A GIM standard extension method and system for quantity surveying

By unifying data names and generating extended data in the current GIM standard, the problem of lack of correspondence between model data and full-element data for quantity calculation in existing technologies has been solved, realizing data coverage and mapping relationship for quantity calculation and providing standard support for 3D quantity calculation modeling.

CN123116404APending Publication Date: 2026-11-17STATE GRID JIANGXI ELECTRIC POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611320354.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-28
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The current GIM standard fails to fully cover the calculation objects, calculation parameters, and calculation elements involved in the engineering quantity calculation in the substation building engineering design. Furthermore, it lacks a unified mapping relationship between component names, geometric data, and attribute data and calculation objects, calculation parameters, and calculation elements, resulting in a lack of correspondence between model data and the full element data of engineering quantity calculation.

Method used

By reading the component names, geometric data, and attribute data from the existing GIM standard, a set of GIM model data elements is formed. The calculation objects, calculation parameters, and calculation elements for quantity calculation are read to form a set of full-element data for quantity calculation. Data names are unified according to preset naming rules, data types are matched, and component classification extended data, geometric data extended data, and attribute data extended data are generated. A mapping relationship is established to form the GIM+ quantity calculation standard.

Benefits of technology

It achieved unified data naming, reduced the impact of data naming differences on matching, supplemented gap data in engineering quantity calculation, established the correspondence between model data and full-element data for engineering quantity calculation, provided standard support for 3D quantity calculation modeling, and reduced data mapping errors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123116404A_ABST
    Figure CN123116404A_ABST
Patent Text Reader

Abstract

This invention relates to the field of GIM standard extension technology, specifically to a GIM standard extension method and system for quantity take-off (FTO) calculation. The invention reads component names, geometric data, and attribute data from the current GIM standard to form a GIM model data element set; it also reads the calculation object, calculation parameters, and calculation elements to form a complete quantity take-off (FTO) data element set. Data names are unified according to preset naming rules and matched according to data type correspondences to obtain quantity take-off (FTO) gap data. Based on this, component classification extension data, geometric data extension data, and attribute data extension data are generated, forming an extended GIM model data element set and mapping relationships. This is then used to form a GIM+ quantity take-off standard according to the framework of the current GIM standard. This invention can supplement the missing quantity take-off (FTO) data in the current GIM standard, connect model data with the complete quantity take-off (FTO) data element set, and provide standard support for 3D quantity take-off modeling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of GIM standard extension technology, specifically to a GIM standard extension method and system for quantity surveying. Background Technology

[0002] The current GIM standard is widely used in the design of substation building engineering. It provides a standard basis for the establishment of three-dimensional design models, visualization and collision detection by specifying the classification of components, the level of detail of geometric information and the level of detail of attribute information.

[0003] However, the current GIM standard is mainly geared towards engineering design needs, and its component classification and attribute data fail to fully cover the calculation objects, parameters, and elements involved in quantity calculation. Furthermore, there is a lack of a unified mapping relationship between component names, geometric data, and attribute data and the calculation objects, parameters, and elements; data names differ across different business systems; and the correspondence between model data and all elements of quantity calculation still relies on manual determination.

[0004] Furthermore, existing technologies lack GIM standard extension methods for quantity take-off calculations, making it difficult to determine the necessary supplementary component classifications, geometric data, and attribute data based on gaps in quantity take-off data. They also lack a GIM+ quantity take-off standard capable of bridging model data with all elements of quantity take-off data. Therefore, it is necessary to extend the existing GIM standard framework and establish corresponding mapping relationships. Summary of the Invention

[0005] This invention provides a GIM standard extension method and system for quantity calculation, aiming to solve the problems of insufficient coverage of quantity calculation data in the current GIM standard and the lack of mapping relationship between model data and full-element data for quantity calculation.

[0006] To achieve the above objectives, the present invention provides the following technical solution: This invention provides a GIM standard extension method for quantity surveying, comprising: S100: Read the component names, geometric data, and attribute data from the current GIM standard to form a set of GIM model data elements; read the calculation objects, calculation parameters, and calculation elements involved in the quantity calculation to form a set of full-element data for the quantity calculation. S200: According to the preset naming rules, unify the data names in the GIM model data element set and the engineering quantity calculation full element data set, and match them according to the data type correspondence between the component name and the calculation object, the geometric data and the calculation parameters, and the attribute data and the calculation element to obtain the engineering quantity calculation gap data composed of unmatched calculation objects, calculation parameters and calculation elements; S300: Based on the unmatched calculation objects, unmatched calculation parameters, and unmatched calculation elements in the quantity calculation gap data, generate component classification extended data, geometric data extended data, and attribute data extended data respectively, and add them to the GIM model data element set to obtain the extended GIM model data element set; S400: According to the data type correspondence, establish the mapping relationship between the extended GIM model data element set and the engineering quantity calculation full element data set, and organize the extended GIM model data element set and the mapping relationship according to the framework of the current GIM standard to form the GIM+ quantity calculation standard.

[0007] As a preferred embodiment of the present invention, in step S100, the step of forming the GIM model data element set includes: Read the component names included in the component classification of the current GIM standard, as well as the geometric and attribute data recorded in the geometric information granularity and attribute information granularity of the component names; The data elements of the GIM model are categorized according to the data types of component names, geometric data, and attribute data, and then associated with the corresponding component names to obtain the GIM model data element set.

[0008] As a preferred embodiment of the present invention, in step S100, the step of forming a complete set of engineering quantity calculation data includes: Read the calculation object corresponding to the component in the engineering quantity calculation business, as well as the calculation parameters and calculation elements corresponding to the calculation object; The calculations are categorized according to the data types of the calculation objects, calculation parameters, and calculation elements, and the calculation parameters and calculation elements are associated with their corresponding calculation objects to obtain the complete set of data for the engineering quantity calculation.

[0009] As a preferred technical solution of the present invention, in step S200, the preset naming rule includes a unified name and one or more original names corresponding to the unified name; Retrieve data names that match the original name from the GIM model data element set and the engineering quantity calculation full element data set, and replace the retrieved data names with the corresponding unified names.

[0010] As a preferred embodiment of the present invention, step S200, the matching step according to the data type correspondence relationship, includes: In the GIM model data element set after the data names have been unified, the component names that have the same name as the calculation object, the geometric data that have the same name as the calculation parameters, and the attribute data that have the same name as the calculation elements are retrieved respectively. The retrieved data pairs with the same name are identified as matched data, and the calculation objects, calculation parameters, and calculation elements for which no data pairs with the same name are retrieved are identified as the gap data for the engineering quantity calculation.

[0011] As a preferred embodiment of the present invention, the component classification extended data includes the component name and component type corresponding to the unmatched computational object; The extended geometric data includes component size data corresponding to the mismatched calculation parameters; The attribute data extension data includes at least one of component material data and construction method data corresponding to the unmatched calculation element; When the extended geometric data and the extended attribute data are added to the GIM model data feature set, they are associated with the corresponding component names.

[0012] As a preferred technical solution of the present invention, in step S400, the mapping relationship includes a first type of mapping data pair consisting of component name and calculation object, a second type of mapping data pair consisting of geometric data and calculation parameters, and a third type of mapping data pair consisting of attribute data and calculation elements; The mapping relationship is validated for consistency. The component name associated with the geometric data in the second type of mapping data pair and the calculation object associated with the calculation parameter are verified to form the first type of mapping data pair. The component name associated with the attribute data in the third type of mapping data pair and the calculation object associated with the calculation element are verified to form the first type of mapping data pair. The second and third type of mapping data pairs that failed the consistency check were identified as conflicting mapping data and excluded from the mapping relationship to obtain the checked mapping relationship. In accordance with the scope of application, normative references, general provisions, and architectural modeling content and detailed requirements, the extended GIM model data element set and the verified mapping relationship are organized. The architectural modeling content and detailed requirements include model type, modeling method, cost-related attributes, and the verified mapping relationship.

[0013] As a preferred embodiment of the present invention, the mapping relationship includes at least one of the following: Mapping between wall component thickness data and wall thickness calculation parameters; Mapping between the width data of door components and the door opening width calculation parameters in the door opening size calculation parameters; Mapping between the height data of door components and the door opening height calculation parameters in the door opening size calculation parameters.

[0014] As a preferred technical solution of the present invention, the component corresponding to the attribute data extension data is a wall component, the engineering quantity calculation gap data includes the calculation elements required for the calculation object of the external wall decoration engineering quantity, and the attribute data extension data includes whether plastering is performed, plastering surface attributes, and surface material attributes.

[0015] This invention also proposes an extended GIM standard system for quantity surveying, the system comprising: The collection formation module reads the component names, geometric data, and attribute data from the current GIM standard to form a collection of GIM model data elements; it also reads the calculation objects, calculation parameters, and calculation elements involved in the quantity calculation to form a complete set of data elements for the quantity calculation. Gap identification module: Based on preset naming rules, it unifies the data names in the GIM model data element set and the engineering quantity calculation full element data set, and matches them according to the data type correspondence between the component name and the calculation object, the geometric data and the calculation parameters, and the attribute data and the calculation elements to obtain engineering quantity calculation gap data composed of unmatched calculation objects, calculation parameters and calculation elements; Data expansion module: Based on the unmatched calculation objects, unmatched calculation parameters, and unmatched calculation elements in the engineering quantity calculation gap data, it generates component classification expansion data, geometric data expansion data, and attribute data expansion data respectively, and adds them to the GIM model data element set to obtain the expanded GIM model data element set; Standard Formation Module: Based on the data type correspondence, establish the mapping relationship between the extended GIM model data element set and the engineering quantity calculation full element data set, and organize the extended GIM model data element set and the mapping relationship according to the framework of the current GIM standard to form the GIM+ quantity calculation standard.

[0016] The beneficial effects of this invention are: 1. This invention unifies the data names in the GIM model data element set and the engineering quantity calculation full element data set according to preset naming rules, and matches them according to the data type correspondence, reducing the impact of data name differences on matching, and obtaining engineering quantity calculation gap data.

[0017] 2. This invention uses gap data in quantity calculation as the basis for expansion. Based on the unmatched calculation objects, unmatched calculation parameters, and unmatched calculation elements, it generates component classification expansion data, geometric data expansion data, and attribute data expansion data, respectively. The geometric data expansion data and attribute data expansion data are associated with the corresponding component names, so that the expansion content is determined by the matching results and the correspondence between the expansion data and the components is maintained, thereby supplementing the quantity calculation data missing in the current GIM standard.

[0018] 3. This invention performs consistency verification on the mapping relationship between the extended GIM model data element set and the engineering quantity calculation full element data set, eliminates conflicting mapping data that does not meet the data association conditions, and organizes the extended GIM model data element set and the verified mapping relationship according to the framework structure of the current GIM standard to form the GIM+ quantity calculation standard, reducing data error mapping between different components and providing standard support for three-dimensional quantity calculation modeling of substation construction projects. Attached Figure Description

[0019] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used in conjunction with embodiments of the invention to explain the invention and do not constitute a limitation thereof. In the drawings: Figure 1 This is a flowchart illustrating a GIM standard extension method for quantity calculation according to the present invention. Figure 2 This is a schematic diagram of the structure of a GIM standard extension system for engineering quantity calculation according to the present invention. Detailed Implementation

[0020] The preferred embodiments of the present invention will be described below with reference to the accompanying drawings. It should be understood that the preferred embodiments described herein are for illustration and explanation only and are not intended to limit the present invention.

[0021] Example 1: As Figure 1 As shown, the present invention provides a GIM standard extension method for quantity surveying, comprising: S100: Read the component names, geometric data, and attribute data from the current GIM standard to form a set of GIM model data elements; read the calculation objects, calculation parameters, and calculation elements involved in the quantity calculation to form a set of full-element data for the quantity calculation. Specifically, the current GIM standard specifies the component classification of substation construction projects and the component names included in the component classification. It records the geometric and attribute data corresponding to the component names through geometric and attribute information granularity. Geometric data includes data reflecting the shape or size of the component, while attribute data includes data reflecting the material or construction method of the component. The quantity calculation process records the calculation objects corresponding to the components, as well as the calculation parameters and elements corresponding to those calculation objects.

[0022] Furthermore, the step of forming the GIM model data element set includes: reading the component names included in the component classification of the current GIM standard, as well as the geometric data and attribute data recorded in the geometric information detail and attribute information detail of the component names; classifying the read component names, geometric data and attribute data according to the data types of component names, geometric data and attribute data, and associating the geometric data and attribute data corresponding to the same component name with the component name respectively, to obtain the GIM model data element set.

[0023] In one implementation, the current GIM standard is "Specification for 3D Design Modeling of Power Transmission and Transformation Engineering Part 1: Substations (Converter Stations)", standard number Q / GDW 11810.1-2023. Chapter 6 of the current GIM standard specifies the component classification and modeling requirements for buildings and other facilities, and Appendix D specifies the level of detail in building geometric information and attribute information.

[0024] It should be noted that the above-mentioned standard names, standard numbers, and sections are used to describe the source of the component names, geometric data, and attribute data in this embodiment. The current GIM standard is not limited to the specific version mentioned above. When the current GIM standard is updated but still includes component classification, geometric information granularity, and attribute information granularity, the component names, geometric data, and attribute data are read according to the corresponding content of the updated standard.

[0025] Furthermore, the step of forming a complete set of data for quantity calculation includes: reading the calculation objects corresponding to the components in the quantity calculation business, as well as the calculation parameters and calculation elements corresponding to the calculation objects; classifying the read calculation objects, calculation parameters and calculation elements according to the data types of the calculation objects, calculation parameters and calculation elements, and associating the calculation parameters and calculation elements corresponding to the same calculation object with the calculation object respectively, to obtain the complete set of data for quantity calculation.

[0026] When forming the GIM model data element set and the engineering quantity calculation full element data set, the original data names of the read data are retained so that the data names can be unified according to the preset naming rules and matched according to the data type correspondence.

[0027] S200: According to the preset naming rules, unify the data names in the GIM model data element set and the engineering quantity calculation full element data set, and match them according to the data type correspondence between the component name and the calculation object, the geometric data and the calculation parameters, and the attribute data and the calculation element to obtain the engineering quantity calculation gap data composed of unmatched calculation objects, calculation parameters and calculation elements; Specifically, the GIM model data element set and the engineering quantity calculation full element data set retain the original data names from the current GIM standard and engineering quantity calculation business, respectively. For data names that are different but corresponding according to preset naming rules, the corresponding data names are unified into the same name; after the data name unification is completed, matching is performed according to the data type correspondence between component names and calculation objects, geometric data and calculation parameters, and attribute data and calculation elements. During the matching process, calculation objects, calculation parameters, and calculation elements for which corresponding data are not found in the GIM model data element set constitute engineering quantity calculation gap data.

[0028] Furthermore, the step of unifying data names according to preset naming rules includes: the preset naming rules include a unified name and one or more original names corresponding to the unified name; retrieving data names from the GIM model data element set and the engineering quantity calculation full element data set respectively, replacing data names consistent with the original names with the corresponding unified names, and retaining the data type to which the data name belongs and the association relationship between the data name and the component name or calculation object.

[0029] In one implementation, for wall components, the data name in the GIM model data element set is "thickness," and the corresponding calculation parameter name in the engineering quantity calculation full element data set is "wall thickness." The preset naming rule records "thickness" and "wall thickness" as their original names corresponding to "wall thickness," and records "wall thickness" as a unified name; after retrieving the data name "thickness" or "wall thickness," the retrieved data name is replaced with "wall thickness," so that the geometric data and the calculation parameter have the same data name.

[0030] In one embodiment, the door opening size calculation parameters include door opening width calculation parameters and door opening height calculation parameters. The data name for the door opening width calculation parameter is "door opening width," and the data name for the door opening height calculation parameter is "door opening height." The preset naming rule unifies the data name of the door component width data from "width" to "door opening width," and unifies the data name of the door component height data from "height" to "door opening height," ensuring that the width and height data have the same data names as the door opening width and door opening height calculation parameters, respectively.

[0031] Furthermore, the step of matching according to the data type correspondence includes: in the GIM model data element set after the data names have been unified, retrieving component names with the same name as the calculation object, geometric data with the same name as the calculation parameters, and attribute data with the same name as the calculation elements; forming data pairs with the same name for the retrieved component names and calculation objects, geometric data and calculation parameters, and attribute data and calculation elements, and determining the data pairs with the same name as matched data.

[0032] Calculation objects for which no matching component name was found are identified as unmatched calculation objects; calculation parameters for which no matching geometric data was found are identified as unmatched calculation parameters; and calculation elements for which no matching attribute data was found are identified as unmatched calculation elements. The unmatched calculation objects, unmatched calculation parameters, and unmatched calculation elements constitute the quantity calculation gap data.

[0033] In one implementation, the full-element data set for quantity calculation records the calculation elements required for the external wall decoration work quantity calculation object, including whether plastering is required, the plaster surface, and the surface material. When there is no attribute data with the same name as "whether plastering is required," "plaster surface," and "surface material" in the GIM model data element set, "whether plastering is required," "plaster surface," and "surface material" are identified as unmatched calculation elements and included in the quantity calculation gap data, so that step S300 can generate corresponding attribute data extension data.

[0034] S300: Based on the unmatched calculation objects, unmatched calculation parameters, and unmatched calculation elements in the quantity calculation gap data, generate component classification extended data, geometric data extended data, and attribute data extended data respectively, and add them to the GIM model data element set to obtain the extended GIM model data element set; Specifically, the data types and names of unmatched calculation objects in the quantity calculation gap data are read, as well as the data types and names of unmatched calculation parameters and unmatched calculation elements, and their associations with the calculation objects. Component classification extended data is generated for the unmatched calculation objects, geometric data extended data is generated for the unmatched calculation parameters, and attribute data extended data is generated for the unmatched calculation elements. The generated component classification extended data, geometric data extended data, and attribute data extended data are added to the corresponding data types in the GIM model data element set, while retaining the association between the extended data and the component names, thus obtaining an extended GIM model data element set.

[0035] Further, the component classification extended data includes the component name and component type corresponding to the unmatched calculation object; based on the association between the calculation object and the component recorded in the quantity calculation business, the component name and component type corresponding to the unmatched calculation object are determined, and the component name and component type are used as the component classification extended data. The geometric data extended data includes the component size data corresponding to the unmatched calculation parameters; the component name is determined according to the calculation object corresponding to the unmatched calculation parameters, and component size data associated with the component name is generated. The attribute data extended data includes at least one of component material data and construction method data corresponding to the unmatched calculation element; when the unmatched calculation element involves component material, the corresponding component material data is generated; when the unmatched calculation element involves construction method, the corresponding construction method data is generated.

[0036] In one implementation, the unmatched calculation elements determined in step S200 include whether plastering is required, the plastering surface, and the surface material for the external wall decoration work quantity calculation object. Based on the unmatched calculation elements, a plastering-option attribute, a plastering surface attribute, and a surface material attribute are generated, and these attributes are associated with the component names of the wall components. Specifically, the plastering-option attribute and the plastering surface attribute belong to construction method data, while the surface material attribute belongs to component material data. The plastering-option attribute value includes "yes" and "no," the plastering surface attribute value includes "single-sided" and "double-sided," and the surface material attribute value includes "stone paint" and "facing brick."

[0037] The attributes of whether or not plastered, the plastered surface, and the surface material are added as extended attribute data to the attribute data corresponding to the wall components in the GIM model data element set to obtain the extended GIM model data element set.

[0038] It should be noted that the thickness data of the wall components has been matched with the wall thickness calculation parameters in step S200 and does not belong to the gap data of the engineering quantity calculation. Therefore, in this embodiment, geometric data extension data is not generated based on the wall thickness calculation parameters.

[0039] S400: According to the data type correspondence, establish the mapping relationship between the extended GIM model data element set and the engineering quantity calculation full element data set, and organize the extended GIM model data element set and the mapping relationship according to the framework of the current GIM standard to form the GIM+ quantity calculation standard.

[0040] Specifically, according to the data type correspondence between component names and calculation objects, geometric data and calculation parameters, and attribute data and calculation elements, the extended GIM model data element set and the engineering quantity calculation full element data set are processed accordingly. Corresponding component names and calculation objects, geometric data and calculation parameters, and attribute data and calculation elements are respectively formed into mapping data pairs to establish the mapping relationship between the extended GIM model data element set and the engineering quantity calculation full element data set.

[0041] Furthermore, the mapping relationship includes a first type of mapping data pair consisting of component name and calculation object, a second type of mapping data pair consisting of geometric data and calculation parameters, and a third type of mapping data pair consisting of attribute data and calculation elements.

[0042] Further, the mapping relationship includes at least one of the following: a mapping between the thickness data of wall components and the wall thickness calculation parameters; a mapping between the width data of door components and the door opening width calculation parameters in the door opening size calculation parameters; and a mapping between the height data of door components and the door opening height calculation parameters in the door opening size calculation parameters. For wall components, the thickness data whose data name is unified from thickness to wall thickness in step S200 is mapped to the wall thickness calculation parameters in the full-element data set for engineering quantity calculation; for door components, the width data of door components is mapped to the door opening width calculation parameters, and the height data of door components is mapped to the door opening height calculation parameters. The door opening width calculation parameters and the door opening height calculation parameters constitute the door opening size calculation parameters.

[0043] Furthermore, the component corresponding to the extended attribute data is a wall component, and the engineering quantity calculation gap data includes the calculation elements required for the external wall decoration engineering quantity calculation object. The extended attribute data includes whether plastering is performed, plaster surface attributes, and surface material attributes. The whether plastering is performed, plaster surface attributes, and surface material attributes added in step S300 to the extended GIM model data element set are mapped to the whether plastering is performed, plaster surface calculation elements, and surface material calculation elements in the full engineering quantity calculation data set, respectively, forming corresponding third-type mapping data pairs for subsequent consistency verification.

[0044] The mapping relationship is validated for consistency. The validation checks whether the component name associated with the geometric data in the second type of mapping data pair and the calculation object associated with the calculation parameter form the first type of mapping data pair. The validation checks whether the component name associated with the attribute data in the third type of mapping data pair and the calculation object associated with the calculation element form the first type of mapping data pair.

[0045] The second and third type of mapping data pairs that failed the consistency check were identified as conflicting mapping data and excluded from the mapping relationship to obtain the checked mapping relationship.

[0046] In one implementation, based on the association between calculation objects and components recorded in the engineering quantity calculation process, the component name corresponding to the wall component and the calculation object of the exterior wall decoration engineering quantity are formed into a first type of mapping data pair, and the surface material attribute and the surface material calculation element are formed into a third type of mapping data pair. Since the component name associated with the surface material attribute and the calculation object associated with the surface material calculation element form the first type of mapping data pair, the third type of mapping data pair passes the consistency check and is retained in the checked mapping relationship; third type of mapping data pairs that do not meet the above association conditions are identified as conflicting mapping data and are excluded.

[0047] Furthermore, the steps of organizing the data according to the framework of the current GIM standard include: organizing the extended GIM model data element set and the verified mapping relationship according to the scope of application, normative references, general provisions, and building modeling content and detailed requirements. Specifically, the scope of application is used to determine the scope of substation construction projects to which the GIM+ quantity surveying standard applies; normative references are used to record the current GIM standard upon which the GIM+ quantity surveying standard is based; general provisions are used to record component classification, modeling methods, and data requirements; and building modeling content and detailed requirements are used to record model type, modeling method, cost-related attributes, and the verified mapping relationship.

[0048] In one implementation, following the framework of the "Specification for 3D Design Modeling of Power Transmission and Transformation Engineering Part 1: Substations (Converter Stations)," the extended GIM model data element set and the verified mapping relationships are organized to form the "Specification for GIM+Quantity Calculation 3D Modeling of Substation Building Engineering." The GIM+Quantity Calculation 3D Modeling Specification includes the scope of application, normative references, general provisions, and building modeling content and detailed requirements. The building modeling content and detailed requirements record the model type, modeling method, cost-related attributes, and the verified mapping relationships of the substation building engineering.

[0049] Therefore, the GIM+ quantity calculation standard includes the component name, geometric data, and attribute data in the current GIM standard, as well as the component classification extension data, geometric data extension data, and attribute data extension data supplemented for quantity calculation, and the verified mapping relationship.

[0050] Through the above steps, this embodiment extends the existing GIM standard based on the gap data of engineering quantity calculation, establishes a mapping relationship between the extended GIM model data element set and the full element data set of engineering quantity calculation, performs consistency verification on the mapping relationship and eliminates conflicting mapping data, and organizes the extended GIM model data element set and the verified mapping relationship according to the framework structure of the existing GIM standard to form the GIM+ quantity calculation standard.

[0051] Example 2: Figure 2 As shown, this embodiment provides a GIM standard extension system for quantity surveying, the system comprising: The collection formation module reads the component names, geometric data, and attribute data from the current GIM standard to form a collection of GIM model data elements; it also reads the calculation objects, calculation parameters, and calculation elements involved in the quantity calculation to form a complete set of data elements for the quantity calculation. Gap identification module: Based on preset naming rules, it unifies the data names in the GIM model data element set and the engineering quantity calculation full element data set, and matches them according to the data type correspondence between the component name and the calculation object, the geometric data and the calculation parameters, and the attribute data and the calculation elements to obtain engineering quantity calculation gap data composed of unmatched calculation objects, calculation parameters and calculation elements; Data expansion module: Based on the unmatched calculation objects, unmatched calculation parameters, and unmatched calculation elements in the engineering quantity calculation gap data, it generates component classification expansion data, geometric data expansion data, and attribute data expansion data respectively, and adds them to the GIM model data element set to obtain the expanded GIM model data element set; Standard Formation Module: Based on the data type correspondence, establish the mapping relationship between the extended GIM model data element set and the engineering quantity calculation full element data set, and organize the extended GIM model data element set and the mapping relationship according to the framework of the current GIM standard to form the GIM+ quantity calculation standard.

[0052] It should be noted that the GIM standard extension system for quantity calculation provided in this embodiment of the invention is used to execute all the process steps of the GIM standard extension method for quantity calculation in Embodiment 1 above. The working principles and beneficial effects of the two are one-to-one, so they will not be described again.

[0053] Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A GIM standard extension method for quantity surveying, characterized in that, include: S100: Read the component names, geometric data and attribute data from the current GIM standard to form a set of GIM model data elements; Read the calculation objects, calculation parameters and calculation elements involved in the quantity calculation to form a complete set of data for the quantity calculation. S200: According to the preset naming rules, unify the data names in the GIM model data element set and the engineering quantity calculation full element data set, and match them according to the data type correspondence between the component name and the calculation object, the geometric data and the calculation parameters, and the attribute data and the calculation element to obtain the engineering quantity calculation gap data composed of unmatched calculation objects, calculation parameters and calculation elements; S300: Based on the unmatched calculation objects, unmatched calculation parameters, and unmatched calculation elements in the quantity calculation gap data, generate component classification extended data, geometric data extended data, and attribute data extended data respectively, and add them to the GIM model data element set to obtain the extended GIM model data element set; S400: According to the data type correspondence, establish the mapping relationship between the extended GIM model data element set and the engineering quantity calculation full element data set, and organize the extended GIM model data element set and the mapping relationship according to the framework of the current GIM standard to form the GIM+ quantity calculation standard.

2. The GIM standard extension method for quantity surveying according to claim 1, characterized in that, In step S100, the step of forming the GIM model data feature set includes: Read the component names included in the component classification of the current GIM standard, as well as the geometric and attribute data recorded in the geometric information granularity and attribute information granularity of the component names; The data elements of the GIM model are categorized according to the data types of component names, geometric data, and attribute data, and then associated with the corresponding component names to obtain the GIM model data element set.

3. The GIM standard extension method for quantity surveying according to claim 1, characterized in that, In step S100, the step of forming a complete set of data for calculating engineering quantities includes: Read the calculation object corresponding to the component in the engineering quantity calculation business, as well as the calculation parameters and calculation elements corresponding to the calculation object; The calculations are categorized according to the data types of the calculation objects, calculation parameters, and calculation elements, and the calculation parameters and calculation elements are associated with their corresponding calculation objects to obtain the complete set of data for the engineering quantity calculation.

4. The GIM standard extension method for quantity surveying according to claim 1, characterized in that, In step S200, the preset naming rule includes a unified name and one or more original names corresponding to the unified name; Retrieve data names that match the original name from the GIM model data element set and the engineering quantity calculation full element data set, and replace the retrieved data names with the corresponding unified names.

5. A GIM standard extension method for quantity surveying according to claim 1, characterized in that, In step S200, the matching step according to the data type correspondence includes: In the GIM model data element set after the data names have been unified, the component names that have the same name as the calculation object, the geometric data that have the same name as the calculation parameters, and the attribute data that have the same name as the calculation elements are retrieved respectively. The retrieved data pairs with the same name are identified as matched data, and the calculation objects, calculation parameters, and calculation elements for which no data pairs with the same name are retrieved are identified as the gap data for the engineering quantity calculation.

6. The GIM standard extension method for quantity surveying according to claim 1, characterized in that, The component classification extended data includes the component name and component type corresponding to the unmatched computational object; The extended geometric data includes component size data corresponding to the mismatched calculation parameters; The attribute data extension data includes at least one of component material data and construction method data corresponding to the unmatched calculation element; When the extended geometric data and the extended attribute data are added to the GIM model data feature set, they are associated with the corresponding component names.

7. A GIM standard extension method for quantity surveying according to claim 1, characterized in that, In step S400, the mapping relationship includes a first type of mapping data pair consisting of component name and calculation object, a second type of mapping data pair consisting of geometric data and calculation parameters, and a third type of mapping data pair consisting of attribute data and calculation elements; The mapping relationship is validated for consistency. The component name associated with the geometric data in the second type of mapping data pair and the calculation object associated with the calculation parameter are verified to form the first type of mapping data pair. The component name associated with the attribute data in the third type of mapping data pair and the calculation object associated with the calculation element are verified to form the first type of mapping data pair. The second and third type of mapping data pairs that failed the consistency check were identified as conflicting mapping data and excluded from the mapping relationship to obtain the checked mapping relationship; In accordance with the scope of application, normative references, general provisions, and architectural modeling content and detailed requirements, the extended GIM model data element set and the verified mapping relationship are organized. The architectural modeling content and detailed requirements include model type, modeling method, cost-related attributes, and the verified mapping relationship.

8. A GIM standard extension method for quantity surveying according to claim 1, characterized in that, The mapping relationship includes at least one of the following: Mapping between wall component thickness data and wall thickness calculation parameters; Mapping between the width data of door components and the door opening width calculation parameters in the door opening size calculation parameters; Mapping between the height data of door components and the door opening height calculation parameters in the door opening size calculation parameters.

9. A GIM standard extension method for quantity surveying according to claim 6, characterized in that, The component corresponding to the extended attribute data is a wall component. The engineering quantity calculation gap data includes the calculation elements required for the calculation of the external wall decoration engineering quantity. The extended attribute data includes whether plastering is used, plastering surface attributes, and surface material attributes.

10. A GIM standard extension system for quantity surveying, characterized in that, The system is used to execute the GIM standard extension method for quantity surveying as described in any one of claims 1-9, the system comprising: The collection formation module reads the component names, geometric data, and attribute data from the current GIM standard to form a collection of GIM model data elements; it also reads the calculation objects, calculation parameters, and calculation elements involved in the quantity calculation to form a complete set of data elements for the quantity calculation. Gap identification module: Based on preset naming rules, it unifies the data names in the GIM model data element set and the engineering quantity calculation full element data set, and matches them according to the data type correspondence between the component name and the calculation object, the geometric data and the calculation parameters, and the attribute data and the calculation elements to obtain engineering quantity calculation gap data composed of unmatched calculation objects, calculation parameters and calculation elements; Data expansion module: Based on the unmatched calculation objects, unmatched calculation parameters, and unmatched calculation elements in the engineering quantity calculation gap data, it generates component classification expansion data, geometric data expansion data, and attribute data expansion data respectively, and adds them to the GIM model data element set to obtain the expanded GIM model data element set; Standard Formation Module: Based on the data type correspondence, establish the mapping relationship between the extended GIM model data element set and the engineering quantity calculation full element data set, and organize the extended GIM model data element set and the mapping relationship according to the framework of the current GIM standard to form the GIM+ quantity calculation standard.