A quantitative assessment method for river and lake ecological connectivity coupled with the downcut hysteresis response

By monitoring networks and ecological water level classification, combined with riverbed incision response analysis, the ecological connectivity of rivers and lakes is quantified. This solves the problems of single evaluation indicators and lag effects in existing technologies, and provides a fully automated method for assessing the ecological connectivity of rivers and lakes, enabling differentiated management strategies and long-term operational assessments based on regional differences.

CN123117546APending Publication Date: 2026-11-17WUHAN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611353796.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-02
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies for assessing river and lake ecological connectivity suffer from limitations such as single evaluation indicators, highly subjective ecological water level thresholds, neglect of the lagged ecological effects of long-term riverbed geomorphological evolution, and lack of support for differentiated regional management. They are unable to fully quantify the multidimensional attributes and lagged responses of river and lake connectivity, resulting in one-sided evaluation results and an inability to provide targeted restoration solutions.

Method used

A quantitative assessment method for river and lake ecological connectivity was adopted, which coupled the downcut lag response of the riverbed. Data was collected through a monitoring network, ecological water level intervals were divided based on the Pearson Type III frequency distribution, a trapezoidal water level suitability function was constructed, a comprehensive ecological connectivity index was calculated, and the response strength and lag years of the diversion channels were identified through linear regression and cross-correlation analysis, and differentiated management and control strategies were output.

Benefits of technology

It has achieved a unified and objective ecological water level benchmark across the entire region, quantified the intensity and lag time of riverbed incision response, provided differentiated management and control schemes for different zones, improved the comprehensiveness and credibility of the evaluation, and adapted to the long-term business assessment needs of large rivers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123117546A_ABST
    Figure CN123117546A_ABST
Patent Text Reader

Abstract

This invention discloses a quantitative assessment method for river and lake ecological connectivity coupled with the lag response of riverbed incision, relating to the technical field of watershed hydrogeomorphology and aquatic ecological connectivity assessment. The method includes: deploying a monitoring network, collecting a basic data set, and outputting an annual-scale standardized water level dataset; dividing ecological water level intervals, constructing a trapezoidal water level suitability function, and obtaining an annual water level suitability time-series matrix; calculating a comprehensive ecological connectivity index; calculating the annual cumulative riverbed incision of the main stream and classifying distributary channel types; outputting assessment results, matching differentiated management strategies for each channel, iterating on the assessment results, and updating the assessment results. This invention, employing the aforementioned quantitative assessment method for river and lake ecological connectivity coupled with the lag response of riverbed incision, achieves quantitative diagnosis of spatiotemporal differentiation of river and lake connectivity across the entire region, and is suitable for routine assessment operations of various reservoir-regulated, uninterrupted large river-multi-distributary lake complex water systems.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of watershed hydrogeomorphology and water ecological connectivity assessment technology, and in particular to a quantitative assessment method for river and lake ecological connectivity coupled with riverbed downcutting hysteresis response. Background Technology

[0002] Large reservoirs impounding sediment and storing water will continuously cause downcutting of the downstream main riverbed, altering the hydraulic gradient of the main stream and its branches, reshaping the rhythm of water exchange between rivers and lakes, and thus generating delayed and differentiated aquatic ecological connectivity responses. This is the core challenge of current watershed ecological management and river-lake connectivity restoration. Existing assessment technologies have four major shortcomings: I. The evaluation indicators are too simplistic and cannot comprehensively represent the multidimensional attributes of connectivity. Existing river and lake connectivity assessments mostly use only single indicators such as annual average flow rate and water level difference, which cannot simultaneously take into account the three core ecological dimensions of suitable habitat duration, connectivity continuity and integrity, and hydrological stability. The evaluation results are one-sided and cannot truly reflect the comprehensive hydraulic conditions required for flood inundation and aquatic organism migration.

[0003] Second, ecological water level thresholds are highly subjective and inconsistent across time and space. Traditional methods rely on experience to fix water level thresholds to divide ecological zones, without objectively classifying them based on the probability distribution of water levels over many years; different judgment criteria are used for the main stream and multiple tributaries, resulting in poor cross-sectional and cross-seasonal horizontal comparisons and making it impossible to form a unified evaluation standard for the entire region.

[0004] Third, the lagged ecological effects of long-term riverbed geomorphological evolution are ignored. Existing assessments only analyze the immediate correlation between hydrological and ecological indicators, without quantifying the threshold-type and time-delay-type ecological connectivity responses brought about by the continuous downcutting of the riverbed caused by the reservoir; they cannot distinguish the differences in response duration among different distributary channels, making it difficult to explain the evolutionary patterns of river-lake connectivity differentiation under the same downcutting background.

[0005] Fourth, there is a lack of support for differentiated management by region. Existing analyses only output conclusions on the overall connectivity quality, and cannot quantitatively identify the three types of diversion channels: upstream buffer type, midstream weak response type, and downstream synchronous response type. Therefore, they cannot provide targeted differentiated management and control schemes for river and lake connectivity restoration and reservoir ecological scheduling for each channel.

[0006] Existing research has proposed a hierarchical approach based on water level frequency and correlation analysis of riverbed incision lag, but it only remains at the level of offline mathematical experiments. It has not formed a complete, automated, and standardized evaluation method that covers the entire process of "data preprocessing - threshold construction - index calculation - geomorphological lag diagnosis - control output", and lacks a complete operational system for water conservancy business. Summary of the Invention

[0007] The purpose of this invention is to provide a quantitative assessment method for river and lake ecological connectivity that couples the riverbed downcutting hysteresis response, thereby solving the evaluation bias problem caused by artificial empirical thresholds.

[0008] To achieve the above objectives, this invention provides a method for quantitatively assessing river and lake ecological connectivity by coupling the riverbed downcutting hysteresis response, comprising the following steps: S1. A monitoring network is deployed along the entire river and lake area. Basic datasets are collected through the monitoring network, merged and preprocessed to output an annual-scale standardized water level dataset, which is then divided into two sets of sub-datasets: flood season and non-flood season. S2. Based on the Pearson Type III frequency distribution, ecological water level intervals are divided, a trapezoidal water level suitability function is constructed and continuous suitability scores are output, thereby obtaining the annual water level suitability time series matrix. S3. Quantitatively calculate the annual ecological suitability score, annual connectivity sustainability score, and annual hydrological stability score each year, and then calculate the comprehensive ecological connectivity index. ; S4. Calculate the annual cumulative riverbed incision of the main stream, determine the strength of the connectivity response of each branch channel through linear regression, extract the ecological response lag years, and classify the branch channel types. S5. Output the evaluation results, match the channel-specific differentiated management and control strategies, iterate the evaluation results, and then update the evaluation results.

[0009] Preferably, S1 includes: S101. Establish a monitoring network: Deploy upstream benchmark hydrological stations, midstream benchmark hydrological stations, and downstream benchmark hydrological stations along the controlled and uninterrupted main stream; deploy at least one set of water level monitoring stations on each natural distributary of the main stream leading to the lake, forming a full-area water level monitoring network of the main stream and multiple distributaries. S102. Collection of Basic Data Sets: Collect multi-year daily average water level sequences from upstream, midstream, and downstream benchmark hydrological stations within a complete water storage and scheduling cycle. Simultaneously collect annual riverbed benchmark elevation data to obtain annual cumulative riverbed incision. Build a basic data set; S103. Preprocess the basic dataset, including the following operations: Short-term missing water levels are filled using linear interpolation; Abnormally high / low water levels were filtered out using a combination of multi-year quantile thresholds and a sliding window. During periods of low flow interruption, missing water levels are not interpolated but marked as river / lake disconnection indicators, which are used to calculate the duration of connectivity. The daily water level time sequence is broken down according to the calendar year, and the annual-scale standardized water level dataset is uniformly organized. S104, Temporal Hierarchy: The annual-scale standardized water level dataset is uniformly divided into two sub-datasets: flood season and non-flood season, for seasonal connectivity difference analysis.

[0010] Preferably, S2 includes: S201. Collect multi-year annual water level samples from the annual and daily water level sequences of each station, fit the PⅢ probability distribution curve, and extract four characteristic exceedance probability water levels, including Z10, Z25, Z75, and Z90. Among them, Z10, Z25, Z75 and Z90 represent water level values ​​with an overshoot probability of 10%, 25%, 75% and 90% respectively, after the water level is sorted from high to low within the year; S202, Delineate ecological water level zones; S203. Constructing a trapezoidal water level suitability function Output a continuous appropriate score of 0 to 1 each day; S204. Calculate the suitability function row by row based on the daily water level for each year. This forms a time series matrix of water level suitability for each year.

[0011] Preferably, S202 includes: When Z75≤Z≤Z25, it is the optimal ecological zone, indicating the highest habitat suitability; When Z90≤Z<Z75 or Z25<Z≤Z10, it is a suitable transitional range, indicating that the ecological conditions are acceptable. When Z < Z90 or Z > Z10, it is an unsuitable range, indicating that the water level is too high / too low, inhibiting the exchange of materials and biological migration in rivers and lakes; Where Z represents the ecological water level.

[0012] Preferably, the trapezoidal water level suitability function in S203 As shown in the following formula: .

[0013] Preferably, the three-dimensional integrated ecological connectivity index in S3 Including: Ecological suitability score Connectivity persistence score Hydrological stability score The three-tiered sub-items are integrated into a comprehensive ecological connectivity index through fixed-weighted aggregation. Among them, fixed weight =0.5、 =0.3、 =0.2.

[0014] Preferably, S3 includes: S301. Calculate the annual ecological suitability score. : ; In the formula, This represents the total number of observation days for that year. For the first Daily water level suitability represents the percentage of time throughout the year that the water level is at a suitable level. S302, Calculate the annual connectivity persistence score. : In the formula, Indicates the longest consecutive period of water outage in a year; S303, Calculate the annual hydrological stability score : ; In the formula, This represents the daily water level variation coefficient for that year. The maximum coefficient of variation for all stations throughout the entire time period; S304, Calculate the comprehensive ecological connectivity index : ; in, The value range is 0~100, with higher values ​​indicating better comprehensive ecological connectivity of rivers and lakes; data is output annually for each water level monitoring station. Time series; S305. Diversion Channel Integration: When a single diversion channel contains multiple water level monitoring stations, the annual water level monitoring data of each station shall be used. The arithmetic mean represents its overall connectivity level.

[0015] Preferably, S4 includes: S401. Calculate the cumulative annual riverbed incision. : Based on the riverbed baseline elevation in the initial year of reservoir impoundment As the baseline, the first The annual benchmark elevation is The cumulative riverbed incision volume year by year The following formula is used to calculate: ; in, >0 indicates continuous riverbed incision; the incision time sequence of adjacent stations on the main stream corresponding to each branch channel is used as the driving factor; S402. Identifying connectivity response threshold features through linear regression: Construct a single-channel annual With cumulative cutting amount Regression model: ; In the formula, and These are all regression coefficients; the coefficient of determination is determined by the sign of the regression coefficient. Through the coefficient of determination Distinguish between different types of response channels: when When the value is ≥0.6, it is a strong response type, indicating that the downcut significantly alters the connectivity of rivers and lakes; When 0.1≤ When <0.6, it is a weak response type; when A value < 0.1 indicates no significant response; S403. Cross-correlation analysis identifies the ecological lag response period: Construct the cross-correlation function as shown in the following equation: ; In the formula, For lagged years, the lagged year corresponding to the maximum correlation coefficient is selected. As a characteristic response duration of the diversion channel: when =0 indicates a synchronous response; when When <0, it indicates a multi-year lag effect, and the absolute value is the number of lag years; S404. The types of diversion channels are classified by the coefficient of determination, including: upstream buffer lag type, midstream weak response type and downstream synchronous strong response type.

[0016] Preferably, S5 includes: S501, Output results, including: multi-year branch sites Interannual evolution curves and annual thermal distribution maps; three major diversion channels Long-term evolution comparison diagram; riverbed incision - Regression scatter plot, lagged cross-correlation curve; spatial map of river and lake connectivity levels across the entire region; S502, Matching channel-specific differentiated management and control strategies; S503. Import the output results and monitoring data into the iteratively updated evaluation results.

[0017] Preferably, S502 includes: Upstream buffer-lagging diversion channel: focuses on long-term river morphology stability management, optimizes continuous water replenishment during the dry season of reservoirs, and pre-regulates and controls many years in advance to offset the lagging degradation effect. Midstream weak-response diversion channel: Focus on optimizing the cross-section of local diversion channels to reduce the obstruction of lake backwater; Downstream synchronous strong response diversion channel: Real-time linkage with main stream downcut monitoring, dynamic adjustment of flood diversion scheduling during the flood season, and maintenance of hydraulic gradient stability.

[0018] Therefore, the present invention employs the above-mentioned quantitative assessment method for river and lake ecological connectivity based on coupled riverbed downcutting hysteresis response, which has the following beneficial effects: (1) A unified objective ecological water level scale is used throughout the region to eliminate human experience bias. This invention adopts the PⅢ probability distribution to objectively divide the ecological water level intervals. All main streams and diversion channels share the same set of classification rules and trapezoidal suitability functions. There are no subjective thresholds with differences in stations or seasons. The reliability of horizontal comparison is much higher than that of the traditional fixed water level method. The assessment results are standardized and reproducible.

[0019] (2) The three-dimensional comprehensive index fully characterizes the ecological attributes of river and lake connectivity. This invention breaks through the limitations of relying solely on single indicators such as flow and water level for evaluation. It simultaneously covers three core ecological dimensions: suitable habitat duration, uninterrupted connectivity throughout the year, and hydrological stability. The weighted integrated EHCI index can fully reflect the comprehensive hydraulic conditions required for flood inundation, fish migration, and wetland maintenance. The evaluation dimensions are more in line with the actual needs of river and lake ecology.

[0020] (3) Simultaneously quantify the intensity and lag years of riverbed incision response to reveal the geomorphic differentiation mechanism. This invention couples the annual riverbed incision time series with the long-term ecological connectivity index, and accurately identifies the lag response years by regressing to quantify the strength and cross-correlation of the response. This can explain the differences in connectivity evolution of multiple distributary channels under the same incision background, solve the shortcomings of existing technologies that cannot distinguish the lag ecological response, and provide quantitative mechanism support for the differentiation and evolution of rivers and lakes.

[0021] (4) The channel classification outputs differentiated management and control schemes, which are highly implementable. This invention classifies three types of diversion channels based on lag time and response strength, and matches targeted differentiated measures for seasonal reservoir scheduling, diversion channel morphology improvement, and lake backwater regulation. The assessment conclusions can be directly converted into watershed water ecological restoration implementation plans without the need for secondary data analysis by professionals.

[0022] (5) Full-process automated batch calculation, suitable for long-term business assessment of large rivers. The steps of this invention are standardized and can be programmed and packaged. Only two types of basic monitoring data, namely daily water level and annual riverbed elevation, are input. The system automatically completes threshold, index, lag analysis and chart output, which greatly reduces the workload of manual analysis and is suitable for continuous and normalized tracking and assessment of large rivers and multi-branch lake systems over many years.

[0023] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description

[0024] Figure 1 This is a flowchart of the quantitative assessment method for river and lake ecological connectivity coupled with the riverbed downcutting hysteresis response of the present invention. Figure 2 This is a system framework diagram of the quantitative assessment method for river and lake ecological connectivity coupled with the riverbed downcutting hysteresis response of the present invention. Figure 3 The three-channel design in this embodiment of the invention Long-term evolution comparison diagram, where (a) is the channel of the Songzikou benchmark hydrological station. Long-term evolution comparison diagram, (b) shows the channel of the Taipingkou benchmark hydrological station. Long-term evolution comparison diagram, (c) shows the flow channel of the Ouchikou benchmark hydrological station. Long-term evolution comparison chart; Figure 4 Riverbed slicing in this embodiment of the invention - Regression scatter plot, where (a) represents the riverbed incision at the Songzikou benchmark hydrological station. Regression scatter plot, (b) shows the riverbed incision at the Taipingkou benchmark hydrological station. Regression scatter plot, (c) represents the riverbed incision at the Ouchikou benchmark hydrological station - Regression scatter plot; Figure 5 The following are hysteresis cross-correlation curves in the embodiments of the present invention, wherein (a) is the hysteresis cross-correlation curve of the upstream main stream reference hydrological station, (b) is the hysteresis cross-correlation curve of the Taipingkou reference hydrological station, and (c) is the hysteresis cross-correlation curve of the Ouchikou reference hydrological station. Detailed Implementation

[0025] The technical solution of the present invention will be further described below with reference to the accompanying drawings and embodiments.

[0026] Unless otherwise defined, the technical or scientific terms used in this invention shall have the ordinary meaning understood by one of ordinary skill in the art to which this invention pertains. The terms "first," "second," and similar terms used in this invention do not indicate any order, quantity, or importance, but are merely used to distinguish different components. Terms such as "comprising" or "including" mean that the element or object preceding the word encompasses the elements or objects listed following the word and their equivalents, without excluding other elements or objects. Terms such as "connected" or "linked" are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. Terms such as "upper," "lower," "left," and "right" are used only to indicate relative positional relationships; when the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0027] Example Please see Figures 1-5 This invention provides a quantitative assessment method for river and lake ecological connectivity based on coupled riverbed downcutting hysteresis response. It is applicable to large rivers that are subject to long-term sediment interception and regulation by large / cascade reservoirs and have no natural flow interruptions throughout the year, as well as coupled water systems where the main stream branches off into multiple natural diversion channels connecting large lakes. The method can be extended to plain network flood diversion river networks and multi-level lake chain connectivity systems. The method includes the following steps: S1. A monitoring network is deployed along the entire river and lake area. Basic datasets are collected through this network, preprocessed, and output as an annual-scale standardized water level dataset. This dataset is then divided into two sub-datasets: one for the flood season and one for the non-flood season. This includes: S101. Establishment of a monitoring network: Three hydrological stations will be established along the controlled, uninterrupted main stream: an upstream benchmark hydrological station, a midstream benchmark hydrological station, and a downstream benchmark hydrological station. At least one set of water level monitoring stations will be established on each natural distributary of the main stream leading to the lake. These multiple hydrological stations and monitoring stations will together form a comprehensive water level monitoring network covering the entire main stream and multiple distributaries. All observations will be conducted using the standard elevation datum (Wusong datum) to ensure horizontal comparability of water level values.

[0028] S102. Collection of Basic Data Set: Collect the multi-year daily average water level series of the upstream main stream benchmark hydrological station, the midstream main stream benchmark hydrological station, and the downstream main stream benchmark hydrological station within the complete water storage and scheduling cycle. Simultaneously collect the annual riverbed benchmark elevation data of the main stream to obtain the annual cumulative riverbed incision. A basic dataset was constructed, with observation timelines fully covering the entire process from initial reservoir impoundment to stable regulation.

[0029] S103. Preprocess the basic dataset, including the following operations: Short-term missing water levels are filled using linear interpolation. Abnormally high / low water levels are removed through a dual screening process using multi-year quantile thresholds and a sliding window. Missing water levels during periods of low flow interruption are not interpolated but marked as river / lake disconnection indicators for calculating connectivity duration. Daily water level time series are split by calendar year and standardized into a unified annual-scale water level dataset.

[0030] In step S1, no interpolation is performed for the period when rivers and lakes are completely dry during the dry season. Only the date of the dry season is marked. This allows for the accurate extraction of the longest continuous disconnection time of the year, avoiding overestimation of the continuity of river and lake connectivity.

[0031] S104, Temporal Stratification: The annual-scale standardized water level dataset is uniformly divided into two sub-datasets: the flood season and the non-flood season. The flood season is from May to September, and the non-flood season is from October to the following month. The two sub-datasets are used for seasonal connectivity difference analysis.

[0032] This step is implemented through a data preprocessing unit.

[0033] S2. Based on the Pearson Type III frequency distribution, ecological water level intervals are divided, a trapezoidal water level suitability function is constructed, and continuous suitability scores are output, thereby obtaining the annual water level suitability time series matrix. This includes: S201. Collect multi-year annual water level samples from the annual and daily water level sequences of each station, fit the PⅢ probability distribution curve, and extract four characteristic exceedance probability water levels, including Z10, Z25, Z75, and Z90. Among them, Z10, Z25, Z75 and Z90 represent water level values ​​with an overshoot probability of 10%, 25%, 75% and 90% respectively, after the water level is sorted from high to low within the year.

[0034] S202. Delineation of ecological water level intervals (a unified rule applicable to all hydrological stations and monitoring sites across the entire region), including: When Z75≤Z≤Z25, it is the optimal ecological range, indicating the highest habitat suitability.

[0035] When Z90≤Z<Z75 or Z25<Z≤Z10, it is a suitable transitional range, indicating that the ecological conditions are acceptable.

[0036] When Z < Z90 or Z > Z10, it is an unsuitable range, indicating that the water level is too high / too low, inhibiting the exchange of materials and biological migration in rivers and lakes; where Z is the ecological water level.

[0037] S203. Constructing a trapezoidal water level suitability function Output a continuous appropriate score of 0 to 1 each day, as shown in the following formula: .

[0038] S204. Calculate the suitability function row by row based on the daily water level for each year. This forms a time series matrix of water level suitability for each year.

[0039] This step is achieved through an ecological water level classification and suitability calculation unit.

[0040] S3. Quantitatively calculate the annual ecological suitability score, annual connectivity sustainability score, and annual hydrological stability score each year, and then calculate the comprehensive ecological connectivity index. Three-dimensional integrated ecological connectivity index Including: Ecological suitability score Connectivity persistence score Hydrological stability score The three-tiered sub-items are integrated into a comprehensive ecological connectivity index through fixed-weighted aggregation. Among them, fixed weight =0.5、 =0.3、 =0.2. This step includes: S301. Calculate the annual ecological suitability score. (0~100 points): ; In the formula, This represents the total number of observation days for that year. For the first Daily water level suitability represents the percentage of time throughout the year that the water level is at a suitable level.

[0041] S302, Calculate the annual connectivity persistence score. (0~100 points): In the formula, This indicates the longest consecutive period of no flow in a year.

[0042] S303, Calculate the annual hydrological stability score (0~100 points): Calculate the daily water level variation coefficient for the year Take the maximum coefficient of variation for all stations throughout the entire time period. Perform normalization, as shown in the following formula: ; In the formula, This represents the daily water level variation coefficient for that year. This represents the maximum coefficient of variation for all stations throughout the entire time period.

[0043] S304, Calculate the comprehensive ecological connectivity index : ; in, The value range is 0~100, with higher values ​​indicating better comprehensive ecological connectivity of rivers and lakes; data is output annually for each water level monitoring station. Time series.

[0044] S305. Diversion Channel Integration: When a single diversion channel contains multiple water level monitoring stations, the annual water level monitoring data of each station shall be used. The arithmetic mean represents its overall connectivity level.

[0045] The calculation formula and weighting coefficients in step S3 are based on a unified standard across the entire region. All main streams, diversion stations, and flood / non-flood seasons use the exact same calculation logic to ensure horizontal comparability of spatiotemporal evaluation results.

[0046] This step is achieved through the three-dimensional integrated ecological connectivity index calculation unit.

[0047] S4. Calculate the annual cumulative riverbed incision of the main stream, determine the strength of the connectivity response of each distributary through linear regression, extract the ecological response lag years, and classify the distributary types. This includes: S401. Calculate the cumulative annual riverbed incision. : Based on the riverbed baseline elevation in the initial year of reservoir impoundment As the baseline, the first The annual benchmark elevation is The cumulative riverbed incision volume year by year The following formula is used to calculate: ; in, >0 indicates continuous riverbed incision; the incision timing of adjacent stations on the main stream corresponding to each branch channel is used as the driving factor.

[0048] S402. Identifying connectivity response threshold features through linear regression: Construct a single-channel annual With cumulative cutting amount Regression model: ; In the formula, and These are all regression coefficients; the coefficient of determination is determined by the sign of the regression coefficient. Through the coefficient of determination Distinguish between different types of response channels: when When the value is ≥0.6, it is a strong response type, indicating that the downcut significantly alters the connectivity of rivers and lakes; When 0.1≤ When <0.6, it is a weak response type; when When <0.1, there is no significant response.

[0049] S403. Cross-correlation analysis identifies the ecological lag response period: Construct the cross-correlation function as shown in the following equation: ; In the formula, The lagged years are represented by values ​​ranging from -5 to 5, and the lagged year corresponding to the highest correlation coefficient is selected. As a characteristic response duration of the diversion channel: when =0 indicates a synchronous response; when When <0, it indicates a multi-year lag effect, and the absolute value is the number of lag years.

[0050] S404. Classifying the branch channel type by determination coefficient, including: Upstream buffer lag type: lag of 2-4 years.

[0051] Midstream weak response type: no obvious lag.

[0052] Downstream synchronous strong response type: lag is close to 0.

[0053] In step S4, univariate linear regression is used to identify the strength of the response to the connection of the incision pair, and cross-correlation analysis is used to extract the ecological lag response years. The two indicators are used together to complete the classification of diversion channel types. A single statistical method cannot simultaneously quantify the response amplitude and time lag characteristics.

[0054] This step is achieved through riverbed downcut regression and hysteresis cross-correlation analysis units.

[0055] S5. Output the evaluation results, match them with differentiated control strategies for different channels, iterate on the evaluation results, and then update the evaluation results. This includes: S501, Output results, including: multi-year branch sites Interannual evolution curves and annual thermal distribution maps; three major diversion channels Long-term evolution comparison diagram; riverbed incision - Regression scatter plot, lagged cross-correlation curve; spatial map of river and lake connectivity levels across the entire region.

[0056] S502. Match the differentiated management and control strategies for each channel and output a reservoir ecological scheduling and management report. The differentiated management and control strategies for each channel include: Upstream buffer-lagging diversion channel: focuses on long-term river morphology stability management, optimizes continuous water replenishment during the dry season of reservoirs, and pre-regulates and controls many years in advance to offset the lagging degradation effect. Midstream weak-response diversion channel: Focus on optimizing the cross-section of local diversion channels to reduce the obstruction of lake backwater; Downstream synchronous strong response diversion channel: Real-time linkage with main stream downcut monitoring, dynamic adjustment of flood diversion scheduling during the flood season, and maintenance of hydraulic gradient stability.

[0057] Through feedback branches, the differentiated management and control strategy of the channel provides reverse guidance for optimizing reservoir scheduling parameters in the following year.

[0058] S503. Import the output results and monitoring data to iteratively update the evaluation results: All assessment datasets, charts, and reservoir ecological scheduling and management reports are standardized and archived. New water level and riverbed monitoring data added the following year are directly imported to iteratively update the assessment results.

[0059] The output of this step is achieved through the result output unit.

[0060] The entire assessment process of this method is automated through a computer program, requiring only two sets of basic monitoring data: standardized daily water level and annual riverbed baseline elevation. The method automatically calculates the ecological threshold. Batch calculation, delayed response identification, visualization charts and control report output.

[0061] The following examples further illustrate this method.

[0062] Using a typical controlled, uninterrupted main stream-three-channel large lake coupled water system as an implementation demonstration, the complete set of evaluation methods of this invention were fully implemented. The practical details of each step are as follows: S1. Hands-on practice of full-domain monitoring network and data preprocessing.

[0063] The monitoring system was established according to the S1 method described in this paper: Three reference hydrological stations were set up along the upstream, midstream, and downstream sections of a main stream: Songzikou, Taipingkou, and Ouchikou. Multiple tributary water level monitoring stations were also established along the three natural distributaries: Shadaoguan, Xinjiangkou, Mituosi, Ouchiguan, and Ouchikang, totaling five water level observation sections. Daily water level observation data from 2003 to 2024 (22 consecutive years) were selected, along with annual riverbed reference elevation series for the upstream, midstream, and downstream reference hydrological stations. All water levels were uniformly converted to the Wusong elevation datum.

[0064] Data preprocessing practice: Linear interpolation is used for short-term missing water levels on a single day; the 5% / 95% quantiles of the annual extreme high and low water levels are removed; the dates of complete flow interruption during the winter dry season are marked but not filled in, and are used to extract the longest flow interruption days of the year; the data is split by natural year, and two subsets are distinguished: the flood season from May to September and the non-flood season from October to April of the following year.

[0065] Practical exercises on S2 and PⅢ ecological water level classification and suitability calculation.

[0066] Following the S2 method of this approach: Pearson type III probability distributions were fitted to all daily water levels for 22 years at each hydrological station and water level monitoring station, and four characteristic water levels of Z10, Z25, Z75, and Z90 were extracted; three sets of ecological zone division standards were unified across the entire region, and the daily values ​​were substituted into the trapezoidal suitability formula to output scores of 0 to 1, as shown in Table 1 below, forming a 22-year annual suitability time series matrix. The calculation logic of all stations was completely consistent to ensure horizontal comparison.

[0067] Table 1. Suitability scores for each hydrological station and water level monitoring station

[0068] S3, Practical Operation of Batch Calculation of Three-Dimensional EHCI Comprehensive Index.

[0069] The scores for the three categories are calculated annually according to the S3 standardized formula: ① Ecological suitability score : Average daily fitness level of the year × 100.

[0070] ② Connectivity persistence score The score is set to 0-100 based on the longest consecutive days of interruption in that year.

[0071] ③ Hydrological stability score The normalized stability score was calculated using the maximum water level variation coefficient of all stations over a 22-year period.

[0072] Based on fixed weights =0.5、 =0.3、 =0.2 Calculation Year When each diversion channel contains multiple water level monitoring stations, the data from each monitoring station within the year shall be used. The arithmetic mean represents its overall connectivity level, and the output is a three-channel system with a 22-year lifespan. Time series.

[0073] S4. Practical exercise on identifying the hysteresis response of riverbed downcutting.

[0074] Based on S4 of this method, a geomorphological-ecological coupling analysis is conducted: ① Calculate the cumulative downcut using the annual baseline elevation of the main stream riverbed Each branch channel is matched with the cutting-off time sequence of the adjacent main channel station as a driving factor.

[0075] ②Construction Simple linear regression, based on the coefficient of determination Distinguish between strong / weak / no-response channels.

[0076] ③ Set the cross-correlation lag window to -5 to 5 years, and take the value corresponding to the highest correlation coefficient. The value is used as the lag response period in years.

[0077] ④ The results of the three-channel classification in the demonstration area: the upstream channel lagged by 4 years, the midstream channel lagged by 2 years, and the downstream channel was synchronous with no lag, and were respectively classified into the three channel types.

[0078] S5. Practical application of visualized results and differentiated management and control solutions.

[0079] Batch output of complete analysis charts: Three-way flow channels for each site over 22 years Long-term evolution comparison diagram, riverbed incision - The regression scatter plot and lagged cross-correlation curve are shown below. Figure 3 , Figure 4 and Figure 5 As shown.

[0080] Matching differentiated management: ① Upstream lagging type: Extend the stable water replenishment period of the reservoir during the dry season, and simultaneously carry out the diversion channel cross-section widening project to offset the 4-year lagging degradation; ② Midstream weak response type: Focus on regulating the backwater level of the lake during the flood season to reduce the hydraulic obstruction to the diversion channel; ③ Downstream synchronous type: Establish a real-time monitoring and linkage scheduling mechanism for the riverbed, and dynamically adjust the flood diversion flow to maintain a stable hydraulic gradient.

[0081] Iterative application of results: All raw data and charts for calculating daily average water level sequences, riverbed incision, and comprehensive ecological connectivity index, as well as reservoir ecological scheduling and management reports, are archived uniformly. For each new year's water level sequence and riverbed baseline elevation data, the entire calculation process is automatically repeated by directly importing the data into the system, updating the multi-year connectivity evolution trend and scheduling recommendations, and achieving long-term operational tracking and evaluation.

[0082] Therefore, this invention adopts the above-mentioned quantitative assessment method of river and lake ecological connectivity based on coupled riverbed downcutting lag response, realizing quantitative diagnosis of spatiotemporal differentiation of river and lake connectivity across the entire region, and is suitable for routine assessment of various complex water systems of large rivers and multi-branch lakes under reservoir regulation.

[0083] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can still be made to the technical solutions of the present invention, and these modifications or equivalent substitutions cannot cause the modified technical solutions to deviate from the spirit and scope of the technical solutions of the present invention.

Claims

1. A quantitative assessment method for river and lake ecological connectivity coupled with riverbed downcutting hysteresis response, characterized in that, Includes the following steps: S1. A monitoring network is deployed along the entire river and lake area. Basic datasets are collected through the monitoring network, merged and preprocessed to output an annual-scale standardized water level dataset, which is then divided into two sets of sub-datasets: flood season and non-flood season. S2. Based on the Pearson Type III frequency distribution, ecological water level intervals are divided, a trapezoidal water level suitability function is constructed and continuous suitability scores are output, thereby obtaining the annual water level suitability time series matrix. S3. Quantitatively calculate the annual ecological suitability score, annual connectivity sustainability score, and annual hydrological stability score each year, and then calculate the comprehensive ecological connectivity index. ; S4. Calculate the annual cumulative riverbed incision of the main stream, determine the strength of the connectivity response of each branch channel through linear regression, extract the ecological response lag years, and classify the branch channel types. S5. Output the evaluation results, match the channel-specific differentiated management and control strategies, iterate the evaluation results, and then update the evaluation results.

2. The method for quantitative assessment of river and lake ecological connectivity based on coupled riverbed downcutting hysteresis response according to claim 1, characterized in that, S1 includes: S101. Establish a monitoring network: Deploy upstream benchmark hydrological stations, midstream benchmark hydrological stations, and downstream benchmark hydrological stations along the controlled and uninterrupted main stream; deploy at least one set of water level monitoring stations on each natural distributary of the main stream leading to the lake, forming a full-area water level monitoring network of the main stream and multiple distributaries. S102. Collection of Basic Data Sets: Collect multi-year daily average water level sequences from upstream, midstream, and downstream benchmark hydrological stations within a complete water storage and scheduling cycle. Simultaneously collect annual riverbed benchmark elevation data to obtain annual cumulative riverbed incision. Build a basic data set; S103. Preprocess the basic dataset, including the following operations: Short-term missing water levels are filled using linear interpolation; Abnormally high / low water levels were filtered out using a combination of multi-year quantile thresholds and a sliding window. During periods of low flow interruption, missing water levels are not interpolated but marked as river / lake disconnection indicators, which are used to calculate the duration of connectivity. The daily water level time sequence is broken down by calendar year, and a standardized water level dataset on an annual scale is compiled. S104, Temporal Stratification: The annual-scale standardized water level dataset is uniformly divided into two sub-datasets: flood season and non-flood season, for seasonal connectivity difference analysis.

3. The method for quantitative assessment of river and lake ecological connectivity based on coupled riverbed downcutting hysteresis response according to claim 2, characterized in that, S2 includes: S201. Collect multi-year annual water level samples from the annual and daily water level sequences of each station, fit the PⅢ probability distribution curve, and extract four characteristic exceedance probability water levels, including Z10, Z25, Z75, and Z90. Among them, Z10, Z25, Z75 and Z90 represent water level values ​​with an overshoot probability of 10%, 25%, 75% and 90% respectively, after the water level is sorted from high to low within the year; S202, Delineate ecological water level zones; S203. Constructing a trapezoidal water level suitability function Output a continuous appropriate score of 0 to 1 each day; S204. Calculate the suitability function row by row based on the daily water level for each year. This forms a time series matrix of water level suitability for each year.

4. The method for quantitative assessment of river and lake ecological connectivity based on coupled riverbed downcutting hysteresis response according to claim 3, characterized in that, S202 includes: When Z75≤Z≤Z25, it is the optimal ecological zone, indicating the highest habitat suitability; When Z90≤Z<Z75 or Z25<Z≤Z10, it is a suitable transitional range, indicating that the ecological conditions are acceptable. When Z < Z90 or Z > Z10, it is an unsuitable range, indicating that the water level is too high / too low, inhibiting the exchange of materials and biological migration in rivers and lakes; Where Z represents the ecological water level.

5. The method for quantitative assessment of river and lake ecological connectivity based on coupled riverbed downcutting hysteresis response according to claim 4, characterized in that, The trapezoidal water level suitability function in S203 As shown in the following formula: 。 6. The method for quantitative assessment of river and lake ecological connectivity based on coupled riverbed downcutting hysteresis response according to claim 5, characterized in that, The three-dimensional integrated ecological connectivity index in S3 Including: Ecological suitability score Connectivity persistence score Hydrological stability score The three-tiered sub-items are integrated into a comprehensive ecological connectivity index through fixed-weighted aggregation. Among them, fixed weight =0.5、 =0.3、 =0.

2.

7. The method for quantitative assessment of river and lake ecological connectivity based on coupled riverbed downcutting hysteresis response according to claim 6, characterized in that, S3 includes: S301. Calculate the annual ecological suitability score. : ; In the formula, This represents the total number of observation days for that year. For the first Daily water level suitability represents the percentage of time throughout the year that the water level is at a suitable level. S302, Calculate the annual connectivity persistence score. : In the formula, Indicates the longest consecutive period of water outage in a year; S303, Calculate the annual hydrological stability score : ; In the formula, This represents the daily water level variation coefficient for that year. The maximum coefficient of variation for all stations throughout the entire time period; S304, Calculate the comprehensive ecological connectivity index : ; in, The value range is 0~100, with higher values ​​indicating better comprehensive ecological connectivity of rivers and lakes; data is output annually for each water level monitoring station. Time series; S305. Diversion Channel Integration: When a single diversion channel contains multiple water level monitoring stations, the annual water level monitoring data of each station shall be used. The arithmetic mean represents its overall connectivity level.

8. The method for quantitative assessment of river and lake ecological connectivity based on coupled riverbed downcutting hysteresis response according to claim 7, characterized in that, S4 includes: S401. Calculate the cumulative annual riverbed incision. : Based on the riverbed baseline elevation in the initial year of reservoir impoundment As the baseline, the first The annual benchmark elevation is The cumulative riverbed incision volume year by year The following formula is used to calculate: ; in, >0 indicates continuous riverbed incision; the incision time sequence of adjacent stations on the main stream corresponding to each branch channel is used as the driving factor; S402. Identifying connectivity response threshold features through linear regression: Construct a single-channel annual With cumulative cutting amount Regression model: ; In the formula, and These are all regression coefficients; the coefficient of determination is determined by the sign of the regression coefficient. Through the coefficient of determination Distinguish between different types of response channels: when When the value is ≥0.6, it is a strong response type, indicating that the downcut significantly alters the connectivity of rivers and lakes; When 0.1≤ When <0.6, it is a weak response type; when A value < 0.1 indicates no significant response; S403. Cross-correlation analysis identifies the ecological lag response period: Construct the cross-correlation function as shown in the following equation: ; In the formula, For lagged years, the lagged year corresponding to the maximum correlation coefficient is selected. As a characteristic response duration of the diversion channel: when =0 indicates a synchronous response; when When <0, it indicates the existence of a multi-year lag effect, and the absolute value is the number of lag years; S404. The types of diversion channels are classified by the coefficient of determination, including: upstream buffer lag type, midstream weak response type and downstream synchronous strong response type.

9. The method for quantitative assessment of river and lake ecological connectivity based on coupled riverbed downcutting hysteresis response according to claim 8, characterized in that, S5 includes: S501, Output results, including: multi-year branch sites Interannual evolution curves and annual thermal distribution maps; three major distributary channels Long-term evolution comparison diagram; riverbed incision - Regression scatter plot, lagged cross-correlation curve; spatial map of river and lake connectivity levels across the entire region; S502, Matching channel-specific differentiated management and control strategies; S503. Import the output results and monitoring data into the iteratively updated evaluation results.

10. The method for quantitative assessment of river and lake ecological connectivity based on coupled riverbed downcutting hysteresis response according to claim 9, characterized in that, S502 includes: Upstream buffer-lagging diversion channel: focuses on long-term river morphology stability management, optimizes continuous water replenishment during the dry season of reservoirs, and pre-regulates and controls many years in advance to offset the lagging degradation effect. Midstream weak-response diversion channel: Focus on optimizing the cross-section of local diversion channels to reduce the obstruction of lake backwater; Downstream synchronous strong response diversion channel: Real-time linkage with main stream downcut monitoring, dynamic adjustment of flood diversion scheduling during the flood season, and maintenance of hydraulic gradient stability.