Integrated design method and system for railway alignment and protection in areas prone to rockfalls.

By constructing a graphical database and linking control point parameters with alignment parameters, the protective structure of tunnels can be automatically determined, solving the data linkage problem between railway alignment and protection design in areas prone to rockfalls and improving design efficiency and safety.

CN123116402APending Publication Date: 2026-11-17CHINA RAILWAY CHONGQING SURVEYING DESIGN RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611309421.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-27
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The lack of an integrated design method for railway alignment and protection measures in areas prone to rockfalls and falling rocks in existing technologies leads to a lack of data linkage between alignment schemes and protection designs, resulting in repeated design iterations, low efficiency, and difficulty in achieving the optimization of the overall scheme.

Method used

A graphical database is constructed, multi-source heterogeneous geological data is collected and integrated, an initial route plan is generated through progressive discrimination rules, and a linkage relationship between control point parameters and route selection parameters is established to automatically determine the location and parameters of the tunnel protection structure, thereby realizing the integrated design of route selection and protection measures.

Benefits of technology

It improves the design efficiency of railway alignment in areas prone to rockfalls, reduces the impact of rockfalls on the line, ensures the safety and stability of the project, and solves the problem of repeated design in existing technologies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123116402A_ABST
    Figure CN123116402A_ABST
Patent Text Reader

Abstract

This invention discloses an integrated design method and system for railway alignment and protection in areas prone to rockfalls. The method includes the following steps: collecting relevant data parameters and constructing a graphic database; establishing an external database with multiple pre-set graphic templates in the graphic database; identifying the terrain features of the current route area and generating an initial route plan; based on the user-selected graphic template, establishing a corresponding linkage relationship between the parameter variables of control points loaded from the graphic template and the alignment parameters determined by the progressive discrimination rules; when the progressive discrimination rules reach the final discrimination level, automatically determining the corresponding parameters of the tunnel protection structure in the graphic database based on the trajectory parameters and impact range parameters of the falling rocks. This technical solution utilizes the linkage mechanism between control point parameter variables and alignment parameters to achieve integrated design of the alignment plan and protection measures, improving the design efficiency and safety of railway alignment in areas prone to rockfalls.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of railway alignment design technology, and relates to an integrated design method and system for railway alignment and protection in areas prone to rockfalls. Background Technology

[0002] In the construction of linear engineering projects such as railways and highways in mountainous areas, rockfall hazards are one of the main geological risks threatening the safe operation of the lines. Once a line is impacted by rockfalls, it can cause damage to the line and interruption of operations, or even lead to major safety accidents, resulting in serious casualties and property losses. Therefore, in the route selection and design of lines in areas prone to rockfalls, how to scientifically and rationally determine the route and simultaneously design effective engineering prevention and control measures has long been a technical challenge in the field of engineering design.

[0003] Currently, the following technical approaches are mainly adopted for route selection and prevention and control measures in areas prone to rockfalls:

[0004] First, detour route selection based on geological surveys and remote sensing interpretation. The distribution range of dangerous rockfalls is determined through geological mapping, drilling, and geophysical exploration. A three-dimensional terrain model is then established using remote sensing imagery and UAV aerial surveying. In the route selection process, routes away from areas with high rockfall development are prioritized. However, due to terrain conditions and control points, some routes cannot completely avoid areas with dangerous rockfalls. In such cases, existing methods lack systematic alternative route selection strategies.

[0005] Second, hazard zoning and protective design based on numerical simulation of rockfall motion. By establishing a numerical model of the rockfall trajectory, the bounce height, impact energy, and impact range of the falling rocks are simulated, and hazard zoning is performed accordingly. After the route selection is determined, protective structures such as rockfall barriers and shelters are designed separately based on the zoning results. This segmented design mode of "route selection first, protection later" leads to a lack of data linkage between the route selection and protective measures—after the route selection parameters are adjusted, the protective design needs to be recalculated, resulting in numerous design iterations, low efficiency, and difficulty in achieving overall scheme optimization.

[0006] In summary, the existing technology lacks a computer-aided implementation method that can integrate multi-layered progressive route selection strategies and engineering prevention and control measures in areas prone to rockfalls. Summary of the Invention

[0007] The purpose of this invention is to address the aforementioned problems in existing technologies by proposing an integrated design method and system for railway alignment and protection in areas prone to rockfalls.

[0008] To achieve the above objectives, the basic solution of this invention is: an integrated design method for railway alignment and protection in areas prone to rockfalls, comprising the following steps:

[0009] Collect planar data, stratigraphic lithology data, rock mass structure data, distribution location and scale data of dangerous rocks, stability parameters of dangerous rocks, and trajectory and impact range parameters of falling rocks in the route selection area to construct a graphic database;

[0010] The graphic database contains multiple pre-set graphic templates, each containing control point parameter variables corresponding to different terrain features. The graphic templates also store terrain and landform data, as well as elevation map information and digital elevation model information associated with the terrain and landform data.

[0011] Establish an external database to store slope control point parameters, vertical curve radius parameters, and geological survey data mileage locations;

[0012] Based on the digital elevation model information in the graphic database, identify the terrain features of the current route area, including terrain openness, topographic relief, distribution of dangerous rocks and mountains, and relative elevation differences;

[0013] Based on the terrain features, an initial route plan is generated according to a progressive discrimination rule;

[0014] Based on the user-selected graphic template, a corresponding linkage relationship is established between the parameter variables of the control points loaded from the graphic template and the line selection parameters determined by the progressive discrimination rules;

[0015] When the progressive discrimination rule enters the final discrimination level, the location, length, and height parameters of the protective structure of the tunnel are automatically determined in the graphic database based on the trajectory parameters and influence range parameters of the falling rocks.

[0016] The working principle and beneficial effects of this basic scheme are as follows: This technical scheme collects planar data, stratigraphic lithology data, rock mass structure data, distribution location and scale data of dangerous rocks, stability parameters of dangerous rocks, trajectory parameters of falling rocks and parameters of influence range of the railway alignment area, and constructs a graphic database containing graphic templates (including control point parameter variables, topographic data, contour map information and digital elevation model information).

[0017] Based on the information from the digital elevation model, terrain features (terrain openness, topographic relief, distribution location of dangerous rocks and relative elevation differences) are identified. An initial route plan is generated according to progressive discrimination rules. Through the collaborative construction of a graphic database and an external database, and the hierarchical route selection logic of the progressive discrimination rules, combined with the linkage and correlation mechanism between control point parameter variables and route selection parameters, the integrated design of the route selection plan and protection measures is realized. This effectively solves the problem of design iteration caused by segmented design of route selection and protection in existing technologies, improves the design efficiency of railway route selection in areas with dangerous rocks and falls, minimizes the impact of dangerous rocks and falls on the line, and ensures the safety and stability of the project.

[0018] Furthermore, the method for collecting planar data, stratigraphic lithology data, rock mass structure data, distribution and scale data of unstable rocks, stability parameters of unstable rocks, trajectory parameters of falling rocks, and impact range parameters of the route selection area to construct a graphical database is as follows:

[0019] The planar data includes geodetic datum information, route planar geometry, topographic planar boundaries, ground feature planar elements, control survey results, and coordinates of planar control points.

[0020] The stratigraphic lithological data includes the occurrence of strata, degree of weathering, and geophysical properties. The geological structural data includes faults, folds, densely jointed zones, width of tectonic influence zones, permeability of fault zones, distribution range of weak zones, and signs of historical tectonic activity.

[0021] The rock mass structure data includes structural plane type, orientation of each group of structural planes, spacing between structural planes, filling material of structural planes, difference in structural plane undulation, and roughness;

[0022] The data on the distribution location and scale of the dangerous rocks include the spatial location of a single dangerous rock, the coordinates of its center of gravity, its bottom boundary, its rear edge boundary, its elevation range, its number, its zone number, its geometric scale, length, width, height, volume, its shape (wedge-shaped, conical, plate-shaped, fragmented), its bottom boundary, the location of the main controlling fracture, the range of the separation surface, the range of the dangerous rock cluster, the polygonal envelope of the dangerous rock zone, the distance between the dangerous rock and the railway line, and the elevation difference.

[0023] Numerical inversion method is used to conduct detailed geological mapping of unstable rocks, clarify the attitude, extension length, infill type, fracture penetration rate, and distribution range of unloading relaxation zone of the main controlling structural plane. Exploration data is collected, including but not limited to borehole, adit, and indoor rock mass test indicators. The boundaries of unstable rocks are identified, and the range of unstable rock blocks, base rock mass, and unloading relaxation zone are delineated. Stability parameters of unstable rocks are obtained, including the cohesion of the main controlling structural plane, internal friction angle, weight of unstable rock blocks, fracture water pressure reduction factor, seismic action coefficient, unstable rock instability mode, stability safety factor, stability level, base punching shear resistance, anti-sliding parameters, and unloading relaxation zone reduction factor.

[0024] The trajectory parameters and impact range parameters of the falling rocks are obtained through numerical simulation, including the longitudinal risk start and end mileage along the line, the maximum horizontal and left-right dispersion distance perpendicular to the line, the outer envelope polygon of the falling rock risk, the boundary of the danger zone, the range of high, medium and low risk zones, and the farthest accumulation boundary of the falling rocks.

[0025] Using an unmanned aerial survey system equipped with photogrammetric equipment, aerial image data was collected in areas prone to rockfalls. Flight routes were planned to cover the entire study area, and ground control point data was collected. The three-dimensional coordinates of the control points were determined through a real-time dynamic differential positioning system (which can be directly accessed from existing systems).

[0026] Extract elevation data of the area traversed by the route, mark the locations of exploration points in the geological exploration database in the graphic database, and draw geological profiles by clicking on the exploration points in the graphic.

[0027] Mark the location of each borehole in the borehole data, associate the basic information of the borehole, including borehole depth and diameter, and draw a borehole histogram;

[0028] The stratigraphic information of the stratigraphic distribution data is displayed in a graphic database using different colors and patterns to show the stratigraphic distribution along the route.

[0029] Associate line elements in the graph database with stratigraphic attributes from stratigraphic distribution data;

[0030] By combining the route diagram and rock mechanics parameter data, the rock mechanics parameters of different regions of the rock mechanics parameter data are marked.

[0031] By effectively integrating multi-source heterogeneous geological data into a unified graphical database, the visualization and associated storage of stratigraphic information, borehole information, and rock mechanical parameters have been realized, providing a data foundation for subsequent progressive discrimination and line selection and parameter linkage.

[0032] Furthermore, the parameter variables of objects with the same name in all graphic templates are linked together;

[0033] The topographic data includes contour map information and digital elevation model information;

[0034] When saving topographic data, the contour map information and digital elevation model information are saved together to the graphics database; when the design project is reopened, the contour map information, digital elevation model information, and control point information are loaded together.

[0035] This enables a linkage mechanism for parameter variables of objects with the same name in the graphic template, as well as persistent storage and one-click loading and reuse of contour map information and digital elevation model information, avoiding repeated input of terrain data and improving work efficiency and data consistency in multi-round design scenarios.

[0036] Furthermore, based on terrain features, the steps for generating an initial route plan according to progressive discrimination rules are as follows:

[0037] First discrimination level: If there is an open and flat area in the current route area, and the distance between the area and the dangerous rock mountain is greater than the preset safety threshold, then the route will be arranged in the area so that the entire route is far away from the dangerous rock and falling rock danger zone.

[0038] Second discrimination level: If there is no area that meets the conditions of the first discrimination level, the current route will be locally adjusted by increasing the distance between the route and the dangerous rock mass or changing the local direction so that the route avoids the direct impact range of the dangerous rockfall.

[0039] Third discrimination level: If the conditions of the first and second discrimination levels are not met, the ridgeline is automatically extracted based on the digital elevation model information, and the route is arranged along the ridgeline.

[0040] Fourth discrimination level: If the conditions of the first to third discrimination levels are not met, the initial design parameters of the tunnel protection structure are generated in the graphic database with the rockfall risk outsourcing range as the bottom line, taking into account the railway construction clearance, terrain boundary constraints, and engineering layout feasibility.

[0041] The first to the fourth discrimination levels are executed sequentially from the first to the fourth. If the conditions of the current level are not met, the next level is automatically entered.

[0042] The "bypass-avoidance-ridge-cave" route selection strategy is transformed into a hierarchical progressive discrimination rule that can be executed by a computer, realizing the automated execution of the complete route selection decision chain from complete bypass to ridge and cave protection, filling the gap in the existing technology for systematic alternative route selection strategies.

[0043] Furthermore, the method for automatically extracting ridgelines based on digital elevation model information is as follows:

[0044] Using contour lines as structural lines, an irregular triangular network is constructed;

[0045] In areas where the curvature of contour lines exceeds a preset threshold, mountain tops, depressions, map edges, and saddles, flat triangle regions are formed because the three vertices of the same triangle originate from the same contour line.

[0046] Identify the non-flat triangles adjacent to the flat triangle region, and combine the flat triangle region and the non-flat triangles into a whole;

[0047] If the non-flat triangles in the flat triangle region are empty, find the elevation values ​​of the adjacent contour lines, and use the elevation of the vertex on the non-common side of the triangle as the elevation value of the adjacent contour lines in the flat triangle region.

[0048] Establish the central axes of the triangles within the flat triangular region, specifically as follows:

[0049] A type of triangle: connecting the midpoint of a common side to its opposite vertex;

[0050] Type II triangle: Connect the midpoints of the two common sides;

[0051] Three types of triangles: connecting the centroid of the triangle to the midpoint of its three common sides;

[0052] A linear tree is formed by interconnected tree-like branches, with any node in the flat triangle region as the root node, the midpoint of the triangle's side as the leaf node, and other nodes in the binary tree as non-leaf nodes.

[0053] Tracing each leaf node of the binary tree, determine the edge of the triangle containing each leaf node:

[0054] If the triangle has a hard edge, the leaf node traces to the midpoint of the other non-hard edge;

[0055] If the triangle has two hard edges, the leaf node traces to the vertex between the two hard edges, and then traces to the midpoint of the other two edges.

[0056] Obtain the main branch of the binary tree;

[0057] The main line of the binary tree is used as the central axis of the flat triangle region, and the central axis is used as the ridge line.

[0058] By combining the geometric characteristics of the flat triangle region with the binary tree algorithm, the automatic identification and accurate extraction of ridge lines are realized, which solves the problems of low efficiency and poor accuracy of manual ridge line drawing and provides reliable terrain constraints for laying lines along the ridge.

[0059] Furthermore, the steps for arranging the route along the ridgeline are as follows:

[0060] Based on the slope, width, and geological conditions of the ridgeline, the route is laid out on the ridgeline; when two or more contour lines participate in the network at the saddle, a flat triangle area is formed, and the average elevation value of the parent contour line and the child contour line at the saddle is taken to obtain the central axis.

[0061] Assign elevation values ​​to each node on the central axis:

[0062] Compare the elevation value H1 of the adjacent contour line with the elevation value H2 of the horizontal triangle region:

[0063] like The area is a depression, and the elevation of the midpoint of the binary tree's main line is [value missing]. , Contour interval;

[0064] like The location is a mountain ridge, and the elevation of the midpoint of the main line of the binary tree is [value missing]. ;

[0065] During the tracing process of a binary tree, for each node traced, the path length from that node to the root node is calculated. The value is the value of the node's parent node plus the length from that node to its parent node. Except for the parent node and leaf nodes, which have elevation values, the other nodes are assigned an initial elevation value of -999, indicating that the node has no actual elevation value.

[0066] Extract the binary tree. There is a path from the root node to each leaf node. Take the largest branch as the main line of the binary tree. Perform linear interpolation on the main line according to the length to obtain the elevation of each node.

[0067] Extract the elevation values ​​of the root node and leaf node of the secondary long branch, perform linear interpolation on each node of the secondary long branch according to the length, and calculate the elevation values ​​of the remaining nodes on the main line.

[0068] The method of interpolating from primary to secondary nodes, layer by layer, is used until all nodes in the binary tree have elevation values.

[0069] By placing the binary tree node information with three-dimensional spatial coordinates (X, Y, Z) into a flat triangular region, a reasonable irregular triangular network is obtained.

[0070] By using elevation assignment methods, the problem of missing elevation information in flat triangle areas is solved. The planar geometric features of the ridgeline are integrated with three-dimensional elevation information to generate a reasonable irregular triangular network, providing accurate topographic data support for the longitudinal profile design of the line.

[0071] Furthermore, based on the user-selected graphic template, a corresponding linkage relationship is established between the parameter variables of the control points loaded from the graphic template and the line selection parameters determined by the progressive discrimination rules, specifically as follows:

[0072] The parameter variables of the control point include the rockfall scale parameter, rockfall frequency parameter, and rockfall direction parameter at the control point.

[0073] Users select a graphic template from the graphic database that matches the terrain features of the current route area;

[0074] The graphic template contains multiple preset control points, each corresponding to a different location of dangerous rocks and falling rocks.

[0075] Load control points from the graphic template, wherein the data format of the control points is "Description of the shed and retaining wall";

[0076] Insert control points at the specified locations, enter the control point abbreviations, and establish a multi-objective optimization model. f1, f2, and f3 represent multiple conflicting optimization objectives. The abbreviations identify the elements of the multi-objective optimization top-level framework model. In the multi-objective optimization model, code 1 represents safety, code 2 represents economy, and code 3 represents environmental protection. The model reads geometric parameters of the route, terrain control point parameters, rockfall trajectory parameters, initial parameters of the protective structure, and geological constraint parameters from the graphical database as input conditions. It loads standard constraints, terrain spatial constraints, and protective envelope constraints to form a model constraint set. Based on an intelligent optimization algorithm, it constructs a parameter search space by combining terrain boundaries, and solves for the optimal solution set by considering rockfall interception effectiveness, protective engineering scale, and the impact on route operation. The optimized protective control point parameters are then stored back into the graphical database for accurate recording.

[0077] Establish a corresponding linkage relationship between the parameter variables of the control points and the line selection parameters determined by the progressive discrimination rules;

[0078] When the progressive discrimination rule enters the fourth discrimination level, the parameters of the tunnel protection structure are automatically determined in the graphic database based on the trajectory parameters and influence range parameters of the falling rocks, and the parameters of the tunnel protection structure are linked with the horizontal and vertical profile parameters of the line. The initial geometric parameters of the tunnel are solved based on the influence range of the falling rock trajectory, and a two-way linkage relationship is established between the tunnel control points and the horizontal and vertical profile control points of the line. When the line shape is changed, the tunnel parameters are automatically synchronized and adapted. All calculations and relationships are stored in the nodes and topological relationships of the graphic database.

[0079] When constructing a new longitudinal profile, the horizontal and vertical designs are linked, the original locations of the slope change points remain unchanged, and the mileage of the slope change points is recalculated.

[0080] Users modify the route selection parameters through an interactive program. The interactive program is linked to an external database, and users can input, modify, or delete design parameters in the external database through the interactive program.

[0081] When any alignment parameter changes, the associated prevention and control measures parameters, including the starting mileage, ending mileage, total protection length, coordinates of the control point on the centerline of the tunnel, coordinates of the left and right outer edges of the tunnel, effective protection width, curve widening value, elevation of the bottom surface of the tunnel foundation, elevation of the top surface of the tunnel foundation, elevation of the tunnel roof, minimum net height of the tunnel, cross-sectional dimensions of the tunnel, and foundation depth, are automatically and synchronously updated in the graphic database.

[0082] By linking control point parameter variables with alignment parameters and using the interactive program to modify design parameters in the external database, real-time linkage updates of alignment parameters and tunnel protection structure parameters are achieved. This solves the technical problems of recalculating protection design after alignment adjustment, repeated design iterations, and low efficiency in the existing technology.

[0083] Furthermore, the steps for users to select a graphic template from the graphic database that matches the terrain features of the current route area are as follows:

[0084] In the matched graphic template, establish the position and size correspondence between objects in different high-risk rockfall areas in the order from left to right and from top to bottom, including the tangent line of the movement trajectory of dangerous rocks and falling rocks, the annotation feature points, the intersection information, the intersection number, the intersection coordinates, the curve deflection angle, the curve radius, the length of the transition curve, the tangent length, and the curve length;

[0085] Based on the design parameters associated with the object's parameter variables, the positional relationship of each object in the graphic template is updated by the value of the starting intersection point, and the design line attribute information of each object in the graphic template after the positional relationship is updated is obtained;

[0086] Using the center of the graphic template as the origin, the graphic template is divided into four quadrants: upper left, lower left, lower right, and upper right using a cross.

[0087] If the distance between the center position of an object in each quadrant and the origin is less than the distance threshold, the color scheme is entered, and the custom configuration is performed according to the preset color scheme. The objects in the graphic template are loaded serially from the graphic database to generate numbers and categories.

[0088] By automatically establishing quadrant division and object positional relationships in the graphic template, standardized preprocessing of the graphic template is achieved before control point loading. This enables the system to automatically identify and call the size and positional correspondences between objects in different high-risk rockfall areas, providing a standardized data input interface for the subsequent linkage between control point parameters and line selection parameters.

[0089] Furthermore, the motion characteristics data of different falling rocks are stored in different layers of the graphics database, and each layer independently stores the motion trajectory parameters and collision process parameters of the corresponding falling rock entity.

[0090] The user selects the layer containing the rockfall entity to be deleted, selects the target entity in the selected layer, and performs the deletion operation. Only the selected rockfall entity in the selected layer is deleted, without affecting the rockfall entity data in other layers.

[0091] When a user selects a line design or a rock entity, grips are displayed on the line design or the rock entity.

[0092] The user pulls the target grip point, and the interaction action is captured based on the direction and distance of the grip point. The type of grip point being dragged is identified, preferably including but not limited to the starting point of the falling rock, the trajectory turning point, the bounce impact point, and the ending point of the falling rock, which changes the motion trajectory parameters and collision process parameters of the falling rock.

[0093] After the trajectory parameters and collision process parameters of the falling rock are updated, the associated control point parameter variables are automatically updated in the graphic database.

[0094] Layered data organization enables independent storage and selective editing of rockfall motion characteristics data. Drag-and-drop operation allows for intuitive adjustment of motion trajectory and collision process. Automatic parameter synchronization ensures data consistency and reduces user operation complexity and the risk of misoperation.

[0095] This invention also provides an integrated design system for railway alignment and protection in areas prone to rockfalls, including a data acquisition unit and a processing unit. The data acquisition unit is used to collect planar data, stratigraphic lithology data, geological structure data, rock mass structure data, distribution location and scale data of dangerous rocks, stability parameters of dangerous rocks, and trajectory parameters and impact range parameters of falling rocks in the alignment area.

[0096] The input end of the processing unit is connected to the output end of the data acquisition unit. The processing unit executes the method described in this invention to realize the integrated design of railway alignment and protection in areas prone to rockfalls.

[0097] This system utilizes data acquisition and processing units to achieve a fully integrated process from data acquisition to solution output. It possesses efficient, stable, and reusable system-level technical effects, providing a deployable hardware-software integrated solution for practical engineering applications. Attached Figure Description

[0098] Figure 1 This is a flowchart illustrating the integrated design method for railway alignment and protection in areas prone to rockfalls, as described in this invention. Detailed Implementation

[0099] Embodiments of the present invention are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention.

[0100] In the description of this invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.

[0101] In the description of this invention, unless otherwise specified and limited, it should be noted that the terms "installation", "connection" and "linking" should be interpreted broadly. For example, they can refer to mechanical or electrical connections, or internal connections between two components. They can be direct connections or indirect connections through an intermediate medium. Those skilled in the art can understand the specific meaning of the above terms according to the specific circumstances.

[0102] This invention discloses an integrated design method for railway alignment and protection in areas prone to rockfalls, such as... Figure 1 As shown, it includes the following steps:

[0103] Collect planar data, stratigraphic lithology data, geological structure data, rock mass structure data, distribution location and scale data of dangerous rocks, stability parameters of dangerous rocks, as well as trajectory parameters and impact range parameters of falling rocks in the route selection area, and construct a graphic database;

[0104] The graphic database has multiple preset graphic templates. Each graphic template contains control point parameter variables corresponding to different terrain features. Preferably, it is not limited to the complete structure of the topographic graphic templates and control point parameter variables in the graphic database (spatial map database). The graphic templates also store topographic data and elevation map information and digital elevation model information associated with the topographic data.

[0105] Establish an external database to store slope control point parameters, vertical curve radius parameters, and geological survey data mileage locations;

[0106] In this embodiment, an external database is created. After executing the command, the user is prompted to select a point on the slope line. After selection, the user can drag the point. The system optimizes the route plan using genetic algorithms and simulated annealing algorithms. The system automatically locates the nearest 10-meter interval in the geological survey data for the determined route direction and parameters. The system defaults to the vertical curve radius configuration used when creating the new longitudinal profile. The system does not provide a method for subsequent on-site monitoring of the vertical curve radius set when creating the new longitudinal profile; however, users can directly modify the route plan data file for interactive processing.

[0107] The external database uses custom entities with information from an online environmental vibration and noise monitoring system to store design parameters such as the intensity, frequency, and duration of vibration and noise. It processes and analyzes the monitoring data, establishes a correlation model between vibration and noise and rockfall activity, and identifies potential risk signals of rockfall.

[0108] After selection, the design line will display two grips: green indicates the "start point" and yellow indicates the "end point." The preferred method displays the acquisition device's information, including acquisition status, serial number, MAC address, number of boards, data push interval, data push platform, embedded program version, and creation time. It expands the detailed information for each acquisition module, allowing you to select the board sampling rate, channel sensitivity, coupling, range, channel status, and channel ID. After the acquisition device is connected, the acquisition device board channels, sensors, and scene work points need to be associated and bound. The data file is a text file; single lines have the suffix ".1xl," and double lines have the suffix ".2xl." Loading the planar data file into the graphic, it is converted into a design line according to the specific situation. Type=1 is equivalent to the command "zx3" (acquisition device); Type=2 is equivalent to the command "zx2" (sensor chip); Type=3 converts one double line into two single lines; Type=4 combines multiple aligned edge intersections into a single line.

[0109] Based on the digital elevation model information in the graphic database, the terrain features of the current route area are identified, including terrain openness, topographic relief, distribution of dangerous rocks and mountains and relative elevation differences; during route analysis, the centerline of the route is used as a constraint to perform spatial filtering, topological discrimination and terrain feature identification within the graphic database.

[0110] Based on the terrain features, an initial route plan is generated according to a progressive discrimination rule;

[0111] Based on the user-selected graphic template, a corresponding linkage relationship is established between the parameter variables of the control points loaded from the graphic template and the line selection parameters determined by the progressive discrimination rules;

[0112] When the progressive discrimination rule reaches the final discrimination level, based on the trajectory parameters and impact range parameters of the falling rocks, the location, length, and height parameters of the protective structure of the tunnel are automatically determined in the graphic database. The progressive discrimination rule is then applied in stages. Upon reaching the final discrimination level for rockfall risk, the falling rock trajectory parameters are input, and the output is a graphic database containing the slope, terrain feature lines, route centerline, control points, and protective templates. The control parameters for the tunnel's planar location, protection length, and tunnel's net height are then calculated.

[0113] By loading control points from the control point graphic template, the complex geological conditions of the dangerous rockfall area are obtained. When constructing a new longitudinal profile, a multi-layered progressive alignment strategy is adopted, and the horizontal and vertical design are linked. The original location of the slope change point will not change, and the mileage of the slope change point will be recalculated to achieve precise optimization of the line. The alignment selection and prevention and control measures are integrated into the design to minimize the impact of dangerous rockfall on the line and ensure the safety and stability of the project.

[0114] In a preferred embodiment of the present invention, the method for collecting planar data, stratigraphic lithology data, geological structure data, rock mass structure data, distribution location and scale data of unstable rocks, stability parameters of unstable rocks, trajectory parameters of falling rocks, and influence range parameters of the route selection area, and constructing a graphical database is as follows:

[0115] The planar data includes geodetic datum information, route planar geometry, topographic planar boundaries, ground feature planar elements, control survey results, and coordinates of planar control points.

[0116] Stratigraphic and lithological data include the occurrence of strata, degree of weathering, and physical properties of soil and rock. Geological structural data includes faults, folds, densely jointed zones, width of tectonic influence zones, permeability of fault zones, distribution range of weak zones, and signs of historical tectonic activity.

[0117] Rock mass structure data includes structural plane type, orientation of each group of structural planes, spacing of structural planes, filling material of structural planes, difference in structural plane undulation, and roughness;

[0118] The distribution and scale data of dangerous rocks include the spatial location of individual dangerous rocks, the coordinates of the center of gravity of the dangerous rocks, the bottom boundary, the rear edge boundary, the elevation range, the dangerous rock number, the dangerous rock zone number, the geometric scale, length, width, height, volume, the shape of the dangerous rock block: wedge-shaped, conical, plate-shaped, fragmented, the bottom boundary of the dangerous rock, the location of the main controlling fracture, the range of the separation surface, the range of the dangerous rock cluster, the outer envelope polygon of the dangerous rock zone, the horizontal distance between the dangerous rock and the railway line, and the elevation difference.

[0119] Numerical inversion method is used to conduct detailed geological mapping of unstable rocks, clarify the occurrence, extension length, infill type, fracture penetration rate, and distribution range of unloading relaxation zone of the main controlling structural plane. Exploration data is collected, including but not limited to borehole, adit, and indoor rock mass test indicators. The boundaries of unstable rocks are identified, and the range of unstable rock blocks, base rock mass, and unloading relaxation zone are delineated. Stability parameters of unstable rocks are obtained, including the cohesion of the main controlling structural plane, internal friction angle, weight of unstable rock blocks, fracture water pressure reduction factor, seismic action factor, unstable rock instability mode, stability safety factor, stability level, base punching shear resistance, anti-sliding parameters, and unloading relaxation zone reduction factor.

[0120] The trajectory parameters and impact range parameters of falling rocks were obtained through numerical simulation, including the longitudinal risk start and end mileage along the line, the maximum horizontal and left-right dispersion distance perpendicular to the line, the outer envelope polygon of falling rock risk, the boundary of the danger zone, the range of high, medium and low risk zones, and the farthest accumulation boundary of falling rocks.

[0121] Using an unmanned aerial survey system equipped with photogrammetric equipment, aerial image data was collected in areas prone to rockfalls. Flight routes were planned to cover the entire study area, and ground control point data was collected. The three-dimensional coordinates of the control points were determined through a real-time dynamic differential positioning system (which can be directly accessed from existing systems).

[0122] Extract elevation data of the area traversed by the route, mark the locations of exploration points in the geological exploration database in the graphic database, and draw geological profiles by clicking on the exploration points in the graphic.

[0123] Mark the location of each borehole in the borehole data, associate the basic information of the borehole, including borehole depth and diameter, and draw a borehole histogram;

[0124] The stratigraphic information of the stratigraphic distribution data is displayed in a graphic database using different colors and patterns to show the stratigraphic distribution along the route.

[0125] Associate line elements in the graph database with stratigraphic attributes from stratigraphic distribution data;

[0126] By combining the route diagram and rock mechanics parameter data, the rock mechanics parameters of different regions of the rock mechanics parameter data are marked.

[0127] In this embodiment, the graphical database includes multiple objects for arranging vibration and noise monitoring points and object parameter variables. The graphical database also includes multiple parameter variables for monitoring rockfall paths and route planning areas. Select the layer where the entity whose environmental information needs to be collected is located, and the system will only collect entities in the set layer. The system defaults to collecting polylines and collecting one point every 5 meters.

[0128] After successful data collection, the system will provide a prompt. Once all data collection is complete, the system will connect to the cloud platform via a protocol and display the connected device status, operating status, basic information, and board information on the collector interface. For example, during operation, clicks can be made out of order, and the system will automatically sort them. The collector serial number, name, and selected device status data are imported into the database. A collector information table can be specified; if the specified file does not exist, the system will automatically create it; if it exists, the system will load the data and sort the original data.

[0129] The generated files are sorted by grouping and marked on the design line. An optimization scheme is set, and the system pops up an editing device. Duplicate points within 1 meter of each other are considered duplicates, and the system retains the last entered mileage information. The data collector restart process is similar to downloading raw data. The data format is set to "data collector name, data push interval, data push platform, and restart device operation," and the content is saved in the graphic database. The operation is similar to that of the ground line point, but requires an additional description. When entering the description, simplified codes can be entered, such as number code 1 representing operating status, number code 2 representing basic information, and number code 3 representing communication board information. These simplified codes are saved in the graphic database and are converted into corresponding text only when referenced.

[0130] In a preferred embodiment of the present invention, the parameter variables of objects with the same name in all graphic templates are linked together.

[0131] The topographic data includes contour map information and digital elevation model information;

[0132] When saving topographic data, contour map information and digital elevation model information are saved together to the graphics database; when the design project is reopened, the contour map information, digital elevation model information and control point information are loaded together.

[0133] The interactive program is set up with a data link between it and an external database. Selecting a slope line entity will save the geometric similarity ratio, density similarity ratio, and elastic modulus similarity ratio information to the database. Selecting a ground line entity will save the model information to a database file. Selecting a prototype entity will also save the model information to a database file. Users can input, modify, or delete design parameters from the external database through the interactive program.

[0134] Users can modify the model material data file through an interactive program, changing the starting elevation and scale length of the model scale. The model scale n is set to 1:120. The longitudinal profile display shows the characteristics of horizontal and vertical stress changes at different depths of the foundation after the excavation of the slope. The longitudinal profile grid lines are dashed lines by default, and each 300*40 grid is displayed as a cyan line. Thirteen earth pressure sensors are installed: sensors 2, 5, 8, 11, and 12 monitor vertical stress, and the rest monitor horizontal stress. The system configuration graphical database can be modified.

[0135] In a preferred embodiment of the present invention, the step of generating an initial route plan based on terrain features and according to a progressive discrimination rule is as follows:

[0136] First discrimination level: If there is an open and flat area in the current route area, and the distance between the area and the dangerous rock mountain is greater than the preset safety threshold, then the route will be arranged in the area so that the entire route is far away from the dangerous rock and falling rock danger zone.

[0137] Second discrimination level: If there is no area that meets the conditions of the first discrimination level, the current route will be locally adjusted by increasing the distance between the route and the dangerous rock mass or changing the local direction so that the route avoids the direct impact range of the dangerous rockfall.

[0138] Third discrimination level: If the conditions of the first and second discrimination levels are not met, the ridgeline is automatically extracted based on the digital elevation model information, and the route is arranged along the ridgeline.

[0139] Fourth discrimination level: If the conditions of the first to third discrimination levels are not met, the initial design parameters of the tunnel protection structure are generated in the graphic database with the rockfall risk outsourcing range as the bottom line, taking into account the railway construction clearance, terrain boundary constraints, and engineering layout feasibility.

[0140] The first to fourth discrimination levels are executed sequentially from first to fourth. If the conditions of the current level are not met, the system automatically moves to the next level.

[0141] In a preferred embodiment of the present invention, the method for automatically extracting ridgelines based on digital elevation model information is as follows:

[0142] Using contour lines as structural lines, an irregular triangular network is constructed;

[0143] In areas where the curvature of contour lines exceeds a preset threshold, mountain tops, depressions, map edges, and saddles, flat triangle regions are formed because the three vertices of the same triangle originate from the same contour line.

[0144] Identify the non-flat triangles adjacent to the flat triangle region, and combine the flat triangle region and the non-flat triangles into a whole;

[0145] If the non-flat triangles in the flat triangle region are empty, find the elevation values ​​of the adjacent contour lines, and use the elevation of the vertex on the non-common side of the triangle as the elevation value of the adjacent contour lines in the flat triangle region.

[0146] Establish the central axes of the triangles within the flat triangular region, specifically as follows:

[0147] A type of triangle: connecting the midpoint of a common side to its opposite vertex;

[0148] Type II triangle: Connect the midpoints of the two common sides;

[0149] Three types of triangles: connecting the centroid of the triangle to the midpoint of its three common sides;

[0150] A linear tree is formed by interconnected tree-like branches, with any node in the flat triangle region as the root node, the midpoint of the triangle's side as the leaf node, and other nodes in the binary tree as non-leaf nodes.

[0151] Tracing each leaf node of the binary tree, determine the edge of the triangle containing each leaf node:

[0152] If the triangle has a hard edge, the leaf node traces to the midpoint of the other non-hard edge;

[0153] If the triangle has two hard edges, the leaf node traces to the vertex between the two hard edges, and then traces to the midpoint of the other two edges.

[0154] Obtain the main branch of the binary tree;

[0155] The main line of the binary tree is used as the central axis of the flat triangle region, and the central axis is used as the ridge line.

[0156] A model of the unstable rockfall terrain was constructed according to the design similarity ratio. The model may include, but is not limited to, mountains, unstable rock masses, and falling rocks. The model simulates the location, shape, and size of the unstable rocks, as well as the movement path of the falling rocks. The selected model box size is 1.0 m × 1.0 m × 0.8 m. Green indicates weathered blocky mudstone with good cementation on site, and red indicates blocky sandstone with a certain degree of weathering. The original soil sample was dried, crushed, and sieved to achieve the density and moisture content of the model designed for the experiment. The model was filled in layers, and each layer was compacted to control the degree of compaction and maintain the properties close to the original rock.

[0157] In a preferred embodiment of the present invention, the step of arranging the route along the ridgeline is as follows:

[0158] Based on the slope, width, and geological conditions of the ridgeline, the route is laid out on the ridgeline; when two or more contour lines participate in the network at the saddle, a flat triangle area is formed, and the average elevation value of the parent contour line and the child contour line at the saddle is taken to obtain the central axis.

[0159] Assign elevation values ​​to each node on the central axis:

[0160] Compare the elevation value H1 of the adjacent contour line with the elevation value H2 of the horizontal triangle region:

[0161] like The area is a depression, and the elevation of the midpoint of the binary tree's main line is [value missing]. , Contour interval;

[0162] like The location is a mountain ridge, and the elevation of the midpoint of the main line of the binary tree is [value missing]. ;

[0163] During the tracing process of a binary tree, for each node traced, the path length from that node to the root node is calculated. The value is the value of the node's parent node plus the length from that node to its parent node. Except for the parent node and leaf nodes, which have elevation values, the other nodes are assigned an initial elevation value of -999, indicating that the node has no actual elevation value.

[0164] Extract the binary tree. There is a path from the root node to each leaf node. Take the largest branch as the main line of the binary tree. Perform linear interpolation on the main line according to the length to obtain the elevation of each node.

[0165] Extract the elevation values ​​of the root node and leaf node of the secondary long branch, perform linear interpolation on each node of the secondary long branch according to the length, and calculate the elevation values ​​of the remaining nodes on the main line.

[0166] The method of interpolating from primary to secondary nodes, layer by layer, is used until all nodes in the binary tree have elevation values.

[0167] By placing the binary tree node information with three-dimensional spatial coordinates (X, Y, Z) into a flat triangular region, a reasonable irregular triangular network is obtained.

[0168] In a preferred embodiment of the present invention, based on the user-selected graphic template, a corresponding linkage relationship is established between the parameter variables of the control points loaded from the graphic template and the line selection parameters determined by the progressive discrimination rule, specifically as follows:

[0169] The parameter variables of the control point include the rockfall scale parameter, rockfall frequency parameter, and rockfall direction parameter at the control point.

[0170] Users select a graphic template from the graphic database that matches the terrain features of the current route area;

[0171] The graphic template contains multiple preset control points, each corresponding to a different location of dangerous rocks and falling rocks.

[0172] Load control points from the graphic template, wherein the data format of the control points is "Description of the shed and retaining wall";

[0173] Insert control points at the specified locations, enter the control point abbreviations, and establish a multi-objective optimization model. f1, f2, and f3 represent multiple conflicting optimization objectives. The abbreviations identify the elements of the multi-objective optimization top-level framework model. In the multi-objective optimization model, code 1 represents safety, code 2 represents economy, and code 3 represents environmental protection. The model reads geometric parameters of the route, terrain control point parameters, rockfall trajectory parameters, initial parameters of the protective structure, and geological constraint parameters from the graphical database as input conditions. It loads standard constraints, terrain spatial constraints, and protective envelope constraints to form a model constraint set. Based on an intelligent optimization algorithm, it constructs a parameter search space by combining terrain boundaries, and solves for the optimal solution set by considering rockfall interception effectiveness, protective engineering scale, and the impact on route operation. The optimized protective control point parameters are then stored back into the graphical database for accurate recording.

[0174] Establish a corresponding linkage relationship between the parameter variables of the control points and the line selection parameters determined by the progressive discrimination rules;

[0175] When the progressive discrimination rule enters the fourth discrimination level, the parameters of the tunnel protection structure are automatically determined in the graphic database based on the trajectory parameters and influence range parameters of the falling rocks, and the parameters of the tunnel protection structure are linked with the horizontal and vertical profile parameters of the line. The initial geometric parameters of the tunnel are solved based on the influence range of the falling rock trajectory, and a two-way linkage relationship is established between the tunnel control points and the horizontal and vertical profile control points of the line. When the line shape is changed, the tunnel parameters are automatically synchronized and adapted. All calculations and relationships are stored in the nodes and topological relationships of the graphic database.

[0176] When constructing a new longitudinal profile, the horizontal and vertical designs are linked, the original locations of the slope change points remain unchanged, and the mileage of the slope change points is recalculated.

[0177] Users modify the route selection parameters through an interactive program. The interactive program is linked to an external database, and users can input, modify, or delete design parameters in the external database through the interactive program.

[0178] When any alignment parameter changes, the associated prevention and control measures parameters, including the starting mileage, ending mileage, total protection length, coordinates of the control point on the centerline of the tunnel, coordinates of the left and right outer edges of the tunnel, effective protection width, curve widening value, elevation of the bottom surface of the tunnel foundation, elevation of the top surface of the tunnel foundation, elevation of the tunnel roof, minimum net height of the tunnel, cross-sectional dimensions of the tunnel, and foundation depth, are automatically and synchronously updated in the graphic database.

[0179] Select a slope section, create a route model and control structure models such as tunnels and retaining walls, input a new slope value, adjust the forward or backward slope change point according to the input new slope value, and install them in the corresponding positions, as well as whether to move forward or backward along the slope.

[0180] On the selected slope section, different test conditions are designed. During the operation, the system will give prompts to avoid local dangerous areas. Input the mileage and elevation, and the system will measure and calculate the position of the displacement markers placed on the side of the foundation according to the mileage and elevation input by the user. The system will obtain the displacement deformation vector before and after excavation at different depths of the foundation and set the default settings according to the scale, frequency and direction of rockfall at the previous slope change point.

[0181] In a preferred embodiment of the present invention, the step of the user selecting a graphic template from the graphic database that matches the terrain features of the current route area is as follows:

[0182] In the matched graphic template, establish the position and size correspondence between objects in different high-risk rockfall areas in the order from left to right and from top to bottom, including the tangent line of the movement trajectory of dangerous rocks and falling rocks, the annotation feature points, the intersection information, the intersection number, the intersection coordinates, the curve deflection angle, the curve radius, the length of the transition curve, the tangent length, and the curve length;

[0183] Based on the design parameters associated with the object's parameter variables, the positional relationship of each object in the graphic template is updated by the value of the starting intersection point, and the design line attribute information of each object in the graphic template after the positional relationship is updated is obtained;

[0184] Using the center of the graphic template as the origin, the graphic template is divided into four quadrants: upper left, lower left, lower right, and upper right using a cross.

[0185] If the distance between the center position of an object in each quadrant and the origin is less than the distance threshold, the color scheme is entered, and the custom configuration is performed according to the preset color scheme. The objects in the graphic template are loaded serially from the graphic database to generate numbers and categories.

[0186] In a preferred embodiment of the present invention, the motion characteristic data of different falling rocks are stored in different layers of the graphic database, and each layer independently stores the motion trajectory parameters and collision process parameters of the corresponding falling rock entity.

[0187] The user selects the layer containing the rockfall entity to be deleted, selects the target entity in the selected layer, and performs the deletion operation. Only the selected rockfall entity in the selected layer is deleted, without affecting the rockfall entity data in other layers.

[0188] When a user selects a line design or a rock entity, grips are displayed on the line design or the rock entity.

[0189] The user pulls the target grip point, and the interaction action is captured based on the direction and distance of the grip point. The type of grip point being dragged is identified, preferably including but not limited to the starting point of the falling rock, the trajectory turning point, the bounce impact point, and the ending point of the falling rock, which changes the motion trajectory parameters and collision process parameters of the falling rock.

[0190] After the trajectory parameters and collision process parameters of the falling rock are updated, the associated control point parameter variables are automatically updated in the graphic database.

[0191] During the design phase, the completed model can be placed in a centrifuge, and the centrifugal acceleration can be determined based on the similarity ratio. If replacement is needed during data merging, the corresponding file can be specified. When merging data, in addition to combining the rockfall trajectory data, information such as "rockfall velocity," "jump height," and "flight distance" will also be generated. The impact information of the rockfall motion is recorded in 1000-meter increments for straight sections and 50-meter increments for curved sections. Centrifugal loading information is output according to the deformation and failure control points of the model.

[0192] Ideally, a feedback mechanism should be set up to number and classify sensor channels in various scenarios. Channels 1, 2, 3, and 4 represent the channel number used by the sensor, CJD represents the project name, A3 represents the scenario name, 2F represents the work site, V represents the vibration sensor, and N represents the noise sensor. Fault warnings should be set up, warning data should be analyzed, and the sensor should collect real-time raw data, real-time effective data, and real-time sound level data. The historical operating trend of the equipment, equipment score, alarm count, etc. should be displayed.

[0193] The present invention also provides an integrated design system for railway alignment and protection in areas prone to rockfalls, including a data acquisition unit (such as a displacement sensor, strain sensor, pressure sensor, etc.) and a processing unit. The data acquisition unit is used to collect planar data, strata lithology data, geological structure data, rock mass structure data, distribution location and scale data of dangerous rocks, stability parameters of dangerous rocks, and trajectory parameters and influence range parameters of falling rocks in the alignment area.

[0194] The input terminal of the processing unit is electrically connected to the output terminal of the data acquisition unit. The processing unit executes the method described in this invention to realize the integrated design of railway alignment and protection in areas prone to rockfalls.

[0195] The specific embodiments described herein are merely illustrative examples of the present invention. Those skilled in the art can make various modifications or additions to the described embodiments or use similar methods to substitute them, without departing from the technology of the present invention or exceeding the scope defined by the appended claims.

[0196] In the embodiments of this application, terms such as "fixed," "fixed connection," and "fixed connection" refer to common fixing methods in the prior art, such as welding, riveting, and screws. "Rotary connection" refers to common rotary connection methods in the prior art, such as hinges and bearing rotation. If electrical components are provided, the functions, control, and power supply methods of all electrical components are common technical means in the prior art. This application has not improved them and they are not within the protection scope of this application. Therefore, this application will not elaborate on them.

[0197] Furthermore, the selection of materials and strength limitations for all components in this application can be made and arranged by those skilled in the art based on the site environment and the requirements of relevant national or industry standards, and are not within the scope of protection of this application. Therefore, this application will not elaborate on these points.

Claims

1. An integrated design method for railway alignment and protection in areas prone to rockfalls, characterized in that, Includes the following steps: Collect planar data, stratigraphic lithology data, rock mass structure data, distribution location and scale data of dangerous rocks, stability parameters of dangerous rocks, and trajectory and impact range parameters of falling rocks in the route selection area to construct a graphic database; The graphic database contains multiple pre-set graphic templates, each containing control point parameter variables corresponding to different terrain features. The graphic templates also store terrain and landform data, as well as elevation map information and digital elevation model information associated with the terrain and landform data. Establish an external database to store slope control point parameters, vertical curve radius parameters, and geological survey data mileage locations; Based on the digital elevation model information in the graphic database, identify the terrain features of the current route area, including terrain openness, topographic relief, distribution of dangerous rocks and mountains, and relative elevation differences; Based on the terrain features, an initial route plan is generated according to a progressive discrimination rule; Based on the user-selected graphic template, a corresponding linkage relationship is established between the parameter variables of the control points loaded from the graphic template and the line selection parameters determined by the progressive discrimination rules; When the progressive discrimination rule enters the final discrimination level, the location, length, and height parameters of the protective structure of the tunnel are determined in the graphic database based on the trajectory parameters and influence range parameters of the falling rocks.

2. The integrated design method for railway alignment and protection in areas prone to rockfalls as described in claim 1, characterized in that, The method for collecting planar data, stratigraphic lithology data, rock mass structure data, distribution and scale data of unstable rocks, stability parameters of unstable rocks, trajectory parameters of falling rocks, and impact range parameters of the route selection area, and constructing a graphical database is as follows: The planar data includes geodetic datum information, route planar geometry, topographic planar boundaries, ground feature planar elements, control survey results, and coordinates of planar control points. The stratigraphic lithological data includes the occurrence of rock strata, degree of weathering, and geophysical indices. The rock mass structure data includes structural plane type, orientation of each group of structural planes, spacing between structural planes, filling material of structural planes, difference in structural plane undulation, and roughness; The data on the distribution location and scale of the dangerous rocks include the spatial location of a single dangerous rock, the coordinates of its center of gravity, its bottom boundary, its rear edge boundary, its elevation range, its number, its zone number, its geometric scale, length, width, height, volume, its shape (wedge-shaped, conical, plate-shaped, fragmented), its bottom boundary, the location of the main controlling fracture, the range of the separation surface, the range of the dangerous rock cluster, the polygonal envelope of the dangerous rock zone, the distance between the dangerous rock and the railway line, and the elevation difference. Numerical inversion was used to conduct detailed geological mapping of the unstable rock mass, clarifying the attitude, extension length, infill type, fracture penetration rate, and distribution range of the unloading relaxation zone of the main controlling structural plane. Exploration data was collected, including borehole, adit, and indoor rock mass test indicators. The boundaries of the unstable rock mass were identified, and the range of the unstable rock mass, the base rock mass, and the unloading relaxation zone were delineated. Stability parameters of the unstable rock mass were obtained, including the cohesion of the main controlling structural plane, internal friction angle, weight of the unstable rock mass, fracture water pressure reduction factor, seismic action factor, unstable rock instability mode, stability safety factor, stability level, base punching shear resistance, anti-sliding parameters, and unloading relaxation zone reduction factor. The trajectory parameters and impact range parameters of the falling rocks are obtained through numerical simulation, including the longitudinal risk start and end mileage along the line, the maximum horizontal and left-right dispersion distance perpendicular to the line, the outer envelope polygon of the falling rock risk, the boundary of the danger zone, the range of high, medium and low risk zones, and the farthest accumulation boundary of the falling rocks. An unmanned aerial survey system was used, equipped with photogrammetric equipment, to collect aerial image data of areas with dangerous rocks and falling rocks. Flight routes were planned to cover the entire study area, and ground control point data was collected. The three-dimensional coordinates of the control points were determined through a real-time dynamic differential positioning system. Extract elevation data of the area traversed by the route, mark the locations of exploration points in the geological exploration database in the graphic database, and draw geological profiles by clicking on the exploration points in the graphic. Mark the location of each borehole in the borehole data, associate the basic information of the borehole, including borehole depth and diameter, and draw a borehole histogram; The stratigraphic information of the stratigraphic distribution data is displayed in a graphic database using different colors and patterns to show the stratigraphic distribution along the route. Associate line elements in the graph database with stratigraphic attributes from stratigraphic distribution data; By combining the route diagram and rock mechanics parameter data, the rock mechanics parameters of different regions of the rock mechanics parameter data are marked.

3. The integrated design method for railway alignment and protection in areas prone to rockfalls as described in claim 2, characterized in that, The parameters and variables of objects with the same name in all graphic templates are linked together; The topographic data includes contour map information and digital elevation model information; When saving topographic data, the contour map information and digital elevation model information are saved together to the graphics database; When the design project is reopened, the contour map information, digital elevation model information, and control point information are loaded together.

4. The integrated design method for railway alignment and protection in areas prone to rockfalls as described in claim 1, characterized in that, The steps for generating an initial route plan based on terrain features and according to progressive discrimination rules are as follows: First discrimination level: If there is an open and flat area in the current route area, and the distance between the area and the dangerous rock mountain is greater than the preset safety threshold, then the route will be arranged in the area so that the entire route is far away from the dangerous rock and falling rock danger zone. Second discrimination level: If there is no area that meets the conditions of the first discrimination level, the current route will be locally adjusted by increasing the distance between the route and the dangerous rock mass or changing the local direction so that the route avoids the direct impact range of the dangerous rockfall. Third discrimination level: If the conditions of the first and second discrimination levels are not met, the ridgeline is automatically extracted based on the digital elevation model information, and the route is arranged along the ridgeline. Fourth discrimination level: If the conditions of the first to third discrimination levels are not met, the initial design parameters of the tunnel protection structure are generated in the graphic database with the rockfall risk outsourcing range as the bottom line, taking into account the railway construction clearance, terrain boundary constraints, and engineering layout feasibility. The first to the fourth discrimination levels are executed sequentially from the first to the fourth. If the conditions of the current level are not met, the next level is automatically entered.

5. The integrated design method for railway alignment and protection in areas prone to rockfalls as described in claim 4, characterized in that, The method for automatically extracting ridgelines based on digital elevation model information is as follows: Using contour lines as structural lines, an irregular triangular network is constructed; In areas where the curvature of contour lines exceeds a preset threshold, mountain tops, depressions, map edges, and saddles, flat triangle regions are formed because the three vertices of the same triangle originate from the same contour line. Identify the non-flat triangles adjacent to the flat triangle region, and combine the flat triangle region and the non-flat triangles into a whole; If the non-flat triangles in the flat triangle region are empty, find the elevation values ​​of the adjacent contour lines, and use the elevation of the vertex on the non-common side of the triangle as the elevation value of the adjacent contour lines in the flat triangle region. Establish the central axes of the triangles within the flat triangular region, specifically as follows: A type of triangle: connecting the midpoint of a common side to its opposite vertex; Type II triangle: Connect the midpoints of the two common sides; Three types of triangles: connecting the centroid of the triangle to the midpoint of its three common sides; A linear tree is formed by interconnected tree-like branches, with any node in the flat triangle region as the root node, the midpoint of the triangle's side as the leaf node, and other nodes in the binary tree as non-leaf nodes. Tracing each leaf node of the binary tree, determine the edge of the triangle containing each leaf node: If the triangle has a hard edge, the leaf node traces to the midpoint of the other non-hard edge; If the triangle has two hard edges, the leaf node traces to the vertex between the two hard edges, and then traces to the midpoint of the other two edges. Obtain the main branch of the binary tree; The main line of the binary tree is used as the central axis of the flat triangle region, and the central axis is used as the ridge line.

6. The integrated design method for railway alignment and protection in areas prone to rockfalls as described in claim 5, characterized in that, The steps for arranging the route along the ridgeline are as follows: Based on the slope, width, and geological conditions of the ridgeline, the route is laid out on the ridgeline; when two or more contour lines participate in the network at the saddle, a flat triangle area is formed, and the average elevation value of the parent contour line and the child contour line at the saddle is taken to obtain the central axis. Assign elevation values ​​to each node on the central axis: Compare the elevation value H1 of the adjacent contour line with the elevation value H2 of the horizontal triangle region: like The area is a depression, and the elevation of the midpoint of the binary tree's main line is [value missing]. , Contour interval; like The location is a mountain ridge, and the elevation of the midpoint of the main line of the binary tree is [value missing]. ; During the tracing process of a binary tree, for each node traced, the path length from that node to the root node is calculated. The value is the value of the node's parent node plus the length from that node to its parent node. Except for the parent node and leaf nodes, which have elevation values, the other nodes are assigned an initial elevation value of -999, indicating that the node has no actual elevation value. Extract the binary tree. There is a path from the root node to each leaf node. Take the largest branch as the main line of the binary tree. Perform linear interpolation on the main line according to the length to obtain the elevation of each node. Extract the elevation values ​​of the root node and leaf node of the secondary long branch, perform linear interpolation on each node of the secondary long branch according to the length, and calculate the elevation values ​​of the remaining nodes on the main line. The method of interpolating from primary to secondary nodes, layer by layer, is used until all nodes in the binary tree have elevation values. By placing the binary tree node information with three-dimensional spatial coordinates (X, Y, Z) into a flat triangular region, a reasonable irregular triangular network is obtained.

7. The integrated design method for railway alignment and protection in areas prone to rockfalls as described in claim 1, characterized in that, Based on the user-selected graphic template, a corresponding linkage relationship is established between the parameter variables of the control points loaded from the graphic template and the line selection parameters determined by the progressive discrimination rules. Specifically: The parameter variables of the control point include the rockfall scale parameter, rockfall frequency parameter, and rockfall direction parameter at the control point. Users select a graphic template from the graphic database that matches the terrain features of the current route area; The graphic template contains multiple preset control points, each corresponding to a different location of dangerous rocks and falling rocks. Load control points from the graphic template, wherein the data format of the control points is "Description of the shed and retaining wall"; Insert control points at the specified locations, enter the control point abbreviations, and establish a multi-objective optimization model. f1, f2, and f3 represent multiple conflicting optimization objectives. The abbreviations identify the elements of the multi-objective optimization top-level framework model. In the multi-objective optimization model, code 1 represents safety, code 2 represents economy, and code 3 represents environmental protection. The model reads geometric parameters of the route, terrain control point parameters, rockfall trajectory parameters, initial parameters of the protective structure, and geological constraint parameters from the graphical database as input conditions. It loads standard constraints, terrain spatial constraints, and protective envelope constraints to form a model constraint set. Combined with terrain boundaries, it constructs a parameter search space. Focusing on rockfall interception effectiveness, protective engineering scale, and the impact on route operation, it solves to obtain the optimal solution set. The optimized protective control point parameters are then stored back into the graphical database for accurate recording. Establish a corresponding linkage relationship between the parameter variables of the control points and the line selection parameters determined by the progressive discrimination rules; When the progressive discrimination rule enters the fourth discrimination level, the parameters of the tunnel protection structure are automatically determined in the graphic database based on the trajectory parameters and influence range parameters of the falling rocks, and the parameters of the tunnel protection structure are linked with the horizontal and vertical profile parameters of the line. The initial geometric parameters of the tunnel are solved based on the influence range of the falling rock trajectory, and a two-way linkage relationship is established between the tunnel control points and the horizontal and vertical profile control points of the line. When the line shape is changed, the tunnel parameters are automatically synchronized and adapted. All calculations and relationships are stored in the nodes and topological relationships of the graphic database. When constructing a new longitudinal profile, the horizontal and vertical designs are linked, the original locations of the slope change points remain unchanged, and the mileage of the slope change points is recalculated. Users modify the route selection parameters through an interactive program. The interactive program is linked to an external database, and users can input, modify, or delete design parameters in the external database through the interactive program. When any alignment parameter changes, the associated prevention and control measures parameters, including the template-built-in control point parameters, are automatically updated in the graphic database: starting mileage of the tunnel, ending mileage, total protection length, coordinates of the tunnel centerline control point, coordinates of the tunnel's left and right outer edges, effective protection width, curve widening value, tunnel foundation bottom elevation, tunnel foundation top elevation, tunnel roof elevation, minimum clear height of the tunnel, tunnel cross-sectional dimensions, and foundation depth.

8. The integrated design method for railway alignment and protection in areas prone to rockfalls as described in claim 7, characterized in that, The steps for a user to select a graphic template from the graphic database that matches the terrain features of the current route area are as follows: In the matched graphic template, establish the position and size correspondence between objects in different high-risk rockfall areas in the order from left to right and from top to bottom, including the tangent line of the movement trajectory of dangerous rocks and falling rocks, the annotation feature points, the intersection information, the intersection number, the intersection coordinates, the curve deflection angle, the curve radius, the length of the transition curve, the tangent length, and the curve length; Based on the design parameters associated with the object's parameter variables, the positional relationship of each object in the graphic template is updated by the value of the starting intersection point, and the design line attribute information of each object in the graphic template after the positional relationship is updated is obtained; Using the center of the graphic template as the origin, the graphic template is divided into four quadrants: upper left, lower left, lower right, and upper right using a cross. If the distance between the center position of an object in each quadrant and the origin is less than the distance threshold, the color scheme is entered, and the custom configuration is performed according to the preset color scheme. The objects in the graphic template are loaded serially from the graphic database to generate numbers and categories.

9. The integrated design method for railway alignment and protection in areas prone to rockfalls as described in claim 1, characterized in that, The motion characteristics data of different falling rocks are stored in different layers of the graphics database, and each layer independently stores the motion trajectory parameters and collision process parameters of the corresponding falling rock entity. The user selects the layer containing the rockfall entity to be deleted, selects the target entity in the selected layer, and performs the deletion operation. Only the selected rockfall entity in the selected layer is deleted, without affecting the rockfall entity data in other layers. When a user selects a line design or a rock entity, grips are displayed on the line design or the rock entity. The user pulls the target grip point, and the interaction action is captured based on the direction and distance of the grip point. The type of grip point being dragged is identified: rockfall start point, trajectory turning point, bounce impact point, rockfall end point. The motion trajectory parameters and collision process parameters of the rockfall are changed. After the trajectory parameters and collision process parameters of the falling rock are updated, the associated control point parameter variables are automatically updated in the graphic database.

10. An integrated design system for railway alignment and protection in areas prone to rockfalls, characterized in that, It includes a data acquisition unit and a processing unit. The data acquisition unit is used to collect planar data, stratigraphic lithology data, geological structure data, rock mass structure data, distribution location and scale data of dangerous rocks, stability parameters of dangerous rocks, and trajectory parameters and impact range parameters of falling rocks in the route selection area. The input terminal of the processing unit is connected to the output terminal of the data acquisition unit. The processing unit executes the method described in any one of claims 1-9 to realize the integrated design of railway alignment and protection in areas prone to rockfalls.