A method for anti-caking mud cake grouting and slag improvement in shield tunneling of moderately weathered mudstone strata

By obtaining the natural water content and water sensitivity index of moderately weathered mudstone samples, the target plastic flow range and allowable liquid phase increment were determined. The amount of water-based slag improvement liquid added and the anti-adhesion treatment at the cutterhead front end were coordinated to solve the problems of cutterhead adhesion and unstable plastic flow state of slag in moderately weathered mudstone strata, and to achieve effective control of slag improvement and anti-caking of mud cake.

CN123109681APending Publication Date: 2026-11-17CHANGCHUN RAILWAY TRAFFIC GRP CO LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611618350.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-20
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In moderately weathered mudstone formations, existing technologies struggle to effectively control cutterhead adhesion and the plastic flow state of the slag within the soil chamber, leading to increased cutterhead torque and propulsion resistance, decreased penetration efficiency, and a tendency for the mud cake to re-form after removal.

Method used

By obtaining the natural water content of moderately weathered mudstone samples, the target plastic flow range and allowable liquid phase increment are determined. Combined with water-sensitive indicators and operating parameters, the amount of water-based slag improvement liquid added and the anti-sticking treatment at the front end of the cutterhead are synergistically controlled to form a mutually constraining regulatory relationship, ensuring the synergistic effect of slag improvement and anti-caking treatment.

Benefits of technology

It effectively stabilizes the plastic flow state of the excavated soil, reduces the formation of mud cake, improves penetration efficiency, reduces cutterhead torque and propulsion resistance, prevents mud cake from re-caking, and achieves coordinated control inside and outside the soil chamber.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109681A_ABST
    Figure CN123109681A_ABST
Patent Text Reader

Abstract

This invention relates to the field of tunnel construction technology and discloses a method for anti-caking mud cake grouting and soil improvement in shield tunneling of moderately weathered mudstone strata. The method includes obtaining representative moderately weathered mudstone samples and determining their initial water content; determining the target plastic flow range by adding water-based soil improvement liquid in stages; determining the allowable liquid phase increment based on the initial water content, the upper limit of the water content in the target plastic flow range, and the dry mass of the cut excavated soil; thereby forming the minimum effective addition amount and the maximum allowable addition amount; and determining the anti-adhesion treatment level at the cutterhead front end in conjunction with the water sensitivity index of the samples. A non-consolidated anti-adhesion treatment medium is applied to the cutting area in front of the cutterhead, while simultaneously adding water-based soil improvement liquid to the cut excavated soil in the soil chamber within the allowable addition range. This invention coordinates the anti-adhesion treatment at the cutterhead front end with the plastic flow regulation of the soil chamber, reducing the possibility of free water precipitation and pressure fluctuations in the soil chamber caused by excessive liquid addition, and reducing the possibility of mudstone accumulating and adhering at the cutterhead front end.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of tunnel construction technology, specifically to a method for anti-caking mud cake grouting and soil improvement in shield tunnels operating in moderately weathered mudstone strata. Background Technology

[0002] During earth pressure balance shield tunneling, the cutterhead is typically used to cut the strata, and the excavated soil forms a soil mass with certain plasticity and fluidity in the soil chamber to maintain the pressure in the soil chamber. This mass is then continuously discharged via a screw conveyor. The water content, agglomeration, kneadability, and fluidity of the excavated soil affect the pressure control at the excavation face and the stability of the excavation process. Moderately weathered mudstone contains a certain proportion of fine particles and clay minerals. Its natural water content, degree of weathering, and water absorption and softening characteristics change with the tunneling section. After being cut by the cutterhead and coming into contact with the liquid phase, the mudstone is easily softened and adhered. Fine particles may adhere to the cutterhead panel, cutterhead opening, and cutter surface, and gradually aggregate to form mud cakes under continuous compression and repeated cutting action. This may cause an increase in cutterhead torque and propulsion resistance, a decrease in penetration efficiency, and a reduction in the unobstructedness of the cutterhead opening.

[0003] In current construction, the condition of the cutting debris can be improved by adding water, foam, and other amendments to the front of the cutterhead or into the soil chamber. The injection volume is usually set based on geological data, construction experience, soil chamber pressure, and debris discharge performance. However, the initial water content and water sensitivity of moderately weathered mudstone vary from section to section. Using a fixed injection volume or adjusting the injection volume mainly based on equipment load changes makes it difficult to continuously adapt the injection volume to the actual condition of the current tunneling section. Insufficient injection volume may prevent the cutting debris from forming a plastic flow state suitable for continuous transport, while excessive injection volume may... It can lead to the precipitation of free water, excessive fluidization of slag, and fluctuations in soil chamber pressure. At the same time, the adhesion of mudstone in front of the cutterhead and insufficient plastic flow of slag in the soil chamber may manifest as similar phenomena such as increased propulsion force, increased cutterhead torque, or abnormal slag discharge. When adjusting based on a single operating parameter, it is difficult to distinguish whether the abnormality is mainly caused by adhesion at the front of the cutterhead or by an unsuitable state of slag in the soil chamber. Consequently, it may lead to a situation where liquid is added to the soil chamber while the adhesion in front of the cutterhead is not treated accordingly. If the original filling state is directly restored after the mud cake is removed, there is also a possibility of adhesion accumulating again.

[0004] Therefore, it is necessary to provide a new method for shield tunneling anti-caking mud cake grouting and slag improvement applicable to moderately weathered mudstone strata. Summary of the Invention

[0005] The purpose of this invention is to provide a method for anti-caking mud cake grouting and slag improvement in shield tunneling of moderately weathered mudstone strata, in order to solve the problems mentioned in the background art, such as the difficulty in reasonably determining the boundary of water-based slag improvement liquid addition under different water content and water sensitivity changes in different tunneling sections, the difficulty in coordinating the anti-adhesion treatment at the cutterhead front end and the slag improvement in the soil chamber, and the control and connection problems to prevent re-caking after mud cake removal.

[0006] To achieve the above objectives, the present invention provides the following technical solution: a method for anti-caking mud cake grouting and soil improvement in moderately weathered mudstone strata using a shield tunneling machine, comprising: S1. Obtain a representative moderately weathered mudstone sample from the current tunneling section, and characterize the initial water content state by the natural water content of the sample. S2. Add water-based slag soil amendment to the sample in stages to determine the target plastic flow range that meets the requirements of stable soil chamber pressure and continuous slag discharge. S3. Determine the allowable liquid phase increment for the current tunneling cycle based on the initial water content, the upper limit of the water content of the target plastic flow zone, and the dry soil mass of the excavated soil in the current tunneling cycle. S4. Determine the maximum allowable addition amount based on the allowable liquid phase increment and the effective liquid phase mass fraction of the water-based slag soil amendment, and determine the minimum effective addition amount based on the minimum addition amount required to reach the target plastic flow range, thus forming the allowable addition range of the water-based slag soil amendment. S5. Measure the water sensitivity index of the sample to determine the mudstone adhesion risk level, and determine the anti-adhesion treatment level of the cutterhead front end based on the allowable liquid phase increment and the mudstone adhesion risk level, so that when the allowable liquid phase increment decreases, the maximum allowable addition amount is reduced and the anti-adhesion treatment level of the cutterhead front end is increased. S6. In the current tunneling cycle, apply the anti-adhesion treatment medium to the cutting area in front of the cutterhead according to the anti-adhesion treatment level of the cutterhead front end, and add the water-based slag improvement liquid to the cutting slag in the soil chamber within the allowable addition range.

[0007] Preferably, based on the construction geological data, the section to be excavated is divided into multiple control sections whose lithology, natural water content, and weathering degree are respectively within the corresponding preset range, and the control section where the current excavation cycle is located is taken as the sampling range of the current excavation section; The liquid limit, plastic limit, fine particle content, and clay mineral composition of the sample are determined, and the water sensitivity index is determined based on the results of the water absorption softening test. The liquid limit and plastic limit are used as the test range and boundary determination criteria for the target plastic flow range.

[0008] Preferably, within the water content test range determined by the plastic limit to the liquid limit, multiple preset addition levels of the water-based slag soil amendment solution are added to the sample in stages; The state of the samples was determined based on their plastic agglomeration state, kneadability, free water precipitation state, stirring resistance, and simulated screw conveyor stability at each preset addition level. The water content range corresponding to each preset addition level that continuously satisfies the requirements of plastic agglomeration, kneadability, no release of free water, stirring resistance within a preset range, and continuous simulated spiral conveying is defined as the target plastic flow interval.

[0009] Preferably, the allowable liquid phase increment and the maximum permissible amount added by mass Determined according to the following formula:

[0010]

[0011] In the formula, The dry soil quality of the excavated soil during the current tunneling cycle is as follows: The natural moisture content, This represents the upper limit of the water content in the target plastic flow range. and All figures are mass fractions based on dry soil mass. The effective liquid phase mass fraction of the water-based slag improvement solution is given, and max indicates that the larger of the two values ​​within the parentheses is taken.

[0012] Preferably, the minimum amount of water-based slag improvement solution required to make the sample reach the lower limit of the water content state of the target plastic flow range is determined based on the state determination results corresponding to each preset addition level of the water-based slag improvement solution. Calculate the ratio of the minimum addition amount to the dry soil mass of the sample, and determine the ratio as the minimum addition amount per unit dry soil mass; The minimum effective addition amount is obtained by multiplying the minimum amount of dry soil added per unit mass by the dry soil mass of the cutting excavation in the current tunneling cycle. The allowable addition range is determined by using the minimum effective addition amount as the lower limit and the maximum allowable addition amount as the upper limit.

[0013] Preferably, the first anti-adhesion treatment level is determined from low to high based on the three-level margin range from high to low where the allowable liquid phase increment is located; Based on the water sensitivity index, a three-level mudstone adhesion risk level from low to high is determined, and based on the mudstone adhesion risk level, a second anti-adhesion treatment level from low to high is determined; The higher of the first and second anti-adhesion treatment levels is determined as the anti-adhesion treatment level of the cutter head front end.

[0014] Preferably, the anti-adhesion treatment medium is a non-consolidation medium; It is applied to the cutting area between the cutterhead surface and the excavation face through at least one of the cutterhead panel injection port, the cutterhead spoke arm injection port, and the cutterhead center area nozzle.

[0015] Preferred options also include: Obtain the thrust, cutterhead torque, and penetration depth for each tunneling cycle in the current tunneling section, and determine the ratio of thrust to penetration depth (FPI) and the ratio of cutterhead torque to penetration depth (TPI). When the cutting debris in a series of predetermined number of tunneling cycles is within the target plastic flow range and continuous slag discharge is maintained in each tunneling cycle, the predetermined number of consecutive tunneling cycles that first meet the above conditions in the current tunneling section are determined as the reference range. The FPI reference range and TPI reference range are determined according to the value range of FPI and TPI in the reference range, respectively. The preset number of consecutive tunneling cycles following the benchmark interval are defined as the verification interval.

[0016] Preferably, when the moisture content of the cutting slag is lower than the lower limit of the moisture content of the target plastic flow range, the slag discharge is discontinuous, and the actual amount of water-based slag amendment added is lower than the maximum allowable amount, the actual amount added is increased within the allowable range. When the water content of the cutting slag is in the target plastic flow range, and the FPI and TPI are continuously higher than the upper limit of their respective reference ranges within the verification range, the actual addition amount is maintained within the allowable addition range, and the anti-sticking treatment level of the cutter head front end is adjusted to a level higher than the current level but not higher than the preset highest level. When the moisture content of the cutting slag is higher than the upper limit of the moisture content of the target plastic flow range, free water is released, and the actual amount added is higher than the minimum effective amount added, the actual amount added shall be reduced within the allowable addition range.

[0017] Preferably, the propulsion speed reference range is determined based on the propulsion speed obtained within the reference range, and the anti-adhesion treatment level of the cutterhead front end corresponding to the reference range is determined as the conventional anti-adhesion treatment level; After the mud cake is removed, the anti-re-caking transition stage begins. The allowable liquid phase increment, maximum allowable addition amount, and mudstone adhesion risk level of the current tunneling cycle are redefined. The redefined maximum allowable addition amount is used as the upper limit for the addition of the water-based slag improvement liquid. Based on the redefined allowable liquid phase increment and mudstone adhesion risk level, a transitional anti-caking treatment level not lower than the conventional anti-caking treatment level is determined. When the FPI, TPI, and propulsion speed recover to their respective reference ranges within the continuous verification interval, the slag discharge remains continuous, and the water content of the cutting slag remains within the target plastic flow range, the transition anti-adhesion treatment level is gradually reduced. When the transition anti-adhesion treatment level is reduced to the conventional anti-adhesion treatment level and the above conditions are still met, the anti-reclamation transition stage is exited.

[0018] Compared with the prior art, the beneficial effects of this invention are as follows: This method for anti-caking mud cake grouting and soil improvement in shield tunneling of moderately weathered mudstone formations addresses the problems of easy adhesion of moderately weathered mudstone to the cutterhead after water absorption and softening, difficulty in stabilizing the plastic flow state of cutterhead soil in the soil chamber, and the limitation of water-based soil improvement liquid addition based on water content. It uses the target plastic flow range, allowable liquid phase increment, mudstone adhesion risk level, and shield tunneling operating parameters for the coordinated control of water-based soil improvement liquid and anti-adhesion treatment at the cutterhead front. This allows soil improvement and anti-caking mud cake treatment to act on the soil chamber interior and the cutterhead front respectively, forming a mutually constraining regulatory relationship, as detailed below: 1. By classifying and adding water-based slag amendment to representative moderately weathered mudstone samples, the target plastic flow range is determined. Based on the natural water content, the upper limit of the water content state of the target plastic flow range, and the dry soil mass of the slag cut in the current tunneling cycle, the allowable liquid phase increment is determined. This forms an allowable addition range with the minimum effective addition amount as the lower limit and the maximum allowable addition amount as the upper limit. The addition amount of water-based slag amendment is constrained by both the minimum addition amount required for the slag to reach a suitable plastic flow state and the amount of liquid phase that the current tunneling cycle can accommodate. This helps to reduce the difficulty of plastic agglomeration and discontinuous slag discharge caused by insufficient addition amount, and reduces the possibility of free water precipitation, excessive fluidization of slag, and fluctuations in soil chamber pressure caused by excessive addition amount. 2. The anti-adhesion treatment level at the cutterhead front end is determined by the first anti-adhesion treatment level corresponding to the allowable liquid phase increment and the second anti-adhesion treatment level corresponding to the water sensitivity index. When the allowable liquid phase increment decreases, the maximum allowable addition amount of water-based slag amendment is reduced and the anti-adhesion treatment level at the cutterhead front end is increased. When the amount of liquid phase that can be added in the soil chamber is small, the anti-adhesion treatment at the front end can be strengthened by applying a non-consolidated anti-adhesion treatment medium to the cutting area between the cutterhead surface and the excavation face. This helps to reduce the impact of simply increasing the water-based slag amendment on the water content of the cutting slag and makes the adhesion control in front of the cutterhead and the plastic flow regulation of the slag in the soil chamber work together. 3. Establish benchmark ranges for FPI, TPI, and propulsion speed through benchmark intervals. Within the verification interval, adjust the parameters based on the moisture content of the cutting debris, the continuity of slag discharge, and the actual amount added. When the moisture content of the debris is low, increase the actual amount added within the allowable range. When the debris is in the target plastic flow range but FPI and TPI are consistently high, increase the anti-adhesion treatment level at the cutterhead front. When the moisture content of the debris is high and free water is released, decrease the actual amount added. This provides a basis for distinguishing between abnormal plastic flow of debris in the soil chamber and the risk of adhesion in front of the cutterhead. After cake removal, set an anti-reclamation transition stage and gradually reduce the transition anti-adhesion treatment level according to the continuous recovery of operating parameters and slag discharge status. This helps reduce the possibility of premature recovery of the anti-adhesion treatment level leading to cake re-accumulation. Attached Figure Description

[0019] Figure 1 This is a schematic diagram of the shield tunneling anti-caking mud cake grouting and slag improvement method of the present invention; Figure 2 This is a schematic diagram illustrating the determination of the permissible addition range of the water-based slag soil amendment solution of the present invention; Figure 3 This is a schematic diagram showing the injection locations of the anti-adhesion treatment medium and the water-based slag improvement liquid of the present invention; Figure 4 This is a schematic diagram illustrating the determination of the anti-adhesion treatment level at the front end of the cutter head in this invention. Figure 5 This is a schematic diagram of the shield tunneling operation verification and anti-reconstruction control process of the present invention, wherein... Figure 5 (a) is a schematic diagram of the shield tunneling operation verification and adjustment process. Figure 5 (b) is a schematic diagram of the anti-reclamation control process after mud cake removal. Detailed Implementation

[0020] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0021] Example 1: Please refer to Figures 1-4 , Figure 5 (a) and Figure 5 (b) This invention provides a technical solution: a method for anti-caking mud cake grouting and slag improvement in moderately weathered mudstone strata using a shield tunneling machine, wherein the specific steps are as follows: S1. Obtain a representative moderately weathered mudstone sample from the current tunneling section, and characterize the initial water-bearing state by the natural water content of the sample. The current tunneling section is a continuous section in which the current tunneling cycle is located and the formation conditions are maintained within the corresponding preset range. The initial water-bearing state obtained from this section is used for subsequent determination of the target plastic flow interval, calculation of the allowable liquid phase increment, and determination of the anti-adhesion treatment level at the cutterhead front end.

[0022] In this embodiment, the section to be excavated is divided into multiple control sections based on the geological data of the construction site. The control section in which the current excavation cycle is located is taken as the sampling range of the current excavation section. Specifically, the control sections are divided along the shield tunneling direction based on the geological survey report, borehole column data, indoor geotechnical test data, and construction supplementary survey data. Continuous sections with the same lithology, the same degree of weathering, and a natural moisture content variation coefficient of no more than 10% are included in the same control section. When the lithology or the degree of weathering changes, or the natural moisture content variation coefficient is greater than 10%, the corresponding change position is taken as the boundary position of adjacent control sections. At least three sampling locations are set up along the shield tunneling direction within the current tunneling section. At each sampling location, at least three moderately weathered mudstone samples without soil amendment are obtained. During sampling, the sampling location, burial depth, and corresponding tunneling cycle are recorded. Parts that have been soaked by external water, lost surface water, or contaminated by amendment media are discarded. Among them, intact samples are used for water absorption and softening tests, and the remaining samples are crushed and uniformly mixed for the determination of natural moisture content, liquid limit, plastic limit, fine particle content, and clay mineral composition. The natural moisture content of the samples at each sampling location is obtained by drying to constant weight. The average natural moisture content of each valid sample is taken as the initial moisture state. When the coefficient of variation of the obtained natural moisture content is greater than 10%, the control section is re-divided and re-sampling is carried out. The liquid limit, plastic limit, fine particle content, and clay mineral composition of the sample were determined, and the water sensitivity index was determined based on the water absorption softening test results. The liquid limit and plastic limit were used as the test range and boundary determination criteria for the target plastic flow interval. Specifically, intact moderately weathered mudstone samples were prepared into parallel specimens of the same size. One set of parallel specimens remained in their natural state after sampling, while the other set was immersed in water until the mass change rate measured between two consecutive 24-hour intervals was no greater than 0.1%. Under the same uniaxial compression test conditions, the uniaxial compressive strength of the parallel specimens without water absorption treatment was measured. Uniaxial compressive strength of parallel specimens after water absorption treatment and in accordance with Determine water sensitivity index ,in, The uniaxial compressive strength of parallel specimens that have not undergone water absorption treatment. To determine the uniaxial compressive strength of parallel specimens after water absorption treatment, A water-sensitive index characterizing the degree to which a sample retains its strength after absorbing water. A decrease indicates that the sample has become more hygroscopic and softened.

[0023] S2. Water-based slag amendment is added to the sample in stages to determine the target plastic flow range that meets the requirements of stable slag pressure and continuous slag discharge. The target plastic flow range represents the range of water content in which the cut slag can form stable plasticity, transmit slag pressure, and be continuously discharged by the screw conveyor. The lower limit of the water content corresponds to the lowest liquid phase state required to maintain plastic agglomeration and continuous conveying, and the upper limit of the water content corresponds to the highest liquid phase state before free water precipitation and excessive fluidization occur. The liquid limit and plastic limit are used to define the range of water content covered by the grading test and serve as the basis for determining the water content of the range boundary. The water content corresponding to the plastic limit is used as the starting boundary of the grading test, and the water content corresponding to the liquid limit is used as the ending boundary of the grading test. The actual lower limit and upper limit of the water content of the target plastic flow range are within the test range and are determined jointly based on the plastic agglomeration state, kneadability, free water precipitation state, stirring resistance, and simulated screw conveying stability of the sample.

[0024] In this embodiment, within the water content test range determined by the plastic limit to the liquid limit, multiple preset addition levels of the water-based slag soil amendment are added to the sample step by step. In this embodiment, a foaming agent aqueous solution prepared by 3 parts by mass of the effective component of the dispersible foaming agent and 97 parts by mass of water is used as the water-based slag soil amendment. The foaming agent aqueous solution is foamed to form foam, and the foaming ratio is fixed at 10. The foam injection rate is characterized by the ratio of the injected foam volume to the natural accumulation volume of the test sample. The foam injection rates are set to 0%, 15%, 30%, 45%, and 60% respectively. Samples with the same dry soil mass are divided into five corresponding parallel samples, and the dry soil mass of each parallel sample is 10 kg. The foam corresponding to each addition level is uniformly added to the parallel sample and stirred for 3 minutes. The actual added mass of the foaming agent aqueous solution and the water content after addition are recorded. The state of the samples was determined based on their plastic agglomeration state, kneadability, free water precipitation state, stirring resistance, and simulated screw conveyor stability at each preset addition level. Specifically, the following criteria were met: plastic agglomeration was defined as follows: the sample was formed into a 50mm diameter agglomerate and remained in its overall shape after standing for 60 seconds; kneadability was defined as follows: the sample was compressed to 50% of its original height and remained continuous without significant loosening or cracking; no visible liquid separated from the solid phase was defined as follows: no free water precipitation was defined as follows: the stirring resistance was defined as being within the preset range if the coefficient of variation of the driving torque of the stirring device was not greater than 10% in the last 60 seconds; and continuous simulated screw conveyor operation was defined as follows: the sample was continuously run in a simulated screw conveyor at a speed of 10r / min for 3 minutes with a single discharge interruption time not exceeding 5 seconds. The target plastic flow interval is defined as the range of water content corresponding to each preset addition level that continuously meets the requirements of plastic agglomeration, kneadability, no release of free water, stirring resistance within a preset range, and continuous simulated screw conveying. Specifically, the water content corresponding to the lowest addition level that meets all the above conditions is defined as the upper limit of the water content of the target plastic flow interval, and the water content corresponding to the highest addition level that meets all the above conditions is defined as the upper limit of the water content of the target plastic flow interval. A 3-minute mixing and discharge test is conducted on this water content range under the design earth chamber pressure of the shield tunnel. When the fluctuation of the earth chamber pressure relative to the set pressure does not exceed 10% and the discharge is continuous during the test, the target plastic flow interval is confirmed. When a state transition occurs between two adjacent addition levels, an intermediate addition level is added between the two adjacent addition levels and the test is repeated to reduce the error in determining the interval boundary.

[0025] S3. Based on the initial water content, the upper limit of the water content of the target plastic flow zone, and the dry soil mass of the cutting excavation in the current tunneling cycle, determine the allowable liquid phase increment for the current tunneling cycle. The allowable liquid phase increment represents the maximum effective liquid phase mass allowed to be introduced into the soil chamber to avoid the cutting excavation exceeding the upper limit of the water content of the target plastic flow zone, based on the existing water content of the moderately weathered mudstone in the current tunneling cycle. It serves as the common basis for determining the subsequent maximum allowable addition amount and the anti-adhesion treatment level at the cutterhead front end.

[0026] In the above process, the shield excavation cross-sectional area is first determined based on the shield excavation diameter. Then, the product of the shield excavation cross-sectional area, the actual advance distance of the current tunneling cycle, and the dry density of weathered mudstone in the current tunneling section is determined as the dry soil mass of the excavated soil in the current tunneling cycle. In the first five tunneling cycles after the start of tunneling in each control section, the wet mass of the discharged excavated soil is recorded and its moisture content is measured. The wet mass of the discharged excavated soil is converted into the corresponding dry soil mass. The ratio of the converted dry soil mass to the dry soil mass obtained based on the actual excavation volume is used as the correction coefficient for the current control section. When the difference between the two exceeds 5% of the dry soil mass obtained based on the actual excavation volume, the correction coefficient is used to correct the dry soil mass of the excavated soil in subsequent tunneling cycles. The correction coefficient is re-determined when the control section is re-divided.

[0027] In this embodiment, liquid phase increment is allowed. Determined according to the following formula:

[0028] In the formula, This represents the allowable liquid phase increment for the current tunneling cycle. The dry soil quality of the excavated soil during the current tunneling cycle is as follows: The natural moisture content, This represents the upper limit of the water content in the target plastic flow range. and All figures are mass fractions based on dry soil mass. Indicates taking 0 and The larger value in; when Below At that time, the effective liquid phase mass that can be introduced into the current tunneling cycle is determined according to the difference between the two values. Reaching or exceeding When the allowable liquid phase increment is zero, the anti-adhesion treatment medium used in this embodiment is an anhydrous medium with a water content of no more than 0.5%. Its application amount is not included in the allowable liquid phase increment based on the water content of the cutterhead. When an additional water-containing medium is applied to the front of the cutterhead during construction or when external water is detected entering the cutting area, the additional effective liquid phase mass entering the current tunneling cycle to cut the cutterhead is determined based on the amount of water-containing medium added and its effective liquid phase mass fraction or the on-site external water monitoring record. The additional effective liquid phase mass is deducted from the allowable liquid phase increment calculated based on the natural water content, and the non-negative result after deduction is used as the corrected allowable liquid phase increment for the current tunneling cycle.

[0029] In the above formula, This indicates the liquid phase mass of the excavated material during the current tunneling cycle before the addition of water-based excavated material amendment. This represents the liquid phase mass corresponding to the upper limit of the water-bearing state of the target plastic flow range, and the difference between the two represents the effective liquid phase mass that can be increased by adjusting from the initial water-bearing state to the upper limit of the water-bearing state. This ensures that the allowable liquid phase increment is simultaneously constrained by both the current initial water-bearing state of the formation and the current cutting scale of the tunneling cycle. When Below At that time, the effective liquid phase mass that can be increased in the current tunneling cycle is determined according to the difference between the two, and The closer The smaller the allowable liquid phase increment; when Reaching or exceeding At that time, through The value is set to zero to indicate that the current tunneling cycle does not have the capacity to continue increasing the effective liquid phase, and this result is passed on to the subsequent determination of the maximum allowable addition amount and the anti-adhesion treatment level at the cutterhead front end.

[0030] During continuous tunneling, the actual advance distance for each tunneling cycle is re-determined. And continue to use the current tunneling section determined by S1 and S2. and Calculate the corresponding When the geological data, sampling results, or discharge soil verification results indicate that the lithology, natural water content, or weathering degree exceeds the preset range of the current control section, return to S1 to redetermine the current tunneling section and its initial water content, so that the allowable liquid phase increment output to S4 corresponds to the actual stratum state.

[0031] S4. Determine the maximum allowable addition amount based on the allowable liquid phase increment and the effective liquid phase mass fraction of the water-based slag improvement liquid, and determine the minimum effective addition amount based on the minimum addition amount required to reach the target plastic flow range, thus forming the allowable addition range of the water-based slag improvement liquid; wherein, the maximum allowable addition amount is used to limit the effective liquid phase mass introduced into the cutting slag in the current tunneling cycle, and the minimum effective addition amount is used to ensure that the cutting slag can reach the water content limit of the target plastic flow range, and the two together form the addition boundary of the water-based slag improvement liquid in the soil chamber.

[0032] The water-based slag amendment solution used in this embodiment is prepared by mixing 3 parts by mass of the effective component of the dispersible foaming agent and 97 parts by mass of water. This increases the amount of water in the hydrated state of the cutting slag included in the effective liquid phase mass. The gas in the foam and the effective component of the foaming agent are not included in the effective liquid phase mass. Therefore, the effective liquid phase mass fraction of the water-based slag amendment solution is... Take 0.97, and measure the actual amount of water-based slag soil amendment solution added on site based on the mass of the foaming agent aqueous solution before foaming.

[0033] The maximum permissible amount added by mass Determined according to the following formula:

[0034] In the formula, This represents the maximum permissible amount of water-based soil amendment solution, by mass, to be added during the current tunneling cycle. This represents the allowable liquid phase increment for the current tunneling cycle. The effective liquid phase mass fraction of the water-based soil amendment solution; when adding it on-site using a volumetric metering method, the effective liquid phase mass fraction should be determined based on the measured density of the water-based soil amendment solution. Converted to the corresponding maximum allowable volume.

[0035] In this embodiment, based on the state determination results corresponding to each preset addition level of the water-based slag improvement liquid, the minimum addition amount of water-based slag improvement liquid required to make the sample reach the water content limit of the target plastic flow range is determined. Specifically, from the preset addition levels in S2 that meet the requirements of plastic agglomeration, kneadability, no precipitation of free water, stirring resistance within a preset range, and continuous simulated spiral conveying, the addition level corresponding to the water content limit of the target plastic flow range is selected, and the mass of water-based slag improvement liquid corresponding to the addition level is taken as the minimum addition amount of the sample. When the initial water content of the sample is already in the target plastic flow range, the minimum addition amount is determined to be zero. Calculate the ratio of the minimum addition amount to the dry soil mass of the sample, and determine the ratio as the minimum addition amount per unit dry soil mass. The dry soil mass of the sample is the dry soil mass of the corresponding parallel sample in the S2 grading test. Both the minimum addition amount and the dry soil mass of the sample are measured by mass and correspond to the same water-based slag soil amendment preparation ratio. Thus, the minimum addition amount per unit dry soil mass can represent the mass of water-based slag soil amendment required per unit dry soil mass when the moderately weathered mudstone in the current tunneling section reaches the lower limit of the target plastic flow range water content. The minimum effective addition amount per unit dry soil mass is obtained by multiplying it by the dry soil mass of the excavated soil in the current tunneling cycle. The allowable addition range is determined by using the minimum effective addition amount as the lower limit and the maximum allowable addition amount as the upper limit. When the minimum effective addition amount is not higher than the maximum allowable addition amount, an effective allowable addition range is formed. When the minimum effective addition amount is higher than the maximum allowable addition amount, the use of this set of parameters is suspended and the current tunneling cycle is entered. The current tunneling section division, initial water content, target plastic flow zone, effective liquid phase mass fraction of water-based excavated soil amendment, and dry soil mass of the excavated soil in the current tunneling cycle are rechecked in sequence. If an effective allowable addition range cannot be formed after rechecking, the current water-based excavated soil amendment is determined to be unsuitable for the control section. The effective component ratio of the foaming agent of the water-based excavated soil amendment is adjusted and S2 to S4 are re-executed until the minimum effective addition amount is not higher than the maximum allowable addition amount before the current tunneling cycle is executed.

[0036] S5. Measure the water sensitivity index of the sample to determine the mudstone adhesion risk level, and determine the cutterhead front-end anti-adhesion treatment level based on the allowable liquid phase increment and the mudstone adhesion risk level. When the allowable liquid phase increment decreases, reduce the maximum allowable addition amount and increase the cutterhead front-end anti-adhesion treatment level. Thus, the water absorption and softening characteristics of weathered mudstone in the current tunneling section and the effective liquid phase mass that can continue to be introduced into the soil chamber in the current tunneling cycle are used as the grading basis for front-end anti-adhesion treatment, so that the mudstone adhesion risk that still exists after the water-based slag improvement liquid in the soil chamber is restricted is borne by the cutterhead front-end anti-adhesion treatment.

[0037] Based on the three-level margin range from high to low where the allowable liquid phase increment is located, the first anti-adhesion treatment level from low to high is determined; in this embodiment, to make the allowable liquid phase increments of different tunneling cycles comparable, the allowable liquid phase increment is divided by the dry soil mass of the cut excavated soil in the current tunneling cycle to obtain the liquid phase margin per unit dry soil mass, and the three-level margin range where the allowable liquid phase increment is located is determined according to the liquid phase margin per unit dry soil mass; the difference between the upper limit of the water content state and the lower limit of the water content state of the target plastic flow interval is determined as the width of the target plastic flow interval, and the single The state where the liquid phase balance per unit dry soil mass is greater than two-thirds of the width of the target plastic flow interval is defined as the high balance interval. The state where the liquid phase balance per unit dry soil mass is greater than one-third but not greater than two-thirds of the width of the target plastic flow interval is defined as the medium balance interval. The state where the liquid phase balance per unit dry soil mass is not greater than one-third of the width of the target plastic flow interval is defined as the low balance interval. The low, medium and high levels are then defined as the first anti-adhesion treatment levels corresponding to the high balance interval, medium balance interval and low balance interval, respectively. Based on the aforementioned water sensitivity index, a three-tiered mudstone adhesion risk level is determined from low to high, and a second anti-adhesion treatment level is determined from low to high based on the aforementioned mudstone adhesion risk level; specifically regarding the water sensitivity index... A value greater than 0.75 is considered a low-grade mudstone adhesion risk. A value greater than 0.50 and not greater than 0.75 is defined as a medium-level mudstone adhesion risk. A value not exceeding 0.50 is identified as a high-risk mudstone adhesion, and low, medium, and high risks are respectively identified as the corresponding second anti-adhesion treatment levels; The higher of the first and second anti-adhesion treatment levels is determined as the anti-adhesion treatment level at the cutterhead front end. The first anti-adhesion treatment level reflects the remaining liquid phase adjustment space on the current tunneling circulation soil chamber side, and the second anti-adhesion treatment level reflects the inherent water absorption, softening, and adhesion tendency of weathered mudstone in the current tunneling section. When the two levels are different, the higher level is adopted so that any anti-adhesion requirement formed by a small allowable increase in liquid phase or a high risk of mudstone adhesion can be included in the anti-adhesion treatment level at the cutterhead front end.

[0038] Since the maximum allowable addition amount in S4 is determined by the allowable liquid phase increment and the effective liquid phase mass fraction of the water-based slag amendment, when the effective liquid phase mass fraction remains unchanged, the allowable liquid phase increment recalculated for the same tunneling cycle decreases, and the maximum allowable addition amount decreases according to the calculation relationship between the two. When determining the first anti-adhesion treatment level between different tunneling cycles, the allowable liquid phase increment is divided by the dry soil mass of the slag cut in the current tunneling cycle, and the resulting unit dry soil mass liquid phase surplus is used as the determination quantity of the surplus interval. When the unit dry soil mass liquid phase surplus moves from the current surplus interval to a lower surplus interval, the first anti-adhesion treatment level is increased, and the higher of the first and second anti-adhesion treatment levels is determined as the cutterhead front-end anti-adhesion treatment level for the current tunneling cycle. If a single measurement fluctuation does not cause the unit dry soil mass liquid phase surplus to cross the surplus interval boundary, the original cutterhead front-end anti-adhesion treatment level is maintained, and the obtained level is used as the execution parameter for applying the anti-adhesion treatment medium in S6.

[0039] S6. In the current tunneling cycle, an anti-adhesion treatment medium is applied to the cutting area in front of the cutterhead according to the anti-adhesion treatment level at the cutterhead front end, and the water-based soil amendment is added to the cutting debris in the soil chamber within the allowable addition range; wherein, the anti-adhesion treatment medium acts on the weathered mudstone before it is cut and in the initial stage after the formation of the cutting interface, and the water-based soil amendment acts on the cutting debris after it enters the soil chamber. The control system of the earth pressure balance shield tunneling machine controls the anti-adhesion treatment medium injection pump and the water-based soil amendment injection pump respectively to coordinate the control of the adhesion risk in front of the cutterhead and the plastic flow state of the cutting debris in the soil chamber.

[0040] In this embodiment, the anti-adhesion treatment medium is a non-consolidated medium; a non-consolidated medium refers to a medium that remains flowable and does not form a gel or hardened solid during the application, cutting, and slag removal of the current tunneling cycle; the anti-adhesion treatment medium is applied to the cutting area between the cutterhead face and the excavation face through at least one of the cutterhead panel injection port, the cutterhead spoke arm injection port, and the cutterhead central area nozzle; as a specific embodiment, anhydrous non-hydrolyzable polyether modified polydimethylsiloxane is used as the anti-adhesion treatment medium, wherein the non-hydrolyzable means that the polyether segments are connected to the polydimethylsiloxane main chain by silicon-carbon bonds, the anti-adhesion treatment medium does not contain curing agents and crosslinking agents, has a water content of no more than 0.5%, and a dynamic viscosity of 200 mPa·s to 1000 mPa·s at 25°C.

[0041] Before the tunnel boring machine (TBM) enters the current excavation section, anti-adhesion treatment parameter tests are conducted using representative moderately weathered mudstone samples, test nozzles with the same orifice diameter as the cutterhead injection port, and the aforementioned anti-adhesion treatment medium. Under the condition that the nozzle pressure is 0.1 MPa to 0.2 MPa higher than the TBM's designed soil chamber pressure, the amount of medium applied is gradually increased. The minimum application amount corresponding to the condition where the medium covers at least 80% of the sample's contact surface with the metal, and the decrease in metal surface adhesion quality does not exceed 5% after each further increase in application amount, is converted into the benchmark application amount per unit excavation volume. The lower-level anti-adhesion treatment uses this benchmark application amount and activates a set of injection nozzles. The intermediate anti-adhesion treatment level is applied at 1.5 times the baseline application amount and with at least two sets of injection ports enabled during the first third of the current tunneling cycle. The advanced anti-adhesion treatment level is applied at twice the baseline application amount and with all available injection ports enabled during the entire cutting period of the current tunneling cycle. When the shield has only one set of available injection ports, keep that set of injection ports enabled and increase the level by increasing the medium flow rate and application duration. The application pressure for each level shall not exceed the smaller of the rated pressure of the injection pipeline and the allowable pressure for stable excavation face. Before the cutterhead begins cutting, the shield tunneling control system starts the anti-adhesion treatment medium injection pump. After the corresponding injection port continuously produces liquid, the cutterhead is started. The system controls the amount of medium applied, the number of injection ports activated, the application duration, and the application pressure according to the anti-adhesion treatment level at the front end of the cutterhead. This disperses the anti-adhesion treatment medium in the cutting area between the cutterhead surface and the excavation face, forming a liquid isolation layer. The water content of the anti-adhesion treatment medium is no more than 0.5%, and its application amount is not included in the allowable liquid phase increment determined based on the water content of the cutterhead excavated soil. When adding water-based soil amendment liquid into the soil chamber, the foaming agent aqueous solution prepared by S2, consisting of 3 parts by mass of the effective component of the dispersible foaming agent and 97 parts by mass of water, is used. The shield tunneling control system controls the water-based soil amendment liquid injection pump to continuously apply the liquid according to the progress of the current tunneling cycle cutting soil entering the soil chamber. The mass of the foaming agent aqueous solution before foaming is accumulated by the flow meter as the actual addition amount. When the actual addition amount reaches the minimum effective addition amount, the adjustment continues according to the water content of the cutting soil, the soil chamber pressure, and the continuity of slag discharge. The increase stops when the actual addition amount reaches the maximum allowable addition amount, so that the actual addition amount is kept within the allowable addition range.

[0042] Furthermore, such as Figure 5As shown in (a), in this embodiment, the thrust, cutterhead torque, and penetration depth of each tunneling cycle in the current tunneling section are obtained, and the ratio of thrust to penetration depth (FPI) and the ratio of cutterhead torque to penetration depth (TPI) are determined. When the cutting debris in a preset number of consecutive tunneling cycles is in the target plastic flow range and continuous slag discharge is maintained in each tunneling cycle, the preset number of consecutive tunneling cycles that first meet the above conditions in the current tunneling section are determined as the benchmark interval. The FPI benchmark range and TPI benchmark range are determined according to the value range of FPI and TPI in the benchmark interval, respectively. The preset number of consecutive tunneling cycles after the benchmark interval are determined as the verification interval. In this embodiment, the preset number is set to five. The earth pressure balance shield tunneling control system reads the thrust, cutterhead torque, cutterhead rotations, and thrust distance of each tunneling cycle from the equipment operation record, and determines the thrust distance corresponding to each rotation of the cutterhead. For penetration depth, when the cutting debris in five consecutive tunneling cycles is within the target plastic flow range and continuous slag removal is maintained in each tunneling cycle, these five tunneling cycles are determined as the benchmark range. When any tunneling cycle does not meet the above conditions, the current continuous counting is terminated and counting restarts from the next tunneling cycle that meets the conditions. The minimum and maximum values ​​of FPI within the benchmark range are used as the lower and upper limits of the FPI benchmark range, respectively. The minimum and maximum values ​​of TPI within the benchmark range are used as the lower and upper limits of the TPI benchmark range, respectively. Every five consecutive tunneling cycles after the benchmark range are sequentially determined as a check range. After each check range is completed, the next check range is formed using the following five consecutive tunneling cycles. When the current tunneling cycle enters a new control section, the original benchmark range and check range are stopped, and the benchmark range, FPI benchmark range, and TPI benchmark range are redefined in the new control section.

[0043] When determining the moisture content of cutting excavated soil, representative cutting excavated soil samples are continuously obtained from the slag discharge end of the screw conveyor during the current tunneling cycle. A rapid moisture content testing device calibrated with the drying method for the same batch of cutting excavated soil is used to measure the moisture content of the samples, and the result is uniformly converted to a mass fraction based on dry soil mass. The latest measurement result is taken as the current moisture content of the cutting excavated soil and compared with the lower limit and upper limit of the moisture content of the target plastic flow range. Furthermore, when the moisture content of the cutting excavated soil is lower than the lower limit of the moisture content of the target plastic flow range, the slag discharge is discontinuous, and the water base... When the actual amount of soil amendment solution added is lower than the maximum allowable amount, the actual amount added is increased within the allowable range. Each increase shall not exceed the mass difference of water-based soil amendment solution corresponding to two adjacent preset addition levels in S2. The increase shall be stopped when the water content of the cut soil enters the target plastic flow zone and the slag discharge resumes continuous operation. When the actual amount added reaches the maximum allowable amount and the cut soil still has not entered the target plastic flow zone, the addition of solution shall be stopped. The target plastic flow zone, minimum effective addition amount, maximum allowable addition amount and allowable addition range shall be re-determined before the start of the next tunneling cycle. When the moisture content of the cutting excavated soil is within the target plastic flow range, and the FPI and TPI are consistently higher than the upper limit of their respective reference ranges within the verification range, the actual addition amount is maintained within the allowable addition range, and the anti-adhesion treatment level of the cutterhead front end is adjusted to a level higher than the current level but not higher than the preset highest level; wherein, consistently higher means that the FPI and TPI are both higher than the upper limit of their respective reference ranges in five tunneling cycles within the same verification range, and the anti-adhesion treatment level of the cutterhead front end is increased by one level each time. When the current level has reached the high level, it is maintained at the high level and a mud cake check is triggered in the cutterhead cutting area to avoid the risk of adhesion in front of the cutterhead by adding water-based excavated soil amendment when the cutting excavated soil is already within the target plastic flow range; When the water content of the cutting slag is higher than the upper limit of the water content of the target plastic flow range, free water is released, and the actual addition amount is higher than the minimum effective addition amount, the actual addition amount is reduced within the allowable addition range. Each reduction amount does not exceed the mass difference of the water-based slag amendment liquid corresponding to two adjacent preset addition amount levels in S2. The reduction stops when the water content of the cutting slag returns to the target plastic flow range. When the actual addition amount reaches the minimum effective addition amount and the cutting slag is still higher than the upper limit of the water content of the target plastic flow range, the entry of external water in front of the cutter head is checked and the initial water content, allowable liquid phase increment, and allowable addition range are re-determined.

[0044] Furthermore, such as Figure 5As shown in (b), in this specific embodiment, the advance speed reference range is determined based on the advance speed obtained within the reference range, and the anti-adhesion treatment level of the cutterhead front end corresponding to the reference range is determined as the conventional anti-adhesion treatment level. After mud cake removal, the anti-re-caking transition stage is entered, and the allowable liquid phase increment, maximum allowable addition amount, and mudstone adhesion risk level of the current tunneling cycle are re-determined. The re-determined maximum allowable addition amount is used as the upper limit for the addition of the water-based slag amendment liquid, and a transitional anti-adhesion treatment level not lower than the conventional anti-adhesion treatment level is determined based on the re-determined allowable liquid phase increment and mudstone adhesion risk level. The treatment level is determined by using the minimum and maximum values ​​of the advance speed within the reference range as the lower and upper limits of the advance speed reference range, respectively. The highest level of anti-adhesion treatment at the cutterhead tip within the reference range is defined as the conventional anti-adhesion treatment level. After mud cake removal is completed and it is confirmed that there are no continuous blocky mud cakes on the cutterhead panel, cutterhead opening, and cutter surface, the anti-reclamation transition stage begins. When the current tunneling cycle after mud cake removal is still within the original control section and the natural water cut, liquid limit, plastic limit, and water sensitivity indicators do not exceed the parameter range of that control section, the initial water cut, target plastic flow range, and... already determined for that control section are used. Water sensitivity index: When the current tunneling cycle enters a new control section or external water enters, causing a change in the water content of the mudstone before cutting, the initial water content, target plastic flow range, and water sensitivity index are resampled and updated. Based on this, the dry soil mass of the cut excavated soil is re-determined according to the actual advance distance of the current tunneling cycle. The allowable liquid phase increment is re-determined according to the relationship between the initial water content, the upper limit of the target plastic flow range water content, and the dry soil mass of the cut excavated soil in S3. The maximum allowable addition amount is re-determined according to the relationship between the allowable liquid phase increment and the effective liquid phase mass fraction of the water-based excavated soil amendment in S4. The mudstone adhesion risk level is redefined according to the risk range corresponding to the water sensitivity index in S5. The newly determined maximum allowable addition amount is used as the upper limit of the addition of water-based slag soil amendment liquid in the anti-reclamation transition stage. The first anti-adhesion treatment level is obtained according to the newly determined allowable liquid phase increment. The second anti-adhesion treatment level is obtained according to the newly determined mudstone adhesion risk level. The higher level between the first and second anti-adhesion treatment levels is determined as the newly determined anti-adhesion treatment level at the cutterhead front end. The higher level between the newly determined anti-adhesion treatment level at the cutterhead front end and the conventional anti-adhesion treatment level is determined as the transitional anti-adhesion treatment level. When FPI, TPI, and propulsion speed recover to their respective baseline ranges within consecutive verification intervals, slag discharge remains continuous, and the water content of the cutting slag remains within the target plastic flow range, the transitional anti-adhesion treatment level is gradually reduced. The anti-re-adhesion transition phase ends when the transitional anti-adhesion treatment level is reduced to the conventional anti-adhesion treatment level and the above conditions are still met. In this embodiment, consecutive verification intervals refer to two verification intervals that are sequentially adjacent in time and without any intermediate verification intervals. When FPI, TPI, and propulsion speed all recover to their respective baselines within two consecutive verification intervals... When the range and slag discharge remain continuous and the moisture content of the cutting slag remains within the target plastic flow range, the transitional anti-adhesion treatment level is reduced by one level. After each reduction, the status is confirmed using the next verification range. When the transitional anti-adhesion treatment level is reduced to the conventional anti-adhesion treatment level and the subsequent two consecutive verification ranges still meet the above recovery conditions, the anti-re-adhesion transition phase is exited. When any verification range does not meet the recovery conditions, the current transitional anti-adhesion treatment level is maintained. When both FPI and TPI in the same verification range are again higher than the upper limit of their respective baseline ranges, the transitional anti-adhesion treatment level is increased by one level, but not exceeding the advanced level.

[0045] Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for preventing balling-up of a shield in a weathered mudstone formation, comprising, The earth pressure balance shield tunneling was employed, including: S1. Obtain a representative moderately weathered mudstone sample from the current tunneling section, and characterize the initial water content state by the natural water content of the sample. S2. Add water-based slag soil amendment to the sample in stages to determine the target plastic flow range that meets the requirements of stable soil chamber pressure and continuous slag discharge. S3. Determine the allowable liquid phase increment for the current tunneling cycle based on the initial water content, the upper limit of the water content of the target plastic flow zone, and the dry soil mass of the excavated soil in the current tunneling cycle. S4. Determine the maximum allowable addition amount based on the allowable liquid phase increment and the effective liquid phase mass fraction of the water-based slag soil amendment, and determine the minimum effective addition amount based on the minimum addition amount required to reach the target plastic flow range, thus forming the allowable addition range of the water-based slag soil amendment. S5. Measure the water sensitivity index of the sample to determine the mudstone adhesion risk level, and determine the anti-adhesion treatment level of the cutterhead front end based on the allowable liquid phase increment and the mudstone adhesion risk level, so that when the allowable liquid phase increment decreases, the maximum allowable addition amount is reduced and the anti-adhesion treatment level of the cutterhead front end is increased. S6. In the current tunneling cycle, apply the anti-adhesion treatment medium to the cutting area in front of the cutterhead according to the anti-adhesion treatment level of the cutterhead front end, and add the water-based slag improvement liquid to the cutting slag in the soil chamber within the allowable addition range.

2. The method for preventing mud cake and improving soil of a weathered mudstone stratum according to claim 1, characterized in that, Based on the geological data of the construction, the section to be excavated is divided into multiple control sections whose lithology, natural water content and weathering degree are respectively within the corresponding preset ranges, and the control section where the current excavation cycle is located is taken as the sampling range of the current excavation section; The liquid limit, plastic limit, fine particle content, and clay mineral composition of the sample are determined, and the water sensitivity index is determined based on the results of the water absorption softening test. The liquid limit and plastic limit are used as the test range and boundary determination criteria for the target plastic flow range.

3. The method for preventing mud cake and improving soil of a weathered mudstone stratum shield according to claim 2, characterized in that, Within the water content test range determined by the plastic limit to the liquid limit, multiple preset addition levels of the water-based slag soil amendment solution are added to the sample in stages; The state of the samples was determined based on their plastic agglomeration state, kneadability, free water precipitation state, stirring resistance, and simulated screw conveyor stability at each preset addition level. The water content range corresponding to each preset addition level that continuously satisfies the requirements of plastic agglomeration, kneadability, no release of free water, stirring resistance within a preset range, and continuous simulated spiral conveying is defined as the target plastic flow interval.

4. The method for preventing mud cake and improving soil of a weathered mudstone stratum according to claim 1, characterized in that, the maximum permissible addition by mass and the maximum permissible addition by mass is determined according to the following formula: wherein is the dry soil mass of the cutting spoil of the current excavation cycle, is the natural moisture content, is the upper moisture limit of the target plastic flow range, and are mass fractions based on the dry soil mass, is the effective liquid mass fraction of the water-based spoil improvement liquid, and max denotes the larger of the two values within the parentheses.

5. The method for preventing mud cake and improving soil of a weathered mudstone stratum according to claim 3, characterized in that, Based on the state determination results corresponding to each preset addition level of the water-based slag soil amendment, determine the minimum addition amount of the water-based slag soil amendment required to make the sample reach the water content limit of the target plastic flow range. Calculate the ratio of the minimum addition amount to the dry soil mass of the sample, and determine the ratio as the minimum addition amount per unit dry soil mass; The minimum effective addition amount is obtained by multiplying the minimum amount of dry soil added per unit mass by the dry soil mass of the cutting excavation in the current tunneling cycle. The allowable addition range is determined by using the minimum effective addition amount as the lower limit and the maximum allowable addition amount as the upper limit.

6. The method for preventing mud cake and improving soil of a weathered mudstone stratum shield according to claim 4, characterized in that, Based on the three-level margin range from high to low where the allowable liquid phase increment is located, the first anti-adhesion treatment level from low to high is determined; Based on the water sensitivity index, a three-level mudstone adhesion risk level from low to high is determined, and based on the mudstone adhesion risk level, a second anti-adhesion treatment level from low to high is determined; The higher of the first and second anti-adhesion treatment levels is determined as the anti-adhesion treatment level of the cutter head front end.

7. The method for shield anti-mud cake grouting and soil improvement in weathered mudstone stratum according to claim 1, characterized in that, The anti-adhesion treatment medium is a non-consolidating medium; It is applied to the cutting area between the cutterhead surface and the excavation face through at least one of the cutterhead panel injection port, the cutterhead spoke arm injection port, and the cutterhead center area nozzle.

8. The method for preventing mud cake and improving soil of a weathered mudstone stratum shield according to claim 6, characterized in that, Also includes: Obtain the thrust, cutterhead torque, and penetration depth for each tunneling cycle in the current tunneling section, and determine the ratio of thrust to penetration depth (FPI) and the ratio of cutterhead torque to penetration depth (TPI). When the cutting debris in a series of predetermined number of tunneling cycles is within the target plastic flow range and continuous slag discharge is maintained in each tunneling cycle, the predetermined number of consecutive tunneling cycles that first meet the above conditions in the current tunneling section are determined as the reference range. The FPI reference range and TPI reference range are determined according to the value range of FPI and TPI in the reference range, respectively. The preset number of consecutive tunneling cycles following the benchmark interval are defined as the verification interval.

9. The method for preventing mud cake and improving soil of a weathered mudstone stratum according to claim 8, characterized in that, include: When the moisture content of the cutting slag is lower than the lower limit of the moisture content of the target plastic flow range, the slag discharge is discontinuous, and the actual amount of water-based slag improvement liquid added is lower than the maximum allowable amount, the actual amount added shall be increased within the allowable range. When the water content of the cutting slag is in the target plastic flow range, and the FPI and TPI are continuously higher than the upper limit of their respective reference ranges within the verification range, the actual addition amount is maintained within the allowable addition range, and the anti-sticking treatment level of the cutter head front end is adjusted to a level higher than the current level but not higher than the preset highest level. When the moisture content of the cutting slag is higher than the upper limit of the moisture content of the target plastic flow range, free water is released, and the actual amount added is higher than the minimum effective amount added, the actual amount added shall be reduced within the allowable addition range.

10. The method for preventing mud cake and improving soil of a weathered mudstone stratum according to claim 8, characterized in that, include: The propulsion speed reference range is determined based on the propulsion speed obtained within the reference range, and the anti-adhesion treatment level of the cutterhead front end corresponding to the reference range is determined as the conventional anti-adhesion treatment level. After the mud cake is removed, the anti-re-caking transition stage begins. The allowable liquid phase increment, maximum allowable addition amount, and mudstone adhesion risk level of the current tunneling cycle are redefined. The redefined maximum allowable addition amount is used as the upper limit for the addition of the water-based slag improvement liquid. Based on the redefined allowable liquid phase increment and mudstone adhesion risk level, a transitional anti-caking treatment level not lower than the conventional anti-caking treatment level is determined. When the FPI, TPI, and propulsion speed recover to their respective reference ranges within the continuous verification interval, the slag discharge remains continuous, and the water content of the cutting slag remains within the target plastic flow range, the transition anti-adhesion treatment level is gradually reduced. When the transition anti-adhesion treatment level is reduced to the conventional anti-adhesion treatment level and the above conditions are still met, the anti-reclamation transition stage is exited.