A method, apparatus, medium, and equipment for unifying the 1985 elevation datum based on hierarchical adjustment.

By using a hierarchical adjustment method, the elevation results of the main leveling network are first determined, and then the elevation results of the auxiliary leveling network are determined based on the main network results. This solves the problem of high computational resource consumption and long processing time caused by the large number of leveling points in large and medium-sized cities, and achieves efficient unification of elevation benchmarks and improved accuracy and reliability of elevation results.

CN123111187APending Publication Date: 2026-11-17GUANGZHOU BAIYUN PLANNING SURVEY & DESIGN INSTITUTE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611052438.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-15
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

When using existing technologies to unify the 1985 elevation datum in large and medium-sized cities, the large number of leveling points and high computational resource consumption result in long data processing times, making it difficult to efficiently unify leveling measurement results of different accuracy levels.

Method used

The hierarchical adjustment method is adopted. First, the elevation results of the main leveling network are determined. Then, the elevation results of the auxiliary leveling network are determined based on the main network results. Through indirect adjustment of the leveling network with fixed constraints, the observation data of the main leveling network and the auxiliary leveling network are solved separately to construct a hierarchical unified elevation benchmark database.

Benefits of technology

It reduced the scale of adjustment calculations, improved the efficiency of unified processing of the 1985 elevation datum, ensured the accuracy and reliability of elevation results, and improved the efficiency of data processing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123111187A_ABST
    Figure CN123111187A_ABST
Patent Text Reader

Abstract

This invention discloses a method, apparatus, medium, and equipment for unifying the 1985 elevation datum based on hierarchical adjustment. The method includes: acquiring leveling network observation data of the target measurement area, the leveling network observation data including main leveling network observation data and auxiliary leveling network observation data; determining a first set of leveling points from the national first-order leveling control points of the target measurement area; performing leveling network indirect adjustment with fixed constraints on the main leveling network observation data based on the first set of leveling points to obtain a main leveling network leveling point set; performing leveling network indirect adjustment with fixed constraints on the auxiliary leveling network observation data based on the main leveling network leveling point set to obtain an auxiliary leveling network leveling point set; and constructing a hierarchical elevation datum unification database based on the main leveling network leveling point set and the auxiliary leveling network leveling point set. This invention improves the processing efficiency of unifying the 1985 elevation datum.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of data processing technology, and in particular to a method, apparatus, medium and equipment for unifying the 1985 elevation datum based on hierarchical adjustment. Background Technology

[0002] The 1985 National Elevation Datum is an important elevation reference for engineering construction, urban planning, natural resource management, and the application of basic surveying and mapping results. Leveling survey results from different regions and at different levels need to be unified under the same elevation datum to ensure consistency between engineering elevations, topographic data, and spatial foundation information.

[0003] Existing technologies typically combine leveling observation data of different accuracy levels within the survey area and then perform a unified solution to determine the elevation results of each leveling point. For large and medium-sized cities, the number of leveling points can reach thousands to tens of thousands, and the number of leveling sections is enormous. The adjustment equations formed during the overall solution are large in scale, resulting in high computational resource consumption and long data processing time. Summary of the Invention

[0004] The purpose of this invention is to propose a method, apparatus, medium, and equipment for unifying the 1985 elevation datum based on hierarchical adjustment. This method involves performing a leveling network indirect adjustment with fixed constraints on the main leveling network observation data based on a first set of leveling points, obtaining the main leveling network leveling point set. Then, based on the main leveling network leveling point set, a leveling network indirect adjustment with fixed constraints is performed on the auxiliary leveling network observation data, obtaining the auxiliary leveling network leveling point set. This allows leveling observation data of different accuracy levels to be split and solved separately, thereby reducing the scale of adjustment calculations and improving the processing efficiency of unifying the 1985 elevation datum.

[0005] To achieve the above objectives, a first aspect of the present invention provides a method for unifying the 1985 elevation datum based on graded adjustment, the method comprising: Acquire leveling network observation data for the target measurement area, wherein the leveling network observation data includes main leveling network observation data and auxiliary leveling network observation data; Determine a first set of leveling points from the national first-order leveling control points in the target measurement area; Based on the first set of leveling points, a leveling network indirect adjustment with fixed constraints is performed on the leveling network observation data to obtain the main network leveling point set of the leveling network. Based on the main network leveling point set, a leveling network indirect adjustment with fixed constraints is performed on the leveling auxiliary network observation data to obtain the auxiliary network leveling point set; Based on the main network leveling point set and the auxiliary network leveling point set, a hierarchical unified elevation benchmark database is constructed.

[0006] In this embodiment, the elevation results of the main leveling network are determined first, and then the elevation results of the auxiliary leveling network are determined based on the main network results. This avoids solving the observation data of different levels as a whole, reduces the scale of adjustment calculations, and improves the efficiency of unified processing of the 1985 elevation datum.

[0007] Further, determining the first set of leveling points from the national first-order leveling control points in the target measurement area includes: Obtain the national first-order leveling control points within the target measurement area; From the national first-order leveling control points, leveling points that meet the preset starting point selection conditions are selected, and a first leveling point set is generated.

[0008] In this embodiment, by selecting leveling points from the national first-order leveling control points that meet the preset starting point selection conditions, the reliability of the starting datum can be improved, providing a stable constraint basis for subsequent main network adjustment.

[0009] Further, the step of performing a leveling network indirect adjustment with fixed constraints on the leveling main network observation data based on the first leveling point set to obtain the main network leveling point set of the leveling main network includes: The leveling points in the first set of leveling points are used as the starting leveling points, and the leveling points to be determined are determined from the observation data of the main leveling network. Based on the starting leveling point, the leveling point to be determined, and the leveling segments in the leveling main network observation data, establish the elevation difference observation error equation corresponding to the leveling main network; An elevation fixed constraint is applied to the starting leveling point, and the observation weight corresponding to each leveling segment is determined; Based on the elevation difference observation error equation, the elevation fixed constraint, and each of the observation weights, least squares adjustment is performed on the leveling main network observation data to obtain the adjusted elevation of each of the leveling points to be determined. Based on the adjusted elevation of each of the leveling points to be determined and the elevation difference observation error equation, determine the elevation difference residual corresponding to each of the leveling sections; Based on the elevation difference residuals corresponding to each leveling segment, the observation weights corresponding to each leveling segment are iteratively corrected, and the adjusted elevations of each leveling point to be determined are updated based on the corrected observation weights. When the updated adjusted elevation meets the preset convergence condition, and the elevation difference residuals corresponding to each leveling segment meet the limits of the second-order leveling specification, the main network leveling point set of the leveling main network is obtained based on the updated adjusted elevation.

[0010] In this embodiment, by establishing an elevation difference observation error equation and combining iterative correction with fixed elevation constraints, observation weights, and elevation difference residuals, the impact of abnormal observation data on adjustment results can be reduced, thereby improving the accuracy and reliability of the elevation results of the main leveling network.

[0011] Further, the auxiliary leveling network includes a first auxiliary leveling network and a second auxiliary leveling network. The step of performing a leveling network indirect adjustment with fixed constraints on the auxiliary leveling network observation data based on the main network leveling point set to obtain the auxiliary network leveling point set includes: Based on the main network leveling point set, a leveling network indirect adjustment with fixed constraints is performed on the observation data of the first auxiliary leveling network to determine the first auxiliary network leveling point set; Based on the main network leveling point set and the first auxiliary network leveling point set, a leveling network indirect adjustment with fixed constraints is performed on the observation data of the second auxiliary leveling network to determine the second auxiliary network leveling point set; The auxiliary network leveling point set is obtained based on the first auxiliary network leveling point set and the second auxiliary network leveling point set.

[0012] In this embodiment, the first auxiliary network leveling point set and the second auxiliary network leveling point set are determined sequentially, so that the leveling auxiliary networks at different levels can be solved step by step based on the elevation results of the higher level, thereby improving the uniformity of the leveling auxiliary network elevation results and increasing the efficiency of adjustment calculation.

[0013] Furthermore, the construction of a hierarchical unified elevation datum database based on the main network leveling point set and the auxiliary network leveling point set includes: Perform a starting point compatibility check on the starting points of the main network corresponding to the set of auxiliary network leveling points; If the compatibility test of the starting point passes, the auxiliary network leveling point set will be attached to the 1985 elevation datum framework corresponding to the main network leveling point set. The main network leveling point set is stored in the first elevation result storage partition, and the auxiliary network leveling point set is stored in the second elevation result storage partition, thus obtaining the hierarchical elevation benchmark unified database.

[0014] In this embodiment, by performing compatibility checks on the starting level points of the main network and storing the main network results and auxiliary network results in separate partitions, the accuracy of the auxiliary network results can be improved, ensuring the clarity of the elevation results hierarchy in the database.

[0015] Furthermore, the method also includes: If the compatibility check of the starting point fails, the abnormal main network starting point corresponding to the auxiliary network leveling point set is identified, and the abnormal main network starting point is removed from the main network starting point used for auxiliary network adjustment to obtain an updated main network starting point set. Based on the updated set of main network starting leveling points, the leveling auxiliary network observation data corresponding to the abnormal main network starting leveling points are re-executed with fixed constraints to redetermine the set of auxiliary network leveling points. The updated set of main network leveling points is stored in the first elevation result storage partition, and the newly determined set of auxiliary network leveling points is stored in the second elevation result storage partition, thus obtaining the hierarchical elevation benchmark unified database.

[0016] In this embodiment, when the compatibility test of the starting point fails, abnormal main network starting leveling points are removed, and the set of auxiliary network leveling points is re-determined based on the observation data of the local auxiliary leveling network. This reduces the impact of abnormal starting points on the adjustment results of the auxiliary network and improves the data accuracy of the unified database of layered elevation datum.

[0017] Furthermore, it also includes: When the elevation of a local leveling point in the main leveling network changes, the corresponding local leveling auxiliary network observation data is selected from the leveling auxiliary network observation data; Based on the main network leveling point set, local constraint adjustment is performed on the local leveling auxiliary network observation data to obtain the updated auxiliary network leveling point set. Based on the updated set of auxiliary network leveling points, the hierarchical unified elevation datum database is updated.

[0018] In this embodiment, when the elevation of local leveling points changes, the observation data of the local leveling auxiliary network are screened and local constraint adjustment is performed, which can avoid full recalculation and improve the local update efficiency of the elevation benchmark database.

[0019] To achieve the above objectives, a second aspect of the present invention further provides an apparatus for unifying the 1985 elevation datum based on hierarchical adjustment, used to implement the method for unifying the 1985 elevation datum based on hierarchical adjustment as described in any of the first aspects above, the apparatus comprising: The data acquisition module is used to acquire leveling network observation data of the target measurement area, including leveling main network observation data and leveling auxiliary network observation data. The first leveling point determination module is used to determine the first leveling point set from the national first-order leveling control points in the target measurement area; The main network adjustment module is used to perform indirect adjustment of the leveling main network observation data with fixed constraints based on the first set of leveling points, so as to obtain the main network leveling point set of the leveling main network. The auxiliary network adjustment module is used to perform indirect adjustment of the leveling auxiliary network observation data with fixed constraints based on the main network leveling point set, so as to obtain the auxiliary network leveling point set of the leveling auxiliary network. The database construction module is used to construct a hierarchical unified elevation datum database based on the main network leveling point set and the auxiliary network leveling point set.

[0020] A third aspect of the present invention also provides a computer-readable storage medium comprising a stored computer program; wherein, when the computer program is executed, it controls the device on which the computer-readable storage medium is located to perform the 1985 elevation datum unification method based on graded adjustment as described in any of the first aspects.

[0021] A fourth aspect of the present invention also provides a terminal device, including a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein the processor, when executing the computer program, implements the 1985 elevation datum unification method based on graded adjustment as described in any of the first aspects above. Attached Figure Description

[0022] Figure 1 This is a flowchart of a preferred embodiment of a method for unifying the 1985 elevation datum based on graded adjustment provided in the first aspect of the present invention; Figure 2 This is a structural block diagram of a preferred embodiment of a unified 1985 elevation datum device based on graded adjustment provided in the second aspect of the present invention; Figure 3 This is a structural block diagram of a preferred embodiment of a terminal device provided in the fourth aspect of the present invention. Detailed Implementation

[0023] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0024] It should be noted that the data involved in this invention (including but not limited to data used for analysis, data stored, data displayed, etc.) are all information and data authorized by the user or fully authorized by all parties. Furthermore, the collection, use and processing of related data must comply with relevant laws, regulations and standards, and corresponding operation entry points are provided for users to choose to authorize or refuse.

[0025] In this embodiment of the invention, the words "exemplarily" or "for example" are used to indicate examples, illustrations, or descriptions. Any embodiment or design described as "exemplarily" or "for example" in this invention should not be construed as being more preferred or advantageous than other embodiments or designs. Rather, the use of the words "exemplarily" or "for example" is intended to present the relevant concepts in a specific manner.

[0026] In this invention description, the terms "first," "second," "third," etc., are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, a feature defined with "first," "second," "third," etc., may explicitly or implicitly include one or more of that feature. In this invention description, unless otherwise stated, "a plurality of" means two or more. In this invention description, the term "comprising" and its variations are open-ended, meaning "including but not limited to." The term "based on" means "at least partially based on." The term "according to" means "at least partially according to." The term "one embodiment" means "at least one embodiment"; the term "another embodiment" means "at least one additional embodiment"; the term "some embodiments" means "at least some embodiments."

[0027] In the description of this invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0028] In the description of this invention, it should be noted that, unless otherwise defined, all technical and scientific terms used in this invention have the same meaning as commonly understood by one of ordinary skill in the art. The terminology used in this specification is for the purpose of describing specific embodiments only and is not intended to limit the invention. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0029] The technical solution of the present invention will be further described below with reference to specific embodiments: The first aspect of this invention provides a method for unifying the 1985 elevation datum based on graded adjustment, see [link to relevant documentation]. Figure 1 The diagram shown is a flowchart of a preferred embodiment of a method for unifying the 1985 elevation datum based on graded adjustment provided by the first aspect of the present invention. The method includes steps S1 to S5, as follows: Step S1: Obtain the leveling network observation data of the target measurement area, wherein the leveling network observation data includes the main leveling network observation data and the auxiliary leveling network observation data; The target measurement area includes urban areas, administrative regions, engineering construction areas, or other surveying and mapping areas that need to be unified with the 1985 National Elevation Datum. The leveling network is divided into a main leveling network and a secondary leveling network according to the functional hierarchy of the urban control network.

[0030] In one example, the main leveling network observation data corresponds to the second-order leveling network observation data, and the auxiliary leveling network observation data corresponds to the third-order leveling network observation data and / or the fourth-order leveling network observation data.

[0031] It is understandable that by pre-distinguishing between the main leveling network observation data and the auxiliary leveling network observation data, a data foundation can be provided for subsequent processing of leveling observation data of different levels.

[0032] In this embodiment, by acquiring leveling network observation data, including both main leveling network observation data and auxiliary leveling network observation data, a data source can be provided for subsequent graded adjustment processing, avoiding indiscriminate overall processing of leveling observation data of different levels.

[0033] Step S2: Determine the first set of leveling points from the national first-order leveling control points in the target measurement area; The first set of leveling points is used as the starting basis for adjusting the observation data of the main leveling network.

[0034] In one example, the first set of leveling points for this unified elevation datum processing is determined from the national first-order leveling control points that can be connected to the leveling main network within or around the target measurement area.

[0035] It should be noted that the leveling points in the first set of leveling points are known leveling points with the results of the 1985 National Height Datum, which are used to provide a fixed elevation basis for the elevation solution of the subsequent leveling main network.

[0036] It is understandable that the specific method for determining the first set of benchmarks is set according to the measurement area, the distribution of control points, the requirements of measurement specifications, and the needs of engineering applications. This embodiment does not impose specific limitations on this.

[0037] In this embodiment, by determining the first set of leveling points from the national first-order leveling control points, a unified elevation calculation basis can be provided for the adjustment of the leveling main network, ensuring that the subsequent elevation results of the main network belong to the 1985 National Elevation Datum.

[0038] Step S3: Based on the first set of leveling points, perform leveling network indirect adjustment with fixed constraints on the leveling main network observation data to obtain the main network leveling point set of the leveling main network; The main network leveling point set includes the point number, elevation results, and related attribute information of each leveling point in the main leveling network. The leveling network indirect adjustment with fixed constraints refers to using the leveling points in the first leveling point set as known elevation control points during the main leveling network adjustment process, and solving for the elevation results of the leveling points to be determined in the main leveling network based on the observation data of the main leveling network.

[0039] In one example, the leveling points in the first leveling point set are used as the starting leveling points, and the main network leveling points in the main leveling network observation data are used as the leveling points to be determined. Constrained adjustment is performed on the main leveling network observation data to obtain the 1985 elevation results corresponding to the main leveling network.

[0040] It should be noted that step S3 only processes the observation data of the main leveling network; the observation data of the auxiliary leveling network are not included in the adjustment solution of the main leveling network.

[0041] Understandably, the main network leveling point set is used to characterize the elevation results of the main leveling network within the target measurement area under the 1985 National Height Datum, and can serve as the higher-level elevation basis for subsequent adjustment processing of the auxiliary leveling network.

[0042] In this embodiment, by performing indirect adjustment of the leveling network observation data with fixed constraints based on the first set of leveling points, the elevation results of the leveling network can be determined first, providing a stable upper-level benchmark for solving the elevation results of the subsequent leveling auxiliary network.

[0043] Step S4: Based on the main network leveling point set, perform leveling network indirect adjustment with fixed constraints on the leveling auxiliary network observation data to obtain the auxiliary network leveling point set; The auxiliary leveling network set includes the point number, elevation results, and related attribute information of each leveling point in the auxiliary leveling network. The auxiliary leveling network includes one or more levels of auxiliary leveling networks, as well as one or more regional auxiliary leveling networks; this embodiment does not specifically limit this.

[0044] In one example, at least some of the leveling points in the main network leveling point set are used as the starting leveling points for the leveling auxiliary network adjustment. The leveling auxiliary network observation data are subjected to leveling network indirect adjustment with fixed constraints to obtain the 1985 elevation results of each leveling point in the leveling auxiliary network.

[0045] It should be noted that step S4 is performed on the basis of having already obtained the main network leveling point set, and the elevation results of the auxiliary leveling network are transferred and determined through the main network leveling point set.

[0046] Understandably, compared to merging the main leveling network observation data and the auxiliary leveling network observation data for overall solution, this embodiment processes the auxiliary leveling network observation data after the main leveling network leveling point set is determined, which can reduce the data scale of a single adjustment process.

[0047] In this embodiment, by performing indirect adjustment of the leveling auxiliary network observation data with fixed constraints based on the main network leveling point set, the leveling auxiliary network results can be determined based on the main network results, thereby improving the benchmark consistency between leveling results of different levels.

[0048] Step S5: Based on the main network leveling point set and the auxiliary network leveling point set, construct a hierarchical unified elevation benchmark database.

[0049] The main network leveling point set is the set of main network elevation results obtained by adjusting the main network leveling observation data, and the auxiliary network leveling point set is the set of auxiliary network elevation results obtained by adjusting the auxiliary network leveling observation data. Both the main network leveling point set and the auxiliary network leveling point set include at least leveling point identifiers, point location information, and corresponding 1985 elevation results.

[0050] It should be noted that the hierarchical elevation benchmark unified database is not the same as the main network leveling point set and the auxiliary network leveling point set themselves, but rather a data structure used to uniformly store and manage the main network leveling point set, the auxiliary network leveling point set, and the associated attribute information of each leveling point.

[0051] In one example, the main network leveling point set can be stored as the main network result layer, and the auxiliary network leveling point set can be stored as the auxiliary network result layer. At the same time, the leveling grade, region, starting source, accuracy evaluation information, result status and observation time of each leveling point can be associated and stored in the hierarchical elevation datum unified database.

[0052] It should be noted that the main network result layer is used to characterize the elevation results of the main leveling network within the target measurement area under the 1985 National Elevation Datum, and the auxiliary network result layer is used to characterize the elevation results of the auxiliary leveling network within the target measurement area under the 1985 National Elevation Datum. The ancillary attribute information in the database is used to assist in result querying, result management, and subsequent maintenance, and does not change the nature of the main network leveling point set and the auxiliary network leveling point set as elevation result sets.

[0053] Understandably, the main network leveling point set and the auxiliary network leveling point set form the data foundation for constructing a unified hierarchical elevation datum database. This database allows the 1985 elevation data from different levels of leveling points to be organized hierarchically for later retrieval and maintenance.

[0054] In this embodiment, the elevation results of the main leveling network are determined first, and then the elevation results of the auxiliary leveling network are determined based on the main network results. This avoids solving the observation data of different levels as a whole, reduces the scale of adjustment calculations, and improves the efficiency of unified processing of the 1985 elevation datum.

[0055] In another preferred embodiment, determining the first set of leveling points from the national first-order leveling control points of the target measurement area includes: Obtain the national first-order leveling control points within the target measurement area; From the national first-order leveling control points, leveling points that meet the preset starting point selection conditions are selected, and a first leveling point set is generated.

[0056] Among them, the national first-class leveling control points are high-level leveling control points within the target measurement area that have known results of the 1985 National Elevation Datum. The first set of leveling points is used as the starting set of leveling points for the adjustment of the main leveling network.

[0057] In one embodiment, the system retrieves the location files, official 1985 elevation data, annual remeasurement elevation data, marker status, and route connectivity information of each national first-order leveling control point within the target measurement area, and filters them based on preset starting point selection criteria. These preset starting point selection criteria include at least the following: the point has the officially published 1985 national elevation datum data; the annual elevation deformation from consecutive years of remeasurement is no greater than 0.3 mm; the markers are well-preserved and free from damage, settlement, or human-caused destruction; and the leveling route can be connected to the main leveling network without any route breaks.

[0058] It should be noted that when elevation changes occur during the re-measurement of national first-order leveling control points, the system first automatically classifies and judges the elevation changes based on the amount of change. When the elevation change is less than or equal to 0.3 mm, only the elevation value of that point is updated, and the results of the second-order main network remain unchanged. When the elevation change is between 0.3 mm and 1.0 mm, the starting point is retained, and only the adjustment calculation of the second-order leveling main network is restarted to update and lock the elevation results of the second-order main network. When the elevation change exceeds 1.0 mm, the unstable point is automatically removed, and other first-order control points are selected as the starting benchmark.

[0059] It should be noted that the first set of leveling points is used to provide fixed elevation constraints for the adjustment of the main leveling network, and it is not the set of leveling points to be determined. By screening national first-order leveling control points, the system can avoid the participation of unstable or unconnected leveling points in subsequent adjustments.

[0060] In this embodiment, by selecting leveling points from the national first-order leveling control points that meet the preset starting point selection conditions, the reliability of the starting datum can be improved, providing a stable constraint basis for subsequent main network adjustment.

[0061] In yet another preferred embodiment, the step of performing a leveling network indirect adjustment with fixed constraints on the leveling network observation data based on the first leveling point set to obtain the main network leveling point set of the leveling network includes: The leveling points in the first set of leveling points are used as the starting leveling points, and the leveling points to be determined are determined from the observation data of the main leveling network. Based on the starting leveling point, the leveling point to be determined, and the leveling segments in the leveling main network observation data, establish the elevation difference observation error equation corresponding to the leveling main network; An elevation fixed constraint is applied to the starting leveling point, and the observation weight corresponding to each leveling segment is determined; Based on the elevation difference observation error equation, the elevation fixed constraint, and each of the observation weights, least squares adjustment is performed on the leveling main network observation data to obtain the adjusted elevation of each of the leveling points to be determined. Based on the adjusted elevation of each of the leveling points to be determined and the elevation difference observation error equation, determine the elevation difference residual corresponding to each of the leveling sections; Based on the elevation difference residuals corresponding to each leveling segment, the observation weights corresponding to each leveling segment are iteratively corrected, and the adjusted elevations of each leveling point to be determined are updated based on the corrected observation weights. When the updated adjusted elevation meets the preset convergence condition, and the elevation difference residuals corresponding to each leveling segment meet the limits of the second-order leveling specification, the main network leveling point set of the leveling main network is obtained based on the updated adjusted elevation.

[0062] The leveling main network observation data includes leveling point information, leveling section information, and measured elevation difference information within the leveling main network. Leveling point information includes at least the point number, location, and leveling grade; leveling section information includes at least the leveling points at both ends of the section and the section length; measured elevation difference information is used to establish the elevation difference observation error equation. Leveling points in the first-order leveling point set are considered as known elevation points, and second-order leveling points are considered as leveling points to be determined.

[0063] In one embodiment, the national first-order leveling points in the first leveling point set are used as known starting leveling points, and the second-order leveling points in the main leveling network are used as leveling points to be determined. For any leveling section, the corresponding elevation difference observation error equation is established based on the elevation corrections of the leveling points at both ends of the section, the approximate elevation values ​​of the leveling points at both ends, and the measured elevation difference of the section. For the national first-order leveling points used as starting leveling points, a fixed elevation constraint is applied to make their elevation corrections zero. Specifically, for any leveling section from leveling point i to leveling point j, the following elevation difference observation error equation is established:

[0064]

[0065] In the formula, For elevation difference residuals, , These are the elevation corrections for the starting and ending points, respectively. For the constant term of the equation, and These are approximate elevation values ​​for two points. The measured elevation difference of the section.

[0066] Taking the section from A (a first-order known point) to B (a second-order fixed point) as an example, the following fixed elevation constraints are applied to the starting leveling points in the first set of leveling points:

[0067] in, This is the elevation correction for the starting level point A.

[0068] In one embodiment, observation weights are determined according to the length of the leveling segment; the longer the segment, the smaller the corresponding observation weight. The system constructs a normal equation based on the elevation difference observation error equation, fixed elevation constraints, and observation weights, and solves for the adjusted elevation of the leveling point according to the least squares criterion. Specifically, after completing one least squares adjustment, the elevation difference residuals of each leveling segment are calculated based on the adjusted elevation and the elevation difference observation error equation. If the elevation difference residual of a certain segment is large, the observation weight of that segment is reduced, and the adjustment is performed again based on the corrected observation weights. The above process is repeated until the updated adjusted elevation meets the preset convergence condition, and the elevation difference residuals of each segment meet the limits of the second-order leveling specification.

[0069] In a specific example, the second-order leveling main network observation data is first read, and initial weighting is performed according to the segment length. An error equation with mandatory constraints from first-order leveling points is established, and the first round of least squares adjustment is completed to calculate the elevation residuals for each segment. Subsequently, the observation weights are dynamically adjusted based on the magnitude of the residuals. Segments with large residuals or suspected observation errors are automatically weighted down to reduce the impact of these observations on the adjustment results. The adjusted weight matrix is ​​then used to perform adjustment calculations again, and the process is iterated repeatedly. When the elevation difference between leveling points obtained from two consecutive iterations is less than 0.05 mm, and the residuals of all segments meet the limits specified in the second-order leveling standard, the iteration is considered to have converged, and the observation error has been effectively eliminated.

[0070] In another specific example, a 1.5 mm gross error was artificially introduced into the target section. After the first round of adjustment, the residual of this section was found to be out of tolerance, and the program automatically reduced the weight of this section and started the second round of iteration. After one round of weight correction, the elevation calculation results converged quickly, and the observation error caused by the gross error was significantly suppressed, finally obtaining the second-order leveling elevation that meets the millimeter-level accuracy. The entire iterative calculation only uses the second-order main network data; the observation data of the third and fourth-order auxiliary networks are not involved in the calculation, ensuring that the primary elevation datum is not affected by the observation errors of the lower levels. Furthermore, the second-order leveling main network completes the elevation accuracy assessment in two levels. First, the unit weight standard error is calculated, using the formula: In the formula, V represents the elevation difference residual, P is the observation weight matrix, n is the total number of survey sections, and t is the number of points to be determined. This is used to evaluate the overall quality of second-order leveling field observations. The converted mean square error per kilometer of elevation difference must meet the limits specified in the second-order leveling standard. Furthermore, the elevation accuracy of each second-order point is evaluated by inverting the coefficient matrix of the normal equation to obtain the elevation cofactor matrix, and then using the formula... The elevation error is calculated point by point until the elevation error of all second-order points meets the millimeter-level accuracy index before the system locks in the elevation results.

[0071] It should be noted that only the observation data of the main leveling network is loaded during the adjustment process; observation data from the auxiliary leveling network is not introduced. The set of main leveling points is the set of elevation results of the main leveling network, which includes at least the leveling point identifiers, point location information, and the adjusted 1985 elevation results.

[0072] In this embodiment, by establishing an elevation difference observation error equation and combining iterative correction with fixed elevation constraints, observation weights, and elevation difference residuals, the impact of abnormal observation data on adjustment results can be reduced, thereby improving the accuracy and reliability of the elevation results of the main leveling network.

[0073] In another preferred embodiment, the auxiliary leveling network includes a first auxiliary leveling network and a second auxiliary leveling network. The step of performing a leveling network indirect adjustment with fixed constraints on the auxiliary leveling network observation data based on the main network leveling point set to obtain the auxiliary network leveling point set includes: Based on the main network leveling point set, a leveling network indirect adjustment with fixed constraints is performed on the observation data of the first auxiliary leveling network to determine the first auxiliary network leveling point set; Based on the main network leveling point set and the first auxiliary network leveling point set, a leveling network indirect adjustment with fixed constraints is performed on the observation data of the second auxiliary leveling network to determine the second auxiliary network leveling point set; The auxiliary network leveling point set is obtained based on the first auxiliary network leveling point set and the second auxiliary network leveling point set.

[0074] The first leveling auxiliary network is an auxiliary network with a higher elevation transfer level than the second leveling auxiliary network, and the second leveling auxiliary network is an auxiliary network further densified based on the main network leveling point set and / or the first auxiliary network leveling point set. In one embodiment, the first leveling auxiliary network is a third-order leveling auxiliary network, and the second leveling auxiliary network is a fourth-order leveling auxiliary network.

[0075] In one embodiment, the system first retrieves the observation data of the first auxiliary leveling network and determines the starting leveling point corresponding to the first auxiliary leveling network from the main network leveling point set. Subsequently, the leveling points to be determined in the first auxiliary leveling network are treated as unknown points, and the starting leveling points in the main network leveling point set are used as fixed constraint points. The system then performs leveling network indirect adjustment with fixed constraints on the observation data of the first auxiliary leveling network to obtain the first auxiliary network leveling point set.

[0076] In another embodiment, the system retrieves observation data from the second auxiliary leveling network and determines the starting leveling point of the second auxiliary leveling network based on the distribution of its area and its superior control points. When the second auxiliary leveling network is adjacent to the main network leveling point, the main network leveling point set is used as the starting basis; when the area corresponding to the second auxiliary leveling network has already formed the first auxiliary network leveling point set, and the second auxiliary leveling network is far from the main network leveling point, the qualified leveling point in the first auxiliary network leveling point set is used as the starting basis.

[0077] It should be noted that both the first and second auxiliary leveling networks are solved based on the higher-level elevation results, and their adjustment process will not reverse the elevation results in the main network leveling point set. Both the first and second auxiliary leveling point sets belong to the 1985 National Elevation Datum.

[0078] It should be noted that the adjustment process of the second leveling auxiliary network does not change the existing elevation results in the main network leveling point set and the first auxiliary network leveling point set. It only determines the second auxiliary network leveling point set based on the higher-level elevation results and the observation data of the second leveling auxiliary network.

[0079] In this embodiment, the first auxiliary network leveling point set and the second auxiliary network leveling point set are determined sequentially, so that the leveling auxiliary networks at different levels can be solved step by step based on the elevation results of the higher level, thereby improving the uniformity of the leveling auxiliary network elevation results and increasing the efficiency of adjustment calculation.

[0080] In yet another preferred embodiment, the step of constructing a hierarchical unified elevation datum database based on the main network leveling point set and the auxiliary network leveling point set includes: Perform a starting point compatibility check on the starting points of the main network corresponding to the set of auxiliary network leveling points; If the compatibility test of the starting point passes, the auxiliary network leveling point set will be attached to the 1985 elevation datum framework corresponding to the main network leveling point set. The main network leveling point set is stored in the first elevation result storage partition, and the auxiliary network leveling point set is stored in the second elevation result storage partition, thus obtaining the hierarchical elevation benchmark unified database.

[0081] The starting point compatibility check is used to determine whether the starting level points of the main network on which the auxiliary network adjustment depends meet the consistency requirements. If multiple main network starting level points are measured in the same auxiliary network area, the system checks the elevation relationship between the starting level points of each main network based on the auxiliary network observation data.

[0082] In one embodiment, when verifying the auxiliary network observation data within a region, one main network starting leveling point is used as a fixed point, and the other main network starting leveling points are used as points to be verified. The elevation of the points to be verified is then calculated using the elevation differences observed in the auxiliary network. The system compares the calculated elevation with the already determined elevation results in the main network leveling point set. If the difference meets a preset compatibility threshold, the compatibility verification of the starting point is deemed to have passed.

[0083] In one embodiment, after the compatibility check of the starting points passes, the auxiliary network leveling point set is associated with the main network leveling point set, thus attaching the auxiliary network leveling point set to the 1985 elevation datum framework corresponding to the main network leveling point set. This association at least records the starting source and the level to which the auxiliary network leveling points belong.

[0084] In a specific implementation, when multiple second-order leveling main network points are connected to a third-order auxiliary network in a region and inconsistencies in elevation occur, the system first uses the empty-point comparison method to conduct a compatibility check of the starting points. This involves fixing one second-order point and temporarily setting the remaining second-order points as unknown points. The elevation is then calculated using the elevation difference observed in the third-order network and compared with the locked results of the second-order main network, using 0.3 mm as the judgment threshold. If the difference between points is no greater than 0.3 mm, it is considered merely an accidental observation error. The system retains all second-order points as redundant constraints to perform least-squares adjustment of the third-order network, weighting the closure error and distributing it within the third-order leveling section, thus absorbing the residuals within the auxiliary network. After the accuracy acceptance is passed, the third-order results are normally uploaded to the main network framework, and the second-order main network elevations remain read-only and locked without any changes. If the difference between points exceeds 0.3 mm, there is a substantial contradiction in the starting points. The program automatically identifies abnormal second-order control points, prioritizes the removal of unstable points, and only selects compatible second-order points to re-adjust the third-order auxiliary network. If multiple second-order points are generally inconsistent, the auxiliary network results are paused from being entered into the database, and the second-order main network is re-measured and verified. The auxiliary network calculation will continue after the main network is re-adjusted and the elevation is fixed.

[0085] It should be noted that the hierarchical unified elevation datum database is not equivalent to the main network leveling point set and the auxiliary network leveling point set themselves, but rather a data structure used to store and manage the main network leveling point set, the auxiliary network leveling point set, and related attribute information. The first elevation result storage partition is used to store the main network leveling point set, and the second elevation result storage partition is used to store the auxiliary network leveling point set.

[0086] In this embodiment, by performing compatibility checks on the starting level points of the main network and storing the main network results and auxiliary network results in separate partitions, the accuracy of the auxiliary network results can be improved, ensuring the clarity of the elevation results hierarchy in the database.

[0087] In yet another preferred embodiment, it further includes: If the compatibility check of the starting point fails, the abnormal main network starting point corresponding to the auxiliary network leveling point set is identified, and the abnormal main network starting point is removed from the main network starting point used for auxiliary network adjustment to obtain an updated main network starting point set. Based on the updated set of main network starting leveling points, the leveling auxiliary network observation data corresponding to the abnormal main network starting leveling points are re-executed with fixed constraints to redetermine the set of auxiliary network leveling points. The updated set of main network leveling points is stored in the first elevation result storage partition, and the newly determined set of auxiliary network leveling points is stored in the second elevation result storage partition, thus obtaining the hierarchical elevation benchmark unified database.

[0088] Among them, abnormal main network starting level points are those that cause the starting point compatibility test to fail. The identification criteria for abnormal main network starting level points include at least one of the following: elevation comparison difference, point stability status, and leveling route connection status.

[0089] In one embodiment, when there is an elevation inconsistency among multiple main network starting leveling points corresponding to the same auxiliary network area, the system determines the abnormal main network starting leveling points based on the starting point compatibility test results. For the main network starting leveling points identified as abnormal, the system removes them from the starting leveling points used in this auxiliary network adjustment and retains their original records in the main network result layer.

[0090] It should be noted that removing abnormal main network starting level points from the main network starting level points used for auxiliary network adjustment means that the abnormal main network starting level point will no longer be used as a constraint point when redetermining the auxiliary network level point set, and does not mean deleting or rewriting the main network result data in the main network level point set.

[0091] In one embodiment, the system re-executes the auxiliary network adjustment based on the updated main network starting leveling point set to obtain a newly determined auxiliary network leveling point set. After verification, the newly determined auxiliary network leveling point set is stored in the second elevation results storage partition; the main network leveling point set remains stored in the first elevation results storage partition.

[0092] It should be understood that when the compatibility check of the starting point fails, only the observation data of the auxiliary network affected by the abnormal main network starting level point will be re-adjusted, and the results of the auxiliary network that are not affected do not need to be recalculated.

[0093] In this embodiment, when the compatibility test of the starting point fails, abnormal main network starting leveling points are removed, and the set of auxiliary network leveling points is re-determined based on the observation data of the local auxiliary leveling network. This reduces the impact of abnormal starting points on the adjustment results of the auxiliary network and improves the data accuracy of the unified database of layered elevation datum.

[0094] In yet another preferred embodiment, it further includes: When the elevation of a local leveling point in the main leveling network changes, the corresponding local leveling auxiliary network observation data is selected from the leveling auxiliary network observation data; Based on the main network leveling point set, local constraint adjustment is performed on the local leveling auxiliary network observation data to obtain the updated auxiliary network leveling point set. Based on the updated set of auxiliary network leveling points, the hierarchical unified elevation datum database is updated.

[0095] The change in local leveling point elevation includes situations where leveling points in the main leveling network experience elevation changes due to re-measurement, surface subsidence, point damage, engineering construction impacts, or result verification. The local auxiliary leveling network observation data refers to auxiliary leveling network observation data that has a starting point relationship or elevation transfer relationship with the main leveling network points where elevation changes have occurred.

[0096] In one embodiment, elevation zones are pre-divided according to administrative regions and the topology of the main leveling network. Specifically, a geographic grid is first divided based on street administrative regions, and then a closed loop formed by the main leveling network points is used as the technical boundary to form several independent elevation zones. A zone number field is set for each auxiliary leveling network point and each auxiliary leveling network section.

[0097] When the elevation of a local leveling point in the main leveling network changes, the system first identifies the main leveling network point where the elevation change occurs, and then determines the target area based on the closed loop to which the main leveling network point belongs. Subsequently, based on the area number field in the auxiliary leveling network observation data, the system filters the auxiliary leveling network observation data within the target area to obtain candidate local auxiliary leveling network observation data.

[0098] Furthermore, the system performs a secondary screening of the candidate local leveling auxiliary network observation data based on the upper-level starting point number field in the leveling auxiliary network observation data to identify local leveling auxiliary network observation data that have a starting relationship or elevation transfer relationship with the leveling main network point where the elevation change has occurred. Auxiliary network observation data that do not have a starting relationship or elevation transfer relationship with the leveling main network point where the elevation change has occurred remain in their original state and are not included in this local constraint adjustment.

[0099] In one embodiment, the leveling auxiliary network includes a third-order leveling auxiliary network and a fourth-order leveling auxiliary network. If a main leveling network point experiencing an elevation change is used as the starting point for the third-order leveling auxiliary network, the system only retrieves the third-order leveling auxiliary network observation data for the corresponding area and performs local constraint adjustment based on the updated main network leveling point set to obtain the updated third-order auxiliary network leveling point set. After the third-order auxiliary network leveling point set is updated and solidified, the system further identifies the fourth-order leveling auxiliary network using the updated third-order leveling points as starting points and performs local constraint adjustment only on the affected fourth-order leveling auxiliary network observation data.

[0100] It should be noted that the local constraint adjustment is performed in descending order of constraint level. That is, first, the affected third-order leveling auxiliary network is updated using the updated main network leveling point set as the constraint basis; then, the affected fourth-order leveling auxiliary network is updated using either the updated third-order auxiliary network leveling point set or the main network leveling point set as the constraint basis. Fourth-order leveling auxiliary networks that directly start from the unchanged main network leveling points, or those that do not depend on the third-order leveling points updated in this instance, are not included in this local update.

[0101] It should be noted that the main network leveling point set is the set of higher-level elevation results. During the local constraint adjustment process, the auxiliary leveling network only reads the locked elevation results from the main network leveling point set as the constraint basis, and does not modify the elevation results in the main network leveling point set in reverse. The auxiliary leveling network observation data and auxiliary network elevation results in unaffected areas remain in a sealed state and are not included in this calculation.

[0102] In one embodiment, after obtaining the updated set of auxiliary network leveling points, the system writes the updated set of auxiliary network leveling points into the corresponding auxiliary network result storage partition in the hierarchical elevation datum unified database, and synchronously updates the result status, update time, region, and upper-level starting point number of the corresponding leveling points. For auxiliary network results that are not affected, the system retains the original database records.

[0103] It should be understood that the local update in this embodiment does not involve re-adjusting all the leveling network observation data. Instead, it determines the affected area based on the area number and the upper-level starting point number, and performs local constraint adjustment only on the affected local leveling auxiliary network observation data, thereby achieving local changes and local updates.

[0104] In this embodiment, when the elevation of local leveling points changes, the observation data of the local leveling auxiliary network are screened and local constraint adjustment is performed, which can avoid full recalculation and improve the local update efficiency of the elevation benchmark database.

[0105] In one application embodiment, the unified 1985 elevation datum method based on graded adjustment provided by the present invention is applied to the dynamic maintenance project of the 1985 urban elevation datum in Liwan District, Guangzhou City. The leveling network in this area includes 54 second-order main network points, 90 second-order survey sections, 226 third-order control points, 338 third-order survey sections, 632 fourth-order densification points, and 966 fourth-order survey sections.

[0106] In this embodiment, the newly added fourth-level encryption points in the area are selected as the test condition, and a comparative experiment is conducted under the condition that the computer hardware and software environments remain consistent. The comparative methods include the traditional global weighted overall adjustment method and the hierarchical and segmented adjustment method of the present invention.

[0107] When using the traditional global weighted adjustment method, all 1394 leveling segments from the second, third, and fourth order leveling networks need to be loaded simultaneously, and all observation data need to be solved simultaneously. Multiple experiments show that the average computation time for the traditional global weighted adjustment method is 138 minutes.

[0108] When using the hierarchical and segmented adjustment method of this invention, the second-order main network elevation results are used as locked upper-level benchmark results and do not participate in the repeated adjustment calculation of the newly added fourth-order densification points. The system only retrieves 236 third- and fourth-order leveling sections within the changed area based on the area where the newly added fourth-order densification points are located and the corresponding elevation transfer relationship, and performs local adjustment based on the locked main network leveling point set. Multiple test results show that the average calculation time of the hierarchical and segmented adjustment method of this invention is 36.7 minutes. Under the same test conditions, the hierarchical and segmented adjustment method of this invention reduces the calculation time by approximately 73.4% compared to the traditional global weighted overall adjustment method.

[0109] A second aspect of this invention provides a device for unifying the 1985 elevation datum based on hierarchical adjustment, used to implement the method for unifying the 1985 elevation datum based on hierarchical adjustment described in any of the embodiments of the first aspect above. See also... Figure 2 The diagram shown is a structural block diagram of a preferred embodiment of a device for unifying the 1985 elevation datum based on graded adjustment, provided in the second aspect of the present invention. The device includes: Data acquisition module 11 is used to acquire leveling network observation data of the target measurement area, the leveling network observation data including leveling main network observation data and leveling auxiliary network observation data; The first leveling point determination module 12 is used to determine a first leveling point set from the national first-order leveling control points in the target measurement area; The main network adjustment module 13 is used to perform indirect adjustment of the leveling main network observation data with fixed constraints based on the first set of leveling points, so as to obtain the main network leveling point set of the leveling main network. The auxiliary network adjustment module is used to perform indirect adjustment of the leveling auxiliary network observation data with fixed constraints based on the main network leveling point set, so as to obtain the auxiliary network leveling point set of the leveling auxiliary network. The database construction module is used to construct a hierarchical unified elevation datum database based on the main network leveling point set and the auxiliary network leveling point set.

[0110] It should be noted that the 1985 elevation datum unification device based on graded adjustment provided in the second aspect embodiment of the present invention can realize all the processes of the 1985 elevation datum unification method based on graded adjustment described in the first aspect. The functions and technical effects of each module and unit in the device are the same as those of the 1985 elevation datum unification method based on graded adjustment described in the first aspect embodiment, and will not be repeated here.

[0111] A third aspect of the present invention also provides a computer-readable storage medium comprising a stored computer program; wherein, when the computer program is executed, it controls the device on which the computer-readable storage medium is located to perform a method for unifying the 1985 elevation datum based on graded adjustment as described in any of the first aspects of the present invention.

[0112] The fourth aspect of the present invention also provides a terminal device, see [link to documentation]. Figure 3 The diagram shown is a structural block diagram of a preferred embodiment of a terminal device provided in the fourth aspect of the present invention. The terminal device includes a processor 10, a memory 20, and a computer program stored in the memory 20 and configured to be executed by the processor 10. When executing the computer program, the processor 10 implements a method for unifying the 1985 elevation datum based on graded adjustment as described in any of the above embodiments.

[0113] Preferably, the computer program can be divided into one or more modules / units (such as computer program 1, computer program 2, ...), and the one or more modules / units are stored in the memory 20 and executed by the processor 10 to complete the present invention. The one or more modules / units can be a series of computer program instruction segments capable of performing specific functions, and the instruction segments are used to describe the execution process of the computer program in the terminal device.

[0114] The processor 10 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor, or the processor 10 may be any conventional processor. The processor 10 is the control center of the terminal device, connecting various parts of the terminal device through various interfaces and lines.

[0115] The memory 20 mainly includes a program storage area and a data storage area. The program storage area can store the operating system, applications required for at least one function, etc., while the data storage area can store related data, etc. Furthermore, the memory 20 can be a high-speed random access memory, or a non-volatile memory, such as a plug-in hard drive, a smart media card (SMC), a secure digital card (SD), and a flash card, or other volatile solid-state storage devices.

[0116] It should be noted that the aforementioned terminal device may include, but is not limited to, processors and memory. Those skilled in the art will understand that the above content is merely an example describing the structure of the terminal device and does not constitute a limitation on the structure of the aforementioned terminal device. The aforementioned terminal device may include more or fewer components than those described above, or combine certain components, or different components.

[0117] It should be noted that the device embodiments described above are merely illustrative. The units described as separate components may or may not be physically separate, and the components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the modules can be selected to achieve the purpose of this embodiment according to actual needs. Furthermore, in the accompanying drawings of the device embodiments provided in this application, the connection relationships between modules indicate that they have communication connections, which can be specifically implemented as one or more communication buses or signal lines. Those skilled in the art can understand and implement this without any creative effort.

[0118] The above description is only a preferred embodiment of the present invention. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the technical principles of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.

Claims

1. A method for unifying the 1985 elevation datum based on graded adjustment, characterized in that, include: Acquire leveling network observation data for the target measurement area, wherein the leveling network observation data includes main leveling network observation data and auxiliary leveling network observation data; Determine a first set of leveling points from the national first-order leveling control points in the target measurement area; Based on the first set of leveling points, a leveling network indirect adjustment with fixed constraints is performed on the leveling network observation data to obtain the main network leveling point set of the leveling network. Based on the main network leveling point set, a leveling network indirect adjustment with fixed constraints is performed on the leveling auxiliary network observation data to obtain the auxiliary network leveling point set; Based on the main network leveling point set and the auxiliary network leveling point set, a hierarchical unified elevation benchmark database is constructed.

2. The method for unifying the 1985 elevation datum based on hierarchical adjustment as described in claim 1, characterized in that, The step of determining the first set of leveling points from the national first-order leveling control points in the target measurement area includes: Obtain the national first-order leveling control points within the target measurement area; From the national first-order leveling control points, leveling points that meet the preset starting point selection conditions are selected, and a first leveling point set is generated.

3. The method for unifying the 1985 elevation datum based on hierarchical adjustment as described in claim 1, characterized in that, The step of performing a leveling network indirect adjustment with fixed constraints on the leveling network observation data based on the first set of leveling points, to obtain the main network leveling point set of the leveling network, includes: The leveling points in the first set of leveling points are used as the starting leveling points, and the leveling points to be determined are determined from the observation data of the main leveling network. Based on the starting leveling point, the leveling point to be determined, and the leveling segments in the leveling main network observation data, establish the elevation difference observation error equation corresponding to the leveling main network; An elevation fixed constraint is applied to the starting leveling point, and the observation weight corresponding to each leveling segment is determined; Based on the elevation difference observation error equation, the elevation fixed constraint, and each of the observation weights, least squares adjustment is performed on the leveling main network observation data to obtain the adjusted elevation of each of the leveling points to be determined. Based on the adjusted elevation of each of the leveling points to be determined and the elevation difference observation error equation, determine the elevation difference residual corresponding to each of the leveling sections; Based on the elevation difference residuals corresponding to each leveling segment, the observation weights corresponding to each leveling segment are iteratively corrected, and the adjusted elevations of each leveling point to be determined are updated based on the corrected observation weights. When the updated adjusted elevation meets the preset convergence condition, and the elevation difference residuals corresponding to each leveling segment meet the limits of the second-order leveling specification, the main network leveling point set of the leveling main network is obtained based on the updated adjusted elevation.

4. The method for unifying the 1985 elevation datum based on hierarchical adjustment as described in claim 1, characterized in that, The auxiliary leveling network includes a first auxiliary leveling network and a second auxiliary leveling network. The process of performing a leveling network indirect adjustment with fixed constraints on the auxiliary leveling network observation data based on the main network leveling point set yields the auxiliary network leveling point set, including: Based on the main network leveling point set, a leveling network indirect adjustment with fixed constraints is performed on the observation data of the first auxiliary leveling network to determine the first auxiliary network leveling point set; Based on the main network leveling point set and the first auxiliary network leveling point set, a leveling network indirect adjustment with fixed constraints is performed on the observation data of the second auxiliary leveling network to determine the second auxiliary network leveling point set; The auxiliary network leveling point set is obtained based on the first auxiliary network leveling point set and the second auxiliary network leveling point set.

5. The method for unifying the 1985 elevation datum based on hierarchical adjustment as described in claim 1, characterized in that, The construction of a hierarchical unified elevation datum database based on the main network leveling point set and the auxiliary network leveling point set includes: Perform a starting point compatibility check on the starting points of the main network corresponding to the set of auxiliary network leveling points; If the compatibility test of the starting point passes, the auxiliary network leveling point set will be attached to the 1985 elevation datum framework corresponding to the main network leveling point set. The main network leveling point set is stored in the first elevation result storage partition, and the auxiliary network leveling point set is stored in the second elevation result storage partition, thus obtaining the hierarchical elevation benchmark unified database.

6. The method for unifying the 1985 elevation datum based on hierarchical adjustment as described in claim 5, characterized in that, Also includes: If the compatibility check of the starting point fails, the abnormal main network starting point corresponding to the auxiliary network leveling point set is identified, and the abnormal main network starting point is removed from the main network starting point used for auxiliary network adjustment to obtain an updated main network starting point set. Based on the updated set of main network starting leveling points, the leveling auxiliary network observation data corresponding to the abnormal main network starting leveling points are re-executed with fixed constraints to redetermine the set of auxiliary network leveling points. The updated set of main network leveling points is stored in the first elevation result storage partition, and the newly determined set of auxiliary network leveling points is stored in the second elevation result storage partition, thus obtaining the hierarchical elevation benchmark unified database.

7. The method for unifying the 1985 elevation datum based on hierarchical adjustment as described in claim 1, characterized in that, Also includes: When the elevation of a local leveling point in the main leveling network changes, the corresponding local leveling auxiliary network observation data is selected from the leveling auxiliary network observation data; Based on the main network leveling point set, local constraint adjustment is performed on the local leveling auxiliary network observation data to obtain the updated auxiliary network leveling point set. Based on the updated set of auxiliary network leveling points, the hierarchical unified elevation datum database is updated.

8. A device for unifying the 1985 elevation datum based on hierarchical adjustment, used to implement the method for unifying the 1985 elevation datum based on hierarchical adjustment as described in any one of claims 1 to 7, the device comprising: The data acquisition module is used to acquire leveling network observation data of the target measurement area, including leveling main network observation data and leveling auxiliary network observation data. The first leveling point determination module is used to determine the first leveling point set from the national first-order leveling control points in the target measurement area; The main network adjustment module is used to perform indirect adjustment of the leveling main network observation data with fixed constraints based on the first set of leveling points, so as to obtain the main network leveling point set of the leveling main network. The auxiliary network adjustment module is used to perform indirect adjustment of the leveling auxiliary network observation data with fixed constraints based on the main network leveling point set, so as to obtain the auxiliary network leveling point set of the leveling auxiliary network. The database construction module is used to construct a hierarchical unified elevation datum database based on the main network leveling point set and the auxiliary network leveling point set.

9. A computer-readable storage medium, characterized in that, The computer-readable storage medium includes a stored computer program; wherein, when the computer program is executed, it controls the device on which the computer-readable storage medium is located to perform a method for unifying the 1985 elevation datum based on graded adjustment as described in any one of claims 1 to 7.

10. A terminal device, characterized in that, It includes a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein the processor, when executing the computer program, implements a method for unifying the 1985 elevation datum based on graded adjustment as described in any one of claims 1 to 7.