A method for controlling the forming of the toe prism slope of a deep-water breakwater

By establishing a slope forming model and using incremental PID control, the problem of inconsistent slope ratios during the construction of the toe prism of a deep-water breakwater was solved, achieving precise slope forming control and improving construction quality.

CN123109096APending Publication Date: 2026-11-17CHINA THREE GORGES UNIV
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611536060.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-30
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In the construction of existing deep-water breakwater toe prisms, the lack of quantitative means to control slope formation leads to inconsistent slope ratios and widespread over- or under-excavation of the slope surface. The lack of real-time monitoring and parameter adjustment strategies affects construction quality and stability.

Method used

By establishing a slope forming model and combining multibeam echo sounding and acoustic Doppler current profiler to obtain seabed topography and hydrological parameters, underwater diffusion prediction of boulders and actual topographic correction are carried out. Incremental PID control is used to adjust the landing point to achieve closed-loop control.

Benefits of technology

It has achieved precise control of the slope ratio of the toe prism of the deep-water breakwater, reduced construction deviations, improved construction quality and efficiency, and ensured that the slope formation meets the design requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109096A_ABST
    Figure CN123109096A_ABST
Patent Text Reader

Abstract

This invention discloses a method for controlling the formation of a deep-water breakwater toe prism slope, belonging to the field of port and coastal engineering construction technology. The method involves acquiring toe prism design parameters, seabed topography, and hydrological parameters; establishing underwater accumulation distribution models for single-ship dumping, multi-ship superimposed accumulation, and slope ratio calculation models to predict underwater boulder diffusion and slope formation. Trial dumping is conducted according to initial parameters, and the dumping parameters are corrected based on actual drift and diffusion range. After formal dumping, a multibeam echo sounder is used to acquire underwater measured topography, calculate the measured slope ratio and slope formation rate, adjust subsequent dumping points based on the deviation between the measured slope ratio and the target slope ratio, supplement dumping in areas with insufficient formation, and cyclically performing underwater measurements, state evaluation, and parameter adjustments until the slope meets the preset formation conditions. This invention establishes a feedback relationship between the dumping point and the underwater slope formation state, achieving quantitative formation control of the toe prism slope under deep-sea conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of port and coastal engineering construction technology, specifically relating to a method for controlling the forming of the toe prism slope of a deep-water breakwater. Background Technology

[0002] The toe prism is placed at the toe of a sloping breakwater. It forms a weighted structure with predetermined cross-sectional dimensions and slope ratio using boulders, thereby improving the stability of the breakwater's toe area. For deep-sea breakwaters, the toe prism is typically located in deep water and dynamic environments. After the boulders are dropped from the water surface, they are affected by factors such as water flow, water resistance, boulder size, and the method of placement, resulting in a deviation between their actual landing position and accumulation range and their initial placement position on the water surface.

[0003] Existing methods for constructing breakwaters with prismatic cores typically determine the volume of boulders based on the designed cross-section and utilize open-body barges for positioning and dumping in the water. For example, existing patent document CN120683826A discloses a deep-water sloping breakwater and its construction method that retains part of the soft soil foundation, mentioning the use of prismatic core stones for weighting to ensure the breakwater's stability, but it does not address the method for controlling the slope formation of the prismatic core. Existing patent document CN121161769B discloses a precise dumping construction method for deep-water breakwaters, which achieves real-time monitoring and feedback of the dumping process by integrating GPS positioning equipment, a multibeam echo sounder system, and a central data processing center, but it mainly focuses on controlling the elevation and volume of the core stones, without addressing the precise control of the slope ratio. The literature "Analysis of Diffusion Angle and Forming Rate of Core Stones Filled by Open-Body Barges in Large Deep-Water Slopes" explores the diffusion law and forming rate control method of open-body barge filling, but its research object is the core stone of the embankment, and it lacks systematic research on the slope forming control of the prism blocks at the foot of the slope.

[0004] In summary, the existing construction methods for filling prismatic stones at the foot of the rock have the following prominent problems: (1) Slope forming relies on human experience. The design slope ratio of the foot prism is usually 1:1.5, but the natural angle of repose of underwater stone accumulation is inconsistent with the design slope ratio. In the current construction, the determination of parameters such as landing point control and material feeding speed mainly relies on the experience judgment of construction personnel, lacking quantitative control methods for slope forming, and the construction quality varies greatly among different operators.

[0005] (2) The accumulation of stones at the toe of the slope is difficult to control. Under deep water conditions, the stones are diffused due to water resistance after entering the water, and the landing point is difficult to control precisely. The stones dumped are prone to be over-accumulated at the toe of the slope, resulting in a gentler actual slope ratio (S<1:1.5), which affects the design stress shape of the foot prism.

[0006] (3) Over-excavation and under-excavation of slopes are common. Due to the lack of real-time monitoring and feedback adjustment of slope surfaces, over-excavation or under-excavation is likely to occur in the upper and middle parts of the slope, resulting in a steep slope ratio (S>1:1.5) or the formation of step-like defects, which affects the connection of subsequent face protection construction.

[0007] (4) Lack of quantitative evaluation indicators for slope forming. There is a lack of quantitative evaluation methods for slope forming quality in existing construction. The concept of "forming rate" is vague and cannot be used as a quantitative target for construction control and optimization.

[0008] (5) Lack of parameter adjustment strategies for slope control. Existing filling parameter adjustments mainly target the filling volume and elevation. When the slope formation is unqualified, it is unclear which parameter should be adjusted and by how much, resulting in low filling efficiency and poor effect. Summary of the Invention

[0009] The purpose of this invention is to overcome the shortcomings of the prior art and provide a method for controlling the forming of the toe prism slope of a deep-water breakwater. This method addresses the problem that underwater drift of boulders and the superposition of multiple vessels have a continuous impact on the slope forming state, while the lack of a quantitative feedback relationship based on underwater measurement results between the dumping location and the final slope ratio makes it difficult to stably control the slope ratio and slope forming state of the toe prism slope.

[0010] To solve the above-mentioned technical problems, the present invention adopts the following technical solution: a method for controlling the forming of a deep-water breakwater toe prism slope, comprising the following steps: S1. Obtain the design parameters of the foot prism and the seabed topography and hydrological parameters of the construction area, and determine the filling range and rock filling volume of the foot prism based on the design parameters. S2. Based on the seabed topography, hydrological parameters, boulders parameters, and filling parameters, establish a foot prism slope forming model. Predict the underwater diffusion, accumulation, and slope forming state of the boulders using the slope forming model, and determine the initial filling parameters. S3. Conduct a trial dumping of boulders according to the initial dumping parameters. Determine the actual drift and diffusion range of the boulders based on the underwater accumulation results after the trial dumping, and correct the initial dumping parameters accordingly. S4. Perform formal filling according to the corrected filling parameters, and obtain the underwater measured topography of the foot prism after filling. Determine the measured slope ratio and slope forming rate based on the underwater measured topography. S5. Based on the deviation between the measured slope ratio and the target slope ratio, determine the adjustment direction and amount of the subsequent filling landing point, and form the optimized filling parameters; S6. Fill in the insufficiently formed areas of the slope according to the optimized filling parameters, and repeat the underwater topographic survey, slope condition evaluation and filling parameter adjustment until the measured slope ratio and slope forming rate meet the preset forming conditions.

[0011] Preferably, in step S1, a multibeam echo sounder is used to perform a full-coverage scan of the construction area to obtain the original seabed topography and the water depth of the landfill; an acoustic Doppler current profiler is used to obtain the flow velocity and direction at different water depths in the construction area. The design parameters include at least the filling elevation range, bottom width, top width, target slope ratio, and boulders specifications of the foot prism, and the boulders filling volume for each shipment is determined based on the design cross-section of the foot prism and the boulders gradation.

[0012] Preferably, in step S2, the foot prism slope forming model includes a single-ship underwater accumulation distribution model, a multi-ship superimposed accumulation distribution model, and a slope ratio calculation model. The underwater accumulation distribution model for single-ship dumping determines the underwater diffusion range of single-ship dumping based on the dumping water depth and the diffusion angle of the boulders along the length and width of the ship, and corrects the underwater diffusion range based on the boulder size using a particle size diffusion correction coefficient. The multi-ship stacking distribution model determines the stacking terrain after continuous stacking by multiple ships based on the landing points of different ship sorties and the corresponding stacking distribution of individual ships.

[0013] Preferably, in step S2, slope elevation points are extracted from the slope control section formed by multiple superimposed boats or the measured slope control section, and the slope elevation points are filtered and fitted with straight lines. The corresponding slope ratio is determined based on the slope of the fitted straight line. Numerical simulations were performed on the drifting process, landing position, accumulation morphology, and slope slip process of boulders sinking from the water surface to the seabed based on the slope forming model. The initial landing point, ship position direction, and dumping control parameters for each ship were determined based on the simulation results.

[0014] Preferably, in step S3, the spacing between boats along the slope direction and perpendicular to the slope direction is determined based on the single boat accumulation range and the preset overlap between adjacent dumping areas, and the single boat dumping volume and initial landing point are determined based on the design cross-section and the boat grid. At least one trial throw is performed based on the initial landing point. The actual landing center position and actual diffusion range of the stones are obtained by adjusting the feeding rate and opening width of the open barge. The subsequent throwing position is corrected based on the difference between the actual landing center position and the predicted landing center position.

[0015] Preferably, in step S4, after each filling cycle is completed, the filling area is scanned by a multibeam echo sounder system, and the measured slope line is extracted from the measured terrain along the designed slope control section. Calculate the slope ratio of the measured slope line and the cumulative length of the deviation between the measured slope and the designed slope within the allowable range, and determine the slope forming rate by the ratio of the cumulative length to the total length of the designed slope.

[0016] Preferably, in step S5, the deviation between the measured slope ratio and the target slope ratio is used as the feedback quantity for adjusting the filling parameters. When the measured slope ratio is less than the target slope ratio, the actual slope is determined to be too steep, and the subsequent additional throwing points are adjusted towards the toe of the slope. When the measured slope ratio is greater than the target slope ratio, the actual slope is determined to be too gentle, and the subsequent additional throwing points are adjusted to the upper part of the slope. The offset of the landing point coordinates is determined based on the slope ratio deviation of the continuous dumping cycle.

[0017] Preferably, the landing point coordinate offset is determined using an incremental proportional-integral-derivative control method, and the single adjustment step size of the landing point coordinate is 0.2 to 0.5 m; The proportional parameters, integral parameters, and differential parameters were determined by testing and measuring slope changes in typical construction sections.

[0018] Preferably, in step S6, the areas of the measured slope that are under-surfaced relative to the designed slope are supplemented by zonal surfacing, with the thickness of a single surfacing not exceeding 0.5m; Rough blasting is carried out using open barges, while local leveling and supplementary blasting are carried out using a combination of flat barges and backhoes.

[0019] Preferably, the preset molding conditions include: The deviation of the measured slope ratio from the target slope ratio shall not exceed 5%, and the slope formation rate shall not be less than 80%. The multibeam echo sounding system has 100% coverage of the dumping area, with a measurement accuracy of no more than ±0.1m, and the allowable elevation deviation of the measured slope surface relative to the designed slope surface is ±0.5m.

[0020] Compared with methods that rely solely on fill volume, ship position, or construction experience for constructing foot prisms, the technical advantages of this invention are: 1. This invention combines underwater diffusion prediction of boulders before construction, on-site trial throwing correction, and post-throwing multibeam measurement, so that the throwing control parameters can correspond to the actual water depth, water flow conditions, and boulder specifications, reducing the deviation caused by determining the landing point solely based on experience.

[0021] 2. This invention establishes a single-ship dumping and accumulation distribution model and a multi-ship superposition model, using the single-ship rock diffusion range and the underwater topography after continuous ship superposition as the basis for slope formation prediction, so that the ship spacing, single-ship volume and landing point can be determined according to the slope formation requirements.

[0022] 3. This invention uses the measured slope ratio as the closed-loop control quantity, and changes the subsequent stone placement point according to the slope's steepness or gentleness, so that the placement point adjustment directly corresponds to the stone distribution state in the upper and middle parts of the slope and the slope toe area.

[0023] 4. This invention uses both slope ratio deviation and slope forming rate as the criteria for forming judgment, so that the overall slope and the degree of local slope conformity can be quantitatively evaluated. Attached Figure Description

[0024] The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0025] Figure 1 This is a flowchart illustrating the overall process of forming the deep-sea breakwater toe prism slope according to the present invention. Figure 2 This is a schematic diagram of the cross-section and slope parameters of the pressure foot prism of the present invention; Figure 3 This is a schematic diagram of the underwater dumping operation of the pressure foot prism of the present invention; Figure 4 This is a schematic diagram of the underwater dumping and diffusion of the pressure foot prism of the present invention; Figure 5 This describes the operation process of the multibeam bathymetry method of the present invention; Figure 6 This is a schematic diagram of the underwater diffusion and accumulation model of a single-ship rock fragment according to the present invention; Figure 7 This is a schematic diagram illustrating the principle of multi-ship dumping and stacking stacking in this invention; Figure 8 This is a flowchart of the multibeam measurement and slope ratio calculation process of the present invention; Figure 9 This is a control principle diagram of the present invention for adjusting the landing point direction based on the slope ratio deviation; Figure 10 This is a flowchart illustrating the closed-loop control process of throwing, measuring, evaluating, adjusting parameters, and re-throwing in this invention. Figure 11 This is a schematic diagram illustrating the principle of slope forming rate evaluation in this invention. Detailed Implementation

[0026] The specific embodiments of the present invention will be further described in detail below with reference to the accompanying drawings. It should be noted that the following embodiments are for illustrative purposes only and are not intended to limit the scope of protection of the present invention.

[0027] Example 1: like Figure 1 and Figure 2 As shown, this embodiment uses a deep-sea breakwater toe prism as the construction object. The total designed fill volume of the toe prism is 640,000 m³, using two sizes of boulders: 500-800 kg and 800-1200 kg. The fill elevation range is -24.0 to -15.0 m, and the designed fill thickness is 9.0 m. The outer toe prism has a bottom width of 23.5 m and a top width of 6.0 m, while the inner toe prism has a bottom width of 21.5 m and a top width of 4.0 m. The designed slope ratio for both sides is 1:1.5.

[0028] First, basic data collection for the construction area was conducted. A multibeam echo sounder was used to perform full-coverage measurements of the original seabed in the construction area, establishing an original seabed elevation model. The average water depth for backfilling in the construction area is taken as ADCP was used to obtain the surface, middle and near-bottom flow velocities and directions along the water depth to determine the lateral drift direction during the sinking of rocks.

[0029] Subsequently, a model of the underwater accumulation distribution of a single-ship dumping operation was established, where the underwater accumulation of a single ship can be considered as a trapezoidal frustum. For example... Figure 3 As shown, let the volume of riprap dumped by a single ship be... The depth of the fill is The divergence angle along the length of the cabin is The spread angle in the width direction of the cabin is ,but: ; ; Among them, the spread angle in the direction of the ship's length Take 14 16 Diffusion angle in the width direction of the ship Take 18 20 , L S The length after diffusion, B b The width after diffusion. This is the correction factor for the diffusion of stone particle size.

[0030] The formula for the volume of a trapezoidal frustum is: ; Right now , , L 1 represents the side length of the upper surface. L 2 represents the side length of the lower surface. B 1 represents the width of the upper surface. B 2 represents the width of the lower surface.

[0031] The maximum stacking thickness can then be calculated as follows: ; The dimensions were determined through test launch and calibration. After the test launch, a multibeam echo sounder was used to obtain the actual bottom dimensions of the accumulation body. L S , B b Calculate using the following formula: or

[0032] In the formula This refers to the opening length of the open-body barge hopper. The average or envelope value of the two back-calculated results is taken as the correction factor for the size of the stone block, representing the opening width. When the stone block size changes, a trial firing calibration is performed again. Larger diameter stones have a smaller diffusion range. Small-diameter boulders have a wide diffusion range. .

[0033] The thickness of the pile at any location is determined according to the bilinear decay law of the trapezoidal frustum, and the pile is continuously filled until the [missing information]. The underwater topography behind the ship is ; Before construction, the measured seabed topography, stratified water flow parameters, boulders specifications, silo opening parameters, and dumping parameters were input into FLOW-3D to simulate the dumping process. During the simulation, the Bingham plastic equivalent method was used to represent the underwater accumulation, and the initial grid spacing for vessel placement was determined based on the simulation results. In this embodiment, an initial grid of 30m × 18m was used. A trial dumping was conducted using an open-hull barge, and the difference between the actual boulders accumulation center and the model's predicted accumulation center was recorded. The landing point for the actual construction was then adjusted based on this difference.

[0034] During the actual filling process, a multibeam sonar is used to re-scan the slope after each filling cycle. The sonar is positioned at fixed intervals along the designed slope. Extracting slope elevation points: ; in: ; Gaussian filtering is used to suppress outliers caused by local boulders and scour pits. The filter kernel function is: ; in, Take 1.5 to 2.0.

[0035] Linear fitting is performed on the filtered slope points using the random sampling consensus method: ; The measured slope ratio corresponds to the following value: ; Target slope ratio corresponding value: ; Definition of the first The slope deviation for each control cycle is: ; It should be noted that, under the above definition, This indicates that the horizontal distance corresponding to a unit elevation difference has decreased, meaning the actual slope is steeper. This indicates that the actual slope is relatively gentle.

[0036] like Figure 6 As shown, when When this happens, the placement point for the next round of additional stones is adjusted towards the foot of the slope, increasing the horizontal extension of the slope foot area with the newly added stones; when At that time, the landing point of the additional throw will be adjusted towards the upper part of the slope.

[0037] If the positive direction is defined as from the upper middle part of the slope towards the toe of the slope, then the increment of the landing point is determined using incremental PID control: ; in, This is the proportionality coefficient. The integral coefficient is... These are the differential coefficients. This is the control cycle for dumping and filling. In actual construction, the calculation results are discretized according to the step size of the landing point adjustment from 0.2 to 0.5m.

[0038] The slope forming rate is defined as: ; in, To design the total length of the slope surface, This represents the cumulative length of the measured slope deviation relative to the design slope that is within ±0.5m.

[0039] When the slope deviation is greater than the allowable value or At that time, supplementary surfacing is carried out according to the under-surfacing location of the corresponding slope section, with the thickness of each supplementary surfacing controlled within 0.5m; after supplementary surfacing, multibeam measurement is performed again. The above process is repeated until the deviation of the measured slope ratio from the target value does not exceed 5%. .

[0040] Example 2: This embodiment illustrates the trial launching process before construction. Based on the mathematical model and FLOW-3D simulation results, the initial barge layout grid is set to 30m × 18m, and the initial water surface landing point for each trial launch is determined according to the design cross-section. After the barge reaches the preset position, its orientation is maintained by the vessel positioning system, and materials are unloaded according to the predetermined opening process.

[0041] After the test launch, a multibeam echo sounder was used to conduct a full-coverage scan of the test launch area. The underwater topography before and after the test launch was subtracted to determine the actual accumulation of newly added rocks, and the actual accumulation center, the actual diffusion range along the ship's length, and the actual diffusion range along the ship's width were obtained.

[0042] The measured accumulation center is compared with the model-predicted accumulation center, and the resulting planar displacement is used as the on-site correction amount for the comprehensive drift of boulders under the current water flow conditions; after comparing the measured diffusion range with the model-predicted diffusion range, the subsequent ship position spacing and the overlap range of adjacent accumulation bodies are corrected.

[0043] When the water flow or the size of the boulders changes significantly during construction, a trial throw can be performed again for calibration, thus avoiding the application of the drift parameters obtained from the initial trial throw to all construction sections. In this invention, the trial throw is not an independent construction result, but rather a parameter calibration step connecting model predictions with actual construction conditions.

[0044] Example 3: This embodiment illustrates the adjustment process when the actual slope is too steep. After a certain filling cycle is completed, the corresponding slope control section is extracted from the multibeam bathymetry point cloud, and obtained through Gaussian filtering and straight line fitting: ; And according to: ; Obtain the current slope ratio.

[0045] When obtained: ; This indicates that the horizontal distance corresponding to the unit vertical elevation difference is insufficient, and the actual slope is steeper than the 1:1.5 target slope. At this point: ; The control system sets the subsequent landing point adjustment direction to the slope direction and calculates the landing point increment for this cycle based on incremental PID. After the calculation is completed, the continuous control quantity is converted into the actual ship position command according to the allowable adjustment step size of 0.2 to 0.5m.

[0046] During the replenishment process, priority should be given to adding stones to the relatively deficient areas at the toe of the slope, while limiting the thickness of each replenishment to within 0.5m to avoid creating new local over-replenishment in one replenishment.

[0047] After the resurfacing is completed, the multibeam system is used for scanning again. If the slope ratio is still less than the target value, the same control logic is continued to be used for adjustment; if it exceeds the target value, the adjustment direction of the next cycle is changed according to the new deviation direction, so that the slope ratio gradually approaches 1.5.

[0048] Example 4: This example illustrates the combined application of the slope ratio index and the local forming rate index.

[0049] The calculation is obtained after a certain filling is completed: ; This indicates that the actual horizontal extension distance of the slope is larger than the elevation difference, and the overall slope is relatively gentle. At this point: ; The control system adjusts the landing point of the next cycle towards the upper and middle part of the slope, so that the newly added stones mainly supplement the insufficient area in the upper and middle part of the slope.

[0050] At the same time, the distance between the measured slope surface and the design slope surface is calculated segment by segment for the entire design slope surface. When the absolute deviation is no greater than 0.5m, the corresponding slope segment is included. Final calculation: ; If, after slope ratio adjustment, the overall slope ratio is already within ±5% of the target slope ratio, but: ; This indicates that the overall slope has met the requirements, but there are still local areas with insufficient leveling, gullies, or discontinuities on the slope. In this case, instead of moving the landing point uniformly based solely on the overall slope ratio, the local sections that do not meet the ±0.5m requirement are identified based on the multibeam elevation difference map, and local supplementary leveling and leveling are carried out using a flat barge in conjunction with a backhoe.

[0051] Until both conditions are met simultaneously: ; as well as: ; Complete the forming of the foot prism slope in this construction section.

[0052] This avoids overlooking local slope defects when judging whether a slope is qualified based solely on the overall slope ratio.

[0053] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for forming a control of a deep water breakwater footing prism slope, characterized by, Includes the following steps: S1. Obtain the design parameters of the foot prism and the seabed topography and hydrological parameters of the construction area, and determine the filling range and rock filling volume of the foot prism based on the design parameters. S2. Based on the seabed topography, hydrological parameters, boulders parameters, and filling parameters, establish a foot prism slope forming model. Predict the underwater diffusion, accumulation, and slope forming state of the boulders using the slope forming model, and determine the initial filling parameters. S3. Conduct a trial dumping of boulders according to the initial dumping parameters. Determine the actual drift and diffusion range of the boulders based on the underwater accumulation results after the trial dumping, and correct the initial dumping parameters accordingly. S4. Perform formal filling according to the corrected filling parameters, and obtain the underwater measured topography of the foot prism after filling. Determine the measured slope ratio and slope forming rate based on the underwater measured topography. S5. Based on the deviation between the measured slope ratio and the target slope ratio, determine the adjustment direction and amount of the subsequent filling landing point, and form the optimized filling parameters; S6. Fill in the insufficiently formed areas of the slope according to the optimized filling parameters, and repeat the underwater topographic measurement, slope condition evaluation and filling parameter adjustment until the measured slope ratio and slope forming rate meet the preset forming conditions.

2. The method for forming the toe prism slope of a deep-sea breakwater according to claim 1, characterized in that: In step S1, a multibeam echo sounder is used to conduct a full-coverage scan of the construction area to obtain the original seabed topography and the water depth of the landfill; an acoustic Doppler current profiler is used to obtain the current velocity and direction at different water depths in the construction area. The design parameters include at least the filling elevation range, bottom width, top width, target slope ratio, and boulders specifications of the foot prism, and the boulders filling volume for each shipment is determined based on the design cross-section of the foot prism and the boulders gradation.

3. The method for forming the prism slope of the deep-sea breakwater toe as described in claim 1, characterized in that: In step S2, the foot prism slope forming model includes a single-ship underwater accumulation distribution model, a multi-ship superimposed accumulation distribution model, and a slope ratio calculation model. The underwater accumulation distribution model for single-ship dumping determines the underwater diffusion range of single-ship dumping based on the dumping water depth and the diffusion angle of the boulders along the length and width of the ship, and corrects the underwater diffusion range based on the boulder size using a particle size diffusion correction coefficient. The multi-ship stacking distribution model determines the stacking terrain after continuous stacking by multiple ships based on the landing points of different ship sorties and the corresponding stacking distribution of individual ships.

4. The method for forming the prism slope of the deep-sea breakwater toe as described in claim 3, characterized in that: In step S2, slope elevation points are extracted from the slope control section formed by multiple boats or the measured slope control section. The slope elevation points are then filtered and fitted with straight lines. The corresponding slope ratio is determined based on the slope of the fitted straight line. Numerical simulations were performed on the drifting process, landing position, accumulation morphology, and slope slip process of boulders sinking from the water surface to the seabed based on the slope forming model. The initial landing point, ship position direction, and dumping control parameters for each ship were determined based on the simulation results.

5. The method for forming the toe prism slope of a deep-sea breakwater according to claim 1, characterized in that: In step S3, the spacing between boats along the slope direction and perpendicular to the slope direction is determined based on the single boat accumulation range and the preset overlap between adjacent dumping areas. The dumping volume of a single boat and the initial landing point are determined based on the design cross section and the boat grid. At least one trial throw is performed based on the initial landing point. The actual landing center position and actual diffusion range of the stones are obtained by adjusting the feeding rate and opening width of the open barge. The subsequent throwing position is corrected based on the difference between the actual landing center position and the predicted landing center position.

6. The method for forming the prism slope of the deep-sea breakwater toe as described in claim 1, characterized in that: In step S4, after each filling cycle is completed, the filling area is scanned using a multibeam echo sounder system, and the measured slope line is extracted from the measured terrain along the designed slope control section. Calculate the slope ratio of the measured slope line and the cumulative length of the deviation between the measured slope and the designed slope within the allowable range, and determine the slope forming rate by the ratio of the cumulative length to the total length of the designed slope.

7. The method for forming the prism slope of the deep-sea breakwater toe as described in claim 1, characterized in that: In step S5, the deviation between the measured slope ratio and the target slope ratio is used as the feedback quantity for adjusting the filling parameters. When the measured slope ratio is less than the target slope ratio, the actual slope is determined to be too steep, and the subsequent additional throwing points are adjusted towards the toe of the slope. When the measured slope ratio is greater than the target slope ratio, the actual slope is determined to be too gentle, and the subsequent additional throwing points are adjusted to the upper part of the slope. The offset of the landing point coordinates is determined based on the slope ratio deviation of the continuous dumping cycle.

8. The method for forming the prism slope of the deep-sea breakwater toe as described in claim 7, characterized in that: The offset of the landing point coordinates is determined by incremental proportional-integral-derivative control, and the single adjustment step of the landing point coordinates is 0.2 to 0.5 m. The proportional parameters, integral parameters, and differential parameters were determined by testing and measuring slope changes in typical construction sections.

9. The method for forming the prism slope of the deep-sea breakwater toe as described in claim 1, characterized in that: In step S6, the areas of the measured slope that are under-surfaced relative to the designed slope are supplemented by zonal surfacing, with a single surfacing thickness not exceeding 0.5m. Rough blasting is carried out using open barges, while local leveling and supplementary blasting are carried out using a combination of flat barges and backhoes.

10. The method for forming the prism slope of the deep-sea breakwater toe as described in claim 1, characterized in that: The preset molding conditions include: The deviation of the measured slope ratio from the target slope ratio shall not exceed 5%, and the slope formation rate shall not be less than 80%. The multibeam echo sounding system has 100% coverage of the dumping area, with a measurement accuracy of no more than ±0.1m, and the allowable elevation deviation of the measured slope surface relative to the designed slope surface is ±0.5m.

Citation Information

Patent Citations

  • Deepwater slope type breakwater with part of soft soil foundation reserved and construction method

    CN120683826A

  • A precise filling construction method for deep water breakwater

    CN121161769B