A smart management and control method for safety and compliance throughout the entire earthwork construction process

By introducing a three-dimensional theoretical model and finite state machine into the soil piling construction, combined with geological sensing and meteorological data, the sampling frequency is adjusted in real time and a tamper-proof data chain is generated, which solves the data lag and tampering problems of the existing soil piling construction control system and realizes efficient and reliable safety monitoring and early warning.

CN123113683APending Publication Date: 2026-11-17CCCC SHANGHAI DREDGING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611600828.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-16
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The existing soil shovel construction management and control system suffers from data collection delays, inaccurate early warnings, lack of direct hardware connection intervention mechanisms, and the risk of data tampering. It is unable to monitor soil stress distribution and environmental changes in real time, resulting in inaccurate safety warnings and unreliable data.

Method used

By importing a three-dimensional theoretical model, dividing it into three-dimensional grid units and allocating finite state machine structures, and combining geological sensing equipment and meteorological parameters, the sampling frequency is adjusted in real time and a tamper-proof traceability data chain is generated. A synchronous mapping mechanism between the physical space grid and the logical judgment state is established to realize hardware circuit breaker intervention and data encapsulation.

Benefits of technology

It improves the safety monitoring response speed and data integrity during soil piling construction, reduces the sensor network load, ensures the safety of the construction process and the immutability of data, and provides reliable safety early warning and traceability records.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123113683A_ABST
    Figure CN123113683A_ABST
Patent Text Reader

Abstract

This invention relates to the field of construction safety management and control technology, and discloses an intelligent management and control method for the safety and compliance of the entire process of earthwork construction. The method includes: importing three-dimensional theoretical model data to divide it into three-dimensional mesh units; assigning finite state machine structures to the three-dimensional mesh units to generate construction task data elements; generating stress influence range boundaries; sending frequency conversion sampling signals to sensing devices within the boundaries to obtain settlement displacement parameters; combining surface point clouds and meteorological parameters to solve for the equivalent moisture evaporation, and generating an unlocking status code when conditions are met; calculating the safe displacement rate threshold using load and displacement parameters, and outputting a gate circuit breaker signal when the limit is exceeded; extracting the actual elevation increment to correct the deduction model; performing hash encapsulation on the interactive data to generate an anti-tampering traceability data chain and writing it to a storage medium. This invention establishes a low-level mapping between physical space and logical state, relies on multi-dimensional environmental parameters to achieve hardware circuit breaker intervention, and constructs an anti-tampering data chain to ensure the accuracy of construction management and control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of construction safety management and control technology, specifically to an intelligent management and control method for the safety and compliance of the entire process of soil piling construction. Background Technology

[0002] Existing soil dumping construction management processes largely rely on fixed-cycle morphological monitoring and equipment inspections. Conventional monitoring systems use uniformly set time intervals during the data acquisition phase, failing to adjust the sampling frequency of geological sensors based on soil stress distribution and actual operational loads. This fixed sampling mode suffers from data lag in the early stages of settlement, making it impossible to provide high-density tracking data during sudden deformation phases. Consequently, safety warnings lack real-time data support. Furthermore, conventional management software architectures separate the three-dimensional spatial entities from the judgment logic, relying on upper-level software code for pointer passing and status verification. This lack of absolute address mapping between the spatial grid and the finite state machine in the underlying physical memory results in delays in the system's addressing response to high-concurrency spatial monitoring tasks.

[0003] Existing technologies rely on experience-set settling time or a single fixed displacement threshold in the construction operation release and hazard assessment stages. Simply relying on settling time ignores the physical coupling relationship between environmental meteorological conditions and soil moisture loss, and cannot truly reflect the recovery of the bearing capacity of the underlying soil. The fixed displacement threshold judgment method does not combine input load and time window for discrete integral deduction, and lacks a safety benchmark that is adaptively updated with the construction progress, which may lead to false alarms or omissions in actual operation.

[0004] Furthermore, conventional construction control systems only provide information prompts on the software interface when exceeding limits, without establishing a direct circuit-breaking intervention mechanism from logical judgment to external hardware. This leaves room for unauthorized operation of vehicles and machinery on site. In the past, the business parameters and control signals of the control system were stored in conventional databases, and the monitoring data and system logs lacked strict encapsulation of underlying hardware clocks and cryptographic hash algorithms. After a safety accident, the work records and early warning data are at risk of being modified or erased, failing to provide tamper-proof digital traceability evidence for accident investigation. Summary of the Invention

[0005] To address the shortcomings of existing technologies, this invention provides an intelligent management and control method for the safety and compliance of the entire soil piling construction process, which solves the problems of sampling lag and inaccurate early warning in existing management and control systems, lack of underlying hardware direct connection intervention mechanism, and risk of tampering with operational data.

[0006] To achieve the above objectives, the present invention provides the following technical solution: A method for intelligent management and control of safety and compliance throughout the entire process of earthwork construction includes the following steps: Import the three-dimensional theoretical model data and divide it into three-dimensional mesh units according to the three-dimensional coordinate system. Assign a finite state machine structure to the three-dimensional mesh units and extract soil source attributes, equipment identification codes, time window information and target work space coordinates to generate construction task data elements. Based on the target work space coordinates, a stress influence range boundary is generated, and a frequency conversion sampling signal is sent to the geological sensing equipment within the stress influence range boundary to obtain settlement displacement parameters. Obtain surface point cloud dataset, temperature parameters, and wind speed parameters. Combine the surface point cloud dataset, temperature parameters, and wind speed parameters to solve for the water evaporation equivalent. Generate an unlocking state code when the water evaporation equivalent is greater than a set water loss limit value and the finite state machine structure is not in a load settlement over-limit locking state. The load parameters are obtained, the virtual simulated elevation increment is calculated using the load parameters, and the safe displacement rate threshold is calculated by combining the settlement displacement parameters. When the rate of change of the derivative of the settlement displacement parameters is greater than or equal to the safe displacement rate threshold, a lock-up trigger command and a gate disconnection electrical signal are generated. Spatial Boolean difference operation is performed on the surface point cloud dataset to extract the real elevation increment, the environmental degradation penalty coefficient is updated to correct the virtual inferred elevation increment, and a hash mapping operation is performed to bind the construction task data element, the frequency conversion sampling signal, the unlock status code, the lockout trigger command and the barrier gate circuit breaker signal with the target operation space coordinates, generate an anti-tampering traceability data chain and write it to the local physical storage medium.

[0007] The innovative principle of this invention, employing the above technical solution, lies in: binding the three-dimensional theoretical model with a finite state machine at the bottom layer to establish a synchronous mapping mechanism between the physical space grid and the logical judgment state; scheduling the acquisition frequency of geological sensing equipment based on the stress influence range limit, and introducing the moisture evaporation equivalent as a physical prerequisite for construction lifting by combining surface point cloud datasets and meteorological parameters; calculating the safe displacement rate threshold by comparing the theoretically derived increment with the actual displacement derivative change rate, and issuing a hardware circuit breaker signal to intercept vehicle passage when the safe displacement rate threshold is triggered; performing hash encapsulation and physical solidification on the entire process of interactive signaling and state flow data. The above process realizes control from data perception and state decision-making to external hardware cutoff, eliminating system intervention delays and data tampering space, and constructing a safety management and control architecture for soil filling operations.

[0008] Furthermore, the steps of importing the three-dimensional theoretical model data, dividing it into three-dimensional mesh units according to the three-dimensional coordinate system, and assigning finite state machine structures to the three-dimensional mesh units include: A translation and rotation matrix is ​​introduced to transform the inherent local engineering coordinate system of the three-dimensional theoretical model data to the absolute geodetic coordinate system to generate a spatial registration model. The extreme values ​​of the three-dimensional boundary contour of the spatial registration model are extracted, and the basic side length of the mesh is calculated based on the angular resolution of the three-dimensional laser device. The spatial registration model is divided into multiple groups of three-dimensional mesh units with independent three-dimensional number indexes in the absolute geodetic coordinate system. Based on the three-dimensional numbering index, an independent finite state machine structure is assigned to each of the three-dimensional mesh cells. The finite state machine structure is set with a main job state, a sampling sub-state, and an admission sub-state. The absolute offset address of the finite state machine structure in the memory heap area is recorded to establish a unique memory mapping relationship between the physical three-dimensional mesh cells and the logical finite state machine structure.

[0009] The innovative principle of this invention, based on the above-mentioned further technical solutions, is as follows: by introducing translation and rotation matrices and angular resolution calculations, the theoretical model is registered with the absolute coordinate system on-site and meshed; by establishing an absolute offset address association between the physical three-dimensional mesh unit and the logical finite state machine structure in the memory heap area, the overhead of multi-layer pointer passing during conventional software operation is avoided, thereby improving the addressing and response efficiency of the control system for concurrent tasks in three-dimensional space.

[0010] Furthermore, the step of extracting soil source attributes, equipment identification codes, time window information, and target work space coordinates to generate construction task data elements includes: The system acquires business data messages and performs deserialization parsing to extract the soil source attributes, the equipment identification code, the time window information, and the target work space coordinates. It then calls the data structure splicing interface to perform fixed-length field encoding and adds preset bit width check and feature bits to generate the construction task data element carrying a unique business sequence number. Based on the target workspace coordinates, an addressing operation is performed in the memory mapping association to locate the target 3D mesh cell in the 3D mesh cell. According to the absolute offset address, the construction task data element, together with the initial parameters of the finite state machine structure bound to the target 3D mesh cell, is synchronously written into the protected working area of ​​the high-speed computing memory.

[0011] The innovative principle of this invention, based on the above-mentioned further technical solutions, is as follows: by using deserialization parsing and fixed-length field encoding technology, bit-width verification and encapsulation are performed on business data to ensure data integrity at the communication layer; by relying on absolute offset address to perform underlying memory addressing, the initial parameters are synchronously written into the protected working area of ​​high-speed computing memory, thereby improving the anti-tampering capability of construction initialization data from the system bottom layer.

[0012] Furthermore, the step of generating the stress influence range limit based on the target work space coordinates includes: The additional stress diffusion angle constant corresponding to the soil source attribute is extracted by combining the business data dictionary, and the load prediction parameter is read according to the equipment identification code and the business serial number; The load estimation parameters are divided by using the product of a preset soil stress sensitivity threshold and pi as the divisor. The elevation coordinate feature value corresponding to the target working space coordinate and the tangent value of the additional stress diffusion angle constant are extracted and multiplied. The result of the division calculation and the result of the multiplication calculation are summed to obtain the equivalent influence radius of the stress influence range limit. The stress influence range limit is generated with the target working space coordinate as the center and the equivalent influence radius as the boundary.

[0013] The innovative principle of this invention, based on the above-mentioned further technical solutions, is as follows: by combining the geometric trigonometric characteristics of soil stress sensitivity threshold, load prediction parameters, elevation coordinate characteristic values ​​and additional stress diffusion angle, the equivalent influence radius is derived, and a boundary range with physical and mechanical calculation basis is established; the boundary range enables the frequency conversion sampling signaling to have directional spatial characteristics, avoids sending invalid global signals to blind zone equipment, and optimizes the data throughput and equipment power consumption of the geological sensing network.

[0014] Furthermore, the step of sending frequency conversion sampling signals to geological sensing devices within the stress influence range to obtain settlement displacement parameters includes: Calculate the spatial Euclidean distance between the three-dimensional coordinates of the sensor node recorded in the underlying hardware device coordinate registry and the target working space coordinates, and send the frequency conversion sampling signal encapsulated with a set high-frequency sampling frequency to the geological sensing device whose spatial Euclidean distance is less than or equal to the equivalent influence radius. The settlement displacement parameters continuously output by the geological sensing device based on the high-frequency sampling frequency are obtained, and a first-order difference calculation operation is performed on the settlement displacement parameters of adjacent sampling periods to extract the rate of change of the derivative of the settlement displacement parameters. The derivative change rate is compared with the set convergence constant. If the derivative change rate is less than the set convergence constant, the continuous trigger counter is incremented. If the cumulative value of the continuous trigger counter reaches the preset period threshold, a command to restore the reference sampling frequency is sent to the geological sensing device.

[0015] The innovative principle of this invention, using the above-mentioned further technical solutions, is as follows: by combining spatial Euclidean distance and first-order difference calculation, a sampling frequency adjustment logic for geological sensing equipment is constructed. The control system maintains a high-frequency sampling state during the soil settlement stage caused by construction operations. After continuously monitoring that the rate of change of the derivative is less than the set convergence constant and reaches the preset period threshold, a command to restore the reference sampling frequency is issued to control the hardware to reduce the frequency. This extends the battery life of the front-end geological sensing equipment while maintaining the ability to capture abrupt change features.

[0016] Furthermore, the step of solving for the equivalent moisture evaporation by combining the surface point cloud dataset, temperature parameters, and wind speed parameters includes: The absolute normal deviation between the actual physical surface vertices and the ideal fitted geometric plane corresponding to the surface point cloud dataset is extracted to calculate the statistical root mean square value, and normalization is performed to obtain the surface roughness index; orthogonal projection is performed on the three-dimensional mesh geometric contour encapsulated by the surface point cloud dataset to extract the windward projection area, and polygon occlusion culling and orthogonal projection operations are performed along the solar incident direction vector to extract the effective illumination area; Within the set integration time window, for the current discrete time step, calculate the empirical coefficient of temperature radiation, the first product of the temperature parameter and the effective irradiance area, and calculate the empirical coefficient of wind speed convection, the second product of the wind speed parameter and the projected area of ​​the windward surface. Add the first product and the second product together, and then multiply them by a summation term with the surface roughness index and the discrete time step size to obtain the single-step evaporation characteristic value. Perform discrete summation operation on the single-step evaporation characteristic values ​​corresponding to all discrete time steps to solve for the moisture evaporation equivalent.

[0017] The innovative principle of this invention, based on the above-mentioned further technical solution, is as follows: the spatial geometric features of point cloud and environmental physical parameters are integrated in discrete time steps. The integration process converts macroscopic meteorological data into micro-environment moisture loss indicators coupled with three-dimensional construction morphology features, providing a quantitative basis for assessing the evolution of soil bearing capacity due to water loss.

[0018] Furthermore, the step of generating an unlocking state code when the water evaporation equivalent is greater than a set water loss threshold and the finite state machine structure is not in a load settlement over-limit locked state includes: Based on the soil source attributes in the construction task data element, the soil category code and water content level code are parsed, and the corresponding set water loss limit value is read from the business configuration dictionary; The equivalent amount of water evaporation is compared with the set water loss limit. If the equivalent amount of water evaporation is greater than the set water loss limit and the access sub-state of the finite state machine structure is not in the load settlement over-limit lock state, the internal transition command of the finite state machine structure is triggered to generate the unlock state code and switch the access sub-state of the finite state machine structure to the safe operation unlock state.

[0019] The innovative principle of this invention, which adopts the above-mentioned further technical solution, is to avoid the experience-based control method of relying on preset static time as the basis for release in conventional construction operations. Instead, it integrates the set water loss limit value based on soil source attribute reading with the internal state judgment of the finite state machine structure, and uses the water evaporation equivalent as a prerequisite for triggering the internal transition command, so as to ensure that the resumption of work environment meets the engineering mechanical stability requirements.

[0020] Furthermore, the steps of obtaining load parameters, calculating the virtual estimated elevation increment using the load parameters, and calculating the safe displacement rate threshold in conjunction with the settlement displacement parameters include: The average value of the stable segment is extracted from the load parameters as the effective load parameter and accumulated. Within the set time window, the product of the received load parameter and the influence depth parameter is calculated for the current discrete moment, and divided by the product of the compression modulus of the bottom soil and the area of ​​force application to obtain the single-step elevation increment characteristic value. Within the set time window, the accumulation operation is performed on all the single-step elevation increment characteristic values ​​to calculate the virtual inferred elevation increment. The ratio of the virtual simulated elevation increment to the settlement displacement parameter obtained at the current moment is calculated and multiplied by the safety reduction factor to obtain the first algebraic term. The product of the zero-limit floating-point constant and the empirical reference rate constant is calculated to obtain the second algebraic term. The first algebraic term and the second algebraic term are added together to calculate the safe displacement rate threshold under the specific load accumulation state.

[0021] The innovative principle of this invention, based on the above-mentioned further technical solution, is as follows: by introducing the compression modulus and the area of ​​force application of the underlying soil, the load parameters are accumulated under a discrete window to obtain the virtual estimated elevation increment; by calculating the ratio between the virtual estimated elevation increment and the settlement displacement parameter, and superimposing the zero-minimum floating-point constant bias, a safe displacement rate threshold model that evolves synchronously with the construction load state is established, overcoming the defects of false alarms or missed alarms caused by the fixed threshold method.

[0022] Furthermore, the step of generating a lock-up trigger command and a gate disconnection signal when the rate of change of the derivative of the settlement displacement parameter is greater than or equal to the safe displacement rate threshold includes: Perform a comparison operation between the rate of change of the derivative and the safe displacement rate threshold; Under the condition that the rate of change of the derivative is greater than or equal to the safe displacement rate threshold, the lock-up trigger command is generated to switch the access sub-state to the load settlement over-limit lock-up state, and the gate disconnection electrical signal is output to the external hardware device according to the lock-up trigger command to cut off the vehicle passage permission circuit. After the access sub-state enters the load settlement over-limit lock state, when the rate of change of the derivative is continuously lower than the safe displacement rate threshold to reach the preset safe recovery period, and the moisture evaporation equivalent is greater than the set water loss limit value, the access sub-state is switched to the safe operation unlock state.

[0023] The innovative principle of this invention, based on the above-mentioned further technical solutions, is as follows: a control mechanism is established from logical judgment to physical level action. When the rate of change of the derivative is greater than or equal to the safe displacement rate threshold, the vehicle passage permission circuit is cut off to perform hardware circuit breaking intervention. The recovery mechanism of the safe operation unlocking state is superimposed with the preset safe recovery cycle and the set water loss limit value judgment threshold to eliminate the error illusion caused by displacement rebound due to short-term load removal on site, and ensure the reliability of the safe recovery judgment.

[0024] Furthermore, the steps of performing spatial Boolean difference operations on the surface point cloud dataset to extract the true elevation increment, updating the environmental degradation penalty coefficient to correct the virtual inferred elevation increment, performing hash mapping operations to bind the construction task data elements, the frequency conversion sampling signaling, the unlocking status code, the lockout trigger command, and the barrier gate circuit breaker electrical signal with the target operation space coordinates, generating an anti-tampering traceability data chain, and writing it to the local physical storage medium include: Spatial Boolean difference operation is performed on the surface point cloud dataset of adjacent periods to strip away the undeformed basic geometric elements, and the true elevation increment representing the difference in physical deformation is extracted by projection integral along the absolute elevation axis. The actual elevation increment is input into the recursive least squares model. The residual parameters of the actual elevation increment and the virtual inferred elevation increment and the internal Kalman gain matrix are combined to perform a weight update iterative operation to output the environmental degradation penalty coefficient. The environmental degradation penalty coefficient is used to perform a multiplicative correction on the virtual inferred elevation increment in the next calculation cycle. The construction task data elements, the lockout trigger command, the barrier gate circuit breaker signal, the unlock status code, the frequency conversion sampling signal, the timestamp feature obtained by the system hardware clock component, and the target work space coordinates are aligned and merged according to a preset byte sequence splicing rule. The merged byte sequence is converted into a hash digest feature code using a cryptographic component with a secure hash algorithm. The byte sequence of the current trace record, the hash digest feature code of the previous trace record, and the hash digest feature code of the current trace record are encapsulated with integrity verification to form the tamper-proof traceability data chain that is linked end to end in chronological order and appended to the local physical storage medium.

[0025] The innovative principle of this invention, employing the aforementioned further technical solutions, lies in: using spatial Boolean difference operations and a recursive least squares model to reverse-correct the deduction deviation of the virtual deduced elevation increment using the real elevation increment, thereby achieving closed-loop calibration of parameters; aligning and merging construction task data elements, signaling instructions, and timestamp feature execution data with hash hashing and encapsulating them, and forming a data traceability record in the local physical storage medium by creating an anti-tampering traceability data chain that is sequentially linked end-to-end according to time, ensuring that external tampering actions are intercepted by integrity verification, and guaranteeing the digital traceability basis for construction safety audits.

[0026] This invention provides an intelligent management and control method for the safety and compliance of the entire soil shovel construction process. It has the following beneficial effects: 1. This invention registers three-dimensional theoretical model data with an absolute geodetic coordinate system and directly establishes an association between the physical three-dimensional mesh unit and the absolute offset address of the finite state machine structure in the system memory heap area. The underlying memory mapping mechanism avoids the overhead of multi-level pointer calls in the conventional software operation process, thereby improving the addressing response speed of the control system to concurrent monitoring tasks in three-dimensional space. At the same time, the construction task data elements are synchronously written into the protected working area of ​​high-speed computing memory, cutting off the path of tampering with the running data from the underlying hardware architecture level and ensuring the security of construction control parameters.

[0027] 2. This invention derives the equivalent influence radius by combining soil source properties and load prediction parameters. While issuing frequency conversion sampling signals in a directional manner, it adaptively adjusts the sampling frequency of the geological sensing equipment according to the rate of change of the derivative of the settlement displacement parameter. The control method further uses the equivalent moisture evaporation obtained by integrating point cloud and meteorological parameters as a prerequisite for triggering the state machine unlocking command. The mechanism of integrating physical parameters and logical judgment reduces the invalid communication load of the sensor network and the power consumption of the terminal. Moreover, it makes the decision to release construction operations depend on the quantified moisture loss index, avoiding the hidden dangers caused by human experience judgment.

[0028] 3. This invention constructs a multi-dimensional data closed-loop calibration and hardware-level circuit breaker intervention process. By performing spatial Boolean difference operations on the surface point cloud dataset to extract the true elevation increment, and using residual parameters to reverse correct the virtual inferred elevation increment, the dynamic update of the safe displacement rate threshold is achieved. When the monitoring exceeds the limit, the control system outputs a gate circuit breaker electrical signal to the external hardware to physically cut off the passage loop. In addition, the control command, status code and timestamp features are hashed and merged in chronological order, and the generated tamper-proof traceability data chain is appended to the local physical storage medium to ensure the integrity and non-forgeability of the construction process traceability record. Attached Figure Description

[0029] Figure 1 This is a schematic diagram of the system timing interaction of the present invention; Figure 2 This is a schematic diagram of the method flow of the present invention; Figure 3 This is a schematic diagram of the convergence monitoring curve of the rate of change of the settlement derivative of the present invention. Detailed Implementation

[0030] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0031] See attached document Figure 1 This invention provides an intelligent management and control system for the safety and compliance of the entire process of soil piling construction. The system includes: a sensing module, an initialization module, a calculation module, a control module, and a storage module.

[0032] The sensing module acquires surface point cloud datasets, settlement displacement parameters, temperature parameters, wind speed parameters, load parameters, and equipment identification codes. The sensing module outputs the surface point cloud datasets, settlement displacement parameters, temperature parameters, and wind speed parameters to the calculation module. At the same time, the sensing module outputs the load parameters to the calculation module and the control module. The sensing module also outputs a service data packet containing the equipment identification code to the initialization module.

[0033] The initialization module connects to the sensing module to receive business data messages containing equipment identification codes. The initialization module extracts soil source attributes, equipment identification codes, and time window information. Based on the soil source attributes, equipment identification codes, and time window information, the initialization module generates construction task data elements. The initialization module imports three-dimensional theoretical model data to divide three-dimensional mesh units and assigns finite state machine structures to the three-dimensional mesh units. Finally, the initialization module outputs the initial parameters of the construction task data elements and the finite state machine structures to the calculation module and the control module.

[0034] The calculation module is connected to the initialization module to receive construction task data elements. The calculation module performs integral operations based on the surface point cloud dataset, temperature parameters, and wind speed parameters to solve for the moisture evaporation equivalent. The calculation module calculates the virtual simulation elevation increment based on the accumulated load parameters. The calculation module combines the virtual simulation elevation increment with the settlement displacement parameters to calculate the safe displacement rate threshold. The calculation module performs spatial Boolean difference operations on the surface point cloud dataset of adjacent periods to extract the real elevation increment. The calculation module updates the environmental degradation penalty coefficient using the recursive least squares model and uses the updated environmental degradation penalty coefficient to correct the virtual simulation elevation increment of the next calculation period. Finally, the calculation module outputs the safe displacement rate threshold and the moisture evaporation equivalent to the control module.

[0035] The control module is connected to the calculation module. The control module receives the rate of change of the derivative of the settlement displacement parameter output by the calculation module. When the rate of change of the derivative is greater than or equal to the safe displacement rate threshold, the control module generates a lock-up trigger command and outputs a gate disconnection electrical signal to the external hardware device. When the moisture evaporation equivalent is greater than the set water loss limit value and the finite state machine structure is not in the load settlement over-limit lock-up state, the control module triggers the internal transition command of the finite state machine structure to generate an unlocking state code. The control module extracts the spatial coordinates carried by the construction task data element, and the control module generates the stress influence range limit based on the spatial coordinates. Then, the control module sends a frequency conversion sampling signal to the geological sensing equipment.

[0036] The storage module is connected to the control module. The storage module receives the lock-up trigger command, the barrier gate circuit breaker signal, the unlock status code, and the frequency converter sampling signal. The storage module performs a hash mapping operation to bind the construction task data elements, the lock-up trigger command, the barrier gate circuit breaker signal, the unlock status code, the frequency converter sampling signal, and the timestamp and spatial coordinate features. Then, the storage module generates an anti-tampering traceability data chain and writes the anti-tampering traceability data chain to the local physical storage medium.

[0037] See attached document Figure 2 This invention provides an intelligent management and control method for the safety and compliance of the entire process of soil piling construction, the method comprising the following steps: S1. Import the three-dimensional theoretical model data and divide it into three-dimensional mesh units according to the three-dimensional coordinate system. Assign an independent finite state machine structure to the three-dimensional mesh unit, and extract the soil source attributes, equipment identification code, time window information and target operation space coordinates. Generate construction task data elements based on soil source attributes, equipment identification code, time window information and target operation space coordinates, and then write the construction task data elements and the initial parameters of the finite state machine structure into the computing memory.

[0038] S2 extracts the spatial coordinates carried by the construction task data elements, and generates the stress influence range limit based on the spatial coordinates. It then sends a frequency conversion sampling signal to the geological sensing device located within the stress influence range limit to obtain the settlement displacement parameter output by the geological sensing device. Under the condition that the rate of change of the derivative of the settlement displacement parameter is continuously less than the set convergence constant, it sends a command to the geological sensing device to restore the reference sampling frequency.

[0039] S3: Obtain the surface point cloud dataset output by the 3D laser device. Calculate the surface roughness index, windward projected area, and effective illumination area based on the surface point cloud dataset. Also, obtain the temperature and wind speed parameters output by the meteorological device. Perform integral calculations by combining the temperature parameters, wind speed parameters, surface roughness index, windward projected area, and effective illumination area to solve for the water evaporation equivalent. If the water evaporation equivalent exceeds the set water loss limit and the finite state machine structure is not in a load settlement over-limit locked state, trigger the internal transition instructions of the finite state machine structure to generate an unlocked state code.

[0040] S4 receives the load parameters output by the logistics equipment, calculates the virtual simulation elevation increment based on the accumulated load parameters, and calculates the safe displacement rate threshold by combining the virtual simulation elevation increment with the settlement displacement parameters. It extracts the derivative rate of change of the settlement displacement parameters and compares it with the safe displacement rate threshold. If the derivative rate of change is greater than or equal to the safe displacement rate threshold, it generates a lock-up trigger command and outputs a barrier gate circuit breaker signal to the external hardware device.

[0041] S5 performs spatial Boolean difference operations on the surface point cloud datasets of adjacent periods to extract the true elevation increment. It uses a recursive least squares model and combines the true elevation increment to update the environmental degradation penalty coefficient. It then uses the updated environmental degradation penalty coefficient to correct the virtual extrapolation elevation increment of the next calculation period. It also receives lockout trigger commands, barrier gate circuit breaker signals, unlocking status codes, and frequency conversion sampling signals. It performs hash mapping operations to bind construction task data elements, lockout trigger commands, barrier gate circuit breaker signals, unlocking status codes, frequency conversion sampling signals, timestamp features, and spatial coordinate features, thereby generating an anti-tampering traceability data chain and writing the anti-tampering traceability data chain to the local physical storage medium.

[0042] S11, the initialization module acquires the 3D theoretical model data exported from the external design environment. The 3D theoretical model data defines geometric vertices in a local engineering coordinate system. The initialization module transforms the inherent local engineering coordinate system of the 3D theoretical model data to the system's unified absolute geodetic coordinate system by introducing translation and rotation matrices, thereby generating a spatial registration model with geophysical anchor point attributes. The transformation relationship satisfies the formula: ; In the formula, , , These are the three-dimensional spatial location characteristic values ​​in the absolute geodetic coordinate system; It is a third-order orthogonal rotation matrix in three-dimensional space; , , These are the eigenvalues ​​of the three-dimensional geometric coordinates in the local engineering coordinate system; It is a translation constant matrix in the form of a third-order column vector.

[0043] The initialization module extracts the extreme values ​​of the three-dimensional boundary contour of the spatial registration model. The initialization module reads the angular resolution set by the three-dimensional laser device, which is configured to be between 0.1° and 0.5°. The initialization module calculates the theoretical point cloud spacing by combining the calibration scanning distance between the three-dimensional laser device and the spatial registration model. The initialization module also counts the median value of the spatial distance between adjacent points in the calibration point cloud data collected during the system initialization phase.

[0044] The initialization module selects the larger value between the theoretical point cloud spacing and the median value of the spatial distance as the reference parameter for point cloud spacing. The initialization module then enlarges the reference parameter for point cloud spacing according to a set scaling factor to serve as the basic side length of the mesh. The value range of the set scaling factor is configured to be 1.2 to 1.5. Subsequently, the initialization module divides the spatial registration model into multiple groups of three-dimensional mesh elements with independent three-dimensional numbered indices in the three-dimensional coordinate system space. The parameter solution operation for the translation and rotation matrix can be performed using existing spatial analytical geometry techniques.

[0045] S12, the initialization module calls the memory resource allocation interface of the system's underlying computing and processing unit to create a pool of finite state machine instance instances. The initialization module allocates an independent finite state machine structure to each 3D mesh cell according to the 3D number index. The finite state machine structure sets the main job state, sampling sub-state, and admission sub-state. The main job state includes the standby receiving state and the task execution state. The sampling sub-state includes the baseline sampling state and the high-frequency sampling state. The admission sub-state includes the moisture condition not meeting the standard locking state, the load settlement exceeding the limit locking state, and the safe operation unlocking state.

[0046] The initialization module configures the main operation state to standby receiving state, the sampling sub-state to reference sampling state, and the admission sub-state to moisture condition not met lock state through parameter assignment operation. The control priority of the load settlement exceeding limit lock state is higher than the safe operation unlock state. At the same time, the initialization module records the absolute offset address of the finite state machine structure in the memory heap area, thereby establishing a unique memory mapping relationship between the physical three-dimensional mesh unit and the logical finite state machine structure.

[0047] S13, the perception module receives the business data message output by the logistics equipment and outputs it to the initialization module. The initialization module performs deserialization and parsing of the business data message according to the preset data dictionary, and extracts the soil source attributes, equipment identification code, time window information and target operation space coordinates. The soil source attributes include at least the soil type code and water content level code, the equipment identification code represents the identity of the transport vehicle, the time window information defines the allowed operation period, and the target operation space coordinates represent the spatial location corresponding to the earthwork unloading or piling task.

[0048] The initialization module calls the data structure splicing interface to encode the soil source attributes, equipment identification code, time window information, and target work space coordinates into fixed-length fields. The initialization module also adds preset bit width check and feature bits, with the preset bit width check and feature bit length configured to be 8 to 16 bits. Then, the initialization module generates construction task data elements carrying unique business sequence number characteristics. At the same time, the time window information is represented as a time interval between the start timestamp and the end timestamp obtained based on the network time protocol.

[0049] S14, the initialization module parses the construction task data elements to extract the target work space coordinates, and performs calculation, comparison and addressing operations in the memory mapping relationship according to the target work space coordinates, thereby locating the target three-dimensional mesh unit corresponding to the target work space coordinates. The initialization module calls the memory bus write instruction according to the absolute offset address to synchronously write the construction task data elements together with the initial parameters of the finite state machine structure bound to the target three-dimensional mesh unit into the protected working area of ​​the high-speed computing memory. The initialization module completes the exclusive write operation on the memory block bound to the target three-dimensional mesh unit through the underlying mutex lock mechanism, thereby forming the memory mapping state between the physical space entity work area and the business data and the physical space.

[0050] S21, the control module calls the memory bus to read the construction task data elements in the protected working area, and parses the construction task data elements to extract the target operation space coordinates as the three-dimensional space coordinates of the center operation position. The control module combines the business data dictionary to extract the additional stress diffusion angle constant corresponding to the soil source attributes, and reads the load estimation parameters from the equipment parameter configuration table and the construction task configuration table according to the equipment identification code and business serial number carried by the construction task data elements. The equipment parameter configuration table stores the rated load range corresponding to different logistics equipment types in advance, and the construction task configuration table stores the load level allowed by the corresponding business serial number.

[0051] The calculation module receives the target working space coordinates, the additional stress diffusion angle constant, and the load estimation parameters. Based on the physical characteristics of stress diffusion generated by concentrated loads in a semi-infinite space, the calculation module calculates the equivalent influence radius using the additional stress diffusion calculation formula. Simultaneously, the calculation module generates a stress influence range boundary with the target working space coordinates as the center and the equivalent influence radius as the boundary. The equivalent influence radius corresponding to the stress influence range boundary satisfies the formula: ; In the formula, The equivalent influence radius is the limit of the stress influence range; For load prediction parameters; The preset soil stress sensitivity threshold is configured to range from 10 kPa to 50 kPa. The elevation coordinate characteristic value corresponding to the target work space coordinates; The additional stress diffusion angle constant is the soil source property, and the value range of the additional stress diffusion angle constant is configured to be 20° to 30°.

[0052] The calculation module translates the abstract target operation space coordinates into quantitative spatial geometric boundaries through calculation.

[0053] S22, the control module reads the pre-set underlying hardware device coordinate registry within the system, traverses the three-dimensional coordinates of the sensor nodes recorded in the registry, and calculates the spatial Euclidean distance between the three-dimensional coordinates of the sensor nodes and the target working space coordinates. If the spatial Euclidean distance is less than or equal to the equivalent influence radius, the control module registers the geological sensing devices that meet the spatial Euclidean distance condition into the target hardware node list. The control module generates a frequency conversion sampling signaling based on the target hardware node list, and the data payload segment of the frequency conversion sampling signaling encapsulates a set high-frequency sampling frequency, configured as 10Hz to 20Hz. The control module calls the underlying industrial communication protocol stack to send the frequency conversion sampling signaling to the geological sensing devices located within the stress influence range boundary, triggering the underlying hardware to perform an internal timer parameter overwrite update operation.

[0054] S23, the sensing module acquires the settlement displacement parameters continuously output by the geological sensing equipment based on the high-frequency sampling frequency, and the sensing module transmits the settlement displacement parameters across processes in real time to the high-speed buffer storage area of ​​the calculation module. The calculation module performs a first-order difference calculation operation on the settlement displacement parameters of adjacent sampling periods in the discrete time series, and then extracts the derivative rate of change of the settlement displacement parameters.

[0055] Settlement displacement parameters are recorded using the settlement amount in the vertically downward direction as positive. The rate of change of the derivative represents the first-order rate of change of the settlement displacement parameter with respect to time, i.e., the settlement rate. The calculation module obtains the settlement rate by dividing the settlement difference between adjacent sampling times by the corresponding sampling time interval, and performs subsequent threshold comparisons in a positive form. The calculation of the first-order difference between adjacent values ​​in the discrete time series and the time domain division operation can be performed using existing discrete numerical differentiation techniques. The calculation module synchronously writes the rate of change of the derivative into the system's shared memory area for the control module to call.

[0056] S24, the control module receives the derivative change rate sequence output by the calculation module. The control module performs a floating-point value comparison operation between the derivative change rate and the set convergence constant. The value range of the set convergence constant is configured to be 0.01mm / s to 0.05mm / s. The control module sets a continuous trigger counter in the internal high-speed register. Under the condition that the derivative change rate is less than the set convergence constant, the control module increments the continuous trigger counter by one. Under the condition that the derivative change rate is greater than or equal to the set convergence constant, the control module clears the continuous trigger counter. Under the condition that the cumulative value of the continuous trigger counter reaches the preset period threshold, the preset period threshold is configured to be a positive integer from 5 to 10. The control module generates a command to restore the reference sampling frequency. The control module sends the command to restore the reference sampling frequency to the geological sensing device through the underlying industrial communication protocol stack, driving the geological sensing device to perform a hardware switching action to low-frequency sleep sampling state.

[0057] Specifically combined with the appendix Figure 3 As shown, attached Figure 3 This demonstrates the dynamic decision-making process of the control module adaptively triggering sampling frequency recovery based on the rate of change of the derivative within a discrete-time series. Figure 3 The solid line with dots reflects the trajectory of the rate of change of the derivative of the settlement displacement parameter output in real time by the calculation module, while the horizontal dashed line represents the preset convergence constant. Figure 3 At the data nodes marked by the boxes, the rate of change of the derivative suddenly increases and is greater than or equal to the set convergence constant, which intuitively reflects the triggering timing of the control module to perform a clear and reset operation on the continuous trigger counter.

[0058] Appendix Figure 3The continuous trigger counter accumulation interval represents the complete time series span from the point of reset, where the rate of change of the derivative falls back down and remains stable below the set convergence constant, and the continuous trigger counter monotonically accumulates periodically; at the end of the continuous trigger counter accumulation interval, i.e., the appendix... Figure 3 At the data node marked with a pentagram, the cumulative value of the continuously triggered counter reaches the preset period threshold for the first time, visually demonstrating the process by which the control module generates a command to restore the reference sampling frequency and drives the geological sensing equipment hardware to switch to a low-frequency sleep sampling state. (Attached) Figure 3 The technical effect of step S24, which involves executing a multi-cycle continuous steady-state comparison criterion within the continuous trigger counter accumulation interval, is clearly demonstrated. This effectively filters out accidental fluctuations caused by transient noise from geological disturbances and ensures that the settlement process enters substantial convergence.

[0059] S31, the perception module calls the underlying system communication interface to obtain the surface point cloud dataset continuously output by the three-dimensional laser device. The surface point cloud dataset is represented in memory as a massive discrete point sequence data structure containing spatial three-dimensional coordinates and reflection intensity attributes. The calculation module performs local normal estimation and micro-plane fitting operations on the surface point cloud dataset, extracts the absolute normal deviation between the actual physical surface vertex and the ideal fitted geometric plane, and calculates the root mean square value of the statistics corresponding to all absolute normal deviations.

[0060] The calculation module normalizes the statistical root mean square value using the grid's basic edge length to obtain a dimensionless surface roughness index. Simultaneously, the sensing module listens for and acquires the floating-point environmental meteorological reports continuously broadcast by the meteorological equipment. The sensing module then outputs the floating-point environmental meteorological reports to the calculation module, which performs deserialization and parsing operations on the reports to extract the current temperature and wind speed parameters.

[0061] S32, the calculation module obtains the prevailing wind direction vector of the construction site by reading the system configuration file, and reads the absolute geodetic coordinates and the current system timestamp corresponding to the spatial registration model. The calculation module performs a spatial coordinate system transformation projection operation on the three-dimensional mesh geometric contour encapsulated in the surface point cloud dataset, and performs a three-dimensional to two-dimensional orthogonal projection on the three-dimensional mesh geometric contour along the real-time wind direction vector to calculate the windward projection area. The calculation module calculates the corresponding solar altitude angle and solar azimuth angle based on the absolute geodetic coordinates and the current system timestamp, and generates the solar incidence direction vector.

[0062] The calculation module performs polygon occlusion culling and orthogonal projection operations along the solar incident direction vector, and then calculates and extracts the effective illumination area of ​​the physical surface. The underlying calculation logic uses coordinate transformation matrix and geometric projection algorithm to map the three-dimensional solid mesh surface into two-dimensional equivalent heated surface geometric parameters under the action of a specific physical field. The specific spatial transformation mathematical operations of the orthogonal projection matrix and occlusion culling algorithm can be performed based on existing computer graphics technology.

[0063] S33, the calculation module extracts temperature parameters, wind speed parameters, surface roughness index, windward projected area, and effective irradiated area within the discrete time series. Combining these parameters, the module performs discrete cumulative integration within a set time step, configured to be 1 to 5 seconds. The module then calculates the water evaporation equivalent, characterizing the physical process of soil water loss. The integration process satisfies the discrete numerical summation formula: ; In the formula, It is the equivalent of water evaporation; This is the index of the current time step in the discrete summation operation; The total number of discrete time steps within the set integration time window, configured from 1 hour to 24 hours. The empirical coefficient for temperature radiation is set to a value range of 0.5 to 1.5. For the current number Temperature parameters corresponding to each discrete moment; Effective light-illuminating area; The empirical coefficient for wind speed convection is set to a value range of 0.8 to 1.2. For the current number Wind speed parameters corresponding to each discrete moment; The projected area of ​​the windward side; It is the surface roughness index; is the discrete time step.

[0064] S34, the control module receives the moisture evaporation equivalent written to the memory bus in real time by the calculation module. The service configuration dictionary pre-stores the water loss limit values ​​corresponding to different soil type codes and water content grade codes. The water loss limit values ​​are pre-calibrated based on the construction design documents or the compaction test results of the corresponding soil samples, and an index mapping relationship is established according to the soil type code and water content grade code. The control module parses the soil type code and water content grade code in the construction task data element and reads the corresponding water loss limit value from the service configuration dictionary. The value range of the water loss limit value is configured to be 10 kg / m³. 2 Up to 30kg / m 2.

[0065] The control module performs a floating-point numerical comparison operation between the moisture evaporation equivalent and the water loss limit value. The set water loss limit value represents the minimum moisture mass requirement for safe compaction operations. When the moisture evaporation equivalent is greater than the set water loss limit value and the access sub-state of the finite state machine structure is not in the load settlement over-limit locked state, the control module triggers the internal transition instruction of the finite state machine structure, calls the instruction encoding logic to generate an unlock status code, and writes the unlock status code into the target memory mapping area through the underlying memory direct access channel. The control module then switches the access sub-state of the finite state machine structure to the safe operation unlock state.

[0066] When the moisture evaporation equivalent is less than or equal to the set water loss limit, the control module keeps the access substate of the finite state machine structure locked in the state where the moisture condition is not met. When the access substate of the finite state machine structure is already locked in the state where the load settlement exceeds the limit, the control module keeps the load settlement exceeds the limit and does not respond to the unlocking state switch triggered by the moisture condition. The control module continues to trigger the integral operation through the instruction polling mechanism to form a state monitoring closed loop.

[0067] S41, the sensing module calls the wireless communication interface to receive the load parameters continuously output by the logistics equipment, and the sensing module synchronously outputs the load parameters to the calculation module and the control module. The load parameters represent the absolute gravity value applied by the logistics equipment to the ground. The calculation module establishes a load event index based on the equipment identification code, business serial number and time window information. The same equipment identification code and the same business serial number correspond to an independent load event in a continuous operation. The calculation module extracts the average value of the stable segment from the continuous load sampling value corresponding to an independent load event as the effective load parameter, and performs accumulation on the effective load parameter according to the independent load event to obtain the accumulated load characteristics.

[0068] Simultaneously, the calculation module reads the compression modulus and influence depth parameters from the geological parameter configuration table based on the 3D number index of the target 3D mesh unit, and reads the tire grounding parameters or track grounding parameters of the logistics equipment from the equipment parameter configuration table based on the equipment identification code. Based on this, it determines the area of ​​force application. The calculation module combines the compression modulus, influence depth parameters, and area of ​​force application, and uses the elastic deformation mechanics formula to calculate the virtual elevation increment based on the cumulative load parameters. The calculation logic for the virtual elevation increment satisfies the following formula: ; In the formula, For virtual simulation elevation increments; This refers to the index number of the discrete moment within the current time window in the discrete accumulation operation; The total number of discrete points for load accumulation within a set time window, with the time window span configured to be from 10s to 30s; The first in the current time window The payload parameters received at each discrete moment; The compression modulus of the underlying soil; The area under the basic force application; To influence depth and thickness parameters.

[0069] The virtual simulation elevation increment is represented by the absolute value of the theoretical vertical compressive deformation generated by the load, which is used to describe the equivalent vertical deformation predicted by the target three-dimensional mesh element under the cumulative load. The calculation module translates the cumulative effect of physical gravity into the theoretical deformation prediction value of geometric dimension through algebraic operations.

[0070] S42, the calculation module calls the system's shared memory to read the settlement displacement parameters uploaded in real time by the geological sensing equipment. The settlement displacement parameters represent the absolute values ​​of the actual vertical deformation of the ground surface. The calculation module combines the virtual simulation elevation increment with the settlement displacement parameters to perform threshold algebraic calculations, and then calculates the safe displacement rate threshold under a specific load accumulation state. The solution for the safe displacement rate threshold satisfies the following formula: ; In the formula, The safe displacement rate threshold; The safety reduction factor is configured to range from 0.7 to 0.9. For virtual simulation elevation increments; This represents the settlement displacement parameter acquired at the current moment. To prevent the elimination of zero-minimal floating-point constants, the zero-minimal floating-point constant is configured to be one part per million; The empirical reference rate constant is configured to range from 0.1 mm / s to 0.5 mm / s.

[0071] S43, the calculation module calls a discrete mathematical algorithm to perform a first-order difference calculation operation on the time series data of the settlement displacement parameter, extracts the derivative rate of change of the settlement displacement parameter, and at the same time, the derivative rate of change objectively characterizes the instantaneous motion rate of the physical surface in the vertical direction. The control module receives the derivative rate of change and the safe displacement rate threshold synchronously output by the calculation module, and sends the derivative rate of change and the safe displacement rate threshold into the system kernel register to perform a floating-point value comparison operation to determine whether the current geological deformation rate exceeds the physical safety boundary dynamically calculated based on the historical accumulated state.

[0072] S44, under the condition that the rate of change of the derivative is greater than or equal to the safe displacement rate threshold, the control module generates a lock-up trigger command and switches the access sub-state to the load settlement over-limit lock-up state. At the same time, the control module outputs the gate circuit breaker signal to the external hardware device through the industrial control local area network bus according to the lock-up trigger command. The external hardware device adopts a power failure safe gate actuator.

[0073] The barrier gate disconnects the vehicle passage permission circuit and the barrier gate holding open drive circuit. After the holding open drive circuit is disconnected, the barrier gate mechanical arm falls back to the closed position under the action of gravity, elastic energy storage mechanism or power failure reset mechanism, blocking the logistics equipment from entering the target operation area from the physical space. Under the condition that the derivative change rate is less than the safe displacement rate threshold and the access sub-state has not entered the load settlement over-limit locking state, the control module maintains the open passage level of the external hardware equipment, and the control module continuously monitors the load parameters to trigger the cumulative calculation logic.

[0074] After the access sub-state has entered the load settlement exceeding the limit lock state, the control module continues to acquire settlement displacement parameters and continuously calculate the derivative change rate. When the derivative change rate is continuously lower than the safe displacement rate threshold to reach the preset safe recovery period, and the water evaporation equivalent is greater than the set water loss limit value, the control module switches the access sub-state to the safe operation unlock state. When the derivative change rate is continuously lower than the safe displacement rate threshold to reach the preset safe recovery period, but the water evaporation equivalent is less than or equal to the set water loss limit value, the control module switches the access sub-state to the water condition not meeting the standard lock state. The preset safe recovery period is configured to be 5 to 10 consecutive sampling periods.

[0075] S51, the calculation module reads the surface point cloud dataset of adjacent periods through the cache interface. The surface point cloud dataset contains the three-dimensional coordinate point series of the physical surface at continuous time nodes. The calculation module performs spatial Boolean difference operation on the surface point cloud dataset of adjacent periods. The calculation module also uses the difference set comparison algorithm in coordinate space to strip off the basic geometric elements that have not undergone deformation and extract the error geometric features that represent the differences in physical deformation.

[0076] The calculation module performs projection integration on the error geometric features along the absolute elevation axis. At the same time, the calculation module extracts the actual elevation increment of the physical surface in adjacent time periods. The physical unit of the actual elevation increment is configured as millimeters. The underlying spatial coordinate system transformation rules for spatial Boolean difference operations can be based on existing 3D computer vision technology.

[0077] S52, the calculation module inputs the actual elevation increment into a pre-configured recursive least squares model. The recursive least squares model has an internal forgetting factor, with a value range of 0.95 to 0.99. The recursive least squares model uses an online adaptive filter structure to dynamically adjust the internal weight matrix based on recently sampled data. The calculation module extracts the virtual extrapolated elevation increment recorded in the historical calculation buffer as a reference benchmark. Furthermore, the calculation module calculates the residual parameter between the actual elevation increment and the virtual extrapolated elevation increment. The recursive least squares model combines the residual parameter with the internal Kalman gain matrix to perform weight update iterations, outputting an environmental degradation penalty coefficient representing the current level of interference in the construction environment. The update logic of the environmental degradation penalty coefficient satisfies the formula: ; In the formula, For the current number Periodically updated environment degradation penalty coefficient; This is the discrete periodicity index of the current adaptive filtering iteration step; For the previous one Environment degradation penalty coefficient for periodic storage; For the current number The adaptive gain vector matrix output from the internal calculations of the periodic model; This represents the actual extracted elevation increment; This represents the virtual simulation elevation increment corresponding to the calculation cycle.

[0078] The calculation module writes the updated environmental degradation penalty coefficient into the protected working area corresponding to the target 3D mesh element. During the initial calculation cycle, the environmental degradation penalty coefficient is set to 1. After entering the subsequent calculation cycle, the calculation module reads the latest environmental degradation penalty coefficient and uses the environmental degradation penalty coefficient to perform multiplicative correction on the virtual simulation elevation increment calculated based on the accumulated load. The correction logic satisfies that the corrected virtual simulation elevation increment is equal to the product of the latest environmental degradation penalty coefficient and the virtual simulation elevation increment. The corrected virtual simulation elevation increment is then used to calculate the safe displacement rate threshold, thereby continuously correcting the theoretical simulation results using the actual elevation changes.

[0079] S53, the storage module receives the lock-up trigger command, the barrier gate circuit breaker signal, the unlock status code, and the frequency converter sampling signal from the control module through the system's underlying control bus. At the same time, the storage module reads the construction task data elements through the memory bus. The storage module calls the system hardware clock component to obtain the absolute timestamp feature accurate to the millisecond level, and parses the construction task data elements to obtain the target work space coordinates. The storage module performs a data alignment and merging operation on the construction task data elements, lock-up trigger command, barrier gate circuit breaker signal, unlock status code, frequency converter sampling signal, timestamp feature, and target work space coordinates according to the preset byte sequence splicing rules.

[0080] S54, the storage module calls the cryptographic component to perform a hash mapping operation on the byte sequence after data alignment and merging. It uses a secure hash algorithm to unidirectionally convert the variable-length byte stream into a fixed-length 256-bit hash digest feature code. For the first trace record, the storage module uses the preset initial chain identifier and the byte sequence of the first trace record as hash input. The preset initial chain identifier is configured as a 256-bit all-zero byte sequence. For the second and subsequent trace records, the storage module uses the hash digest feature code corresponding to the previous trace record and the byte sequence of the current trace record as hash input.

[0081] The storage module performs integrity verification and encapsulation on the byte sequence of the current trace record, the hash digest feature code corresponding to the previous trace record, and the hash digest feature code corresponding to the current trace record according to the preset data block format, so that adjacent trace records form a tamper-proof trace data chain with head-to-tail association in chronological order.

[0082] The storage module calls the file system application programming interface to append the tamper-proof traceability data chain to the local physical storage medium in chronological order. The local physical storage medium is set to a write-once-read-many storage structure or a sequential append storage area configured with hardware write protection. Overwrite and erase operations are prohibited for data blocks that have already been written. The storage controller rejects external overwrite and erase requests for data blocks that have already been written.

[0083] To aid in understanding the technical solution of this invention, the following provides application examples of intelligent management and control of safety and compliance throughout the entire process of earthwork construction.

[0084] The application example receives three-dimensional theoretical model data exported from the external design environment and multi-source business data messages output by logistics equipment. It also has a pre-configured system configuration file containing soil source attributes, geological parameters, equipment parameter configuration tables and underlying hardware device coordinate registry, which serves as the benchmark for three-dimensional spatial division of soil piling operations, state machine flow scheduling and closed-loop feedback of safety deformation monitoring.

[0085] The initialization module acquires the 3D theoretical model data, introduces a translation and rotation matrix to transform the 3D theoretical model data into an absolute geodetic coordinate system to generate a spatial registration model with geophysical anchor point attributes, and divides the 3D mesh cells by combining the angular resolution of the laser equipment; then the initialization module calls the memory resource allocation interface of the underlying computing processing unit to independently allocate a finite state machine structure containing the main state of the operation, the sampling sub-state, and the admission sub-state for each 3D mesh cell, and records the unique absolute offset address of the memory mapping between the physical mesh and the logical state machine; Subsequently, the initialization module performs deserialization parsing and fixed-length field encoding on the received business data messages to generate construction task data elements carrying business sequence number characteristics. It then uses the underlying mutex lock mechanism to synchronously write the construction task data elements and the initial parameters of the finite state machine into the protected working area of ​​the high-speed computing memory, thus completing the memory state binding between the physical entity work area and the business data.

[0086] The calculation module extracts the spatial coordinates carried by the construction task data elements, combines them with the additional stress diffusion angle constant and load prediction parameters in the business data dictionary, and calculates the equivalent influence radius to generate a quantitative stress influence range boundary; the control module then traverses the registry and sends frequency conversion sampling signals encapsulated with high-frequency sampling frequency to the geological sensing devices within the boundary, triggering the underlying hardware to execute internal timer updates to obtain high-frequency settlement displacement parameters.

[0087] Meanwhile, the calculation module performs local normal estimation and orthogonal projection on the surface point cloud dataset acquired by the 3D laser equipment, extracts the surface roughness and effective heating surface geometric parameters, and performs discrete cumulative integration calculation in combination with the temperature and wind parameters output by the meteorological equipment. When the calculated water evaporation equivalent is greater than the set water loss limit value and the finite state machine is not in the over-limit lock state, the control module calls the instruction encoding logic to generate the unlock status code, and completes the access unlock for safe operation through the underlying memory direct access channel.

[0088] The control module continuously monitors the absolute gravity load parameters output by the logistics equipment. The calculation module calculates the virtual elevation increment based on the elastic deformation mechanics formula and calculates the safe displacement rate threshold under specific load accumulation conditions by combining the actual settlement displacement parameters. Then, the calculation module performs first-order difference calculation on the settlement displacement parameters to extract the rate of change of the derivative and sends it to the system kernel register for floating-point value comparison with the safe threshold. When the rate of change of the derivative exceeds the safe displacement rate threshold, the control module immediately generates a lock-up trigger command, forcibly switching the state machine to the load settlement over-limit lock-up state. Simultaneously, the control module outputs a barrier gate disconnection electrical signal to external hardware devices through the industrial control local area network bus, cutting off the vehicle passage permission circuit and the open drive circuit, driving the power-de-sustaining safety barrier gate mechanical arm to fall back to the closed position, strictly blocking the logistics equipment from entering the target hazardous operation area from the physical space.

[0089] The computation module reads the surface point cloud datasets from adjacent periods through a high-speed cache, performs spatial Boolean difference operations, strips away the undeformed basic geometric elements to extract the true elevation increment, and inputs the true elevation increment into a pre-set recursive least squares model. It then uses an adaptive filter structure to dynamically iterate and output the environmental degradation penalty coefficient, which is multiplicatively corrected to adjust the virtual inferred elevation increment for the next period, forming a closed-loop correction logic. Finally, the storage module calls the hardware clock component to obtain the absolute timestamp, aligns and merges the construction task data elements, lockout trigger instructions, gate circuit breaker signals, unlocking status codes, and frequency converter sampling signaling execution data, and calls the cryptographic component's secure hash algorithm to perform a hash mapping operation. The storage module performs integrity verification and encapsulation on the hash digest feature codes of the current traceability record and the previous traceability record, generating a tamper-proof traceability data chain that is linked end-to-end. It then calls the file system application programming interface to append the data to a local physical storage medium configured with hardware write protection, achieving underlying solidification and audit traceability of safety and compliance instructions and status throughout the entire earth-filling operation process under extreme conditions.

[0090] While specific embodiments of the present invention have been described above, those skilled in the art should understand that these specific embodiments are merely illustrative. Those skilled in the art can omit, substitute, and modify the details of the above methods and systems in various ways without departing from the principles and essence of the present invention. For example, combining the above method steps to perform substantially the same function and achieve substantially the same result using substantially the same method falls within the scope of the present invention.

Claims

1. A safety compliance intelligent management and control method for the whole process of earthwork construction, characterized in that, The method includes the following steps: Import the three-dimensional theoretical model data and divide it into three-dimensional mesh units according to the three-dimensional coordinate system. Assign a finite state machine structure to the three-dimensional mesh units and extract soil source attributes, equipment identification codes, time window information and target work space coordinates to generate construction task data elements. Based on the target work space coordinates, a stress influence range boundary is generated, and a frequency conversion sampling signal is sent to the geological sensing equipment within the stress influence range boundary to obtain settlement displacement parameters. Obtain surface point cloud dataset, temperature parameters, and wind speed parameters. Combine the surface point cloud dataset, temperature parameters, and wind speed parameters to solve for the water evaporation equivalent. When the water evaporation equivalent is greater than the set water loss limit value and the finite state machine structure is not in the load settlement over-limit locking state, generate an unlocking state code. The load parameters are obtained, the virtual simulated elevation increment is calculated using the load parameters, and the safe displacement rate threshold is calculated by combining the settlement displacement parameters. When the rate of change of the derivative of the settlement displacement parameters is greater than or equal to the safe displacement rate threshold, a lock-up trigger command and a gate disconnection electrical signal are generated. Spatial Boolean difference operation is performed on the surface point cloud dataset to extract the real elevation increment, the environmental degradation penalty coefficient is updated to correct the virtual inferred elevation increment, and a hash mapping operation is performed to bind the construction task data element, the frequency conversion sampling signal, the unlock status code, the lockout trigger command and the barrier gate circuit breaker signal with the target operation space coordinates, generate an anti-tampering traceability data chain and write it to the local physical storage medium.

2. The safety compliance intelligent management and control method for the whole process of earthwork construction according to claim 1, characterized in that, The steps of importing three-dimensional theoretical model data, dividing three-dimensional mesh units according to the three-dimensional coordinate system, and assigning finite state machine structures to the three-dimensional mesh units include: A translation and rotation matrix is ​​introduced to transform the inherent local engineering coordinate system of the three-dimensional theoretical model data to the absolute geodetic coordinate system to generate a spatial registration model. The extreme values ​​of the three-dimensional boundary contour of the spatial registration model are extracted, and the basic side length of the mesh is calculated based on the angular resolution of the three-dimensional laser device. The spatial registration model is divided into multiple groups of three-dimensional mesh units with independent three-dimensional number indexes in the absolute geodetic coordinate system. Based on the three-dimensional numbering index, an independent finite state machine structure is assigned to each of the three-dimensional mesh cells. The finite state machine structure is set with a main job state, a sampling sub-state, and an admission sub-state. The absolute offset address of the finite state machine structure in the memory heap area is recorded to establish a unique memory mapping relationship between the physical three-dimensional mesh cells and the logical finite state machine structure.

3. The safety compliance intelligent management and control method for the whole process of earthwork construction according to claim 2, characterized in that, The steps for extracting soil source attributes, equipment identification codes, time window information, and target work space coordinates to generate construction task data elements include: The system acquires business data messages and performs deserialization parsing to extract the soil source attributes, the equipment identification code, the time window information, and the target work space coordinates. It then calls the data structure splicing interface to perform fixed-length field encoding and adds preset bit width check and feature bits to generate the construction task data element carrying a unique business sequence number. Based on the target workspace coordinates, an addressing operation is performed in the memory mapping association to locate the target 3D mesh cell in the 3D mesh cell. According to the absolute offset address, the construction task data element, together with the initial parameters of the finite state machine structure bound to the target 3D mesh cell, is synchronously written into the protected working area of ​​the high-speed computing memory.

4. The safety compliance intelligent management and control method for the whole process of earthwork construction according to claim 3, characterized in that, The steps for generating the stress influence range limit based on the target work space coordinates include: Combine the business data dictionary to extract the additional stress diffusion angle constant corresponding to the soil source attributes, and read the load estimation parameters based on the equipment identification code and the business serial number; The load estimation parameters are divided by using the product of a preset soil stress sensitivity threshold and pi as the divisor. The elevation coordinate feature value corresponding to the target working space coordinate and the tangent value of the additional stress diffusion angle constant are extracted and multiplied. The result of the division calculation and the result of the multiplication calculation are summed to obtain the equivalent influence radius of the stress influence range limit. The stress influence range limit is generated with the target working space coordinate as the center and the equivalent influence radius as the boundary.

5. The safety compliance intelligent management and control method for the whole process of earthwork construction according to claim 4, characterized in that, The steps of sending frequency conversion sampling signals to geological sensing devices within the stress influence range to obtain settlement displacement parameters include: Calculate the spatial Euclidean distance between the three-dimensional coordinates of the sensor node recorded in the underlying hardware device coordinate registry and the target working space coordinates, and send the frequency conversion sampling signal encapsulated with a set high-frequency sampling frequency to the geological sensing devices whose spatial Euclidean distance is less than or equal to the equivalent influence radius. The settlement displacement parameters continuously output by the geological sensing device based on the high-frequency sampling frequency are obtained, and a first-order difference calculation operation is performed on the settlement displacement parameters of adjacent sampling periods to extract the rate of change of the derivative of the settlement displacement parameters. The derivative change rate is compared with the set convergence constant. If the derivative change rate is less than the set convergence constant, the continuous trigger counter is incremented. If the cumulative value of the continuous trigger counter reaches the preset period threshold, a command to restore the reference sampling frequency is sent to the geological sensing device.

6. The intelligent management and control method for safety compliance of the whole process of earthwork construction according to claim 1, characterized in that, The steps for solving the moisture evaporation equivalent by combining the surface point cloud dataset, temperature parameters, and wind speed parameters include: The absolute normal deviation between the actual physical surface vertices and the ideal fitted geometric plane corresponding to the surface point cloud dataset is extracted to calculate the statistical root mean square value, and normalization is performed to obtain the surface roughness index; orthogonal projection is performed on the three-dimensional mesh geometric contour encapsulated by the surface point cloud dataset to extract the windward projection area, and polygon occlusion culling and orthogonal projection operations are performed along the solar incident direction vector to extract the effective illumination area; Within the set integration time window, for the current discrete time step, calculate the empirical coefficient of temperature radiation, the first product of the temperature parameter and the effective irradiance area, and calculate the empirical coefficient of wind speed convection, the second product of the wind speed parameter and the projected area of ​​the windward surface. Add the first product and the second product together, and then multiply them by a summation term with the surface roughness index and the discrete time step size to obtain the single-step evaporation characteristic value. Perform discrete summation operation on the single-step evaporation characteristic values ​​corresponding to all discrete time steps to solve for the moisture evaporation equivalent.

7. The safety compliance intelligent management and control method for the whole process of earthwork construction according to claim 2, characterized in that, The step of generating an unlocking state code when the moisture evaporation equivalent exceeds a set water loss threshold and the finite state machine structure is not in a load settlement over-limit locked state includes: Based on the soil source attributes in the construction task data element, the soil category code and water content level code are parsed, and the corresponding set water loss limit value is read from the business configuration dictionary; The equivalent amount of water evaporation is compared with the set water loss limit. If the equivalent amount of water evaporation is greater than the set water loss limit and the access sub-state of the finite state machine structure is not in the load settlement over-limit lock state, the internal transition command of the finite state machine structure is triggered, the unlocking state code is generated, and the access sub-state of the finite state machine structure is switched to the safe operation unlocking state. 8.The intelligent management and control method for safety compliance of the whole process of earthwork construction according to claim 1, characterized in that, The steps of obtaining load parameters, calculating the virtual estimated elevation increment using the load parameters, and calculating the safe displacement rate threshold using the settlement displacement parameters include: The average value of the stable segment is extracted from the load parameters as the effective load parameter and accumulated. Within the set time window, the product of the received load parameter and the influence depth parameter is calculated for the current discrete moment, and divided by the product of the compression modulus of the bottom soil and the area of ​​force application to obtain the single-step elevation increment characteristic value. Within the set time window, the accumulation operation is performed on all the single-step elevation increment characteristic values ​​to calculate the virtual inferred elevation increment. The ratio of the virtual simulated elevation increment to the settlement displacement parameter obtained at the current moment is calculated and multiplied by the safety reduction factor to obtain the first algebraic term. The product of the zero-limit floating-point constant and the empirical reference rate constant is calculated to obtain the second algebraic term. The first algebraic term and the second algebraic term are added together to calculate the safe displacement rate threshold under the specific load accumulation state. 9.The intelligent management and control method for safety compliance of the whole process of earthwork construction according to claim 2, characterized in that, The steps for generating a lock-up trigger command and a barrier gate disconnection signal when the rate of change of the derivative of the settlement displacement parameter is greater than or equal to the safe displacement rate threshold include: Perform a comparison operation between the rate of change of the derivative and the safe displacement rate threshold; Under the condition that the rate of change of the derivative is greater than or equal to the safe displacement rate threshold, the lock-up trigger command is generated to switch the access sub-state to the load settlement over-limit lock-up state, and the gate disconnection electrical signal is output to the external hardware device according to the lock-up trigger command to cut off the vehicle passage permission circuit. After entering the load settlement over-limit lock state in the access sub-state, when the rate of change of the derivative is continuously lower than the safe displacement rate threshold to reach the preset safe recovery period, and the water evaporation equivalent is greater than the set water loss limit value, the access sub-state is switched to the safe operation unlock state. 10.The intelligent management and control method for safety compliance of the whole process of earthwork construction according to claim 1, characterized in that, The steps of performing spatial Boolean difference operations on the surface point cloud dataset to extract the real elevation increment, updating the environmental degradation penalty coefficient to correct the virtual inferred elevation increment, performing hash mapping operations to bind the construction task data elements, the frequency conversion sampling signaling, the unlocking status code, the lockout trigger command, and the barrier gate circuit breaker signal with the target operation space coordinates, and generating an anti-tampering traceability data chain and writing it to the local physical storage medium include: Spatial Boolean difference operation is performed on the surface point cloud dataset of adjacent periods to strip away the undeformed basic geometric elements, and the true elevation increment representing the difference in physical deformation is extracted by projection integral along the absolute elevation axis. The actual elevation increment is input into the recursive least squares model. The residual parameters of the actual elevation increment and the virtual inferred elevation increment, as well as the internal Kalman gain matrix, are combined to perform a weight update iterative operation to output the environmental degradation penalty coefficient. The environmental degradation penalty coefficient is then used to perform a multiplicative correction on the virtual inferred elevation increment in the next calculation cycle. The construction task data elements, the lockout trigger command, the barrier gate circuit breaker signal, the unlock status code, the frequency conversion sampling signal, the timestamp feature obtained by the system hardware clock component, and the target work space coordinates are aligned and merged according to a preset byte sequence splicing rule. The merged byte sequence is converted into a hash digest feature code using a cryptographic component with a secure hash algorithm. The byte sequence of the current trace record, the hash digest feature code of the previous trace record, and the hash digest feature code of the current trace record are encapsulated with integrity verification to form the tamper-proof traceability data chain that is linked end to end in chronological order and appended to the local physical storage medium.