Tunnel lining trolley side formwork structure, tunnel lining trolley and its lining method
By introducing an adjustable small side mold, soft overlapping rubber strips, and pressure sensors into the side mold structure of the tunnel lining trolley, the problems of loose connection, misalignment, and grout leakage caused by construction errors in traditional side mold structures have been solved, achieving high-quality and safe construction of tunnel lining.
Patent Information
- Application Number
- CN202611229850.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-13
- Publication Date
- 2026-11-17
AI Technical Summary
Traditional tunnel lining trolleys suffer from problems such as poor joint fit, misalignment, and grout leakage due to construction errors, large formwork rigidity, and poor adjustment capabilities. These issues affect the appearance quality of the lining and threaten the safety of the tunnel structure.
The structure adopts a split-type side mold with adjustable small side mold, soft overlapping rubber strip and pressure sensor. The adjustable small side mold is added to the bottom of the side mold of the lining trolley through hinge, and a soft overlapping rubber strip is set on the outside of it. The pressure sensor monitors the contact pressure and achieves flexible and close overlapping in combination with the positioning connecting rod.
It achieves adaptive deformation on construction errors and uneven concrete surfaces, avoids hard impacts, ensures the flatness and sealing of lining joints, and improves the appearance quality of lining and the reliability of structural joints.
Smart Images

Figure CN123109709A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of tunnel lining construction technology, and in particular to a tunnel lining trolley side formwork structure, a tunnel lining trolley, and a lining method thereof. Background Technology
[0002] In tunnel construction, the lining trolley is a key piece of equipment used for pouring concrete for the tunnel arch walls. As a crucial part of tunnel construction, the quality of tunnel lining construction directly affects the stability and service life of the tunnel structure.
[0003] Traditional tunnel lining trolleys often employ an integral side formwork structure, with its bottom directly and rigidly contacting the already poured invert arch sidewall concrete. During the pouring of the arch wall concrete, problems such as poor fit, misalignment, and grout leakage frequently arise between the side formwork and the completed invert arch sidewall concrete due to construction errors, high formwork rigidity, and poor adjustment capabilities. Especially when the invert arch sidewall concrete has irregular lines or localized bulging, traditional lining trolley side formwork struggles to achieve a smooth fit, affecting not only the appearance of the lining but also potentially causing the sidewall concrete to be crushed or cracked, severely threatening the tunnel's structural safety. Summary of the Invention
[0004] This invention provides a tunnel lining trolley side formwork structure, a tunnel lining trolley, and a lining method thereof, to solve the defects of existing tunnel lining construction in the pouring of arch wall concrete, such as poor connection, misalignment, and grout leakage, due to construction errors, large formwork rigidity, and poor adjustment ability.
[0005] This invention provides a tunnel lining trolley side formwork structure, including a lining trolley side formwork, an adjustable small side formwork, a positioning connecting rod, a flexible lap rubber strip, and a pressure sensor. The adjustable small side formwork is hinged to the bottom of the lining trolley side formwork via a connecting pin. The first end of the positioning connecting rod is connected to the lining trolley side formwork, and the second end is connected to the adjustable small side formwork, for driving the adjustable small side formwork to rotate around the connecting pin to expand outward or contract inward. The flexible lap rubber strip is embedded on the outer side of the adjustable small side formwork for flexible contact with the invert arch sidewall concrete structure. The pressure sensor is disposed on the adjustable small side formwork, and the pressure probe of the pressure sensor is located on the surface of the flexible lap rubber strip facing the invert arch sidewall concrete structure, for monitoring the contact pressure between the flexible lap rubber strip and the invert arch sidewall concrete structure, and providing an early warning upon contact with the poured concrete.
[0006] According to the present invention, a tunnel lining trolley side formwork structure is provided, wherein a first connecting lug is provided at the bottom of the inner side of the lining trolley side formwork, a second connecting lug is provided on the inner side of the adjustable small side formwork, the positioning connecting rod is a telescopic spiral screw, the first end of the positioning connecting rod is hinged to the first connecting lug, and the second end of the positioning connecting rod is hinged to the second connecting lug.
[0007] According to the present invention, a tunnel lining trolley side formwork structure is provided, which further includes a support mechanism. The support mechanism connects the lining trolley side formwork and the adjustable small side formwork, and is used to support the lining trolley side formwork and the adjustable small side formwork.
[0008] According to the present invention, a tunnel lining trolley side formwork structure includes a supporting mechanism comprising a vertical support for the lining trolley side formwork, an inclined support for the lining trolley side formwork, and an adjustable small side formwork inclined support. The top end of the vertical support for the lining trolley side formwork is connected to an upper support stack, and the bottom end is supported by a lower support stack. The upper support stack is connected to the inner bottom of the lining trolley side formwork, and the lower support stack is disposed on one side of the invert arch filling concrete structure inside the tunnel. The first end of the inclined support for the lining trolley side formwork is hinged to a first connecting lug, and the second end is supported by the invert arch filling concrete structure. The first end of the adjustable small side formwork inclined support is hinged to a second connecting lug, and the second end is supported by the invert arch filling concrete structure.
[0009] According to the present invention, the tunnel lining trolley side formwork structure includes a vertical support for the lining trolley side formwork, an inclined support for the lining trolley side formwork, and an adjustable small side formwork inclined support, all of which are retractable spiral screws.
[0010] According to the present invention, a protective angle steel is provided at the top corner of the side of the inverted arch filled concrete structure, and the second end of the side formwork inclined support of the lining trolley and the second end of the adjustable small side formwork inclined support are both inclined to the protective angle steel.
[0011] The present invention also provides a tunnel lining trolley, wherein the main body of the tunnel lining trolley is symmetrically provided with the tunnel lining trolley side formwork structure described in any one of the above-mentioned claims on both sides.
[0012] The present invention also provides a lining method for a tunnel lining trolley, applicable to the aforementioned tunnel lining trolley, comprising the following steps S1 to S4.
[0013] S1. Move the tunnel lining trolley to the designated pouring position inside the tunnel.
[0014] S2. By extending the positioning connecting rod, drive the adjustable small side mold to rotate around the connecting pin to expand outward until the soft overlapping rubber strip makes contact with the concrete structure of the inverted arch side wall.
[0015] S3. Based on the displayed value of the pressure sensor, adjust the extension of the positioning connecting rod until the contact pressure between the soft overlapping rubber strip and the concrete structure of the inverted arch side wall reaches the set value, thus completing the mold closing process.
[0016] S4. The arch wall lining concrete is poured using a tunnel lining trolley.
[0017] According to the lining method of a tunnel lining trolley provided by the present invention, before pouring the arch wall lining concrete after completing the formwork assembly process, a side formwork support reinforcement process is further included. The side formwork support reinforcement process includes: extending the vertical support of the lining trolley side formwork so that the bottom end of the vertical support of the lining trolley side formwork is supported on the lower support pier; extending the oblique support of the lining trolley side formwork and the adjustable small oblique support of the side formwork so that the second end of the oblique support of the lining trolley side formwork and the second end of the adjustable small oblique support of the side formwork are obliquely supported on the invert arch filling concrete structure.
[0018] According to a tunnel lining trolley lining method provided by the present invention, after the pouring of the arch wall lining concrete is completed, a demolding process is further included. The demolding process includes: shrinking the side formwork inclined support and the adjustable small side formwork inclined support of the lining trolley, so that the second end of the side formwork inclined support and the second end of the adjustable small side formwork inclined support are separated from the invert arch filling concrete structure; shrinking the side formwork vertical support of the lining trolley, so that the bottom end of the side formwork vertical support of the lining trolley is separated from the lower support stack; shrinking the positioning connecting rod, driving the adjustable small side formwork to rotate inward, so that the soft overlapping rubber strip is separated from the contact with the invert arch side wall concrete structure; completing the demolding process, and moving the tunnel lining trolley to the next pouring position.
[0019] The tunnel lining trolley side formwork structure provided by this invention adds an adjustable small side formwork to the bottom of the lining trolley side formwork via a hinged connection, and a soft lap rubber strip and pressure sensor are installed on the adjustable small side formwork. The adjustable small side formwork is rotatably connected to the lining trolley side formwork via a connecting pin, and its opening and closing angle is controlled by a positioning connecting rod. When the formwork is closed, the adjustable small side formwork is pushed outward by extending the positioning connecting rod until the soft lap rubber strip contacts the already poured inverted arch sidewall concrete structure. The pressure sensor monitors the contact pressure in real time, and the contact pressure is maintained within a set range by adjusting the positioning connecting rod, thereby achieving a flexible and tight lap joint. On the one hand, the soft lap rubber strip serves as an elastic medium, allowing the side formwork to adapt to deformation when in contact with uneven concrete, avoiding hard collisions; on the other hand, the pressure sensor provides pressure feedback and provides an early warning after contact with the already poured concrete, ensuring a tight fit without damaging the existing concrete. This invention improves the flatness and sealing of lining joints by combining a split-type side mold structure with a flexible overlapping method that monitors pressure. Even when the inverted arch side wall is not straight or there is local bulging, a smooth transition and leak-free grouting construction can be achieved, avoiding common problems in traditional construction. This ensures the appearance quality of the lining and enhances the reliability of the structural joints. Attached Figure Description
[0020] To more clearly illustrate the technical solutions in this invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0021] Figure 1 This is a schematic diagram of the overall structure of the tunnel lining trolley side formwork structure provided by the present invention during mold closing.
[0022] Figure 2 This is a schematic diagram of the overall structure of the tunnel lining trolley side formwork structure during demolding provided by the present invention.
[0023] Reference numerals: 1. Lining trolley side formwork; 2. Adjustable small side formwork; 3. Connecting pin; 4. Positioning connecting rod; 5. Soft overlapping rubber strip; 6. Concrete structure of invert arch side wall; 7. Pressure sensor; 8. Vertical support of lining trolley side formwork; 9. Upper support stack; 10. Lower support stack; 11. Invert arch filling concrete structure; 12. Inclined support of lining trolley side formwork; 13. Inclined support of adjustable small side formwork; 14. Protective angle steel. Detailed Implementation
[0024] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of this invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this invention. All other embodiments obtained by those skilled in the art based on the embodiments of this invention without creative effort are within the scope of protection of this invention.
[0025] The following is combined Figure 1 and Figure 2 The present invention describes the tunnel lining trolley side formwork structure, the tunnel lining trolley, and the lining method thereof.
[0026] One embodiment of the present invention provides a tunnel lining trolley side formwork structure, see [link to relevant documentation]. Figure 1 As shown, the system includes a lining trolley side mold 1, an adjustable small side mold 2, a positioning connecting rod 4, a flexible lap rubber strip 5, and a pressure sensor 7. The adjustable small side mold 2 is hinged to the bottom of the lining trolley side mold 1 via a connecting pin 3. The first end of the positioning connecting rod 4 is connected to the lining trolley side mold 1, and the second end is connected to the adjustable small side mold 2, which is used to drive the adjustable small side mold 2 to rotate around the connecting pin 3 to expand outward or contract inward. The flexible lap rubber strip 5 is embedded on the outside of the adjustable small side mold 2 for flexible contact with the inverted arch side wall concrete structure 6. The pressure sensor 7 is set on the adjustable small side mold 2, and the pressure probe of the pressure sensor 7 is located on the surface of the flexible lap rubber strip 5 facing the inverted arch side wall concrete structure 6. It provides an early warning after contact with the poured concrete (inverted arch side wall concrete structure 6) and is used to monitor the contact pressure between the flexible lap rubber strip 5 and the inverted arch side wall concrete structure 6.
[0027] It is understood that in this embodiment of the tunnel lining trolley side formwork structure, an adjustable small side formwork 2 is added to the bottom of the lining trolley side formwork 1 via a hinged connection. A soft overlapping rubber strip 5 is installed on the outside of the adjustable small side formwork 2, and a pressure sensor 7 is installed on the inside of the adjustable small side formwork 2. The pressure probe of the pressure sensor 7 penetrates the adjustable small side formwork 2 and acts on the surface of the soft overlapping rubber strip 5 facing the invert arch sidewall concrete structure 6, monitoring the contact pressure between the soft overlapping rubber strip 5 and the invert arch sidewall concrete structure 6. Specifically, the adjustable small side formwork 2 is rotatably connected to the main side formwork (lining trolley side formwork 1) via a connecting pin 3, and its opening and closing angle is controlled by a positioning connecting rod 4. When the formwork is closed, the adjustable small side formwork 2 is pushed outward by extending the positioning connecting rod 4 until the soft overlapping rubber strip 5 contacts the poured invert arch sidewall concrete structure 6. The pressure sensor 7 monitors the contact pressure in real time, and the contact pressure is maintained within a set range by adjusting the positioning connecting rod 4, thereby achieving a flexible and tight overlap.
[0028] This embodiment primarily utilizes flexible adjustment and closed-loop pressure control to achieve the positioning of the tunnel lining trolley's side formwork. On one hand, the soft-lap rubber strip 5 serves as an elastic medium, allowing the side formwork to adapt and deform when in contact with uneven concrete, avoiding hard impacts. On the other hand, pressure feedback from the pressure sensor 7 controls the contact pressure, ensuring a tight fit without damaging the existing concrete. The entire process achieves automatic leveling and pressure stabilization between the tunnel lining trolley's side formwork and the existing structure, improving the accuracy of formwork positioning and joint quality.
[0029] It is important to understand that, compared to traditional monolithic formwork which struggles to accommodate concrete deviations and is prone to misalignment, grout leakage, and pressure damage, this embodiment utilizes a split-type side formwork structure combined with a flexible overlapping method involving pressure monitoring. This improves the smoothness and sealing of the lining joints. Even in cases of irregularities in the invert arch sidewall alignment or localized formwork bulging, a smooth transition and leak-free construction can be achieved, avoiding common problems in traditional construction. This ensures both the appearance quality of the lining and enhances the reliability of the structural joints.
[0030] In some embodiments of the tunnel lining trolley side formwork structure of the present invention, a first connecting ear is provided on the bottom inner side of the lining trolley side formwork 1, a second connecting ear is provided on the inner side of the adjustable small side formwork 2, and the positioning connecting rod 4 is a telescopic spiral screw, with the first end of the positioning connecting rod 4 hinged to the first connecting ear and the second end of the positioning connecting rod 4 hinged to the second connecting ear.
[0031] It is understood that in this embodiment, the lining trolley side mold 1 and the adjustable small side mold 2 are controllably linked and adjusted by setting connecting ears (first connecting ear and second connecting ear) and positioning connecting rod 4. In specific implementation, the first connecting ear is fixedly installed on the inner bottom of the lining trolley side mold 1, and the second connecting ear is set at the corresponding position on the inner side of the adjustable small side mold 2. The positioning connecting rod 4 is a telescopic spiral screw, one end of which is connected to the first connecting ear by a hinge, and the other end is also hinged to the second connecting ear. During the mold closing process, by driving the positioning connecting rod 4 to extend, the adjustable small side mold 2 is pushed to rotate outward around the connecting pin 3 between it and the lining trolley side mold 1, thereby realizing the unfolding and fitting of the adjustable small side mold 2; during demolding, the connecting rod 4 is retracted in the opposite direction, causing the adjustable small side mold 2 to retract inward and disengage.
[0032] This embodiment utilizes a connecting lug and hinge design to ensure that the positioning connecting rod 4 always acts in the correct direction when transmitting push and pull forces, avoiding additional bending moments or jamming, and ensuring a smooth and reliable adjustment process. Using a screw drive as the driving element not only provides sufficient jacking force and stroke accuracy but also enables stepless adjustment and self-locking functions, facilitating fine-tuning according to actual conditions during construction and maintaining the stability of the formwork during pouring. Construction personnel can achieve precise control over the opening and closing angle and overlap pressure of the formwork through simple operation, improving the adaptability and construction efficiency of the formwork system.
[0033] In some embodiments of the tunnel lining trolley side formwork structure of the present invention, the tunnel lining trolley side formwork structure further includes a support mechanism, which connects the lining trolley side formwork 1 and the adjustable small side formwork 2, and is used to support the lining trolley side formwork 1 and the adjustable small side formwork 2.
[0034] Understandably, this embodiment further adds a support mechanism to the tunnel lining trolley side formwork structure, serving as a stabilizing and reinforcing unit for the side formwork structure, providing support for both the lining trolley side formwork 1 and the adjustable small side formwork 2. In specific implementation, the support mechanism is connected to the lining trolley side formwork 1 and the adjustable small side formwork 2. After the formwork is unfolded and positioned, the support mechanism applies a supporting force to effectively resist the lateral pressure and buoyancy generated during concrete pouring, preventing displacement, deformation, or sinking of the formwork. By adding an independent support mechanism, the structural rigidity and overall stability of the entire side formwork system can be improved without interfering with the formwork positioning and flexible overlap functions. The applied supporting force can be evenly distributed to all parts of the side formwork, avoiding localized stress concentration, thereby ensuring that the formwork maintains its designed position and shape throughout the pouring process.
[0035] In some specific examples, the support mechanism includes a lining trolley side formwork vertical support 8, a lining trolley side formwork inclined support 12, and an adjustable small side formwork inclined support 13. The top end of the lining trolley side formwork vertical support 8 is connected to the upper support stack 9, and the bottom end is supported by the lower support stack 10. The upper support stack 9 is connected to the inner bottom of the lining trolley side formwork 1, and the lower support stack 10 is set on one side of the invert arch filling concrete structure 11 inside the tunnel. The first end of the lining trolley side formwork inclined support 12 is hinged to the first connecting ear, and the second end is supported by the invert arch filling concrete structure 11. The first end of the adjustable small side formwork inclined support 13 is hinged to the second connecting ear, and the second end is supported by the invert arch filling concrete structure 11.
[0036] It is understood that the support mechanism in this example consists of three parts: the vertical support 8 of the lining trolley side formwork, the inclined support 12 of the lining trolley side formwork, and the adjustable small side formwork inclined support 13. In specific implementation, the upper end of the vertical support 8 of the lining trolley side formwork is fixedly connected to the inner bottom of the lining trolley side formwork 1 through the upper support stack 9, and the lower end is vertically supported on the lower support stack 10 set on the side of the inverted arch filling concrete structure 11, thereby providing stable support in the vertical direction. At the same time, one end of the inclined support 12 of the lining trolley side formwork is hinged to the first connecting lug on the lining trolley side formwork 1, and the other end is inclinedly supported on the surface of the inverted arch filling concrete structure 11; the adjustable small side formwork inclined support 13 is hinged to the second connecting lug of the adjustable small side formwork 2 at one end, and the other end is also inclinedly supported on the inverted arch filling concrete structure 11, and the two together constitute an inclined lateral support.
[0037] The support mechanism in this example, through a combination of vertical and diagonal braces, forms a stable spatial triangular support structure between the lining trolley side formwork 1 and the adjustable small side formwork 2, capable of resisting the lateral pressure, buoyancy, and vibration loads generated during concrete pouring. The vertical support 8 of the lining trolley side formwork mainly bears the vertical load and prevents the formwork from sinking, while the two sets of diagonal supports (lining trolley side formwork diagonal support 12 and adjustable small side formwork diagonal support 13) constrain the horizontal displacement and rotation of the lining trolley side formwork 1 and the adjustable small side formwork 2 from different angles, enhancing the overall rigidity and anti-overturning capacity of the formwork system. The support points are set on the existing inverted arch filling concrete structure 11, making full use of the bearing capacity of the existing structures inside the tunnel and optimizing the force transmission path.
[0038] It is important to understand that the support mechanism in this example not only improves the stability and safety of the formwork during the pouring process, but also reduces the reliance on the structural strength of the formwork itself, which is conducive to achieving lightweight and modular design. Furthermore, each support member adopts an independently adjustable structure, allowing for fine-tuning according to actual site conditions, further ensuring the accuracy of the lining contour and the quality of the concrete forming.
[0039] In some specific examples, the vertical support 8 of the lining trolley side formwork, the inclined support 12 of the lining trolley side formwork, and the adjustable small inclined support 13 are all telescopic screw rods. It is understood that the vertical support 8 of the lining trolley side formwork, the inclined support 12 of the lining trolley side formwork, and the adjustable small inclined support 13 are all designed as telescopic structures, implemented using screw rod drive elements. During implementation, construction personnel can adjust the telescopic length of each support member according to the tunnel cross-section dimensions, formwork positioning, and ground flatness. For example, by extending the vertical support 8 of the lining trolley side formwork so that its bottom end is firmly against the lower support pier 10, and simultaneously adjusting the lengths of the two sets of inclined supports so that their upper ends are hinged to the corresponding connecting lugs and their lower ends are supported at an appropriate angle on the surface of the inverted arch filling concrete structure 11, a support posture matching the formwork system and the tunnel profile is formed.
[0040] It is important to understand that the support rods in this example are designed to be telescopic, which can improve the adaptability and adjustment accuracy of the support mechanism. The screw can achieve stepless telescopic and self-locking functions, so that the length of each support rod can be adjusted according to the actual working conditions on site, ensuring that the support force is evenly transmitted and effectively fits the existing structural surface, avoiding false support or over-support.
[0041] In some embodiments of the tunnel lining trolley side formwork structure of the present invention, a protective angle steel 14 is provided at the top corner of the side of the inverted arch filling concrete structure 11, and the second end of the lining trolley side formwork inclined support 12 and the second end of the adjustable small side formwork inclined support 13 are both inclined to the protective angle steel 14.
[0042] It is understood that in this embodiment, protective angle steel 14 is pre-installed or installed at the top corner of the side of the invert arch-filled concrete structure 11, serving as a dedicated load-bearing and protective component for the lower end of the diagonal support. In specific implementation, the protective angle steel 14 is fixedly laid along the top of the side edge of the invert arch-filled concrete structure 11, forming a continuous or spaced stress band. When erecting the support mechanism, the lower ends of the lining trolley side formwork diagonal support 12 and the adjustable small side formwork diagonal support 13 no longer directly abut against the surface of the invert arch-filled concrete structure 11, but are diagonally supported on the protective angle steel 14, allowing the support force to be distributed and transmitted to the lower concrete structure through the protective angle steel 14.
[0043] By installing protective angle steel 14 at the corners of the invert arch filling concrete structure 11, the problems of local crushing, spalling, or stress concentration that are easily caused by the direct contact between the ends of the inclined supports and the invert arch filling concrete structure 11 are solved. The protective angle steel 14 acts as a rigid pad, transforming the concentrated load at the support end into a line-distributed load, reducing the pressure on the surface of the invert arch filling concrete structure 11, and protecting the integrity of the existing structure. At the same time, the smooth surface and uniform material of the protective angle steel 14 provide a stable and reliable force-bearing surface for the inclined supports, avoiding support slippage, settlement, or eccentric loading caused by uneven surface or strength of the invert arch filling concrete structure 11, and enhancing the force transmission efficiency and safety redundancy of the support mechanism.
[0044] In another aspect, this invention provides a tunnel lining trolley, wherein the main body of the tunnel lining trolley is symmetrically provided with the tunnel lining trolley side formwork structures as described in any of the above embodiments or examples on both sides. It is understood that the main structure of the tunnel lining trolley of this invention has symmetrically provided tunnel lining trolley side formwork structures as described in the aforementioned embodiments or examples on both sides. In specific implementation, the trolley main body includes a traveling mechanism, an arch template, and a hydraulic system, etc. The side formwork structures on both sides are connected to the trolley main body by hinges or detachable means, forming a complete tunnel lining template system. During construction, the entire trolley can move longitudinally along the tunnel. When it reaches the predetermined pouring section, the side formwork structures on both sides simultaneously perform mold closing, support, and pressure adjustment operations to achieve precise connection with the already poured inverted arch sidewall concrete.
[0045] By integrating the side formwork structure of the tunnel lining trolley onto both sides of the trolley, the side formwork structures can be adjusted independently while maintaining symmetrical movement. This ensures the symmetry and dimensional accuracy of the left and right contours of the tunnel lining, avoiding overall misalignment or uneven stress caused by improper adjustment on one side. Furthermore, the side formwork structure shares a hydraulic or control system with the trolley body, reducing independent power requirements and improving equipment integration and ease of operation.
[0046] In another aspect, the present invention provides a lining method for a tunnel lining trolley, applicable to the tunnel lining trolley in the above embodiments. Some embodiments of the lining method for the tunnel lining trolley of the present invention include the following steps S1 to S4.
[0047] S1. Move the tunnel lining trolley to the designated pouring position inside the tunnel.
[0048] S2. By extending the positioning connecting rod 4, the adjustable small side mold 2 is driven to rotate around the connecting pin 3 to expand outward until the soft overlapping rubber strip 5 makes contact with the concrete structure 6 of the inverted arch side wall.
[0049] S3. Based on the displayed value of the pressure sensor 7, adjust the extension of the positioning connecting rod 4 until the contact pressure between the soft overlapping rubber strip 5 and the concrete structure 6 of the inverted arch side wall reaches the set value, thus completing the mold closing process.
[0050] S4. The arch wall lining concrete is poured using a tunnel lining trolley.
[0051] It is understood that the lining method of the tunnel lining trolley in this embodiment is applicable to tunnel lining trolleys integrated with adjustable small side molds 2, and mainly includes the following steps: First, the tunnel lining trolley is moved to the predetermined pouring position in the tunnel; then, by extending the positioning connecting rod 4, the adjustable small side mold 2 is driven to rotate outward around the connecting pin 3 between it and the side mold 1 of the lining trolley until the soft overlapping rubber strip 5 set on the side of the adjustable small side mold 2 forms an overlapping contact with the surface of the already constructed inverted arch side wall concrete structure 6; on this basis, according to the real-time pressure value fed back by the pressure sensor 7, the extension of the positioning connecting rod 4 is finely adjusted so that the contact pressure between the soft overlapping rubber strip 5 and the inverted arch side wall concrete structure 6 stably reaches the preset control value (generally controlled at 10 MPa), thereby completing the precise mold closing of the side mold system; finally, under the premise that the mold closing state is reliably maintained, the pouring operation of the arch wall lining concrete is carried out through the lining trolley system.
[0052] It is important to understand that the tunnel lining trolley lining method in this embodiment achieves adaptive flexible and tight bonding between the formwork and the existing concrete structure through a closed-loop control process of mechanically driven deployment, sensor feedback, and real-time pressure adjustment. The introduction of pressure sensor 7 transforms the contact state judgment, which originally relied on the experience of construction personnel, into a quantifiable and monitorable objective parameter, ensuring that the contact pressure provides an effective seal while strictly remaining within a safe range that does not damage the existing concrete structure. The entire formwork closing process is executed by mechanical devices and monitored by sensors, improving the accuracy and repeatability of the operation and solving problems such as misalignment, grout leakage, and damage to the sidewall concrete caused by rigid contact or uneven bonding between the formwork and the existing concrete in traditional methods. Through standardized and controllable formwork closing technology, not only is the flatness, density, and appearance quality of the lining joints guaranteed, but also the excessive reliance on the experience of operators is reduced, improving the consistency and efficiency of the construction process.
[0053] In some embodiments of the tunnel lining trolley lining method of the present invention, before pouring the arch wall lining concrete after completing the formwork assembly process, a side formwork support reinforcement process is further included. The side formwork support reinforcement process includes: extending the vertical support 8 of the side formwork of the lining trolley so that the bottom end of the vertical support 8 of the side formwork of the lining trolley is supported on the lower support pier 10; extending the oblique support 12 of the side formwork of the lining trolley and the adjustable small oblique support 13 so that the second end of the oblique support 12 of the side formwork of the lining trolley and the second end of the adjustable small oblique support 13 are obliquely supported on the inverted arch filling concrete structure 11.
[0054] See Figure 1As shown, it can be understood that the tunnel lining trolley lining method of this embodiment adds a side formwork support and reinforcement process after the formwork closing process and before the arch wall concrete pouring. The specific implementation process is as follows: First, the vertical support 8 of the side formwork of the lining trolley is extended so that its bottom end is stably supported on the lower support stack 10 preset on the side of the invert arch filling concrete structure 11, providing vertical support for the side formwork; then, the oblique support 12 of the side formwork of the lining trolley and the adjustable small side formwork oblique support 13 are extended simultaneously so that the lower ends of the two are obliquely supported on the protective angle steel 14 at the corner of the invert arch filling concrete structure 11 at a certain angle, forming lateral constraints on the side formwork 1 and the adjustable small side formwork 2 of the lining trolley.
[0055] The purpose of adding support and reinforcement is to further construct a rigid spatial support system after the formwork has been positioned and pressure adjusted, in order to resist the huge lateral pressure, buoyancy and vibration load generated during the subsequent concrete pouring process. Through the action of vertical supports (vertical supports 8 of the lining trolley side formwork) and two sets of diagonal supports (diagonal supports 12 of the lining trolley side formwork and adjustable small side formwork diagonal supports 13), the formwork system is reliably connected to the solid existing concrete structure (inverted arch filling concrete structure 11), effectively preventing the formwork from shifting, deforming or floating during pouring, and ensuring the dimensional accuracy and stability of the lining outline.
[0056] It is important to understand that by adding support and reinforcement procedures, the safety and reliability of the entire lining construction process are improved. This ensures that the formwork system maintains its preset position and posture when subjected to dynamic construction loads, avoiding quality risks such as formwork displacement and bulging caused by insufficient support. Simultaneously, reinforcement measures reduce excessive reliance on the rigidity of the formwork itself, facilitating lightweight and modular design of the formwork. It also provides technological assurance for the continuous one-time pouring of large-volume, high-strength concrete, thereby improving the overall construction quality and efficiency of tunnel lining engineering.
[0057] In some embodiments of the tunnel lining trolley lining method of the present invention, after the pouring of the arch wall lining concrete is completed, a demolding process is also included. The demolding process includes: shrinking the lining trolley side formwork inclined support 12 and the adjustable small side formwork inclined support 13, so that the second end of the lining trolley side formwork inclined support 12 and the second end of the adjustable small side formwork inclined support 13 are separated from the invert arch filling concrete structure 11; shrinking the lining trolley side formwork vertical support 8, so that the bottom end of the lining trolley side formwork vertical support 8 is separated from the lower support stack 10; shrinking the positioning connecting rod 4, driving the adjustable small side form 2 to rotate inward, so that the soft overlapping rubber strip 5 is separated from the invert arch side wall concrete structure 6; completing the demolding process, and moving the tunnel lining trolley to the next pouring position.
[0058] Understandably, after the concrete lining of the arch wall is poured and reaches its demolding strength, a systematic demolding process is performed. (See also...) Figure 2As shown, the demolding process is carried out in the following order: First, the inclined support 12 of the side formwork of the lining trolley and the adjustable small side formwork inclined support 13 are retracted so that the lower ends of both are simultaneously removed from the support surface of the invert arch filling concrete structure 11; second, the vertical support 8 of the side formwork of the lining trolley is retracted so that its bottom end is lifted away from the lower support stack 10; finally, the positioning connecting rod 4 is retracted, driving the adjustable small side formwork 2 to rotate inward around the connecting pin 3 and retract so that the soft overlapping rubber strip 5 on it is smoothly removed from contact with the invert arch side wall concrete structure 6; after all the connecting and supporting components are safely retracted, the demolding is completed, and the tunnel lining trolley can be moved to the next lining construction section.
[0059] In this embodiment, the demolding process achieves safe and non-destructive separation of the formwork system from the concrete structure through the orderly retraction of each adjustment and support component. Reverse operation avoids scratches, collisions, or tensile stress damage to the hardened lining concrete surface and edges, especially protecting the integrity of the lining joint area. The synchronous or sequential shrinkage design also avoids stress concentration or instability caused by the sudden release of unilateral constraints on the formwork, ensuring a smooth and controllable demolding process.
[0060] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A tunnel lining trolley side formwork structure, characterized in that, include: Lining trolley side formwork (1); An adjustable small side mold (2) is hinged to the bottom of the lining trolley side mold (1); The positioning connecting rod (4) is connected at the first end to the side mold (1) of the lining trolley and at the second end to the adjustable small side mold (2), and is used to drive the adjustable small side mold (2) to rotate for outward expansion or inward contraction. A soft-lap rubber strip (5) is embedded on the outside of the adjustable small side mold (2) for flexible contact with the concrete structure (6) of the inverted arch side wall; A pressure sensor (7) is installed on the adjustable small side mold (2). The pressure probe of the pressure sensor (7) is located on the surface of the soft overlapping rubber strip (5) facing the concrete structure (6) of the inverted arch side wall, and is used to monitor the contact pressure between the soft overlapping rubber strip (5) and the concrete structure (6) of the inverted arch side wall.
2. The tunnel lining trolley side formwork structure according to claim 1, characterized in that, The inner bottom of the lining trolley side mold (1) is provided with a first connecting ear, the inner side of the adjustable small side mold (2) is provided with a second connecting ear, the positioning connecting rod (4) is a telescopic spiral screw, the first end of the positioning connecting rod (4) is hinged to the first connecting ear, and the second end of the positioning connecting rod (4) is hinged to the second connecting ear.
3. The tunnel lining trolley side formwork structure according to claim 2, characterized in that, The tunnel lining trolley side formwork structure also includes: The support mechanism connects the lining trolley side mold (1) and the adjustable small side mold (2) and is used to support the lining trolley side mold (1) and the adjustable small side mold (2).
4. The tunnel lining trolley side formwork structure according to claim 3, characterized in that, The supporting structure includes: The lining trolley side formwork vertical support (8) is connected at the top to the upper support stack (9) and at the bottom to the lower support stack (10). The upper support stack (9) is connected to the inner bottom of the lining trolley side formwork (1), and the lower support stack (10) is set on one side of the invert arch filling concrete structure (11) in the tunnel. The lining trolley side formwork inclined support (12) has its first end hinged to the first connecting ear and its second end supported on the inverted arch filling concrete structure (11). An adjustable small side formwork inclined support (13) has its first end hinged to the second connecting ear and its second end supported on the inverted arch filling concrete structure (11).
5. The tunnel lining trolley side formwork structure according to claim 4, characterized in that, The vertical support (8) of the lining trolley side mold, the inclined support (12) of the lining trolley side mold, and the adjustable small side mold inclined support (13) are all telescopic screws.
6. The tunnel lining trolley side formwork structure according to claim 4, characterized in that, A protective angle steel (14) is provided at the top corner of the side of the inverted arch filled concrete structure (11). The second end of the lining trolley side formwork inclined support (12) and the second end of the adjustable small side formwork inclined support (13) are both inclined to the protective angle steel (14).
7. A tunnel lining trolley, characterized in that, The tunnel lining trolley has symmetrically arranged side formwork structures as described in any one of claims 1 to 6 on both sides of its main body.
8. A lining method for a tunnel lining trolley, characterized in that, The tunnel lining trolley applicable to claim 7 comprises: Move the tunnel lining trolley to the designated pouring position inside the tunnel; By extending the positioning connecting rod (4), the adjustable small side mold (2) is driven to rotate to expand outward until the soft overlapping rubber strip (5) makes contact with the concrete structure (6) of the inverted arch side wall; Based on the displayed value of the pressure sensor (7), adjust the extension of the positioning connecting rod (4) until the contact pressure between the soft overlapping rubber strip (5) and the concrete structure (6) of the inverted arch side wall reaches the set value, and complete the mold closing process. The concrete for the arch wall lining is poured using a tunnel lining trolley.
9. The lining method of the tunnel lining trolley according to claim 8, characterized in that, Before pouring the arch wall lining concrete after completing the formwork assembly process, a side formwork support and reinforcement process is also included. This side formwork support and reinforcement process includes: Extend the vertical support (8) of the lining trolley side formwork so that the bottom end of the vertical support (8) of the lining trolley side formwork is supported on the lower support stack (10). The lining trolley side formwork inclined support (12) and the adjustable small side formwork inclined support (13) are extended so that the second end of the lining trolley side formwork inclined support (12) and the second end of the adjustable small side formwork inclined support (13) are inclined to the inverted arch filling concrete structure (11).
10. The lining method of the tunnel lining trolley according to claim 9, characterized in that, After the concrete pouring for the arch wall lining is completed, a demolding process is also included, which includes: Shrink the lining trolley side formwork inclined support (12) and the adjustable small side formwork inclined support (13) so that the second end of the lining trolley side formwork inclined support (12) and the second end of the adjustable small side formwork inclined support (13) are separated from the inverted arch filling concrete structure (11). Shrink the vertical support (8) of the lining trolley side formwork so that the bottom end of the vertical support (8) of the lining trolley side formwork is separated from the lower support stack (10). The positioning connecting rod (4) is retracted, and the adjustable small side mold (2) is driven to rotate inward, so that the soft overlapping rubber strip (5) is separated from the concrete structure (6) of the arch side wall; After the demolding process is completed, the tunnel lining trolley is moved to the next pouring position.