be enough for the next device; nor can too much power be taken away, otherwise the cart will not be able to complete its task after the swap.
[0085] The replaced battery is not recharged and is directly sent to the subsequent equipment. Two physical constraints jointly determine which battery to replace. First, the battery is a single unit; its capacity can only be the actual value of the existing battery, not arbitrarily adjusted. Second, the battery is not recharged; its capacity will only decrease during transport, not increase; this loss is transport loss and cannot be recovered. Therefore, the actual amount of power that the subsequent equipment can use equals the capacity of the preceding equipment when it was removed minus the loss. Based on these two constraints, how much the preceding equipment can take (limited by the task after replacement) and how much the subsequent equipment needs to receive (limited by task requirements) refer to the same capacity of the same battery; the area between these two points is the transferable range for process continuity. This range is determined by physical constraints, not by scheduling preferences. An empty range indicates that the tasks of the two devices cannot be simultaneously satisfied under this transfer method; it is an unsolvable problem, not a failure to account for it.
[0086] First, calculate how much electricity the trolley is allowed to take. Let the total usable electricity on the trolley before the battery swap be... The battery c that the electric vehicle is preparing to install has Battery level, the battery k to be removed Battery life, required for the task after the trolley replacement. The power consumption during the battery swapping process, which is borne by the trolley and not yet included in the task requirements, is... The power consumption after the trolley is replaced should satisfy equation (3).
[0087] (3) In the formula Indicates the available power after the trolley is replaced, indicated by the superscript. The plus signs and plus signs represent the state before and after battery swapping, respectively. The meaning of this formula is: the original power supply minus the power removed, plus the power installed, minus the power consumed during battery swapping, and the remaining amount must be enough for the trolley to continue operating.
[0088] Next, calculate the minimum amount of electricity required for the next device. Assume the task requires [electricity] after device B is replaced. The battery charge, the loss of battery k from being removed from the trolley to being delivered to equipment B is... Then it needs to satisfy equation (4). The losses here include battery self-consumption and power consumption during inspection, etc. Other power consumption consumed by the battery swapping vehicle during operation is not included in this battery.
[0089] (4) This formula indicates that the battery supplied to device B, after deducting losses during transit, must still be sufficient to complete its next stage of the task. Because device B uses a single-pack power supply, the removed old battery cannot continue to share the task with the new battery.
[0090] Combining the two requirements above, we get equation (5).
[0091] (5) The left side of the formula represents the minimum amount of electricity that should be taken to ensure the next piece of equipment has enough power, while the right side represents the maximum amount of electricity that the trolley itself can take. This method defines the range between the upper and lower limits as the process continuity transferable range, which is the range of battery power that can be swapped out to simultaneously meet the needs of the tasks of the preceding and following equipment.
[0092] The system then checks the actual batteries on the cart block by block, retaining only those with a charge level within the specified range and compatible with the power requirements of both devices. If the lower limit is greater than the upper limit, it means that the two tasks cannot be handled simultaneously under the current arrangement; even if the range exists, the arrangement cannot be executed if there are no actual batteries with the corresponding charge level on the cart. For example, if the calculation requires the removal of batteries with a charge level of 28 to 32 kWh, but the cart only has 20 kWh and 40 kWh batteries available, the delivery batteries still need to be replaced, and the service sequence or time needs to be adjusted.
[0093] The battery level used here is the estimated charge level at the time of the battery swap. The equipment may still be operational before the battery swap vehicle arrives, so the current charge level cannot be directly taken as the charge level at the time of the swap. If the service time changes, the remaining charge level of the vehicle, the task requirements of subsequent equipment, and transportation losses should all be recalculated.
[0094] Considering the errors in power and power consumption prediction, a conservative value is used for verification before execution: the battery power is calculated based on a reliable lower bound, and the task requirements and losses are calculated based on an upper bound, as shown in equation (6).
[0095] (6) In the formula, the superscript low indicates the lower bound, and the superscript up indicates the upper bound; This indicates the battery pack before the trolley undergoes battery swapping. After removing the 'k', the actual battery remaining on the trolley is the value. The first line checks if the remaining batteries plus the new batteries are enough for the trolley. The second line checks if the retrieved batteries, after being transported, are enough for the next device. Directly calculating the remaining battery capacity avoids double-counting errors related to the total trolley capacity and the batteries removed.
[0096] Therefore, the task of subsequent equipment is not considered only after the previous battery swap is completed, but rather it participates in the selection of the batteries swapped out in advance. For the preceding trolley, a set of swappable batteries can be formed that does not affect its continued operation; for subsequent equipment, a set of receiving batteries sufficient to undertake its task can be formed. Only actual batteries that belong to both sets simultaneously are included in the comparison for subsequent routes.
[0097] 2.4 The role of battery supply and reconfiguration in single-pack equipment: Battery transfer can also be done in reverse. For example, an excavator has just completed a power-intensive task and still has a high remaining battery, but only needs to travel a short distance; the trolley is about to perform a longer drilling task. In this case, the battery swapping vehicle can first replace the original battery with a battery with a lower charge but sufficient to complete the excavator's subsequent tasks, and then send the recovered higher-charge battery to the trolley to replace one of the trolley's batteries.
[0098] The reverse transfer is checked according to the same principles: the battery received by the excavator must be sufficient for its remaining tasks; the battery received by the trolley, combined with the reserved battery, must be sufficient for the trolley's use; the timing, route, and power supply compatibility of both battery swaps must meet the requirements. The excavator's still necessary power cannot be removed simply because the trolley is out of power.
[0099] The following supplementary calculations quantitatively explain why reconfiguration can reduce the need for external power replenishment before the current task begins. Between the two devices, the battery swapping vehicle is only responsible for transportation and does not provide additional power to either device. The net transferred power is the difference between the increase and decrease in available power between the two devices.
[0100] Let s be the margin of the trolley exceeding its own task requirements. And s is not less than 0, where, This indicates the total available energy of the power supply configuration of construction equipment D after the battery swap is completed; This represents the energy required to power the remaining work section after the battery swap of construction equipment D; the remaining power shortage for a single unit is d= And d is greater than 0; where, This indicates the energy required for the remaining working section of construction equipment L after the battery swap is completed; This indicates the available energy of the battery pack of the construction equipment L to be delivered at the time of delivery, that is, the energy that can actually be used to supply power after deducting the energy loss during transportation. The net amount of electricity transferred from the trolley to the single-box equipment through battery swapping is δ. The net transfer amount is the difference between the increase and decrease in electricity between the two, and is not simply equal to the total amount of electricity of a single battery that was moved.
[0101] If δ exceeds the spare capacity s of the trolley, the excess needs to be replenished to the trolley; if δ is less than the gap d of the single-box equipment, the remaining amount still needs to be replenished to the single-box equipment. Therefore, the minimum available power that needs to be replenished for both equipment can be calculated according to formula (7).
[0102] (7) In the formula, and The available power for the additional supply trolley and the single-box equipment must not be negative, and must respectively meet the following requirements. ≥δ s and ≥d δ; B(δ) represents the total amount of electricity that still needs to be replenished after the net transfer. The square bracket subscript + indicates that only positive values are taken: if the value inside the brackets is greater than 0, the number is taken; if it is less than or equal to 0, 0 is taken.
[0103] For example, if the trolley has a surplus of 10 kWh and a single-unit device is short of 8 kWh: if a net transfer of 8 to 10 kWh is made, neither device needs additional power for this task; if only 5 kWh is transferred, the single-unit device will still be short of 3 kWh; if 12 kWh is transferred, the trolley will be short of 2 kWh. It is clear that transferring too little or too much power may leave behind avoidable power replenishment needs.
[0104] The net transfer amount is divided into three cases: below the smaller value of s and d, in between, and above the larger value of s and d. Expanding Equation (7) in each case yields Equation (8).
[0105] (8) The first term of equation (8) represents the portion of the total power of the two devices that is indeed insufficient; the second term represents the additional gap caused by the transfer amount deviating from the appropriate range. dist represents the distance to the range: 0 when it falls within the range; the difference between the lower limit and the number when it is below the lower limit; the difference between the number and the upper limit when it is above the upper limit. When the transfer amount is within the range, there are two situations: either the trolley's spare capacity is sufficient to cover the gap of a single box, or the total gap still exists but has not been expanded due to incorrect allocation; the amount of deviation from the range will increase the additional energy replenishment demand.
[0106] The actual battery being transported is a complete battery; it's not possible to arbitrarily cut out 8 or 10 degrees of electricity. Therefore, based on the actual battery serial numbers and allowed exchange combinations, a set A of achievable net transfer amounts is listed, with 0 added for the case of no exchange. These choices are iterated through, and the minimum distance from each to the aforementioned suitable range is taken, denoted as [missing information]. This is called the configurational energy gap, as shown in equation (9).
[0107]
[0108] (9) This represents the minimum additional gap left due to the inability to allocate power exactly to the appropriate locations, given a practical battery configuration. This represents the minimum external energy replenishment within this comparison range. Configurational energy replenishment gap. This is the minimum additional energy that must remain due to the inability to arbitrarily divide the battery capacity, given a specific battery configuration, and is used as an independent criterion. The feasibility of the entire service route is still determined by the aforementioned joint calculation of complete inventory and route.
[0109] 2.5 Determine the battery swapping procedure based on the construction sequence: Battery swapping times must comply with on-site construction arrangements. For example, if drilling cannot be stopped midway, the only permitted stop time after the borehole is completed can be chosen; if the loader is in a state where it cannot stop operating, the battery cannot be immediately removed just because the battery swapping vehicle arrives. The equipment can continue to operate while the battery swapping vehicle is traveling, and it should be safely stopped and the power supply isolated only when the actual battery swap is performed.
[0110] The system records the start conditions, estimated duration, equipment used, and work surface for each task. If a subsequent task requires waiting for the completion of the previous task and a necessary safety interval, it is calculated according to formula (10).
[0111] (10) In the formula, p and q represent the preceding and following tasks, respectively. , At the start time, The duration of the previous task. A safety or process interval that must be maintained between two tasks. Task relationship set. Record which tasks have this sequential requirement. The formula states that a later task cannot begin before the previous task is completed and after a specified interval.
[0112] During blasting warnings, ventilation, and safety checks, the equipment may be in a waiting state, but this does not mean that the battery swapping vehicle can enter. A battery swapping period is only permitted when on-site work permits allow entry and the equipment is allowed to be shut down. The service route avoids closed roads and restricted areas.
[0113] Once these conditions are met, the system prioritizes utilizing the equipment's existing normal waiting time. For example, if the equipment normally waits for 10 minutes, while battery swapping requires 5 minutes, and these 5 minutes fall entirely within the allowed entry and battery swapping waiting period, no new work interruption will be added. If 2 minutes exceed the normal waiting time, the extra 2 minutes will be recorded first, and then it will be calculated whether it will delay subsequent construction.
[0114] Assume this battery swap starts from... Begin, Continue The normal gap is from to Equation (11) calculates the time when the battery swapping and normal intervals coincide. And the battery swapping time not covered by normal gaps .
[0115] (11) In the formula, min takes the smaller value and max takes the larger value, and the meaning of the positive part sign is the same as described above. When there are multiple normal gaps, the overlapping gaps are first merged, and then the intersection of the battery swapping time and each gap is calculated to avoid double counting.
[0116] An extra 2 minutes in a localized area may not necessarily extend the overall construction cycle by 2 minutes, but it could potentially affect multiple subsequent tasks. The system should recalculate the start and finish times of subsequent tasks based on their sequence. These new times for each task will then impact subsequent battery swapping needs, therefore requiring comparison with battery selection and vehicle routes.
[0117] 2.6 Record the actual whereabouts of the battery and check the vehicle service status: Each time a mobile battery swapping vehicle completes a service, the number of batteries on board changes. Which battery can be delivered at the next stop depends on which batteries were actually delivered and which were actually retrieved this time. Therefore, the system records the battery number for each battery individually, rather than simply recording the total charge on the vehicle.
[0118] First, each battery can only be in one actual position at any given time. The battery compartment, battery swapping vehicle compartment, legal temporary storage location, and transitional location during disassembly and assembly are all recorded and represented by equation (12).
[0119] (12) In the formula, L represents the set consisting of all the above positions; The value is 1 when battery k is at position j, and 0 otherwise; the sum of all position marks for the same battery must equal 1. When a battery is in a transitional position between installation and removal, it cannot be recorded as a battery that is being used by the equipment, nor as a battery that is already ready for delivery on the vehicle.
[0120] Secondly, the available power of the same battery needs to be updated during use. When the equipment continues to work, its actual power consumption is deducted, and when it is removed for transportation, the corresponding loss is deducted. The battery will not be restored to full charge just because its position is changed. For the transfer process without charging, it is calculated according to formula (13).
[0121] (13) In the formula, and These represent two separate moments, one before and one after. This indicates the available power of battery k; This represents the actual discharge power that the battery can handle, and its integral is the amount of electricity consumed between two points in time. For battery pack k at time ; output power; This indicates that the power loss has not yet been included in the power integration. The amount of power each package of the multi-box trolley carries is determined according to the actual power supply method of the original machine, and the output power of each package cannot be arbitrarily allocated if the equipment does not support it. When the battery is transferred without charging, the available power of the battery will only decrease, not increase. This energy constraint, together with the position unique constraint of equation (12), jointly ensures that which battery the subsequent equipment can receive and how much power is left is entirely determined by the actual result of the battery swap of the preceding equipment, and is not guaranteed unilaterally by the scheduled plan.
[0122] Record the h-th service as =( , , , ),in For the equipment being serviced, For the start time of service, For delivery of battery serial number, To retrieve the battery number. After delivery is completed and the retrieved battery passes inspection, the update relationship of deliverable batteries on the vehicle is shown in Equation (14).
[0123] (14) In the formula This refers to the set of batteries available for delivery on the vehicle prior to this service. This formula represents removing already delivered batteries from the inventory. Then add the recovered and inspected products. If a returned battery is found to be defective, its actual storage location will be recorded and marked as pending inspection or charging; it will not be added to the deliverable collection.
[0124] When developing a plan, the battery to be retrieved in the future can be scheduled to service the next device, but this step should be indicated as dependent on the successful retrieval of the previous battery. During execution, the battery must be actually obtained and inspected before delivery can proceed as planned. If the inspection fails, subsequent actions dependent on it should be cancelled; the next device should not be assured of a battery swap as originally planned.
[0125] Vehicle time is accumulated in chronological order: only after completing this battery swap can the vehicle proceed to the next device and begin the next battery swap, as shown in equation (15).
[0126] (15) In the formula This is the start time of this service. The time required for this battery swap is as follows: The travel time between the service locations of the two devices. For the start time of the next service, and They represent the first The and the first Each battery swap operation corresponds to a service installation or service location. Even if the battery is correctly assigned, if the vehicle cannot arrive on time, the plan must be excluded or rescheduled.
[0127] Each step requires checking the vehicle's storage space, load capacity, and temporary storage location during installation and removal. If the vehicle's storage space is full, battery swapping can only continue if the existing battery swapping facility has a permitted temporary storage location and can complete the handover. The next stop is only calculated after the battery location, available power, and vehicle location in the service record are updated.
[0128] 2.7 Select a battery swapping arrangement from multiple feasible options: The system first determines whether a plan is feasible, and then compares the execution results. For example, if a route is relatively short, but the recovered batteries are not suitable for the next device, or the device is no longer operational when it arrives, it will be directly excluded without being included in the comparison.
[0129] One feasible calculation method is to list the options step by step. First, list the candidate service times based on the task end point, the allowed battery swapping period, and the set time interval; then list the next device to be serviced, the deliverable batteries on the vehicle, and the batteries that can be retrieved from the device. For batteries that are to be transferred again, use Equation (5) and the corresponding power supply conditions for screening; for reverse transfers, check according to the conditions in 2.4.
[0130] For each candidate action identified, the remaining power of each device, the number of batteries on the vehicle, the vehicle's location, and the current stage of the task are temporarily calculated after the action is completed. The next action is then calculated based on these results. The entire process is halted if any step fails due to insufficient time to reach the destination, lack of available batteries, or insufficient device power.
[0131] Since the task at the next station will affect which battery should be picked up at the previous station, multiple preceding candidates should be retained for comparison during the calculation. It's not advisable to fix one swap packet first and then independently arrange the route. Instead, list the preceding and following services and the batteries involved, and then incorporate the two services that pass the checks into the subsequent plan.
[0132] For feasible solutions, this implementation method compares them in the following order: first, compare when all the specified construction tasks are completed, and prioritize those that are completed earlier; if the completion times are the same, compare the time occupied by the newly added battery swapping; if they are still the same, compare the number of return replenishment times; finally, compare the energy consumption of the battery swapping vehicle's travel and the battery swapping process. This item-by-item comparison method is represented by equation (16).
[0133] (16) In the formula, To specify the latest completion time for the construction task, To accumulate the additional battery swapping time, To return the number of supply replenishments, This refers to the energy consumption for the mobile battery swapping vehicle's operation and battery swapping; the subscript lex indicates that the items are compared one by one in the aforementioned order. Since the units for each item are different, minutes, number of swaps, and energy consumption are not directly added together.
[0134] If a critical process must be completed before a specified time, this requirement should be treated as an inviolable condition. The comparison order can also be adjusted on-site, and the adopted rules should be recorded. If none of the solutions meet the conditions, the system should explain the reasons and arrange routine resupply or necessary safety shutdowns.
[0135] When the number of devices is small, a complete set of finite candidate solutions can be listed and compared. When the number is large, one confirmed executable solution can be retained first, and other solutions can be searched step by step, eliminating branches that are obviously infeasible or unlikely to improve the result in advance. Within a set time range and time interval, all candidates are fully compared to determine the service chain to be executed. When the number of candidates exceeds the calculation time limit, the currently verified optimal feasible solution is output.
[0136] In practice, only actions that need to be performed in the near future are issued. Service arrangements that are further in the future are reserved as conditional follow-up plans, and will be checked again after the task and battery status are updated, in order to avoid mechanically executing arrangements that have become invalid after changes in the field.
[0137] 2.8 Actual actions of the battery swapping plan conversion: Figure 3 Provide the overall process. Figure 4 The state changes during the battery swapping process are described. The specific steps are as follows.
[0138] S101 Collects on-site information. Reads construction tasks, equipment locations, permitted battery swapping periods, battery numbers and statuses, as well as the location, compartment, and batteries of the battery swapping vehicle. Verifies the collection time of each data point; if expired or conflicting records are found, reconfirm them first.
[0139] S102 Calculate task requirements. Determine the tasks that must be completed for each device before it can be swapped or safely shut down, estimate power and energy requirements, and record the latest time when service is needed, which tasks cannot be interrupted, and which areas are off-limits.
[0140] S103 lists the battery transfer options. These include transferring from the trolley to a single-unit device, transferring from the single-unit device to the trolley, and a standard battery swap using the existing onboard battery. Since the previous battery retrieval plan needs to be utilized, this step simultaneously checks the task requirements of both the preceding and following devices.
[0141] S104 Compare service arrangements. Calculate the different battery delivery, battery return, service times, and routes sequentially; update the battery, vehicle, and task records after each simulation action is completed. Eliminate unfeasible options, and then select the arrangements to be executed in the order of 2.7.
[0142] S105 Confirm Recent Actions. The instruction must include at least the action number, plan version, equipment number, delivered and retrieved battery numbers, service location, and permitted start time. Once both the equipment and the battery swapping vehicle are confirmed, the system enters a ready state and locks the batteries and time slots involved to prevent the same battery from being assigned to two incomplete actions simultaneously.
[0143] S106 Disassembly and assembly are performed. After the vehicle arrives, verify the work permit, equipment shutdown, and safety status of the operating mechanism, and check the main circuit current and contactor status. After completing the necessary power supply isolation according to the original machine procedure, remove and install the designated battery; only after confirming that the connection is in place, the mechanical lock is engaged, the battery is identified, and communication with the BMS is established, power supply to the equipment is restored.
[0144] S107 Inspect the retrieved battery. Read the actual available power, temperature, fault status, and insulation condition, and compare them with the requirements of subsequent tasks. Only batteries that pass the inspection are marked as ready for direct transfer; unqualified batteries are recorded as pending inspection or pending charging, and subsequent deliveries relying on them are cancelled.
[0145] S108 Update for the next service. Write the actual time taken, actual battery status, and on-site task progress back to the system. Continue service if subsequent conditions are still met; otherwise, reselect batteries, adjust routes, or arrange resupply, and provide the affected equipment with updated estimated service times and necessary operational restrictions.
[0146] Recalculation can be triggered by task completion, significant deviations from predicted power consumption, road closures, or changes in battery status; fixed-period updates are also possible. Actions already in the disassembly / reassembly process are completed or safely aborted by the local control unit, without being arbitrarily altered by new scheduling results. In the event of a communication interruption, the local unit executes necessary safety controls to halt any new, unconfirmed battery swapping actions.
[0147] The present invention has the following specific beneficial effects: (1) By imposing reverse restrictions on the preceding replacement packs through subsequent tasks, task gaps on one side are avoided by selecting recycling batteries solely based on the highest or lowest SOC. In Example 1, only the 30 kWh recycling pack simultaneously meets the needs of both parties, providing a verifiable selection basis.
[0148] (2) By leveraging the difference in task applicability between multi-pack and single-pack equipment, the same battery can be used in different equipment configurations. Given resources and task conditions, multiple outgoing services can be initiated using a partially charged onboard pack, reducing the need to return for resupply in order to obtain a suitable battery.
[0149] (3) Service timing is determined by the process window, travel time, and energy cutoff constraints. Battery swapping should be embedded within the existing normal gap of the equipment as much as possible; it should be completed within the gap to avoid adding new work interruptions; only the part exceeding the gap is counted as additional battery swapping. This reduces additional downtime and delays in critical processes.
[0150] (4) By confirming and updating the actual status of the recycling packs, we can avoid the inconsistency between the planned inventory and the actual inventory, which could lead to subsequent supply disruptions. By verifying the energy and power at each moment, we can avoid intermediate failures caused by judging based solely on the total power consumption.
[0151] (5) Configuration optimization improves the availability of existing batteries for specified operations, reducing unnecessary refueling and resupply travel before the current work segment. The physical electrical energy consumed by the equipment to complete the same task is not reduced due to the exchange itself. The technical effect of this invention is reflected in reducing resupply travel and waiting, and eliminating avoidable return resupply and its transportation energy consumption.
[0152] Example 3: To further illustrate how to determine usable battery packs based on the remaining power supply requirements of preceding and subsequent construction equipment when transferring battery packs from multi-battery-pack equipment to single-battery-pack equipment, and how to complete two related battery swapping operations using a mobile battery swapping vehicle, the following example illustrates the transfer of battery packs from a three-box trolley to a single-box loader. This embodiment mainly describes the bidirectional screening of candidate battery packs, the determination of usable intervals for process continuity, and the process by which the mobile battery swapping vehicle executes the candidate service chain according to the allowed battery swapping window.
[0153] The three-box trolley, single-box loader, and mobile battery swapping vehicle use compatible batteries, and the voltage, power, and interface of the battery packs used all meet the original machine requirements. This embodiment is for a normal temperature, stationary, short-distance transport condition. Transport losses and auxiliary power consumption for battery swapping are calculated based on the measured lower limit and can be ignored under this condition. For other conditions, losses and error margins are still calculated using the aforementioned method.
[0154] When the service is started, the trolley has three batteries with capacities of 37, 31, and 25 kWh respectively, the loader has a battery with a capacity of 11.5 kWh, and the battery swapping vehicle carries a battery with a capacity of 28 kWh. It takes 5 minutes for the battery swapping vehicle to travel to the trolley, and another 5 minutes for the trolley to travel to the loader. Each battery swap takes 5 minutes.
[0155] Within the first 5 minutes, the trolley completes its current short task, consuming 2 kWh and 1 kWh of electricity from the first two batteries, respectively. Therefore, when the battery swapping cart arrives at the trolley, the three batteries have 35, 30, and 25 kWh of electricity, totaling 90 kWh. The trolley is allowed to swap batteries between the 5th and 10th minute. The operation from the swapped battery to the 60th minute requires 80 kWh, with an additional 8 kWh safety reserve. =88 kWh.
[0156] The loader completes its current task within the first 15 minutes, consuming 1.5 kWh. By the 15th minute, the original battery has 10 kWh remaining. The loader is allowed to swap batteries between the 15th and 20th minutes. The subsequent task up to the 60th minute requires 25 kWh, with an additional 5 kWh safety reserve. =30 kWh. Both devices operate within their respective authorized work areas, without assuming simultaneous drilling and loading on the same work surface.
[0157] Now, we're installing a 28 kWh battery from the battery swapping vehicle onto the trolley. We need to determine which battery should be removed. To meet the loader's needs, at least 30 kWh of battery should be removed; to ensure the trolley still has 88 kWh after the swap, a maximum of 90 + 28 kWh can be removed. 88 = 30 degrees. Therefore, only the battery with 30 degrees meets both requirements. The comparison of the three options is as follows.
[0158]
[0159] After selection, the battery swapping vehicle swaps the battery for the trolley between the 5th and 10th minute. After the swap, the trolley retains two batteries (35 kWh and 25 kWh), plus the newly installed 28 kWh battery, for a total of 88 kWh. The battery swapping vehicle obtains the 30 kWh battery and inspects it for compliance. It then travels for 5 minutes, and between the 15th and 20th minute, swaps the 30 kWh battery for the loader, recovering the loader's original 10 kWh battery. See the table below for the specific timing. Figure 5 .
[0160]
[0161] By the 60th minute, the trolley had 8 kWh of safety reserve remaining, the loader had 5 kWh of safety reserve remaining, and the battery swapping vehicle carried the recovered 10 kWh of battery. The initial total power was 132.5 kWh; the power consumption during construction was 3 + 1.5 + 80 + 25 = 109.5 kWh; and the final remaining power was 23 kWh, consistent with the initial estimate.
[0162] The purpose of this arrangement is as follows: the battery swapping vehicle starts with only one 28 kWh battery, which cannot directly meet the loader's 30 kWh requirement; through a single battery exchange on the trolley, the battery swapping vehicle obtains a battery that can serve the loader, while the trolley can still complete its own task. Removing the lowest capacity 25 kWh battery will cause the loader to lack 5 kWh; removing the highest capacity 35 kWh battery will cause the trolley to lack 5 kWh.
[0163] If the strategy used for comparison only allows delivery of the batteries already carried at departure, and the journey from the starting point to the resupply point takes 15 minutes, battery swapping takes 5 minutes, and then to the loader takes another 15 minutes, then the loader will not arrive until the 35th minute, and the battery swap will be completed in the 40th minute, 20 minutes later than the originally planned start time of the 20th minute. This comparison is based on the listed resource and time conditions. A new comparison will be made if the number of spare batteries, vehicle location, or permitted service methods change.
[0164] Example 4: Example 3 described above illustrates the process of transferring the battery pack removed from the rock drilling rig to a single-battery-pack device. To further illustrate that cross-device battery reconfiguration can also be carried out in the opposite direction, the following example uses an excavator powered by a single-battery-pack as the preceding construction equipment and a rock drilling rig powered by multiple battery packs as the subsequent construction equipment to illustrate the process of combining the battery pack removed from the excavator with the remaining battery pack of the rock drilling rig to provide power, taking advantage of the differences in the remaining task requirements and battery configuration methods of different construction equipment.
[0165] The excavator has completed its main power-consuming tasks, with 35 kWh remaining on its primary battery. However, it only needs 15 kWh for continued operation and safety reserves. The trolley has three batteries, each with 20 kWh, totaling 60 kWh. The remaining tasks, including safety reserves, require 75 kWh. The battery swapping vehicle has one 15 kWh battery.
[0166] The above-mentioned power levels represent the expected available power at the corresponding service time, assuming that the time period, travel time, and power supply combination for both services meet the requirements. The battery swapping vehicle first loads a 15 kWh battery into the excavator and then retrieves a 35 kWh battery. Although the excavator is equipped with a lower-capacity battery, it still has enough power to complete its task.
[0167] The battery swapping vehicle then delivers the 35 kWh battery to the trolley, replacing one of the 20 kWh batteries. The trolley then has a total of 35 + 20 + 20 = 75 kWh, meeting the task requirements; the battery swapping vehicle then retrieves the 20 kWh battery. Before the swap, the total battery capacity was 35 + 60 + 15 = 110 kWh; after the swap, it is 15 + 75 + 20 = 110 kWh. The change is in battery distribution, not an increase in total battery capacity.
[0168] This example demonstrates that even if a single-pack device has not yet reached the low-charge battery swapping threshold, it can still participate in battery reconfiguration that facilitates construction continuity. However, this should only be implemented when additional battery swapping space, travel time, and trolley service period all allow for it; it cannot be assumed that this arrangement is necessarily better based solely on battery charge calculations.
[0169] Example 5: During actual construction, battery status, task progress, mobile battery swapping vehicle travel time, and work site permitting conditions may change, potentially rendering the originally planned battery pack unusable or the original service chain unable to continue. To address these situations, the system adjusts battery resources, servicing equipment, or service times according to the updated actual status, and if an executable service chain still cannot be formed, it switches to normal replenishment or safe shutdown. The following describes the corresponding anomaly handling methods and other optional implementation methods.
[0170] If a battery that can simultaneously satisfy the tasks of both the preceding and following equipment cannot be found, the system may attempt to replace the onboard delivery battery, change the equipment being served, or adjust the service schedule. If these methods are still not feasible, routine resupply or necessary safety shutdown will be arranged. When a change to the construction task is required, it must be confirmed by the field task interface; the system cannot cancel the drilling task or shorten safety procedures on its own to make the calculation results meet the conditions.
[0171] If the battery interface is incompatible, or if the temperature, insulation, fault, or connection status is unqualified, the cross-device transfer will not be performed. If the battery charge is lower than predicted, the actual vehicle usage time increases, or the subsequent equipment tasks change, all affected subsequent services will be re-examined, not just the current station.
[0172] Mobile battery swapping vehicles can carry fully charged and partially charged batteries; whether to use them depends on the receiving equipment's mission. Recycled batteries that cannot be directly transferred are still sent for inspection or charging as usual; the system does not require every recycled battery to be reused immediately.
[0173] One or more mobile battery swapping vehicles can be used, or one or more batteries on a vehicle can be swapped at a time. When swapping multiple batteries at once, the numbers of the batteries actually swapped out and installed should be recorded separately, the total charge should be calculated, and the combination conditions after each disassembly and assembly step and power restoration should be checked.
[0174] When batteries need to be transferred between multiple battery swapping vehicles, an actual handover process should be added, recording the handover location, start and end times, and the numbers of the vehicles giving and receiving the batteries. Only after the handover and inspection are completed can the receiving vehicle use the battery for subsequent services; the batteries of two vehicles should not be considered readily available for mutual use in the calculation.
[0175] Task requirements can be predicted from historical power consumption or provided directly by the device controller; candidate solutions can be compared using methods such as complete enumeration, branch and bound, or time-limited search. Specific algorithms can be replaced, but the following execution relationships must be maintained: subsequent tasks participate in the selection of preceding batteries; preceding equipment can still complete the task after replacement; delivery continues only after the recovered battery is actually obtained and inspected for compliance; the entire process must meet construction time and power supply conditions.
[0176] Example 6: Based on the same inventive concept, this invention also provides a cross-device battery reconfiguration mobile battery swapping system, such as... Figure 6 As shown, it includes: The determination module is used to determine the remaining working section and allowed battery swapping window for each of the multiple construction equipment before the next refueling opportunity, based on the construction task progress, process dependencies and work surface permit conditions. A construction module is used to determine a reusable battery pack from the candidate battery packs of the preceding construction equipment based on the power supply requirements of the remaining working section after the battery swap of the preceding construction equipment and the power supply requirements of the remaining working section of the subsequent construction equipment, and to establish a candidate service chain by associating the reusable battery pack with the preceding battery swap action and the subsequent battery swap action. The marking module is used to perform executability verification on the candidate service chains based on the driving and battery swapping sequence of the mobile battery swapping vehicle, the battery resource status and the allowed battery swapping window, determine the service chains to be executed, and mark the reusable battery packs in the service chains to be executed that have not yet been actually recovered as battery resources to be confirmed. The verification module is used to perform the preceding battery swapping action according to the service chain to be executed, to verify the identity and availability status of the actually recovered reusable battery pack, and after the verification is passed, update it as a deliverable battery resource, and the mobile battery swapping vehicle directly transfers it to the subsequent construction equipment to perform the subsequent battery swapping action without charging. If the verification fails, cancel the subsequent battery swapping action associated with the reusable battery pack, and re-determine the service chain to be executed.
[0177] Preferably, determining the remaining work segments in the module and the power supply requirements for the remaining work segments includes: Based on the execution sequence of the construction tasks, the next target node is determined from the next energy replenishment opportunity confirmed by the arrival time of battery resources and mobile battery swapping vehicles, the designated process completion point or safe stopping point, and the tasks that the construction equipment must complete from the current time to the next target node are determined as the remaining work segments of the construction equipment. The energy required for the remaining work segment is obtained by adding the power consumption of the remaining work segment, the power consumption of driving (not included in the power consumption of the work segment), the power consumption of auxiliary power consumption during waiting, and the safety reserve. The power demand is determined based on the expected power of each task in the remaining work segment, and the energy and power demand required for the remaining work segment are determined as the power supply demand for the remaining work segment.
[0178] Preferably, the construction module determines a reusable battery pack from the candidate battery packs of the preceding construction equipment, including: Based on whether the power supply configuration formed after the preceding construction equipment replaces the candidate battery pack with the battery pack carried by the mobile battery swapping vehicle meets the power supply requirements of the remaining working section of the preceding construction equipment, the first candidate battery pack set is determined. Based on whether the selected battery packs, after deducting the energy loss during the period from collection to delivery, meet the power supply requirements of the remaining working section after the subsequent construction equipment has been swapped when powered alone or when powered together with the reserved battery packs of the subsequent construction equipment, a second set of candidate battery packs is determined. Select candidate battery packs from the intersection of the first candidate battery pack set and the second candidate battery pack set, and verify whether the power supply configuration of the preceding construction equipment and the subsequent construction equipment after battery swapping meets the battery compatibility and allowable power supply conditions. The candidate battery packs that pass the verification are determined as reusable battery packs.
[0179] Preferably, the preceding construction equipment is a rock drilling rig with multiple replaceable battery packs, and the subsequent construction equipment is an excavator or loader powered by a single battery pack, and the preceding battery pack replacement operation involves screening the candidate battery packs in the construction module, including: The lower limit of the available energy of the selected battery pack is determined by the sum of the energy required for the remaining operation section after the subsequent construction equipment battery swap and the energy loss of the selected battery pack from the time of collection to delivery. Add the total available energy of the battery pack of the preceding construction equipment at the start of the candidate battery swap to the available energy of the battery pack to be installed, and then subtract the energy required for the remaining operation section after the preceding construction equipment swaps the battery, as well as the power consumption of the battery swap process undertaken by the preceding construction equipment that has not yet been included in the energy required for the remaining operation section, to obtain the upper limit of the available energy of the candidate battery pack. From the candidate battery packs of the preceding construction equipment, select battery packs whose available energy is not lower than the lower limit of available energy and not higher than the upper limit of available energy, and determine the candidate battery packs that pass the battery compatibility and allowable power supply conditions verification as reusable battery packs.
[0180] Preferably, when the preceding construction equipment is an excavator or loader powered by a single battery pack, and the subsequent construction equipment is a rock drilling rig with multiple replaceable battery packs; the determination of the reusable battery pack in the construction module includes: From the battery packs carried by the mobile battery swapping vehicle, select the battery packs whose available energy is lower than that of the candidate battery packs of the preceding construction equipment, and which meet the power supply needs of the remaining work section after the preceding construction equipment has swapped batteries, and use them as the battery packs to be delivered to the preceding construction equipment. For the battery packs to be replaced by subsequent construction equipment, verify whether the power supply configuration formed by the selected battery pack after deducting the energy loss from the time of collection to delivery, together with the retained battery pack of the subsequent construction equipment, meets the power supply requirements and allowable power supply conditions for the remaining working section of the subsequent construction equipment. If the verification is passed, the selected battery pack is determined as a reusable battery pack.
[0181] Preferably, the determination of the allowed battery swapping window in the determining module includes: The time periods during which construction equipment is permitted to stop after a process is completed, during site relocation, or during process waiting are selected as candidate time periods. Uninterrupted operation periods and prohibited shutdown periods are excluded from the candidate time periods to obtain the allowed battery swapping window. When the completion time of a task is changed by a preceding or subsequent battery swapping action, the start and end times of the affected task and the allowed battery swapping window are updated according to the process dependency relationship and necessary safety intervals.
[0182] Preferably, the executability verification of the candidate service chain in the marking module includes: Simulate each battery swapping action according to the service sequence, taking into account the duration of each battery swapping action and the travel time between adjacent battery swapping actions, and update the expected location of the mobile battery swapping vehicle, the inventory of candidate on-board batteries, and the expected task status of the serviced construction equipment one by one. Verify whether each battery swapping action is within the corresponding allowed battery swapping window, and whether the construction equipment meets the power supply requirements of the corresponding stage before and after the arrival of the mobile battery swapping vehicle, and exclude candidate service chains that do not arrive on time, lack deliverable battery packs, or whose power supply requirements are not met.
[0183] Preferably, the marking module determines the service chain to be executed, including: Among the candidate service chains that have passed the executability verification, the candidate service chains with smaller corresponding values are selected in order of the latest completion time of the specified construction task, the cumulative new battery swapping time, the number of times the mobile battery swapping vehicle returns for replenishment, and the energy consumption of the mobile battery swapping vehicle's travel and battery swapping execution. If the previous comparison item is the same, the next comparison item is compared to determine the service chain to be executed. The cumulative newly added battery swapping time is the sum of the time taken for each battery swapping session after deducting the time that overlaps with the original normal gap of the construction equipment.
[0184] Preferably, the verification module verifies the identity and availability of the actually recovered reusable battery packs, including: Verify whether the identity of the actual recovered battery pack is consistent with the identity of the reusable battery pack specified in the service chain to be executed, and based on the available energy, allowable output power, temperature and fault status of the actual recovered reusable battery pack, re-determine whether the actual recovered reusable battery pack meets the power supply requirements and allowable power supply conditions of the remaining working section of the subsequent construction equipment when it is used to supply power independently or together with the reserved battery pack of the subsequent construction equipment after delivery. Only when the identity is consistent and the reassessment result meets the requirements will the actually recovered reusable battery pack be updated as a deliverable battery resource; Otherwise, mark it as a battery pack to be inspected or charged, and redetermine the service chain to be executed using the updated actual on-board battery inventory.
[0185] Example 7 like Figure 7 As shown, the present invention also provides an electronic device, which may be a computer device, a microcontroller device, a smart mobile device, etc. The electronic device in this embodiment may include a processor, a memory, a transceiver component, etc. The memory, processor, and transceiver component are connected via a bus; the memory can be used to store executable programs, and an exemplary executable program may include instructions; the processor is used to execute the instructions stored in the memory. The memory can also be used to store data, which can be accessed and / or modified when instructions are executed.
[0186] The processor may be a Central Processing Unit (CPU), or it may be other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. It is the computing and control core of the terminal, and it is suitable for implementing one or more instructions. Specifically, it is suitable for loading and executing one or more instructions in the storage medium to implement the corresponding method flow or corresponding function, so as to realize the steps of the cross-device battery reconfiguration mobile battery swapping method in the above embodiments.
[0187] Example 8 Based on the same inventive concept, this invention also provides a readable storage medium, specifically an electronic device readable storage medium (Memory). This readable storage medium is a memory device within an electronic device used to store programs and data. It is understood that the storage medium here can include both built-in storage media within the electronic device and extended storage media supported by the electronic device. The storage medium provides storage space, which stores the terminal's operating system. Furthermore, this storage space also stores one or more instructions suitable for loading and execution by a processor. These instructions can be one or more executable programs (including program code). It should be noted that the storage medium here can be high-speed RAM or non-volatile memory, such as at least one disk storage device. Loading and executing one or more instructions stored in the storage medium by the processor can implement the steps of the cross-device battery reconfiguration mobile battery swapping method described in the above embodiments.
[0188] Those skilled in the art will understand that embodiments of the present invention can be provided as methods, systems, or computer program products. Therefore, the present invention can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present invention can take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0189] This invention is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart illustrations and / or block diagrams. Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.
[0190] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.
[0191] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.
[0192] The above are merely embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention are included within the scope of the claims of the present invention pending approval.
Claims
1. A mobile battery swapping method for cross-device battery reconfiguration, characterized in that, include: Based on the construction task progress, process dependencies and work surface permitting conditions, the remaining working sections and allowable battery swapping windows for each of the multiple construction equipment before the next refueling opportunity are determined. Based on the power supply requirements of the remaining work section after the battery swap of the preceding construction equipment and the power supply requirements of the remaining work section of the subsequent construction equipment, a reusable battery pack is determined from the candidate battery packs of the preceding construction equipment, and the reusable battery pack is associated with the preceding battery swap action and the subsequent battery swap action to establish a candidate service chain. Based on the driving and battery swapping sequence of the mobile battery swapping vehicle, the battery resource status, and the allowed battery swapping window, the executability of the candidate service chains is verified, the service chains to be executed are determined, and the reusable battery packs that have not yet been actually recovered in the service chains to be executed are marked as battery resources to be confirmed. According to the service chain to be executed, the preceding battery swapping action is performed. The identity and availability status of the actually recovered reusable battery pack are verified. If the verification is successful, it is updated as a deliverable battery resource, and the mobile battery swapping vehicle directly transfers it to the subsequent construction equipment without charging to perform the subsequent battery swapping action. If the verification fails, the subsequent battery swapping action associated with the reusable battery pack is canceled, and the service chain to be executed is re-determined.
2. The method according to claim 1, characterized in that, The determination of the remaining work section and its power supply requirements includes: Based on the execution sequence of the construction tasks, the next target node is determined from the next energy replenishment opportunity confirmed by the arrival time of battery resources and mobile battery swapping vehicles, the designated process completion point or safe stopping point, and the tasks that the construction equipment must complete from the current time to the next target node are determined as the remaining work segments of the construction equipment. The energy required for the remaining work segment is obtained by adding the power consumption of the remaining work segment, the power consumption of driving (not included in the power consumption of the work segment), the power consumption of auxiliary power consumption during waiting, and the safety reserve. The power demand is determined based on the expected power of each task in the remaining work segment, and the energy and power demand required for the remaining work segment are determined as the power supply demand for the remaining work segment.
3. The method according to claim 1, characterized in that, Reusable battery packs were identified from the pool of candidate battery packs for the preceding construction equipment, including: Based on whether the power supply configuration formed after the preceding construction equipment replaces the candidate battery pack with the battery pack carried by the mobile battery swapping vehicle meets the power supply requirements of the remaining working section of the preceding construction equipment, the first candidate battery pack set is determined. Based on whether the selected battery packs, after deducting the energy loss during the period from collection to delivery, meet the power supply requirements of the remaining working section after the subsequent construction equipment has been swapped when powered alone or when powered together with the reserved battery packs of the subsequent construction equipment, a second set of candidate battery packs is determined. Select candidate battery packs from the intersection of the first candidate battery pack set and the second candidate battery pack set, and verify whether the power supply configuration of the preceding construction equipment and the subsequent construction equipment after battery swapping meets the battery compatibility and allowable power supply conditions. The candidate battery packs that pass the verification are determined as reusable battery packs.
4. The method according to claim 3, characterized in that, The preceding construction equipment is a rock drilling rig with multiple individually replaceable battery packs, and the subsequent construction equipment is an excavator or loader powered by a single battery pack. When the preceding battery pack replacement operation is performed, the selection of candidate battery packs includes: The lower limit of the available energy of the selected battery pack is determined by the sum of the energy required for the remaining operation section after the subsequent construction equipment battery swap and the energy loss of the selected battery pack from the time of collection to delivery. Add the total available energy of the battery pack of the preceding construction equipment at the start of the candidate battery swap to the available energy of the battery pack to be installed, and then subtract the energy required for the remaining operation section after the preceding construction equipment swaps the battery, as well as the power consumption of the battery swap process undertaken by the preceding construction equipment that has not yet been included in the energy required for the remaining operation section, to obtain the upper limit of the available energy of the candidate battery pack. From the candidate battery packs of the preceding construction equipment, select battery packs whose available energy is not lower than the lower limit of available energy and not higher than the upper limit of available energy, and determine the candidate battery packs that pass the battery compatibility and allowable power supply conditions verification as reusable battery packs.
5. The method according to claim 3, characterized in that, When the preceding construction equipment is an excavator or loader powered by a single battery pack, and the subsequent construction equipment is a rock drilling rig with multiple replaceable battery packs; the determination of the reusable battery pack includes: From the battery packs carried by the mobile battery swapping vehicle, select the battery packs whose available energy is lower than that of the candidate battery packs of the preceding construction equipment, and which meet the power supply needs of the remaining work section after the preceding construction equipment has swapped batteries, and use them as the battery packs to be delivered to the preceding construction equipment. For the battery packs to be replaced by subsequent construction equipment, verify whether the power supply configuration formed by the selected battery pack after deducting the energy loss from the time of collection to delivery, together with the retained battery pack of the subsequent construction equipment, meets the power supply requirements and allowable power supply conditions for the remaining working section of the subsequent construction equipment. If the verification is passed, the selected battery pack is determined as a reusable battery pack.
6. The method according to claim 1, characterized in that, The determination of the permitted battery swapping window includes: The time periods during which construction equipment is permitted to stop after a process is completed, during site relocation, or during process waiting are selected as candidate time periods. Uninterrupted operation periods and prohibited shutdown periods are excluded from the candidate time periods to obtain the allowed battery swapping window. When the completion time of a task is changed by a preceding or subsequent battery swapping action, the start and end times of the affected task and the allowed battery swapping window are updated according to the process dependency relationship and necessary safety intervals.
7. The method according to claim 1, characterized in that, The executability verification of the candidate service chain includes: Simulate each battery swapping action according to the service sequence, taking into account the duration of each battery swapping action and the travel time between adjacent battery swapping actions, and update the expected location of the mobile battery swapping vehicle, the inventory of candidate on-board batteries, and the expected task status of the serviced construction equipment one by one. Verify whether each battery swapping action is within the corresponding allowed battery swapping window, and whether the construction equipment meets the power supply requirements of the corresponding stage before and after the arrival of the mobile battery swapping vehicle, and exclude candidate service chains that do not arrive on time, lack deliverable battery packs, or whose power supply requirements are not met.
8. The method according to claim 7, characterized in that, The determination of the service chain to be executed includes: Among the candidate service chains that have passed the executability verification, the candidate service chains with smaller corresponding values are selected in order of the latest completion time of the specified construction task, the cumulative new battery swapping time, the number of times the mobile battery swapping vehicle returns for replenishment, and the energy consumption of the mobile battery swapping vehicle's travel and battery swapping execution. If the previous comparison item is the same, the next comparison item is compared to determine the service chain to be executed. The cumulative newly added battery swapping time is the sum of the time taken for each battery swapping session after deducting the time that overlaps with the original normal gap of the construction equipment.
9. The method according to claim 1, characterized in that, The verification of the identity and availability of the actually recovered reusable battery packs includes: Verify whether the identity of the actual recovered battery pack is consistent with the identity of the reusable battery pack specified in the service chain to be executed, and based on the available energy, allowable output power, temperature and fault status of the actual recovered reusable battery pack, re-determine whether the actual recovered reusable battery pack meets the power supply requirements and allowable power supply conditions of the remaining working section of the subsequent construction equipment when it is used to supply power independently or together with the reserved battery pack of the subsequent construction equipment after delivery. Only when the identity is consistent and the reassessment result meets the requirements will the actually recovered reusable battery pack be updated as a deliverable battery resource; Otherwise, mark it as a battery pack to be inspected or charged, and redetermine the service chain to be executed using the updated actual on-board battery inventory.
10. A mobile battery swapping system for cross-device battery reconfiguration, characterized in that, include: The determination module is used to determine the remaining working section and allowed battery swapping window for each of the multiple construction equipment before the next refueling opportunity, based on the construction task progress, process dependencies and work surface permit conditions. A construction module is used to determine a reusable battery pack from the candidate battery packs of the preceding construction equipment based on the power supply requirements of the remaining working section after the battery swap of the preceding construction equipment and the power supply requirements of the remaining working section of the subsequent construction equipment, and to establish a candidate service chain by associating the reusable battery pack with the preceding battery swap action and the subsequent battery swap action. The marking module is used to perform executability verification on the candidate service chains based on the driving and battery swapping sequence of the mobile battery swapping vehicle, the battery resource status and the allowed battery swapping window, determine the service chains to be executed, and mark the reusable battery packs in the service chains to be executed that have not yet been actually recovered as battery resources to be confirmed. The verification module is used to perform the preceding battery swapping action according to the service chain to be executed, to verify the identity and availability status of the actually recovered reusable battery pack, and after the verification is passed, update it as a deliverable battery resource, and the mobile battery swapping vehicle directly transfers it to the subsequent construction equipment to perform the subsequent battery swapping action without charging. If the verification fails, cancel the subsequent battery swapping action associated with the reusable battery pack, and re-determine the service chain to be executed.
11. An electronic device, characterized in that, include: At least one processor and memory; The memory and processor are connected via a bus; The memory is used to store one or more programs; When the one or more programs are executed by the at least one processor, the cross-device battery reconfiguration mobile battery swapping method as described in any one of claims 1 to 9 is implemented.
12. A readable storage medium, characterized in that, It contains an executable program, which, when executed, implements the cross-device battery reconfiguration mobile battery swapping method as described in any one of claims 1 to 9.