A NdFeB adhesive component pickup and transfer system and NdFeB magnet manufacturing equipment
By automating the pick-and-transfer system and manufacturing equipment for NdFeB adhesive components, the problems of low efficiency and safety hazards in traditional manual preparation have been solved, achieving efficient and stable manufacturing of NdFeB adhesive components.
Patent Information
- Application Number
- CN202611057066.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-15
- Publication Date
- 2026-11-17
AI Technical Summary
Traditional artificial preparation of NdFeB adhesive components has low production efficiency, unstable product quality, and safety hazards, such as skin allergies and organic matter damage.
The neodymium iron boron adhesive assembly pick-and-transfer system includes a material feeding device, an adhesive coating device, and a pick-and-transfer device to achieve automatic adhesive coating and stacking of neodymium iron boron magnetic sheets. Combined with a locking and scraping adhesive system, a fixture feeding system, and an assembly transfer system, it achieves fully automated manufacturing.
It improves the production efficiency and quality stability of NdFeB adhesive components, reduces labor intensity, enhances safety, and avoids human contact with harmful adhesives.
Smart Images

Figure CN123105262A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of neodymium iron boron magnet manufacturing technology, and in particular to a neodymium iron boron adhesive assembly pick-and-transfer system and neodymium iron boron magnet manufacturing equipment. Background Technology
[0002] Sintered NdFeB magnets are widely used in high-performance motors, generators, medical equipment, and other fields due to their excellent magnetic properties. With the rapid development of high-speed motors, laminated magnet assemblies have attracted widespread attention because they can effectively suppress eddy current losses. In high-speed motor applications, to reduce eddy current losses in the magnets, it is necessary to cut a single NdFeB magnet into multiple pieces and form an insulating layer between the pieces; this structure is called an adhesive assembly.
[0003] Traditional adhesive bonding assembly production is done manually, involving manual feeding, cleaning, gluing, bonding, and stacking of adjacent magnets. In this manual process, manual feeding can lead to chipping and chipping of magnets, affecting product quality. During manual bonding, glue is applied to the magnet surface using a scraper, and the thickness of the glue layer is controlled by manual skill; too much glue results in excessive glue overflow, while too little results in insufficient glue between components, affecting bonding strength. Therefore, existing methods of manually bonding and stacking adhesive assemblies are inefficient, produce inconsistent product quality, and are labor-intensive. Furthermore, the adhesive can cause skin irritation and allergies upon contact with skin, and the volatile organic compounds released from the adhesive can be harmful to human health. Summary of the Invention
[0004] The purpose of this invention is to provide a NdFeB adhesive assembly pick-and-transfer system. This NdFeB adhesive assembly pick-and-transfer system can automatically complete the adhesive stacking, realize the automated manufacturing of NdFeB adhesive assemblies, have high production efficiency, high product quality stability, and eliminate the need for human contact with the adhesive on the magnetic sheets, thus improving safety.
[0005] The second objective of this invention is to provide a neodymium iron boron magnet manufacturing equipment that has high production efficiency, high product quality stability, and eliminates the need for human contact with the adhesive used to bond the magnets, thereby improving safety.
[0006] To achieve this objective, the present invention adopts the following technical solution: This invention discloses a NdFeB adhesive assembly pickup and transfer system, comprising: a material feeding device for conveying NdFeB magnetic sheets, the NdFeB magnetic sheets including a first surface and a second surface disposed opposite to each other; an adhesive coating device mounted on the material feeding device for applying adhesive to the first surface of the NdFeB magnetic sheets; and a pickup and transfer device capable of adsorbing the NdFeB magnetic sheets to drive the NdFeB magnetic sheets to rise and fall; wherein, the pickup and transfer device adsorbs the first surface of an uncoated NdFeB magnetic sheet as the basic body of the NdFeB adhesive assembly, the material feeding device transports the coated NdFeB magnetic sheet to a position below the pickup and transfer device, and the pickup and transfer device drives the basic body to descend so that the basic body is adhered to the coated NdFeB magnetic sheet.
[0007] In some embodiments, the pickup and transfer device includes: a first driving member; a first sliding seat connected to the first driving member and capable of sliding along a first direction under the action of the first driving member; a second driving member mounted on the first sliding seat; and an adsorption unit connected to the second driving member and capable of rising and falling along a second direction under the action of the second driving member, wherein the second direction is perpendicular to the first direction, and the adsorption unit is used to adsorb the neodymium iron boron magnetic sheet.
[0008] In some specific embodiments, the adsorption unit includes: a third driving member, which is mounted on the power output end of the second driving member; a fourth driving member, which is mounted on the power output end of the third driving member and is capable of rotating under the drive of the third driving member; and a suction cup body, which is connected to the fourth driving member and is capable of rising and falling along the second direction under the drive of the fourth driving member.
[0009] In some more specific embodiments, the suction cup bodies are arranged in pairs, and the paired suction cup bodies are respectively adsorbed onto both ends of the neodymium iron boron magnet along its length.
[0010] In some more specific embodiments, the adsorption unit further includes a limiting support member, which is mounted on the housing of the fourth driving member. The suction cup body is mounted on the output end of the fourth driving member. After the third driving member drives the fourth driving member and the suction cup body to rotate, the limiting support member can support the side wall of the neodymium iron boron adhesive assembly.
[0011] In some optional embodiments, the limiting support includes at least two first limiting support rods and one second limiting support rod, with the at least two first limiting support rods supported on the sidewall of the NdFeB adhesive assembly extending along its length, and the second limiting support rod supported at one end of the NdFeB adhesive assembly along its length.
[0012] In some embodiments, the material feeding device includes: a first transport line for transporting the NdFeB magnetic sheet to below the adhesive coating device; a second transport line arranged parallel to the first transport line and used for transporting the NdFeB magnetic sheet; and a handling mechanism for handling the NdFeB magnetic sheet on the first transport line to the second transport line.
[0013] In some specific embodiments, the second transport lines are arranged in pairs, and the two pairs of second transport lines are located on both sides of the first transport line in a direction perpendicular to the transport direction of the first transport line; the pick-up and transfer devices are arranged in pairs, and the two pairs of pick-up and transfer devices are respectively arranged corresponding to the two second transport lines.
[0014] The present invention also discloses a neodymium iron boron magnet manufacturing equipment, comprising the aforementioned neodymium iron boron adhesive component pick-and-transfer system, locking and scraping adhesive system, jig loading system, component transfer system, and pallet transport system; wherein: the jig loading system is used to transport a U-shaped jig to the working platform of the locking and scraping adhesive system, the locking and scraping adhesive system can lock the U-shaped jig to the working platform, the neodymium iron boron adhesive component pick-and-transfer system places the manufactured neodymium iron boron adhesive component inside the U-shaped jig, the locking and scraping adhesive system can scrape off excess adhesive on the neodymium iron boron adhesive component, and the component transfer system transports the scraped neodymium iron boron adhesive component to the pallet transport system.
[0015] In some embodiments, the locking adhesive scraping system, the fixture feeding system, the component transfer system, and the pallet transport system are all arranged in pairs, and the adhesive application devices are symmetrically distributed with respect to the NdFeB adhesive component pick-up and transfer system.
[0016] The beneficial effects of this invention are as follows: In actual operation, during the transfer of NdFeB magnetic sheets by the material feeding device, the first surface of an uncoated NdFeB magnetic sheet is first transported as the base of the NdFeB adhesive assembly to the area below the pickup and transfer device. The pickup and transfer device picks up the base and rises. A specified number of NdFeB magnetic sheets located behind the base in the material feeding device are coated with adhesive. When the coated NdFeB magnetic sheets are transported to the area below the pickup and transfer device, the pickup and transfer device drives the base to descend, and the base contacts the NdFeB magnetic sheets. When the first surface of the NdFeB magnetic sheet is coated with an adhesive, the substrate can be bonded to the coated NdFeB magnetic sheet. After the first NdFeB magnetic sheet is bonded to the substrate, the next coated NdFeB magnetic sheet is transported to the bottom of the pick-and-transfer device. The pick-and-transfer device drives the first NdFeB magnetic sheet to descend, so that the second surface of the first NdFeB magnetic sheet is bonded to the adhesive coated on the first surface of the second NdFeB magnetic sheet, thus completing the bonding of the second NdFeB magnetic sheet. This process is repeated to complete the fabrication of the entire NdFeB adhesive assembly. This achieves automated adhesive coating and stacking of NdFeB magnetic sheets, enabling automated manufacturing of NdFeB adhesive assemblies, improving production efficiency and quality stability.
[0017] Additional aspects and advantages of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. Attached Figure Description
[0018] Figure 1 This is a schematic diagram of the structure of the neodymium iron boron magnet manufacturing equipment according to an embodiment of the present invention; Figure 2 This is a schematic diagram of the structure of the pickup and transfer device according to an embodiment of the present invention; Figure 3 This is a schematic diagram of the structure of the pickup and transfer device adsorption base and the coated neodymium iron boron magnetic sheet according to an embodiment of the present invention. Figure 4 Is Figure 3 A schematic diagram of the structure after the basic body is bonded to the NdFeB magnetic sheet after adhesive coating; Figure 5 Is Figure 4 A schematic diagram of a structure on which a neodymium iron boron magnet is then bonded together; Figure 6 This is a partial structural schematic diagram of the adsorption unit of the pickup and transfer device according to an embodiment of the present invention; Figure 7 This is a schematic diagram of the locking adhesive scraping system, the fixture feeding system, and the component transfer system according to an embodiment of the present invention.
[0019] Figure label: 100. Neodymium iron boron adhesive assembly pickup and transfer system; 110. Material feeding device; 111. First transport line; 112. Second transport line; 113. Handling mechanism; 120. Adhesive application device; 130. Pickup and transfer device; 131. First driving component; 132. First sliding seat; 133. Second driving component; 134. Adsorption unit; 1341. Third driving component; 1342. Fourth driving component; 1343. Suction cup body; 1344. Limiting support component; 13441. First limiting support rod; 13442. Second limiting support rod; 200. Locking and scraping adhesive system; 210. Worktable; 220. Positioning and locking device; 230. Adhesive removal device; 240. Component transfer device; 300. Fixture feeding system; 310. Fixture storage device; 320. Fixture lifting device; 330. Fixture handling device; 400, Component transfer system; 500, Pallet transport system; 10, Neodymium iron boron magnet; 101, First surface; 102, Second surface; 20, Basic body; 30, U-shaped fixture. Detailed Implementation
[0020] The present invention will now be described in further detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and not intended to limit it. Furthermore, it should be noted that, for ease of description, the accompanying drawings show only the parts relevant to the present invention, and not all of the structures.
[0021] In the description of this invention, unless otherwise explicitly specified and limited, the terms "connected," "linked," and "fixed" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.
[0022] In the description of this embodiment, the terms "upper," "lower," "left," "right," "front," and "rear," etc., refer to the orientation or positional relationship shown in the accompanying drawings. They are used only for ease of description and simplification of operation, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the present invention. Furthermore, the terms "first" and "second" are used only for distinction in description and have no special meaning.
[0023] This invention discloses a neodymium iron boron adhesive assembly pick-and-transfer system 100 (hereinafter referred to as the pick-and-transfer system for ease of description), referenced Figure 1As shown, the pickup and transfer system disclosed in this invention includes a material feeding device 110, an adhesive coating device 120, and a pickup and transfer device 130. The material feeding device 110 is used to transport neodymium iron boron magnetic sheets 10. The neodymium iron boron magnetic sheets 10 include a first surface 101 and a second surface 102 disposed opposite to each other. The adhesive coating device 120 is mounted on the material feeding device 110 and is used to apply adhesive to the first surface 101 of the neodymium iron boron magnetic sheets 10. The pickup and transfer device 130 is capable of adsorbing neodymium iron boron magnetic sheets. The neodymium iron boron magnetic sheet 10 is driven to rise and fall; wherein, the pick-and-transfer device 130 adsorbs the first surface 101 of an uncoated neodymium iron boron magnetic sheet 10 as the base body 20 of the neodymium iron boron adhesive assembly, and the material feeding device 110 transports the coated neodymium iron boron magnetic sheet 10 to the area below the pick-and-transfer device 130, and the pick-and-transfer device 130 can drive the base body 20 to fall so that the base body 20 is bonded to the coated neodymium iron boron magnetic sheet 10. Understandably, in the actual working process, during the transfer of NdFeB magnetic sheets 10 by the material feeding device 110, an uncoated NdFeB magnetic sheet 10 is first transported as the base 20 of the NdFeB adhesive assembly to the area below the pick-and-transfer device 130. The pick-and-transfer device 130 then picks up the base 20 and rises. A specified number of NdFeB magnetic sheets 10 located behind the base 20 in the material feeding device 110 are then coated with adhesive. When the coated NdFeB magnetic sheets 10 are transported to the area below the pick-and-transfer device 130 (e.g., ...), the process is repeated. Figure 3 As shown), the pickup and transfer device 130 drives the base body 20 to descend. When the base body 20 contacts the adhesive coated on the first surface 101 of the NdFeB magnetic sheet 10, the base body 20 can adhere to the adhesive-coated NdFeB magnetic sheet 10. After the first NdFeB magnetic sheet 10 is bonded to the base body 20, the next adhesive-coated NdFeB magnetic sheet 10 is transported to the area below the pickup and transfer device 130 (as shown). Figure 4 As shown), the pickup and transfer device 130 drives the bonding process to complete the descent of the first NdFeB magnetic sheet 10 and the base body 20, causing the second surface 102 of the first NdFeB magnetic sheet 10 to bond with the adhesive coated on the first surface 101 of the second NdFeB magnetic sheet 10, thus completing the bonding of the second NdFeB magnetic sheet 10 (as shown). Figure 5 As shown in the diagram, the entire NdFeB adhesive assembly is prepared by following this process. This achieves automated adhesive application and stacking of the NdFeB magnetic sheets 10, realizing automated manufacturing of NdFeB adhesive assemblies, improving production efficiency and quality stability.
[0024] It should be noted that after a NdFeB adhesive assembly is manufactured, the pick-and-transfer device 130 can transport it to the next workstation for placement. Then, the material feeding device 110 transports an uncoated NdFeB magnetic sheet 10 to the pick-and-transfer device 130 as the base 20 for the preparation of the second NdFeB adhesive assembly.
[0025] It should be further explained that, for the symmetrically distributed pick-and-transfer devices 130, after the left pick-and-transfer device 130 completes the component pick-up, it moves to the vicinity of the next process on the left to place the component, and then moves to the second transport line 112 on the left to pick up the first substrate of the new bonding component; at the same time, the right pick-and-transfer device 130 picks up the first substrate from the second transport line 112 on the right and moves to the first transport line 111 to start picking up the NdFeB magnetic sheet 10 with adhesive. In this way, the left and right pick-and-transfer devices 130 operate alternately, reducing the waiting time of the adhesive application device 120.
[0026] refer to Figure 2 As shown, the pickup and transfer device 130 includes a first driving member 131, a first sliding seat 132, a second driving member 133, and an adsorption unit 134. The first sliding seat 132 is connected to the first driving member 131 and can slide along a first direction under the action of the first driving member 131. The second driving member 133 is mounted on the first sliding seat 132. The adsorption unit 134 is connected to the second driving member 133 and can move up and down along a second direction under the action of the second driving member 133. The second direction is perpendicular to the first direction. The adsorption unit 134 is used to adsorb neodymium iron boron magnetic sheets 10. Understandably, in practice, the first sliding seat 132 moves to directly above the NdFeB magnetic sheet 10 under the drive of the first driving member 131, and the second driving member 133 drives the adsorption unit 134 to descend. When the adsorption unit 134 comes into contact with the NdFeB magnetic sheet 10, the negative pressure generated by the external negative pressure device on the adsorption unit 134 can stably adsorb the NdFeB magnetic sheet 10, ensuring that the NdFeB magnetic sheet 10 can be stably raised and lowered during the process. Using the first driving member 131 and the second driving member 133 with two perpendicular driving directions helps to simplify the structure of the pick-and-transfer device 130 and reduce manufacturing costs.
[0027] In this embodiment, the first driving component 131 includes a drive motor, a lead screw, and a nut. The first sliding seat 132 is connected to the nut. During actual operation, the drive motor drives the lead screw to rotate, causing the nut to move along the axial direction of the lead screw. By selecting a drive motor in conjunction with the lead screw and nut pair to drive the first sliding seat 132, it is possible to ensure that the adsorption unit 134 is stably stopped above the NdFeB magnetic sheet 10, avoiding the sticking phenomenon caused by misalignment between the adsorption unit 134 and the NdFeB magnetic sheet 10. The second driving component 133 is an electric cylinder, specifically a long-stroke electric cylinder, suitable for the large-stroke movement of picking up and placing the NdFeB magnetic sheet 10. Of course, in other embodiments of the present invention, the specific types of the first driving component 131 and the second driving component 133 can be replaced according to actual needs and are not limited to the above-listed examples. In an alternative embodiment of the present invention, the first driving component 131, the first sliding seat 132, and the second driving component 133 can be directly replaced by a robotic arm; that is, in this embodiment, the adsorption unit 134 is directly mounted on the robotic arm.
[0028] Optional, see reference Figure 2 As shown, the adsorption unit 134 includes a third driving member 1341, a fourth driving member 1342, and a suction cup body 1343. The third driving member 1341 is installed at the power output end of the second driving member 133, and the fourth driving member 1342 is installed at the power output end of the third driving member 1341 and can rotate under the drive of the third driving member 1341. The suction cup body 1343 is connected to the fourth driving member 1342 and can rise and fall along the second direction under the drive of the fourth driving member 1342. Understandably, in actual operation, after the second driving component 133 drives the adsorption unit 134 to the designated position, the fourth driving component 1342 then drives the suction cup body 1343 to descend, so that the suction cup body 1343 is in contact with the first surface 101 of the NdFeB magnetic sheet 10 or the first surface 101 of the NdFeB magnetic sheet 10 to be bonded is in contact with the adhesive on the NdFeB magnetic sheet 10 below after being coated with glue. This method of descending at both ends can more precisely control the stroke of the suction cup body 1343, ensuring that the first surface 101 of the NdFeB magnetic sheet 10 to be bonded is bonded to the adhesive on the NdFeB magnetic sheet 10 below after being coated with glue. After the NdFeB adhesive assembly is manufactured, it needs to be rotated 90° and placed into the U-shaped fixture 30 for positioning, locking, and adhesive removal. In this embodiment, the adsorption unit 134 is equipped with a third driving component 1341 for driving the suction cup body 1343 to rotate, which can ensure that the NdFeB adhesive assembly is rotated stably during manufacturing, so that it is stably placed in the U-shaped fixture 30 for subsequent processes.
[0029] In this embodiment, the third driving component 1341 is a rotary cylinder, and the fourth driving component 1342 is a linear electric cylinder, which reduces the manufacturing cost of the adsorption unit 134. The fourth driving component 1342 is a short-stroke high-frequency electric cylinder, suitable for rapid pickup. Of course, in other embodiments of the present invention, the specific types of the third driving component 1341 and the fourth driving component 1342 can be selected according to actual needs.
[0030] Optionally, the suction cup bodies 1343 are arranged in pairs, with each pair of suction cup bodies 1343 adsorbing onto both ends of the NdFeB magnetic sheet 10 along its length. It is understood that, compared to a single suction cup body 1343, using pairs of suction cup bodies 1343 to adsorb onto both ends of the NdFeB magnetic sheet 10 along its length ensures the stability of the NdFeB magnetic sheet 10, thereby reducing the occurrence of bonding failure or misalignment caused by unstable adsorption of the NdFeB magnetic sheet 10.
[0031] Optional, see reference Figure 6 As shown, the adsorption unit 134 also includes a limiting support 1344, which is mounted on the housing of the fourth driving member 1342. The suction cup body 1343 is mounted on the output end of the fourth driving member 1342. After the third driving member 1341 drives the fourth driving member 1342 and the suction cup body 1343 to rotate, the limiting support 1344 can be supported on the side wall of the neodymium iron boron adhesive assembly. Understandably, during the actual process, the NdFeB adhesive assembly after lamination and bonding needs to be rotated 90° before being placed on the U-shaped fixture 30 at the subsequent adhesive removal station. However, when the third drive component 1341 drives the fourth drive component 1342 and the suction cup body 1343 to rotate, the length direction of the NdFeB magnetic sheet 10 changes from horizontal to vertical, which poses a risk of the NdFeB magnetic sheet 10 falling off. In this embodiment, after the third drive component 1341 drives the fourth drive component 1342 and the suction cup body 1343 to rotate, the limiting support component 1344 can support the side wall of the NdFeB adhesive assembly. The added limiting support component 1344 can provide stable support for the NdFeB adhesive assembly, preventing the NdFeB magnetic sheet 10 from falling off, thereby improving the manufacturing yield of the NdFeB adhesive assembly.
[0032] Further optional, see reference Figure 6As shown, the limiting support member 1344 includes at least two first limiting support rods 13441 and one second limiting support rod 13442. The at least two first limiting support rods 13441 are supported on the side wall of the NdFeB adhesive assembly extending along its length direction, and the second limiting support rod 13442 is supported at one end of the NdFeB adhesive assembly along its length direction. In actual operation, when the third driving component 1341 drives the fourth driving component 1342 and the suction cup body 1343 to rotate, the length direction of the NdFeB magnetic sheet 10 changes from horizontal to vertical. The two first limiting support rods 13441 are supported on the side wall of the NdFeB adhesive assembly extending along its length direction, and the second limiting support rod 13442 is supported at one end of the NdFeB adhesive assembly along its length direction. The positioning support in both directions can ensure stable support for the NdFeB adhesive assembly and prevent the NdFeB magnetic sheet 10 from falling off, thereby improving the manufacturing yield of the NdFeB adhesive assembly.
[0033] Optional, see reference Figure 1 As shown, the material feeding device 110 includes a first transport line 111, a second transport line 112, and a handling mechanism 113. The first transport line 111 is used to transport the neodymium iron boron magnetic sheet 10 to the area below the adhesive coating device 120. The second transport line 112 is arranged in parallel with the first transport line 111 and is used to transport the neodymium iron boron magnetic sheet 10. The handling mechanism 113 is used to handle the neodymium iron boron magnetic sheet 10 on the first transport line 111 to the second transport line 112. Understandably, in actual operation, after the neodymium iron boron magnetic sheet 10 is placed on the first transport line 111, it is transported to the area below the adhesive coating device 120 for adhesive coating. A small portion of the neodymium iron boron magnetic sheets 10 on the second transport line 112 are transported directly to the area below the pick-and-transfer device 130 without passing through the handling mechanism 113, and used as the base body 20. In this way, the first transport line 111 transports the adhesive-coated neodymium iron boron magnetic sheets 10, and the second transport line 112 transports the base body 20. The transport of the two transport lines simplifies the control logic and makes it easier for the pick-and-transfer device 130 to pick up the neodymium iron boron magnetic sheets 10.
[0034] In this embodiment, the first transport line 111 is a conveyor belt structure, including a first pulley, a first conveyor belt, and a second pulley. The second transport line 112 is a conveyor belt structure, including a third pulley, a second conveyor belt, and a fourth pulley. Of course, in other embodiments of the present invention, the first transport line 111 and the second transport line 112 may also be chain conveyor structures, and are not limited to the above description.
[0035] It should be noted that the conveying mechanism 113 can be a robotic arm directly, or it can include a lateral drive, a lifting drive and a suction nozzle. The lateral drive is used to drive the lifting drive and the suction nozzle to move back and forth between the first transport line 111 and the second transport line 112, and the lifting drive is used to drive the suction nozzle to lift.
[0036] It should be further noted that a storage bin can be installed above the second transport line 112, on which multiple neodymium iron boron magnetic sheets 10 are stacked. During actual operation, a push rod inside the storage bin can push the bottom neodymium iron boron magnetic sheet 10 onto the second transport line 112. The structure of the storage bin can be selected based on existing technology. Alternatively, a material storage platform can be installed parallel to the second transport line 112, and a robotic arm on the material storage platform can place the neodymium iron boron magnetic sheets 10 one by one onto the second transport line 112.
[0037] Optionally, the second transport lines 112 are arranged in pairs, perpendicular to the transport direction of the first transport line 111, with the two pairs of second transport lines 112 located on either side of the first transport line 111; the pick-and-transfer devices 130 are also arranged in pairs, with each pair of pick-and-transfer devices 130 corresponding to one of the two second transport lines 112. It is understood that in actual operation, with two pick-and-transfer devices 130 and multiple second transport lines 112, the two second transport lines 112 can operate synchronously, and the two pick-and-transfer devices can also operate synchronously, greatly improving production efficiency.
[0038] This invention also discloses a neodymium iron boron magnet manufacturing apparatus, with reference to Figure 1 As shown, the neodymium iron boron magnet manufacturing equipment includes a neodymium iron boron adhesive component pick-and-transfer system 100, a locking and scraping adhesive system 200, a jig loading system 300, a component transfer system 400, and a pallet transport system 500. The jig loading system 300 is used to transport the U-shaped jig 30 to the working platform of the locking and scraping adhesive system 200. The locking and scraping adhesive system 200 can lock the U-shaped jig 30 to the working platform. The neodymium iron boron adhesive component pick-and-transfer system 100 places the manufactured neodymium iron boron adhesive component inside the U-shaped jig 30. The locking and scraping adhesive system 200 can scrape off the excess adhesive on the neodymium iron boron adhesive component. The component transfer system 400 transports the scraped neodymium iron boron adhesive component to the pallet transport system 500. Understandably, in the actual working process, the NdFeB adhesive assembly pick-and-transfer system 100 places the manufactured NdFeB adhesive assembly into the U-shaped fixture 30, the adhesive scraping system 200 scrapes the adhesive from the NdFeB adhesive assembly, and the assembly transfer system 400 transports the scraped NdFeB adhesive assembly to the pallet transport system 500, completing the manufacturing process. The NdFeB magnet manufacturing equipment achieves fully automated NdFeB magnet manufacturing, improving the manufacturing yield and efficiency of NdFeB magnets.
[0039] Optionally, the locking adhesive application system 200, the fixture loading system 300, the component transfer system 400, and the pallet transport system 500 are all arranged in pairs, and the adhesive application devices 120 are symmetrically distributed with respect to the NdFeB adhesive component pick-up and transfer system 100. This further improves the manufacturing efficiency of NdFeB magnets.
[0040] Optionally, when the paired component transfer systems 400 are in operation, the two component transfer systems 400 alternately pick up the NdFeB magnetic sheets 10 with adhesive coating output from the NdFeB adhesive component pick-up and transfer system 100, thereby reducing the waiting time of the NdFeB adhesive component pick-up and transfer system 100.
[0041] Optionally, the fixture feeding system 300 includes a fixture storage device 310, a fixture lifting device 320, and a fixture transport device 330. The locking and adhesive scraping system 200 includes a worktable 210, a positioning and locking device 220, an adhesive removal device 230, and a component transfer device 240. The fixture storage device 310 is used to store fixture groups, which include multiple U-shaped fixtures 30 stacked sequentially along a second direction. The fixture lifting device 320 is used to drive the fixture group to move along the second direction. The worktable 210 is used to support the U-shaped fixtures 30. The fixture transport device 330 is used to transport the fixtures located at the top of the fixture group and extending out of the fixture storage device. The U-shaped fixture 30 of the placement 310 is transported to the worktable 210 and positioned on the worktable 210. The positioning and locking device 220 is installed on the worktable 210. The positioning and locking device 220 is used to align the multiple neodymium iron boron magnets 10 in the adhesive assembly along the second direction and the first direction, and can lock the adhesive assembly in the U-shaped fixture 30 along the third direction. The adhesive removal device 230 is installed on the worktable 210. The adhesive removal device 230 can remove the adhesive residue on the worktable 210. The component transfer device 240 is used to move the U-shaped fixture 30 with the adhesive assembly locked away from the worktable 210. Understandably, in the actual working process, the NdFeB adhesive assembly pick-up and transfer system 100 of the previous station places the manufactured adhesive assembly on the worktable 210. Then, the fixture lifting device 320 drives the fixture assembly to move in the second direction. When the U-shaped fixture 30 at the top of the fixture assembly extends out of the fixture storage device 310, the fixture transport device 330 can transport the U-shaped fixture 30 to the worktable 210, so that the adhesive assembly is located in the opening of the U-shaped fixture 30. Then, the positioning and locking device 220 can lock the U-shaped fixture 30 on the worktable 210 and lock the adhesive assembly in the U-shaped fixture. During the locking process, excess adhesive may overflow from the U-shaped fixture 30 containing the adhesive component. After the component transfer device 240 moves the U-shaped fixture 30 with the adhesive component locked away from the worktable 210, the adhesive removal device 230 can remove the adhesive residue on the worktable 210. This invention uses a U-shaped fixture to fix the adhesive component. During the process, the handling of the U-shaped fixture 30, the locking of the U-shaped fixture 30 and the adhesive component, the handling of the U-shaped fixture 30 with the adhesive component locked, and the removal of residual adhesive on the worktable 210 are all automated, ensuring the accuracy and consistency of positioning dimensions, thereby improving the manufacturing efficiency and yield of neodymium iron boron magnets.
[0042] In the description of this specification, references to terms such as "some embodiments," "other embodiments," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of the invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples.
[0043] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the implementation of the present invention. Those skilled in the art will be able to make various obvious changes, readjustments, and substitutions without departing from the scope of protection of the present invention. It is neither necessary nor possible to exhaustively describe all embodiments here. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the scope of protection of the claims of the present invention.
Claims
1. A neodymium iron boron adhesive assembly pickup and transfer system, characterized in that, include: Material feeding device (110) is used to transport neodymium iron boron magnetic sheet (10), the neodymium iron boron magnetic sheet (10) includes a first surface (101) and a second surface (102) disposed opposite to each other. A glue-applying device (120) is installed on the material feeding device (110) and is used to apply glue to the first surface (101) of the neodymium iron boron magnetic sheet (10); A pickup and transfer device (130) is provided, which is capable of adsorbing onto the neodymium iron boron magnet (10) to drive the neodymium iron boron magnet (10) to move up and down; wherein, The pick-and-transfer device (130) adsorbs the first surface (101) of an uncoated NdFeB magnetic sheet (10) and uses it as the base (20) of the NdFeB adhesive assembly. The material feeding device (110) transports the coated NdFeB magnetic sheet (10) to the area below the pick-and-transfer device (130). The pick-and-transfer device (130) can drive the base (20) to descend so that the base (20) is bonded to the coated NdFeB magnetic sheet (10).
2. The NdFeB adhesive assembly pickup and transfer system according to claim 1, characterized in that, The pickup and transfer device (130) includes: First drive unit (131); The first sliding seat (132) is connected to the first driving member (131) and can slide along the first direction under the action of the first driving member (131); The second driving member (133) is mounted on the first sliding seat (132); An adsorption unit (134) is connected to the second driving member (133) and can move up and down along a second direction under the action of the second driving member (133). The second direction is perpendicular to the first direction. The adsorption unit (134) is used to adsorb the neodymium iron boron magnetic sheet (10).
3. The NdFeB adhesive assembly pickup and transfer system according to claim 2, characterized in that, The adsorption unit (134) includes: The third drive unit (1341) is installed at the power output end of the second drive unit (133); A fourth driving member (1342) is mounted on the power output end of the third driving member (1341) and is capable of rotating under the drive of the third driving member (1341). The suction cup body (1343) is connected to the fourth driving member (1342) and can move up and down along the second direction under the drive of the fourth driving member (1342).
4. The NdFeB adhesive assembly pickup and transfer system according to claim 3, characterized in that, The suction cup bodies (1343) are arranged in pairs, and the pairs of suction cup bodies (1343) are respectively adsorbed at both ends of the length direction of the neodymium iron boron magnetic sheet (10).
5. The NdFeB adhesive assembly pickup and transfer system according to claim 3, characterized in that, The adsorption unit (134) further includes a limiting support (1344), which is mounted on the outer shell of the fourth driving member (1342). The suction cup body (1343) is mounted on the output end of the fourth driving member (1342). After the third driving member (1341) drives the fourth driving member (1342) and the suction cup body (1343) to rotate, the limiting support (1344) can support the side wall of the neodymium iron boron adhesive assembly.
6. The NdFeB adhesive assembly pickup and transfer system according to claim 5, characterized in that, The limiting support (1344) includes at least two first limiting support rods (13441) and one second limiting support rod (13442). The at least two first limiting support rods (13441) are supported on the side wall of the NdFeB adhesive assembly extending along its length direction, and the second limiting support rod (13442) is supported at one end of the NdFeB adhesive assembly along its length direction.
7. The NdFeB adhesive assembly pickup and transfer system according to claim 1, characterized in that, The material feeding device (110) includes: The first transport line (111) is used to transport the neodymium iron boron magnetic sheet (10) to below the adhesive coating device (120); The second transport line (112) is arranged in parallel with the first transport line (111) and is used to transport the neodymium iron boron magnetic sheet (10). A transport mechanism (113) is used to transport the neodymium iron boron magnet (10) on the first transport line (111) to the second transport line (112).
8. The NdFeB adhesive assembly pickup and transfer system according to claim 7, characterized in that, The second transport lines (112) are arranged in pairs, and the two pairs of second transport lines (112) are located on both sides of the first transport line (111) in a direction perpendicular to the transport direction of the first transport line (111). The pickup and transfer devices (130) are arranged in pairs, and the two pickup and transfer devices (130) arranged in pairs are respectively arranged for two second transport lines (112).
9. A neodymium iron boron magnet manufacturing equipment, characterized in that, Includes the neodymium iron boron adhesive assembly pick-and-transfer system, locking and scraping adhesive system (200), jig loading system (300), assembly transfer system (400), and pallet transport system (500) as described in any one of claims 1-8; wherein: The fixture loading system (300) is used to transport the U-shaped fixture (30) to the working platform of the locking and scraping adhesive system (200). The locking and scraping adhesive system (200) can lock the U-shaped fixture (30) to the working platform. The neodymium iron boron adhesive assembly picking and transferring system places the manufactured neodymium iron boron adhesive assembly into the U-shaped fixture (30). The locking and scraping adhesive system (200) can scrape off the excess adhesive on the neodymium iron boron adhesive assembly. The assembly transferring system (400) transports the scraped neodymium iron boron adhesive assembly to the pallet transported by the pallet transport system (500).
10. The neodymium iron boron magnet manufacturing equipment according to claim 9, characterized in that, The locking adhesive scraping system (200), the fixture feeding system (300), the component transfer system (400), and the pallet transport system (500) are all arranged in pairs, and are symmetrically distributed with respect to the adhesive application device (120) of the NdFeB adhesive component picking and transferring system.
