A Smart Scheduling and Control Method for Multi-Pump Collaborative Operation of Vertical Water Supply and Drainage Emergency Vehicles

By using intelligent scheduling and control methods, data from emergency rescue operations are collected and processed, water accumulation units are divided and hydraulic connection diagrams are constructed, and multi-pump scheduling instructions are generated. This solves the scheduling mismatch problem when the water level drops in the multi-pump control of vertical water supply and drainage emergency vehicles, and realizes efficient drainage through multi-pump collaborative operation.

CN123117697APending Publication Date: 2026-11-17HUBEI SHUNFENG SPECIAL AUTOMOBILE CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611422708.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-14
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The existing multi-pump control of vertical water supply and drainage emergency vehicles makes it difficult to identify the actual role of each pump in different waterlogged areas when the water level drops. This leads to a mismatch between the pump group scheduling results and the sustainable water replenishment capacity of the water intake point, which can easily cause problems such as local water loss protection triggering, lack of drainage capacity in independent waterlogged areas, and extended overall drainage time.

Method used

By collecting emergency rescue operation data, performing spatial registration, temporal alignment and normalization processing, dividing candidate water accumulation units, conducting cross-correlation time delay analysis and differential orthogonal identification, constructing a hydraulic load diagram, generating multi-pump scheduling instructions, and generating multi-pump scheduling instructions through mixed integer rolling time domain optimization, intelligent scheduling control of multi-pump collaborative operation is realized.

Benefits of technology

It effectively solves the problem of multiple pumps operating separately according to fixed control logic, realizes programmed collaborative control of vertical main pump and portable auxiliary pump, ensures that the changes in pump flow rate and the changes in water volume of water collection unit form an identifiable causal relationship, improves the identification ability of the actual range of water intake point, realizes the matching of pump drainage capacity with the actual water replenishment capacity of water intake point, and shortens the overall drainage time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123117697A_ABST
    Figure CN123117697A_ABST
Patent Text Reader

Abstract

This application discloses an intelligent scheduling and control method for multi-pump collaborative operation of a vertical water supply and drainage emergency vehicle, relating to the field of intelligent scheduling and control technology. The method includes: S1, collecting emergency operation data and processing it through spatial registration, temporal alignment, and normalization; S2, dividing candidate water accumulation units, and forming a multi-pump flow identification sequence and a water surface elevation response sequence through cross-correlation time delay analysis and differential orthogonal identification; S3, performing finite impulse response identification and constructing a hydraulic load-bearing diagram; S4, determining the pump deployment target and candidate pump deployment locations, generating pump transfer paths, and generating multi-pump scheduling instructions through mixed integer rolling time domain optimization; S5, executing the multi-pump scheduling instructions. The method provided in this application can achieve dynamic identification of water accumulation area separation and delayed water replenishment relationships as water levels drop, and adjust the multi-pump operation area and drainage flow rate according to the actual hydraulic load-bearing relationship, so that the multi-pump operation area matches the actual replenishable water range.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of intelligent scheduling and control technology, and in particular to an intelligent scheduling and control method for multi-pump collaborative operation of a vertical water supply and drainage emergency vehicle. Background Technology

[0002] With the acceleration of urbanization and the expansion of underground space utilization, underpasses, underground parking garages, tunnels, underground passages, and other low-lying areas are prone to water accumulation during heavy rain, floods, pipeline overflows, or water ingress into underground facilities, impacting road traffic, underground facility operation, and on-site safety. Waterlogging emergency response primarily utilizes mobile water supply and drainage equipment, transporting drainage equipment to the work site and deploying the equipment and carrying out drainage operations based on the water accumulation area, site terrain, drainage distance, and drainage needs. Vertical water supply and drainage emergency vehicles, characterized by mobile transportation, rapid deployment, vertical water intake, and multi-equipment joint operation, have been applied in urban flood control and drainage, underground space drainage, tunnel emergency repairs, and emergency water supply and drainage scenarios. As the scope of water accumulation expands and the complexity of site terrain increases, the joint deployment of multiple water pumps, zoned drainage, and coordinated operation are gradually becoming important forms of mobile drainage emergency response.

[0003] For example, the invention patent with announcement number CN108873842B discloses a one-stop unattended pumping station automation control system, which includes a field control layer, a SCADA monitoring layer, a data storage layer, and a data application layer. The SCADA monitoring layer controls the equipment in the field control layer, including pump start-stop control, power distribution control, auxiliary equipment linkage control, and a visual description of the sequential control process. The data application layer integrates and displays the real-time status of the entire station's pumping units, electrical system, water system, valve control system, and DC system with simulation animations, video images, and GIS information on the SCADA screen, realizing pumping station operation optimization, energy consumption control, predictive equipment maintenance, and unattended management.

[0004] For example, the invention patent with announcement number CN108153266B discloses a calibration method for a pump station information intelligent monitoring terminal based on power detection. The method includes: checking the status of the pump station unit and determining that the pump station unit is in a shutdown state; starting the pump station information intelligent monitoring terminal and completing initialization, information configuration, and zero-point detection; powering on the pump station unit, and after the pump station unit is in a full-load state, acquiring power and flow detection data from multiple detection points at time intervals, running a parameter calibration algorithm based on power detection, and extracting calibration parameters; powering off the pump station unit to a shutdown state and performing zero-point drift detection; storing, uploading, and checking the integrity of the configuration information and calibration parameters to realize dynamic monitoring and parameter calibration of the pump station unit's operating information.

[0005] The existing multi-pump control of vertical water supply and drainage emergency vehicles mainly relies on the initial water accumulation zone, water level, and pump set operating parameters to perform start-up, shutdown, and flow regulation. It is difficult to identify the actual role of each pump in different water accumulation areas when the water level drops, causing the water accumulation area to split or the water supply channel to change. This leads to a mismatch between the pump set scheduling results and the sustainable water supply capacity of the water intake point, which can easily cause problems such as local water loss protection triggering, lack of drainage capacity in independent water accumulation areas, and extended overall drainage time. Summary of the Invention

[0006] This application provides an intelligent scheduling and control method for multi-pump collaborative operation of a vertical water supply and drainage emergency vehicle. It can identify the actual operating range of each pump during the water level drop, reduce the triggering of water loss protection and independent water accumulation, and shorten the overall drainage time.

[0007] This application provides an intelligent scheduling and control method for multi-pump collaborative operation of a vertical water supply and drainage emergency vehicle, comprising: S1, collecting emergency operation data and performing spatial registration, temporal alignment, and normalization processing to obtain ground point extraction results and normalized emergency operation data; S2, dividing candidate water accumulation units based on the ground point extraction results, and forming a multi-pump flow identification sequence and a water surface elevation response sequence through cross-correlation time delay analysis and differential orthogonal identification; S3, performing finite impulse response identification on the multi-pump flow identification sequence and the water surface elevation response sequence, constructing a hydraulic continuity map, and obtaining the sustainable drainage flow rate of each pump stage; S4, determining the pump deployment target and candidate pump deployment positions based on the hydraulic continuity map, generating pump transfer paths, and generating multi-pump scheduling instructions through mixed integer rolling time domain optimization; S5, executing the multi-pump scheduling instructions and updating the multi-pump scheduling instructions.

[0008] The beneficial effects achieved by the technical solutions provided in this application include at least the following: (1) In this invention, the vehicle-mounted controller sequentially executes the candidate water accumulation unit division, multi-pump flow identification, hydraulic connection diagram construction, multi-pump scheduling instruction generation and re-identification, and updates the control instructions cyclically according to the identification results, forming a control chain that connects data acquisition, program calculation, instruction issuance and feedback correction, thereby realizing the effect of programmed collaborative control of vertical main pump and portable auxiliary pump, effectively solving the problem of multiple water pumps operating separately according to fixed control logic in the prior art.

[0009] (2) This invention controls the working pump to perform differential orthogonal identification and same-direction increase / decrease flow identification, and combines the water volume response generated by each candidate water accumulation unit to determine the hydraulic response ratio and hydraulic response time delay, so that the change in water pump flow rate and the change in water volume of water accumulation unit form an identifiable causal relationship, thereby achieving the effect of identifying the actual range of water intake point, effectively solving the problems of the inability to distinguish regional drainage, limited water replenishment and water body separation in the prior art due to the water level change of a single water intake point.

[0010] (3) The present invention determines the sustainable drainage flow rate of each pump stage by the remaining water volume of the water intake unit, the hydraulic carrying flow rate and the hydraulic response delay, and limits the target drainage flow rate to within the sustainable drainage flow rate of each pump stage, thereby achieving the effect of matching the drainage capacity of the water pump with the actual water replenishment capacity of the water intake point, effectively solving the problem of the water intake point being emptied in advance and the water loss protection being frequently triggered when the water pump is operated according to the rated flow rate in the prior art.

[0011] (4) The present invention characterizes the water replenishment relationship between candidate water accumulation units with directionality and transmission delay through hydraulic connection diagram, and participates in node water balance according to hydraulic response delay during scheduling, thereby realizing the effect of multi-pump indirect hydraulic influence participating in coordinated scheduling, effectively solving the problem in the prior art of directly adding the drainage capacity of multiple pumps according to the flow of each pump and ignoring the regional water replenishment transmission process.

[0012] It should be understood that the content described in this section is not intended to identify key or important features of the embodiments of this application, nor is it intended to limit the scope of this application. Attached Figure Description

[0013] To more clearly illustrate the technical solutions of the embodiments of this application, the drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0014] Figure 1 This is a flowchart of an intelligent scheduling and control method for multi-pump collaborative operation of a vertical water supply and drainage emergency vehicle, provided in Embodiment 1 of this application. Figure 2 This is a flowchart of hydraulic connection relationship determination and directed edge construction based on Embodiment 1 of this application; Figure 3 This is a schematic diagram constructed based on the hydraulic connection diagram provided in Embodiment 1 of this application; Figure 4 This is a schematic diagram of the re-layout of pumps at the underpass provided in Embodiment 1 of this application. Detailed Implementation

[0015] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of this application.

[0016] The following is a brief explanation of the relevant technical terms used in this application.

[0017] Please see Figures 1-4 Embodiment 1 of the present invention provides a technical solution: an intelligent scheduling and control method for multi-pump collaborative operation of a vertical water supply and drainage emergency vehicle, comprising the following steps: S1, collecting emergency operation data, and obtaining ground point extraction results and normalized emergency operation data through spatial registration, temporal alignment and normalization processing; S2, dividing candidate water accumulation units based on the ground point extraction results, and forming a multi-pump flow identification sequence and a water surface elevation response sequence through cross-correlation time delay analysis and differential orthogonal identification; S3, performing finite impulse response identification on the multi-pump flow identification sequence and the water surface elevation response sequence, constructing a hydraulic continuity diagram and obtaining the sustainable drainage flow rate of each pump stage; S4, determining the pump deployment target and candidate pump deployment positions based on the hydraulic continuity diagram, generating pump transfer paths, and generating multi-pump scheduling instructions through mixed integer rolling time domain optimization; S5, executing the multi-pump scheduling instructions and updating the multi-pump scheduling instructions.

[0018] Optionally, the specific process for collecting emergency rescue operation data is as follows: The vertical water supply and drainage emergency vehicle is parked at the edge of the flooded area, which is a ground area where the vehicle's support device can be deployed and the vehicle-mounted reel can lay water hoses into the flooded area; the vertical main pump is lowered to the main water intake point via a telescopic water intake pipe, which is the position with the lowest water surface elevation measurement within the mechanical stroke of the telescopic water intake pipe; portable auxiliary pumps are respectively set up in the flooded area separated by a central divider, threshold, or ramp, with the water intake of the portable auxiliary pumps kept submerged and avoiding non-ground obstacles in the work area; each pump is connected to the corresponding vehicle-mounted reel via a water hose, and the water hose is wound around the corresponding vehicle-mounted reel, which is used to reel in and out the water hose. Each pump corresponds one-to-one with a vehicle-mounted reel, and the rotary encoder of the vehicle-mounted reel records the water hose usage. The length of the hose reel is calculated by subtracting the length of the hose reel from the total length of the hose reel to obtain the remaining hose length of each pump reel. The vehicle-mounted lidar faces the work area, and its scanning range includes the boundary of the flooded area, the central median strip, the threshold, and the surface of the ramp. Before continuous data collection for the emergency rescue operation, the vehicle-mounted lidar performs a terrain scan of the work area and constructs a ground elevation grid according to the coordinate registration, voxel filtering, and ground point extraction methods for the work area point cloud described later. Water level sensors are installed at various terrain depressions. A terrain depression is a position in the ground elevation grid where there are no adjacent grids with lower elevations along different horizontal directions. The identification scale of the terrain depression is consistent with the unit size of the ground elevation grid. When the catchment grids of adjacent terrain depressions overlap, the terrain depression with the lower grid elevation is retained.

[0019] Data collected during emergency rescue operations includes: point cloud of the work area, coordinates of each water level measuring point, water surface elevation at each measuring point, drainage flow rate of each pump, coordinates of each pump intake, remaining pipe length of each pump reel, water loss protection status of each pump, and sampling time. The point cloud of the work area contains the three-dimensional coordinates of the laser scanning points. The water surface elevation at each measuring point is obtained by adding the water level sensor measurement value to the ground elevation at the water level measuring point. The drainage flow rate of each pump is obtained from the pump outlet flow meter. The water loss protection status of each pump is obtained from the protection contact signal of the pump controller. The sampling time is recorded by the unified clock of the vehicle controller.

[0020] This implementation plan achieves unified perception and synchronous representation of the spatial status, water accumulation status, and pump operation status at the emergency rescue operation site, forming a data foundation for emergency rescue operations with consistent spatial and temporal benchmarks. This improves the accuracy of data correspondence between different candidate water accumulation units, water level measuring points, and working pumps, providing stable data support for subsequent candidate water accumulation unit division, multi-pump flow identification, hydraulic connection relationship determination, and multi-pump scheduling. It also enhances the ability to identify water accumulation areas and delayed water replenishment relationships during water level decline, reduces the judgment deviation between the multi-pump operation area and the actual replenishable water range, and improves the consistency between subsequent multi-pump collaborative scheduling results and the actual drainage status on site.

[0021] Optionally, the specific process for obtaining ground point extraction results and normalized emergency rescue operation data after spatial registration, temporal alignment, and normalization is as follows: Coordinate registration, voxel filtering, and ground point extraction are performed on the point cloud of the operation area. Coordinate registration transforms each scan frame to the vehicle coordinate system based on the installation pose of the vehicle-mounted LiDAR. Voxel filtering divides the point cloud into three-dimensional voxels according to the average point spacing and retains the voxel center. Ground point extraction separates ground points from non-ground points based on the spatial continuity relationship between the point cloud normal direction and the ground slope. The coordinates of each water level measuring point and each pump intake are transformed... Switching to a point cloud coordinate system, the coordinate transformation is completed using a rigid body transformation matrix between the ultra-wideband positioning base station and the vehicle-mounted lidar, ensuring a unified spatial reference for water level measuring points, pump intakes, and ground points. Hampel filtering, linear interpolation, and time alignment are applied to the water surface elevation at each measuring point and the drainage flow rate of each pump. The remaining hose length of each pump reel is processed using a sliding mean. The water loss protection status of each pump is maintained at zero order. The Hampel filtering is a Hampel outlier filter, which replaces pulse anomalies based on the median and absolute deviation of the median within the sliding window. The value and sliding window length are determined according to the sampling frequency; linear interpolation converts data from different sampling times into a sampling time sequence, and time alignment is completed using the vehicle controller clock; the Min-Max normalization method with shared boundaries for similar data is adopted to map the point cloud of the work area, the coordinates of each water level measuring point, the water surface elevation of each measuring point, the drainage flow of each pump, the coordinates of each pump intake, and the remaining pipe length of each pump reel to a unified interval, which is [0,1]. The shared boundaries for similar data are taken as the minimum and maximum values ​​of the original values ​​of similar data, respectively. The scaling factor is the difference between the corresponding maximum and minimum values. When the maximum and minimum values ​​are equal, the corresponding normalization result is set to 0. Each time normalization is performed, the minimum and maximum values ​​are determined based on the original values ​​of the same type of data included in that processing. The corresponding minimum and maximum values ​​are shared by each measuring point or pump in the same type of data. The minimum and maximum values ​​are determined according to the three coordinate dimensions of the operation area point cloud, the coordinates of each water level measuring point, and the coordinates of each pump intake, respectively, to maintain the proportional relationship between different measuring points and different pumps, forming normalized emergency rescue operation data and retaining the original values. The sampling time retains the original time reference and is not included in the normalization.

[0022] This implementation plan achieves a unified expression of emergency rescue operation data in terms of spatial location, sampling time sequence, and dimensional scale. It reduces the interference of point cloud noise, measurement anomalies, and asynchronous sampling on data correspondence, maintains the relative change characteristics between different water level measuring points and different working pumps, improves the stability, comparability, and spatiotemporal consistency of normalized emergency rescue operation data, enhances the reliability of candidate water accumulation unit division, multi-pump flow identification, hydraulic response delay calculation, and hydraulic connection relationship determination, reduces misjudgments of water accumulation area separation and delayed water replenishment relationship during water level decline, and improves the accuracy of matching results between multi-pump operation areas and actual replenishable water range.

[0023] Optionally, the specific process of dividing candidate water accumulation units based on the ground point extraction results is as follows: A ground elevation grid is constructed based on the ground point extraction results. The cell size of the ground elevation grid is taken as the average spacing between ground points after voxel filtering. The median elevation of the ground points within each grid is used as the grid elevation. The Priority-Flood depression marking method is used to divide candidate water accumulation units. The Priority-Flood depression marking method, also known as the priority flood filling depression marking method, searches for the catchment area of ​​topographic depressions in ascending order of ground elevation. A grid is generated, and grids flowing towards the same topographic depression are grouped into the same candidate water accumulation unit. A water surface elevation-water storage volume curve is generated based on the ground elevation grid and the water surface elevation at each measuring point. The water surface elevation-water storage volume curve is generated separately for each candidate water accumulation unit, and the accumulation range is limited to the grids contained within the corresponding candidate water accumulation unit. The water surface elevation at each measuring point is determined according to the water storage volume in the corresponding curve for the candidate water accumulation unit to which the water level measuring point belongs. When there are more than two water level measuring points in the same candidate water accumulation unit, the average water surface elevation of each measuring point is taken. The product of the water depth and the grid area of ​​each grid below the water surface is accumulated in ascending order to form a piecewise mapping relationship between the water surface elevation and the water storage volume. The overflow turning elevation is extracted from the saddle point of the shared boundary of the candidate water storage units. The saddle point is the lowest grid position that water must cross to enter another candidate water storage unit within the shared boundary, and its grid elevation is recorded as the overflow turning elevation. Based on the corresponding positions of the coordinates of each water level measuring point and each pump intake in the ground elevation grid, the candidate water storage units to which each water level measuring point and each pump intake belong are determined. When the coordinates of a water accumulation unit are located at the grid boundary, the corresponding position is determined according to the nearest grid center. If there is no ground point at the corresponding position, the grid position with the nearest ground point is taken. The water surface elevation of each measuring point, the drainage flow of each pump, and the water loss protection status of each pump are assigned to the candidate water accumulation unit. Pumps with positive drainage flow and non-activated water loss protection status are determined as working pumps. Positive drainage flow means that the flowmeter output value exceeds the upper limit of the flowmeter zero-point error. The upper limit of the flowmeter zero-point error is obtained from the flowmeter measurement results in the pump-stopped state.

[0024] This implementation plan achieves structured division of water accumulation space and characterization of water volume status in the work area, clarifies the spatial relationship between different candidate water accumulation units, water level measuring points, pump intakes and working pumps, improves the accuracy of expressing the boundaries of candidate water accumulation units, changes in water surface elevation and remaining water volume status, enhances the identification basis for changes in connectivity and separation trends of water accumulation areas during water level decline, improves the reliability of subsequent multi-pump flow identification, hydraulic connection relationship determination and pump deployment target determination, and reduces inconsistencies between the fixed work area division and the actual replenishable water range.

[0025] Optionally, the specific process of forming the multi-pump flow identification sequence and water surface elevation response sequence through cross-correlation time delay analysis and differential orthogonal identification is as follows: The candidate water accumulation unit where each pump intake is located is determined as the pump intake unit. Each pump intake unit is updated according to the coordinates of each pump intake or the division results of the candidate water accumulation units. The three-dimensional straight-line distance between the coordinates of the water level measuring point within each pump intake unit and the coordinates of the water intake is calculated. The water surface elevation of the water level measuring point with the smallest distance is taken as the water surface elevation of the intake unit. When there are identical three-dimensional straight-line distances, the water surface elevation is selected. For water level measuring points with relatively small variance values, the variance of water surface elevation measurement is calculated from the water surface elevation sampling values ​​before identification. For each pump's drainage flow rate and the water surface elevation of the water intake unit, pre- and post-differences are performed, followed by cross-correlation time delay analysis. The pre- and post-differences are formed by subtracting the previous value from the subsequent value at adjacent sampling times. The cross-correlation time delay analysis calculates the cross-correlation coefficient between the two difference results within the non-negative lag range. The α quantile of the absolute value of the random permutation cross-correlation coefficient is taken as the cross-correlation confidence limit. The random permutation preserves the numerical distribution of each difference result and shuffles the time. The order of random permutations is based on the two difference results participating in this cross-correlation time delay analysis. Each time, the time order of one of the results is kept unchanged while the time order of the other result is shuffled. In this embodiment, the random permutation is repeated 1000 times. The absolute values ​​of the obtained cross-correlation coefficients are arranged in ascending order, and the value corresponding to the quantile position of α is taken as the cross-correlation confidence limit. α is determined by the complement of the allowable false positive probability and its value range is greater than 0 and less than 1. The lag time when the absolute value of the cross-correlation coefficient first reaches the cross-correlation confidence limit is taken as the identification time slot length. The cross-correlation time delay analysis starts from zero lag and searches sequentially in the positive lag direction with the sampling time interval as the step size. The search range does not exceed the difference between the first and last sampling times included in this cross-correlation time delay analysis. If the cross-correlation confidence limit is not reached within the search range, the drainage flow rate of each pump and the water surface elevation of the water intake unit are collected again and the cross-correlation time delay analysis is performed again. The drainage flow rate of each pump at the identification start is recorded as the basic drainage flow rate of each pump. The identification start is the first sampling time after the number of working pumps is determined and the cross-correlation time delay analysis is completed.

[0026] A Walsh-Hadamard differential orthogonal sequence is generated based on the number of operating pumps. Walsh-Hadamard is the algorithm for selecting the minimum available Hadamard matrix order that provides at least a number of columns with the same number of boost and deboost codes as the number of operating pumps. From these columns, columns matching the number of operating pumps are extracted. Each extracted column corresponds one-to-one with each operating pump according to their pump numbering order, and each row corresponds to a differential time slot. The number of boost and deboost codes for each operating pump in the differential orthogonal sequence is the same. Based on the differential orthogonal sequence, the normalized operating range of each pump's drainage flow rate, the measurement variance of the normalized water surface elevation at each measuring point, and the identification time slot length, the operating range of each pump's drainage flow rate after normalization is determined by the minimum value of the preprocessed operating pump drainage flow rate. The maximum value is determined, and the measurement variance of the water surface elevation at each measuring point after normalization is calculated from the water surface elevation sampling value before identification. A D-optimal experimental design with the constraint that the sum of flow changes is zero is adopted, that is, an experimental design based on maximizing the determinant of the identification information matrix. The corresponding terms are weighted by the reciprocal of the measurement variance of the water surface elevation at each measuring point after normalization. The solution is obtained within the range where the identification amplitude of the flow of each pump is within the operating range of the drainage flow when the drainage flow of each pump increases or decreases. The constraint that the sum of the flow changes is zero is converted to the original value space using the Min-Max scaling coefficient of the drainage flow of each pump, and the normalized flow identification amplitude of each pump is obtained. The flow identification amplitude of each pump is restored according to the Min-Max scaling coefficient of the drainage flow of each pump, and differential time slots are generated by combining differential orthogonal sequences. The duration of the differential time slot is the identification time slot length. The flow identification amplitude of each pump is limited between the basic drainage flow of each pump and the boundary of the drainage flow operating range. Based on the basic drainage flow of each pump and the flow identification amplitude of each pump, a unidirectional flow increase time slot and a unidirectional flow decrease time slot with a duration equal to the identification time slot length are generated. The unidirectional flow increase time slot refers to each working pump increasing the flow identification amplitude of each pump, and the unidirectional flow decrease time slot refers to each working pump decreasing the flow identification amplitude of each pump, so that the average drainage flow of each pump within the identification period is equal to the basic drainage flow of each pump. The identification period refers to the time range from the start of the basic drainage time slot of each pump to the end of the unidirectional flow decrease time slot.

[0027] Each working pump is controlled to operate at its base drainage flow rate for one identification time slot length, forming a base drainage time slot. No flow identification amplitude is applied during the base drainage time slot, and the water surface elevation change under the combined effects of natural replenishment and continuous pumping is recorded. Each working pump is controlled to sequentially execute the base drainage time slot, differential time slot, unidirectional flow increase time slot, and unidirectional flow decrease time slot, synchronously recording the drainage flow rate of each pump and the water surface elevation of each measuring point, forming a multi-pump flow identification sequence and a water surface elevation response sequence. The multi-pump flow identification sequence is arranged according to the working pump number, and the water surface elevation response sequence is arranged according to the candidate water accumulation unit where the water level measuring point is located. The two sequences use the same sampling time index. When any working pump switches from water loss protection status to active status, the identification is terminated, the active pump stops running, the non-active pumps resume their base drainage flow rates, and the multi-pump flow identification sequence and water surface elevation response sequence after the protection status switching time are deleted.

[0028] This implementation scheme establishes an identifiable excitation structure between the changes in the drainage flow of the working pumps and the water surface elevation response of each candidate water accumulation unit. This reduces the interference of natural water replenishment, continuous pumping, and simultaneous operation of multiple pumps on the hydraulic response determination, improves the independence, comparability, and temporal consistency of the multi-pump flow identification sequence and the water surface elevation response sequence, enhances the ability to separate the actual degree of effect and response speed of different working pumps on different candidate water accumulation units, provides a stable data foundation for the subsequent identification of hydraulic response delay, hydraulic response ratio, and hydraulic response quantity, improves the reliability of water accumulation area separation and delayed water replenishment relationship identification, and reduces the judgment deviation caused by the mismatch between the multi-pump operating area and the actual replenishable water range.

[0029] Optionally, the specific process for finite impulse response identification of the multi-pump flow identification sequence and the water surface elevation response sequence is as follows: Based on the water surface elevation-storage volume curve, the water surface elevation response sequence is converted into a candidate water accumulation unit remaining water volume sequence. During the conversion, piecewise linear interpolation is performed on the water surface elevation-storage volume curve according to the water surface elevation at each sampling time, and the last value of the candidate water accumulation unit remaining water volume sequence of each pump intake unit is taken as the remaining water volume of the intake unit; the candidate water accumulation unit remaining water volume sequence is normalized by Min-Max to form a normalized remaining water volume sequence, and the normalized remaining water volume reduction sequence is obtained by difference between the previous and subsequent steps. The difference between the previous and subsequent sampling times is calculated by subtracting the value from the value at the next sampling time, ensuring that the reduction in residual water volume caused by drainage is positive. The time interval between adjacent sampling times is the sampling time interval. Using the normalized multi-pump flow identification sequence as input and the normalized residual water volume reduction sequence as output, a multi-input multi-output finite impulse response (FIR) identification with causal and non-negative constraints is performed. Each operating pump corresponds to one input, and each candidate water accumulation unit corresponds to one output. Each operating pump and each candidate water accumulation unit corresponds to a set of FIR coefficient sequences, with the hysteresis range of the FIR coefficient sequences from zero to the identification period. The flow rate changes of each pump are discretized according to the sampling time interval. A block Toplitz matrix is ​​constructed from the flow rate changes of each pump in time sequence, and the finite impulse response coefficients are solved using the non-negative least squares method. The non-negative least squares method aims to minimize the sum of the squared differences between the normalized residual water volume reduction sequence at each sampling time and the calculated finite impulse response. Causality constraints limit the response to not being earlier than the flow rate change time, and non-negativity constraints limit the finite impulse response coefficients to not be less than zero. The hydraulic response delay and finite impulse response coefficients are obtained. The hydraulic response delay is the product of the number of lag sampling points of the first non-zero term in the finite impulse response coefficient sequence and the sampling time interval. The value ranges from zero to the identification period length. The accumulated finite impulse response coefficients are accumulated item by item within the lag range from zero to the identification period length for each working pump and each candidate water accumulation unit. The original values ​​are converted according to the remaining water volume of the candidate water accumulation unit, the Min-Max scaling factor of each pump's drainage flow rate, and the sampling time interval to obtain the hydraulic response ratio. The hydraulic response ratio is the ratio of the change in the water replenishment flow rate of the candidate water accumulation unit to the change in the pump flow rate, and the value is not less than zero. The hydraulic response ratio, the identification amplitude of each pump flow rate, and the identification time slot length are multiplied to obtain the hydraulic response quantity.

[0030] Linear detrending is performed on the normalized residual water volume sequence within the basic drainage time slot. Least squares linear fitting is used to fit the change in normalized residual water volume with sampling time, and the fitting result is subtracted from the normalized residual water volume sequence. The absolute value of the detrending change is divided by the normalized flow rate identification amplitude of each pump. The detrending change is the difference between the detrending results of adjacent sampling times, calculated sequentially for each adjacent sampling time within the basic drainage time slot. For each candidate water accumulation unit and each operating pump, the absolute value of the detrending change of the candidate water accumulation unit is divided by the normalized flow rate identification amplitude of the corresponding operating pump, and the result is calculated according to the minimum values ​​of the residual water volume of the candidate water accumulation unit and the drainage flow rate of each pump. The Max scale coefficient and sampling time interval are converted into the same values ​​as the hydraulic response ratio to form the natural water volume change ratio. The upper inner limit of the natural water volume change ratio box plot is taken as the hydraulic response ratio limit. The sample of the box plot consists of the natural water volume change ratios formed by each candidate water accumulation unit and each working pump within the basic drainage time slot. The upper inner limit of the box plot is obtained by the sum of the upper quartile and the interquartile range of the natural water volume change ratio. If the effective sample is insufficient to calculate the upper quartile and the interquartile range, a new basic drainage time slot is collected and the effective samples are merged and recalculated so that the hydraulic response ratio limit is derived from the measured fluctuation of the basic drainage time slot.

[0031] like Figure 2 The diagram shows the process of determining hydraulic connection relationships and constructing directed edges. No directed edges are established when the hydraulic response ratio is less than the hydraulic response ratio limit. Intra-time slot connection relationships are formed when the hydraulic response ratio is greater than or equal to the hydraulic response ratio limit and the hydraulic response delay is less than or equal to the identification time slot length. Intra-time slot connection relationships indicate that the water volume response of the candidate water accumulation unit can reach the water intake unit within one identification time slot. Cross-time slot connection relationships are formed when the hydraulic response ratio is greater than or equal to the hydraulic response ratio limit and the hydraulic response delay is greater than the identification time slot length. Cross-time slot connection relationships indicate that the water volume response of the candidate water accumulation unit reaches the water intake unit after at least two identification time slots.

[0032] This implementation plan enables the quantitative characterization of the hydraulic relationship between changes in the remaining water volume of candidate water accumulation units and changes in the flow rate of each working pump. It improves the ability to identify the degree and order of response of different candidate water accumulation units to changes in the flow rate of working pumps, reduces the interference of natural water volume changes on the determination of effective hydraulic response, enhances the on-site adaptability and determination stability of the hydraulic response ratio limit, accurately distinguishes between unestablished connection relationships, intra-time slot connection relationships, and cross-time slot connection relationships, and enhances the reliability of identifying water accumulation area separation and delayed water replenishment relationships. This provides a reliable hydraulic relationship basis for subsequent hydraulic connection map construction, determination of staged sustainable drainage flow, and multi-pump scheduling.

[0033] Optionally, the specific process of constructing the hydraulic connection diagram and obtaining the sustainable drainage flow rate for each pump stage is as follows: Using candidate water accumulation units as nodes, and intra-time slot connection relationships and inter-time slot connection relationships as directed edges, each directed edge records the working pump number, hydraulic response delay, and hydraulic response amount. A hydraulic connection diagram is constructed by pointing from the candidate water accumulation unit that forms the connection relationship to the water intake unit. The direction of the directed edge indicates the direction of water flow from the candidate water accumulation unit to the water intake unit where the working pump is located. No directed edges pointing to the working pump's own water intake unit are established based on the hydraulic response results between the working pump and its own water intake unit; the hydraulic response ratio is retained for identification result determination after pump redeployment. The hydraulic connection flow rate flowing into the water intake unit is only counted from directed edges pointing to that water intake unit from other candidate water accumulation units. The hydraulic response amount is divided by the identification time slot length to obtain the hydraulic connection flow rate. The remaining water volume of the water intake unit is then calculated according to the identification... The cycle is converted into the discharge capacity of the intake unit. The remaining water volume of the intake unit is divided by the identification cycle length and added to the hydraulic flow rate flowing into the intake unit. When there is only one working pump in the same intake unit, the sum is used as the sustainable discharge flow rate of that pump stage. When there are two or more working pumps in the same intake unit, the discharge capacity and hydraulic flow rate of the intake unit are allocated according to the proportion of each pump's hydraulic response to the total hydraulic response of the same intake unit. The allocation results are used as the stage sustainable discharge flow rate of the corresponding working pump. The sum of the stage sustainable discharge flow rates of all pumps in the same intake unit is equal to the sum of the discharge capacity of the intake unit and the hydraulic flow rate flowing into the intake unit. The stage sustainable discharge flow rate of each pump takes effect after the hydraulic flow rate map is constructed and ends when the multi-pump flow rate identification is re-executed and the hydraulic flow rate map is updated. The calculation is then based on the updated hydraulic flow rate map.

[0034] like Figure 3The diagram shows a schematic of the hydraulic connection construction. The light gray curve represents the topographical undulation of the work area, and the light blue irregular area represents the candidate water accumulation units. The area of ​​the region only indicates the relative relationship of the remaining water volume of the candidate water accumulation units. The pump graphics in candidate water accumulation unit 1 and candidate water accumulation unit 2 represent working pump 1, working pump 2, and working pump 3, respectively. "Water intake unit" refers to the candidate water accumulation unit where the water intake of the working pump is located. The blue dashed box represents working pump 2 and working pump 3 within the same water intake unit. The cyan solid arrows represent the connection relationship within a time slot, and the orange dashed arrows represent the connection relationship across time slots. The direction of the arrows indicates the direction of water flow from the candidate water accumulation unit that forms the connection relationship to the water intake unit. The arrow width represents the hydraulic connection flow rate. Candidate water accumulation unit 1 and candidate water accumulation unit 2 are mutually accessible and can be combined to form the current drainage unit. Each directed edge's information box records the working pump number, hydraulic response delay, and hydraulic response amount. The two cyan rectangles within candidate water collection unit 2 represent the allocation of the water intake unit's discharge capacity and hydraulically received flow rate by working pumps 2 and 3 according to the proportion of each pump's hydraulic response amount to the total hydraulic response amount of the same water intake unit. Candidate water collection unit 6 is not equipped with a working pump and is shown in the figure as a target for pump placement.

[0035] This implementation plan realizes a graphical representation of the water replenishment direction, response speed, and response strength among candidate water accumulation units, forming a hydraulic connection diagram that reflects the connection relationship within and across time slots. This improves the clarity of identifying the water replenishment source and delayed water replenishment path of the water intake unit, enhances the accuracy of calculating the sustainable drainage flow rate at each pump stage, improves the rationality of the drainage capacity allocation results among multiple working pumps within the same water intake unit, improves the reliability of the basis for determining pump deployment targets and reconstructing the current drainage unit, strengthens the matching capability between the multi-pump operation area and the actual replenishable water range, and enhances the consistency between the subsequent generation of multi-pump scheduling instructions and the actual drainage status on site.

[0036] Optionally, the specific process of determining the pumping target and candidate pumping locations based on the hydraulic connection diagram and generating pump transfer paths is as follows: Candidate water accumulation units that are mutually reachable through time slot connection relationships are combined into current drainage units. A directed graph strongly connected component search is used to group candidate water accumulation units with time slot connection paths in any two directions into the same current drainage unit. Cross-time slot connection relationships are retained as directed edges with hydraulic response delay and hydraulic connection flow. These directed edges are converted into delayed water replenishment paths between current drainage units after merging. Each current drainage unit is obtained by summarizing the water surface elevation and water surface elevation-storage volume curves at each measuring point. The remaining drainage volume is determined by first obtaining the remaining water volume of each candidate water accumulation unit at the current sampling time. When there are more than two water level measuring points for the same candidate water accumulation unit, the remaining water volume is obtained from the corresponding water surface elevation-storage volume curve based on the average water surface elevation of each measuring point. The remaining water volume of each candidate water accumulation unit is only counted once. Then, the remaining water volume is summed according to the candidate water accumulation units included in the current drainage unit. The working pumps in each current drainage unit are determined based on the coordinates of each pump intake. The grid where the coordinates of each pump intake are located is spatially indexed and matched with the ground elevation grid included in the current drainage unit. The current drainage unit without a working pump is determined as the pump deployment target.

[0037] Submerged depressions and catchment points are extracted from the ground elevation grid. These points are grid locations where surface flow tracking results converge and the ground elevation is lower than the water surface elevation. Specifically, if there is only one water level measuring point in a candidate water accumulation unit, that point's water surface elevation is used. If there are two or more water level measuring points, the average water surface elevation of all measuring points is used. This average is compared with the grid elevation of each grid within the candidate water accumulation unit. If the grid elevation is lower than the corresponding water surface elevation, the unit is considered submerged and becomes a candidate pumping location. If multiple depressions and catchment points exist in the same candidate water accumulation unit, each is retained as a candidate pumping location. Starting from the coordinates of each pump intake, a fast-moving method is used, i.e., solving the problem in ascending order of path propagation cost. The method of reaching the time field avoids non-ground point projection areas in the point cloud of the work area, sets non-ground point projection areas as impassable areas, and sets the spatial distance of the remaining ground elevation grid as the path propagation cost to generate pump transfer paths. It backtracks from the candidate pump placement positions to the coordinates of each pump intake along the decreasing direction of the arrival time field. It calculates the length of the new pipeline required for the pump transfer path, sums the lengths of each segment of the pump transfer path, and takes the three-dimensional straight-line distance between adjacent ground elevation grid positions as the length of the pump transfer path, so that the change in ground elevation is included in the length of the pump transfer path. The sum of the lengths of each segment of the pump transfer path is used as the length of the new pipeline, and the candidate pump placement positions with the new pipeline length not exceeding the remaining pipe length of each pump reel are retained.

[0038] In this implementation scheme, the current drainage unit is reconstructed based on the intra-time slot connection relationship, and the delayed water replenishment path is retained across time slot connections. The pump deployment target is determined by combining the remaining drainage volume of the current drainage unit and the distribution of working pumps. Then, candidate pump deployment locations are generated based on the water catchment points of the depressions submerged by the water surface. The executable candidate pump deployment locations are screened by combining the non-ground point projection area, the pump transfer path, and the remaining pipe length of each pump reel. This achieves the effect of dynamically determining the re-deployment location and transfer path as the hydraulic relationship of the water accumulation area changes. This effectively solves the problem in the prior art that fixed pump positions are difficult to adapt to the separation of water accumulation areas and the changes in delayed water replenishment, resulting in the lack of effective drainage capacity for independent water accumulation areas.

[0039] Optionally, the specific process of generating multi-pump scheduling instructions through mixed-integer rolling time-domain optimization is as follows: Pump placement positions are selected from candidate pump placement locations. The pump placement position, target drainage flow rate, and flow rate switching time are used as decision variables. The pump placement position is represented by a binary decision variable, with a value of 1 indicating that the corresponding candidate pump placement position is selected, and a value of 0 indicating that it is not selected. Each working pump requiring re-deployment selects a pump placement position. The target drainage flow rate and flow rate switching time are represented by continuous decision variables. Directed graph-constrained mixed-integer rolling time-domain optimization is performed, using the identification period as the discrete recursive interval. The optimization time domain starts from the current sampling time and is recursively pushed to the remaining time of each current drainage unit according to the identification period. All drainage volumes are reset to zero, and the optimized time domain is re-established after the hydraulic connection diagram is updated. The target drainage flow rate is limited to the sustainable drainage flow rate of each pump stage. When there are two or more working pumps in the same water intake unit, the sum of the target drainage flow rates of each pump does not exceed the sum of the sustainable drainage flow rates of each pump stage in that water intake unit. The hydraulic connection flow rate across time slots participates in the node water balance after the hydraulic response delay ends. When the hydraulic response delay does not coincide with the discrete recursive time, it is counted from the first discrete recursive time after the hydraulic response delay ends. The node water balance is recursively calculated by adding the inflow volume to the remaining drainage volume of the current drainage unit, subtracting the outflow volume, and the pump drainage volume. The inflow volume is taken as the volume pointing to the current drainage unit and already... The outflow volume is calculated as the product of the hydraulic flow rate reaching the hydraulic response delay and the corresponding discrete recursive interval. The outflow volume is the product of the hydraulic flow rate from the current drainage unit to other current drainage units that has reached the hydraulic response delay and the corresponding discrete recursive interval. The pump discharge volume is the product of the sum of the target discharge flows of each working pump within the current drainage unit and the corresponding discrete recursive interval. The remaining drainage volume of the current drainage unit after recursion is not less than zero. The estimated drainage time is calculated based on the remaining drainage volume of each current drainage unit. The maximum value among the estimated drainage times of each current drainage unit is taken as the total estimated drainage time. The estimated drainage time is the time interval from the current sampling time to the moment when the remaining drainage volume of the current drainage unit first reaches zero. When the remaining drainage volume of a water unit reaches zero and there is no cross-time slot succession relationship pointing to the current drainage unit and the hydraulic response delay has not yet ended, the recursion for the current drainage unit is stopped, and the number of flow switching is counted according to the flow switching time. When the drainage flow of the same working pump before and after the two target drainage flows are not equal, it is counted as one flow switching. With the expected total drainage time as the first optimization objective, the total length of pump transfer paths as the second optimization objective, and the number of flow switching as the third optimization objective, the optimization objectives are solved according to their priority and multi-pump scheduling instructions are generated. First, the minimum value of the expected total drainage time is obtained, then the total length of pump transfer paths is solved while keeping the expected total drainage time unchanged, and finally the number of flow switching is solved while keeping the first two results unchanged.

[0040] This implementation plan achieves coordinated optimization of pump placement, target drainage flow rate, and flow switching time under the constraints of the hydraulic connection diagram. It improves the adaptability of multi-pump scheduling results to the remaining drainage volume of the current drainage unit, the sustainable drainage flow rate of each pump stage, and the cross-time slot connection relationship. It enhances the accuracy of node water balance and expected total drainage time calculation under delayed water replenishment conditions, reduces pump transfer path length and flow switching times, avoids the target drainage flow rate from exceeding the actual sustainable drainage capacity, improves the matching degree between the multi-pump operation area and the actual replenishable water range, and improves the executability of multi-pump scheduling instructions and overall drainage efficiency.

[0041] Optionally, the specific process of executing and updating multi-pump scheduling instructions is as follows: According to the multi-pump scheduling instructions, the pump placement location, target drainage flow rate, flow switching time, and pump transfer path are issued. The vehicle controller sends the target drainage flow rate and flow switching time to the pump driver and converts the pump transfer path into a sequentially arranged ground elevation grid position. Based on the coordinates of each pump intake, the controller enters the grid where the pump placement location is located to confirm the completion of pump re-deployment. After re-deployment, the basic drainage flow rate of each pump is updated with the target drainage flow rate, and the identification cycle is re-executed. A differential orthogonal sequence, differential time slot, unidirectional flow increase time slot, and unidirectional flow decrease time slot are regenerated, consistent with the number of working pumps after re-deployment. When there is only one working pump, the differential time slot is skipped, and the basic drainage time slot, unidirectional flow increase time slot, and unidirectional flow decrease time slot are retained to complete single-pump flow identification. When the multi-pump scheduling instruction only adjusts the target drainage flow rate or flow switching time and the pump placement location remains unchanged, it is executed according to the adjusted target drainage flow rate and flow switching time, and the identification cycle is not re-executed separately due to this adjustment. Each working pump and its respective pump placement location are... If the hydraulic response ratios between the candidate water accumulation units where the pump placement location is located are all greater than or equal to the hydraulic response ratio limit, and the sustainable drainage flow rate of each pump stage is greater than or equal to the corresponding target drainage flow rate, the pump placement results are retained, and the hydraulic response ratio is taken from the identification results between the working pump and the candidate water accumulation unit where the pump placement location is located; otherwise, the multi-pump scheduling command is regenerated. If the pump placement location is not changed and the following re-identification conditions are not triggered, the adjustment of the target drainage flow rate or the flow switching time will not trigger the re-execution of the identification cycle separately. When the water surface elevation of any measuring point drops from the overflow turning elevation of the shared boundary of the candidate water accumulation unit to less than or equal to the overflow turning elevation, the candidate water accumulation unit division, multi-pump flow identification, hydraulic connection map construction, and multi-pump scheduling command generation are re-executed. When there are at least two shared boundaries for the candidate water accumulation unit, the overflow turning elevation corresponding to any shared boundary will trigger re-execution if it meets the above conditions. The same overflow turning elevation will trigger once when the water surface elevation drops from higher than it to less than or equal to it, so as to avoid repeated triggering caused by water surface elevation fluctuations. When the water surface elevation of all measuring points is less than or equal to the ground elevation at the coordinates of each water level measuring point within one identification cycle, it means that all measuring points at each sampling time within the identification cycle meet the above conditions, and the water surface elevation of each candidate water accumulation unit is determined according to the water level measuring points set by the aforementioned topographic concave points. The water depth of each water level measuring point is determined to be zero, and short-term backflow of water surface is excluded within one identification cycle. The drainage end command is output, the pumps are controlled to stop running, and the last hydraulic connection diagram and multi-pump scheduling command are saved.

[0042] In this embodiment, at a waterlogged underpass with a central median and a high point on the ramp, the vertical main pump and portable auxiliary pump are respectively positioned at different candidate waterlogged units. Each pump is controlled to perform differential orthogonal identification and unidirectional flow rate increase / decrease identification. The results show that the hydraulic response ratio of the candidate waterlogged unit on the other side of the ramp is less than the hydraulic response ratio limit, indicating that it has not established a connection with the current water intake unit, and is therefore identified as the pumping target. Based on the candidate pumping locations, pump transfer paths, and stage sustainable drainage flow rates, multi-pump scheduling instructions are generated to transfer the portable auxiliary pump to the pumping target. After re-identification, if the hydraulic response ratio is greater than or equal to the hydraulic response ratio limit, and the stage sustainable drainage flow rate is greater than or equal to the target drainage flow rate, the pumping result is retained, and drainage continues.

[0043] like Figure 4 The diagram shows a schematic of the pump redeployment at an underpass interchange. It illustrates the operational status of the interchange before and after pump redeployment, given the presence of a central median and a ramp elevation. "Candidate Flooding Unit 1," "Candidate Flooding Unit 2," and "Candidate Flooding Unit 3" represent different flooded areas. The vertical main pump and portable auxiliary pump represent the working pumps deployed within their respective candidate flooding units. The "Pump Transfer Path" indicates the path taken by the portable auxiliary pump to the target pumping unit according to multi-pump scheduling instructions. Before redeployment, the hydraulic response ratio of candidate flooding unit 3 was less than the hydraulic response ratio limit, no connection was established, and it was identified as the target pumping unit. After redeployment, the portable auxiliary pump was transferred to candidate flooding unit 3. After re-identification, its hydraulic response ratio was greater than or equal to the hydraulic response ratio limit, and the stage's sustainable drainage flow rate was greater than or equal to the target drainage flow rate. Therefore, the pumping result was retained, and drainage continued.

[0044] This implementation plan enables closed-loop verification and dynamic correction of the execution results of multi-pump scheduling commands on-site, improves the consistency between the re-deployment results and the actual water replenishment relationship of candidate waterlogged units, enhances the constraint effect of hydraulic response ratio, hydraulic response ratio limit, sustainable drainage flow rate and target drainage flow rate of each pump stage on the retention or adjustment of pump deployment results, improves the adaptive update capability of candidate waterlogged unit division, multi-pump flow identification, hydraulic connection diagram construction and multi-pump scheduling command generation during water level decline, reduces the scheduling mismatch risk caused by cross-flow turning elevation, insufficient sustainable drainage flow rate of each stage, water loss protection state switching and pump intake coordinate changes, improves the accuracy of pump deployment target identification and effectiveness determination after pump transfer, enhances the response capability of multi-pump collaborative operation at underpass waterlogged sites to changes in waterlogged area separation and delayed water replenishment relationship, ensures that the drainage end determination is consistent with the actual emptying status on site, and improves the matching degree between the multi-pump operation area and the actual water replenishment range and the overall drainage operation stability.

[0045] In summary, this application divides the waterlogged area into candidate waterlogged units, identifies the hydraulic response ratio and hydraulic response delay using multi-pump flow identification sequences and water surface elevation response sequences, constructs a hydraulic load-bearing map that updates with water level changes, and combines the generation and verification of multi-pump scheduling commands with the sustainable drainage flow of each pump stage. This enables the dynamic identification of the separation and delayed water replenishment relationship of the waterlogged area, allowing the multi-pump operation area to be adjusted according to the actual hydraulic load-bearing relationship, improving the matching degree between the multi-pump operation area and the actual replenishable water range, and enhancing the collaborative drainage capability and scheduling stability of vertical water supply and drainage emergency vehicles in complex waterlogged scenarios.

[0046] The terms "first," "second," etc., in the specification, claims, and drawings of this application are used to distinguish different objects, not to describe a specific order. Furthermore, the term "comprising," and any variations thereof, are intended to cover non-exclusive inclusion. For example, a process, method, apparatus, product, or device that includes a series of steps or units is not limited to the listed steps or modules, but may optionally include steps or modules not listed, or may optionally include other step units inherent to these processes, methods, apparatuses, products, or devices.

[0047] In the embodiments of this application, the terms "module" or "unit" refer to a computer program or part of a computer program that has a predetermined function and works with other related parts to achieve a predetermined goal, and can be implemented wholly or partially using software, hardware (such as processing circuitry or memory), or a combination thereof. Similarly, a processor (or multiple processors or memory) can be used to implement one or more modules or units. Furthermore, each module or unit can be part of an overall module or unit that includes the functionality of that module or unit.

[0048] Those skilled in the art will recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of both. To clearly illustrate the interchangeability of hardware and software, the components and steps of the various examples have been generally described in terms of functionality in the foregoing description. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementations should not be considered beyond the scope of this application.

[0049] The methods and related apparatuses provided in this application are described with reference to the method flowcharts and / or structural diagrams provided in this application. Specifically, each block of the method flowchart and / or structural diagram, as well as combinations of blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing device to create a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing device, generate instructions for implementing the process. Figure 1 A schematic diagram of one or more processes and / or structures. Figure 1 The computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to operate in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 A schematic diagram of one or more processes and / or structures. Figure 1 The functions specified in one or more boxes. These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable apparatus for implementing the process. Figure 1 A process or multiple processes and / or structures illustrate the steps of the functions specified in one or more boxes.

[0050] The above-disclosed embodiments are merely preferred embodiments of this application and should not be construed as limiting the scope of this application. Therefore, any equivalent variations made in accordance with the claims of this application shall still fall within the scope of this application.

Claims

1. An intelligent scheduling and control method for multi-pump collaborative operation of a vertical water supply and drainage emergency vehicle, characterized in that, include: S1 collects emergency rescue operation data, and after spatial registration, temporal alignment and normalization processing, obtains ground point extraction results and normalized emergency rescue operation data; S2, based on the ground point extraction results, candidate water accumulation units are divided, and through cross-correlation time delay analysis and differential orthogonal identification, a multi-pump flow identification sequence and a water surface elevation response sequence are formed; S3, perform finite impulse response identification on multi-pump flow identification sequence and water surface elevation response sequence, construct hydraulic continuity diagram and obtain sustainable drainage flow for each pump stage; S4. Based on the hydraulic connection diagram, determine the target and candidate pump locations, generate pump transfer paths, and generate multi-pump scheduling instructions through mixed integer rolling time-domain optimization. S5 executes and updates the multi-pump scheduling instructions.

2. The intelligent scheduling and control method for multi-pump collaborative operation of a vertical water supply and drainage emergency vehicle according to claim 1, characterized in that, The specific process for collecting emergency rescue operation data is as follows: The vertical water supply and drainage emergency vehicle is parked at the edge of the flooded area; the vertical main pump is lowered to the main water intake point via a telescopic water intake pipe; portable auxiliary pumps are set up in the flooded areas separated by the central isolation zone, threshold, or ramp; each pump is connected to the corresponding vehicle-mounted reel via a water delivery hose; the vehicle-mounted lidar is pointed towards the work area; water level sensors are set at various terrain depressions; and ultra-wideband positioning tags are installed at water level measuring points and water intakes of each pump. Collect emergency rescue operation data, which includes: point cloud of the operation area, coordinates of each water level measuring point, water surface elevation of each measuring point, drainage flow rate of each pump, coordinates of each pump intake, length of each pump reel pipe, water loss protection status of each pump, and sampling time.

3. The intelligent scheduling and control method for multi-pump collaborative operation of a vertical water supply and drainage emergency vehicle according to claim 2, characterized in that, The specific process for obtaining ground point extraction results and normalized emergency rescue operation data through spatial registration, temporal alignment, and normalization is as follows: Coordinate registration, voxel filtering, and ground point extraction were performed on the point cloud of the work area. The coordinates of each water level measuring point and each pump intake were transformed to the point cloud coordinate system. Hampel filtering, linear interpolation, and time alignment were performed on the water surface elevation of each measuring point and the drainage flow of each pump. The sliding mean was applied to the remaining pipe length of each pump reel, and the zero-order maintenance was performed on the water loss protection status of each pump. The Min-Max normalization method with shared boundaries for similar data was adopted to map the point cloud of the work area, the coordinates of each water level measuring point, the water surface elevation of each measuring point, the drainage flow of each pump, the coordinates of each pump intake, and the remaining pipe length of each pump reel to a unified interval, forming normalized emergency rescue operation data while retaining the original values.

4. The intelligent scheduling and control method for multi-pump collaborative operation of a vertical water supply and drainage emergency vehicle according to claim 3, characterized in that, The specific process of dividing candidate water accumulation units based on ground point extraction results is as follows: A ground elevation grid was constructed based on the ground point extraction results, and candidate water accumulation units were divided using the Priority-Flood depression marking method. A water surface elevation-storage volume curve was generated based on the ground elevation grid and the water surface elevation of each measuring point, and the overflow turning elevation was extracted from the saddle point of the shared boundary of the candidate water accumulation units. Based on the corresponding positions of the coordinates of each water level measuring point and the coordinates of each pump intake in the ground elevation grid, the candidate water accumulation units to which each water level measuring point and each pump intake belonged were determined, and the water surface elevation of each measuring point, the drainage flow rate of each pump, and the water loss protection status of each pump were assigned to their respective candidate water accumulation units. Pumps with positive drainage flow rate and inactive water loss protection status were identified as working pumps.

5. The intelligent scheduling and control method for multi-pump collaborative operation of a vertical water supply and drainage emergency vehicle according to claim 4, characterized in that, The specific process of generating the multi-pump flow identification sequence and water surface elevation response sequence through cross-correlation time delay analysis and differential orthogonal identification is as follows: The candidate water accumulation units where each pump intake is located are determined as the pump intake units. The three-dimensional straight-line distance between the coordinates of the water level measuring point in each pump intake unit and the coordinates of the water intake is calculated, and the water surface elevation of the water level measuring point with the smallest distance is taken as the water surface elevation of the intake unit. The drainage flow rate of each pump and the water surface elevation of the intake unit are compared before and after, and cross-correlation time delay analysis is performed. The α quantile of the absolute value of the cross-correlation coefficient of random permutation is taken as the cross-correlation confidence limit, and the lag time when the absolute value of the cross-correlation coefficient first reaches the cross-correlation confidence limit is taken as the identification time slot length. The drainage flow rate of each pump at the identification start-up is recorded as the basic drainage flow rate of each pump. A Walsh-Hadamard differential orthogonal sequence is generated based on the number of operating pumps. Using the differential orthogonal sequence, the normalized operating range of each pump's drainage flow rate, the measurement variance of the normalized water surface elevation at each measuring point, and the identification time slot length, a D-optimal experimental design is employed to obtain the normalized flow identification amplitude for each pump. The flow identification amplitude of each pump is then restored using the Min-Max scaling factor of its drainage flow rate. Differential time slots are generated by combining these differential orthogonal sequences, with the duration of each differential time slot being the identification time slot length. Based on the basic drainage flow rate of each pump and the flow identification amplitude of each pump, unidirectional flow-increasing and unidirectional flow-decreasing time slots with durations equal to the identification time slot length are generated, ensuring that the average drainage flow rate of each pump within the identification period equals the basic drainage flow rate of each pump. Each working pump is controlled to operate at its basic drainage flow rate for one identification time slot length, forming a basic drainage time slot. Each working pump is controlled to sequentially execute the basic drainage time slot, differential time slot, unidirectional flow increase time slot, and unidirectional flow decrease time slot, synchronously recording the drainage flow rate of each pump and the water surface elevation of each measuring point, forming a multi-pump flow identification sequence and a water surface elevation response sequence. When any working pump switches from water loss protection status to active status, identification is terminated, the active pump stops operating, and the non-active pumps resume their basic drainage flow rates.

6. The intelligent scheduling and control method for multi-pump collaborative operation of a vertical water supply and drainage emergency vehicle according to claim 5, characterized in that, The specific process for performing finite impulse response identification on the multi-pump flow identification sequence and the water surface elevation response sequence is as follows: Based on the water surface elevation-storage volume curve, the water surface elevation response sequence is converted into a candidate water accumulation unit remaining water volume sequence, and the last value of the candidate water accumulation unit remaining water volume sequence of each pump intake unit is taken as the remaining water volume of the intake unit; the candidate water accumulation unit remaining water volume sequence is normalized by Min-Max to form a normalized remaining water volume sequence, and the normalized remaining water volume reduction sequence is obtained by difference; using the normalized multi-pump flow identification sequence as input and the normalized remaining water volume reduction sequence as output, multi-input multi-output finite impulse response identification with causal constraints and non-negative constraints is performed to obtain the hydraulic response time delay and finite impulse response coefficients; Accumulate the finite impulse response coefficients to obtain the hydraulic response ratio. Multiply the hydraulic response ratio, the flow rate identification amplitude of each pump, and the identification time slot length to obtain the hydraulic response quantity. Perform linear detrending on the normalized residual water volume sequence within the basic drainage time slot; Divide the absolute value of the detrended change by the normalized flow identification amplitude of each pump to form the natural water volume change ratio, and take the upper inner limit of the natural water volume change ratio box plot as the hydraulic response ratio limit. When the hydraulic response ratio is less than the hydraulic response ratio limit, no directed edge is established; when the hydraulic response ratio is greater than or equal to the hydraulic response ratio limit and the hydraulic response delay is less than or equal to the identification time slot length, an intra-time slot connection relationship is formed; when the hydraulic response ratio is greater than or equal to the hydraulic response ratio limit and the hydraulic response delay is greater than the identification time slot length, an inter-time slot connection relationship is formed.

7. The intelligent scheduling and control method for multi-pump collaborative operation of a vertical water supply and drainage emergency vehicle according to claim 6, characterized in that, The specific process of constructing the hydraulic connection diagram and obtaining the sustainable drainage flow rate for each pump stage is as follows: Using candidate water accumulation units as nodes and intra-time slot and inter-time slot connection relationships as directed edges, a hydraulic connection diagram is constructed by pointing from candidate water accumulation units that form connection relationships to water intake units. The hydraulic response is divided by the identification time slot length to obtain the hydraulic connection flow rate. The remaining water volume of the water intake unit is converted into the discharge flow rate of the water intake unit according to the identification period, and added to the hydraulic connection flow rate flowing into the water intake unit to obtain the sustainable drainage flow rate of each pump stage.

8. The intelligent scheduling and control method for multi-pump collaborative operation of a vertical water supply and drainage emergency vehicle according to claim 7, characterized in that, The specific process of determining the target and candidate pump placement locations based on the hydraulic connection diagram and generating the pump transfer path is as follows: Candidate water accumulation units that are mutually reachable through time slot connection relationships are combined into current drainage units. Cross-time slot connection relationships are retained as directed edges with hydraulic response delay and hydraulic connection flow. The remaining drainage volume of each current drainage unit is obtained by summarizing the water surface elevation and water surface elevation-storage volume curves at each measuring point. The working pumps in each current drainage unit are determined according to the coordinates of each pump intake, and the current drainage units without working pumps are identified as pump deployment targets. Extract water catchment points in depressions submerged by the ground elevation grid to form candidate pump placement locations; using the coordinates of each pump intake as the starting point, adopt a rapid travel method to avoid non-ground point projection areas in the work area point cloud and generate pump transfer paths; calculate the length of new pipeline required for the pump transfer path, and retain candidate pump placement locations whose new pipeline length does not exceed the remaining pipe length of each pump reel.

9. The intelligent scheduling and control method for multi-pump collaborative operation of a vertical water supply and drainage emergency vehicle according to claim 8, characterized in that, The specific process of generating multi-pump scheduling instructions through mixed integer rolling time-domain optimization is as follows: Pump placement locations are selected from candidate pump placement locations. Using pump placement location, target drainage flow rate, and flow rate switching time as decision variables, a directed graph-constrained mixed-integer rolling time-domain optimization is performed. The target drainage flow rate is limited to the sustainable drainage flow rate of each pump stage. The hydraulic transfer flow rate across time slots participates in node water balance after the hydraulic response delay. The estimated drainage duration is recursively calculated based on the remaining drainage volume of each current drainage unit. The maximum value among the estimated drainage durations of each current drainage unit is taken as the total estimated drainage duration. The number of flow rate switching times is counted based on the flow rate switching time. The total estimated drainage duration is the first optimization objective, the sum of pump transfer path lengths is the second optimization objective, and the number of flow rate switching times is the third optimization objective. The optimization objectives are prioritized to solve the problem and generate multi-pump scheduling instructions.

10. The intelligent scheduling and control method for multi-pump collaborative operation of a vertical water supply and drainage emergency vehicle according to claim 9, characterized in that, The specific process of executing and updating the multi-pump scheduling instructions is as follows: According to the multi-pump scheduling command, the pump placement location, target drainage flow rate, flow switching time, and pump transfer path are issued. After the pumps are redeployed, the basic drainage flow rate of each pump is updated with the target drainage flow rate, and the identification cycle is re-executed. If there is only one working pump, the differential time slot is skipped. The pump placement results are retained when the hydraulic response ratio between each working pump and the candidate water accumulation unit where its placement location is located is greater than or equal to the hydraulic response ratio limit, and the sustainable drainage flow rate of each pump stage is greater than or equal to the corresponding target drainage flow rate. Otherwise, the multi-pump scheduling command is regenerated. When the water surface elevation of any measuring point drops from the overflow turning elevation, which is higher than the boundary of the candidate water accumulation unit to which the water level measuring point belongs, to less than or equal to the overflow turning elevation, the candidate water accumulation unit division, multi-pump flow identification, hydraulic connection map construction, and multi-pump scheduling command generation are re-executed. When the water surface elevation of all measuring points is less than or equal to the ground elevation at the coordinates of each water level measuring point within one identification cycle, the drainage end command is output.

Citation Information

Patent Citations

  • A Calibration Method for an Intelligent Monitoring Terminal for Pump Station Information Based on Power Detection

    CN108153266B

  • One-stop unattended pumping station automation control system

    CN108873842B